[go: up one dir, main page]

SU1099897A1 - Rice irrigation system - Google Patents

Rice irrigation system Download PDF

Info

Publication number
SU1099897A1
SU1099897A1 SU823514278A SU3514278A SU1099897A1 SU 1099897 A1 SU1099897 A1 SU 1099897A1 SU 823514278 A SU823514278 A SU 823514278A SU 3514278 A SU3514278 A SU 3514278A SU 1099897 A1 SU1099897 A1 SU 1099897A1
Authority
SU
USSR - Soviet Union
Prior art keywords
water
waste
irrigation
drainage
discharge
Prior art date
Application number
SU823514278A
Other languages
Russian (ru)
Inventor
Василий Васильевич Рябов
Original Assignee
Всесоюзный Научно-Исследовательский Институт Риса
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Научно-Исследовательский Институт Риса filed Critical Всесоюзный Научно-Исследовательский Институт Риса
Priority to SU823514278A priority Critical patent/SU1099897A1/en
Application granted granted Critical
Publication of SU1099897A1 publication Critical patent/SU1099897A1/en

Links

Landscapes

  • Sewage (AREA)

Abstract

1. РИСОВАЯ ОРОСИТЕЛЬНАЯ СИСТЕМА, содержаща  насосную станцию, распределительный трубопровод, сбросный коллектор, оросительные, дренажные и сбросные трубопроводы с водовыпускными и сбросными сооружени ми и бассейн-отстойник, отличающа с  тем, что, с целью снижени  капитальных и эксплуатационны.х затрат и улучшени  экологической обстановки источника орошени  и водоприемника, всасывающие и напорные линии насосной станции соединены посредство.м дополнительных трубопроводов и перепускных задвижек со сбросным коллектором, распределительным трубопроводом и бассейном - отстойником, оросительные трубопроводы совмещены с дренажными и сбросными трубопроводами и снабжены устройствами дл  приема дренажных вод, а водовыпускные сооружени  совмещены со сбросными и снабжены устройствами дл  приема загр знений. 2. Система по п. 1, отличающа с  тем, что бассейн-отстойник оснащен перепускной задвижкой и ДОННЫ.М ВОДОВЫГПСКОМ.1. RISK IRRIGATING SYSTEM, comprising a pumping station, a distribution pipeline, a waste collector, irrigation, drainage and waste pipelines with water discharge and discharge structures and a settling basin, in order to reduce capital and operating costs and improve the environmental situation of the irrigation source and water intake, the suction and pressure lines of the pumping station are connected by means of additional pipelines and by-pass valves to the waste manifold The piping and the settling basin, the irrigation piping are combined with the drainage and waste piping and equipped with drainage water receiving devices, and the water discharge structures are combined with the wastewater disposal system and equipped with pollution receiving devices. 2. The system of claim 1, characterized in that the settling pool is equipped with a by-pass valve and a BOTTOM.

Description

;о со оо со | Изобретение относитс  к сельскохоз йственной мелиорации и может быть использовано при возделывании различных культур орошаемого земледели , преимущественно как совмещенна  оросительно-осущительна  система рисоводства. Известна рисова  оросительна  система, включающа  насосную станцию, оросительные и сбросные каналы, устройства дл  подачи воды в чеки и сброса, в которой оросительные и сбросные каналы выполнены закрытыми и размещены в одной транщее, причем сбросной трубопровод соединен посредством перепускной задвижки с оросительным трубопроводом и в верхней части оснащен дренажными отверсти ми I. Известна также рисова  оросительна  система, содержаща  насосную станцию, распределительный трубопровод, сбросный коллектор, оросительные, дренажные и сбросные трубопроводы с водовыпускными и сбросными сооружени ми и бассейн-отстойник 2. Недостатком известных оросительных систем  вл етс , то, что сброс воды самотечным способом требует значительного времени дл  осуществлени  полного осущени  больщих площадей, например, перед уборкой риса. При истечении воды под напором через дренажные отверсти , расположенные в верхней части сбросного трубопровода , происходит размыв фильтрующего сло  и грунта, а затем просадка грунта и поломка оросительного трубопровода, расположенного в транщее над сбросным. Истечение воды , под напором через дренажные отверсти  приводит также к подтоплению и заболачиванию прилегающей к сбросному трубопроводу территории. Кроме того, дл  известных оросительных систем характерно: неиспользование сбросной и дренажной воды дл  повторного орошени  возделываемой культуры, например риса в цел х экономии оросительной воды; невозможность обеспечени  в сжатые сроки форсированной подачи оросительной воды, например, в период первоначального затоплени  риса вследствие недостаточной пропускной способности оросительного трубопровода; отсутствие взаимозамен емости оросительного и сбросного трубопроводов; высока  строительна  стоимость оросительных и сбросных трубопроводов, а также установленных на них устройств дл  подачи воды в чеке и сброса; сложность проведени  ремонта сбросного трубопровода вследствие расположени  его в транщее под оросительным трубопроводом. Цель изобретени  - снижение капитальнь х и эксплуатационных затрат и улучщение экологической обстановки источника орошени  и водоприемника. Поставленна  цель достигаетс  тем, что в рисовой оросительной системе, содержащей насосную станцию, закрытые распределительный трубопровод и сбросной коллектор , оросительные, сбросные и дренажные трубопроводы с водовыпускными и сбросными сооружени ми и бассейн-отстойник, всасывающие и напорные линии насосной станции соединены посредством дополнитель ных трубопроводов и перепускных задвижек со сбросным коллектором, распределительным трубопроводом и бассейном-отстойником , оросительные трубопроводы совмещены с дренажными и сбросными трубопроводами и снабжены устройствами дл  приема дренажных вод, а водовыпускные сооружени  совмещены со сбросными и снабжены устроиствами дл  приема загр знении. Кроме того, бассейн-отстойник оснащен перепускной задвижкой и донным водовыпуском . На фиг. 1 схематически показано расположение оросительной системы закрытого типа; на фиг. 2 - схема, компановки насосной станции со всеми трубопроводами и перепускными задвижками; на фиг. 3 - разрез А-А на фиг. 2; на фиг. 4 - распределительный колодец, вид сверху; на фиг. 5 - разрез Б-Б на фиг. 4; на фиг. 6 - расположение в плане звена из двух труб совмещенного оросительного, сбросного и древажного трубопроводов сустройствами Тл  приема дренажной воды; на фиг. 7 - разрез В-В на фиг. 6; на фиг. 8 - разрез Г-Г на фиг. 7; на фиг. 9 - узел I на фиг. 7; на фиг. 10 - узел И на фиг. 9; на фиг. 11, 12 и 13 - детали устройства дл  приема дренажной воды; на фиг. 14 -- вариант работы устройства дл  приема дренажной воды (клапан устройства закрыт); на фиг. 15 - вариант устройства дл  приема дренажной воды (клапан устройства открыт); на фиг. 16 - совмещенное водовыпускное. сбросное и смотровое устройства с сороудерживающими рещетками, мусорораспределительными камерами и мусороприемнои корзиной; на фиг. 17 - разрез Д-Д на фиг. 16; на фиг. 18 - узел III на фиг. 17; на фиг. 19 - разрез Е-Е на фиг. 18; на фиг. 20 - вариант сто ка совмещенного водовьЕпускного, сбросного и с.мотрового устройств во врем  подачи оросительной воды; на фиг. 21 - то же, во врем  сброса воды с рисовой карты-чека. Оросительна  система закрытого типа состоит из источника орошени  1; подвод щего канала 2, аванкамеры 3, насосных агрегатов 4, размещенных в насосной станции 5, распределительного трубопровода 6, распределительных колодцев 7, совмещенных картовых оросительных, сбросных и дренажных трубопроводов 8, сов.мещенных водовыпускных, сбросных и смотровых сооружений 9 с сороудерживающими решетками , мусорораспределительными камера.ми и мусороприемными корзинами, рисовых карт-чеков 10 с оросител ми-сбросами (ложбинами ) 11, сбросного коллектора 12, колодца-гасител  13 в бассейне-отстойнике, бассейна-отстойника 14, дополнительного; о со оо со | The invention relates to agricultural land reclamation and can be used in the cultivation of various crops of irrigated agriculture, mainly as a combined irrigation and drainage system of rice farming. The famous rice irrigation system, which includes a pumping station, irrigation and drainage channels, devices for supplying water to checks and discharge, in which irrigation and discharge channels are closed and placed in one trench, with the discharge pipeline connected by means of an overflow valve to the irrigation pipeline and in the upper the parts are equipped with drainage holes I. The rice irrigation system is also known, comprising a pumping station, a distribution pipeline, a waste collector, irrigation, drainage and waste piping with water outlets and discharges and a settling basin 2. A disadvantage of the known irrigation systems is that the discharge of water by a gravity flow method takes considerable time to complete complete drainage of large areas, for example, before rice is harvested. At the outflow of water under pressure through the drainage holes located in the upper part of the waste pipeline, the filter layer and the soil are washed out, and then the soil subsides and the irrigation pipeline in the trench is above the waste. The outflow of water under pressure through the drainage holes also leads to flooding and waterlogging of the territory adjacent to the discharge pipeline. In addition, the following irrigation systems are characterized by the following: failure to use waste and drainage water to re-irrigate the crop, such as rice, in order to save irrigation water; the impossibility of ensuring in a short time a forced supply of irrigation water, for example, during the period of initial flooding of rice due to insufficient capacity of the irrigation pipeline; lack of interchangeability of irrigation and waste pipelines; high construction cost of irrigation and waste pipelines, as well as devices installed on them for supplying water to the check and discharge; the difficulty of repairing the waste pipeline due to its location in the trench under the irrigation pipeline. The purpose of the invention is to reduce capital and operating costs and improve the environmental situation of the irrigation source and water intake. The goal is achieved by the fact that in a rice irrigation system containing a pumping station, closed distribution pipelines and waste collectors, irrigation, waste and drainage pipelines with water discharge and waste disposal facilities and a settling basin, suction and pressure lines of the pumping station are connected by means of additional pipelines and by-pass valves with a waste collector, distribution pipe and a settling basin, irrigation pipelines are combined with drainage and discharge pipes they are supplied with drainage water receiving devices, and the outflow structures are combined with wastewater and equipped with receiving devices for receiving contamination. In addition, the settling pool is equipped with a by-pass valve and a bottom outlet. FIG. 1 schematically shows the location of a closed-type irrigation system; in fig. 2 shows the layout of a pumping station with all pipelines and bypass valves; in fig. 3 shows section A-A in FIG. 2; in fig. 4 - distribution well, top view; in fig. 5 is a section BB in FIG. four; in fig. 6 - location in terms of a link of two pipes of combined irrigation, waste and demanding pipelines with devices T of receiving drainage water; in fig. 7 is a section bb of FIG. 6; in fig. 8 - section G-Y in FIG. 7; in fig. 9 — node I in FIG. 7; in fig. 10 — node AND in FIG. 9; in fig. 11, 12 and 13 are details of a device for receiving drainage water; in fig. 14 is a variant of the operation of the device for receiving drainage water (the valve of the device is closed); in fig. 15 is a variation of a device for receiving drainage water (the valve of the device is open); in fig. 16 - combined inlet. waste and inspection devices with trash racks, trash chambers and waste receptacle basket; in fig. 17 is a section d-d in FIG. sixteen; in fig. 18 — node III in FIG. 17; in fig. 19 is a section E-E of FIG. 18; in fig. 20 is a variant of the combined wastewater, waste and sowing device flow during irrigation water supply; in fig. 21 - the same, during the discharge of water from the rice card-check. A closed-type irrigation system consists of irrigation source 1; supply channel 2, avankemers 3, pump units 4 located in the pump station 5, distribution pipeline 6, distribution wells 7, combined kart irrigation, waste and drainage pipelines 8, combined offset water discharge, discharge and viewing structures 9 with trash grids, garbage disposal chambers and garbage receptacles, rice card checks 10 with irrigator m-discharges (hollows) 11, waste collector 12, well-extinguisher 13 in the settling basin, settling basin 14, add body

