[go: up one dir, main page]

RU2746498C1 - Method of treatment of bottomhole zone of production well operated with downhole pump - Google Patents

Method of treatment of bottomhole zone of production well operated with downhole pump Download PDF

Info

Publication number
RU2746498C1
RU2746498C1 RU2020133515A RU2020133515A RU2746498C1 RU 2746498 C1 RU2746498 C1 RU 2746498C1 RU 2020133515 A RU2020133515 A RU 2020133515A RU 2020133515 A RU2020133515 A RU 2020133515A RU 2746498 C1 RU2746498 C1 RU 2746498C1
Authority
RU
Russia
Prior art keywords
well
pipe string
acid
sucker rod
rod pump
Prior art date
Application number
RU2020133515A
Other languages
Russian (ru)
Inventor
Ильшат Маратович Насибулин
Наталья Анатольевна Хасанова
Михаил Александрович Петров
Original Assignee
Общество с ограниченной ответственностью Сервисная Компания "Карат"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Общество с ограниченной ответственностью Сервисная Компания "Карат" filed Critical Общество с ограниченной ответственностью Сервисная Компания "Карат"
Priority to RU2020133515A priority Critical patent/RU2746498C1/en
Application granted granted Critical
Publication of RU2746498C1 publication Critical patent/RU2746498C1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/27Methods for stimulating production by forming crevices or fractures by use of eroding chemicals, e.g. acids

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Chemical & Material Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)

Abstract

FIELD: oil and gas industry.SUBSTANCE: method of treatment of a bottomhole zone of a production well with an operating well borehole pump includes a pipe string lowered to a production well with a sucker rod pump inserted into the lock support of the pipe string, pumping of acid into the bottomhole zone of the production well, holding the well and subsequent extraction of oil from the production well. At that, the sucker rod pump drive is stopped, the pump unit, liquid flow switch, tank truck with acid, tank truck with anticorrosion liquid and chute tank are installed and hydraulically connected to each other. After that the well is analyzed by liquid level extraction in annular space of the well. Include drive sucker rod pump and produce download anticorrosion fluid in the well annulus in volume of 1.5-3 m3,not exceeding 2.0 MPa injection pressure. At the same time sucker rod pump pumping oil from well to line. Drive of sucker rod pump is stopped and liquid level in annular space of the well is expected to decrease. After that, the well is analyzed by repeated liquid level bleeding in the annular space of the well. Rod-type bottom-hole pump is withdrawn from the lock support of the pipe string; acid is pumped into the well string. Then, by pumping anticorrosion liquid in pipe string into 1.25 of pipe string volume, acid is forced from pipe string through bottomhole zone of the well into formation. Production well for reaction of acid in bottomhole zone is followed by pumping anticorrosion liquid into annular space of well in 1.25 volume of pipe string, rod bottomhole pump is installed into lock support of pipe string, drive of sucker-rod pump is started, and waste liquid is pumped by sucker-rod pump from the formation into flute tank to neutral pH, after which oil is extracted from production well.EFFECT: reduction of negative effect of acid on production string and underground equipment, elimination of environmental contamination due to spillage at the wellhead of acid during installation and dismantling of equipment at the wellhead with simultaneous reduction of costs for implementation of the method and reduced duration of treatment of the bottomhole zone of the production well.1 cl, 4 dwg

Description

Изобретение относится к нефтяной промышленности, в частности к способам обработки кислотосодержащими растворами призабойных зон добывающих скважин эксплуатирующихся скважинными глубинными насосами.The invention relates to the oil industry, in particular to methods of processing acid-containing solutions of bottomhole zones of production wells operated by downhole pumps.

Известен способ обработки призабойных зон добывающих скважин (патент RU №2373385, МПК Е21В 43/25, опубл. 20.11.2009 г. в бюл. №32) путем закачки по колонне труб пеногенерирующих реагентов, в качестве которых используют азотгенерирующие реагенты совместно с поверхностно-активными веществами (ПАВ), и декольматирующих реагентов, Азотгенерирующие реагенты совместно с ПАВ и декольматирующие реагенты продавливают в пласт, а в качестве декольматирующих реагентов используют кислоту, и/или ПАВ, и/или органический растворитель, в качестве азотгенерирующих реагентов используют нитрит натрия с мочевиной и сульфаминовой кислотой или нитрит натрия с солью аммония или сульфаминовой кислотой.A known method of treatment of bottomhole zones of production wells (patent RU No. 2373385, IPC Е21В 43/25, publ. 20.11.2009, in bulletin No. 32) by pumping foam-generating reagents through the pipe string, which are used as nitrogen-generating reagents together with surface active substances (surfactants), and decolmating reagents, Nitrogen-generating reagents together with surfactants and decolmating reagents are forced into the formation, and acid and / or surfactant and / or organic solvent are used as decolmating reagents, sodium nitrite with urea is used as nitrogen-generating reagents and sulfamic acid or sodium nitrite with an ammonium salt or sulfamic acid.

