RU2135758C1 - Method of treating well bottom zone - Google Patents
Method of treating well bottom zone Download PDFInfo
- Publication number
- RU2135758C1 RU2135758C1 RU98123181A RU98123181A RU2135758C1 RU 2135758 C1 RU2135758 C1 RU 2135758C1 RU 98123181 A RU98123181 A RU 98123181A RU 98123181 A RU98123181 A RU 98123181A RU 2135758 C1 RU2135758 C1 RU 2135758C1
- Authority
- RU
- Russia
- Prior art keywords
- well
- distillate
- perforation
- injecting
- bottom zone
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 12
- 239000000243 solution Substances 0.000 claims abstract description 8
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 7
- 238000002347 injection Methods 0.000 claims abstract description 7
- 239000007924 injection Substances 0.000 claims abstract description 7
- 239000002736 nonionic surfactant Substances 0.000 claims abstract description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 6
- 238000004140 cleaning Methods 0.000 claims description 7
- 238000004519 manufacturing process Methods 0.000 abstract description 7
- 239000000126 substance Substances 0.000 abstract description 2
- 239000004094 surface-active agent Substances 0.000 description 3
- 230000003001 depressive effect Effects 0.000 description 2
- 230000035515 penetration Effects 0.000 description 2
- 241001517019 Philomachus Species 0.000 description 1
- 239000007864 aqueous solution Substances 0.000 description 1
- 125000004432 carbon atom Chemical group C* 0.000 description 1
- 239000000356 contaminant Substances 0.000 description 1
- 230000001186 cumulative effect Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000012188 paraffin wax Substances 0.000 description 1
- 229930195734 saturated hydrocarbon Natural products 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Landscapes
- Detergent Compositions (AREA)
Abstract
Description
Изобретение относится к нефтедобывающей промышленности и может быть использовано при обработке призабойной зоны добывающей скважины или скважины, переведенной в нагнетательную из добывающей. The invention relates to the oil industry and can be used in the treatment of the bottom-hole zone of a producing well or a well, transferred to the injection from the producing.
Известен способ обработки призабойной зоны скважины, включающий закачку в скважину дистиллата и технологическую выдержку [1]. A known method of processing the bottom-hole zone of the well, including the injection of distillate into the well and technological exposure [1].
Недостатком этого способа является низкая производительность скважин. The disadvantage of this method is the low productivity of the wells.
Наиболее близким к предлагаемому изобретению по технической сущности является способ обработки призабойной зоны скважины, включающий закачку в скважину дистиллата, проведение первой технологической выдержки, закачку в скважину и продавку в пласт 0,5 - 5%-ного раствора неионогенного поверхностно-активного вещества в попутной девонской воде, проведение второй технологической выдержки и выполнение дополнительной перфорации [2]. Closest to the proposed invention in technical essence is a method for processing the bottom-hole zone of a well, including injecting distillate into the well, conducting the first technological exposure, injecting into the well and injecting into the formation a 0.5 - 5% solution of nonionic surfactant in associated Devonian water, conducting a second technological exposure and performing additional perforation [2].
Недостатком этого способа является недостаточно высокая производительность скважин. The disadvantage of this method is the insufficiently high productivity of the wells.
В изобретении решается задача увеличенияе производительности скважин. The invention solves the problem of increasing the productivity of wells.
Задача решается тем, что в способе обработки призабойной зоны скважины, включающем закачку в скважину дистиллата, проведение первой технологической выдержки, закачку в скважину и продавку в пласт 0,5 - 5%-ного раствора неионогенного поверхностно-активного вещества в попутной девонской воде, проведение второй технологической выдержки и выполнение дополнительной перфорации, согласно изобретению, перед закачкой дистиллата механически очищают обсадную колонну, при выполнении дополнительной перфорации проводят депрессионную перфорацию, после чего проводят повторную очистку обсадной колонны. The problem is solved in that in a method for processing a bottom-hole zone of a well, including injecting distillate into the well, conducting the first technological exposure, injecting into the well and injecting into the formation a 0.5-5% solution of nonionic surfactant in associated Devonian water, the second technological exposure and the implementation of additional perforation, according to the invention, before the distillate is pumped, the casing is mechanically cleaned, while additional perforation is carried out, depression perforation is carried out then re-clean the casing.
