SG11201708196PA - Piling construction management method - Google Patents
Piling construction management methodInfo
- Publication number
- SG11201708196PA SG11201708196PA SG11201708196PA SG11201708196PA SG11201708196PA SG 11201708196P A SG11201708196P A SG 11201708196PA SG 11201708196P A SG11201708196P A SG 11201708196PA SG 11201708196P A SG11201708196P A SG 11201708196PA SG 11201708196P A SG11201708196P A SG 11201708196PA
- Authority
- SG
- Singapore
- Prior art keywords
- management method
- construction management
- piling construction
- piling
- management
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D1/00—Investigation of foundation soil in situ
- E02D1/02—Investigation of foundation soil in situ before construction work
- E02D1/022—Investigation of foundation soil in situ before construction work by investigating mechanical properties of the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D1/00—Investigation of foundation soil in situ
- E02D1/02—Investigation of foundation soil in situ before construction work
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/06—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers for observation while placing
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/02—Placing by driving
- E02D7/06—Power-driven drivers
- E02D7/10—Power-driven drivers with pressure-actuated hammer, i.e. the pressure fluid acting directly on the hammer structure
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01L—MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
- G01L5/00—Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes
- G01L5/0052—Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes measuring forces due to impact
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Soil Sciences (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Applications Claiming Priority (6)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015254925A JP5918435B1 (en) | 2015-12-25 | 2015-12-25 | Pile construction management method |
| JP2016047296A JP5932178B1 (en) | 2016-03-10 | 2016-03-10 | Pile hole excavation apparatus and pile construction management method |
| JP2016071845A JP5994035B1 (en) | 2016-03-31 | 2016-03-31 | Pile hole penetration test device and pile construction management method |
| JP2016078302A JP5972494B1 (en) | 2016-04-08 | 2016-04-08 | Penetration testing machine for excavation rod connection and pile construction management method |
| JP2016120081A JP6329590B2 (en) | 2016-06-16 | 2016-06-16 | Pile construction management method |
| PCT/JP2016/083919 WO2017110314A1 (en) | 2015-12-25 | 2016-11-16 | Piling construction management method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| SG11201708196PA true SG11201708196PA (en) | 2017-11-29 |
Family
ID=59089319
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| SG11201708196PA SG11201708196PA (en) | 2015-12-25 | 2016-11-16 | Piling construction management method |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US10557241B2 (en) |
| EP (1) | EP3263773B1 (en) |
| SG (1) | SG11201708196PA (en) |
| WO (1) | WO2017110314A1 (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108149678A (en) * | 2018-01-12 | 2018-06-12 | 中铁三局集团有限公司 | A kind of loess retaining wall does the construction method of operation pore-creating filling pile |
| CN110644475A (en) * | 2019-09-25 | 2020-01-03 | 瑞森新建筑有限公司 | Method for filling pile by inserting steel bars after long spiral drilling and concrete pressure pouring |
| CN110805400B (en) * | 2019-11-09 | 2021-12-07 | 大畏机床(江苏)有限公司 | Positioning device for petroleum drilling machine |
| CN111155964A (en) * | 2020-03-10 | 2020-05-15 | 何华 | A exempt from to bore stopper cementing ware for oil development |
| CN112415340B (en) * | 2020-10-27 | 2021-12-21 | 清华大学 | Device and method for observing three-dimensional discharge morphology of soil around ground rod |
| JP7699778B2 (en) * | 2022-03-17 | 2025-06-30 | 鹿島建設株式会社 | Pile driving method |
