[go: up one dir, main page]

SU1119219A1 - Line of casting to moulds,mainly metal moulds faced with liquid self-hardening mixtures - Google Patents

Line of casting to moulds,mainly metal moulds faced with liquid self-hardening mixtures Download PDF

Info

Publication number
SU1119219A1
SU1119219A1 SU833558708A SU3558708A SU1119219A1 SU 1119219 A1 SU1119219 A1 SU 1119219A1 SU 833558708 A SU833558708 A SU 833558708A SU 3558708 A SU3558708 A SU 3558708A SU 1119219 A1 SU1119219 A1 SU 1119219A1
Authority
SU
USSR - Soviet Union
Prior art keywords
conveyor
molds
chill
crystallization
chamber
Prior art date
Application number
SU833558708A
Other languages
Russian (ru)
Inventor
В.В. Кругов
А.Ф. Ермаков
Original Assignee
Научно-производственное объединение по комплексному технологическому проектированию станкостроительных предприятий "Оргстанкинпром"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-производственное объединение по комплексному технологическому проектированию станкостроительных предприятий "Оргстанкинпром" filed Critical Научно-производственное объединение по комплексному технологическому проектированию станкостроительных предприятий "Оргстанкинпром"
Priority to SU833558708A priority Critical patent/SU1119219A1/en
Application granted granted Critical
Publication of SU1119219A1 publication Critical patent/SU1119219A1/en

Links

Landscapes

  • Casting Devices For Molds (AREA)

Abstract

1Ьши  лить  в формы, преимущественно КОКИЛИ, облицованные жидкими самотверде1 11щми смес ми, со держаща  агрегат дл  заполнени  оснастки смесью,поворотно-выт жную машину, камеру дл  сушки кокилей,механизмы сборки кокилей. заливки мет алла, транспортер кристаллизации отливок,агрегат выбивки кокилей, межагрегатные транспортеры и передаточные тележки,от л и ч а ю щ а   с   тем, что, с целью повышени  качества отливок, она снабжена вибростолом, установленным между роликами транспортера в зоне агрегата заполнени  оснастки смесью с возможностью верти ..кального перемещени  от привода, камерой стабилизации температуры кокилей с-транспортером, располбженной .после транспортера кристаллизации, дополнительным транспортером охлаж .дени  кокилей, расположенным над транспортером кристаллизации, причем транспортер кристаллизации вы (Л полнен в виде пр мой и возвратной ветвей, и устройством дл  передачи кокилей с дополнительного транспортера охлаждени  кокилей на транспортер камеры стабилизации температуры кокилей.1) Pour into molds, mainly COKILE, lined with liquid self-hardening 11 mixtures, containing an aggregate for filling the equipment with a mixture, a rotary-extractor, a chamber for drying chills, and mechanisms for assembling chills. metal pouring, casting crystallization conveyor, chill mold knockout unit, inter-aggregate conveyors and transfer carts, from which it is equipped with a vibrating table installed between the conveyor rollers in the area of the equipment filling unit to improve the quality of castings a mixture with the possibility of vertical movement from the drive, a chamber for stabilizing the temperature of the chill molds with a conveyor belt, disposed. After the crystallization conveyor, an additional conveyor for cooling the day molds of the chill molds m above the crystallization conveyor, the crystallization conveyor you (L is filled in the form of direct and returning branches, and a device for transferring the molds from the additional conveyor for cooling the molds to the conveyor of the temperature stabilization chamber of the molds.

Description

11 eleven

Изобрет.ение относитс  к ли.тейному производству, в частности к питью в кокили, облицованные жидкими самотвердекэдими смес ми.The invention relates to a lithic industry, in particular, to drinking in a chill mold, lined with liquid self-hardened mixtures.

Известна лини  лить  в блицованные кокили, содержаща  агрегат нанесени  облицовки, агрегат сборки кокилей , заливочную установку, камеру кристаллизации, агрегат разборки кокилей , агрегат удалени  отливок, камеру охлаждени  кокилей, рольганги и механизмы передачи кокилей с рольганга на рольганг til.The known line is cast into blitz molds, containing a facing application unit, a mold assembly unit, a casting installation, a crystallization chamber, a chip mold disassembly unit, a casting removal unit, a chill mold cooling chamber, a roller table and a transfer mechanism for the chill mold from the roller table to the roller table til.