Существенными признаками изобретения являются:
1. закачка в скважину дистиллата;
2. проведение первой технологической выдержки;
3. закачка в скважину и продавка в пласт 0,5 - 5%-ного раствора неионогенного поверхностно-активного вещества в попутной девонской воде;
4. проведение второй технологической выдержки;
5. выполнение дополнительной перфорации;
6. перед закачкой дистиллата механическая очистка обсадной колонны;
7. при выполнении дополнительной перфорации проведение депрессионной перфорации;
8. проведение повторной очистки обсадной колонны.The essential features of the invention are:
1. injection into the well of distillate;
2. conducting the first technological exposure;
3. injection into the well and pushing into the formation of 0.5 - 5% solution of nonionic surfactant in associated Devonian water;
4. carrying out the second technological exposure;
5. performing additional perforation;
6. before the injection of distillate, mechanical cleaning of the casing string;
7. when performing additional perforation, conducting depressive perforation;
8. re-cleaning the casing.
Признаки 1 - 5 являются сходными с прототипом, признаки 6 - 8 являются существенными отличительными признаками изобретения. Signs 1 to 5 are similar to the prototype, signs 6 to 8 are essential distinguishing features of the invention.
Сущность изобретения
При эксплуатации скважин происходит кольматация призабойной зоны и снижение продуктивности скважины. В изобретении решается задача за счет обработки призабойной зоны увеличить продуктивность скважин.SUMMARY OF THE INVENTION
During the operation of the wells, mudding of the bottomhole zone occurs and the productivity of the well decreases. The invention solves the problem by increasing the bottomhole zone to increase well productivity.
Закачка дистиллата в основном позволяет растворить парафиновые отложения, а закачка водного раствора поверхностно-активного вещества позволяет, по-видимому, воздействовать на последствия буровых растворов. Однако без дистиллатной промывки и обеспечения возможности проникновения раствора поверхностно-активного вещества в пласт невозможно провести успешную обработку. Возможность проникновения раствора поверхностно-активного вещества в пласт обеспечивается депрессионной перфорацией. При этом обеспечивается одновременная очистка перфорационных отверстий за счет возникающей вслед за перфорацией мгновенной депрессии и извлечением и удерживанием в депрессионной камере загрязнений. Применение механической очистки обсадной колонны перед закачкой дистиллата в скважину и после перфорации позволяет повысить качество очистки не только призабойной зоны, но и самой конструкции скважины. Механическую очистку проводят при спуско-подъемных операциях колонны насосно-компрессорных труб, на которых на наружной поверхности закрепляют скребки в виде ершей из проволоки и т.п. Injecting distillate basically allows you to dissolve paraffin deposits, and injecting an aqueous solution of a surfactant apparently allows you to influence the consequences of drilling fluids. However, without distillate washing and allowing the penetration of the surfactant solution into the formation, it is not possible to conduct a successful treatment. The possibility of penetration of a surfactant solution into the formation is provided by depressive perforation. This ensures simultaneous cleaning of the perforation holes due to the instant depression that occurs after perforation and the extraction and retention of contaminants in the depression chamber. The use of mechanical cleaning of the casing string before the distillate is injected into the well and after perforation improves the quality of cleaning not only in the bottomhole zone, but also in the well design itself. Mechanical cleaning is carried out during tripping operations of the tubing string, on which scrapers are fixed on the outer surface in the form of wire brushes, etc.