Недостатки способа:Disadvantages of the method:

- во-первых, негативное воздействие кислоты на подземное оборудование и эксплуатационную колонну скважины из-за чего происходит интенсивное коррозионное разрушение эксплуатационной колонны, особенно при высокой пластовой температуре, что в конечном итоге может привести к значительному износу эксплуатационной колонны и даже потери ее герметичности в скважинах с большим сроком эксплуатации (30-50 лет);- firstly, the negative effect of acid on the underground equipment and the production casing of the well, due to which intensive corrosion destruction of the production casing occurs, especially at high reservoir temperature, which ultimately can lead to significant wear of the production casing and even loss of its tightness in the wells with a long service life (30-50 years);

- во-вторых, загрязнение окружающей среды из-за излива на устье скважины кислоты при монтаже и демонтаже оборудования в процессе проведения обработки призабойной зоны добывающей скважины;- secondly, environmental pollution due to the outflow of acid at the wellhead during installation and dismantling of equipment in the process of treating the bottomhole zone of a production well;

- в-третьих, высокие затраты, так как для реализации способа требуется привлечения бригады подземного ремонта скважины для извлечения эксплуатационного оборудования (колонны труб и насоса) из добывающей скважины, спуска в скважину технологической колонны труб, а после обработки призабойной зоны добывающей скважины для извлечение из скважины технологической колонны труб, установки в добывающей скважине эксплуатационного оборудования;- thirdly, high costs, since the implementation of the method requires the involvement of a well workover team to extract the production equipment (pipe string and pump) from the production well, run the production string into the well, and after processing the bottomhole zone of the production well to extract from production wells, installation of production equipment in a production well;

- в-четвертых, длительный процесс обработки призабойной зоны добывающей скважины, так как для реализации способа необходимо несколько раз закачивать в скважину различные реагенты.- fourthly, a long process of treatment of the bottomhole zone of the producing well, since for the implementation of the method it is necessary to pump various reagents into the well several times.

Наиболее близким по технической сущности и достигаемому результату является способ обработки призабойной зоны добывающей скважины (патент RU №2555975, МПК Е21В 43/27, опубл. 10.07.2015 г. в бюл. №19), эксплуатирующейся скважинным глубинным насосом, включающим снятие штангового глубинного насоса из замковой опоры колонны труб добывающей скважины, извлечение штангового глубинного насоса из колонны труб на поверхность, извлечение колонны труб с замковой опорой на поверхность, после чего проводят определение зависимости структуры адсорбционного слоя от концентрации неионогенного поверхностно-активного вещества, при этом концентрацию поверхностно-активного вещества в водном растворе неионогенного поверхностно-активного вещества принимают из условия образования «островкового» адсорбционного слоя на поверхности породы - чередующихся гидрофильных участков поверхности нефтяного коллектора и гидрофобных участков адсорбированных молекул поверхностно-активного вещества, обеспечивающих структурирование капель нефти в потоке, выбор скважины для проведения операции, проведение контрольных замеров дебита, устьевых и забойных давлений, исследование скважины на установившихся и неустановившихся режимах, спуск в скважину колонны труб с пакером и закачку кислоты на забой скважины, удаление из скважины кислоты промывкой скважины нефтью, посадку пакерующего устройства в скважине, дальнейшую последовательную закачку водоудаляющей композиции, водного раствора неионогенного поверхностно-активного вещества, продавочной жидкости в добывающую скважину, выдержку скважины и последующий отбор нефти из добывающей скважины.The closest in technical essence and the achieved result is a method for treating the bottomhole zone of a production well (patent RU No. 2555975, IPC Е21В 43/27, publ. 10.07.2015 in bulletin No. 19), operated by a borehole pump, including the removal of a sucker rod pump from the interlock support of the production well pipe string, extraction of the sucker rod pump from the pipe string to the surface, extraction of the pipe string with interlock support to the surface, after which the dependence of the structure of the adsorption layer on the concentration of nonionic surfactant is determined, while the concentration of surfactant substances in an aqueous solution of a nonionic surfactant are taken from the condition of the formation of an "island" adsorption layer on the rock surface - alternating hydrophilic areas of the oil reservoir surface and hydrophobic areas of adsorbed surfactant molecules that provide structure oil droplets in the flow, selection of a well for the operation, control measurements of flow rate, wellhead and bottomhole pressures, study of the well in steady and unsteady modes, lowering a string of pipes with a packer into the well and pumping acid to the bottom of the well, removing acid from the well by flushing the well oil, planting a packer in the well, further sequential injection of a water-removing composition, an aqueous solution of a non-ionic surfactant, a displacement fluid into a production well, holding the well and then withdrawing oil from the production well.

Недостатки способа:Disadvantages of the method:

- во-первых, негативное воздействие кислоты на подземное оборудование и эксплуатационную колонну скважины из-за чего происходит интенсивное коррозионное разрушение эксплуатационной колонны, особенно при высокой пластовой температуре, что в конечном итоге может привести к значительному износу эксплуатационной колонны и даже потери ее герметичности в скважинах с большим сроком эксплуатации (30-50 лет);- firstly, the negative effect of acid on the underground equipment and the production casing of the well, due to which intensive corrosion destruction of the production casing occurs, especially at high reservoir temperature, which ultimately can lead to significant wear of the production casing and even loss of its tightness in the wells with a long service life (30-50 years);

- во-вторых, загрязнение окружающей среды из-за излива на устье скважины кислоты при монтаже и демонтаже оборудования в процессе проведения обработки призабойной зоны добывающей скважины;- secondly, environmental pollution due to the outflow of acid at the wellhead during installation and dismantling of equipment in the process of treating the bottomhole zone of a production well;

- в-третьих, высокие затраты, так как для реализации способа требуется привлечения бригады подземного ремонта скважины для извлечения эксплуатационного оборудования (колонны труб и насоса) из добывающей скважины, спуска в скважину технологической колонны труб, а после обработки призабойной зоны добывающей скважины для извлечение из скважины технологической колонны труб, установки в добывающей скважине эксплуатационного оборудования;- thirdly, high costs, since the implementation of the method requires the involvement of a well workover team to extract the production equipment (pipe string and pump) from the production well, run the production string into the well, and after processing the bottomhole zone of the production well to extract from production wells, installation of production equipment in a production well;

- в-четвертых, длительный процесс обработки призабойной зоны добывающей скважины, так как необходимо несколько раз монтировать и демонтировать оборудование на устье скважины в зависимости от технологической операции (закачка кислоты на в скважину, удаление из скважины кислотосодержащего раствора промывкой скважины нефтью, спуск и установка пакерующего устройства в скважине и т.д.).- fourthly, a long process of processing the bottomhole zone of a production well, since it is necessary to mount and dismantle equipment at the wellhead several times, depending on the technological operation (pumping acid into the well, removing acid-containing solution from the well by flushing the well with oil, running and installing a packer devices in the well, etc.).