Однако на известной линии невозможно изготовление крупногабаритных .отливок, например станин фрезерных станков.However, on a known line it is impossible to manufacture large-sized castings, for example beds of milling machines.

Наиболее близким техническим решением к предлагаемому  вл етс  лини  лить  в формы, облицованные жидкими самотвердеющими смес ми (ЖСМ) модели ЛН 218 В, предназначенна  дл  изготовлени  крупногабаритных отливок в услови х серийного производства .The closest technical solution to the proposed one is to be cast into molds lined with liquid self-hardening mixtures (LFM) of the model LN 218 V, intended for the manufacture of large-sized castings under conditions of mass production.

Указанна  лини  содержит агрегат дл  заполнени  оснастки смесью, поворотно-выт жную машину, камеру дл  сушки форм, механизмы сборки, заливки форм, транспортер кристаллизации отливок, агрегат выбивки форм, межагрегатные транспортеры и передаточные тележки. . ,This line contains a unit for filling the equipment with a mixture, a rotary-stretching machine, a mold drying chamber, assembly mechanisms, mold casting, a casting crystallization conveyor, a mold knockout unit, inter-assembly conveyors and transfer carts. . ,

После нанесени  облицовки на поворотно-выт жной машине происходит кантование модельного комплекта и выт жка модели. Передача полуформ на рольганги и возврат модельной оснастки обеспечиваетс  передаточными тележками . Сборка полуформ осуществл етс  краном. Собранные формы передаютс  на участок заливки. Заливка, кристаллизаци  и охлаждение осуществл етс  на одном транспортере.After applying the cladding on the rotary-exhausting machine, the model set can be turned over and the model is stretched. The transfer of the molds to the live rolls and the return of the tooling is provided by transfer carts. The half-molds are assembled by a crane. The assembled forms are transferred to the casting area. Filling, crystallization and cooling is carried out on a single conveyor.

Возврат форм с выбивки на участок нанесени  облицовки осуществл етс  краном C2j.The return of the molds from the knockout to the lining area is carried out with a crane C2j.

Недостатком линии  вл етс  низкое качество облицовочного сло  ввиду неполного заполнени  облицовочной смесью и нестабильности температуры поступающих с разборки форм, вследствие чего при температуре, превьш1ающёй технологически необходимую, затруднено обслуживание кокилей, а при температуре ниже технологически необходимой замедл етс  отверждение смеси.The disadvantage of the line is the poor quality of the lining layer due to incomplete filling with the lining mixture and instability of the temperature of the molds coming out of the disassembly, as a result of which, at a temperature that is technologically necessary, maintenance of the chill molds is difficult, and at a temperature lower than the technologically necessary hardening of the mixture.

192192

Целью изобретени   вл етс  повышение качества отливок.The aim of the invention is to improve the quality of castings.

Поставленна  цель достигаетс  тем что лини  лить  в формы, преимущественно кокили, облицованные жидкими самотвердеющими смес ми, содержаща  агрегат дл  заполнени  оснастки смесью, поворотно-выт жную машину, камеру дл  сушки кокилей, механизмы сборки кокилей, запивки металла, транспортер кристаллизации отливок, агрегат выбивки кокилей, межагрегатные транспортеры и передаточные тележки , согласно изобретению, снабжена вибростолом, установленным между роликами транспортера в зоне агрегата заполнени  оснастки смесью с возможностью вертикального перемещени  от привода, камерой стабилизации температуры кокилей с транспортером, расположенной после транспортера кристаллизации, дополнительным транспортером охлаждени  кокилей, расположенным над транспортером кристаллизации , причем транспортер кристаллизации выполнен в виде .пр мой и возвратной ветвей и устройством дл  передачи кокилей с дополнительного траспортера охлаждени  кокилей на транспортер камеры стабилизации температуры кокилей.This goal is achieved by pouring molds, mainly chill molds, lined with liquid self-hardening mixtures, containing an aggregate for filling the equipment with a mixture, a rotary-stretching machine, a chill mold drying chamber, an assembly mechanism for chill molds, metal wiping, a conveyor for casting crystallization, a embossing unit chill molds, inter-aggregate conveyors and transfer trolleys, according to the invention, are equipped with a vibrating table installed between the conveyor rollers in the area of the equipment filling unit with the possibility of vertical movement from the drive, a chill mold temperature stabilization chamber with a conveyor located after the crystallization conveyor, an additional chill mold conveyor located above the crystallization conveyor, the crystallization conveyor being made in the form of direct and return branches and a device for transferring the chill molds from the additional chill mold transporter to Conveyor chamber for stabilizing the temperature of the molds.