Дистиллат - смесь предельных углеводородов с числом атомов углерода 7 - 10. Дистиллят представляет собой легковоспламеняющуюся не растворимую в воде жидкость темно-коричневого цвета плотностью 815 кг/м3, с температурой вспышки 30oC.The distillate is a mixture of saturated hydrocarbons with the number of carbon atoms 7 - 10. The distillate is a flammable, water-insoluble dark brown liquid with a density of 815 kg / m 3 , with a flash point of 30 o C.
Пример конкретного выполнения
Пример 1. Добывающая скважина глубиной 17215 м, пересекающая продуктивный пласт с терригенным коллектором, находилась в бездействии, дебит ее был равен нулю. Никакими способами обработки призабойной зоны не удалось оживить скважину, т. е. вызвать приток. В скважину спускают колонну насосно-компрессорных труб с проволочными ершами на наружной поверхности и тем самым проводят обработку поверхности обсадной колонны. В скважину закачивают 25 м3 дистиллата. Проводят технологическую выдержку в течение 24 час. В скважину закачивают и продавливают в пласт 3%-ный раствор неионогенного поверхностно-активного вещества ОП-10 в попутной девонской воде плотностью 1,07 г/см3 в объеме 15 м3. Проводят технологическую выдержку в течение 8 час. Спускают на забой скважины кумулятивный перфоратор с депрессионной камерой и проводят перфорацию в имеющемся интервале перфорации. Поднимают колонну насосно-компрессорных труб с проволочными ершами. Скважину запускают в эксплуатацию. Дебит скважины после обработки составил 22 т нефти в сутки.Concrete example
Example 1. A production well with a depth of 17,215 m, crossing the reservoir with a terrigenous reservoir, was inactive, its flow rate was zero. It was not possible to revive the well by any means of treating the bottom-hole zone, i.e., to cause inflow. A tubing string with wire ruffs on the outer surface is lowered into the well and the surface of the casing is treated. 25 m 3 of distillate is pumped into the well. Carry out technological exposure for 24 hours. A 3% solution of non-ionic surfactant OP-10 in associated Devonian water with a density of 1.07 g / cm 3 in a volume of 15 m 3 is pumped and pushed into the well into the well. Spend technological exposure for 8 hours. A cumulative perforator with a depression chamber is lowered to the bottom of the well and perforation is carried out in the existing perforation interval. Raise the tubing string with wire brushes. The well is put into operation. The well production rate after processing amounted to 22 tons of oil per day.
Применение предложенного способа позволит освоить ранее не осваиваемые скважины и увеличить добычу нефти на залежи. The application of the proposed method will allow to develop previously undeveloped wells and increase oil production in the deposits.
Источники информации, принятые во внимание при составлении заявки:
1. Бакиров А.У. и др. Химические методы в процессах добычи нефти.-М: Наука, 1987, с. 18 - 19.Sources of information taken into account when preparing the application:
1. Bakirov A.U. and other Chemical methods in the processes of oil production.-M: Nauka, 1987, p. 18-19.
2. Патент РФ N 2060369, 1996 г. - прототип. 2. RF patent N 2060369, 1996 - a prototype.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU98123181A RU2135758C1 (en) | 1998-12-28 | 1998-12-28 | Method of treating well bottom zone |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU98123181A RU2135758C1 (en) | 1998-12-28 | 1998-12-28 | Method of treating well bottom zone |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| RU2135758C1 true RU2135758C1 (en) | 1999-08-27 |
Family
ID=20213731
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| RU98123181A RU2135758C1 (en) | 1998-12-28 | 1998-12-28 | Method of treating well bottom zone |
Country Status (1)
| Country | Link |
|---|---|
| RU (1) | RU2135758C1 (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2169833C1 (en) * | 1999-12-22 | 2001-06-27 | Акционерное общество НПФ "Геофизика" | Gear to perforate wells under depression |
| RU2175052C1 (en) * | 2000-02-09 | 2001-10-20 | Открытое акционерное общество Нефтяная компания "ПРИОРИТЕТ" | Method to increase output of wells |
| RU2182650C1 (en) * | 2001-02-21 | 2002-05-20 | Габдуллин Рафагат Габделвалиевич | Way of secondary development of productive pool |
| RU2316645C1 (en) * | 2006-08-28 | 2008-02-10 | Общество с ограниченной ответственностью "СН-Технологии" | Method for productive reservoirs treatment in gas, gas-condensate and oil well |
| RU2359114C2 (en) * | 2007-08-24 | 2009-06-20 | Сергей Александрович Ерилин | Method and facility for simultaneous selective treatment of perforation channels and treatment of bottomhole of conditionally endless thickness layer |
| RU2564427C2 (en) * | 2011-02-03 | 2015-09-27 | ТиСиО АС | Device and method for plug installation and well abandonment |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4207193A (en) * | 1978-03-24 | 1980-06-10 | Halliburton Company | Methods and compositions for removing asphaltenic and paraffinic containing deposits |
| US4673040A (en) * | 1986-04-17 | 1987-06-16 | Marathon Oil Company | Permeability restoration of damaged formations |
| SU1495429A1 (en) * | 1987-04-06 | 1989-07-23 | Государственный Научно-Исследовательский И Проектный Институт Нефтяной Промышленности "Укргипрониинефть" | Method of secondary exposing of producing formation by perforation |
| RU2042800C1 (en) * | 1992-09-23 | 1995-08-27 | Валентин Тимофеевич Гребенников | Method for treatment of well perforated zone |
| SU1637418A1 (en) * | 1989-08-08 | 1996-01-10 | Татарский Государственный Научно-Исследовательский И Проектный Институт Нефтяной Промышленности | Compound for electrohydraulic action on close to face zone of oil pool |
| RU2060369C1 (en) * | 1995-06-08 | 1996-05-20 | Акционерное общество закрытого типа "Татнефтеотдача" | Method for developing oil deposit |
| RU2072421C1 (en) * | 1996-04-19 | 1997-01-27 | Научно-техническое общество с ограниченной ответственностью "Волго-Уральский геоэкологический центр" | Method and device for perforation and treatment of downhole adjacent zone |
| RU2082877C1 (en) * | 1992-11-10 | 1997-06-27 | Вениамин Дмитриевич Куртов | Method of treatment of bottom-hole formation zone |
| RU2111348C1 (en) * | 1994-01-05 | 1998-05-20 | Валерий Петрович Дыбленко | Method of treatment and cleaning of wells and bottom-hole formation zone |
-
1998
- 1998-12-28 RU RU98123181A patent/RU2135758C1/en active
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4207193A (en) * | 1978-03-24 | 1980-06-10 | Halliburton Company | Methods and compositions for removing asphaltenic and paraffinic containing deposits |
| US4673040A (en) * | 1986-04-17 | 1987-06-16 | Marathon Oil Company | Permeability restoration of damaged formations |
| SU1495429A1 (en) * | 1987-04-06 | 1989-07-23 | Государственный Научно-Исследовательский И Проектный Институт Нефтяной Промышленности "Укргипрониинефть" | Method of secondary exposing of producing formation by perforation |
| SU1637418A1 (en) * | 1989-08-08 | 1996-01-10 | Татарский Государственный Научно-Исследовательский И Проектный Институт Нефтяной Промышленности | Compound for electrohydraulic action on close to face zone of oil pool |
