SU1206397A1 - Pile foundation - Google Patents

Pile foundation Download PDF

Info

Publication number
SU1206397A1
SU1206397A1 SU843740064A SU3740064A SU1206397A1 SU 1206397 A1 SU1206397 A1 SU 1206397A1 SU 843740064 A SU843740064 A SU 843740064A SU 3740064 A SU3740064 A SU 3740064A SU 1206397 A1 SU1206397 A1 SU 1206397A1
Authority
SU
USSR - Soviet Union
Prior art keywords
grillage
recesses
foundation
parts
protrusions
Prior art date
Application number
SU843740064A
Other languages
Russian (ru)
Inventor
Владимир Николаевич Бронин
Игорь Владиславович Носков
Original Assignee
Ленинградский Ордена Октябрьской Революции И Ордена Трудового Красного Знамени Инженерно-Строительный Институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ленинградский Ордена Октябрьской Революции И Ордена Трудового Красного Знамени Инженерно-Строительный Институт filed Critical Ленинградский Ордена Октябрьской Революции И Ордена Трудового Красного Знамени Инженерно-Строительный Институт
Priority to SU843740064A priority Critical patent/SU1206397A1/en
Application granted granted Critical
Publication of SU1206397A1 publication Critical patent/SU1206397A1/en

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

Изобретение относитс  к строительству, а именно к конструкци м свайных фундаментов , возводимых на подрабатываемых территори х , а также в сложных инженерно- геологических услови х, сопровождающихс  неравномерными осадками оснований.The invention relates to the construction, in particular to the structures of the pile foundations erected in the undermined areas, as well as in complex engineering and geological conditions, accompanied by uneven precipitation of foundations.

Цель изобретени  - повышение несущей способности фундамента и обеспечение возможности ее регулировани  при возведении, эксплуатации и подработке основани  в процессе эксплуатации.The purpose of the invention is to increase the bearing capacity of the foundation and to ensure its regulation during the construction, operation and undermining of the foundation during operation.

На фиг. 1 изображен фрагмент фундамента , разрез; на фиг. 2 - вид А на фиг. 1; на фиг. 3 - вид Б на фиг. 2; на фиг. 4 - разрез В-В на фиг. 2; на фиг. 5 - разрез Г-Г на фиг. 2; на фиг. 6 - фрагмент свайного фундамента, разрез (после обжати  основани  нижней плитой ростверка).FIG. 1 shows a fragment of the foundation, section; in fig. 2 is a view A of FIG. one; in fig. 3 is a view B in FIG. 2; in fig. 4 shows a section B-B in FIG. 2; in fig. 5 is a section of YYD in FIG. 2; in fig. 6 - fragment of the pile foundation, section (after the base has been compressed by the bottom plate of the grillage).

