RU2137886C1 - Method for erection of multistory framework building - Google Patents
Method for erection of multistory framework building Download PDFInfo
- Publication number
- RU2137886C1 RU2137886C1 RU98112632A RU98112632A RU2137886C1 RU 2137886 C1 RU2137886 C1 RU 2137886C1 RU 98112632 A RU98112632 A RU 98112632A RU 98112632 A RU98112632 A RU 98112632A RU 2137886 C1 RU2137886 C1 RU 2137886C1
- Authority
- RU
- Russia
- Prior art keywords
- columns
- reinforcement
- framework
- floor
- coverings
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 13
- 230000002787 reinforcement Effects 0.000 claims abstract description 38
- 238000005452 bending Methods 0.000 claims abstract description 6
- 238000004519 manufacturing process Methods 0.000 claims abstract description 6
- 238000009415 formwork Methods 0.000 claims description 7
- 210000002435 tendon Anatomy 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 9
- 238000009416 shuttering Methods 0.000 abstract 3
- 230000000694 effects Effects 0.000 abstract 1
- 239000000126 substance Substances 0.000 abstract 1
- 238000009434 installation Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 3
- 239000000243 solution Substances 0.000 description 2
- 238000011905 homologation Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 230000003313 weakening effect Effects 0.000 description 1
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
Description
Изобретение относится к области строительства и предназначено для монолитного возведения зданий и сооружений. The invention relates to the field of construction and is intended for monolithic construction of buildings and structures.
Известен способ возведения зданий каркасной системы ИМС, включающий установку колонн, монтаж плит перекрытий, укладку между плитами перекрытий напрягаемой арматуры в двух взаимно перпендикулярных направлениях с пропуском арматуры в отверстия, выполненные в колоннах в уровне перекрытия, натяжение арматуры и последующее омоноличивание швов между плитами и отверстий бетоном (1). A known method of erecting buildings frame system IMS, including the installation of columns, the installation of floor slabs, laying between the floor slabs of prestressed reinforcement in two mutually perpendicular directions with the passage of reinforcement into the holes made in the columns at the level of overlap, the tension of the reinforcement and subsequent monolithic joints between the plates and holes concrete (1).
Недостатком известного способа является ограничение использования монолитного бетонирования элементов каркаса из-за трудоемкости выполнения поперечных отверстий в колоннах и значительных сроков монтажа. The disadvantage of this method is the restriction of the use of monolithic concrete elements of the frame due to the complexity of the transverse holes in the columns and the significant installation time.
Наиболее близким к предлагаемому является способ возведения многоэтажного предварительно напряженного каркасного здания, включающий поэтажное возведение колонн, изготовление перекрытий, размещение в уровне перекрытий напрягаемой арматуры во взаимно перпендикулярных направлениях и натяжение ее с последующим омоноличиванием швов между плитами и отверстий. Возведение колонн производят из сборных элементов с отверстиями для пропуска напрягаемой арматуры, бетонируют пакет перекрытий и монтируют его методом подъема и соединения с колонной напрягаемой арматурой (2). Closest to the proposed one is a method of erecting a multi-storey prestressed frame building, including floor-by-floor erection of columns, production of ceilings, placement of tensioned reinforcement in mutually perpendicular directions at the level of ceilings and its tension with subsequent monolithic seams between plates and holes. The erection of columns is made from prefabricated elements with holes for the passage of prestressing reinforcement, the package of floors is concreted and mounted by lifting and connecting to the column of prestressing reinforcement (2).
Недостатками известного способа является трудоемкость возведения каркаса из-за необходимости точности установки колонн для обеспечения соосности отверстий, выполненных для пропуска напрягаемой арматуры, пропуска арматуры через эти отверстия и последующего инъецирования в них раствора после натяжения арматуры, а также длительные сроки изготовления каркаса из-за последовательного поэтажного монтажа и необходимости предварительного бетонирования пакета перекрытий. The disadvantages of this method is the complexity of the construction of the frame due to the need for accurate installation of the columns to ensure alignment of the holes made for the passage of prestressed reinforcement, the passage of reinforcement through these holes and subsequent injection of solution into them after tensioning the reinforcement, as well as the long production time of the frame due to the sequential floor installation and the need for preliminary concreting of the floor package.
Техническая задача заключается в снижении трудоемкости изготовления каркаса, сокращении сроков его возведения и повышении качества строительных работ при монолитном бетонировании за счет исключения устройства отверстий в колоннах, пропуска напрягаемой арматуры в них, инъецирования раствора в отверстия после натяжения арматуры и омоноличивания стыков колонн с перекрытиями, а также за счет возможности поэтажного бетонирования колонн и перекрытий независимо от монтажа напрягаемой арматуры, натяжения ее и последующего омоноличивания. The technical problem is to reduce the complexity of manufacturing the frame, reducing the time of its construction and improving the quality of construction work with monolithic concreting by eliminating the opening of holes in the columns, skipping prestressed reinforcement in them, injecting the solution into the holes after tensioning the reinforcement and monoling the joints of the columns with ceilings, and also due to the possibility of floor-level concreting of columns and ceilings, regardless of the installation of prestressed reinforcement, its tension and subsequent homologation.