| RU2042800C1 (en) * | 1992-09-23 | 1995-08-27 | Валентин Тимофеевич Гребенников | Method for treatment of well perforated zone |
| RU2082877C1 (en) * | 1992-11-10 | 1997-06-27 | Вениамин Дмитриевич Куртов | Method of treatment of bottom-hole formation zone |
| RU2111348C1 (en) * | 1994-01-05 | 1998-05-20 | Валерий Петрович Дыбленко | Method of treatment and cleaning of wells and bottom-hole formation zone |
| RU2060369C1 (en) * | 1995-06-08 | 1996-05-20 | Акционерное общество закрытого типа "Татнефтеотдача" | Method for developing oil deposit |
| RU2072421C1 (en) * | 1996-04-19 | 1997-01-27 | Научно-техническое общество с ограниченной ответственностью "Волго-Уральский геоэкологический центр" | Method and device for perforation and treatment of downhole adjacent zone |
Non-Patent Citations (1)
| Title |
|---|
| Руководство по применению системной технологии воздействия на нефтяные пласты месторождения ГЛАВТЮМЕННЕФТЕГАЗ, РД 39-0147035-254-88Р, с.69-73. Бакиров А.Ч. и др. Химические методы в процессе добычи нефти. - М.: Недра, 1987, с.18-19. * |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2169833C1 (en) * | 1999-12-22 | 2001-06-27 | Акционерное общество НПФ "Геофизика" | Gear to perforate wells under depression |
| RU2175052C1 (en) * | 2000-02-09 | 2001-10-20 | Открытое акционерное общество Нефтяная компания "ПРИОРИТЕТ" | Method to increase output of wells |
| RU2182650C1 (en) * | 2001-02-21 | 2002-05-20 | Габдуллин Рафагат Габделвалиевич | Way of secondary development of productive pool |
| RU2316645C1 (en) * | 2006-08-28 | 2008-02-10 | Общество с ограниченной ответственностью "СН-Технологии" | Method for productive reservoirs treatment in gas, gas-condensate and oil well |
| RU2359114C2 (en) * | 2007-08-24 | 2009-06-20 | Сергей Александрович Ерилин | Method and facility for simultaneous selective treatment of perforation channels and treatment of bottomhole of conditionally endless thickness layer |
| RU2564427C2 (en) * | 2011-02-03 | 2015-09-27 | ТиСиО АС | Device and method for plug installation and well abandonment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US2045899A (en) | Method of increasing production from wells | |
| US8469099B2 (en) | Hydraulic fracturing of subterranean formations | |
| US7770647B2 (en) | Hydraulic fracturing of subterranean formations | |
| RU2261986C1 (en) | Method for complex well bottom zone treatment | |
| RU2512216C1 (en) | Treatment method of bottomhole zone | |
| RU2135758C1 (en) | Method of treating well bottom zone | |
| RU2117145C1 (en) | Method for treating bottom-hole zone of producing well | |
| RU2312211C1 (en) | Method for well bottom zone treatment | |
| RU2168621C2 (en) | Method of treatment of bottom-hole formation zone | |
| RU2630938C1 (en) | Method for cleaning and treating bottomhole zone of horizontal well in bitumen deposit | |
| RU2085711C1 (en) | Method for development of terrigenous oil bed | |
| RU2042803C1 (en) | Method for reagent treatment of well | |
| US3912012A (en) | Method for removing plastic from the inside diameter of wellbore casing | |
| SU1696683A1 (en) | Method of acid treatment of face zone of encroached oil pool | |
| RU2146329C1 (en) | Method for treating bottom-hole zone of well | |
| RU2066372C1 (en) | Method for treating well critical zone | |
| RU2462586C2 (en) | Method of synergetic reactant-impulse-wave treatment of bottom-hole formation zone and plant for its implementation | |
| RU2258134C1 (en) | Treatment method for bottomhole zone of injection well | |
| RU2168620C2 (en) | Method of treatment of bottom-hole formation zone | |
| RU2117146C1 (en) | Method for treating bottom-hole zone of injection well | |
| RU2243366C2 (en) | Method for acoustic treatment of wells of system for preservation of bed pressure | |
| RU2278967C1 (en) | Method for bottomhole zone of terrigenous formation treatment | |
| RU2156353C1 (en) | Method of treatment of bottom-hole zone of oil producing well | |
| RU2101483C1 (en) | Method for treating down-hole zone of well | |
| RU2143062C1 (en) | Method of treatment of bottom-hole formation zone of injection well |