RU2388912C2 - Method for formation of dumps for technical recultivation in open development of mines - Google Patents
Method for formation of dumps for technical recultivation in open development of mines Download PDFInfo
- Publication number
- RU2388912C2 RU2388912C2 RU2008131248A RU2008131248A RU2388912C2 RU 2388912 C2 RU2388912 C2 RU 2388912C2 RU 2008131248 A RU2008131248 A RU 2008131248A RU 2008131248 A RU2008131248 A RU 2008131248A RU 2388912 C2 RU2388912 C2 RU 2388912C2
- Authority
- RU
- Russia
- Prior art keywords
- dumps
- technical
- formation
- technological
- recultivation
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 8
- 230000015572 biosynthetic process Effects 0.000 title abstract description 6
- 238000005065 mining Methods 0.000 claims abstract description 7
- 239000002689 soil Substances 0.000 claims abstract description 4
- 210000001520 comb Anatomy 0.000 abstract 1
- 239000000126 substance Substances 0.000 abstract 1
- 239000003245 coal Substances 0.000 description 4
- 239000010410 layer Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 238000005056 compaction Methods 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 235000008216 herbs Nutrition 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/32—Reclamation of surface-mined areas
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Remote Sensing (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Cultivation Of Plants (AREA)
Abstract
Description
Изобретение относится к открытым разработкам горнодобывающей промышленности, в частности к рекультивации техногенно нарушенных территорий, преимущественно в засушливых степных зонах средней Сибири. Существующие технологии добычи угля открытым способом предусматривают снятие вскрышных пород и размещение их на внутренних и внешних отвалах с последующей технической и биологической рекультивацией. Техническая рекультивация, прописанная ГОСТ (17.5,304-83, 17.502-65), предусматривает селективное или валовое формирование отвалов, выполаживание их после осадки и остывания породы, нанесение потенциально плодородного слоя вскрышных пород ППС мощностью 1-2 м, нанесение плодородного слоя почвы ПСП мощностью 1,1-1,2 м и планирование поверхности. Процесс трудоемкий по времени и затратам и малоэффективен. По этой причине рекультивация нарушенных территорий ведется горнодобывающими предприятиями по сокращенной программе в основном валовым формированием отвалов с последующим выполаживанием и подготовкой площадей под самозарастание. В засушливых условиях средней Сибири процесс самозарастания горных отвалов, усложненный переуплотненным поверхностным слоем и засушливым континентальным климатом, длится многие годы. Так как выположенные площади отвалов, засеянные травами и засаженные кустарниками и деревьями, иссушаются высокой солнечной радиацией и суховеями.The invention relates to open-pit mining, in particular to the reclamation of technologically disturbed areas, mainly in the arid steppe zones of central Siberia. Existing open-pit coal mining technologies provide for stripping rock removal and their placement on internal and external dumps with subsequent technical and biological reclamation. Technical reclamation prescribed by GOST (17.5,304-83, 17.502-65) provides for the selective or gross formation of dumps, flattening them after sedimentation and cooling of the rock, the application of a potentially fertile overburden layer of PPS with a thickness of 1-2 m, the application of a fertile soil layer of PSP 1.1-1.2 m capacity and surface planning. The process is time-consuming and time-consuming and inefficient. For this reason, reclamation of disturbed territories is carried out by mining enterprises under an abbreviated program, mainly by gross formation of dumps with subsequent flattening and preparation of areas for self-growth. In the arid conditions of central Siberia, the process of self-growth of mountain dumps, complicated by a densified surface layer and an arid continental climate, lasts for many years. Since the paved areas of the dumps, sown with herbs and planted with bushes and trees, are drained by high solar radiation and dry winds.
