[go: up one dir, main page]

RU2184344C1 - Method for charging of flooded vertical and inclined holes (modifications) - Google Patents

Method for charging of flooded vertical and inclined holes (modifications) Download PDF

Info

Publication number
RU2184344C1
RU2184344C1 RU2001100665/03A RU2001100665A RU2184344C1 RU 2184344 C1 RU2184344 C1 RU 2184344C1 RU 2001100665/03 A RU2001100665/03 A RU 2001100665/03A RU 2001100665 A RU2001100665 A RU 2001100665A RU 2184344 C1 RU2184344 C1 RU 2184344C1
Authority
RU
Russia
Prior art keywords
well
water
shell
tape
hole
Prior art date
Application number
RU2001100665/03A
Other languages
Russian (ru)
Inventor
Г.А. Басс
Original Assignee
Басс Георгий Анатольевич
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Басс Георгий Анатольевич filed Critical Басс Георгий Анатольевич
Priority to RU2001100665/03A priority Critical patent/RU2184344C1/en
Application granted granted Critical
Publication of RU2184344C1 publication Critical patent/RU2184344C1/en

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

FIELD: mining industry, applicable for charging of flooded holes with an explosive. SUBSTANCE: a shell of waterproof paper is formed by unreeling paper tape from two spools, the paper tape width exceeding half the length of the hole circle, the obtained shell is dipped in the hole by a charging hose. For free dipping through a water column the given section of the shell is perforated by slots. The hole is charged with plastic flowing explosives that are hydrolabile in running water, the explosive is fed by the hose under the water column. According to the second modification, the shell with a perforated bottom part is dipped in the hole under the hose pressure for removal of water. The perforated shell is sealed, dipping in the hole the film shell with liquid or plastic compound with a density exceeding the water density. The hole mouth is sealed by the body of the drum feeder, an enhanced gas pressure is built up in the hole, and water is displaced from the hole by gas pressure or by pumping-out, after that the hole is charged with a hydrolabile explosive, feeding it by the drum feeder and maintaining a high gas pressure in the hole at charging, the drum feeder serves in this case as a gate. According to the third modification, after sealing of the lower part of the perforated shell the hole is charged with an oxidant, for example, nitrates of ammonium, calcium, sodium with formation of a saturated solution, after that solid components of the explosive are charged in the hole, for example, ammonium nitrate, combustible and sensitizer, trinitrotoluene is used as sensitizer. EFFECT: provided charging of the hole with running water. 3 cl, 3 dwg

Description

Изобретение относится к горной промышленности и предназначено для заряжания взрывчатым веществом (ВВ) вертикальных и наклонных скважин, пробуренных в обводненных породах. The invention relates to the mining industry and is intended for loading explosive (vertical) vertical and deviated wells drilled in flooded rocks.

Прототипом изобретения является совокупность следующих приемов заряжания: над скважиной после ее осушения размещают две катушки с лентой из водонепроницаемой бумаги или эквивалентного пленочного материала шириной, превышающей половину длины окружности скважины, и длиной, превышающей удвоенную глубину скважины, на высоту размещения катушек над ее устьем, ленту протягивают через воронку в устье скважины, направляя ленту по двум сторонам скважины с дублированием ее краев в размере избыточной ширины и с образованием цилиндрической оболочки, на прогиб ленты, протянутой через воронку, помещают торец зарядного шланга и под давлением шланга и вместе с ним опускают ленту до забоя скважины, после чего скважину заряжают ВВ, размещают в заряде средства его инициирования, концы ленты освобождают от катушек и производят забойку скважины. The prototype of the invention is a combination of the following loading methods: after the drainage, two coils with a tape of waterproof paper or equivalent film material with a width exceeding half the circumference of the well and a length exceeding twice the depth of the well by the height of the coils above the wellhead, tape are placed over the well pulled through a funnel at the wellhead, guiding the tape along two sides of the well with duplication of its edges in the amount of excess width and with the formation of a cylindrical shell cells, on the deflection of the tape stretched through the funnel, put the end of the charging hose and under pressure of the hose and with it lower the tape to the bottom of the well, after which the well is charged with explosives, the means of its initiation are charged, the ends of the tape are freed from the coils and the bottom hole is made .

Недостатком прототипа является необходимость осушения скважины перед ее заряжанием, что ограничивает область применения способа, неприменимого в скважинах с проточной водой, особенно с интенсивным водопритоком. The disadvantage of the prototype is the need to drain the well before loading it, which limits the scope of the method, not applicable in wells with running water, especially with intense water flow.