Техническими задачами изобретения являются снижение негативного воздействия кислоты на эксплуатационную колонну, исключение загрязнение окружающей среды из-за излива на устье скважины кислоты при монтаже и демонтаже оборудования на устье скважины, а также сокращение затрат на реализацию способа и снижение продолжительности процесса обработки призабойной зоны добывающей скважины.The technical objectives of the invention are to reduce the negative impact of acid on the production casing, to eliminate environmental pollution due to the outflow of acid at the wellhead during the installation and dismantling of equipment at the wellhead, as well as to reduce the cost of implementing the method and reduce the duration of the treatment process of the bottomhole zone of the producing well.

Поставленные технические задачи решаются способом обработки призабойной зоны добывающей скважины, эксплуатирующейся скважинным глубинным насосом, включающим спущенную в добывающую скважину колонну труб со штанговым глубинным насосом, вставленным в замковую опору колонны труб, исследование скважины, закачку кислоты в призабойную зону добывающей скважины, выдержку скважины и последующий отбор нефти из добывающей скважины.The set technical problems are solved by the method of processing the bottomhole zone of the production well, operated by a downhole pump, including a string of pipes lowered into the production well with a sucker rod pump inserted into the key support of the pipe string, well research, acid injection into the bottomhole zone of the production well, well holding and subsequent extraction of oil from a production well.

Новым является то, что останавливают привод штангового глубинного насоса, устанавливают и гидравлически обвязывают между собой насосный агрегат, переключатель потока жидкости, автоцистерну с кислотой, автоцистерну с антикоррозионной жидкостью и желобную емкость, после чего исследуют скважину отбивкой уровня жидкости в затрубном пространстве скважины, включают привод штангового глубинного насоса и производят закачку антикоррозионной жидкости в затрубное пространство скважины в объеме 1,5-3 м3, не превышая давление закачки 2,0 МПа, при этом штанговый глубинный насос откачивает нефть из скважины в линию, останавливают привод штангового глубинного насоса и ожидают снижения уровня жидкости в затрубном пространстве скважины, после чего исследуют скважину повторной отбивкой уровень жидкости в затрубном пространстве скважины, извлекают штанговый глубинный насос из замковой опоры колонны труб, производят закачку кислоты в колонну труб скважины, а затем закачкой по колонне труб антикоррозионной жидкости в 1,25 объема колонны труб производят продавку кислоты из колонны труб через призабойную зону скважины в пласт, осуществляют выдержку добывающей скважины на реакцию кислоты в призабойной зоне, после чего осуществляют закачку антикоррозионной жидкости в затрубное пространство скважины в 1,25 объеме колонны труб, устанавливают штанговый глубинный насос в замковую опору колонны труб запускают привод штангового глубинного насоса и производят откачку штанговым глубинным насосом отработанной жидкости из пласта в желобную емкость до нейтрального рН, после чего осуществляют отбор нефти из добывающей скважины.The novelty is that they stop the sucker rod pump drive, install and hydraulically tie together the pump unit, the fluid flow switch, the acid tank truck, the anti-corrosion liquid tank truck and the trough tank, after which the well is examined by beating the liquid level in the annular space of the well, the drive is turned on sucker rod pump and inject anti-corrosion liquid into the annulus of the well in a volume of 1.5-3 m 3 , not exceeding the injection pressure of 2.0 MPa, while the sucker rod pump pumps oil from the well into the line, stop the sucker rod pump drive and wait lowering the liquid level in the annulus of the well, after which the well is examined by re-chipping the fluid level in the annular space of the well, the sucker rod pump is removed from the tool joint support of the pipe string, acid is injected into the pipe string of the well, and then by anticorrosive injection along the pipe string th liquid in 1.25 volume of the pipe string, acid is pushed out of the pipe string through the bottomhole zone of the well into the formation, the production well is held for the acid reaction in the bottomhole zone, after which the anticorrosive liquid is pumped into the annular space of the well in 1.25 volume of the pipe string , a sucker rod pump is installed in the key support of the pipe string, the drive of the sucker rod pump is started, and the sucker rod pump is pumped out of the reservoir into the trough tank to a neutral pH, after which oil is taken from the production well.

На фиг. 1-4 схематично и последовательно изображен способ обработки призабойной зоны добывающей скважины эксплуатирующейся скважинным глубинным насосом.FIG. 1-4 schematically and sequentially depicts a method for treating the bottomhole zone of a production well operated by a submersible pump.

На нефтяном месторождении эксплуатируется добывающая скважина 1, оснащенная колонной труб 2 со штанговым глубинным насосом (ШГН) 3, установленным в замковую опору 4 колонны труб 2.At the oil field, a production well 1 is operated, equipped with a pipe string 2 with a sucker rod pump (SRP) 3 installed in the key support 4 of the pipe string 2.

