[go: up one dir, main page]

SG11201510225PA - Probabilistic methodology for real time drilling - Google Patents

Probabilistic methodology for real time drilling

Info

Publication number
SG11201510225PA
SG11201510225PA SG11201510225PA SG11201510225PA SG11201510225PA SG 11201510225P A SG11201510225P A SG 11201510225PA SG 11201510225P A SG11201510225P A SG 11201510225PA SG 11201510225P A SG11201510225P A SG 11201510225PA SG 11201510225P A SG11201510225P A SG 11201510225PA
Authority
SG
Singapore
Prior art keywords
real time
time drilling
probabilistic methodology
probabilistic
methodology
Prior art date
Application number
SG11201510225PA
Inventor
Jeffrey Marc Yarus
Rae Mohan Srivastava
Kalyan Saikia
Jordan Michael Yarus
Original Assignee
Landmark Graphics Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Landmark Graphics Corp filed Critical Landmark Graphics Corp
Publication of SG11201510225PA publication Critical patent/SG11201510225PA/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/02Determining slope or direction
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/02Determining slope or direction
    • E21B47/022Determining slope or direction of the borehole, e.g. using geomagnetism
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/003Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by analysing drilling variables or conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/04Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N7/00Computing arrangements based on specific mathematical models
    • G06N7/01Probabilistic graphical models, e.g. probabilistic networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • General Physics & Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • Software Systems (AREA)
  • Artificial Intelligence (AREA)
  • Theoretical Computer Science (AREA)
  • Medical Informatics (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Health & Medical Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Automation & Control Theory (AREA)
  • Chemical & Material Sciences (AREA)
  • Mathematical Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Algebra (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Computing Systems (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Physics (AREA)
  • Probability & Statistics with Applications (AREA)
  • Earth Drilling (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • User Interface Of Digital Computer (AREA)
  • Numerical Control (AREA)
SG11201510225PA 2013-08-13 2013-08-13 Probabilistic methodology for real time drilling SG11201510225PA (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/US2013/054755 WO2015023266A1 (en) 2013-08-13 2013-08-13 Probabilistic methodology for real time drilling

Publications (1)

Publication Number Publication Date
SG11201510225PA true SG11201510225PA (en) 2016-01-28

Family

ID=52468533

Family Applications (1)

Application Number Title Priority Date Filing Date
SG11201510225PA SG11201510225PA (en) 2013-08-13 2013-08-13 Probabilistic methodology for real time drilling

Country Status (11)

Country Link
US (1) US10145228B2 (en)
CN (1) CN105408583A (en)
AR (1) AR097334A1 (en)
AU (1) AU2013397959B2 (en)
CA (1) CA2915178C (en)
DE (1) DE112013007332T5 (en)
GB (1) GB2529364B (en)
MX (1) MX2016000350A (en)
RU (1) RU2015154674A (en)
SG (1) SG11201510225PA (en)
WO (1) WO2015023266A1 (en)