сбросного коллектора 15 с дополнительной всасывающей линией и пропускными задвижками , дополнительного напорного трубопровода 16 с перепускными задвижками, перепускных задвижек 17, соедин ющих напорный (распределительный) трубопровод 6 со сбросным коллектором 12, совмещенных водовыпускных, сбросных и смотровых сооружений одностороннего командовани  18, картовых грунтовых валиков 19, дорог вдоль трубопроводов и по периметру оросительной системы 20; задвижки 21 на сбросном трубопроводе, перепускной задвижки 22 бассейна-отстойника, донного водовыпуска 23 бассейна-отстойника 14, перепускной задвижки 24, основной всасывающей линии 25 насосных агрегатов, основной напорной линии 26 насосных агрегатов, задвижки 27 на основной всасывающей линии , задвижки 28 на дополнительной всасывающей линии, соедин ющей дополнительный сбросной коллектор с всасывающей лининей насосных агрегатов, задвижки 29 на напорной линии насосных агрегатов, задвижки 20 на дополнительной напорной линии , соедин ющей основную напорную линию с дополнительным напорным трубопроводом , задвижки 31 на напорном (распределительном ) трубопроводе, предназначенной дл  перекрыти  напорного трубопровода при подаче оросительной воды по сбросному коллектору, дополнительной всасывающей линии 32, перепускных задвижек 33, соедин ющих сбросной коллектор с совмещенными картовыми оросительными, сбросными и дренажными трубопроводами, имеющими устройства дл  приема дренажной воды, перепускных задвижек 34, отводов 35, соедин ющих напорный (распределительный ) трубопровод с совмещенными картовыми оросител ми, сбросными и дренажными трубопроводами, люка 36 колодца, лестницы 37, дороги 38 вдоль распределительного трубопровода и сбросного коллектора , стыка 39 трубопроводов, дренажного фильтра 40, траншей 41, совмещенного картового оросительного, сбросного и дренажного трубопровода, корпуса 42 дренажного клапана с верхним гнездом 43 клапана с отверсти ми дл  приема дренажной воды, и нижним гнездом 44 клапана, дренажным клапаном 45 щарикового типа.a discharge manifold 15 with an additional suction line and pass valves, an additional pressure pipe 16 with overflow valves, bypass valves 17 connecting a pressure (distribution) pipe 6 with a waste collector 12, combined discharge, unilateral command 18 structures, kart soil rollers 19, roads along pipelines and along the perimeter of the irrigation system 20; gate valves 21 on the discharge pipeline, overflow valves 22 of the settling basin, bottom outfall 23 of the drain basin 14, overflow gate 24, main suction line 25 pumping units, main pressure line 26 of pumping units, gate valve 27 on the main suction line, gate valve 28 for an additional the suction line connecting the additional waste manifold to the suction line of pumping units, the valve 29 on the pressure line of pumping units, the valve 20 on the additional pressure line connecting the main a pressure line with an additional pressure pipe, gate valves 31 on a pressure (distribution) pipe, designed to shut off the pressure pipe when supplying irrigation water through the discharge manifold, additional suction line 32, bypass valves 33 connecting the waste collector with combined map irrigation, waste and drainage pipelines having devices for receiving drainage water, bypass valves 34, outlets 35 connecting the pressure (distribution) pipe with combined card irrigators, waste and drainage pipelines, manhole 36, ladder 37, road 38 along the distribution pipeline and waste collector, junction 39 of pipelines, drainage filter 40, trenches 41, combined card irrigation, waste and drainage pipeline, drainage body 42 a valve with an upper valve seat 43 with openings for receiving drainage water, and a lower valve seat 44, a ball-type drain valve 45.

Кроме того, предлагаема  система содержит корпус 46 устройства дл  приема дренажной воды, прокладки 47, ст жные болты 48, отжимную пружину 49 и гнездо 50 отжимной пружины (фиг. 9), сто к 51 совмещенного водовыпускного, сбросного и смотрового сооружени , перепускные задвижки 52 на водовыпускных и сбросных трубопроводах, водовыпускные и сбросные трубопроводы 53, отмостка 54 вокруг колодцев гасителей-отстойников, колодец 55 устройства, лестницу 56, люк 57 колодца, гаситель-отстойник 58 (фиг. 16), перегородку 59, дел щую сто к на две части, водораспределительную камеру 60, нижнюю сороудерживающую рещетку 61, дополнительный водораспределительный сто к 62, отвод 63 дл  подачи оросительной воды, хлопушку 64, верхний отвод 65 дл  оросительной и сбросной воды, верхнюю сороудерживающую решетку 66, водомусорораспределительную камеру 67, мусороприемную корзину 68 с отверстием, камеру сбросной воды 69, хлопушку 70 в камере сбросной воды, герметичный люк 71, верхнюю перегородку 72, верхнюю камеру дл  легкого мусора 73, осевший в корзине мусор 74 (фиг. 18).In addition, the proposed system includes a device housing 46 for receiving drainage water, gaskets 47, fastening bolts 48, a release spring 49 and a release spring 50 (Fig. 9), a one-to-one 51 combined water outlet, waste and viewing facility, overflow valves 52 on water outlets and waste pipelines, water outlets and waste pipelines 53, pavement 54 around the wells of quenchers-settlers, device well 55, ladder 56, manhole 57 57, sump absorber 58 (Fig. 16), partition 59 dividing hundred to two parts, water distribution A chamber 60, a lower trash receptacle 61, an additional water distribution station 62, an outlet 63 for supplying irrigation water, a rammer 64, an upper outlet 65 for irrigation and waste water, an upper decontamination lattice 66, a waste water distribution chamber 67, a garbage disposal basket 68 with an opening, a chamber waste water 69, a flapper 70 in the waste water chamber, a sealed hatch 71, an upper partition 72, an upper chamber for light waste 73, trash 74 settled in a basket (FIG. 18).

Оросительна  система работает следующим образом.Irrigation system works as follows.

1. Первоначальное затопление риса, т. е. форсированна  подача оросительной воды по сбросному коллектору.1. The initial flooding of rice, i.e. the forced supply of irrigation water through the waste collector.

В насосной станции 5 (фиг. 1 и 2) установлено , напри.мер, 3 насосных агрегата 4 (I, И и III). При одновременной подаче оросительной воды двум  насосными агрегатами , пропуск их расхода обеспечивает напорный (распределительный) трубопровод 6, а при форсированной подаче воды трем  насосными агрегатами пропуск их расхода обеспечивает сбросной коллектор 12, имеющий большой диаметр. Оросительна  вода из аванкамеры 3 (фиг. 1 и 2) по основной всасывающей линин 25 при открытых 27 и закрытых 28 задвижках с помощью насосных агрегатов (I, П и III) по основной напорной линии 26 при открытых 29 и закрытых 30 задвижках подаетс  в сбросной коллектор 12 при открытой задвижке 24 и закрь тых задвижках 17, 21 и 31 на напорном трубопроводе 6 и сбросном коллекторе 12. По сбросному коллектору 12 (фиг. 1) оросительна  вода транспортируетс  к распределительным колодцам 7 (фиг. 1, 4 и 5). Напорный (распределительный) трубопровод 6 и сбросной коллектор 12 расположены р дом, ступенчато, причем напорный трубопровод 6 имеет превышение над сбросным коллектором 12, достаточное дл  пропуска под собой примыкающих слева оросительных , сбросных и дренажных трубопроводов 8 и сопр жени  последних со сбросным коллектором 12 (фиг. 5).In the pumping station 5 (Fig. 1 and 2), for example, 3 pumping units 4 (I, I and III) were installed. With the simultaneous supply of irrigation water to two pumping units, the passage of their flow is ensured by the pressure (distribution) pipeline 6, and with the forced water supply by the three pumping units, the flow collector 12, which has a large diameter, passes the flow. Irrigation water from avancamera 3 (Fig. 1 and 2) along the main suction line 25 with 27 open and 28 closed valves using pumping units (I, P and III) along the main pressure line 26 with 29 open and 30 closed valves is fed into the waste the collector 12 with the open valve 24 and the closed valves 17, 21 and 31 in the discharge pipe 6 and the discharge collector 12. Through the discharge collector 12 (Fig. 1), the irrigation water is transported to the distribution wells 7 (Fig. 1, 4 and 5). The pressure (distribution) pipe 6 and the waste collector 12 are arranged in a stepwise manner, with the pressure pipe 6 having an excess over the waste collector 12, sufficient to allow irrigation, waste and drain pipelines 8 to pass to the left and adjacent the waste collector 12 ( Fig. 5).