Свайный фундамент, возводимый на подрабатываемом грунтом основании 1, содержит составной по высоте из нижней сборной 2 и верхней монолитной 3 частей, размещенных с зазором 4 относительно одна другой, ростверк и сваи 5, жестко соединенные с верхней частью 3 ростверка и снабженные тиксотропной рубащкой 6 на глубину активной зоны просадки основани  1. Обращенные одна к другой поверхности частей 2 и 3 ростверка выполнены с чередующимис  выступами 7 и 8 соответственно, и выемками 9 и 10 соответственно, причем выступы одной части ростверка частично заведены в соответствующие выемки другой части, а зазор 4 образован между торцовыми поверхност ми каждого выступа и соответствующей выемки, и в каждой выемке 9, образованной в нижней части ростверка, установлено распорное приспособление, выполненное в виде баллона 11 из эластичного материала, соединенного штуцером 12 с источником рабочей среды, например, сжатого воздуха (не показан). Выемки 10, образованные в верхней части ростверка, ограничены съемными металлическими накладками 13, прикрепленными к верхней части 3 ростверка болтами 14, а выемки 9, образованные в нижней части 2 ростверка, ограничены с одного торца стенкой 15 верхней части 3 ростверка, а с другого торца - металлической перфорированной пластиной 16 с патрубкой 17.The pile foundation, erected on the foundation 1 that is being mined, contains a composite of height from the lower team 2 and the upper monolithic 3 parts, placed with a gap 4 relative to one another, the grillage and piles 5, rigidly connected to the upper part 3 of the grillage and equipped with a thixotropic jacket 6 on the depth of the active zone of the subsidence of the base 1. The grillage parts 1 and 3 facing one another are made with alternating protrusions 7 and 8, respectively, and notches 9 and 10, respectively, with the protrusions of one part of the grillage partially put in the corresponding notches of the other part, and the gap 4 is formed between the end surfaces of each protrusion and the corresponding notch, and in each notch 9 formed in the lower part of the grillage, a spacer is installed, made in the form of a cylinder 11 of elastic material connected by a 12 sec. source of working medium, such as compressed air (not shown). The notches 10 formed in the upper part of the grillage are limited to removable metal plates 13 attached to the upper part 3 of the grillage by bolts 14, and the notches 9 formed in the lower part 2 of the grillage are limited from one end to the wall 15 of the upper part 3 of the grillage, and from the other end - metal perforated plate 16 with pipe 17.

Между торцовыми поверхност ми выступов 7, образованных в нижней части 2 ростверка , и выемок 10, образованных в верхней части 3 ростверка, расположен слой смазочного материала 18.Between the end surfaces of the protrusions 7 formed in the lower part 2 of the grillage, and the recesses 10 formed in the upper part 3 of the grillage, there is a layer of lubricant 18.

Монтаж свайного фундамента осуществл ют следующим образом.The installation of the pile foundation is carried out as follows.

В грунтовом основании 1 на подрабатываемой территории бур т скважины (не показаны ) на глубину активной зоны грунта от обжати  ростверком, заполн ют скважины материалом тиксотропной рубащки 6 и забивают в скважины сваи 5. На поверхность грунта между сва ми 5 укладывают сборные элементы нижней части 2 ростверка , имеющие выступы 7 и выемки 9. Торцовые поверхности выступов 7 покрывают слоем смазочного материала 18. Над нижней частью 2 ростверка с зазором 4 бетонируют верхнюю часть 3 ростверка так, что головы свай 5 и выступы 7 нижней части 2 ростверка заход т в опалубку (не показана) верхней части 3 ростверка.In the soil base 1 in the underdeveloped area, wells are drilled (not shown) to the core depth of the soil from swathing with a grillage, the wells are filled with the material of the thixotropic scissors 6 and pile pins 5 are driven into the wells of the soil. grillage having protrusions 7 and notches 9. The end surfaces of the protrusions 7 are covered with a layer of lubricant 18. Above the lower part 2 of the grillage with a gap of 4, the upper part 3 of the grillage is concrete, so that the pile heads 5 and the projections 7 of the lower part 2 grow pka set out in the formwork (not shown) of the upper part 3 grillage.

После твердени  бетона в выемки 9, об0 разованные в нижней части 2 ростверка, устанавливают баллоны 11 из эластичного материала, устанавливают металлические накладки 13, прикрепл   их к верхней части 3 ростверка болтами 14. Выемки 10, образованные в верхней части 3 ростверка, закрывают металлическими перфорированными пластинами 16, прикрепл емыми на сварке к закладным детал м (не показано), верхней части 3 ростверка. Штуцер 12 каждого баллона 11 подсоедин ют к источнику ра0 бочей среды и производ т обжатие грунта основани  нижней частью 2 ростверка с помощью регулируемой подачи рабочей среды (сжатого воздуха) в баллоны 11. После обжати  грунта патрубок 17 подсоедин ют к источнику водопесчаной смеси (не пока5 зан) и осуществл ют нагнетание материала заполнени  в образующийс  после обжати  грунта зазор в выемках 10 над торцами выступов 7 нижней части 2 ростверка. Вода при этом выдавливаетс  через перфорацииAfter the concrete has hardened into the grooves 9 formed in the lower part 2 of the grillage, cylinders 11 are made of elastic material, metal pads 13 are installed, attached to the upper part 3 of the grillage by bolts 14. The notches 10 formed in the upper part 3 of the grillage are metal perforated plates 16, attached to the welding of the mortgage parts (not shown), the upper part 3 of the grillage. The fitting 12 of each cylinder 11 is connected to a source of working medium and the base is compressed by the bottom part 2 of the grillage with the help of an adjustable supply of working medium (compressed air) to the cylinders 11. After the soil is compressed, the branch pipe 17 is connected to the source of water-sand mixture (until 5 zan) and the filling material is injected into the gap formed after the soil has been compressed in the recesses 10 above the ends of the projections 7 of the lower part 2 of the grillage. Water is squeezed out through the perforations.