В процессе эксплуатации снижается дебит добываюшей скважины 1 (см. фиг. 1) из-за того, что призабойная зона 5 добывающей скважины 1 кольматируется различными отложениями (глинистой коркой, присутствующими в породе пласта 6 карбонатами кальция, магния и другими минералами и загрязненями, способными вступать в активную реакцию с кислотой). Кроме того, в призабойной зоне 5 пласта 6 добывающей скважины 1 образуются камеры-полости (на фиг. 1-4 не показано), в которых происходит накопление нефти. Все это приводит к потере фильтрационных свойств призабойной зоны 5 (см. фиг. 1) добывающей скважины 1, и как следствие к снижению притока из пласта 6, т.е. снижению дебита добывающей скважины 1.During operation, the flow rate of producing well 1 decreases (see Fig. 1) due to the fact that the bottom-hole zone 5 of the producing well 1 is clogged with various deposits (clay cake present in the rock of formation 6 with calcium, magnesium carbonates and other minerals and contaminants capable of react actively with acid). In addition, in the bottomhole zone 5 of the formation 6 of the production well 1, chamber-cavities are formed (not shown in Figs. 1-4), in which oil accumulates. All this leads to the loss of filtration properties of the bottomhole zone 5 (see Fig. 1) of the producing well 1, and as a consequence to a decrease in the inflow from the formation 6, i.e. Decrease in production rate of production well 1.

Проведением кислотной обработки производят очистку призабойной зоны 5 добывающей скважины. Это восстанавливает или повышает фильтрационные свойства призабойной зоны 5 добывающей скважины 1. На устье добывающей скважины установлены линейная 7 и затрубная 8 задвижки.By carrying out acid treatment, the bottom-hole zone 5 of the producing well is cleaned. This restores or increases the filtration properties of the bottom-hole zone 5 of the producing well 1. At the wellhead of the producing well, a linear 7 and an annular valve 8 are installed.

С целью очистки призабойной зоны 5 скважины 1 останавливают привод ШГН 3, затем устанавливают и гидравлически обвязывают между собой насосный агрегат 9 (см. фиг. 2), переключатель потока 10 жидкости, автоцистерну с антикоррозионной жидкостью (АКЖ) 11, автоцистерну с кислотой 12 и желобную емкость 13, также в гидравлическую обвязку устанавливают технологические задвижки 14, 15, 16, 17, 18. Закрывают технологические задвижки 14, 15, 16, 17, 18.In order to clean the bottomhole zone 5 of well 1, the drive of the sucker rod pump 3 is stopped, then the pump unit 9 (see Fig. 2), the fluid flow switch 10, the tank truck with the anti-corrosive liquid (AKZH) 11, the tank truck with the acid 12 and gutter tank 13, technological valves 14, 15, 16, 17, 18 are also installed in the hydraulic piping. Process valves 14, 15, 16, 17, 18 are closed.

В качестве насосного агрегата 9 применяют, например насосную установку СИН35.64 производства ООО «Завод «Синергия», РФ, г. Пермский край, г. Чермоз.As a pumping unit 9 is used, for example, a pumping unit SIN35.64 manufactured by OOO Plant Synergy, RF, Perm Territory, Chermoz.

В качестве переключателя потока 10 жидкости применяют, например переключатель потока, выпускаемый ООО «ОЗНА» Измерительные системы РФ, Республика Башкортостан, г. Октябрьский.As a fluid flow switch 10, use is made, for example, of a flow switch manufactured by OOO OZNA Measuring systems of the Russian Federation, Republic of Bashkortostan, Oktyabrsky.

В качестве автоцистерны для АКЖ и кислоты применяют, например кислотовозы марки СИН37.51 на баз прицепа «НЕФАЗ», выпускаемые ООО «Завод «Синергия», РФ, г. Пермский край, г. Чермоз.As a tanker truck for AKZh and acid, for example, acid trucks of the SIN37.51 brand are used at the bases of the NEFAZ trailer, produced by Synergy Plant LLC, Russian Federation, Perm Territory, Chermoz.

В качестве желобной емкости 13, например, применяют емкость технологическую на тракторном прицепе-шасси ЕТ 18.КШП «УНИКОМ»кислотостойкого исполнения, производства ЗАО ЗНПО «УНИКОМ» РФ, Свердловская область, г. Первоуральск.As a chute tank 13, for example, a technological tank is used on a tractor chassis trailer ET 18. KShP "UNIKOM" of acid-resistant design, produced by ZAO ZNPO "UNIKOM" RF, Sverdlovsk region, Pervouralsk.

В качестве АКЖ применяют ингибитор кислотной коррозии, например, TATOL/TATOL 1-10 м.2 по ТУ 20.59.42-007-48694360-2017, выпускаемый РФ, Республика Татарстан, г. Казань. АКЖ готовят на базе производственного обслуживания и завозят на скважину в автоцистерне 11.An acid corrosion inhibitor is used as an ACL, for example, TATOL / TATOL 1-10 m2 according to TU 20.59.42-007-48694360-2017, manufactured in the Russian Federation, Republic of Tatarstan, Kazan. AKZH is prepared on the basis of production services and delivered to the well in a tanker truck 11.

В качестве кислоты применяют, например, кислоту соляную ингибированную синтетическую техническую 12%, получаемую из кислоты соляной технической марки А по ГОСТ 857-95 путем добавления, например сточной воды плотностью 1100 кг/м.The acid used is, for example, inhibited synthetic technical acid hydrochloric acid 12%, obtained from hydrochloric acid technical grade A according to GOST 857-95 by adding, for example, waste water with a density of 1100 kg / m3.

12% соляную ингибированную синтетическую техническую завозят на скважину 1 на автоцистерне 12.12% inhibited synthetic technical salt is delivered to well 1 by tanker truck 12.