В распределитьных колодцах 7 (фиг. 1, 4 и 5) оросительна  вода из сбросного коллектора 12 поступает в совмещенные картовые оросительные, сбросные и дренажные трубопроводы 8 с устройствами дл  приема дренажной воды при открытых 33 и закрытых 35 задвижках.In the distribution wells 7 (Figs. 1, 4 and 5), the irrigation water from the waste collector 12 enters the combined map irrigation, waste and drainage pipelines 8 with devices for receiving drainage water with 33 open and 35 closed valves.

При подаче воды в совмещенные картовые оросительные сбросные и дренажные трубопроводы 8 (фиг. 1, 6, 7 и 8) и при достижении в трубопроводах давлени  (Р) большего одного их диаметра, дренажные клапаны 45 шарикового типа (фиг. 9 и 14) из нижнего гнезда 44 клапана поднимаютс , сжимают отжимные пружины 49 (фиг. 10) и занимают место в верхних гнездах 43 клапанов 45 (фиг. 45 (фиг. 9 и 14), закрыв отверсти  дл  приема дренажной воды (фиг. 14).When water is supplied to the combined irrigation kart irrigation and drainage pipelines 8 (Fig. 1, 6, 7 and 8) and when the pressure (P) in the pipelines exceeds one diameter, ball type drain valves 45 (Fig. 9 and 14) the lower valve receptacle 44 is lifted, the squeezing springs 49 (Fig. 10) are compressed and take up space in the upper sockets 43 of the valves 45 (Fig. 45 (Fig. 9 and 14)), closing the openings for receiving drainage water (Fig. 14).

По совмещенным картовым оросительным , сбросным и дренажным трубопроводам 8 (фиг. 1, 16 и 17) оросительна  вода поступает в совмещенные водовыпускные, сбросные и смотровые сооружени  9 (фиг. 1) с сороудерживающими решетками, мусорораспределительными камерами и мусороприемными корзинами 68 (фиг. 16 и 17).Through combined kart irrigation, waste and drainage pipelines 8 (Fig. 1, 16 and 17), irrigation water flows into the combined water outlet, waste and inspection structures 9 (Fig. 1) with trash grids, garbage disposal chambers and garbage disposal baskets 68 (Fig. 16 and 17).

Совмещенные водовыпускные, сбросные и смотровые сооружени  9 (фиг. 1) устанавливаютс  на совмещенных картовых оросительных сбросных и дренажных трубопроводах в местах подачи воды в чеки и сброса, т. е. в створах картовых оросителей-сбросов (ложбин) 11 (фиг. 1 и 16).Combined water outlet, waste and inspection structures 9 (Fig. 1) are installed on combined map irrigation waste and drainage pipelines in places where water is supplied to checks and discharges, i.e., in the sections of kart irrigation discharges (hollows) 11 (Fig. 1 and sixteen).

Работа совмещенного водовыпускного, сбросного и смотрового сооружений 9 (фиг. 1 и 16) во врем  подачи оросительной воды заключаетс  в следующем.The operation of the combined water outlet, discharge and inspection facilities 9 (Figs. 1 and 16) during the supply of irrigation water is as follows.

Вода под напоро.м (Р) (фиг. 20, 18 и 16) поступает из совмещенного картового трубопровода 8 в сто к 51 совмещенного водовыпускного , сбросного и смотрового сооружени  9 (фиг. 1 и 16) где, закрыв хлопущку 70 (фир. 19 и 20), установленную на перегородке 59, дел щей сто к на две части, поступает в водораспределительную камеру 60 (фиг. 18, 20 и 19). Затем по водораспределительной камере 60 и дополнительному сто ку 62 (фиг. 18, 20 и 19), через отверсти  нижней сороудерживающей решетки 61, отвод 63 дл  подачи оросительной воды, открыв хлопущку (обратный клапан ) 64 на отводе 63, а также через верхний отвод 65 и отверсти  в верхней сороудерживающей рещетке 66, оросительна  вода поступает в водомусорораспределительную камеру 67 (фиг. 18, .20 и 19), промыва  при этом отверсти  сороудерживающих решеток 61 и 66 (фиг. 18, 20 и 19). Из водомусорораспределительной камеры 67 вода поступает в водовыпускные и сбросные трубопроводы 53 при открытых задвижках 52 в колодцах 55 (фиг. 18 и 16) и по трубопроводам 53, погасив энергию в гасител хотстойниках 58, поступает в оросители-сбросы (ложбины) 11 рисовых карт-чеков 10 (фиг. 16 и 1), заполн   их оросительной водой (фиг. 1, справа) форсированное затопаение ). Каждую карту рисового севооборота можно затапливать форсированным расходом из двух совмещенных , сбросных и смотровых сооружений 9 (фиг. 1 справа, форсированное затопление), расположенных на противоположных сторонах рисовых карт 10 (фиг. 1), таким же образом можно осществл ть и форсированный сброс воды.Water under pressure (P) (Figs. 20, 18, and 16) flows from the combined map pipeline 8 to one hundred to 51 combined water discharge, discharge and viewing structures 9 (Figs. 1 and 16) where, having closed the clap 70 (firm. 19 and 20), mounted on the partition 59, which divides the station into two parts, enters the water distribution chamber 60 (Figures 18, 20 and 19). Then through the water distribution chamber 60 and the additional drain 62 (Fig. 18, 20 and 19), through the openings of the lower trash rack 61, branch 63 for supplying irrigation water, opening the clapping (check valve) 64 on branch 63, as well as through the upper branch 65 and the holes in the upper trash rack 66, the irrigation water enters the water-dispensing chamber 67 (Fig. 18, .20 and 19), while washing the openings of the trash grids 61 and 66 (Fig. 18, 20 and 19). From the water disposal chamber 67, water enters the water outlet and waste pipelines 53 with the valves 52 open in the wells 55 (Fig. 18 and 16) and through pipelines 53, extinguishing energy to the quencher hot sinks 58, goes to the sprinklers (hollows) 11 rice karty- checks 10 (Fig. 16 and 1), filled with irrigation water (Fig. 1, right) forced flooding). Each rice crop map can be flooded with forced flow from two combined, waste and viewing structures 9 (Fig. 1, right, forced flooding) located on opposite sides of rice cards 10 (Fig. 1), and forced water discharge can be realized in the same way. .

II.В случае поломки напорного (распределительного ) трубопровода, т. е. при обеспечении подачи оросительной воды на севооборотные участки по сбросному коллектору работа оросительной системы осуществл етс  аналогично 1-й схеме водораспределени .II. In the event of a breakdown of the pressure (distribution) pipeline, i.e., while ensuring the supply of irrigation water to crop rotation plots along the discharge collector, the operation of the irrigation system is carried out similarly to the 1st water distribution scheme.

III.Ускоренный отвод сбросной воды в бассейн-отстойник одновременно по сбросному коллектору и напорному (распределительному ) трубопроводу с помощью насосных агрегатов оросительной насосной станции (форсированный сброс).III. Accelerated discharge of waste water into the pool-sump simultaneously through the discharge manifold and pressure (distribution) pipeline using pumping units of the irrigation pumping station (forced discharge).

С каждой рисовой карты 10 можно производить сброс воды через два водовыпускных , сбросных и смотровых сооружени  9 и 18, расположенных на противоположных сторонах рисовых карт (фиг. 1, справа форсированный сброс). Во врем  ускоренного (форсированного) сброса вода из рисовых карт 10 и оросителей-сбросов 11 (фиг. 16 и 17) поступает в колодцы-гасители-отстойники 58 совмещенных водовыпускных, сбросных и смотровых сооружений 9 (фиг. 1) с сороудерживающими решетками и мусороприемными корзинами. По водовыпускным и сбросным трубопроводам 53 при открытых задвижках 52 в колодцах 55 (фиг. 16) сбросна  вода под напором, созданны.м перепадом уровней воды, поступает в водораспределительные камеры 67 сто ков 51 совмещенных сооружений (фиг. 18 и 21).From each rice card 10, water can be discharged through two outlets, discharges and observation structures 9 and 18 located on opposite sides of the rice cards (Fig. 1, right-side forced reset). During the accelerated (forced) discharge of water from the rice cards 10 and sprinklers-discharges 11 (Fig. 16 and 17) enters the wells-absorbers-sumps 58 combined water outlet, waste and viewing structures 9 (Fig. 1) with trash grids and garbage receptacles baskets. Through the water discharge and waste pipelines 53 with open valves 52 in the wells 55 (Fig. 16), waste water under pressure created by the difference in water levels enters the water distribution chambers 67 of the sewers 51 of the combined structures (Fig. 18 and 21).

