[go: up one dir, main page]

SU1048119A1 - Method of constructing multilevel underground structures for working mineral deposits - Google Patents

Method of constructing multilevel underground structures for working mineral deposits Download PDF

Info

Publication number
SU1048119A1
SU1048119A1 SU823457919A SU3457919A SU1048119A1 SU 1048119 A1 SU1048119 A1 SU 1048119A1 SU 823457919 A SU823457919 A SU 823457919A SU 3457919 A SU3457919 A SU 3457919A SU 1048119 A1 SU1048119 A1 SU 1048119A1
Authority
SU
USSR - Soviet Union
Prior art keywords
layer
soil
elements
strips
bulk material
Prior art date
Application number
SU823457919A
Other languages
Russian (ru)
Inventor
Феликс Петрович Спиваков
Исак Леонидович Ладыженский
Виктор Алексеевич Горский
Original Assignee
Молдавский Научно-Исследовательский И Проектно-Конструкторский Институт Строительных Материалов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Молдавский Научно-Исследовательский И Проектно-Конструкторский Институт Строительных Материалов filed Critical Молдавский Научно-Исследовательский И Проектно-Конструкторский Институт Строительных Материалов
Priority to SU823457919A priority Critical patent/SU1048119A1/en
Application granted granted Critical
Publication of SU1048119A1 publication Critical patent/SU1048119A1/en

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

СПОСОБ СООРУЖЕНИЯ МНОГОЯРУСНЫХ . ПОДЗЕМНЫХ ОБЪЕКТОВ ПРИ РАЗРАБОТКЕ МЕСТОРОЖДЕНИИ ПОЛЕЗНЫХ ИСКОПАЕМЫХ, включающий выемку полезного ископаемого сло ми на всю мощность пласта, формирование опорных элементов в стенах очистной выработки и монтаж на них межъ русных железобетонных перекрытий, отличающийс  тем, что, с целью снижени  затрат на сооружени  объектов за счет упрощени  технологии монтажа межъ русных перекрытий, после выемки сло  полезного ископаемого на почве сло  укладывают, профилируют и уплотн ют слой сыпучего материала, опорные элементы перекрытий формируют путем разделки врубов на отметке почвы очистной выработки, вдоль продольной оси очистной выработки на слой сыпучего материала укладывают параллельно две полосы сборных элементов, выпуски арматуры из которых размещают во врубах, причем полосы сборных элементов укладывают друг от друга на рассто нии ширины € ходовой части горно-проходческого оборудо (Л вани , затем почву очистной выработки бетонируют , а нижележащий слой полезного ископаемого вынимают под защитой сформированного перекрыти .METHOD OF CONSTRUCTION OF MULTIPLE. UNDERGROUND OBJECTS IN Mining comprising a recess of mineral layers on the entire bed thickness, forming support elements in the walls of the cleaning formulation and assembling them internuclear-tier reinforced concrete slabs, characterized in that, in order to reduce the costs of construction of the facility due to simplification technologies for the installation of interfacial overlaps, after a layer of minerals are excavated on the soil, the layer is laid, profiled and compacted a layer of bulk material, the supporting elements of floor slabs They are cut by cutting the cuttings at the soil mark of the clearing generation, along the longitudinal axis of the clearing generation, two strips of prefabricated elements are placed parallel to the layer of bulk material, the outlets of reinforcement from which are placed in the notches, and the strips of precast elements are placed apart from each other - pavement equipment (L vani, then the soil of the clearing generation is concreted, and the underlying mineral layer is removed under the protection of the formed overlap.