На фиг. 1 изображена лини  лить  в кокили, облицованные жидкими самотвердеющими смес ми (ЖСС) ; на .2разрез А-А фиг. Ij на фиг. 3 - вид Б фиг.1; на фиг. 4 - то же, вид в плане; на фиг. 5 - разрез В-В (|мг.4.FIG. 1 shows a casting line in a chill mold lined with liquid self-hardening mixtures (LSC); on .2 section AA of FIG. Ij in FIG. 3 is a view B of FIG. in fig. 4 - the same plan view; in fig. 5 - section bb (| mg.4.

Лини  состоит из участка 1 подготовки полуформ к заливке, рольганга 2, агрег.ата 3 дл  нанесени  жидкой самотвердек цей смеси на кокили, вибростола 4, смонтированного между приводными роликами 5 рольганга 2 в зоне агрегата 3, транспортера 6 отверждени  ЖСС, поворотно-выт жной машины 7, конвейера 8 отделки и окраски кокилей, сушильной камеры 9 с двум  транспортными ветв ми 10 и II дл  Верхней и нижней полуформ, конвейера 12 дополнительной окраски и простановки стержней, заливочного транспортера 13, снабженного ограждением 14 и выт жной панелью 15, продольной 16 и возвратной 17 ветв ми транспортера кристаллизации, смонтированных в камере 18, агрегата выбивки и разборки кокилей 19, транспортера 20 охлаждени  кокилей, раз3 метенного на перекрытии камеры 8 камеры стабилизации 21 температуры кокилей до t 60 CtS°C с транспор тером 22, устройства дл  передачи к килей, например, гидроподъемник 23 с транспортера 20 охлаждени  кокиле на транспортер 22 камеры стабилизации температуры кокилей, участка 24 очистки и обдувки полуформ, оснащен ного пневмощётками и приспособлени  ми дл  отсоса, и тележек 25-29 пере дачи кокилей и оснастки с транспортера на транспортер, две из которых 27 и 26 оснащены механизмом адресовани . Вйбростол 4 выполнен в виде основани  30 со штыр ми 31, на которые помещена.с возможностью возвратно-поступательного вертикального перемещени  платформа 32 дл  при ема кокилей. Платформа 32 оснащена механическими вибраторами 33. Между о.браще;ннЬ1 ш друг к другу г ризонтальными поверхност ми основани  30.- платформы 32 смонтирована пневмокамера 34 переменного объема, снабженна  пневмоприводом 35. Сушильна  камера 9, имеет две- зоны сущки: перва  дл  нагрева кокилей , заполненных ЖСС до t° 300-400 втора  - дл  охлаждени  кокилей до t 60-70°.С, максимально возможной дл  осуществлени  дальнейших переходов , а именно простановки стержней , дополнительной окраски кокилей Конструкци  сушильной камеры  вл етс  традиционной и не требующей до полнительного описани . Тележки 25-29-дл  передачи кокилей и оснастки выполнены в виде рамы 36 с приводной секцией рольганга 37 и приводом 38 дл  колесной пары . 39., . Тележки 26 и 27 оснащены механизмами адресовани , закрепленными на раме 36 и выпoлнeины a в виде стойки 40 с неподвижным валом 41, вокруг оси которого вращаетс  барабан 42 с неподвижно закрепленным на нем дисками 43, 44 и копиром 45, На диске 43 закреплены четыре лепестка 46 смещенные один относительно другого, на 90 (на фиг. 5 условно показаны два лепестка) на диске 44 закреплено два лепестка 47, смещеншле один относительно другого на фиг.5 условно показан 1 лепесток). Копир 45 оснащен роликами 48, контактирующими поочередно со смонтированным 194 на стойке 40 подпружиненным двуплечим рычагом 49,.