Наиболее близким к изобретению является техническое решение, предлагаемое Л.П.Баранником и Е.Л.Счастливцевым (Кемеровский НЦ СО РАН) «Экологические проблемы угледобывающей отрасли в регионе при переходе к устойчивому развитию.» Кемерово 1999, предусматривающее снижение переуплотненности плодородного слоя, при технической рекультивации, за счет частичного разравнивания отвалов - срезка вершин и гребней, некоторое выполаживание крутых откосов.Closest to the invention is a technical solution proposed by L. P. Barannik and E. L. Schastlivtsev (Kemerovo Scientific Center of the Siberian Branch of the Russian Academy of Sciences) “Ecological problems of the coal mining industry in the region during the transition to sustainable development.” Kemerovo 1999, which provides for the reduction of over-compaction of the fertile layer, with technical reclamation, due to the partial leveling of dumps - cutting peaks and ridges, some flattening of steep slopes.
Однако и это техническое решение в засушливых условиях степных зон средней Сибири не снижает энергоемкости процесса и его эффективности, так как процесс образования мелкозема, основы эмбриозема, происходит более эффективно на склоновых участках отвалов.However, this technical solution in the arid conditions of the steppe zones of Central Siberia does not reduce the energy intensity of the process and its efficiency, since the formation of fine earth, the basis of embryozem, occurs more efficiently on the slope sections of the dumps.
Цель изобретения - снизить затраты на техническую рекультивацию отвалов, ускорить процесс образования мелкозема и создать оптимальные по тепловым и влажностным параметрам агротехнические условия для биологической рекультивации.The purpose of the invention is to reduce the cost of technical reclamation of dumps, accelerate the formation of fine earth and create optimal agrotechnical conditions for biological reclamation in terms of thermal and humidity parameters.
Поставленная цель достигается тем, что техническую рекультивацию отвалов проводят путем формирования поверхности отвалов технологическими или насыпными гребнями с безуклонными впадинами между ними, закрытыми с обеих сторон технологическими проездами, без землевания поверхности отвалов плодородным слоем почвы.This goal is achieved in that the technical reclamation of the dumps is carried out by forming the surface of the dumps with technological or bulk ridges with steadless cavities between them, closed on both sides by technological passages, without grounding the surface of the dumps with a fertile soil layer.
Изобретение реализуется следующим образом. Железнодорожные отвалы формируют шагающими экскаваторами технологическими безуклонными гребнями на заданную высоту и шаг, с последующей засыпкой торцов впадины; автомобильные отвалы формируют плоскими с отбортовкой по периметру и отсыпкой гребней на заданные высоту и шаг (расстояние между гребнями) отсыпкой в один или несколько кузовов самосвала; бестранспортные отвалы формируют аналогично автомобильным; технологические проезды проводят на железнодорожных, бестранспортных и автомобильных отвалах по закрытым торцам впадин.The invention is implemented as follows. Railway dumps are formed by walking excavators with technological steady ridges to a given height and step, followed by backfilling of the ends of the cavity; automobile dumps are formed flat with flanging around the perimeter and filling of the ridges to the specified height and pitch (distance between the ridges) by dumping into one or several dump truck bodies; non-transport dumps form similarly to automobile ones; technological drives are carried out on railway, non-transport and automobile dumps at the closed ends of the depressions.