Технической задачей данного изобретения является исключение изложенного недостатка. The technical task of the present invention is the elimination of the above disadvantage.

Технический результат достигается тем, что прогиб ленты, образующий в скважине низ оболочки заряда, примыкающий к забою скважины, перфорируют таким образом, чтобы вода, находящаяся в скважине, проходила внутрь оболочки, не препятствуя ее опусканию до забоя скважины, после чего скважину заряжают ВВ, ограниченно водоустойчивым в неподвижной воде и неводоустойчивым в проточной воде. Заряжание осуществляют подачей ВВ под столб воды. The technical result is achieved by the fact that the deflection of the tape, forming the bottom of the shell of the charge adjacent to the bottom of the well, is perforated so that the water in the well passes into the shell without interfering with its lowering to the bottom of the well, after which the well is charged with explosives, limitedly waterproof in still water and non-waterproof in running water. Charging is carried out by supplying explosives under a column of water.

По второму варианту ленту с перфорацией в месте ее прогиба опускают в скважину под давлением шланга для удаления воды, продолжая прижимать низ оболочки к забою, в скважину засыпают гравий или гальку в количестве, необходимом и достаточном для придания бумажной или полимерной оболочки отрицательной плавучести, после чего шланг для откачивания воды поднимают, в скважину подают пакет из пленочного материала, содержащий жидкость или пластичную композицию, например водный раствор аммиачной селитры, водосодержащее ВВ или бентонитовую глину с водой. После опускания пакета через столб воды до забоя скважины перфорированный низ оболочки будет герметизирован. Шланг для удаления воды из скважины вновь опускают, концы ленты отделяют от катушек, в воронку вставляют корпус барабанного питателя, герметизируя и устье скважины, после чего воду из скважины удаляют, откачивая насосом при одновременной подаче в скважину газа под давлением, или воду вытесняют давлением газа, превышающим гидростатическое давление столба воды, равное высоте скважины. После осушения скважины ее заряжают неводоустойчивым ВВ, подавая его через барабанный питатель, служащий затвором, при избыточное давлении газа в скважине. According to the second variant, the tape with perforation in the place of its deflection is lowered into the well under the pressure of the hose to remove water, continuing to press the bottom of the shell to the bottom, gravel or pebbles are poured into the well in an amount necessary and sufficient to impart negative buoyancy to the paper or polymer shell, after which the hose for pumping water is raised, a packet of film material containing a liquid or plastic composition, for example, an aqueous solution of ammonium nitrate, a water-containing explosive or bentonite clay, is fed into the well water. After lowering the package through the water column until the bottom of the well, the perforated bottom of the shell will be sealed. The hose for removing water from the well is lowered again, the ends of the tape are separated from the coils, the drum feeder body is inserted into the funnel, sealing the wellhead, after which the water is removed from the well by pumping while the gas is supplied to the well under pressure, or the water is displaced by gas pressure exceeding the hydrostatic pressure of a water column equal to the height of the well. After draining the well, it is charged with a non-water-resistant explosive, feeding it through a drum feeder, which serves as a shutter, at excess gas pressure in the well.

По третьему варианту перфорированную в прогибе ленту опускают до забоя скважины через столб воды под давлением упругого элемента, например канализационного троса, полимерной ленты или зарядного шланга, засыпают гравий или гальку, прижимая дно оболочки к забою скважины, гибкий элемент поднимают и убирают из скважины, в скважину опускают пакет из пленочного материала, содержащий жидкость или пластичную композицию с отрицательной плавучестью, герметизируют перфорированный низ оболочки, после чего в скважину загружают растворимые в воде окислители, например нитраты аммония, кальция, натрия или их смеси с образованием насыщенных растворов, и загружают твердые компоненты ВВ - гранулированную аммиачную селитру, горючее и сенсибилизаторы. Гидрофобизаторы, загустители и сшивающие агенты не требуются. According to the third option, the perforated tape in the deflection is lowered to the bottom of the well through a column of water under the pressure of an elastic element, such as a sewer cable, a polymer tape or a charging hose, gravel or pebbles are poured, pressing the bottom of the shell to the bottom of the well, the flexible element is lifted and removed from the well, into a bag of film material containing a liquid or a plastic composition with negative buoyancy is lowered into the well, the perforated bottom of the shell is sealed, and then water-soluble are loaded into the well kisliteli, for example ammonium nitrate, calcium, sodium, or mixtures thereof to form a saturated solution and solid components charged BB - prilled ammonium nitrate, fuel and sensitizer. Water repellents, thickeners and crosslinking agents are not required.