взаимодействующим вторым плечом с кокилем (оснасткой). Лийи  работает следующим образом. . Цодготовленные полуформы краном устанавливаютс  на участке 1 на подмодельную плиту, затем комплект (плита и полуформа) поступает по рольгангу /2 к агрегату 3. нанесени  ЖСС на кокили. После нанесени  ЖСС на кокили включаетс  пневмопривод 35, текуча  среда заполн ет камеру 34, перемеща  платформу 32 по штыр м 31 вверх до уровн , превьшающего уровень роликов 5 рольганга 2 на 10 мм, включаютс  вибраторы 33 на 3-5 с дн  лучшего заполнени  ЖСС карманов кокилей , затем вибраторы 33 отключаютс , пневмопривод 35 отключаетс , платформа 32 под собственным весом и весом полуформ опускаетс , помеща  последние на ролики 5 рольганга 2. С рольганга 2 комплекты тележкой 25 передаютс  на транспортер 6, во врем  движени  по которому происходит отверждение ЖСС, и в поворотно-выт жную машину 7, где кантуютс  на 180°, производитс  прот жка моделей и выдача полуформы и подмодельной дпиты . на последующий транспортер 50, с которого полуформы через тележку 26 поступают на конвейер 8 дл  отделки и окраски облицовочного сло , производимой средствами малой механизации. При атом кокиль, поступивший на секцию рольганга 37 тележки 26, толкает .рычаг 49, которьй, воздейству  через один из роликов 48, поворачивает копир 45 и барабан 42 на 90 , в результате .чего поворачиваютс  диски 43 и.44, при зтом одни из лепестков 46 и 47, оказыва сь в одной вертикальной плоскости, замыкают злектрическую цепь (на фиг. не показана) включак цую привод рольганга конвейера 8, который-снимает полуформу с тележки 26 и направл ет ее к тележке 27; рычаг 49, выход  из контакта с полуформой, возвращаетс  в исходное положение. Следук ца  за полуформой подмоельна  плита, поступив на.рольганговую секцию 37 тележки 26, толкает рычаг 49, который теперь воздействует на другой ролик 48, поворачиает копир 45 И барабан 42 на сле1Унвдие 90 , ввод  в контакт с электрической цепью только один из леS11The line consists of a section 1 for preparing half-molds for pouring, a roller table 2, aggregate 3 for applying a liquid self-hardening mixture on a chill mold, a vibrating table 4 mounted between the drive rollers 5 of the roller table 2 in the area of the unit 3, a conveyor 6 for curing the CSH, rotary-exhausting machine 7, conveyor 8 finishing and dyeing of chill molds, drying chamber 9 with two transport branches 10 and II for the upper and lower half-molds, conveyor 12 additional coloring and insertion of rods, filling conveyor 13 equipped with fencing 14 and exhaust panel 15, the longitudinal 16 and 17 return branches of the crystallization conveyor mounted in chamber 18, the unit for stripping and disassembling the molds 19, the conveyor 20 for cooling the molds, marked on the ceiling 8 of the stabilization chamber 21 of the temperature of the molds to t 60 CtS ° C with transport 22, devices for transferring to keels, for example, a hydraulic lift 23 from a conveyor 20 of a chill mold to a conveyor 22 of a chill mold temperature stabilization chamber, a section 24 for cleaning and blowing half-molds equipped with pneumatic brushes and suction appliances, and carts 25-29. D garden molds and tooling from the conveyor onto the conveyor, two of which 27 and 26 are equipped with targeting mechanism. Vibrostol 4 is made in the form of a base 30 with pins 31 on which the platform 32 is placed with the possibility of reciprocating vertical movement for receiving chill molds. The platform 32 is equipped with mechanical vibrators 33. Between the revolving; nn11 w the horizontal surfaces of the base 30.