Description

4four

00 Изобретение относитс  к горному делу и строительству подземных объектов и может быть использовано при разработке мощных пластов полезного ископаемого и сооружении промышленно-складских и других много русных объектов в выработанном пространстве . Известен способ разработки месторождений , при котором выемка нижележащего сло  полезного ископаемого осуществл етс  под специально сооружаемым железобетонным перекрытием, выполн емым на почве выработки во врубах 1. Недостатком способа при использовании дл  создани  подземных объектов  вл етс  высока  трудоемкость работ при возведении перекрыти . Наиболее близким к предлагаемому по технической сущности и достигаемому результату  вл етс  способ сооружени  много русных подземных объектов при разработке месторождений полезных ископаемых включающий выемку полезного ископаемого сло ми на всю мощность пласта, формирование опорных элементов в стенах очистной выработки и монтаж на них межъ русных железобетонных перекрытий 2. Недостаток известного способа - относительно высокие затраты на сооружени  объектов, св занные со сложностью технологии и высокой трудоемкостью монтажа перекрытий . Цель изобретени  - снижение затрат на сооружение объектов за счет упрощени  технологии монтажа межъ русных перекрытий. Поставленна  цель достигаетс  тем, что согласно способу сооружени  много русных подземных объектов при разработке месторождений полезных ископаемых, включающему выемку полезного ископаемого сло ми на всю мощность пласта, формирование опорных элементов в стенах очистной выработки и монтаж на них межъ русных железобетонных перекрытий, после выемки сло  полезного ископаемого на почве сло  укладывают , профилируют и уплотн ют слой сыпучего .материала, опорные элементы перекрытий формируют путем разделки врубов на отметке почвы очистной выработки, вдоль продольной оси очистной выработки на слой сыпучего .материала укладывают параллельно две полосы сборных эле.ментов, выпуски арматуры из которых размещают во врубах, причем полосы сборных элементов укладывают друг от друга па рассто нии щирины ходовой части горно-проходческого оборудовани , затем почву очистной выработки бетонируют, а нижележащий слой полезного ископаемого вынимают под защитой сформированного перекрыти . Способ осуществл етс  следующим образо .м. Разработку мощного пласта полезного ископаемого ведут горизонтальными сло .ми с опережающей .мкой выщерасположенных слоев, например, с помощью камнерезных мащин МКД-1, При этом в нижней части стен образовавшейс  очистной выработки на отметке почвы формируют опорные элементы путем разделки врубов дл  опирани  межъ русного перекрыти . Врубы проход т этими же камнерезными машинами, на пильную головку которых навещиваютс  фрезы. После выемки вышележащего сло  на почве очистной выработки укладывают, профилируют и уплотн ют слой сыпучего .материала , например отходы камнепилени . Этот слой предохран ет рабочие органы добычных машин от контакта с вышерасположенным железобетонны.м перекрытием при разработке нижних слоев. В последне.м случае , выполнив свои защитные функции, он просыпаетс  на почву выработки. На слое сыпучего материала вдоль оси очистной выработки укладывают параллельно две полосы сборных элементов дл  перемещени  по ним горно-проходческого оборудовани . Сборочные элементы, укладываемые друг от друга на рассто нии щирины ходовой части оборудовани , имеют выпуски арматуры, которые  вл ютс  арматурой железобетонного межъ русного перекрыти , формируемого путем бетонировани  на почве выработки. Выпуски арматуры размещают во врубах. Под защитой перекрыти  осуществл ют выемку нижележащего сло . Отставание разработки Нижележащего сло  от вышележащего обусловливаетс  временем достижени  необходимой прочности материала перекрыти . Использование изобретени  позвол ет повысить производительность труда при разработке полезного ископаемого, сократить сроки и у.меньшить стоимость строительства подзе.мных обьектов, осуществл е.