[go: up one dir, main page]

RU2549659C1 - Method of abandonment of methane saturated mine - Google Patents

Method of abandonment of methane saturated mine Download PDF

Info

Publication number
RU2549659C1
RU2549659C1 RU2014114153/03A RU2014114153A RU2549659C1 RU 2549659 C1 RU2549659 C1 RU 2549659C1 RU 2014114153/03 A RU2014114153/03 A RU 2014114153/03A RU 2014114153 A RU2014114153 A RU 2014114153A RU 2549659 C1 RU2549659 C1 RU 2549659C1
Authority
RU
Russia
Prior art keywords
methane
mine
wells
isolation
mining
Prior art date
Application number
RU2014114153/03A
Other languages
Russian (ru)
Inventor
Виктор Семенович Забурдяев
Original Assignee
Федеральное государственное бюджетное учреждение науки ИНСТИТУТ ПРОБЛЕМ КОМПЛЕКСНОГО ОСВОЕНИЯ НЕДР РОССИЙСКОЙ АКАДЕМИИ НАУК (ИПКОН РАН)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Федеральное государственное бюджетное учреждение науки ИНСТИТУТ ПРОБЛЕМ КОМПЛЕКСНОГО ОСВОЕНИЯ НЕДР РОССИЙСКОЙ АКАДЕМИИ НАУК (ИПКОН РАН) filed Critical Федеральное государственное бюджетное учреждение науки ИНСТИТУТ ПРОБЛЕМ КОМПЛЕКСНОГО ОСВОЕНИЯ НЕДР РОССИЙСКОЙ АКАДЕМИИ НАУК (ИПКОН РАН)
Priority to RU2014114153/03A priority Critical patent/RU2549659C1/en
Application granted granted Critical
Publication of RU2549659C1 publication Critical patent/RU2549659C1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

FIELD: mining.
SUBSTANCE: method of extraction of methane during abandonment of methane saturated mine comprising the termination of coal mining in a working face, isolation of local sections, execution and sealing of wellheads, connection of wells to a vent pipeline and methane extraction is offered. The wells are made from mining near break-down chamber over coal block into free space of the broken-down rocks of the main roof of the stopped working face, wells connect to the main vent pipeline and methane extract before isolation of local developments and after isolation of mine.
EFFECT: increase of time of operation of vent wells and increase of volumes of extracted methane suitable for utilisation.

Description

Изобретение относится к горному делу, преимущественно к угольной промышленности, и может быть использовано для извлечения шахтного метана в процессе и после ликвидации метанообильной шахты.The invention relates to mining, mainly to the coal industry, and can be used to extract mine methane during and after the liquidation of methane mine.

Известен способ ликвидации метанообильной шахты, включающий прекращение работ по добыче угля, извлечение метана из выработанного пространства через скважины и изоляцию погашенных участковых выработок (Инструкция по дегазации угольных шахт. Серия 05. Выпуск 22. - М.: ЗАО «Научно-технический центр исследований проблем промышленной безопасности», 2012. - 250 с.).There is a known method of liquidating a methane-rich mine, including the cessation of coal mining, extraction of methane from the produced space through wells and isolation of quenched mine workings (Instructions for the degassing of coal mines. Series 05. Issue 22. - M .: Scientific and Technical Center for Research of Problems industrial safety ”, 2012. - 250 p.).

Недостатком этого способа является то, что метан из выработанного пространства извлекают через участковые скважины кратковременно в связи с погашением и изоляцией выработки.The disadvantage of this method is that methane is extracted from the produced space through the district wells for a short time in connection with the repayment and isolation of the output.

Известен способ ликвидации метанообильной шахты, включающий прекращение работ по добыче угля, извлечение метана и изоляцию выработанного пространства (Оценка ресурсов и объемов извлечения метана при подземной разработке угольных месторождений России / А.Д. Рубан, B.C. Забурдяев. - М.: ИПКОН РАН, 2005. - 152 с.).A known method of liquidating a methane-rich mine, including the cessation of coal mining, methane extraction and isolation of the mined-out space (Estimating the resources and volumes of methane extraction in underground mining of Russian coal deposits / A.D. Ruban, BC Zaburdyaev. - M .: IPKON RAS, 2005 . - 152 p.).