Далее исследуют скважину 1 отбивкой уровня 20 жидкости в затрубном пространстве 20 скважины 1. Отбивку уровня производят с помощью эхолота (на фиг. 1-4 не показано). Например, используют эхолот марки МИКОН-811-02, выпускаемый ООО «Микон», РФ, Республика Татарстан, г. Набережные Челны.Next, investigate the well 1 by cutting off the liquid level 20 in the annulus 20 of the well 1. The leveling off is performed using an echo sounder (not shown in Figs. 1-4). For example, they use an echo sounder of the MIKON-811-02 brand, manufactured by LLC Mikon, RF, Republic of Tatarstan, Naberezhnye Chelny.

Например, по результатам проведенных исследований уровень - L жидкости в затрубном пространстве 20 (см. фиг. 2) скважины 1 составляет 900 м.For example, according to the results of the studies carried out, the level - L of the fluid in the annulus 20 (see Fig. 2) of well 1 is 900 m.

Устанавливают переключатель потока 10 жидкости в положение «а». Открывают затрубную 8 и технологическую 17 задвижки. Включают привод ШГН 3. С помощью насосного агрегата 9 из автоцистерны 11 через переключатель потока 10 жидкости производят закачку АКЖ в затрубное пространство 20 скважины 1 в объеме 1,5-3 м3, например 2,5 м3, не превышая давление закачки 2,0 МПа, чтобы не передавить ШГН 3, находящийся в замковой опоре 4 колонны труб 2, при этом ШГН 3 откачивает нефть из скважины 1 в линию через открытую линейную задвижку 7.Set the fluid flow switch 10 to position "a". The casing 8 and process 17 valves are opened. Include the sucker rod pump 3.Using the pumping unit 9 from the tank truck 11 through the fluid flow switch 10, the ACL is injected into the annulus 20 of the well 1 in a volume of 1.5-3 m 3 , for example 2.5 m 3 , without exceeding the injection pressure 2, 0 MPa, so as not to transfer the sucker rod pump 3, which is in the key support 4 of the pipe string 2, while the sucker rod pump 3 pumps oil from well 1 into the line through the open linear valve 7.

Останавливают привод ШГН 3. Ожидают снижения уровня жидкости в затрубном пространстве 20 скважины 1, например в течении 1,5 часов с целью снижения уровня жидкости в затрубном пространстве 20 скважины 1 до значения 900 м отбитого ранее.Stop the sucker rod pump 3. Expect a decrease in the liquid level in the annular space 20 of the well 1, for example, within 1.5 hours in order to reduce the liquid level in the annular space 20 of the well 1 to a value of 900 m previously bounced.

После этого исследуют скважину 1 повторной отбивкой уровень жидкости в затрубном пространстве скважины 1. Отбивку уровня производят с помощью эхолота. Убедившись, по результатам проведенных исследований уровень - L жидкости в затрубном пространстве 20 (см. фиг. 2) скважины 1 снизился до вышеуказанного значения 900 м. В результате в стволе скважины 1 происходит замещение нефти на АКЖ.After that, the well 1 is examined by re-chipping the liquid level in the annulus of the well 1. The chipping of the level is performed using an echo sounder. Having made sure, according to the results of the studies, the level - L of the fluid in the annulus 20 (see Fig. 2) of well 1 decreased to the above-mentioned value of 900 m. As a result, oil is replaced by ALC in the wellbore of 1.

Закрывают линейную 7 и затрубную 8 задвижки, а также все линейные задвижки 14, 15, 16, 17, 18. Извлекают его из замковой опоры 4 колонны труб 2, например, с помощью подъемного крана 21, установленного на устье скважины 1.Close the linear 7 and casing 8 valves, as well as all linear valves 14, 15, 16, 17, 18. It is removed from the lock support 4 of the pipe string 2, for example, using a crane 21 installed at the wellhead 1.

Далее устанавливают переключатель потока 10 жидкости в положение «б». Закрывают линейную 7 и затрубную 8 задвижки, а также технологические 14 и 16. Открывают технологические задвижки 15, 17, 18.Next, set the fluid flow switch 10 to position "b". Line 7 and casing 8 valves are closed, as well as process valves 14 and 16. Process valves 15, 17, 18 are opened.

Определяют объем кислоты для закачки в призабойную зону 5 пласта 6, например из расчета 1,0 м3 на один метр перфорированной высоты продуктивного пласта 6. Например, при перфорированной высоте пласта равной 3,5 м объем закачки кислоты составит: 1 м3 ⋅ 3,5 = 3,5 м3.Determine the volume of acid for injection into the bottomhole zone 5 of formation 6, for example, at the rate of 1.0 m 3 per one meter of the perforated height of the productive formation 6. For example, with a perforated height of the formation equal to 3.5 m, the volume of acid injection will be: 1 m 3 ⋅ 3 , 5 = 3.5 m 3 .

С помощью насосного агрегата 9 из автоцистерны 12 через переключатель потока 10 жидкости производят закачку кислоты в колонну труб 2 скважины 1 в объеме 3 м3.With the help of the pumping unit 9 from the tanker 12 through the fluid flow switch 10, acid is pumped into the pipe string 2 of the well 1 in a volume of 3 m 3 .

Далее закрывают задвижку 15, открывают задвижку 14.Next, close the valve 15, open the valve 14.

Закачкой антикоррозионной жидкости в 1,25 объема колонны труб 2, насосным агрегатом 9 из автоцистерны 11 через переключатель потока 10 по колонне труб 2. и производят продавку кислоты из колонны труб 2 через призабойную зону 5 скважины 1 в пласт 6By pumping an anticorrosive liquid into 1.25 volumes of the pipe string 2, pumping unit 9 from the tank truck 11 through the flow switch 10 along the pipe string 2. and pumping acid from the pipe string 2 through the bottomhole zone 5 of the well 1 into the reservoir 6

Например, объем колонны труб 2 составляет 4 м3. Тогда объем АКЖ используемый для продавки кислоты в пласт 6 составляет: 1,25 ⋅ 4 м3 = 5 м3.For example, the volume of pipe string 2 is 4 m 3 . Then the volume of ACL used for pumping acid into reservoir 6 is: 1.25 ⋅ 4 m 3 = 5 m 3 .