На фиг. 18 изображен сто к, а на фиг. 21работа сто ка совмещенного водопускного, сбросного и смотрового сооружений во врем  сброса воды с рисовых карт. При закрытой хлопушке 64 на отводе 63 дл  подачи оросительной воды часть воды из водомусорораспределительной камеры 67 поступает в мусороприемную корзину 68 с отверсти ми, котора  установлена в камере сбросной воды 69 (фиг. 18, 19 и 20). Между стенками мусороприемной корзины 68 и камеры сбросной воды 69 и.меетс  зазор (фиг. 18, 19 и 21), необходимый дл  пропуска воды, выход щей из отверстий мусороприемной корзины 68. Мусор крупных фракций,, поступающий вместе со сбросной водой в корзину 68, оседает в ней, а вода вместе с .мелким мусором через отверсти  в корзине поступает в камеру сбросной воды 69 и, открыв хлопушку (обратный клапан) 70 камеры сбросной воды, попадает в совмещенный картовый оросительный сбросной и дренажный трубопроводы 8 (фиг. 18 и 21). Хлопушка (обратный клапан 70 (фиг. 18 и 21) предназначена дл  предотвращени  вымыва мусора из корзины 68 во врем  подачи оросительной воды по сто ку 51 (фиг. 16, 18 и 21) совмещенного водовыпускного , сбросного и смотрового сооружений.FIG. 18 depicts one hundred K, and FIG. 21 working the combined wastewater, waste and viewing facilities during water discharge from the rice cards. With the flapper 64 closed at the outlet 63 for supplying irrigation water, a portion of the water from the waste-dispensing chamber 67 enters the receptacle basket 68 with openings, which is installed in the waste water chamber 69 (Figs. 18, 19 and 20). Between the walls of the garbage disposal basket 68 and the waste water chamber 69 and. There is a gap (figs. 18, 19 and 21) necessary for the passage of water coming out of the openings of the garbage receptacle 68. Large fraction waste that comes with waste water to the basket 68 , it settles in it, and the water along with. fine debris through the holes in the basket enters the waste water chamber 69 and, opening the cracker (check valve) 70 of the waste water chamber, enters the combined irrigation map drainage and drainage pipelines 8 (Fig. 18 and 21). The flapper (check valve 70 (Fig. 18 and 21) is designed to prevent debris from washing out of the basket 68 during the supply of irrigation water in the stand 51 (Fig. 16, 18 and 21) of the combined outflow, discharge and inspection structures.

Часть сбросной воды вместе с мелким мусором из водомусорораспределительной камеры 67 (фиг. 18 и 21) через отверсти  нижней сороудерживающей решетки 61, расположенной под углами 45° к камере сбросной воды 69 с корзиной 68 и отверстием водовыпускных и сбросных трубопроводов 53 (фиг. 18 и 21), поступает в водораспределительную камеру 60 и из нее - в совмещенный оросительный, сбросной и дренажный трубопровод 8 (фиг. 18 и 31). Т желый мусор крупных фракций, попада  на нижнюю сороудерживающую решетку 61, расположенную под острым угло.м к .мусороприемной корзине 68, скатываетс  в корзину , оседа  в ней (фиг. 18 и 21). По мере заполнени  корзины 68 мусором и засорени  отверстий корзины и сороудерживающей решетки 61 (фиг. 18 и 21), уменьшаетс  пропускна  способность совмещенного водовыпускного , сбросного и смотрового сооружени . Сбросна  вода полностью заполн ет водомусорораспределительную камеру 67 и вместе с легким мелким мусором через отверсти  верхней сероудерживающей решетки 66 (фиг. 18, 21), расположенной под углом к верхней перегородке 72 камеры дл  легкого мусора 73, и отверсти  водовыпускных и сбросных трубопроводов 53 (фиг. 18 и 21), поступает в верхний отвод 65, из которого по дополнительному водораспределительному сто ку 62 попадает в водораспределительную камеру, а затем- в совмешенный трубопровод 8 (фиг. 18 и 21), Легкий мусор крупных фракций, наход щийс  в водомусорораспределительной камере 67, при ее полном заполнении водой над стенкой верхней сороудерживающей решетки 66 (фиг. 18 и 21), расположенной под острым углом к верхней перегородке 72, поднимаетс  вверх и занимает место в верхней камере дл  легкого мусора 73. По мере прекращени  сброса воды легкий мусор оседает в мусороприемной корзине 68 (фиг. 18 и 21).Part of the waste water along with small debris from the water-dispensing chamber 67 (Fig. 18 and 21) through the openings of the lower trash rack 61, located at 45 ° angles to the waste water chamber 69 with the basket 68 and the outlet of the discharge and waste pipelines 53 (Fig. 18 and 21) enters the water distribution chamber 60 and from there into the combined irrigation, waste and drainage pipeline 8 (Fig. 18 and 31). Heavy waste of large fractions, falling on the lower trash rack 61, located at a sharp angle to the garbage disposal basket 68, rolls down into the basket, settling in it (Figures 18 and 21). As the basket 68 is filled with debris and clogged with the holes of the basket and the trash rack 61 (Figs. 18 and 21), the carrying capacity of the combined discharge, discharge and viewing structure is reduced. The waste water completely fills the waste water dispensing chamber 67 and together with light fine debris through the openings of the upper grate-holding grate 66 (Fig. 18, 21) at an angle to the upper partition 72 of the chamber for light debris 73, and the opening of the discharge and waste pipelines 53 (FIG. 18 and 21) enters the upper outlet 65, from which, via the additional water distribution stand 62, it enters the water distribution chamber, and then into the combined pipeline 8 (Fig. 18 and 21), Light debris from large fractions in the water The distribution chamber 67, when it is completely filled with water over the wall of the upper trash rack 66 (Figures 18 and 21), located at an acute angle to the upper partition 72, rises up and takes place in the upper chamber for light debris 73. As the water discharge stops light debris settles in the dust collector basket 68 (Fig. 18 and 21).

Отвод 63 (фиг. 18 и 20) с хлопушкой (обратным клапаном) 64 предназначен дл  увеличени  пропускной способности и напора совмещенного водовыпускного, сбросного и смотрового сооружени  во врем  подачи оросительной воды, так как во врем  прохождени  ее через отверсти  сороудерживающих рещеток 61 и 66 происходит снижение напора и расхода оросительной воды в водовыпускных и сбросных трубопроводах 53.The outlet 63 (figs. 18 and 20) with a clapper (non-return valve) 64 is designed to increase the capacity and pressure of the combined water outlet, discharge and viewing structure during the supply of irrigation water, as during its passage through the openings of the trash grids 61 and 66 reduction of pressure and irrigation water consumption in discharge and waste pipelines 53.

Оросительна  вода, выход ща  под напором из отвода 63 дл  оросительной воды, отталкивает легкий мусор крупных фракций , наход щийс  в водомусорораспределительной камере 67, от водовыпускных и сбросных трубопроводов 53, предотвраща  тем самым возможное их засорение.The irrigation water discharged under pressure from the irrigation water outlet 63 pushes the light debris of large fractions located in the water-dispensing chamber 67 away from the outflow and waste pipelines 53, thus preventing their possible clogging.

В хлопушке (обратном клапане) 64 выполнены отверсти , аналогичные отверсти м мусороприемной корзины 68, поэтому сбросна  вода отводитс  и по отводу 63 (фиг. 18).In the flapper (non-return valve) 64, holes are made similar to the holes of the garbage receptacle 68, so waste water is discharged through the outlet 63 (Fig. 18).

После заполнени  мусороприемна  корзина 68 вынимаетс  через люк 71 (фиг. 18 и 21), освобождаетс  от мусора и устанавливаетс  обратно.After filling, the garbage receptacle 68 is taken out through the hatch 71 (Figs. 18 and 21), freed from the debris and set back.

Сто ки 51 (фиг. 16 и 18) совмещенных водовыпускных сбросных и смотровых сооружений 9 (фиг. 1) используютс  также в качестве смотровых колодцев дл  определеНИН , например, участков возможных поломок совмещенных картовых оросительных, сбросных и дренажных трубопроводов 8Stokes 51 (Figs. 16 and 18) of combined water outlet waste and viewing structures 9 (Fig. 1) are also used as viewing wells for identifying, for example, sections of possible breakdowns of the combined map irrigation, waste and drainage pipelines 8

(фиг. 16 и 18), дл  чего необходимо открыть люк 71 (фиг. 18), сн ть сороудерживающие решетки 61 и 66 и через отверстие водораспределительной камеры 60 осмотреть совмещенный трубопровод 8.(Fig. 16 and 18), for which it is necessary to open the hatch 71 (Fig. 18), remove the trash racks 61 and 66 and inspect the combined pipeline 8 through the opening of the water distribution chamber 60.

Из совмещенных оросительных, сбросных и смотровых сооружений 9 (фиг. 16) с сороудерживающими решетками, мусорораспределительными ка.мерами и мусороприемными корзинами сбросна  вода поступает в совмещенные картовые ороситель ные сбросные и дренажные трубопроводы 8 (фиг. 16, 17 и 21) с устройствами дл  приема дренажной воды. Если напор сбросной воды в совмещенных трубопроводах 8 больще их диаметра, например, во врем  форсированного сброса воды с рисовой системы, тогда под действием давлени  (Р) дренажные клапаны шарикового типа 45 устройств дл  приема дренажной воды из нижнего гнезда клапана 44 поднимаютс  вверх, сжимают отжимные пружины 49 (фиг. 18) и занимают места в верхних гнездах клапанов 43, закрыв отверсти  дл  приема дренажной воды (фиг. 9 и 14). Сбросна  вода по сов- мешенным картовым оросительным, сбросным и дренажным трубопроводам 8 (фиг. I, 6, 7 и 8), имеюшим укло-н в сторону сбросного коллектора - 12 и напорного (распределительного ) трубопровода 6, при открытых перепускных задвижках 33 (фиг. 4, 5) соедин ющих совмещенные картовые оросительные , сбросные и дренажные трубопроводы 8 со сбросным коллектором 12, поступает в последний, заполн   его. Есл1 напор сбросной воды (давление Р) больше диаметра сбросного коллектора 12, тогда при открытых задвижках 34 на отводах 35 сбросна  вода заполн ет напорный (распределитьный ) трубопровод 6 (фиг. 4 и 5).From the combined irrigation, waste and viewing structures 9 (Fig. 16) with trash racks, garbage disposal cages and waste receiving baskets, the waste water flows into the combined irrigation card waste and drainage pipelines 8 (Fig. 16, 17 and 21) receiving drainage water. If the pressure of the waste water in the combined pipelines 8 is larger than their diameter, for example, during the forced discharge of water from the rice system, then under the action of pressure (P) ball drainage valves 45 of devices for receiving drainage water from the lower valve nest 44 rise up, squeezing springs 49 (FIG. 18) and occupy places in the upper sockets of the valves 43, closing the openings for receiving drainage water (FIGS. 9 and 14). Discharge water through a combination of card irrigation, waste and drainage pipelines 8 (Fig. I, 6, 7 and 8), which had 12 in the direction of the discharge collector and 12 pressure (distribution) pipeline 6, with open bypass valves 33 ( Fig. 4, 5) connecting the combined kart irrigation, waste and drainage pipelines 8 with the waste collector 12, enters the latter, filling it. If the discharge water pressure (pressure P) is larger than the diameter of the discharge manifold 12, then with the valves 34 open at the outlet 35, the waste water fills the discharge (distribution) pipeline 6 (Fig. 4 and 5).

