RU2369726C1 - Method of oil deposit development - Google Patents
Method of oil deposit development Download PDFInfo
- Publication number
- RU2369726C1 RU2369726C1 RU2008142242/03A RU2008142242A RU2369726C1 RU 2369726 C1 RU2369726 C1 RU 2369726C1 RU 2008142242/03 A RU2008142242/03 A RU 2008142242/03A RU 2008142242 A RU2008142242 A RU 2008142242A RU 2369726 C1 RU2369726 C1 RU 2369726C1
- Authority
- RU
- Russia
- Prior art keywords
- wells
- amount
- consumed
- well
- production wells
- Prior art date
Links
Landscapes
- Pipeline Systems (AREA)
Abstract
Description
Изобретение относится к нефтяной промышленности и может найти применение при разработке нефтяной залежи.The invention relates to the oil industry and may find application in the development of oil deposits.
Известен способ разработки залежи нефти на поздней стадии, включающий выделение из всего фонда пробуренных на залежи нагнетательных скважин со снижением их приемистости не менее чем на 70% от первоначальной приемистости и/или добывающих скважин с обводнением добываемой в них нефти не менее чем на 80%. Осуществляют поочередное выключение этих скважин из работы. Осуществляют контроль реакции работающих добывающих скважин количеством и/или темпом и обводнением и/или газированием извлекаемой нефти на выключение из работы каждой из выделенных скважин. Выделяют на залежи зоны реагирования на выключение из работы выделенных скважин. Осуществляют последующее стимулирование работающих добывающих скважин в выделенных зонах поочередными взрывами в выделенных скважинах. Взрывы проводят в скважинах, примыкающих к контуру выделенных зон. Взрывы осуществляют направленными с локализацией их энергии в зону продуктивного пласта (Патент РФ №2221137, опублик. 2004.01.10).There is a known method of developing an oil deposit at a late stage, including the allocation from the entire stock of injection wells drilled into the deposits with a decrease in their injectivity of at least 70% of the initial injectivity and / or production wells with a water cut of the oil produced in them of at least 80%. Carry out an alternate shutdown of these wells from work. The reaction of operating production wells is monitored by the quantity and / or rate and watering and / or aeration of the extracted oil to shut down each of the selected wells from operation. Allocate zones of the response to the shutdown of selected wells from operation. Subsequent stimulation of operating production wells in the allocated zones is carried out by successive explosions in the allocated wells. The explosions are carried out in wells adjacent to the contour of the selected zones. The explosions are carried out directed with the localization of their energy in the zone of the reservoir (RF Patent No. 2221137, published. 2004.01.10).
Известный способ не позволяет проследить остановку добывающей скважины и оперативно провести мероприятия по ликвидации простоев добывающих скважин.The known method does not allow to trace the shutdown of a producing well and to promptly take measures to eliminate downtime of producing wells.
Наиболее близким к предложенному изобретению по технической сущности является способ разработки нефтяного месторождения, включающий бурение скважин, контроль за энергетическим состоянием залежи и каждой скважины, закачку воды в нагнетательные скважины и отбор нефти из добывающих скважин. Контроль за энергетическим состоянием осуществляют путем расчета текущего пластового давления по залежи в целом и по каждой скважине (Заявка на изобретение РФ №2002118443, опублик. 2004.01.20 - прототип).Closest to the proposed invention in technical essence is a method of developing an oil field, including drilling wells, monitoring the energy state of the reservoir and each well, pumping water into injection wells, and taking oil from production wells. Monitoring the energy state is carried out by calculating the current reservoir pressure for the reservoir as a whole and for each well (Application for invention of the Russian Federation No. 2002118443, published. 2004.01.20 - prototype).
Недостатком известного способа является сложность выполнения оперативного контроля за работой добывающей скважины по текущему пластовому давлению.The disadvantage of this method is the difficulty of performing operational control over the operation of the producing well at the current reservoir pressure.
В предложенном изобретении решается задача оперативного выявления простаивающих добывающих скважин.The proposed invention solves the problem of quickly identifying idle production wells.