- the platform 32 are mounted to each other; a pneumatic pneumatic chamber 34 of variable volume, equipped with a pneumatic actuator 35. The drying chamber 9 has two zones of the same: the first for heating chill molds filled with LSS to t ° 300-400 second - to cool the chill molds to t 60-70 ° C. As much as possible for further transitions, namely placing rods, additional coloring of the chill molds. The design of the drying chamber is traditional and does not require detailed description. Trolleys 25-29-for transferring dies and accessories are made in the form of a frame 36 with a drive section of the roller table 37 and a drive 38 for the wheel set. 39.,. The carts 26 and 27 are equipped with addressing mechanisms fixed on the frame 36 and made in the form of a stand 40 with a fixed shaft 41, around which axis the drum 42 rotates with the disks 43, 44 fixedly fixed on it and the copier 45. Four lobes 46 are fixed on the disk 43 displaced one with the other, 90 (two petals conventionally shown in Fig. 5) two petals 47 are fixed on the disk 44, one petal displaced one relative to the other in FIG. 5 conventionally shown). Copier 45 is equipped with rollers 48, which are in contact alternately with mounted 194 on a rack 40 with a spring-loaded two-arm lever 49, an interacting second arm with a chill mold (rigging). Liya works as follows. . Prepared molds with a crane are installed on site 1 on the submodel slab, then the kit (plate and mold half) enters the roller table / 2 to the unit 3. applying the LCS to the chill mold. After applying the LSS to the molds, the pneumatic actuator 35 is turned on, the fluid fills the chamber 34, moving the platform 32 along the pins 31 up to a level that exceeds the level of the rollers 5 of the roller table 2 by 10 mm, vibrators 33 are turned on for 3-5 days from the best filling of the LSS pockets the molds, then the vibrators 33 are turned off, the pneumatic drive 35 is turned off, the platform 32 under its own weight and the weight of the half-molds lowers, placing the latter on the rollers 5 of the roller table 2. From the roller table 2 sets of the trolley 25 are transferred to the conveyor 6, during which it hardens s CSH, and an exhaust rotary-machine 7 where kantuyuts 180 °, produced prot buckle arrangement patterns and issuing mold and submodel dpity. a subsequent conveyor 50, from which the molds through the carriage 26 are fed to the conveyor 8 for finishing and painting the facing layer produced by means of small-scale mechanization. With an atom, the chill, which entered the section of the roller table 37 of the carriage 26, pushes the lever 49, which, through one of the rollers 48, pushes the copier 45 and the drum 42 90, as a result of which the disks 43 and 44 turn, one of the the lobes 46 and 47, appearing in the same vertical plane, close the electrical circuit (not shown in fig.) on the drive of the conveyor roller of the conveyor 8, which removes the mold from the carriage 26 and guides it to the carriage 27; lever 49, coming out of contact with the half-form, returns to its original position. Following the half-form, the undermount plate, arriving at the rolling table 37 of the carriage 26, pushes the lever 49, which now acts on another roller 48, rotates the copier 45 And the drum 42 on the next section 90, bringing into contact with the electric circuit only one of the S11