| CN119434284A (en) * | 2024-11-26 | 2025-02-14 | 中国十七冶集团有限公司 | Auxiliary support device for deep foundation pit of large staggered span and double high span steel structure |
| CN120251071B (en) * | 2025-06-09 | 2025-08-26 | 山西省安装集团股份有限公司 | An integrated bored pile machine for engineering |
Family Cites Families (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS54181704U (en) * | 1978-06-14 | 1979-12-22 | ||
| JPS5748019A (en) * | 1980-09-01 | 1982-03-19 | Takechi Koumushiyo:Kk | Pile including steel pipe pile |
| JPS61151307A (en) * | 1984-12-22 | 1986-07-10 | Nippon Concrete Kogyo Kk | Measuring method of n-value in process of concrete pile driving |
| US4770030A (en) * | 1987-10-09 | 1988-09-13 | Smith James C | Soil penetration and sampling system |
| US4993500A (en) * | 1989-03-27 | 1991-02-19 | Mobile Drilling Company, Inc. | Automatic drive hammer system and method for use thereof |
| JP2735733B2 (en) | 1992-04-01 | 1998-04-02 | 日本コンクリート工業株式会社 | Pile support layer detection device |
| JPH06287944A (en) * | 1993-04-05 | 1994-10-11 | Kawasaki Steel Corp | Rotary penetration pile |
| JPH09279560A (en) * | 1996-04-11 | 1997-10-28 | Seiichi Mafune | Intrusion testing machine |
| JP2000245058A (en) | 1999-02-23 | 2000-09-08 | Nec Corp | Voltage generating circuit |
| JP3798281B2 (en) | 2000-12-27 | 2006-07-19 | 新日本製鐵株式会社 | Ground survey method |
| KR100423119B1 (en) * | 2001-08-02 | 2004-03-16 | 에스케이건설 주식회사 | apparatus for standard penetration test for performming the same |
| US20040065453A1 (en) * | 2002-10-07 | 2004-04-08 | Jiin-Song Tsai | Downhole sampling method and device used in standard penetration test |
| GB2398581B (en) * | 2003-02-13 | 2006-07-19 | Archway Engineering | Ground penetration |
| US7328757B2 (en) * | 2003-12-14 | 2008-02-12 | Davies Jeffrey D | All terrain vehicle powered mobile drill |
| JP2005200962A (en) * | 2004-01-16 | 2005-07-28 | Toei Tokushu Kiko:Kk | Method for controlling refusal of pile |
| JP2009057693A (en) * | 2007-08-29 | 2009-03-19 | Kubota Corp | Cast pile |
| JP2013112953A (en) * | 2011-11-28 | 2013-06-10 | Jfe Steel Corp | Steel pipe pile connection structure |
| JP5412501B2 (en) * | 2011-12-09 | 2014-02-12 | 株式会社泉州イワタニ | Reinforcement rod erection method, buoyancy imparting device used in the method, and buoyancy body detachment device |
-
2016
- 2016-11-16 WO PCT/JP2016/083919 patent/WO2017110314A1/en not_active Ceased
- 2016-11-16 EP EP16878210.0A patent/EP3263773B1/en active Active
- 2016-11-16 SG SG11201708196PA patent/SG11201708196PA/en unknown
-
2017
- 2017-09-26 US US15/715,782 patent/US10557241B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| US10557241B2 (en) | 2020-02-11 |
| WO2017110314A1 (en) | 2017-06-29 |
| EP3263773A1 (en) | 2018-01-03 |
| EP3263773B1 (en) | 2021-01-13 |
| EP3263773A4 (en) | 2018-12-05 |
| US20180016763A1 (en) | 2018-01-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| GB201502645D0 (en) | Method | |
| GB201502810D0 (en) | Method | |
| SG11201708196PA (en) | Piling construction management method | |
| GB201500427D0 (en) | Method | |
| GB201506870D0 (en) | Method | |
| GB201507581D0 (en) | Method | |
| GB201506869D0 (en) | Method | |
| GB201501565D0 (en) | Method | |
| GB201510649D0 (en) | Method | |
| GB201509961D0 (en) | Method | |
| GB201503792D0 (en) | Method | |
| GB201513490D0 (en) | Foundation improvements | |
| GB201502409D0 (en) | Method | |
| GB201601209D0 (en) | Method | |
| SG11201605798WA (en) | Demolishing method | |
| GB201506315D0 (en) | Method | |
| ZA201803467B (en) | Management method | |
| GB201713640D0 (en) | Interlocking construction method | |
| TWI560751B (en) | Patterning method | |
| GB201520426D0 (en) | Improved method | |
| GB201522840D0 (en) | Method | |
| GB201515268D0 (en) | Concrete | |
| GB201522397D0 (en) | Method | |
| GB201515716D0 (en) | Method | |
| GB201515714D0 (en) | Method |