Задача решается тем, что в способе разработки нефтяной залежи, включающем закачку рабочего агента через нагнетательные скважины, отбор продукции через добывающие скважины и контроль за состоянием добывающих скважин, согласно изобретению добывающие скважины, запитываемые от одного источника электроэнергии, объединяют в группу, при всех работающих добывающих скважинах в группе определяют общее количество потребляемой электроэнергии, в выделенной группе проводят поочередную остановку каждой добывающей скважины и определяют количество потребляемой электроэнергии оставшимися в работе добывающими скважинами, при работе добывающих скважин проводят постоянный контроль за количеством потребляемой электроэнергии добывающими скважинами данной группы, при изменении потребляемой энергии в группе скважин выявляют измененное количество потребляемой энергии, устанавливают скважину, остановка которой приводит к достижению установленного количества потребляемой энергии, выполняют мероприятия по установлению причины остановки выявленной добывающей скважины и устранению этих причин и запускают скважину в работу.The problem is solved in that in the method of developing an oil reservoir, which includes injecting a working agent through injection wells, selecting products through production wells and monitoring the state of production wells, according to the invention, production wells fed from one electric power source are combined into a group for all operating production wells the wells in the group determine the total amount of electricity consumed, in the allocated group, each production well is stopped in turn and the quantities are determined about the energy consumed by the remaining production wells during operation, during operation of the production wells, the amount of electricity consumed by the production wells of this group is constantly monitored, when the energy consumption in the group of wells changes, the changed amount of energy consumed is detected, a well is installed, the shutdown of which leads to the achievement of the set amount of energy consumed , carry out measures to establish the cause of the shutdown of the identified production well and eliminate these reasons and run well in the job.
Признаками изобретения являются:The features of the invention are:
1. закачка рабочего агента через нагнетательные скважины;1. injection of a working agent through injection wells;
2. отбор продукции через добывающие скважины;2. selection of products through production wells;
3. контроль за состоянием добывающих скважин;3. monitoring the state of production wells;
4. объединение в группу добывающих скважин, запитываемых от одного источника электроэнергии;4. Association in a group of production wells powered from a single source of electricity;
5. при всех работающих добывающих скважинах в группе определение общего количества потребляемой электроэнергии;5. with all working production wells in the group, determining the total amount of electricity consumed;
6. в выделенной группе проведение поочередной остановки каждой добывающей скважины и определение количества потребляемой электроэнергии оставшимися в работе добывающими скважинами;6. in the selected group, holding an alternate shutdown of each production well and determining the amount of electricity consumed by the remaining production wells in operation;
7. при работе добывающих скважин проведение постоянного контроля за количеством потребляемой электроэнергии добывающими скважинами данной группы;7. during the operation of production wells, continuous monitoring of the amount of electricity consumed by production wells of this group;
8. при изменении потребляемой энергии в группе скважин выявление измененного количества потребляемой энергии;8. when changing the energy consumed in the group of wells, identifying the changed amount of energy consumed;
9. установление скважины, остановка которой приводит к достижению установленного количества потребляемой энергии;9. the establishment of a well, the shutdown of which leads to the achievement of a specified amount of energy consumed;
10. выполнение мероприятий по установлению причины остановки выявленной добывающей скважины, устранение этих причин и запуск скважины в работу.10. the implementation of measures to establish the reasons for the shutdown of the identified producing well, the elimination of these causes and the launch of the well into operation.
Признаки 1-3 являются общими с прототипом, признаки 4-10 являются существенными отличительными признаками изобретения.Signs 1-3 are common with the prototype, signs 4-10 are the salient features of the invention.
