SU1133331A1 - Method of constructing earth-fill dam with film diaphragm - Google Patents

Method of constructing earth-fill dam with film diaphragm Download PDF

Info

Publication number
SU1133331A1
SU1133331A1 SU833644116A SU3644116A SU1133331A1 SU 1133331 A1 SU1133331 A1 SU 1133331A1 SU 833644116 A SU833644116 A SU 833644116A SU 3644116 A SU3644116 A SU 3644116A SU 1133331 A1 SU1133331 A1 SU 1133331A1
Authority
SU
USSR - Soviet Union
Prior art keywords
stacker
diaphragm
dam
construction
film
Prior art date
Application number
SU833644116A
Other languages
Russian (ru)
Inventor
Вячеслав Ильич Петроченко
Original Assignee
Украинский Научно-Исследовательский Институт Гидротехники И Мелиорации
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Украинский Научно-Исследовательский Институт Гидротехники И Мелиорации filed Critical Украинский Научно-Исследовательский Институт Гидротехники И Мелиорации
Priority to SU833644116A priority Critical patent/SU1133331A1/en
Application granted granted Critical
Publication of SU1133331A1 publication Critical patent/SU1133331A1/en

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

СПОСОБ СООРУЖЕНИЯ ГРУНТОВОЙ ДАМБЫ С ПЛЕНОЧНОЙ ДИАФРАГМОЙ , включающий возведение диаф / //////////////////////////////////// 5 /////////// ///7// / W//////л рагмы из секции при послойной отсыпке грунтовой дамбы, отличающийс  тем, что, с целью повышени  эффективности производства работ, возведение диафрагмы выполн ют бестраншейным укладчиком вертикальных пленочных экранов путем рабочего перемеш ,ени  укладчика по поверхност м последовательно отсыпаемых слоев грунтовой дамбы с боковым смешением трассы последующего рабочего перемешени  укладчика относительно трассы предыдупдего рабочего перемещени  укладчика в сторону верхнего бьефа сооружаемой дамбы, при этом глубина каждой сооружаемой укладчиком секции диафрагмы превь1шает толщину последовательно отсыпаемого сло  дамбь 1 на величину заданного нахлеста пленочной диафрагмы.METHOD OF CONSTRUCTION OF SOIL DAMPS WITH A FILM DIAPHRAGM, including construction of diaphals / ////////////////////////////////// 5 / //////// /// 7 // / W //// // L rags from the section during the layered dumping of the soil dam, characterized in that, in order to increase the efficiency of work, the construction of the diaphragm is performed trenchless stacker of vertical film screens by working mix, stacking the layer on the surfaces of successive layers of soil dam with side mixing of the route of the next working mixing of the layer relative predydupdego route of the working movement of the stacker toward the upstream dam being constructed, the depth of each aperture being constructed stacker section prev1shaet thickness sequentially backfilled dam layer 1 by an amount predetermined overlap film diaphragm.