Недостатком этого способа является то, что извлечение метана из выработанного пространства производят через участковые скважины, которые функционируют кратковременно вследствие погашения и изоляции участковых выработок.The disadvantage of this method is that the extraction of methane from the produced space is carried out through the district wells, which operate for a short time due to the repayment and isolation of the district workings.

Наиболее близким способом является способ, включающий прекращение работ по добыче угля, извлечение метана, отключение от вакуумной системы участковых скважин и трубопровода и изоляцию погашаемых выработок (Методические основы проектирования дегазации на действующих и ликвидируемых шахтах / В.С. Забурдяев, А.Д. Рубан, Г.С. Забурдяев и др. - М.: ННЦ ГП-ИГД им. А.А. Скочинского, 2002. - 316 с.).The closest way is a method that includes stopping coal mining, extracting methane, disconnecting local wells and pipelines from the vacuum system and isolating repayable workings (Methodological principles for the design of degassing in existing and abandoned mines / V.S. Zaburdyaev, A.D. Ruban G.S. Zaburdyaev et al. - M.: NSC GP-IGD named after A.A. Skochinsky, 2002 .-- 316 p.).

И этому способу присущи недостатки вследствие того, что извлечение метана из выработанного пространства оставленного очистного забоя осуществляют кратковременно, поскольку функционирующие на выемочном участке дегазационные скважины отключают от вакуумной системы шахты в процессе погашения и изоляции участковой выработки.And this method has drawbacks due to the fact that the extraction of methane from the mined-out space of the left face is carried out for a short time, since the degassing wells operating in the extraction section are disconnected from the mine’s vacuum system in the process of extinguishing and isolating the local output.

Целью нового технологического решения является оптимальное расположение дегазационных скважин, при котором обеспечиваются продолжительность работы скважины и повышение объемов извлекаемого метана, пригодного для утилизации.The aim of the new technological solution is the optimal location of degassing wells, which ensures the duration of the well and increase the amount of recoverable methane suitable for disposal.

Поставленная цель изобретения достигается тем, что в способе ликвидации метанообильной шахты, включающем прекращение работ по добыче угля, извлечение метана, отключение от вакуумной системы участковых скважин, трубопровода и изоляцию погашенных выработок, в свободное пространство обрушенных пород кровли остановленного очистного забоя из горной выработки вблизи демонтажной камеры над целиком угля бурят скважины, герметизируют их устья от рудничной атмосферы и подсоединяют к магистральному дегазационному трубопроводу с выводом его на поверхность и сообщением с вакуумной дегазационной установкой.The object of the invention is achieved in that in a method for liquidating a methane-rich mine, including terminating coal mining operations, extracting methane, disconnecting district wells, a pipeline and isolating quenched workings, into the free space of collapsed rock of the roof of a stopped working face from a mine working near the dismantling the chambers above the whole coal drill wells, seal their mouths from the mine atmosphere and connect to the main degassing pipeline with its output and the surface and communication with a vacuum degassing installation.

Способ осуществляют следующим образом.The method is as follows.

На метанообильной угольной шахте, планируемой к ликвидации, измеряют объемы добываемого угля и метановыделения до прекращения работ по добыче угля, а после остановки очистных забоев измеряют интенсивность метановыделения из дегазационных скважин, функционирующих на выемочном участке, до отключения их от подземной вакуумной сети и погашения участковой выработки.At a methane-rich coal mine planned to be liquidated, the volumes of coal mined and methane emissions are measured until the coal mining operations are stopped, and after stopping the treatment faces, the methane emissions from degassing wells operating in the extraction site are measured until they are disconnected from the underground vacuum network and the district production is extinguished .