Сущность изобретенияSUMMARY OF THE INVENTION
При разработке нефтяной залежи весьма трудно зарегистрировать остановку добывающей скважины. Визуальные наблюдения за работой скважин требуют периодического присутствия на скважинах обслуживающего персонала, а реакция на остановку скважины пластового давления происходит весьма медленно. В предложенном изобретении решается задача оперативного выявления простаивающих добывающих скважин, создание предпосылок для уменьшения простоев скважин и повышения, тем самым, объемов добычи нефти. Задача решается следующим образом.When developing an oil field, it is very difficult to register a shutdown of a producing well. Visual observations of the operation of the wells require periodic attendance at the wells by service personnel, and the reaction to shutting down the formation pressure well is very slow. The proposed invention solves the problem of quickly identifying idle production wells, creating the prerequisites for reducing downtime of wells and increasing, thereby, oil production. The problem is solved as follows.
При разработке нефтяной залежи ведут закачку рабочего агента через нагнетательные скважины, отбор продукции через добывающие скважины и контроль за состоянием добывающих скважин. Добывающие скважины, запитываемые от одного источника электроэнергии, объединяют в группу. При работе всех добывающих скважин в группе определяют общее количество потребляемой электроэнергии. В выделенной группе проводят поочередную остановку каждой добывающей скважины и определяют количество потребляемой электроэнергии оставшимися в работе добывающими скважинами. При работе добывающих скважин проводят постоянный контроль за количеством потребляемой электроэнергии добывающими скважинами данной группы. При изменении потребляемой энергии в группе скважин выявляют измененное количество потребляемой энергии, устанавливают скважину, остановка которой приводит к достижению установленного количества потребляемой энергии, выполняют мероприятия по установлению причины остановки выявленной добывающей скважины и устранению этих причин и запускают скважину в работу. Определяют количество потребляемой электроэнергии запущенной в работу скважиной после устранения причин ее остановки, фиксируют новое количество потребляемой энергии и учитывают его вместо прежнего значения для данной скважины.When developing an oil deposit, the working agent is injected through injection wells, production is taken through production wells and the state of production wells is monitored. Production wells, powered from a single source of electricity, are combined into a group. During the work of all producing wells in the group, the total amount of electricity consumed is determined. In the selected group, each production well is shut down in turn and the amount of electricity consumed by the remaining production wells in operation is determined. During the operation of production wells, constant monitoring of the amount of electricity consumed by production wells of this group is carried out. When changing the consumed energy in the group of wells, a changed amount of consumed energy is detected, a well is installed, the shutdown of which leads to the achievement of the set amount of consumed energy, measures are taken to establish the cause of the shutdown of the identified producing well and eliminate these causes, and the well is put into operation. The amount of energy consumed by the well launched into operation is determined after eliminating the reasons for its shutdown, the new amount of energy consumed is fixed and taken into account instead of the previous value for this well.
Пример конкретного выполненияConcrete example
Разрабатывают нефтяную залежь со следующими характеристиками: глубина 1100 м, пластовое давление 10 МПа, пластовая температура 24°С, пористость 0,12, проницаемость 0,002 мкм2, нефтенасыщенность 0,8, направление естественной трещиноватости 310°, вязкость нефти 28 мПа·с, плотность нефти 920 кг/м3, коллектор карбонатный трещиновато-порово-кавернозный. Закачивают рабочий агент через нагнетательные скважины, отбирают нефть через добывающие скважины. 