Description

Изобретение относитс  к гидротехническому строительству и может быть использовано при сооружении грунтовых дабм и плотин с нротифовильтрационными диафрагмами . Известен раздельный способ строительства грунтовой дамбы с противофильтрационной диафрагмой, включающий строительство дамбы, устройство траншеи в дамбе с одновременным заполнением ее глинистым раствором и укладку в траншею противофильтрационного материала 1. Недостатками указанного способа  вл ютс  сложность выполн емых строительных операций и высока  трудоемкость строительного процесса. Наиболее близким по технической сушности и достигаемому результату к изобретению  вл етс  способ сооружени  грунтовой дамбы с пленочной диафрагмой, включаюший возведение диафрагмы из секций при послойной отсыпке грунтовой дамбы 2. Недостатком известного способа  вл етс  низка  производительность, св занна  с трудоемкостью осуществлени  механизированной засыпки грунтом пленочного полотнища , а также с применением ручного труда. Цель изобретени  - повы1пение эффективности нроизводства работ. Цель достигаетс  тем, что возведение диафрагмы выполн ют бестраншейным укладчиком вертикальных пленочных экранов путем рабочего перемещени  укладчика по поверхност м последовательно отсыпаемых слоев грунтовой дамбы с боковым смещением трассы последуюшего рабочего перемещени  укладчика относительно трассы предыдущего перемещени  укладчика в сторону верхнего бьефа сооружаемой дамбы, при этом глубина каждой сооружаемой укладчиком секции диафрагмы превышает толщину последовательно отсыпаемого сло  дамбы на величину заданного нахлеста секций пленочной ди.афрагмы. На чертеже показаны все конструктивные элементы дамбы с диафрагмой и последовательность их возведени  по предлагаемому способу. Способ сооружени  грунтовой дамбы с пленочной диафрагмой заключаетс  в следующем . Строительство дамбы 1 с пленочной диафрагмой 2 начинают после разметки коль ми на грунтовом основании 3 трассы заложени  нижней секции диафрагмы. По размеченной трассе путем рабочего перемещени  бестранщейного укладчика вертикальных пленочных экранов прокладывают первую (нижнюю) секцию 4 пленочной диафрагмы 2. Затем отсыпают первый (снизу) слой 5 дамбы 1, высота которого должна быть меньще глубины заложени  секции 4 диафрагмы 2 на величину необходимого нахлеста секций 4 диафрагмы 2. После отсыпки первого сло  4 дамбы 1 производ т планировку и разметку последующей трассы движени  бестранщейного укладчика вертикальных пленочных экранов. Разметку трассы производ т с условием параллельного смещени  последующей трассы относительно предыдущей на величину а, котора  обеспечивает сохранность ранее уложенной секции 4 от механического повреждени  рабочим органом укладчика при его последующем проходе. Смещение последующей трассы движени  укладчика относительно предыдущей осуществл ют в сторону верхнего бьефа 6 сооружаемой дамбы 1. После раз.метки трассы производ т укладку секции 4 диафрагмы 2 укладчиком. Процесс строительства последующих слоев 5 дамбы 1 и секции 4 диафрагмы 2 производ т в том же пор дке. При предлагаемом способе строительства грунтовой дамбы с пленочной диафрагмой устанавливаетс  незначительный фильтрационный поток 7. Однако смещение последующих секций пленочной диафрагмы относительно предыдущих способствует тому, что фильтрационный поток в местах нахлеста пленок поднимаетс  вверх, что создает благопри тные услови  дл  накоплени  в местах нахлестов секций пленочной диафрагмы мелкодисперсных кальматирующих грунтовые поры веществ. Это способствует повышению противофильтрационных свойств диафрагмы в процессе ее работы. Использование предлагаемого способа сооружени  грунтовой дамбы с пленочной диафрагмой обеспечивает повышение эффективности производства работ по сравнению с известными способами.The invention relates to hydraulic construction and can be used in the construction of subsoil dubmas and dams with nrotyphofiltration diaphragms. A separate method for the construction of a soil dam with an impervious diaphragm is known, including building a dam, setting up a trench in a dam while filling it with a clay mortar and laying it in a trench of antifiltration material 1. The disadvantages of this method are the complexity of construction operations and the complexity of the construction process. The closest in technical drying and the achieved result to the invention is a method of constructing an earth dam with a film diaphragm, including the construction of a diaphragm from sections with layer-by-layer filling of an earth dam 2. A disadvantage of the known method is the low productivity associated with the laboriousness of mechanized backfilling of a film canvas. , as well as using manual labor. The purpose of the invention is to increase the efficiency of work production. The goal is achieved by erecting a diaphragm by a trenchless stacker of vertical film screens by working movement of the stacker over the surfaces of successive layers of earthen dam with lateral displacement of the track of the subsequent working movement of the stacker relative to the route of the stacker being built, and the depth of each the section of the diaphragm being constructed by the stacker exceeds the thickness of the successively filled layer of the dam by the amount specified overlap sections of film diaphragm. The drawing shows all the structural elements of the dike with a diaphragm and the sequence of their construction according to the proposed method. The method for constructing a film diaphragm dam is as follows. The construction of the dam 1 with the film diaphragm 2 begins after marking the rings on the unpaved foundation 3 of the route of laying the lower section of the diaphragm. The first (lower) section 4 of the film diaphragm 2 is laid along the marked path by the working movement of the trenchless stacker of vertical film screens. Then, the first (bottom) layer 5 of dam 1 is poured, the height of which should be less than the laying depth of section 4 of the diaphragm 2 by the amount of necessary overlap of sections 4 diaphragm 2. After dumping the first layer 4 of the dam 1, the subsequent route of movement of the trenchless stacker of vertical film screens is planned and marked. The marking of the route is carried out with the condition of a parallel displacement of the subsequent route relative to the previous one by an amount a, which ensures the safety of the previously laid section 4 from mechanical damage by the worker of the stacker during its subsequent passage. The displacement of the subsequent track of the stacker’s movement relative to the previous one is carried out towards the upstream 6 of the dam 1. After the marking of the track, section 4 of the diaphragm 2 is laid by the stacker. The construction process of the subsequent layers 5 of dam 1 and section 4 of diaphragm 2 is performed in the same order. With the proposed method of building a groundwater dam with a film diaphragm, a slight filtration flow 7 is established. However, the displacement of the subsequent sections of the film diaphragm relative to the previous ones contributes to the fact that the filtration flow at the overlap of the films rises, which creates favorable conditions for accumulating in the places of overlap of the sections of the film diaphragm of fine dispersed grounding pores of substances. This contributes to an increase in the anti-filtration properties of the diaphragm during its operation. The use of the proposed method of constructing a soil dike with a film diaphragm provides an increase in the efficiency of the production of work in comparison with known methods.