„ пластин 16, а в выемках 10 образуютс  песчаные пробки 19.The plates are 16, and sand plugs 19 are formed in the recesses 10.

Металлические накладки 13 и баллоны 11 могут использоватьс  последовательно при возведении следующих участков фундамента. При подработке территории или сниже5 НИИ несущей способности свай, вызванных другими причинами, на стадии эксплуатации сооружени  в таком же пор дке может производитьс  дополнительное регулирующее обжатие грунта основани  нижними част ми ростверка.Metal plates 13 and cylinders 11 may be used successively in the construction of the following sections of the foundation. When the territory is undermined or reduced, the scientific research institute of the carrying capacity of piles, caused by other reasons, at the stage of operation of the structure, in the same order, additional regulating soil compression by the lower parts of the grillage can be performed.

В, Г, Т-Ч Г Г 1 I IB, G, T-C G G 1 I I

II III I

Вид иView and

MI I I MI I I

Фиг. 2FIG. 2

В-ВBb

Г-ГYr

ФиаМFiaM

Фиг. 5FIG. five

Фиг.66

Составитель В. ГоникCompiled by V. Gonik

Редактор О. ГоловачТехред И. ВересКорректор А. ЗимокосовEditor O. GolovachTekhred I. VeresKorrektor A. Zimokosov

Заказ 8663/31Тираж 642ПодписноеOrder 8663/31 Circulation 642 Subscription

ВНИИПИ Государственного комнтета СССРVNIIPI USSR State Office

по делам Изобретений и открытийInventions and discoveries

113035, Москва, Ж-35, Раушска  наб., д. 4/5113035, Moscow, Zh-35, Raushsk nab. 4/5

Филиал ППП «Патент, г. Ужгород, ул. Проектна , 4Branch PPP "Patent, Uzhgorod, st. Project, 4

Claims (1)

СВАЙНЫЙ ФУНДАМЕНТ, содержащий составной по высоте из верхней и нижней частей, размещенных с зазором относительно одна другой, ростверк, сваи, жестко соединенные с верхней частью ростверка, распорные приспособления расположенные в зазоре между частями ростверка, и материал заполнения, отличающийся тем, что, с целью повышения несущей способности фундамента и обеспечения возможнос- ти ее регулирования при возведении, эксплуатации и подработке основания в процессе эксплуатации, обращенные одна к другой поверхности частей ростверка выполнены с чередующимися выступами и выемками, причем выступы одной части ростверка частично заведены в соответствующие выемки другой части, а зазор образован между торцовыми поверхностями выступов и выемок, причем каждое распорное приспособление выполнено в виде баллона из эластичного материала, соединенного с источником рабочей среды, и установлено в соответствующей выемке в нижней части ростверка, а в качестве материала заполнения использована водопесчаная смесь, причем материал заполнения расположен в выемках, образованных § в верхней части ростверка, а верхняя часть свай на глубину активной зоны просадки Г основания снабжена тиксотропной рубашкой. V ю о 05 со со >PILED FOUNDATION, comprising a height component of the upper and lower parts placed with a gap relative to one another, the grillage, piles rigidly connected to the upper part of the grillage, spacers located in the gap between the parts of the grillage, and filling material, characterized in that, with In order to increase the bearing capacity of the foundation and to ensure the possibility of its regulation during the construction, operation and underworking of the foundation during operation, facing one another surface of the grillage parts with alternating protrusions and recesses, and the protrusions of one part of the grillage are partially brought into the corresponding recesses of the other part, and the gap is formed between the end surfaces of the protrusions and recesses, and each expansion device is made in the form of a container of elastic material connected to the source of the working medium, and installed in the corresponding recess in the lower part of the grillage, and a water-sand mixture was used as the filling material, the filling material being located in the recesses formed in the upper parts of the grillage, and the upper part of the piles to the depth of the active zone of subsidence G of the base is equipped with a thixotropic shirt. V u about 05 with>
SU843740064A 1984-05-15 1984-05-15 Pile foundation SU1206397A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU843740064A SU1206397A1 (en) 1984-05-15 1984-05-15 Pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU843740064A SU1206397A1 (en) 1984-05-15 1984-05-15 Pile foundation