10 добывающих скважин, запитываемых от одного источника электроэнергии, объединяют в группу. При работе всех добывающих скважин в группе определяют общее количество потребляемой электроэнергии, которое равно 215 кВт. В выделенной группе проводят поочередную остановку каждой добывающей скважины и определяют количество потребляемой электроэнергии оставшимися в работе добывающими скважинами. Скважины потребляют соответственно 1 - 10,8, 2 - 40,3, 3 - 27,1, 4 - 22,8, 5 - 16,2, 6 - 25,1, 7 - 15,3, 8 - 12,7, 9 - 32,4, 10 - 13,2 кВт. При работе добывающих скважин проводят постоянный контроль за количеством потребляемой электроэнергии добывающими скважинами данной группы. Определяют, что произошло уменьшение общего количества потребляемой энергии в группе скважин на 16,2 кВт. Устанавливают, что такое потребление электроэнергии соответствует скважине 5. Выполняют мероприятия по установлению причины остановки скважины 5 и устранению этих причин и запускают скважину 5 в работу. Определяют количество потребляемой электроэнергии скважиной 5 после устранения причин ее остановки, фиксируют новое количество потребляемой энергии и учитывают его вместо прежнего значения для данной скважины. В данном случае количество потребляемой электроэнергии осталось прежним.An oil reservoir is developed with the following characteristics: depth 1100 m, reservoir pressure 10 MPa, reservoir temperature 24 ° C, porosity 0.12, permeability 0.002 μm 2 , oil saturation 0.8, direction of natural fracture 310 °, oil viscosity 28 MPa · s, oil density 920 kg / m 3 , carbonate reservoir fractured-pore-cavernous. The working agent is pumped through injection wells, oil is taken through production wells. 10 production wells, powered from a single source of electricity, are combined into a group. During the operation of all producing wells in the group, the total amount of electricity consumed is determined, which is 215 kW. In the selected group, each production well is shut down in turn and the amount of electricity consumed by the remaining production wells remaining in operation is determined. Wells consume respectively 1 - 10.8, 2 - 40.3, 3 - 27.1, 4 - 22.8, 5 - 16.2, 6 - 25.1, 7 - 15.3, 8 - 12.7 , 9 - 32.4, 10 - 13.2 kW. During the operation of production wells, constant monitoring of the amount of electricity consumed by production wells of this group is carried out. It is determined that there has been a decrease in the total amount of energy consumed in the group of wells by 16.2 kW. It is established that such power consumption corresponds to well 5. Perform measures to establish the reason for stopping well 5 and to eliminate these causes and start well 5 to work. The amount of energy consumed by the well 5 is determined after eliminating the reasons for its shutdown, the new amount of energy consumed is fixed and taken into account instead of the previous value for this well. In this case, the amount of electricity consumed remains the same.
В результате удалось сократить простои добывающих скважин на 10% и соответственно увеличить добычу нефти.As a result, it was possible to reduce the downtime of production wells by 10% and, accordingly, increase oil production.
Применение предложенного способа позволит решить задачу оперативного выявления простаивающих добывающих скважин.The application of the proposed method will solve the problem of the operational identification of idle production wells.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU2008142242/03A RU2369726C1 (en) | 2008-10-27 | 2008-10-27 | Method of oil deposit development |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU2008142242/03A RU2369726C1 (en) | 2008-10-27 | 2008-10-27 | Method of oil deposit development |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| RU2369726C1 true RU2369726C1 (en) | 2009-10-10 |
Family
ID=41260951
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| RU2008142242/03A RU2369726C1 (en) | 2008-10-27 | 2008-10-27 | Method of oil deposit development |
Country Status (1)
| Country | Link |
|---|---|
| RU (1) | RU2369726C1 (en) |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4454914A (en) * | 1982-05-03 | 1984-06-19 | Union Oil Company Of California | Method for conditioning geothermal brine to reduce scale formation |
| RU1149U1 (en) * | 1994-03-15 | 1995-11-16 | Предприятие в форме товарищества с ограниченной ответственностью "Лайф" | Device for optimizing power consumption |
| RU2189439C2 (en) * | 1999-02-22 | 2002-09-20 | Тимашев Анис Тагирович | Method of developing oil deposits and block complex system of plants for method embodiment |