Claims (1)

СПОСОБ СООРУЖЕНИЯ ГРУНТОВОЙ ДАМБЫ С ПЛЕНОЧНОЙ ДИАФРАГМОЙ, включающий возведение диаф рагмы из секций при послойной отсыпке грунтовой дамбы, отличающийся тем, что, с целью повышения эффективности производства работ, возведение диафрагмы выполняют бестраншейным укладчиком вертикальных пленочных экранов путем рабочего перемещения укладчика по поверхностям последовательно отсыпаемых слоев грунтовой дамбы с боковым смещением трассы последующего рабочего перемещения укладчика относительно трассы предыдущего рабочего перемещения укладчика в сторону верхнего бьефа сооружаемой дамбы, при этом глубина каждой сооружаемой укладчиком секции диафрагмы превышает толщину последовательно отсыпаемого слоя дамбы на величину заданного нахлеста секций пленочной диафрагмы.METHOD FOR STRUCTURING A SOIL DAMG WITH A FILM DIAPHRAGM, including the construction of a diaphragm from sections during layer-by-layer filling of a dirt dam, characterized in that, in order to increase the efficiency of work, the construction of a diaphragm is performed by a trenchless stacker of vertical film screens by working moving the stacker from the stacker sequentially along the surface of the stacker dams with lateral displacement of the route of the subsequent working movement of the stacker relative to the route of the previous working movement of sensor in the direction of the upper pool of the dam under construction, while the depth of each diaphragm section constructed by the stacker exceeds the thickness of the dam layer in series by the amount of the specified overlap of the sections of the film diaphragm. со со со соco stock co stock
SU833644116A 1983-07-18 1983-07-18 Method of constructing earth-fill dam with film diaphragm SU1133331A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU833644116A SU1133331A1 (en) 1983-07-18 1983-07-18 Method of constructing earth-fill dam with film diaphragm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU833644116A SU1133331A1 (en) 1983-07-18 1983-07-18 Method of constructing earth-fill dam with film diaphragm

Publications (1)

Publication Number Publication Date
SU1133331A1 true SU1133331A1 (en) 1985-01-07

Family

ID=21082462

Family Applications (1)

Application Number Title Priority Date Filing Date
SU833644116A SU1133331A1 (en) 1983-07-18 1983-07-18 Method of constructing earth-fill dam with film diaphragm

Country Status (1)

Country Link
SU (1) SU1133331A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2176700C1 (en) * 2000-03-14 2001-12-10 Кириенко Юрий Егорович Method for protecting territory from flooding

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Временные рекомендации по технологии строительства противофильтрационных диафрагм. Киев, Издание НИЙСП Госстро УССР, 1969, с. 10-23. 2. Зенкевич И. И. и дрг Центральна пленочна диафрагма плотины Атбашинской ГЭС. «Энергетическое .строительство, 1974, № 3, с. 5-7 (прототип). *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2176700C1 (en) * 2000-03-14 2001-12-10 Кириенко Юрий Егорович Method for protecting territory from flooding

Similar Documents

Publication Publication Date Title
US11674393B2 (en) Method for constructing dam inside dump of inner-dump strip mine
CN103741714A (en) Full-cover excavation top-down construction method for underground engineering
CN113957913A (en) Construction method of film bag sand filling combined steel sheet pile cofferdam
CN105804007A (en) Reinforced soil bank wall structure based on beach soft foundation
JP2016102313A (en) Retaining wall structure and construction method thereof
CN112695763A (en) Deep sludge stratum foundation pit excavation method
SU1133331A1 (en) Method of constructing earth-fill dam with film diaphragm
JP2004108142A (en) Method for construction of a control type revetment
EP0541813A1 (en) Wire saw excavator, cut-off wall or landslide protection construction constructed thereby and construction method thereof
RU2198258C2 (en) Single-stage dike of tailing dump
CN101748735A (en) Foundation ditch excavation method for reducing pile deflection in soft soil area
US3245222A (en) Construction of underground dams
CN117569263A (en) Dam impervious wall and construction method thereof
CN115012362B (en) Construction technology of a deep silt layer flood drainage channel in the intertidal zone
US1602623A (en) Dam and method of constructing the same
JPH0454011B2 (en)
SU885446A1 (en) Method of constructing pile foundation on sagging soil
NL194007C (en) Monolith sheet pile stabilization.
CN217710783U (en) Occupy full section cofferdam of river course structure and break stream structure not
SU1209749A1 (en) Method of constructing earth-fill dam fith film-type core wall
JP4606454B2 (en) Construction method of managed revetment
CN205421157U (en) Reinforced earth quaywall structure based on soft base of mud flat
CN111042144A (en) Excavation method for foundation pit of underground beam under condition of continuous flow of riverway in cold region
CN118932979A (en) A construction technology of underground drainage system under high fill
CN120889233A (en) Ecological dams for hydropower project spoil disposal sites in canyons and their construction methods