пест ков 46 и замыка  теперь элек трическую цепЬ| включающую привод 38; колесной пары 39, перемещающей тележку по поперечным направл ющим 51 в зону участка 1 подготовки полуформ к заливке.pestles 46 and the closure are now electric | actuator 38; a wheel pair 39 transporting the trolley along transverse guides 51 to the zone of the area 1 of the preparation of half-molds for casting.

Отделанные и окршаёншае нижние и верхние полуформы с транспортера посредством тележки 27, работающей аналогично тележке 26 передачи, поступают поочередно: нижние - на транспортну ветвь 10, верхние - на транспортную ветвь 1I супшльной камеры 9, из которой при помощи мостовых кранов (на фиг. не показаны) передаютс  на конвейер 12 повторной окраски , сборки с использованием мостовых кранов и простановки стержней при помощи консольных кранов 52. После сборки кокиди подаютс  на транспортер заливки 13, Заливка производитс  барабанными ковшами с помощью мостового крана (на фиг. не показаны ). Запитые кокили тележкой 28 передаютс  на продольную ветвь 16 транспортера кристаллизации, с которого тележкой 29 передаютс  на воз19The lower and upper halves of the conveyor, trimmed and painted, by means of a trolley 27 operating similarly to the transfer trolley 26, are fed alternately: the lower ones - to the transport branch 10, the upper ones - to the transport branch 1I of the suction chamber 9, from which no bridge cranes (in Fig. shown) are transferred to the re-painting conveyor 12, assemblies using bridge cranes and rods insertion using cantilever cranes 52. After assembling the kokidis, they are fed to the pouring conveyor 13, the buckets are filled with drum heads new bridge crane (not shown in Fig.). Wet chills with trolley 28 are transferred to the longitudinal branch 16 of the crystallization conveyor, from which trolley 29 are transferred to the air.

вратную ветвь 17 .транспортера кристаллизации . Далее кокили с помощью крана передаютс  на агрегат выбивки и разборки кокилей 19.gateway 17. crystallization transporter. Further, the chill molds are transferred by means of a crane to the chill mold disassembly and disassembly unit 19.

После разборки полуформы кокилей поступают на транспортер 20 охлаждени  кокилей, последн   секци  которого взаимодействует с гидроподъемником 23, опускающем полуформы на транспортер 22 камеры стабилизации 21, В которой кокили Либо охлаждаютс  (либо нагреваютс ) до температуры +60- . После выхода полуформ из камеры 21 полуформы краном передаютс  на участок очистки 24, где при помощи пневмощеток и обдувки очищаютс  от остатков ЖСС. Очищенные полуформы передаютс  на участок 1 подготовки комплектов к запивке.After disassembling the mold halves, the molds are fed to the mold cooling conveyor 20, the last section of which interacts with the hydraulic ram 23, lowering the mold halves onto the conveyor 22 of the stabilization chamber 21, in which the molds are either cooled (or heated) to a temperature of + 60-. After the half-molds exit the chamber 21, the half-molds are transferred to the cleaning section 24 by a crane, where they are cleaned of residual LSC with the help of pneumatic brushes and blasting. The cleaned mold halves are transferred to the preparation section 1 for zapivka.

Реализаци  изобретени  позвол ет повысить качество отливок вследствие улучщени -качества облицовочного сло  кокилей, а за счет более компактной планировки и размещени  транспортера кристаллизации увеличить съем продукции с единицы производственной площади. .LThe implementation of the invention makes it possible to improve the quality of castings due to the improved quality of the cladding layer, and, due to a more compact layout and placement of the crystallization conveyor, to increase the removal of products per unit of production area. .L

KJKj

fut.ifut.i

Jf J 5Jf j 5

JSJs

Bud В повернутоBud v rotated

(pui.3(pui.3

ftft

НH

Claims (1)