Способ заряжения скважины и его варианты иллюстрируются чертежами, где на фиг.1 и 2 - схема в двух проекциях первого варианта способа заряжания, на фиг.3 - схема второго варианта. The method of charging the well and its variants are illustrated by drawings, where in Fig.1 and 2 is a diagram in two projections of the first embodiment of the loading method, Fig.3 is a diagram of the second embodiment.

На чертежах приняты следующие обозначения: 1 - скважина, 2 - катушки с лентой, 3 - лента, 4 - воронка, 5 - зарядный шланг, 6 - опорная плита, 7 - кресообразные прорези на прогибе ленты после ее пропускания через воронку, образующей низ цилиндрической оболочки, после опускания примыкающий к забою скважины (фиг.1 и 2); 8 - гравий или галька, 9 - пакет из пленочного материала, содержащий жидкость или пластичную композицию, герметизирующие перфорированный низ оболочки, 10 - барабанный питатель, 11 - патрубок к шлангу для подачи в скважину газа под давлением, 12 - шланг для удаления воды из скважины. The following notation is used in the drawings: 1 - well, 2 - reels with tape, 3 - tape, 4 - funnel, 5 - charging hose, 6 - base plate, 7 - recesses on the deflection of the tape after passing through the funnel, forming the bottom of the cylindrical shell, after lowering adjacent to the bottom of the well (Fig.1 and 2); 8 - gravel or pebbles, 9 - a package of film material containing a liquid or plastic composition, sealing the perforated bottom of the shell, 10 - drum feeder, 11 - pipe to the hose for supplying pressure gas to the well, 12 - hose for removing water from the well .

Примеры применения способа
1) При диаметре скважины 243 мм половина ее окружности 332 мм, при избытке 20% ширина ленты составит 458 мм, а ширина сдублированных краев ленты на поверхности скважины будет 38 мм.
Application examples of the method
1) With a well diameter of 243 mm, half of its circumference is 332 mm, with an excess of 20%, the width of the tape will be 458 mm, and the width of the duplicated edges of the tape on the surface of the well will be 38 mm.

Применяют бумагу упаковочную битумированную БУ-Б и дегтевую БУ-Д ГОСТ 515-77 и бумагу двухслойную водонепроницаемую упаковочную ГОСТ 8828-89. Бумагу, выпускаемую в рулонах шириной от 600 до 2100 мм, нарезают на ленты шириной, определяемой диаметром скважин, и наматывают на каждую из двух катушек поровну. Ленту 3 перед протягиванием через воронку 4 перфорируют в месте прогиба над воронкой, прорезая ножом с кинжальной заточкой крестообразные прорези 7. Apply bituminous packaging paper BU-B and tar BU-D GOST 515-77 and two-layer waterproof packaging paper GOST 8828-89. Paper produced in rolls with a width of 600 to 2100 mm is cut into strips of a width determined by the diameter of the wells and wound equally on each of the two coils. The tape 3 is punched before being pulled through the funnel 4 at the deflection point above the funnel, cutting cross-shaped slots 7 with a knife with a dagger sharpening.

На центральную часть прогиба ленты помещают торец зарядного шланга 5, который опускают вместе с лентой 3 до забоя скважины 1. Крестообразные щелевые прорези образуют лепестки, отгибающиеся при движении ленты через столб воды. При длине прорезей 3-4 см четыре таких крестообразных прорезей образуют квадратные отверстия общей площадью 36-64 см2, что обеспечит беспрепятственное опускание оболочки через столб воды, до забоя скважины, после чего по зарядному шлангу под столб воды подают ВВ: акватолы Т-20, ГЛТ-20, карбатол, порэмит, смесь эмульсионного ВВ с составом АС-ДТ в таком соотношении, чтобы эмульсия заполняла межгранульное пространство.On the central part of the deflection of the tape is placed the end of the charging hose 5, which is lowered together with the tape 3 to the bottom of the well 1. Cross-shaped slotted slots form petals, bending when the tape moves through a column of water. With a length of cuts of 3-4 cm, four such cruciform cuts form square holes with a total area of 36-64 cm 2 , which will ensure unimpeded lowering of the shell through the column of water until the bottom of the well, after which explosives are supplied through the charging hose under the column of water: T-20 aquatoles , GLT-20, carbatol, poremit, a mixture of emulsion explosives with the composition of AC-DT in such a ratio that the emulsion fills the intergranular space.