Поставленная задача решается таким образом, что в способе возведения многоэтажного каркасного здания, включающем поэтажное возведение колонн, изготовление перекрытий, размещение в уровне перекрытий напрягаемой арматуры во взаимно перпендикулярных направлениях и натяжение ее с последующим омоноличиванием элементов каркаса, согласно изобретению, колонны и перекрытия бетонируют в опалубке каждого этажа, при этом перекрытия бетонируют с открытыми каналами для предварительно напряженной арматуры с переменной глубиной с уклоном к центру каждого пролета каркаса, равной в середине пролета толщине перекрытия, напрягаемую арматуру размещают в открытых каналах перекрытия вдоль граней колонн в соответствии с эпюрой изгибающих моментов с последующим натяжением и фиксированием арматуры на торцах перекрытия по периметру каркаса здания. The problem is solved in such a way that in the method of erecting a multi-story frame building, including floor-by-floor erection of columns, production of ceilings, placement at the level of ceilings of prestressed reinforcement in mutually perpendicular directions and tensioning it with subsequent monolithic elements of the frame, according to the invention, columns and ceilings are concreted in the formwork each floor, while the floors are concreted with open channels for prestressed reinforcement with a variable depth with a slope to the center at each span of the carcass, equal in the middle of the span to the thickness of the floor, the prestressed reinforcement is placed in the open channels of the floor along the faces of the columns in accordance with the diagram of bending moments, followed by tension and fixing the reinforcement at the ends of the floor along the perimeter of the building frame.
Предлагаемый способ отличается от известного тем, что колонны и перекрытия бетонируют в опалубке каждого этажа, при этом перекрытия бетонируют с открытыми каналами для предварительно напряженной арматуры с переменной глубиной с уклоном к центру каждого пролета каркаса, равной в середине пролета толщине перекрытия, напрягаемую арматуру размещают в открытых каналах перекрытия вдоль граней колонн в соответствии с эпюрой изгибающих моментов с последующим натяжением и фиксированием арматуры на торцах перекрытия по периметру каркаса здания. The proposed method differs from the known one in that the columns and floors are concreted in the formwork of each floor, while the floors are concreted with open channels for prestressed reinforcement with a variable depth with a slope to the center of each span of the frame, equal to the thickness of the ceiling in the middle of the span, the tensioned reinforcement is placed in open channels of overlap along the faces of the columns in accordance with the diagram of bending moments with subsequent tension and fixing of reinforcement at the ends of the overlap along the perimeter of the frame and I.
Расположение напрягаемой арматуры вдоль граней колонн в выполненных в монолитном перекрытии каналах позволяет отказаться от трудоемких операций устройства отверстий в колоннах с расположением в теле бетона при бетонировании колонн формообразуюших трубок с соблюдением большой точности их расположения, а также необходимости пропускать через отверстия напрягаемую арматуру, а после натяжения омоноличивать отверстия, и, кроме того, избежать ослабления сечения колонны и снижения несущей способности конструкции колонны, т.е. необходимости ее усиления. Выполнение каналов переменной глубины в сечении перекрытия дает возможность располагать напрягаемую арматуру в растянутых зонах, а в сжатых обычную рабочую арматуру, при этом обеспечивает возможность напрягаемую арматуру фиксировать по сечению в соответствии с эпюрой изгибающих моментов и полностью использовать ее свойства. Поэтажное бетонирование колонн и перекрытия сокращает сроки возведения каркаса, поскольку натяжение арматуры производят автономно и фиксируют ее на торцах перекрытия по периметру каркаса здания после твердения бетона и снятия опалубки. The location of the prestressed reinforcement along the faces of the columns in the channels made in a monolithic overlap allows you to abandon the laborious operations of arranging holes in the columns with the location in the body of the concrete when concreting the columns of the formative tubes with the great accuracy of their location, as well as the need to pass prestressed reinforcement through the holes, and after tension monopolize the holes, and, in addition, avoid weakening the cross section of the column and reduce the bearing capacity of the column structure, i.e. the need to strengthen it. The implementation of channels of variable depth in the cross-section of the overlap makes it possible to locate the tensioned reinforcement in the stretched zones, and in the compressed conventional working reinforcement, while providing the possibility of the tensioned reinforcement to fix the cross-section in accordance with the diagram of bending moments and make full use of its properties. Floor-level concreting of columns and floors reduces the time frame is erected, since the reinforcement is tensioned independently and fixed at the ends of the floor around the perimeter of the building frame after hardening the concrete and removing the formwork.