Для извлечения шахтного метана из подготовленной к ликвидации шахты после выдачи на поверхность основного оборудования из горной выработки вблизи демонтажной камеры над целиком угля бурят скважины в свободное пространство обрушенных пород кровли остановленного очистного забоя, герметизируют их устья от рудничной атмосферы и подсоединяют к магистральному дегазационному трубопроводу с выводом его на поверхность и сообщением с вакуумной дегазационной установкой. В качестве магистрального дегазационного трубопровода могут быть использованы дегазационные трубы, проложенные по стволу, либо специально оборудованные скважины в соответствии с положениями Инструкции по дегазации угольных шахт, а в качестве вакуумной дегазационной установки - стационарная или передвижная наземная вакуум-насосная станция (ВНС или ПН ВИС).In order to extract mine methane from a mine prepared for liquidation after issuing the main equipment from the mine near the dismantling chamber, entirely over coal is drilled into the free space of the collapsed rocks of the roof of the stopped mine face, their mouths are sealed from the mine atmosphere and connected to the main degassing pipeline with a conclusion it to the surface and in communication with a vacuum degassing installation. As the main degassing pipeline, degassing pipes laid along the bore or specially equipped wells can be used in accordance with the provisions of the Coal Mines Degassing Instructions, and as a vacuum degassing installation, a stationary or mobile ground-based vacuum pump station (ANS or PN VIS) .

Извлекаемый из шахты метан подается потребителю.Methane extracted from the mine is supplied to the consumer.

Правила измерения объемов каптируемого метана, эксплуатации оборудования вакуум-насосной станции и трубопроводов выполняют в соответствии с положениями нормативного документа и паспортов на оборудование и контрольно-измерительную аппаратуру как вакуум-насосной станции, так и потребителя извлеченного метана из закрытой шахты.The rules for measuring the volume of captive methane, the operation of the equipment of the vacuum pump station and pipelines are carried out in accordance with the provisions of the regulatory document and passports for the equipment and control equipment of both the vacuum pump station and the consumer of the extracted methane from the closed mine.

Внедрение способа позволит продолжительное время извлекать из закрытой шахты метан, пригодный для утилизации, что будет способствовать защите окружающей среды от неконтролируемого проникновения метана на поверхность, получения дополнительного экономико-экологического эффекта.The implementation of the method will allow for a long time to extract methane suitable for disposal from a closed mine, which will help to protect the environment from uncontrolled penetration of methane to the surface, to obtain an additional economic and environmental effect.

Claims (1)

Способ извлечения метана при ликвидации метанообильной шахты, включающий прекращение работ по добыче угля в очистном забое, изоляцию участковых выработок, проведение и герметизацию устьев скважин, подсоединение скважин к дегазационному трубопроводу и извлечение метана, отличающийся тем, что скважины проводят из выработки вблизи демонтажной камеры над целиком угля в свободное пространство обрушенных пород основной кровли остановленного очистного забоя, скважины подсоединяют к магистральному дегазационному трубопроводу и метан извлекают до изоляции участковых выработок и после изоляции шахты. A method for extracting methane during the liquidation of a methane-rich mine, including the termination of coal mining in the working face, isolation of local workings, conducting and sealing wellheads, connecting wells to a degassing pipeline, and extracting methane, characterized in that the wells are carried out from a mine near the dismantling chamber above the whole coal into the free space of the collapsed rocks of the main roof of the stopped working face, the wells are connected to the main degassing pipeline and methane is extracted hitch before isolation of local workings and after isolation of the mine.
RU2014114153/03A 2014-04-10 2014-04-10 Method of abandonment of methane saturated mine RU2549659C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2014114153/03A RU2549659C1 (en) 2014-04-10 2014-04-10 Method of abandonment of methane saturated mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2014114153/03A RU2549659C1 (en) 2014-04-10 2014-04-10 Method of abandonment of methane saturated mine

Publications (1)

Publication Number Publication Date
RU2549659C1 true RU2549659C1 (en) 2015-04-27

Family

ID=53289833

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2014114153/03A RU2549659C1 (en) 2014-04-10 2014-04-10 Method of abandonment of methane saturated mine

Country Status (1)