2) Бумажную ленту с крестообразными прорезями под давлением шланга 12 для откачивания воды опускают до забоя скважины, в скважину засыпают гравий или гальку 8 для исключения подъема в воде бумажной оболочки, после чего шланг 12 поднимают и в скважину подает пакет 9 из пленочного материала, содержащий водный раствор аммиачной селитры или пластичные композиции: водосодержащее ВВ, бентонитовую глину с водой. Пакет заполняют до 75-80% его объема для того, чтобы после опускания до забоя скважины содержимое пакета приняло любую форму и полностью заполнило все призабойное пространство, благодаря плотности, в 1,5 раза превышающей плотность воды, вытеснило воду и надежно герметизировало донную часть оболочки заряда с прорезями. 2) A paper tape with cross-shaped slots under the pressure of the hose 12 for pumping water is lowered to the bottom of the well, gravel or pebbles 8 are poured into the well to prevent the paper shell from rising in the water, after which the hose 12 is lifted and a packet 9 of film material is supplied to the well, containing an aqueous solution of ammonium nitrate or plastic compositions: a water-containing explosive, bentonite clay with water. The package is filled up to 75-80% of its volume so that after lowering to the bottom of the well, the contents of the package take any shape and completely fill the entire bottom hole, due to a density 1.5 times the density of water, it displaces water and reliably seals the bottom of the shell charge with slots.

Пакет с жидкостью, суспензией или желатиной опускают в режиме свободного падения. Стенки скважины покрыты бумажной оболочкой, что исключает разрыв полимерной пленки пакета, а в воде пакет плавно опустится до забоя. A bag of liquid, suspension or gelatin is lowered in a free fall mode. The walls of the well are covered with a paper shell, which eliminates the rupture of the polymer film of the bag, and in the water the bag gradually drops to the bottom.

После изложенного опускают шланг 12 до упора о пакет с герметизирующим материалом, слегка приподнимают шланг для откачивания воды, концы ленты 3 отделяют от катушек 2 и в воронку 4 вставляют корпус барабанного питателя 10, герметизируя устье скважины. Воду откачивают насосом при одновременной подаче в скважину по патрубку 11 газа под давлением, что необходимо для исключения отслаивания бумажной ленты от стенок скважины под давлением грунтовых вод в массиве, окружающем скважину, с образованием продольной щели на стыке ленты, в местах дублирования ее краев, что может сопровождаться проникновением воды в откачиваемый объем. After the foregoing, lower the hose 12 until it stops against a bag of sealing material, slightly raise the hose for pumping water, the ends of the tape 3 are separated from the coils 2 and the drum feeder housing 10 is inserted into the funnel 4, sealing the wellhead. Water is pumped out while gas is supplied to the well through the pipe 11 under pressure, which is necessary to prevent peeling of the paper tape from the walls of the well under ground water pressure in the array surrounding the well, with the formation of a longitudinal gap at the junction of the tape, in places of duplication of its edges, which may be accompanied by the penetration of water into the pumped volume.

Вода из скважины кроме насоса может быть удалена по шлангу 12 давлением газа, превышающим гидростатическое давление столба воды высотой, несколько превышающей глубину скважины на небольшую величину, необходимую для слива воды. Water from the well, in addition to the pump, can be removed via a hose 12 with a gas pressure exceeding the hydrostatic pressure of a water column with a height slightly exceeding the depth of the well by a small amount necessary to drain the water.

После осушения скважину заряжают неводоустойчивым ВВ, подавая ВВ барабанным питателем, который служит затвором, продолжая при этом прижимать к стенкам скважины водонепроницаемую оболочку из ленты давлением газа в скважине. After drainage, the well is charged with a non-water-resistant explosive, feeding the explosive with a drum feeder, which serves as a shutter, while continuing to press the waterproof casing of the tape against the walls of the well with gas pressure in the well.