Способ поясняется чертежом, где на фиг. 1 изображен каркас многоэтажного здания (разрез); на фиг. 2 - А-А фиг. 1. The method is illustrated in the drawing, where in FIG. 1 shows the frame of a multi-story building (section); in FIG. 2 - AA of FIG. 1.
Способ реализуют следующим образом. The method is implemented as follows.
На возведенном фундаменте монтируют арматурный каркас колонны 1 на один, два или более этажей. Сначала устанавливают опалубку колонн на высоту этажа, затем горизонтальную опалубку перекрытия 2, в которую размещают каналообразователи, для устройства открытых каналов для напрягаемой арматуры и арматурные каркасы перекрытия. Каналообразователи размещают таким образом, чтобы они проходили вдоль граней колонн во взаимно перпендикулярных направлениях и имели у граней колонн высоту равную kd, где k -толщина защитного слоя бетона, d - диаметр напрягаемой арматуры, а в середине каждого пролета каркаса равную высоте перекрытия, а ширину - knd, где n - количество арматурных прутков. После чего производят бетонирование колонн 1 и перекрытия 2 этажа. После твердения бетона снимают каналообразователи, разбирают опалубку перекрытия и колонн, оставляя временные опоры в пролетах перекрытия, монтируют ее на следующем этаже и производят бетонирование следующего этажа каркаса и т. д. В образованные открытые каналы 3 в перекрытии 2 вдоль граней колонн 1 во взаимно перпендикулярных направлениях укладывают напрягаемую арматуру 4 и фиксируют ее с помощью элементов 5 в местах перегиба арматуры в соответствии с эпюрой изгибающих моментов. Затем производят натяжение арматуры гидродомкратами до расчетной величины усилия натяжения и фиксирование ее на торцах перекрытия с помощью анкерных устройств. В качестве преднапрягаемой арматуры используют канатную диаметром 9,12,15мм ГОСТ 13840-68 или проволочную арматуру диаметром 3 - 10 мм ГОСТ 7348-81. После чего осуществляют бетонирование открытых каналов. Операции бетонирования колонн и перекрытия этажа и натяжения арматуры ведутся автономно в непрерывном цикле и позволяют значительно снизить сроки возведения многоэтажного каркасного здания. On the erected foundation, the reinforcing cage of
Источники информации:
1. Ст Б. Копривица "Применение каркасной системы ИМС для строительства жилых и общественных зданий", ж. "Жилищное строительство", N 1, М., 1984, с. 30-32.Sources of information:
1. St. B. Koprivitsa "Application of the IMS frame system for the construction of residential and public buildings", g. "Housing",
2. SU Авторское свидетельство N981547, кл. E 04 G 21/14, БИ N 46, 1982 (прототип). 2. SU Copyright certificate N981547, cl. E 04 G 21/14, BI N 46, 1982 (prototype).
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU98112632A RU2137886C1 (en) | 1998-07-01 | 1998-07-01 | Method for erection of multistory framework building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU98112632A RU2137886C1 (en) | 1998-07-01 | 1998-07-01 | Method for erection of multistory framework building |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| RU2137886C1 true RU2137886C1 (en) | 1999-09-20 |
Family
ID=20207936
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| RU98112632A RU2137886C1 (en) | 1998-07-01 | 1998-07-01 | Method for erection of multistory framework building |
Country Status (1)
| Country | Link |
|---|---|
| RU (1) | RU2137886C1 (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2166032C1 (en) * | 1999-10-22 | 2001-04-27 | Государственное унитарное предприятие "Научно-исследовательский, проектно-конструкторский и технологический институт бетона и железобетона" | Pre-stressed reinforced concrete building skeleton |
| RU2199632C1 (en) * | 2001-06-13 | 2003-02-27 | Мартынов Александр Александрович | Process of tension of cable reinforcement while manufacturing prefabricated-monolithic floors of buildings with spanner-free frame |
| RU2206674C1 (en) * | 2001-10-11 | 2003-06-20 | Государственное унитарное предприятие "Научно-исследовательский, проектно-конструкторский и технологический институт бетона и железобетона" | Process of erection of spanner-free building frame |
| RU2632830C1 (en) * | 2016-07-19 | 2017-10-10 | Теймуриз Ильич Гуладзе | Method of erecting monolithic prestressed reinforced concrete framework of multi-section building |
| RU2710229C1 (en) * | 2019-03-05 | 2019-12-25 | Акционерное общество "СТЭФС" | Method for erection of monolithic multi-span overlapping |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0060352A1 (en) * | 1981-03-13 | 1982-09-22 | Ingenieursbureau voor Systemen en Octrooien "SPANSTAAL" B.V. | Building structure |