Сбросной коллектор 12 и напорный (распределительный ) трубопровод 6 укладываютс  в транщее с уклоном в сторону бассейна-отстойника 14 и насосной станции 5. Сбросна  вода по сбросному коллектору 12 и напорному (распределительному) трубопроводу 6 отводитс  к их, соответственно, концевой и начальной част м, затем из напорного трубопровода 6 при открытой задвижке 17 (фиг. 2), соедин ющей напорный трубопровод 6 со сбросным коллектором 12, перепускаетс  в последний, имеющий с этой части увеличенный диаметр, достаточный дл  приема расхода сбросной воды из напорного (распределительного) трубопровода 6 (фиг. 2). При этом задвижка 31 на напорном (распределительном) трубопроводе 6 и задвижка 24, соедин юща  напорный трубопровод 6 со сбросным коллектором, должны быть закрыты. По увеличенной в диаметре концевой части сбросного коллектора 12 при закрытой задвижке 21 (фиг. 2) соедин ющей коллектор с бассейном-отстойником 14, сбросна  вода поступает в дополнительный сбросной коллектор 15 (фиг. 2 и 3), имеющий диаметр, аналогичный концевой части сбросного коллектора 12, т. е.  вл ющийс  ответвлением последнего к всасывающей линии насосных агрегатов оросительной насосной станции 5 (фиг. 1, 2 и 3). Агрегаты 4 насосной станции 5 имеют дополнительную всасывающую линию 32 (фиг. 2 и 3) из дополнительного сбросного коллектора 15, причем отверсти  всасывающих трубопроводов располагаютс  в дополнительном коллекторе 15 ступенчатого, например , дл  насосного агрегата I (фиг. 2 и 3) выше оси дополнительного коллектора 15, II - по оси, а III - ниже оси (фиг. 3) и снабжены датчиками уровн , которые дают сигналы на автоматическое отключение насосов, при понижении уровней воды в дополнительном коллекторе 15, ниже допустимых дл  каждой из дополнительных всасывающих линий (фиг. 3 и 2), с целью предотвращени  поломки насосных агрегатов . По дополнительному сбросному коллектору сбросна  вода под напором, обусловленным разностью отметок воды в чеке и концевой части коллектора по дополнительной всасывающей линии 32 при открытых 28 и закрытых 27 задвижках на основной всасывающей линии, по трубопроводам поступает к насосным агрегатам 4 (I, II, III), с помощью которых осуществл етс  ускоренный отвод воды одновременно по сбросному коллектору 12 и напорному (распределительному ) трубопроводу 6 (фиг. 3, 2 и 1), С помощью насосных агрегатов (I, И, III) сбросна  вода по основной напорной линии при закрытых задвижках 29 и открытых перепускных задвижках 30 на дополнительной напорной линии поступает в дополнительный напорный трубопровод 16 (фиг. 2, 3 и I), бассейн-отстойник 14. IV. Ускоренный отвод сбросной воды в бассейн-отстойник одновременно по сбросному коллектору и напорному (распределительному ) трубопроводу самотечным способом . Работа оросительной системы аналогична описанной в III схеме водораспределени , за исключением работы насосных агрегатов 4 (I, П, III). Тогда при закрытых задвижках 28 на дополнительных всасывающих трубопроводах и открытой перепускной задвижке 21 сбросна  вода по сбросному коллектору 12 (фиг. 2, 3), погасив энергию в колодце 13 поступает в бассейн-отстойник 14. V. Работа оросительной системы во врем  отвода сбросной воды по напорному (распределительному ) трубопроводу самотечным способом или с помощью насосного агрегата в случае поломки сбросного коллектора аналогична описанной в 111 схеме водораспределени , однако задвижки 33 в распределительных колодцах 7 (фиг. 4, 5 и 1) закрыты. В этом случае также возможно и ускорение отвода сбросной-воды, например с помощью одного насосного агрег,ата 4 (фиг. 2), если трубопровод 6 обеспечивает необходимый дл  работы насосного агрегата приток сбросной воды. VI. Ускоренный отвод сбросной и дренажной воды по сбросному коллектору с помощью насосных агрегатов и подача его по напорному (распределительному) трубопроводу обратно на орощение, например риса, с помощью этих же насосных агрегатов. Рассмотрим план универсальной оросительной системы (фиг. 1), а именно расположение в плане рисовых карт 10, совмещенных картовых оросительных, сбросных и дренажных трубопроводов 8 и установленных на них совмещенных водовыпускных, сбросных и смотровых устройств 9 и 18, а также распределительных колодцев 7. Допустим , что первые и третьи совмещенные картовые оросительные, сбросные и дренажные трубопроводы 8, примыкающие слева и справа к сбросному коллектору 12 и напорному (распределительному) трубопроводу 6 в первом и третьем распределительных колодцах 7 (фиг 2, работают на подачу оросительной воды в рисовые карты 10, а вторые и четвертые совмещенные картовые трубопроводы 8, примыкающие слева и справа к сбросному коллектору и напорному (распределительному ) трубопроводу во втором и четвертом распределительных колодцах, работают на отвод сбросной и дренажной воды (На фиг. 7 показана работа совмещенных картовых оросительных, сбросных и дренажных трубопроводов и установленных на них совмещенных водовыпускных, сбросных и смотровых сооружений, примыкающих слева к сбросному коллектору напор ному трубопроводу). Тогда из рисовых карт 10 (фиг. 1, слева), подлежащих, например, опорожнению, сбросна  вода через совмещенные водовыпускные, сбросные и смотровые сооружени  9 при открытых в них задвижках 52 (фиг. 16) поступает во вторые и четвертые слева и справа совмещенные картовые оросительные, сбросные и дренажные трубопроводы 8, работающие на сброс воды с системы (на фиг. 1, лева  часть системы). По совмещенным трубопроводам 8 сбросна  вода отводитс  к сбросному коллектору 12 (фиг. 1), а если давление (Р) в трубопроводах 8 .меньще одного их диаметра , то в этом случае дренажные клапаны шарикового типа 45 устройств дл  приема дренажной воды (фиг. 9), устанавленных на совмещенных картовых трубопроводах 8 ( фиг. 6, 7 и 8),наход тс  в нижних гнездах 44 клапанов 45, дренажна  вода через отверсти  в верхних гнездах 43 клапанов 45 также поступает в совмещенные картовые оросительные, сбросные и дренажные трубопроводы 8 (фиг. 15). Затем при открытых перепускных 33 и закрытых 34 задвижках во втором и четвертом распределительных колодцах 7 (фиг. 1, 4 и 5), сбросна  и дренажна  вода из вторых и четвертых слева и справа совмещенных картовых оросительных, сбросных и дренажных трубопроводов начинает поступать в сбросной коллектор 12, по которому отводитс  к водоприемнику. При закрытых задвижках 17, 24 tt 21 (фиг. 2 и 1) сбросна  и дренажна  вода по дополнительному сбросному коллектору 15 поступает к дополнительной всасывающей лиНИИ 32 насосных агрегатов 4 (фиг. 2 и 1). Ускорение отвода сбросной и дренажной воды по сбросному коллектору 12 и одновременную подачу ее на повторное орошение риса по напорному (распределительному ) трубопроводу 6 осуществл ют, напрИ: мер, два насосных агрегата II и III (фиг. 2 и 1). Тогда при закрытой на дополнительном всасывающем трубопроводе насосного агрегата 1 (фиг. 2 и 3) и открытых задвижках 28 на дополнительных всасывающих трубопроводах насосных агрегатов II, III (фиг. 3 и 2) закрытых задвижках 27 на основной всасывающей линии 25 сбросна  и дренажна  вода под действием напора, обусловленного разностью отметок воды, или с помощью вакуум-системы, установленной на насосах, поступает по основной всасывающей линии 25 к насосным агрегатам II, III насосной станции 4 (фиг. 2 и 3), с помощью которых откачиваетс . По основной напорной линии 26 при открытых задвижках 29 насосных агрегатов II, III и закрытий задвижках 30 на дополнительной напорной линии сбросна  и дренажна  вода подаетс  по напорному (распределительному) трубопроводу 6 при открытой на нем, задвижке 31 (фиг. 2 и 1), транспортируетс  к картовым совмещенным оросительным, сбросным и дренажным трубопроводам 8 и при открытых задвижках 34 на отводах 35 и закрытых 33 в первом и третьем распредельных колодцах 7 (фиг. 1, 4 и 5) поступает в первые и третьи слева и справа от напорного (распределительного) трубопровода 6 и сбросного коллектора 12 совмещенные картовые оросительные, сбросные и дренажные трубопроводы 8 (фиг. 1, где показана работа левой части оросительной системы). По совмещенным картовым оросительным , сбросным и дренажным трубопроводам 8 оросительна  вода под действием напора (давлени  Р) закрывает клапаны устройств дл  приема дренажной воды (фиг. 14), заполн ет сто ки 51 совмещенных водовыпускных, сбросных и смотровых сооружений 18 и 9 (фиг. 16 и 20). При открытых перепускных задвижках 52 в колодках 55 оросительна  вода через водовыпускные и сбросные трубопроводы 53, колодцы (гасители-отстойники) 58 оросители , сбросы (ложбины) 11 заполн ет 1, лева  часть сие рисовые карты темы). Дл  равномерного отвода дренажной воды со всей площади оросительной системы необходимо комбинировать подачу и сброс воды по совмещенным картовым оросительным , сбросным и дренажным трубопроводам 8 (фиг. 1). Т. е. если подача оросительной воды осуществл етс  по первым и третьим совмещенным картовым оросительным , сбросным и дренажным трубопроводам 8, примыкающим, слева и справа к напорному (распределительному) трубопроводу 12, то во втором случае по ним целесообразно производить отвод сбросной и дренажной воды. VII.Одновременна  подача оросительной и ускоренный отвод сбросной и дренажной воды, пропорциональное смешивание оросительной воды со сбросной внутри напорного (распределительного) трубопровода и подача смешанной воды на орошение например, риса. Подача оросительной воды осуществл етс  насосным агрегатом III (фиг. 2), а отвод сбросной и дренажной воды с рисовой системы осуществл етс  насосным агрегатом II (фиг. 2). При открытой задвижке 27 на основной всасывающей линии 25 насосного агрегата III (фиг. 2) и закрытой задвижке 28 на дополнительной оросительна  вода по основной всасывающей линии 25 поступает к насосному агрегату 111 (фиг. 2), с помощью которого по основной напорной линии 26 при открытой 29 и закрытой 30 задвижках на основной и дополнительной напорных лини х подаетс  в напорный (распределительный ) трубопровод 6 при открытой на нем задвижке 31 (фиг. 2). Сбросна  и дренажна  вода отводитс  с рисовых карт по сбросному коллектору 12, при закрытых задвижках 17, 24 и 21 поступает в дополнительный сбросной коллектор 15 (фиг. 2 и 3) и при открытой задвижке 28 на дополнительной всасывающей линии насосного агрегата II (фиг. 2, 3) и закрытой 27 на основной всасывающей линии 25 поступает к насосному агрегату II, с помощью которого откачиваетс  и при открытой 29 на основной и закрытой 30 задвижках на допол-нительной напорных лини х подаетс  так же в напорный (распределительный) трубопровод 6, смещива сь с оросительной, и транспортируетс  на рисовые карты 1 1 (фиг. 2, 1). VIII.