мого одновременно с разработкой месторождени  полезных ископаемых.00 The invention relates to the mining and construction of underground objects and can be used in the development of thick mineral layers and in the construction of industrial and warehouse and other large-scale facilities in the developed space. There is a method of mining, in which the excavation of the underlying mineral layer is carried out under specially constructed reinforced concrete slab, which is made on the soil of the cuttings 1. The disadvantage of the method when used to create underground objects is the high labor intensity of the construction of the slab. The closest to the proposed technical essence and the achieved result is a method of constructing multi-underground facilities in the development of mineral deposits, including the excavation of mineral layers in the entire thickness of the reservoir, the formation of supporting elements in the walls of the clearing generation and the installation of inter-ferro-concrete ceilings on them 2 The disadvantage of this method is the relatively high cost of construction of facilities associated with the complexity of the technology and the high complexity of installation overlaps. The purpose of the invention is to reduce the cost of construction of facilities by simplifying the technology of installation of interfacial floors. The goal is achieved by the fact that according to the method of constructing multi-underground objects during the development of mineral deposits, including mining the mineral layers for the entire thickness of the reservoir, the formation of supporting elements in the walls of the clearing generation and the installation of inter-concrete reinforced concrete floors on them the fossil layer on the soil is laid, profiled and compacted layer of bulk material, the supporting elements of the floors are formed by cutting the cuts at the soil level. tine workings, along the longitudinal axis of the treatment workings on a layer of bulk material, two parallel strips of prefabricated elements are placed in parallel, the reinforcement outlets of which are placed in the cuts, and the strips of prefabricated elements are laid apart from each other by the distance of the mining equipment, then the soil of the clearing is concreted, and the underlying layer of the mineral is removed under the protection of the formed overlap. The method is carried out as follows. Development of a thick mineral reservoir is carried out in horizontal layers with an advance ahead of lame layers, for example, using MCD-1 stone-cutting masks. At the same time, support elements are formed at the soil level in the lower part of the walls by cutting logs to support cross-section . The cut-offs are made by the same stone-cutting machines, where cutters are visited on the saw head. After excavation of the overlying layer on the soil of the clearing generation, the layer of bulk material is laid, profiled and compacted, for example, sawing waste. This layer protects the working bodies of the mining machines from contact with the overhead reinforced concrete. Overlap during the development of the lower layers. In the latter case, having fulfilled his protective functions, he wakes up on the soil of development. On the layer of bulk material along the axis of the clearing excavation, two strips of prefabricated elements are laid in parallel to move the mining tunnel equipment along them. The assembly elements, stacked apart from each other at the spacing of the equipment chassis width, have reinforcement outlets, which are reinforcement of reinforced concrete interfacial overlap formed by concreting on the working soil. Releases fittings placed in the cut. Under cover protection, the underlying layer is dredged. The lag in the development of the underlying layer from the overlying layer is due to the time it takes to achieve the required strength of the overlap material. The use of the invention allows to increase labor productivity in the development of mineral resources, reduce the time and reduce the cost of construction of under-sized objects, carried out simultaneously with the development of the mineral deposit.