Families Citing this family (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106062310A (en) * 2014-02-28 2016-10-26 界标制图有限公司 Facies definition using unsupervised classification procedures
EP3191683A1 (en) 2014-09-12 2017-07-19 Exxonmobil Upstream Research Company Discrete wellbore devices, hydrocarbon wells including a downhole communication network and the discrete wellbore devices and systems and methods including the same
US10408047B2 (en) 2015-01-26 2019-09-10 Exxonmobil Upstream Research Company Real-time well surveillance using a wireless network and an in-wellbore tool
WO2017180124A1 (en) * 2016-04-14 2017-10-19 Landmark Graphics Corporation Parameter based roadmap generation for downhole operations
EP3443198A4 (en) * 2016-04-15 2020-02-19 Landmark Graphics Corporation REAL-TIME OPTIMIZATION AND VISUALIZATION OF PARAMETERS FOR DRILLING OPERATIONS
US10344583B2 (en) 2016-08-30 2019-07-09 Exxonmobil Upstream Research Company Acoustic housing for tubulars
US10697287B2 (en) 2016-08-30 2020-06-30 Exxonmobil Upstream Research Company Plunger lift monitoring via a downhole wireless network field
US10415376B2 (en) 2016-08-30 2019-09-17 Exxonmobil Upstream Research Company Dual transducer communications node for downhole acoustic wireless networks and method employing same
US10364669B2 (en) 2016-08-30 2019-07-30 Exxonmobil Upstream Research Company Methods of acoustically communicating and wells that utilize the methods
US10526888B2 (en) 2016-08-30 2020-01-07 Exxonmobil Upstream Research Company Downhole multiphase flow sensing methods
US10590759B2 (en) 2016-08-30 2020-03-17 Exxonmobil Upstream Research Company Zonal isolation devices including sensing and wireless telemetry and methods of utilizing the same
US10487647B2 (en) 2016-08-30 2019-11-26 Exxonmobil Upstream Research Company Hybrid downhole acoustic wireless network
MX374060B (en) * 2016-08-30 2020-07-29 Exxonmobil Upstream Res Co CHARACTERIZATION OF A RESERVOIR FORMATION USING A DOWN-WELL WIRELESS NETWORK.
US10465505B2 (en) * 2016-08-30 2019-11-05 Exxonmobil Upstream Research Company Reservoir formation characterization using a downhole wireless network
GB2571460B (en) * 2016-12-20 2021-09-22 Landmark Graphics Corp Real-time trajectory control during drilling operations
US10739318B2 (en) * 2017-04-19 2020-08-11 Baker Hughes, A Ge Company, Llc Detection system including sensors and method of operating such
WO2019005908A1 (en) * 2017-06-27 2019-01-03 Schlumberger Technology Corporation Real-time well construction process inference through probabilistic data fusion
CA3079020C (en) 2017-10-13 2022-10-25 Exxonmobil Upstream Research Company Method and system for performing communications using aliasing
CN111201755B (en) 2017-10-13 2022-11-15 埃克森美孚上游研究公司 Method and system for performing operations using communication
WO2019074654A2 (en) 2017-10-13 2019-04-18 Exxonmobil Upstream Research Company Method and system for performing hydrocarbon operations with mixed communication networks
CN111201454B (en) 2017-10-13 2022-09-09 埃克森美孚上游研究公司 Method and system for performing operations using communications
US10697288B2 (en) 2017-10-13 2020-06-30 Exxonmobil Upstream Research Company Dual transducer communications node including piezo pre-tensioning for acoustic wireless networks and method employing same
US10837276B2 (en) 2017-10-13 2020-11-17 Exxonmobil Upstream Research Company Method and system for performing wireless ultrasonic communications along a drilling string
US12000273B2 (en) 2017-11-17 2024-06-04 ExxonMobil Technology and Engineering Company Method and system for performing hydrocarbon operations using communications associated with completions
US10690794B2 (en) 2017-11-17 2020-06-23 Exxonmobil Upstream Research Company Method and system for performing operations using communications for a hydrocarbon system
CN111247310B (en) 2017-11-17 2023-09-15 埃克森美孚技术与工程公司 Methods and systems for performing wireless ultrasonic communications along tubular members
CN108343424B (en) * 2017-12-19 2021-08-03 中国石油天然气股份有限公司 Method and device for determining drilling position
US10844708B2 (en) 2017-12-20 2020-11-24 Exxonmobil Upstream Research Company Energy efficient method of retrieving wireless networked sensor data
CA3086529C (en) 2017-12-29 2022-11-29 Exxonmobil Upstream Research Company Methods and systems for monitoring and optimizing reservoir stimulation operations
US11156081B2 (en) 2017-12-29 2021-10-26 Exxonmobil Upstream Research Company Methods and systems for operating and maintaining a downhole wireless network
CA3090799C (en) 2018-02-08 2023-10-10 Exxonmobil Upstream Research Company Methods of network peer identification and self-organization using unique tonal signatures and wells that use the methods
US11268378B2 (en) 2018-02-09 2022-03-08 Exxonmobil Upstream Research Company Downhole wireless communication node and sensor/tools interface
US10895131B2 (en) 2018-03-01 2021-01-19 Schlumberger Technology Corporation Probabilistic area of interest identification for well placement planning under uncertainty
WO2019240994A1 (en) 2018-06-12 2019-12-19 Baker Hughes, A Ge Company, Llc Gas ratio volumetrics for reservoir navigation
US11293280B2 (en) 2018-12-19 2022-04-05 Exxonmobil Upstream Research Company Method and system for monitoring post-stimulation operations through acoustic wireless sensor network
US11952886B2 (en) 2018-12-19 2024-04-09 ExxonMobil Technology and Engineering Company Method and system for monitoring sand production through acoustic wireless sensor network
US12221867B2 (en) * 2019-02-21 2025-02-11 Sensia Llc Event driven control schemas for artificial lift
US20200308934A1 (en) * 2019-03-26 2020-10-01 Saudi Arabian Oil Company Automatic calibration of forward depositional models
US11802989B2 (en) * 2020-05-11 2023-10-31 Saudi Arabian Oil Company Systems and methods for generating vertical and lateral heterogeneity indices of reservoirs
WO2023102041A1 (en) * 2021-11-30 2023-06-08 Schlumberger Technology Corporation Property modeling using attentive neural processes
US12221875B2 (en) * 2021-12-29 2025-02-11 Halliburton Energy Services, Inc. Real time drilling model updates and parameter recommendations with caliper measurements
US12385382B2 (en) 2023-03-23 2025-08-12 Halliburton Energy Services, Inc. Optimal probabilistic steering control of directional drilling systems
CN118958946B (en) * 2024-10-16 2024-12-27 山东省地质矿产勘查开发局第八地质大队(山东省第八地质矿产勘查院) Automatic control system and method for horizontal well drilling