| RU2002118443A (en) * | 2002-07-10 | 2004-01-20 | Общество с ограниченной ответственностью "Нефт на инновационна компани "ПЕТРОС" | A method of developing an oil field |
| RU2252453C1 (en) * | 2004-08-12 | 2005-05-20 | Смирнов Дмитрий Петрович | Method for modeling emergency, diagnostics and restoration of operation of complicated structure and computer system for realization of said method |
| RU2005118758A (en) * | 2002-11-14 | 2005-11-20 | Лтс Ломанн Терапи-Системе Аг (De) | DEVICE FOR CONTROLLED VOLTAGE MATTERING |
| RU2296305C1 (en) * | 2005-08-22 | 2007-03-27 | Закрытое Акционерное Общество Российская Приборостроительная Корпорация "Системы Управления" | Method and integrated system for individual counting and adjustment of consumption of energy resources in housing and communal services |
-
2008
- 2008-10-27 RU RU2008142242/03A patent/RU2369726C1/en active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4454914A (en) * | 1982-05-03 | 1984-06-19 | Union Oil Company Of California | Method for conditioning geothermal brine to reduce scale formation |
| RU1149U1 (en) * | 1994-03-15 | 1995-11-16 | Предприятие в форме товарищества с ограниченной ответственностью "Лайф" | Device for optimizing power consumption |
| RU2189439C2 (en) * | 1999-02-22 | 2002-09-20 | Тимашев Анис Тагирович | Method of developing oil deposits and block complex system of plants for method embodiment |
| RU2002118443A (en) * | 2002-07-10 | 2004-01-20 | Общество с ограниченной ответственностью "Нефт на инновационна компани "ПЕТРОС" | A method of developing an oil field |
| RU2005118758A (en) * | 2002-11-14 | 2005-11-20 | Лтс Ломанн Терапи-Системе Аг (De) | DEVICE FOR CONTROLLED VOLTAGE MATTERING |
| RU2252453C1 (en) * | 2004-08-12 | 2005-05-20 | Смирнов Дмитрий Петрович | Method for modeling emergency, diagnostics and restoration of operation of complicated structure and computer system for realization of said method |
| RU2296305C1 (en) * | 2005-08-22 | 2007-03-27 | Закрытое Акционерное Общество Российская Приборостроительная Корпорация "Системы Управления" | Method and integrated system for individual counting and adjustment of consumption of energy resources in housing and communal services |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| RU2496979C1 (en) | Development method of deposit of high-viscosity oil and/or bitumen using method for steam pumping to formation | |
| RU2336413C1 (en) | Method of oil pool development | |
| EA018242B1 (en) | Methods of treating a wellbore and method and system for breaking a filtercake formed on a surface of a wellbore | |
| RU2611789C1 (en) | Method of development of field of high viscous and ultra high viscous oil by thermal methods at late stage of development | |
| RU2369726C1 (en) | Method of oil deposit development | |
| RU2542016C1 (en) | Method of well bore zone treatment for productive formation | |
| CN103573235A (en) | Immovable string acidizing pressure-reducing injection-increasing process method for water injection well | |
| DK179197B1 (en) | Process for controlling the production of hydrocarbons from an underground reservoir | |
| RU2323331C1 (en) | Method for stacked oil pool development with the use of simultaneous separate working agent injection | |
| RU2543843C1 (en) | Thermoshaft method of high-viscosity oil pool development | |
| RU2451160C1 (en) | Method of acid treatment of bottom-hole formation zone with carbonate reservoir | |
| RU2368783C1 (en) | Development method of coal stratum by water jet boring-and-reaming | |
| RU2459938C1 (en) | Oil deposit development method | |
| RU2517674C1 (en) | Development method of non-homogeneous oil deposit | |
| RU2481467C1 (en) | Oil deposit development method | |
| RU2387820C1 (en) | Method to develop sticky oil and bitumen accumulation | |
| RU2481465C1 (en) | Oil deposit development method | |
| RU2382184C1 (en) | Oil field development method | |
| RU2620099C1 (en) | Method of increasing productivity of development wells and injection capacity of injection wells | |
| CN104747128A (en) | Intelligent oil production system | |
| RU2652243C1 (en) | Method of developing oil deposits | |
| RU2400620C1 (en) | Development method of high-viscosity oil field at thermal steam action on formation | |
| RU2712904C1 (en) | Development method of ultraviscous oil deposit with gas cap | |
| RU2014448C1 (en) | Method of optimizing gas-lift well operation duty | |
| Smirnov et al. | Modeling the acidizing of a carbonate formation |