Закрывают линейную 7 и затрубную 8 задвижки, а также все линейные задвижки 14, 15, 16, 17, 18 и осуществляют технологическую выдержку, например в течении 6 часов на реакцию кислоты в призабойной зоне 5 добывающей скважины 1.Linear 7 and annular 8 valves, as well as all linear valves 14, 15, 16, 17, 18, are closed and technological exposure is carried out, for example, within 6 hours for the acid reaction in the bottomhole zone 5 of producing well 1.

Далее устанавливают переключатель потока 9 жидкости (см. фиг. 2) в положение «а». Открывают затрубную 8 и технологическую 17 задвижки.Next, set the flow switch 9 of the liquid (see Fig. 2) in position "a". The casing 8 and process 17 valves are opened.

С помощью насосного агрегата 9 из автоцистерны 11 через переключатель потока 10 жидкости производят закачку АКЖ в затрубное пространство 20 скважины 1 в 1,25 объема колонны труб 2. Как указано выше объем колонны труб 2 составляет 4 м3. Тогда объем АКЖ составляет: 1,25 ⋅ 4 м3 = 5 м3. После чего закрывают линейную 7 и затрубную 8 задвижки, а также технологические 14 и 16. Открывают технологические задвижки 15, 17, 18.By means of the pumping unit 9 from the tank truck 11 through the fluid flow switch 10, the ACL is pumped into the annulus 20 of the well 1 in 1.25 of the volume of the pipe string 2. As mentioned above, the volume of the pipe string 2 is 4 m 3 . Then the volume of ACL is: 1.25 ⋅ 4 m 3 = 5 m 3 . After that, the linear 7 and the annular 8 valves, as well as the technological valves 14 and 16, are closed. The process valves 15, 17, 18 are opened.

АКЖ, закачанная в межколонное пространство 20 скважины 1 до закачки кислоты в призабойную зону скважины и после продавки кислоты в пласт снижает негативное воздействие кислоты на эксплуатационную колонну и подземное оборудование (колонна труб 2 и ШГН 3) скважины 1 и кратно замедляет коррозионный процесс, происходящий при проведении обработки призабойной зоны 5 скважины 1.AKL, pumped into the annular space 20 of well 1 before the acid is pumped into the bottomhole zone of the well and after the acid is pumped into the formation, reduces the negative effect of acid on the production casing and underground equipment (pipe string 2 and sucker rod pump 3) of well 1 and slows down the corrosion process that occurs when treatment of bottom-hole zone 5 of well 1.

С помощью подъемного крана устанавливают ШГН 3 в замковую опору 4 колонны труб 2. Устанавливают переключатель потока 9 жидкости (см. фиг. 4) в положение «а», открывают технологические задвижки 17 и 18, закрывают линейную 7 и затрубную 8 задвижки, а также технологические задвижки 14, 15, 17.With the help of a crane, the sucker rod pump 3 is installed in the lock support 4 of the pipe string 2. Set the fluid flow switch 9 (see Fig. 4) to position "a", open the process valves 17 and 18, close the linear 7 and annular 8 valves, and process valves 14, 15, 17.

Запускают привод ШГН 3 и производят откачку ШГН 3 отработанной жидкости из призабойной зоны 5 скважины 1 в желобную емкость 13 до нейтрального рН. Нейтральный рН=7. Величину рН замеряют на входе в желобную емкость 13.The drive of the sucker rod pump 3 is started and the sucker rod pump 3 is pumped out of the waste liquid from the bottomhole zone 5 of the well 1 into the trough tank 13 to a neutral pH. Neutral pH = 7. The pH value is measured at the entrance to the trough container 13.

Например, в начале откачки рН=5,0 и по мере откачки ШГН 3 жидкости из добывающей скважины 1 в объеме 10 м3 рН достиг нейтрального значения равного 7. После этого останавливают привод ШГН 3.For example, at the beginning of pumping, pH = 5.0 and as the sucker rod pump 3 is pumped out of the production well 1 in a volume of 10 m 3, the pH reached a neutral value equal to 7. After that, the sucker rod pump 3 drive is stopped.

Показатель рН измеряют, например с помощью цифрового портативного рН метра, выпускаемого ООО «Триас» РФ, г. Москва.The pH value is measured, for example, using a digital portable pH meter manufactured by OOO Trias RF, Moscow.

На устье скважины демонтируют: насосный агрегат 9 (см. фиг. 1), переключатель потока 10 жидкости, автоцистерну с антикоррозионной жидкостью (АКЖ) 11, автоцистерну с кислотой 12, желобную емкость 13, технологические задвижки 14, 15, 16, 17, 18. Закрывают затрубную задвижку 8 (см. фиг. 1) и открывают линейную задвижку 7.At the wellhead, the following are dismantled: pumping unit 9 (see Fig. 1), fluid flow switch 10, tank truck with anti-corrosive liquid (ACL) 11, tank truck with acid 12, chute tank 13, process valves 14, 15, 16, 17, 18 Close the annular valve 8 (see Fig. 1) and open the linear valve 7.

Вновь запускают привод ШГН 3 и осуществляют отбор нефти из добывающей скважины 1.The sucker rod pump 3 drive is started again and oil is taken from the producing well 1.