Одновременный ускоренный отвод сбросной и дренажной воды в бассейн-отстойник , подача оросительной, отвод и подача сбросной и дренажной воды дл  пропорционального смещивани  с оросительной и подача смешанной воды на орошение возделываемой культуры, например риса. Кроме водораспределени  описанного в схеме VII дл  ускорени  отвода сбросной воды используетс , например, и 1 насосный агрегат (фиг. 2). Тогда, при открытой задвижке 28 на дополнительном всасываюиюм трубопроводе 32 (фиг. 3, 2) и закрытой задвижке 27 на основной напорной линии 25 насосного агрегата 1 (фиг. 2 и 3) с помощью насосного агрегата 1 сбросна  и дренажна  вода откачиваетс  и по основной напорной линии 26 при закрытой 29 и открытой 30 задвижках на основной и дополнительной напорных лини х подаетс  в дополнительный напорный трубопровод 16, i по которому, погасив энергию в колодце-гасителе 13, поступает в бассейн-отстойник 14 (фиг. 2 и 1). Дл  смещивани  сбросной воды с оросительной в других, более сложных пропорци х , на основной напорной линии 26 за задвижками 29 устанавливаютс  водомеры ( не показаны), тогда расход сбросной и дренажной воды дл  смещивани  ее с оросительной регулируют задвижками 20 и 30 на основной и на дополнительной напор- j ных лини х, т. е. лищн  , например, часть сбросной воды перепускаетс  через задвижки 30 и по дополнительному напорному трубопроводу 16 отводитс  в бассейн-отстойник - 14 (фиг. 2). IX. Одновременна  подача оросительной 2 воды по напорному (распределительному) трубопроводу на орощение и ускоренный от вод сбросной и дренажной воды по сбросному коллектору в бассейн-отстойник. Напри.мер, два насосных агрегата II и III (фиг. 2) работают на подачу оросительной воды по напорному (распределительному ) трубопроводу 6 (фиг. 2), а один насосный агрегат I (фиг. 2) производит откачку сбросной и дренажной воды в бассейн-отстойник . Тогда при открытьЕХ задвиж ках 27 на основной и закрытых 28 - на дополнительной всасывающих лини х с помощью насосных агрегатов II, III (фиг. 2) при открытых задвижках 29 на основной и закрытых 30 - на дополнительной напорной лини х агрегатов II, III оросительна  вода по напорному (распределительному) трубопроводу 6 при открытой задвижке 31 транспортируетс  на орошение возделываемой культуры, например риса (фиг. 2 и 1) Одновременно при закрытой 27 и открытой 28 задвижках на основной и дополнительной всасывающих лини х насосного агрегата 1 (фиг. 2, 3) сбросна  вода из дополнительного сбросного коллектора 15 поступает к насосному агрегату 1 (фиг. 2), с помощью которого откачиваетс  и по основной напорной линии при закрытой 29 и открытой 30 задвижках, поступает по дополнительной напорной линии в дополнительный напорный трубопровод 16, по которому транспортируетс  в бассейн-отстойник 14 (фиг. 2). X. Откачка сбросной и дренажной воды из бассейна-отстойника и подача ее дл  повторного орошени  возделываемой культуры , например риса. Если бассейн-отстойник 14 (фиг. 2 и I) наполнен сбросной и дренажной водой, то при открытой задвижке 21, соедин ющей сбросной коллектор 12 с бассейном-отстойником , вода под напором, обусловленным разностью отметок воды в отстойнике и сбросном коллекторе, заполн ет дополнительный сбросной коллектор 15 (фиг. 2 и 3) и определенную часть сбросного коллектора 12. Тогда, например, с помощью двух или одного насосных агрегатов можно производить откачку воды из бассейна-отстойника аналогично описанным схемам водораспределени , где производитс  ускорен ый отвод сбросной воды по сбросному коллектору с помощью насосных агрегатов 4 (фиг. 2) насосной станции 5. XI. Подача оросительной воды из источника орошени  в бассейн-отстойник, например, дл  смещивани  со сбросной и дренажной водой, обработанной гербицидами и другими  дохимикатами дл  снижени  ее токсичности и возможности последующего использовани  в цел х повторного оро шени  риса, или перепуска в источник орощени  1 через перепускную задвижку 22 и донный водовыпуск 23, соедин ющий бассейн-отстойник 14 с источнико.м орощени  (фиг. 1). Например, насосные агрегаты I, III (фиг. 2) обеспечивают подачу ороситетьной воды в бассейн-отстойник 14. Тогда, при открытых 27 и закрытых 28 задвижках на основной 25 и дополнительной всасывающих лини х насосных агрегатов I и III вода поступает к насосным агрегатам и при закрытых задвижках 29 на основной и .,..„,„ „ крытых 30 - на дополнительной напорных лини х подаетс  в дополнительный напорный трубопровод 16 (фиг. 2 и 1), по которому , погасив энергию в колодце гасителе 13, поступает в бассейн-отстойник 14, с.мещива сь со сбросной и дренажной водой, В течение всего года, в оросительный и неоросительный периоды, т. е. во всех случа х , когда давление в сов.мещенных картовых оросительных сбросных и дренажных трубопроводах 8 (фиг. 1 и 15) меньше однога их диаметра, происходит прием и отвод дренажной воды, т. е. система работает как осушительна . Использование изобретени  в мелиорации обеспечит: экономию оросительной воды , так как дл  повторного орощени  риса используетс  сбросна  и дренажна  вода или смешанна  в определенных пропорци х с оросительной водой, снижение капитальных затрат на строительство сбросных, дренажных трубопроводов и устройств дл  пода чи и сброса воды, так как они выполнены совмещенными; снижение эксплуатационных затрат, св занных с ремонто.м и обслуживанием оросительных, сбросных, дренажныхThe waste manifold 12 and the pressure (distribution) pipe 6 are laid in a trench with a slope towards the pool-sump 14 and the pump station 5. The waste water through the waste collector 12 and the pressure (distribution) pipe 6 is diverted to their end and initial parts, respectively Then, from the pressure pipeline 6 with the open valve 17 (Fig. 2) connecting the pressure pipe 6 to the waste manifold 12, it is transferred to the latter, which has an increased diameter from this part, sufficient to receive the waste water flow from the pressure (distribution) pipeline 6 (Fig. 2). At the same time, the valve 31 on the pressure (distribution) pipe 6 and the valve 24, which connects the pressure pipe 6 to the waste collector, must be closed. The increased in diameter end portion of the waste manifold 12, with the valve 21 closed (FIG. 2) connecting the collector to the settling basin 14, the waste water enters an additional waste collector 15 (FIGS. 2 and 3) having a diameter similar to the end portion of the waste collector 12, i.e., which is a branch of the latter to the suction line of pumping units of the irrigation pumping station 5 (Figures 1, 2 and 3). The units 4 of the pumping station 5 have an additional suction line 32 (Fig. 2 and 3) from the additional waste manifold 15, and the openings of the suction lines are located in the additional manifold 15 of the stepped one, for example for the pump unit I (Fig. 2 and 3) above the axis of the additional collector 15, II - axis, and III - below the axis (Fig. 3) and equipped with level sensors, which give signals for automatic shutdown of pumps, when the water levels in the additional collector 15 fall below the permissible for each of the additional suction boiling lines (Figs. 2 and 3), in order to prevent breakage of pump units. The additional discharge manifold discharges water under pressure due to the difference of water marks in the check and the end part of the collector through an additional suction line 32 with open 28 and closed 27 valves in the main suction line, through pipelines to pump units 4 (I, II, III) , with the help of which water is accelerated simultaneously through the discharge manifold 12 and the pressure (distribution) pipeline 6 (Fig. 3, 2 and 1); With the help of pumping units (I, I, III) the waste water along the main pressure line and closed valves 29 and open relief valves 30 on an additional pressure line enters an additional pressure pipe 16 (Fig. 2, 3 and I), a settling basin 14. IV. Accelerated discharge of waste water into the settling basin at the same time through the discharge manifold and pressure (distribution) pipeline by gravity flow method. The operation of the irrigation system is similar to the water distribution scheme described in III, except for the operation of pumping units 4 (I, P, III). Then, with closed valves 28 on additional suction pipes and open bypass valve 21, waste water through discharge manifold 12 (Fig. 2, 3), extinguishing energy in well 13 enters the settling basin 14. V. Irrigation system operation during discharge of waste water in the pressure (distribution) pipeline by gravity method or with the help of a pump unit in case of a waste collector breakdown, similar to that described in 111 water distribution scheme, however, the valves 33 in distribution wells 7 (Fig. 4, 5 and 1) are closed. In this case, it is also possible to accelerate the discharge of waste-water, for example, using a single pump unit, atm 4 (Fig. 2), if the pipeline 6 provides the inflow of waste water necessary for the operation of the pump unit. Vi. Accelerated discharge of waste and drainage water through the waste manifold using pumping units and feeding it through a pressure (distribution) pipeline back to irrigation, such as rice, using the same pumping units. Consider the plan of the universal irrigation system (Fig. 1), namely the location in terms of rice cards 10, combined kart irrigation, waste and drainage pipelines 8 and mounted on them combined discharge, waste and viewing devices 9 and 18, and distribution wells 7. Suppose that the first and third combined kart irrigation, waste and drainage pipelines 8 adjacent to the left and right of the waste collector 12 and the pressure (distribution) pipeline 6 in the first and third distribution x wells 7 (FIG. 2, work for supplying irrigation water to rice cards 10, and the second and fourth combined map pipelines 8 adjacent to the waste collector and the pressure (distribution) pipeline in the second and fourth distribution wells on the left and right, discharging waste and drainage water (Fig. 7 shows the work of the combined kart irrigation, waste and drainage pipelines and the combined water discharge, discharge and viewing facilities adjacent to the waste collection on their left yelling head Nome pipeline). Then, from rice cards 10 (Fig. 1, left), for example, to be emptied, waste water through combined water discharge, waste and viewing structures 9 with gate valves 52 opened in them (Fig. 16) goes to the second and fourth left and right kart irrigation, waste and drainage pipelines 8, working on the discharge of water from the system (in Fig. 1, the left part of the system). Through the combined pipelines 8, the waste water is discharged to the waste collector 12 (Fig. 1), and if the pressure (P) in the pipelines 8 is smaller than one of their diameter, then in this case the ball drainage valves 45 of the devices for receiving drainage water (Fig. 9 ) installed on the combined map pipelines 8 (Figs. 6, 7 and 8) are located in the lower slots 44 of the valves 45, the drainage water through the holes in the upper slots 43 of the valves 45 also enters the combined map irrigation, drainage and drainage pipelines 8 ( Fig. 15). Then, with open bypass 33 and closed 34 valves in the second and fourth distribution wells 7 (Fig. 1, 4 and 5), the waste and drainage water from the second and fourth left and right of the combined map irrigation, waste and drainage pipelines begins to flow into the waste collector 12, which is diverted to the water intake. With the closed valves 17, 24 tt 21 (Fig. 2 and 1), the waste and drainage water is supplied through an additional waste collector 15 to the additional suction line 32 of pumping units 4 (Fig. 2 and 1). Acceleration of the discharge of drainage and drainage water through the discharge manifold 12 and its simultaneous supply to re-irrigation of rice in the pressure (distribution) pipeline 6 is carried out, for example: measures, two pump units II and III (Fig. 2 and 1). Then, with the pump unit 1 closed on the additional suction pipe (Fig. 2 and 3) and the open valves 28 on the additional suction pipes of the pump units II, III (Fig. 3 and 2) closed valves 27 on the main suction line 25, waste and drainage water the action of the pressure caused by the difference of water marks, or by means of a vacuum system installed on the pumps, flows through the main suction line 25 to the pumping units II, III of the pumping station 4 (Fig. 2 and 3), with which they are pumped out. Along the main pressure line 26, with the valves 29 of the pump units II, III open and the valves 30 closed, the wastewater and drainage water is supplied to the additional pressure line through the pressure (distribution) pipeline 6 with the valve 31 open on it (Fig. 2 and 1), transported to the combined kart irrigation, waste and drainage pipelines 8 and with open valves 34 on the taps 35 and closed 33 in the first and third distribution wells 7 (Fig. 1, 4 and 5) enters the first and third left and right of the pressure (distribution) pipe rovoda discharge collector 6 and 12 combined Cartesian irrigation, relief and drain pipes 8 (FIG. 1, which illustrates the operation of the left part of the irrigation system). Through combined irrigation kart, waste and drainage pipelines 8, irrigation water under the pressure (pressure P) closes the valves of the drainage water receiving devices (Fig. 14), fills the outlets 51 of the combined outflow, waste and inspection structures 18 and 9 (Fig. 16 and 20). With the open bypass valves 52 in the pads 55, irrigation water through the discharge and waste pipelines 53, wells (extinguishers, settling tanks) 58 irrigators, discharges (hollows) 11 fills 1, the left part is rice theme cards). To evenly drain the drainage water from the entire area of the irrigation system, it is necessary to combine the supply and discharge of water through the combined map irrigation, waste and drainage pipelines 8 (Fig. 1). That is, if the irrigation water is supplied through the first and third combined map irrigation, waste and drainage pipelines 8 adjacent to the left and right of the pressure (distribution) pipeline 12, then in the second case it is advisable to discharge the drainage and drainage water through them . VII. Simultaneous supply of irrigation and accelerated removal of waste and drainage water, proportional mixing of irrigation water from the discharge inside the discharge (distribution) pipeline and supply of mixed water for irrigation, such as rice. Irrigation water is supplied by pumping unit III (Fig. 2), while waste and drainage water is drained from the rice system by pumping unit II (Fig. 2). With the open valve 27 on the main suction line 25 of the pumping unit III (Fig. 2) and the closed valve 28 to the additional irrigation water through the main suction line 25 goes to the pumping unit 111 (Fig. 2), through which the main pressure line 26 at Open 29 and 30 closed valves on the main and additional pressure lines are supplied to the pressure (distribution) pipeline 6 with the valve 31 open on it (Fig. 2). Dump and drainage water is discharged from the rice cards through the waste manifold 12, with the valves 17, 24 and 21 closed, it goes to the additional waste collector 15 (Fig. 2 and 3) and with the open valve 28 on the additional suction line of the pump unit II (Fig. 2 , 3) and closed 27 on the main suction line 25 is supplied to the pump unit II, through which it is pumped out even at open 29 on the main and closed 30 valves on the additional pressure line, it is also supplied to the pressure (distribution) pipe 6, displacing water irrigation oh, and transported to rice cards 1-1 (Figs. 2, 1). VIII. Simultaneous accelerated diversion of waste and drainage water into the settling basin, irrigation supply, drainage and drainage water supply and supply for proportional displacement from irrigation and mixed water supply for irrigation of the cultivated crop, such as rice. In addition to the water distribution described in scheme VII, for example, 1 pump unit is used to speed up the discharge of waste water (Fig. 2). Then, with the open valve 28 on the additional suction pipe 32 (Fig. 3, 2) and the closed valve 27 on the main pressure line 25 of the pump unit 1 (Fig. 2 and 3), the waste and drain water is pumped out by the pump unit 1 and Pressure line 26 with closed 29 and open 30 valves on the main and additional pressure lines is fed into an additional pressure pipe 16, i through which, having extinguished the energy in the well-extinguisher 13, enters the pool-sump 14 (Fig. 2 and 1). To displace wastewater from irrigation in other, more complex proportions, water meters (not shown) are installed on the main pressure line 26 behind the valves 29, then the flow of the waste and drainage water is adjusted with valves 20 and 30 on the primary and secondary valves. pressure lines j, i.e. linchs, for example, part of the waste water is bypassed through valves 30 and is led through an additional pressure pipe 16 to the settling basin 14 (Fig. 2). Ix. Simultaneous supply of irrigation water 2 through the pressure (distribution) pipeline to irrigation and accelerated from waste water and drainage water through the waste collector to the pool-sump. For example, two pumping units II and III (Fig. 2) operate to supply irrigation water through a pressure (distribution) pipeline 6 (Fig. 2), and one pumping unit I (Fig. 2) pumps out waste and drainage water to pool sump. Then, with the opening of the EH valves 27 on the main and closed 28 - on the additional suction lines with the help of pump units II, III (Fig. 2) with the open valves 29 on the main and closed 30 - on the additional pressure lines II, III irrigation water along the pressure (distribution) pipeline 6 with the open valve 31, it is transported to irrigate the cultivated crop, such as rice (Fig. 2 and 1) At the same time, with the closed 27 and open 28 valves, on the main and additional suction lines of the pump unit 1 (Fig. 2, 3 ) reset and the water from the additional discharge manifold 15 flows to the pump unit 1 (FIG. 2), through which it is pumped out along the main pressure line with the valves 29 closed and 30 open, flows through the additional pressure line to the additional pressure pipe 16, which is transported in pool-sump 14 (Fig. 2). X. Pumping waste and drainage water from the settling basin and supplying it for re-irrigation of the crop, such as rice. If the settling basin 14 (Fig. 2 and I) is filled with waste and drainage water, then with open valve 21 connecting the discharge collector 12 to the settling basin, the water under pressure caused by the difference in water levels in the settling basin and the discharge collector fills additional waste collector 15 (figs. 2 and 3) and a certain part of waste collector 12. Then, for example, using two or one pumping units, it is possible to pump water from the sump basin similarly to the described water distribution schemes, which are accelerated. th discharge waste water on the discharge collector using pump units 4 (Fig. 2), the pumping station 5. XI. Supply irrigation water from the irrigation source to the settling basin, for example, to dislodge with waste and drainage water treated with herbicides and other chemical chemicals to reduce its toxicity and possible subsequent use for re-irrigation of rice, or bypass to irrigation source 1 through the bypass the valve 22 and the bottom outlet 23 connecting the settling basin 14 to the irrigation source (Fig. 1). For example, pump units I, III (Fig. 2) provide irrigation water to the settling pool 14. Then, with 27 valves open and 27 closed on the main 25 and additional suction lines of pump units I and III, the water goes to the pump units and with closed valves 29 on the main and., .. „,„ „covered 30 - on additional pressure lines, it is fed to an additional pressure pipe 16 (Fig. 2 and 1), through which, having quenched the energy in the well of the extinguisher 13, enters the pool - settling tank 14, moving with waste and drainage water In the whole year, during the irrigation and non-irrigation periods, i.e., in all cases when the pressure in the combined offset irrigation kart irrigation and drainage pipelines 8 (Fig. 1 and 15) is less than one of their diameter, the drainage water is received and discharged i.e. the system works like a drain. The use of the invention in amelioration will provide: savings in irrigation water, as for re-irrigation of rice, waste and drainage water or mixed in certain proportions with irrigation water is used, reduction of capital costs for construction of wastewater, drainage pipelines and devices for water supply and discharge, as well how they are made combined; reduction of operating costs associated with repairs and maintenance of irrigation, waste, drainage