Claims (1)

СПОСОБ СООРУЖЕНИЯ МНОГОЯРУСНЫХ. ПОДЗЕМНЫХ ОБЪЕКТОВ ПРИ РАЗРАБОТКЕ МЕСТОРОЖДЕНИЙ ПОЛЕЗНЫХ ИСКОПАЕМЫХ, включающий выемку полезного ископаемого слоями на всю мощность пласта, формирование опорных элементов в стенах очистной выработки и монтаж на них межъярусных жёлезобетонных перекрытий, отличающийся тем, что, с целью снижения затрат на сооружения объектов за счет упрощения технологии монтажа межъярусных перекрытий, после выемки слоя полезного ископаемого на почве слоя укладывают, профилируют и уплотняют слой сыпучего материала, опорные элементы перекрытий формируют путем разделки врубов на отметке почвы очистной выработки, вдоль продольной оси очистной выработки на слой сыпучего материала укладывают параллельно две полосы сборных элементов, выпуски арматуры из которых размещают во врубах, причем полосы сборных элементов укладывают друг от друга на расстоянии ширины ходовой части горно-проходческого оборудования, затем почву очистной выработки бетонируют, а нижележащий слой полезного ископаемого вынимают под защитой сформированного перекрытия.METHOD FOR STRUCTURING MULTILAYER. UNDERGROUND OBJECTS WHEN DEVELOPING DEPOSITS OF USEFUL FOSSILS, including the extraction of minerals in layers at the entire thickness of the formation, the formation of supporting elements in the walls of the mine workings and the installation of inter-storey reinforced concrete floors, characterized in that, in order to reduce the cost of installation of facilities due to the simplification of construction facilities due to the simplification of construction facilities floors, after excavation of a layer of minerals on the soil layer is laid, profiled and compacted layer of bulk material, the supporting elements of the floors form by cutting the cuts at the soil level of the mine workings, along the longitudinal axis of the mine workings, two strips of prefabricated elements are laid in parallel on a layer of bulk material, the outlets of which are placed in the cuts, and the strips of prefabricated elements are laid apart from each other at a distance of the width of the running gear of the mining and sinking equipment , then the soil of the mine workings is concreted, and the underlying mineral layer is taken out under the protection of the formed overlap.
SU823457919A 1982-06-18 1982-06-18 Method of constructing multilevel underground structures for working mineral deposits SU1048119A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823457919A SU1048119A1 (en) 1982-06-18 1982-06-18 Method of constructing multilevel underground structures for working mineral deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823457919A SU1048119A1 (en) 1982-06-18 1982-06-18 Method of constructing multilevel underground structures for working mineral deposits

Publications (1)

Publication Number Publication Date
SU1048119A1 true SU1048119A1 (en) 1983-10-15

Family

ID=21018284

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823457919A SU1048119A1 (en) 1982-06-18 1982-06-18 Method of constructing multilevel underground structures for working mineral deposits

Country Status (1)

Country Link
SU (1) SU1048119A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Булатов В. Ф. и др. Совершенствование систем разработки на Дегт рском руднике. - «Горный журнал, 1975, № 3, с. 27-29. 2. Папернов М. М. и др. Производственные и складские объекты в горных выработ. ках. М., Стройиздат, 1980, с. 96-97 (прототип). *

Similar Documents

Publication Publication Date Title
US4075852A (en) Steel reinforced underground wall
JPH11152761A (en) Underground structure and its construction method
CN1837506B (en) Construction method for excavating box-shape structure over an operating tunnel
SU1048119A1 (en) Method of constructing multilevel underground structures for working mineral deposits
US5211507A (en) Method of making a huge elongated space of square or rectangular cross section under the ground
RU2060398C1 (en) Method for preparation of waterproofing stopping for operation under emergency conditions
SU1668667A1 (en) Method for combination mining of gently sloping seams
US4056154A (en) Squaring off and reaming tool for deep elongated trench excavations
KR102294870B1 (en) Core wall structure of composite cassion for offshore runway
RU96108488A (en) METHOD FOR DEVELOPING THE COAL FORMATION ENVIRONMENT IN THE EXTRAORDINARY ZONES OF THE CAREER
JPH0813521A (en) Construction method of underground structure
Hulme et al. Bored tunneling for Singapore metro
SU1142634A1 (en) Method of liquidation of vertical mine workings
SU1624161A1 (en) Method of developing thick sloping coal seams
SU750072A1 (en) Method of working sloping ore deposits
SU1765435A1 (en) Wide-span chamber work dome liming construction method
JPS6317999B2 (en)
SU574535A1 (en) Method of developing thick unstable ore body
SU699186A1 (en) Method of underground excavation of wall stone
SU1323715A1 (en) Method of strip mining of inclined mineral deposits
SU1458574A1 (en) Method of mining ore bodies
SU1661424A1 (en) Method for working out closely contiguous disrupted coal seams
SU1203241A1 (en) Method of mining mineral deposits with filling-up of excavated space
SU1758224A1 (en) Method of mining thick flat deposits
SU958594A1 (en) Prefabricated-monolythic wall in soil