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020177955A1 (en) * 2000-09-28 2002-11-28 Younes Jalali Completions architecture
US7546884B2 (en) * 2004-03-17 2009-06-16 Schlumberger Technology Corporation Method and apparatus and program storage device adapted for automatic drill string design based on wellbore geometry and trajectory requirements
CN200940444Y (en) * 2006-05-23 2007-08-29 中国石油天然气管道局 Automatic guide system for horizontal positioning drill
US7606666B2 (en) * 2007-01-29 2009-10-20 Schlumberger Technology Corporation System and method for performing oilfield drilling operations using visualization techniques
US8286729B2 (en) * 2008-02-15 2012-10-16 Baker Hughes Incorporated Real time misalignment correction of inclination and azimuth measurements
US9182517B1 (en) * 2010-09-10 2015-11-10 Selman and Associates, Ltd. Drilling rig for horizontal, lateral, and directional drilling that is adjustable in real time
US8596385B2 (en) 2011-12-22 2013-12-03 Hunt Advanced Drilling Technologies, L.L.C. System and method for determining incremental progression between survey points while drilling

Also Published As

Publication number Publication date
GB2529364B (en) 2020-04-15
CN105408583A (en) 2016-03-16
CA2915178C (en) 2017-12-12
GB201521820D0 (en) 2016-01-27
WO2015023266A1 (en) 2015-02-19
RU2015154674A (en) 2017-09-19
CA2915178A1 (en) 2015-02-19
US20160145991A1 (en) 2016-05-26
US10145228B2 (en) 2018-12-04
AU2013397959B2 (en) 2016-06-16
GB2529364A (en) 2016-02-17
MX2016000350A (en) 2016-07-26
DE112013007332T5 (en) 2016-05-04
AR097334A1 (en) 2016-03-09
AU2013397959A1 (en) 2016-02-04

Similar Documents

Publication Publication Date Title
GB2529364B (en) Probabilistic methodology for real time drilling
GB201323121D0 (en) Downhole Apparatus
IL240363A0 (en) נגזרות פירידין כמעכבי rock עדינים
GB2534272B (en) Rotationally-independent wellbore ranging
GB201323127D0 (en) Downhole apparatus
ZA201506156B (en) Novel inhibitors
GB201406414D0 (en) Downhole Apparatus
GB201312011D0 (en) Packer apparatuses
GB201308047D0 (en) Downhole Protection Apparatus
PL2781682T3 (en) Small drilling device
ZA201504929B (en) Wellbore conveyor device
GB2513934B (en) Downhole tool system
GB201318020D0 (en) Drilling apparatus
GB201304801D0 (en) Downhole apparatus
GB2517167B (en) Centraliser
GB2521622B (en) Umbilical
GB201304825D0 (en) Downhole arrangement
GB2543886B (en) Downhole tool
GB2500109B (en) Downhole Apparatus
GB2514613B (en) Construction apparatus
SG11201510563SA (en) Method for tanker construction
GB2518181B (en) Barrier Testing
GB201312605D0 (en) Path planning
GB201303116D0 (en) Barriers
GB201308485D0 (en) Location based real time marketing