Проведенные институтом научные исследования и накопленные знания дают возможность сформулировать технологию как технические условия, а проведенные на полигонах угольных разрезов Хакасии практические опыты и экономические расчеты подтверждают возможность использования способа в засушливых зонах угледобычи. Способ дает возможность снизить в 7-10 раз затраты и уменьшить на 7-9 лет время биологической рекультивации.The scientific research and accumulated knowledge carried out by the institute make it possible to formulate the technology as technical conditions, and practical experiments and economic calculations carried out at the landfills of coal mines in Khakassia confirm the possibility of using the method in arid coal mining zones. The method makes it possible to reduce costs by 7-10 times and reduce the time of biological reclamation by 7-9 years.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU2008131248A RU2388912C2 (en) | 2008-07-28 | 2008-07-28 | Method for formation of dumps for technical recultivation in open development of mines |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU2008131248A RU2388912C2 (en) | 2008-07-28 | 2008-07-28 | Method for formation of dumps for technical recultivation in open development of mines |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| RU2008131248A RU2008131248A (en) | 2010-02-10 |
| RU2388912C2 true RU2388912C2 (en) | 2010-05-10 |
Family
ID=42123329
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| RU2008131248A RU2388912C2 (en) | 2008-07-28 | 2008-07-28 | Method for formation of dumps for technical recultivation in open development of mines |
Country Status (1)
| Country | Link |
|---|---|
| RU (1) | RU2388912C2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2615533C2 (en) * | 2015-04-21 | 2017-04-05 | Федеральное государственное бюджетное научное учреждение "Федеральный исследовательский центр "Красноярский научный центр Сибирского отделения Российской академии наук" (КНЦ СО РАН) | Method of high environmental capacity antierosion piles mine technical reclamation |
| RU2779159C1 (en) * | 2021-11-17 | 2022-09-05 | Федеральное государственное бюджетное научное учреждение Научно-исследовательский институт аграрных проблем Хакасии | Method for preparing the surface of automobile displays for forest direction of reclamation under drid conditions of coal mining |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113789793A (en) * | 2021-08-31 | 2021-12-14 | 国能宝日希勒能源有限公司 | Refuse dump slope remodeling method and refuse dump slope |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU898063A1 (en) * | 1980-04-03 | 1982-01-15 | Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела | Method of enhancing dump capacities |
| DE4106799A1 (en) * | 1991-03-04 | 1992-09-10 | Rheinische Braunkohlenw Ag | Reducing contamination of ground water by lignite mining spoil - by covering spoil deposits with permeable material layer of low di:sulphide content, and at least in part, surrounding by sealing and/or buffer layers |
| RU2052117C1 (en) * | 1993-08-02 | 1996-01-10 | Уральский государственный институт по проектированию предприятий горнорудной промышленности | Method for formation of dumps inside open pits |
| RU2109427C1 (en) * | 1996-06-07 | 1998-04-27 | Читинский государственный технический университет | Method for restoration of lands disturbed during open mining works |
| DE10309151A1 (en) * | 2003-02-28 | 2004-09-09 | Bul - Bergbausanierung Und Landschaftsgestaltung Brandenburg Gmbh | Water-permeable vegetative fence of fascines for the embankment systems of mining residue water comprises a net-like mat or fleece provided with a water-soluble alkalization medium and plants with humus-free substrate balls |
| RU2244393C1 (en) * | 2003-10-14 | 2005-01-20 | Федеральное государственное унитарное предприятие "Дальневосточный научно-исследовательский институт гидротехники и мелиорации" | Sandy land reclamation method |
| RU2289694C1 (en) * | 2006-01-27 | 2006-12-20 | Общество с ограниченной ответственностью "Экостройресурс" | Method for reclamation of limestone quarries during construction of industrial structures |
-
2008
- 2008-07-28 RU RU2008131248A patent/RU2388912C2/en not_active IP Right Cessation
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU898063A1 (en) * | 1980-04-03 | 1982-01-15 | Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела | Method of enhancing dump capacities |
| DE4106799A1 (en) * | 1991-03-04 | 1992-09-10 | Rheinische Braunkohlenw Ag | Reducing contamination of ground water by lignite mining spoil - by covering spoil deposits with permeable material layer of low di:sulphide content, and at least in part, surrounding by sealing and/or buffer layers |