Publications (1)

Publication Number Publication Date
SU1206397A1 true SU1206397A1 (en) 1986-01-23

Family

ID=21118774

Family Applications (1)

Application Number Title Priority Date Filing Date
SU843740064A SU1206397A1 (en) 1984-05-15 1984-05-15 Pile foundation

Country Status (1)

Country Link
SU (1) SU1206397A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2353740C2 (en) * 2004-11-11 2009-04-27 КО.ГЕ.Пи.Ай. С.Р.Л. Modular system for erection of aerial circuit and/or consolidation pile support foundations
RU2379425C1 (en) * 2008-08-14 2010-01-20 Федеральное государственное образовательное учреждение высшего профессионального образования Кубанский государственный аграрный университет Method for erection of slab-pile foundation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 920114, кл. Е 02 D 27/12, 1980. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2353740C2 (en) * 2004-11-11 2009-04-27 КО.ГЕ.Пи.Ай. С.Р.Л. Modular system for erection of aerial circuit and/or consolidation pile support foundations
RU2379425C1 (en) * 2008-08-14 2010-01-20 Федеральное государственное образовательное учреждение высшего профессионального образования Кубанский государственный аграрный университет Method for erection of slab-pile foundation

Similar Documents

Publication Publication Date Title
RU2103441C1 (en) Ground stabilization method
US3555830A (en) Concrete wall structure and method
US1598300A (en) Foundation and the like
SU1206397A1 (en) Pile foundation
SU1781386A1 (en) Method of erecting foundation
EP0514559B1 (en) Transfer of building load via a steelmember, to the ground, by use of a special ramhead
RU2184188C2 (en) Method for erection of piles foundation on sagged grounds
RU2014394C1 (en) Method for constructing foundation for buildings on subsiding ground
RU2105100C1 (en) Method for strengthening of strip foundations
RU2225480C2 (en) Foundation for eccentric loaded column
SU1060762A2 (en) Foundation
SU1671778A1 (en) Base reinforcing arrangement
JPH09209364A (en) How to create an embankment
SU912837A1 (en) Pile foundation
SU1276762A1 (en) Method of constructing the foundation of building
SU983177A1 (en) Earth-fill dam on undermined territory
RU2722905C1 (en) Device for pile foundation for machines with dynamic loads and vibration-sensitive equipment
KR960002378B1 (en) A working method for a protective structure
RU2064999C1 (en) Method for widening bases for foundation foot
CA1077281A (en) Pre-fabricated architectural footing block
RU1818417C (en) Method for erection of underground structure
SU887733A1 (en) Method of constructing a foundation
SU1168648A1 (en) Method of concreting massive concrete structures
RU2230155C2 (en) Fixed coupling unit for eccentric loaded column made of reinforced concret e and having foundation
SU1758163A1 (en) Device for pile spread