Линия литья в формы, преимущественно кокили, облицованные жидкими самотвердеющими смесями, со держащая агрегат для заполнения оснастки смесью,поворотно-вытяжную машину, камеру для сушки кокилей,механизмы сборки кокилей, заливки металла,транспортер кристаллизации отливок,агрегат выбивки кокилей, межагрегатные транспортеры и передаточные тележки,от л и ч а ю щ а я с я тем, что, с целью повышения качества отливок, она снабжена вибростолом, установленным между роликами транспортера в зоне агрегата заполнения оснастки смесью с возможностью верти.кального перемещения от привода, камерой стабилизации температуры кокилей с«транспортером, расположенной ,после транспортера кристаллизации, дополнительным транспортером охлаждения кокилей, расположенным над транспортером кристаллизации, причем транспортер кристаллизации выполнен в виде прямой и возвратной ветвей, и устройством для передачи кокилей с дополнительного транспортера охлаждения кокилей на транспортер камеры стабилизации температуры кокилей.Casting line, mainly chill molds lined with liquid self-hardening mixtures, containing an aggregate for filling tooling with a mixture, a rotary-exhaust machine, a chamber for drying chill molds, mechanisms for assembling chill molds, pouring metal, a crystallization conveyor for castings, a chill knocking machine, inter-unit conveyors and transfer trolleys, from the point of view of the fact that, in order to improve the quality of castings, it is equipped with a vibration table installed between the conveyor rollers in the area of the filling machine with a mixture with the possibility of erythical movement from the drive, a chill temperature stabilization chamber with a “conveyor located, after the crystallization conveyor, an additional chill cooling conveyor located above the crystallization conveyor, and the crystallization conveyor is made in the form of direct and return branches, and a device for transferring chill molds from the additional conveyor cooling the chill molds onto the conveyor of the chill temperature stabilization chamber.
SU833558708A 1983-02-24 1983-02-24 Line of casting to moulds,mainly metal moulds faced with liquid self-hardening mixtures SU1119219A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU833558708A SU1119219A1 (en) 1983-02-24 1983-02-24 Line of casting to moulds,mainly metal moulds faced with liquid self-hardening mixtures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU833558708A SU1119219A1 (en) 1983-02-24 1983-02-24 Line of casting to moulds,mainly metal moulds faced with liquid self-hardening mixtures

Publications (1)

Publication Number Publication Date
SU1119219A1 true SU1119219A1 (en) 1985-05-23

Family

ID=21051827

Family Applications (1)

Application Number Title Priority Date Filing Date
SU833558708A SU1119219A1 (en) 1983-02-24 1983-02-24 Line of casting to moulds,mainly metal moulds faced with liquid self-hardening mixtures

Country Status (1)

Country Link
SU (1) SU1119219A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112024858A (en) * 2020-09-22 2020-12-04 广东先导稀材股份有限公司 Automatic casting equipment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Авторское свидетельство СССР №737113, кл. В 22 D 15/04, 1976. 2. Красников В.Ф.Автоматические линии в литейном производстве. Ростов-на-Дону. 1981, С..31-34, рис.8. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112024858A (en) * 2020-09-22 2020-12-04 广东先导稀材股份有限公司 Automatic casting equipment

Similar Documents

Publication Publication Date Title
CN107639226B (en) Flexible casting system of foundry goods
US4186793A (en) Automatic line for coated metal mould casting
SU1119219A1 (en) Line of casting to moulds,mainly metal moulds faced with liquid self-hardening mixtures
US1870406A (en) Molding machine for the production of a continuous ingot
US3620285A (en) Slab casting apparatus
US2252219A (en) Centrifugal tube casting machine
US4256167A (en) Apparatus for centrifugal casting
JPS55153668A (en) Metal mold casting device
FI61279C (en) AUTOMATISK LINJE FOER GJUTNING AV METALL I BELAGDA KOKILLER
CN1009173B (en) Metal Ball Continuous Casting Method and Casting Mold
SU874260A1 (en) Complex automated line for making castings in cold-hardening sands
US3605864A (en) Turntable shell moulding machine with pivotally interconnected mould parts
JPS6342545B2 (en)
CN112427635A (en) Continuous casting and forging line device
CN118543820B (en) Connecting piece casting equipment for warmhouse booth
CN216151010U (en) Device for casting high-boron wear-resistant stainless steel
CN220805425U (en) Hydraulic tank Liang Gangmo structure
SU737113A1 (en) Line for casting in lined chill moulds
SU763038A1 (en) Low-pressure injection casting machine
SU405652A1 (en) CAROUSEL MOLDING MACHINE FOR COCKILS WITH THERMAL INSULATING FACING
SU846103A1 (en) Automatic casting line
SU1108015A1 (en) Process line for manufacturing three-dimensional concrete articles
SU1004004A1 (en) Complex power line for producing casting of cold hardenable mixtures in moulds
RU2048971C1 (en) Device for manufacturing bimetal cast
SU1069947A1 (en) Line for producing castings in moulds from cold-hardened mixes