3) По третьему варианту ленту с крестообразными прорезями опускают до забоя скважины под давлением упругого тела, например канализационного троса, полимерной ленты или зарядного шланга, продолжая прижимать к забою упругим элементом донную часть оболочки, в скважину засыпают гравий или гальку для исключения подъема бумажной оболочки в воде, после чего упругий элемент поднимают и удаляют из скважина, и в скважину подают пакет из пленочного материале, содержащий водный раствор аммиачной селитры, водосодержащее ВВ или бентонитовую глину с водой, заполняющие пакет на 75-80% его объема, и в скважину загружают растворимые в воде окислители, например нитраты аммония, кальция, натрия или их смеси с образованием насыщенных растворов при температуре воды в скважине, и после изложенного в скважину засыпают твердые компоненты ВВ - гранулированную аммиачную селитру, горючее и сенсибилизаторы, в качестве последнего - гранулированный тротил. 3) According to the third option, the tape with cross-shaped slots is lowered to the bottom of the well under the pressure of an elastic body, such as a sewer cable, a polymer tape or a charging hose, while continuing to press the bottom of the shell against the bottom of the elastic element, gravel or pebbles are poured into the well to prevent the paper shell from rising into water, after which the elastic element is lifted and removed from the well, and a packet of film material containing an aqueous solution of ammonium nitrate, a water-containing explosive or bentonite clay with odes that fill the bag to 75-80% of its volume, and water-soluble oxidizing agents, for example, ammonium, calcium, sodium nitrates or a mixture of them, are formed into the well to form saturated solutions at water temperature in the well, and after the above, solid explosive components are poured into the well - granular ammonium nitrate, fuel and sensitizers, granulated TNT as the latter.

Известные предложения по уменьшению потерь ВВ в обводненных скважинах путем предварительной загрузки в скважину аммиачной селитры и после образования насыщенного раствора загружать неводоустойчивое ВВ совершенно не улучшило водоустойчивость ВВ в скважинах с проточной водой и лишь сопровождалось дополнительными потерями аммиачной селитры. Known proposals to reduce the loss of explosives in flooded wells by pre-loading ammonium nitrate into the well and after the formation of a saturated solution to load a non-water-resistant explosive did not at all improve the water resistance of the explosive in wells with running water and was only accompanied by additional losses of ammonium nitrate.

Благодаря проведению описанных операций в изолированном от окружающего массива объеме скважины, описанный способ осуществляется без потерь компонентов и без ухудшения экологии региона. Due to the performance of the described operations in a well volume isolated from the surrounding array, the described method is carried out without loss of components and without compromising the ecology of the region.

Источники информации
RU 2159405, F 42 D 1/08, 09.07.1999.
Sources of information
RU 2159405, F 42 D 1/08, 07/09/1999.

Claims (3)