Country Link
RU (1) RU2549659C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386231A (en) * 2018-04-25 2018-08-10 淮南矿业(集团)有限责任公司 A kind of abandoned mine gas Collection utilization device and its application method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU883514A1 (en) * 1980-03-20 1981-11-23 Кузбасский Политехнический Институт Method for degassing mined space of coal bed
US4303274A (en) * 1980-06-04 1981-12-01 Conoco Inc. Degasification of coal seams
SU1559207A1 (en) * 1988-01-04 1990-04-23 Кузбасский Политехнический Институт Method of degassing an excavated space
RU2360128C1 (en) * 2008-01-29 2009-06-27 Институт горного дела Сибирского отделения Российской академии наук Method of degassing of mined-out space
RU2393353C1 (en) * 2008-11-26 2010-06-27 РОССИЙСКАЯ ФЕДЕРАЦИЯ в лице Министерства энергетики Российской Федерации Method for extracting methane on fields of abandoned coal mines

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU883514A1 (en) * 1980-03-20 1981-11-23 Кузбасский Политехнический Институт Method for degassing mined space of coal bed
US4303274A (en) * 1980-06-04 1981-12-01 Conoco Inc. Degasification of coal seams
SU1559207A1 (en) * 1988-01-04 1990-04-23 Кузбасский Политехнический Институт Method of degassing an excavated space
RU2360128C1 (en) * 2008-01-29 2009-06-27 Институт горного дела Сибирского отделения Российской академии наук Method of degassing of mined-out space
RU2393353C1 (en) * 2008-11-26 2010-06-27 РОССИЙСКАЯ ФЕДЕРАЦИЯ в лице Министерства энергетики Российской Федерации Method for extracting methane on fields of abandoned coal mines

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Инструкция по дегазации угольных шахт, выпуск 22, Москва: ЗАО НТЦ ПБ, 2012, с.183. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386231A (en) * 2018-04-25 2018-08-10 淮南矿业(集团)有限责任公司 A kind of abandoned mine gas Collection utilization device and its application method
CN108386231B (en) * 2018-04-25 2024-03-26 淮南矿业(集团)有限责任公司 Abandoned mine gas collection and utilization device and its use method

Similar Documents

Publication Publication Date Title
CN103195466B (en) A kind of directed hydraulic pressure demolition improves the method for gas permeability of coal seam
BR112012021093A2 (en) underground mining
Szlązak et al. Methane drainage from roof strata using an overlying drainage gallery
AU2017405652A1 (en) Method for stepwise construction of preferential gas migration pathway at stope in coal seam
CN105089493B (en) Ground vertical well combines pressure released seam gas pumping method with underground layer-through drilling
CN104329113B (en) A kind of method of surface drilling standing seat earth release mash gas extraction
EA201890135A1 (en) ANTI-SCALE CONSTRUCTION FOR ROLLING OUT ON METHOD 110 UNDERGROUND DEVELOPMENT WITH DESTRUCTION OF ROOF
NO20190121A1 (en) Wellbore thermal, pressure, and stress analysis above end of operating string
CN102644476A (en) Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel
SA521430660B1 (en) mineral formation in fractures in a geological formation
TN2014000507A1 (en) Method of exploiting potassium salts from an undergound deposit
Brigida et al. Methane release in drainage holes ahead of coal face
CN107816365A (en) A kind of quick-fried pumping integration anti-burst method of coal seam drilling
CN111828081A (en) A method for gas extraction and fire prevention using compound boreholes
RU2419723C1 (en) Degasation method of developed coal beds
CN108266226A (en) A kind of rock burst solution danger method based on hydraulic machinery splitting
RU2549659C1 (en) Method of abandonment of methane saturated mine
CN103940307A (en) Blasting method
SA518391195B1 (en) System and Methods for Breaking Friction Reducers In-Situ
Kawata et al. The relationship between TBM data and rockburst in long-distance tunnel, Pahang-Selangor raw water transfer tunnel, Malaysia
CN202249922U (en) Device for sealing high-pressure slip casting open hole deep hole with preposed expand tube
RU2533479C1 (en) Method of degasification of contiguous coal bed on sites of pillar mining activities
RU2807283C1 (en) Method for degassing excavated coal field
RU2607131C1 (en) Thick flat dipping ore deposits at big depths development method
Lunarzewski Gas drainage practices

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20170411