При реализации способа исключен монтаж и демонтаж оборудования на устье скважины, что гарантировано исключает загрязнение окружающей среды из-за излива на устье скважины кислоты.When implementing the method, installation and dismantling of equipment at the wellhead is excluded, which is guaranteed to exclude environmental pollution due to the outflow of acid at the wellhead.

Сокращается продолжительность обработки призабойной зоны добывающей скважины, так как все оборудование монтируется перед реализацией способа и демонтируется после реализации способа, а все работы при реализации способа проводятся путем проведения манипуляций с линейной 7, затрубной 8, технологическими 14, 15, 16, 17,18 задвижками и изменением положения «а» или «б» переключателя потока 9 жидкости, а также исключается применение пакерующего устройства.The duration of the treatment of the bottomhole zone of the production well is reduced, since all equipment is mounted before the implementation of the method and dismantled after the implementation of the method, and all work during the implementation of the method is carried out by manipulating linear 7, annular 8, technological 14, 15, 16, 17, 18 valves and by changing the position "a" or "b" of the fluid flow switch 9, and also eliminating the use of a packer device.

Снижаются затраты на реализацию способа, так как все работы производятся при спущенном в скважину эксплуатационном оборудования: колонна труб 2 и насос (ШГН 3). Поэтому не требуется привлечения бригады подземного ремонта скважины для извлечения эксплуатационного оборудования (колонны труб и насоса) из добывающей скважины, спуска в скважину технологической колонны труб, а после обработки призабойной зоны добывающей скважины для извлечение из скважины технологической колонны труб, установки в добывающей скважине эксплуатационного оборудования.The cost of implementing the method is reduced, since all work is carried out with the production equipment lowered into the well: pipe string 2 and a pump (sucker rod pump 3). Therefore, it is not required to involve a well workover team to extract the production equipment (pipe string and pump) from the production well, run the production pipe string into the well, and after processing the bottomhole zone of the production well to remove the production pipe string from the well, install production equipment in the production well. ...

Способ обработки призабойной зоны добывающей скважины эксплуатирующейся скважинным глубинным насосом позволяет:The method for treating the bottomhole zone of a production well operated by a borehole pump allows:

- снизить негативное воздействие кислоты на эксплуатационную колонну и подземное оборудование (колонну труб);- to reduce the negative effect of acid on the production casing and underground equipment (pipe string);

- исключить загрязнение окружающей среды из-за излива на устье скважины кислоты при монтаже и демонтаже оборудования на устье скважины;- to exclude environmental pollution due to acid spillage at the wellhead during installation and dismantling of equipment at the wellhead;

- сократить затраты на реализацию способа;- to reduce the cost of implementing the method;

- снизить продолжительность процесса обработки призабойной зоны добывающей скважины.- to reduce the duration of the treatment process of the bottomhole zone of the producing well.

Claims (1)

Способ обработки призабойной зоны добывающей скважины, эксплуатирующейся скважинным глубинным насосом, включающий спущенную в добывающую скважину колонну труб со штанговым глубинным насосом, вставленным в замковую опору колонны труб, исследование скважины, закачку кислоты в призабойную зону добывающей скважины, выдержку скважины и последующий отбор нефти из добывающей скважины, отличающийся тем, что останавливают привод штангового глубинного насоса, устанавливают и гидравлически обвязывают между собой насосный агрегат, переключатель потока жидкости, автоцистерну с кислотой, автоцистерну с антикоррозионной жидкостью и желобную емкость, после чего исследуют скважину отбивкой уровня жидкости в затрубном пространстве скважины, включают привод штангового глубинного насоса и производят закачку антикоррозионной жидкости в затрубное пространство скважины в объеме 1,5-3 м3, не превышая давление закачки 2,0 МПа, при этом штанговый глубинный насос откачивает нефть из скважины в линию, останавливают привод штангового глубинного насоса и ожидают снижения уровня жидкости в затрубном пространстве скважины, после чего исследуют скважину повторной отбивкой уровень жидкости в затрубном пространстве скважины, извлекают штанговый глубинный насос из замковой опоры колонны труб, производят закачку кислоты в колонну труб скважины, а затем закачкой по колонне труб антикоррозионной жидкости в 1,25 объема колонны труб производят продавку кислоты из колонны труб через призабойную зону скважины в пласт, осуществляют выдержку добывающей скважины на реакцию кислоты в призабойной зоне, после чего осуществляют закачку антикоррозионной жидкости в затрубное пространство скважины в 1,25 объеме колонны труб, устанавливают штанговый глубинный насос в замковую опору колонны труб, запускают привод штангового глубинного насоса и производят откачку штанговым глубинным насосом отработанной жидкости из пласта в желобную емкость до нейтрального рН, после чего осуществляют отбор нефти из добывающей скважины.A method for treating the bottomhole zone of a production well operated by a borehole pump, including a string of pipes lowered into a production well with a sucker rod pump inserted into the key support of the pipe string, researching the well, pumping acid into the bottomhole zone of the producing well, holding the well and then withdrawing oil from the producing well wells, characterized in that they stop the sucker rod pump drive, install and hydraulically tie together the pumping unit, the fluid flow switch, the acid tanker, the anticorrosive liquid tanker and the chute tank, after which the well is examined by beating the liquid level in the annulus of the well, turn on sucker rod pump drive and pumping anti-corrosion liquid into the annulus of the well in a volume of 1.5-3 m 3 , not exceeding the injection pressure of 2.0 MPa, while the sucker rod pump pumps oil from the well into the line, stop The sucker rod pump is driven and the liquid level in the annular space of the well is expected to decrease, after which the well is examined by re-chipping the liquid level in the annular space of the well, the sucker rod pump is removed from the pipe string tool joint, acid is injected into the well pipe string, and then by injection along the pipe string of anti-corrosive liquid in 1.25 volume of the pipe string, acid is pumped from the pipe string through the bottomhole zone of the well into the formation, the production well is held for the acid reaction in the bottomhole zone, after which the anti-corrosion liquid is injected into the annular space of the well in 1.25 volume pipe string, install a sucker rod pump in the key support of the pipe string, start the drive of the sucker rod pump and pump out the waste fluid from the reservoir into the trough tank with a sucker rod pump to a neutral pH, after which oil is withdrawn from the production well.
RU2020133515A 2020-10-12 2020-10-12 Method of treatment of bottomhole zone of production well operated with downhole pump RU2746498C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2020133515A RU2746498C1 (en) 2020-10-12 2020-10-12 Method of treatment of bottomhole zone of production well operated with downhole pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2020133515A RU2746498C1 (en) 2020-10-12 2020-10-12 Method of treatment of bottomhole zone of production well operated with downhole pump