трубопроводов и устройств дл  подачи воды в чеки и ее сброса, так как они выполнены совмещенными , а устройства дл  подачи и сброса воды предотвращают попадание в трубопроводы различного мусора; улучщение экологической обстановки источника орощени  и водоприемника, так как зараженную гербицидами сбросную и дренажную воду можно, мину  водоприемник, подавать обратно по трубопроводам на повторное орощение, например, риса либо смещивать с оросительной внутри трубопроводов , снижа  ее токсичность до нормальной, и подавать на орошение, или производить отстой в бассейне-отстойнике.pipelines and devices for supplying water to checks and its discharge, as they are combined, and devices for supplying and discharge of water prevent various debris from entering the pipelines; Improving the ecological situation of the source of irrigation and water intake, since the waste and drainage water contaminated with herbicides can, mine the water intake, be fed back through the pipelines for re-irrigation, for example, of rice or shifted from the irrigation inside the pipelines, reducing its toxicity to normal, and giving for irrigation or produce sludge in a sediment basin.

Ожидаемый годовой экономический эффект от использовани  данного изобретени  1,801 млн. руб.The expected annual economic effect from the use of this invention is 1,801 million rubles.

/iT/ iT

77

/J/ J

2525

Г2G2

Фиг.ЗFig.Z

М M

ПP

77

JJJj

Фиг.55

8 Фиг.Ю Фиг.д8 FIG. FIG. D

8eight

Фиг.66

ренсгжна бош Фиг. Фиг.12 Фиг.11Reng Bosh Figs. Fig. 12

Сбросна  иReset and

peHuf;f / C7peHuf; f / C7

MaMa

СЕCE

Фиг.IS vA vJ S/A CJXVC% Xv/9 % V/A / Wv ФигМFig.IS vA vJ S / A CJXVC% Xv / 9% V / A / Wv FigM

Е-ЕHER

Фиг. 19 Риг. 18FIG. 19 Rig. 18

Фиг.20Fig.20

.21.21

Claims (2)

1. РИСОВАЯ ОРОСИТЕЛЬНАЯ СИСТЕМА, содержащая насосную станцию, распределительный трубопровод, сбросный коллектор, оросительные, дренажные и сбросные трубопроводы с водовыпускными и сбросными сооружениями и бассейн-отстойник, отличающаяся тем, что, с целью снижения капитальных и эксплуатационных затрат и улучшения экологической обстановки источника орошения и водоприемника, всасывающие и напорные линии насосной станции соединены посредством дополнительных трубопроводов и перепускных задвижек со сбросным коллектором, распределительным трубопроводом и бассейном - отстойником, оросительные трубопроводы совмещены с дренажными и сбросными трубопроводами и снабжены устройствами для приема дренажных вод, а водовыпускные сооружения совмещены со сбросными и снабжены устройствами для приема загрязнений.1. RICE IRRIGATION SYSTEM, comprising a pumping station, a distribution pipe, a waste collector, irrigation, drainage and waste pipelines with water outlet and waste structures and a settling basin, characterized in that, in order to reduce capital and operating costs and improve the environmental situation of the irrigation source and water intake, suction and pressure lines of the pumping station are connected via additional pipelines and bypass valves with a discharge manifold, distributor th pipeline and the pool - a sump, irrigation pipes combined with drainage and waste pipes and provided with devices for receiving drain water and the water-discharge structures are aligned with and are provided with discharge devices for receiving dirt. 2. Система по π. 1, отличающаяся тем, что бассейн-отстойник оснащен перепускной задвижкой и донным водовыпуском.2. The system by π. 1, characterized in that the sump pool is equipped with a bypass valve and a bottom outlet. СО соSO with QOQO СО <1CO <1
SU823514278A 1982-08-17 1982-08-17 Rice irrigation system SU1099897A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823514278A SU1099897A1 (en) 1982-08-17 1982-08-17 Rice irrigation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823514278A SU1099897A1 (en) 1982-08-17 1982-08-17 Rice irrigation system

Publications (1)

Publication Number Publication Date
SU1099897A1 true SU1099897A1 (en) 1984-06-30

Family

ID=21036644

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823514278A SU1099897A1 (en) 1982-08-17 1982-08-17 Rice irrigation system

Country Status (1)

Country Link
SU (1) SU1099897A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2813772C1 (en) * 2023-06-19 2024-02-16 Федеральное государственное бюджетное образовательное учреждение высшего образования "Кубанский государственный аграрный университет имени И.Т. Трубилина" Subsoil irrigation method for rice

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Авторское свидетельство СССР № 385561, кл. А 01 G 25/00, 1971. 2. Авторское свидетельство СССР № 704542, кл. А 01 G 25/00, 1978. *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2813769C1 (en) * 2023-06-07 2024-02-16 Федеральное государственное бюджетное образовательное учреждение высшего образования "Кубанский государственный аграрный университет имени И.Т. Трубилина" Method of subsoil irrigation of rice
RU2818130C1 (en) * 2023-06-07 2024-04-24 Федеральное государственное бюджетное образовательное учреждение высшего образования "Кубанский государственный аграрный университет имени И.Т. Трубилина" Environmentally sustainable rice drying and moistening system
RU2814818C1 (en) * 2023-06-08 2024-03-05 Федеральное государственное бюджетное образовательное учреждение высшего образования "Кубанский государственный аграрный университет имени И.Т. Трубилина" Rice irrigation system
RU2813775C1 (en) * 2023-06-13 2024-02-16 Федеральное государственное бюджетное образовательное учреждение высшего образования "Кубанский государственный аграрный университет имени И.Т. Трубилина" Rice drying-humidifying system
RU2813772C1 (en) * 2023-06-19 2024-02-16 Федеральное государственное бюджетное образовательное учреждение высшего образования "Кубанский государственный аграрный университет имени И.Т. Трубилина" Subsoil irrigation method for rice
RU2816171C1 (en) * 2023-06-19 2024-03-26 Федеральное государственное бюджетное образовательное учреждение высшего образования "Кубанский государственный аграрный университет имени И.Т. Трубилина" Rice irrigation method

Similar Documents

Publication Publication Date Title
KR100924075B1 (en) Vertical Initial Rainwater Purifier
ES2371695B2 (en) HYDRAULIC STATION FOR RECOVERY, MANAGEMENT AND DISTRIBUTION OF PLUVIAL WATERS.
JP6242097B2 (en) Underground drainage pump equipment
CN114855700B (en) An ecologically integrated protective slope structure for water conservancy projects
US10865547B1 (en) Distributed integrated water management system
CN205637036U (en) Urban street rainwater is collected to abandon to flow through and is strained storage leakage system
KR101906937B1 (en) Non-Point Pollution Reduction Facilities and Method therefor
RU2358916C1 (en) Construction for purifying and control over quality of drainage water
SU1099897A1 (en) Rice irrigation system
RU2634952C1 (en) System for receiving and cleaning storm runoff water
CN211646549U (en) Multifunctional rainwater collecting device for residential area
SE511200C2 (en) Device and method of a sewerage system where the main drainage pipe is designed as a closed ring pipe
KR101635966B1 (en) River with clean water for ecological function
CN207582650U (en) Sewage lifter
CN102297340B (en) Water lute drainer
CN216039036U (en) Intelligent total-station rainwater collecting, purifying and recycling device
JP4320758B2 (en) Wastewater treatment facility
KR102290677B1 (en) Rainwater treatment facility that can exclude pipeline type initial rainwater
CN209900812U (en) Automatic intercepting filter tank, intercepting filter device and system
WO2022103381A1 (en) Distributed integrated water management system
CN220044417U (en) Gravity drip irrigation system
US1992586A (en) Dirt trap for gas-distributing lines
CN212835772U (en) Urban pipe network rain and sewage flow dividing device
SU652275A1 (en) Water level lowering apparatus
PL195015B1 (en) Method and device for periodic rinsing of a waste water pipe