| US4574545A (en) * | 1984-03-30 | 1986-03-11 | Breivik-Reigstad, Inc. | Method for installing or replacing tendons in prestressed concrete slabs |
| SU1544901A1 (en) * | 1987-10-02 | 1990-02-23 | Тбилисский зональный научно-исследовательский и проектный институт типового и экспериментального проектирования жилых и общественных зданий | Ferroconcrete skeleton of building or structure |
-
1998
- 1998-07-01 RU RU98112632A patent/RU2137886C1/en active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0060352A1 (en) * | 1981-03-13 | 1982-09-22 | Ingenieursbureau voor Systemen en Octrooien "SPANSTAAL" B.V. | Building structure |
| US4574545A (en) * | 1984-03-30 | 1986-03-11 | Breivik-Reigstad, Inc. | Method for installing or replacing tendons in prestressed concrete slabs |
| SU1544901A1 (en) * | 1987-10-02 | 1990-02-23 | Тбилисский зональный научно-исследовательский и проектный институт типового и экспериментального проектирования жилых и общественных зданий | Ferroconcrete skeleton of building or structure |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2166032C1 (en) * | 1999-10-22 | 2001-04-27 | Государственное унитарное предприятие "Научно-исследовательский, проектно-конструкторский и технологический институт бетона и железобетона" | Pre-stressed reinforced concrete building skeleton |
| RU2199632C1 (en) * | 2001-06-13 | 2003-02-27 | Мартынов Александр Александрович | Process of tension of cable reinforcement while manufacturing prefabricated-monolithic floors of buildings with spanner-free frame |
| RU2206674C1 (en) * | 2001-10-11 | 2003-06-20 | Государственное унитарное предприятие "Научно-исследовательский, проектно-конструкторский и технологический институт бетона и железобетона" | Process of erection of spanner-free building frame |
| RU2632830C1 (en) * | 2016-07-19 | 2017-10-10 | Теймуриз Ильич Гуладзе | Method of erecting monolithic prestressed reinforced concrete framework of multi-section building |
| RU2710229C1 (en) * | 2019-03-05 | 2019-12-25 | Акционерное общество "СТЭФС" | Method for erection of monolithic multi-span overlapping |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107700653B (en) | Mixed connection post-tensioned prestressing assembled concrete frame system and construction method thereof | |
| WO2017219063A1 (en) | Method for constructing a concrete floor in a multistorey building | |
| RU2020210C1 (en) | Framework of multistory building | |
| RU2318099C1 (en) | Composite form of multistory building and method of erection thereof | |
| RU2220258C1 (en) | Process of erection of multilevel underground structure ( variants ) | |
| CN107587605A (en) | A kind of complete precast prestressed fabricated construction and its construction method | |
| CN108086488A (en) | Assembled frame-shear structure wall splitlevel connection structure and assembling method | |
| CN206189590U (en) | Full precast prestressed assembly structure | |
| RU2552506C1 (en) | Method for construction of monolithic structures of buildings and non-removable universal modular formwork system | |
| JP2915897B1 (en) | Building construction method | |
| RU2137886C1 (en) | Method for erection of multistory framework building | |
| CN110984367A (en) | Prefabricated building frame structure member and construction method thereof | |
| WO1990013716A1 (en) | Improved masonry block | |
| RU2184816C1 (en) | Built-up-monolithic reinforced-concrete frame of many-storied building "kazan-100" | |
| CN208363343U (en) | The fabricated shear wall of curved scissors stress separation | |
| RU2488667C2 (en) | Method to manufacture buildings and structures with layout transformed in process of operation | |
| RU2133802C1 (en) | Prestressed reinforced concrete framework of building or structure | |
| RU2281362C1 (en) | Composite reinforced concrete multistory building frame | |
| RU2338843C1 (en) | Method of multistorey building carcassing | |
| RU2226593C2 (en) | Composite multi-store building frame made of reinforced concrete | |
| RU2250966C2 (en) | Composite reinforced concrete frame for multistory building | |
| RU2000133028A (en) | CONSTRUCTIVE SYSTEM OF A MULTI-STOREY BUILDING AND METHOD OF ITS BUILDING (OPTIONS) | |
| RU2617813C2 (en) | The method of erection of prefabricated multi-storey reinforced concrete frame of a building | |
| RU2166032C1 (en) | Pre-stressed reinforced concrete building skeleton | |
| US20050093190A1 (en) | Concrete structures and construction methods |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PD4A | Correction of name of patent owner | ||
| QB4A | License on use of patent |
Effective date: 20090212 |
|
| HK4A | Changes in a published invention |