| RU2052117C1 (en) * | 1993-08-02 | 1996-01-10 | Уральский государственный институт по проектированию предприятий горнорудной промышленности | Method for formation of dumps inside open pits |
| RU2109427C1 (en) * | 1996-06-07 | 1998-04-27 | Читинский государственный технический университет | Method for restoration of lands disturbed during open mining works |
| DE10309151A1 (en) * | 2003-02-28 | 2004-09-09 | Bul - Bergbausanierung Und Landschaftsgestaltung Brandenburg Gmbh | Water-permeable vegetative fence of fascines for the embankment systems of mining residue water comprises a net-like mat or fleece provided with a water-soluble alkalization medium and plants with humus-free substrate balls |
| RU2244393C1 (en) * | 2003-10-14 | 2005-01-20 | Федеральное государственное унитарное предприятие "Дальневосточный научно-исследовательский институт гидротехники и мелиорации" | Sandy land reclamation method |
| RU2289694C1 (en) * | 2006-01-27 | 2006-12-20 | Общество с ограниченной ответственностью "Экостройресурс" | Method for reclamation of limestone quarries during construction of industrial structures |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2615533C2 (en) * | 2015-04-21 | 2017-04-05 | Федеральное государственное бюджетное научное учреждение "Федеральный исследовательский центр "Красноярский научный центр Сибирского отделения Российской академии наук" (КНЦ СО РАН) | Method of high environmental capacity antierosion piles mine technical reclamation |
| RU2779159C1 (en) * | 2021-11-17 | 2022-09-05 | Федеральное государственное бюджетное научное учреждение Научно-исследовательский институт аграрных проблем Хакасии | Method for preparing the surface of automobile displays for forest direction of reclamation under drid conditions of coal mining |
Also Published As
| Publication number | Publication date |
|---|---|
| RU2008131248A (en) | 2010-02-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103216238B (en) | A kind of Opencut coal mine mining technique | |
| CN110409359B (en) | A method for segmented construction of bottom reservoirs in inner row open pit mines | |
| CN103216237B (en) | A kind of Opencut coal mine mining technique | |
| CN102726187A (en) | Surface ecological management method for mining subsidence area of coal mine | |
| CN111448867B (en) | Method for land reclamation of waste rock soil based on open pit coal mine rock dumping field | |
| CN109869150B (en) | A method for full mining and full mining of mine resources | |
| RU2388912C2 (en) | Method for formation of dumps for technical recultivation in open development of mines | |
| CN104047210B (en) | Rail track roadbed | |
| PH12017501665A1 (en) | Hard road construction method for natural groundwater recharge | |
| RU2374447C1 (en) | Method for reclamation of disturbed lands | |
| CN1782326B (en) | Method for treating waste rock in coal mine | |
| CN102465481A (en) | Soilbag roadbed and method | |
| RU2011149407A (en) | METHOD FOR OPEN DEVELOPMENT OF MINERAL DEPOSITS DEPOSITS WITH CREATION OF DUMP OF LARGE CAPACITY AND HEIGHT IN DIFFICULT CONDITIONS | |
| CN108331580B (en) | Clean and efficient coal mining method | |
| CN102677681A (en) | Layering processing method for rapid backfill of large-scale earthwork | |
| CN1888391A (en) | Fast spoil disposal slope protection and ecological recovery open-pit mining technology | |
| CN219621795U (en) | Reconstruction structure for repairing abandoned mine by utilizing engineering slag soil | |
| RU2274750C1 (en) | Method for land reclamation in the case of land corruption by opened deposit development | |
| CN101089297A (en) | Shallow layer vibration compaction and deep layer explosion compaction combined with high vacuum well point dewatering foundation treatment method | |
| RU2310756C1 (en) | Method for exhausted pit reclamation | |
| RU2715134C1 (en) | Peat extraction method during winter season | |
| CN116097938A (en) | A method for reclamation and land reclamation in subsidence and gully areas of coal mines filled with coal gangue | |
| CN1952349A (en) | Mining method for replacement of pressed coal under village by waste rock | |
| WO2019109601A1 (en) | Coal mining method applying alternately arranged long and short faces | |
| CN101538849B (en) | Foundation treatment method combining vibration ramming compaction at shallow layer and blasting compaction at deep layer with well-point dewatering |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| QB4A | Licence on use of patent |
Free format text: LICENCE Effective date: 20120829 |
|
| MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20130729 |
|
| NF4A | Reinstatement of patent |
Effective date: 20160227 |
|
| MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20170729 |