Publications (1)

Publication Number Publication Date
RU2746498C1 true RU2746498C1 (en) 2021-04-14

Family

ID=75521175

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2020133515A RU2746498C1 (en) 2020-10-12 2020-10-12 Method of treatment of bottomhole zone of production well operated with downhole pump

Country Status (1)

Country Link
RU (1) RU2746498C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2762640C1 (en) * 2021-07-19 2021-12-21 Публичное акционерное общество «Татнефть» имени В.Д. Шашина Method for removing and preventing salt deposition in a well operated by a sucker rod pump

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4066126A (en) * 1976-12-20 1978-01-03 Mobil Oil Corporation Surfactant waterflooding with hydrocarbon slug
RU94025398A (en) * 1994-07-05 1996-06-10 Всероссийский нефтегазовый научно-исследовательский институт Method of working of face zone of production well
RU2298642C1 (en) * 2005-09-14 2007-05-10 Николай Александрович Петров Method for asphalt-tar-paraffin deposits prevention in oil production equipment
RU2373385C1 (en) * 2008-02-01 2009-11-20 Виктор Николаевич Гусаков Method for treatment of well bottom zones of production wells
RU2555975C1 (en) * 2014-07-25 2015-07-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Тюменский государственный нефтегазовый университет" (ТюмГНГУ) Method to treat bottomhole area of production well

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4066126A (en) * 1976-12-20 1978-01-03 Mobil Oil Corporation Surfactant waterflooding with hydrocarbon slug
RU94025398A (en) * 1994-07-05 1996-06-10 Всероссийский нефтегазовый научно-исследовательский институт Method of working of face zone of production well
RU2298642C1 (en) * 2005-09-14 2007-05-10 Николай Александрович Петров Method for asphalt-tar-paraffin deposits prevention in oil production equipment
RU2373385C1 (en) * 2008-02-01 2009-11-20 Виктор Николаевич Гусаков Method for treatment of well bottom zones of production wells
RU2555975C1 (en) * 2014-07-25 2015-07-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Тюменский государственный нефтегазовый университет" (ТюмГНГУ) Method to treat bottomhole area of production well

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
ЛОГИНОВ Б.Г. и др. Руководство по кислотным обработкам скважин, Москва, "Недра", 1966, с. 106-110, 117-150. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2762640C1 (en) * 2021-07-19 2021-12-21 Публичное акционерное общество «Татнефть» имени В.Д. Шашина Method for removing and preventing salt deposition in a well operated by a sucker rod pump

Similar Documents

Publication Publication Date Title
US5458198A (en) Method and apparatus for oil or gas well cleaning
RU2010104006A (en) METHOD FOR PROCESSING UNDERGROUND RESERVOIRS
Khusnutdinova et al. Experience of applying the shock wave impact method for the bottomhole zone
RU2746498C1 (en) Method of treatment of bottomhole zone of production well operated with downhole pump
RU2270913C2 (en) Method for well bottom zone treatment
US9284828B2 (en) Method for increasing hydrocarbon extraction and for ensuring the continuous operation of wells
RU2416024C1 (en) Procedure for treatment of bottomhole zone of pressure well
RU2743983C1 (en) Method for treating the bottomhole zone of a production well operated by a submersible electric centrifugal pump
RU2217584C1 (en) Method of well treatment in formation
CN114575787B (en) A plugging unblocking string and method for contaminated wells in long well sections
RU2528803C1 (en) Processing of bottomhole of low-cemented terrigenous bed at abnormally low bed pressure
RU2762640C1 (en) Method for removing and preventing salt deposition in a well operated by a sucker rod pump
RU2708647C1 (en) Method of treatment of bottomhole zone of the well
RU2816618C1 (en) Method for increasing oil recovery on carbonate reservoirs of middle carboniferous
RU2495231C1 (en) Flushing method for wells with lost-circulation formation
WO2012087466A1 (en) Inducing flowback of damaging mud-induced materials and debris to improve acid stimulation of long horizontal injection wells in tight carbonate formations
RU2717163C1 (en) Treatment method of borehole zone of productive formation
RU2237805C1 (en) Method for treatment of face-adjacent well zone
RU2156353C1 (en) Method of treatment of bottom-hole zone of oil producing well
RU2172824C1 (en) Method of treatment and demudding of bottom-hole zone of development wells
RU2243366C2 (en) Method for acoustic treatment of wells of system for preservation of bed pressure
SU1004625A1 (en) Method of working bottom-adjoining zone of injection well
RU2848487C1 (en) Device for cleaning the bottom of the formation of a pressure well
RU2848537C1 (en) Method of acid treatment of prizaboynaya zone and development of production well with side shaft
RU2753721C1 (en) Method for removing liquid from wells and bhz by hydropneumatic swabbing