1. Способ заряжания обводненных скважин взрывчатым веществом (ВВ), включающий размещение над скважиной двух катушек с лентой из водонепроницаемой бумаги или эквивалентного пленочного материала шириной, превышающей половину длины окружности скважины, и длиной, превышающей удвоенную глубину скважины на высоту размещения катушек над ее устьем, протягивание ленты через воронку под давлением зарядного шланга, направляя ленту по двум сторонам скважины с дублированием ее краев в размере избыточной ширины, отличающийся тем, что прогиб ленты, образующий в скважине низ оболочки заряда, примыкающий к забою скважины, перфорируют таким образом, чтобы вода проходила внутрь оболочки, не препятствуя ее опусканию через столб воды до забоя скважины, после чего скважину заряжают ВВ, ограниченно водоустойчивым в неподвижной воде и неводоустойчивым в проточной воде, подавая ВВ под столб воды. 1. The method of loading flooded wells with explosives (BB), comprising placing over the well two coils with a tape of waterproof paper or equivalent film material with a width exceeding half the circumference of the well and a length exceeding twice the depth of the well by the height of the coils above its mouth, pulling the tape through the funnel under the pressure of the charging hose, directing the tape on two sides of the well with duplication of its edges in the amount of excess width, characterized in that the deflection of the tape, about the bottom of the charge shell that is in the borehole and adjacent to the bottom of the borehole is perforated so that water passes into the shell without interfering with its lowering through the column of water until the bottom of the borehole, after which the borehole is charged with explosives that are limitedly waterproof in still water and non-waterproof in running water, feeding explosives under a column of water. 2. Способ заряжания обводненных скважин ВВ, включающий размещение над скважиной двух катушек с лентой из водонепроницаемой бумаги или эквивалентного пленочного материала шириной, превышающей половину длины окружности скважины, и длиной, превышающей удвоенную глубину скважины на высоту размещения катушек над ее устьем, протягивание ленты через воронку под давлением шланга, направляя ленту по двум сторонам скважины с дублированием ее краев в размере избыточной ширины, отличающийся тем, что прогиб ленты, образующий в скважине низ оболочки заряда, примыкающий к забою скважины, перфорируют, опускают до забоя скважины под давлением шланга для откачивания воды, продолжают прижимать низ оболочки к забою и в скважину засыпают гравий или гальку в количестве, необходимом и достаточном для придания бумажной или полимерной оболочке отрицательной плавучести, после чего шланг для откачивания воды поднимают, в скважину подают пакет из пленочного материала, содержащий жидкость или пластичную композицию, например водный раствор аммиачной селитры, водосодержащее ВВ или бентонитовую глину с водой, пакет после опускания до забоя через столб воды герметизирует перфорированную часть оболочки, затем концы ленты отделяют от катушек, в воронку вставляют корпус барабанного питателя и герметизируют устье скважины, в скважину подают газ под давлением, воду из скважины удаляют по шлангу, вытесняя давлением газа или откачивая насосом, после осушения скважины ее заряжают неводоустойчивым ВВ, подавая ВВ через барабанный питатель, служащий затвором, при этом продолжают прижимать к стенкам скважины водонепроницаемую оболочку давлением газа в скважине. 2. A method of loading flooded well BB, comprising placing over the well two coils with a tape of waterproof paper or equivalent film material with a width exceeding half the circumference of the well and a length exceeding twice the depth of the well by the height of the coils above its mouth, pulling the tape through the funnel under the pressure of the hose, directing the tape on two sides of the well with duplication of its edges in the amount of excess width, characterized in that the deflection of the tape, forming the bottom of the shell in the well charge adjacent to the bottom of the well is perforated, lowered to the bottom of the well under pressure of a hose for pumping water, continue to press the bottom of the shell to the bottom, and gravel or pebbles are poured into the well in an amount necessary and sufficient to impart negative buoyancy to the paper or polymer shell, after which the hose for pumping water is raised, a bag of film material containing a liquid or plastic composition, for example, an aqueous solution of ammonium nitrate, a water-containing explosive or bentonite g, is fed into the well a line with water, the bag after lowering to the bottom through the water column seals the perforated part of the shell, then the ends of the tape are separated from the coils, the drum feeder body is inserted into the funnel and the wellhead is sealed, gas is supplied to the well under pressure, water is removed from the well through the hose, displacing gas pressure or pumping it out, after the well has been drained, it is charged with a non-water-resistant explosive, feeding the explosive through a drum feeder serving as a shutter, while the waterproof shell pressure is pressed against the walls of the well gas in the well. 3. Способ заряжания обводненных скважин ВВ, включающий размещение над скважиной двух катушек с лентой из водонепроницаемой бумаги или эквивалентного пленочного материала шириной, превышающей половину длины окружности скважины, и длиной, превышающей удвоенную глубину скважины на высоту размещения катушек над ее устьем, протягивание ленты через воронку под давлением шланга, направляя ленту по двум сторонам скважины с дублированием ее краев в размере избыточной длины, отличающийся тем, что прогиб ленты, образующий в скважине низ оболочки заряда, примыкающий к забою скважины, перфорируют, опускают до забоя скважины под давлением упругого тела, например канализационного троса, полимерной ленты или зарядного шланга, продолжают прижимать низ оболочки к забою и в скважину засыпают гравий или гальку в количестве, необходимом и достаточном для придания материалу оболочки отрицательной плавучести, упругое тело убирают из скважины и в скважину опускают пакет из пленочного материала, содержащий жидкость или пластичную композицию, например водный раствор аммиачной селитры, водосодержащее ВВ или бентонитовую глину с водой, которые после опускания до забоя герметизируют перфорированную часть оболочки, после герметизации оболочки в скважину загружают окислители, например нитраты аммония, кальция, натрия или их смеси с образованием насыщенного раствора, и загружают твердые компоненты ВВ - гранулированную аммиачную селитру, горючее и сенсибилизаторы, в качестве последнего предпочтительнее тротил. 3. The method of loading waterlogged BB explosives, including placing over the well two coils with a tape of waterproof paper or equivalent film material with a width exceeding half the circumference of the well and a length exceeding twice the depth of the well by the height of the coils above its mouth, pulling the tape through the funnel under pressure of the hose, directing the tape on two sides of the well with duplication of its edges in the amount of excess length, characterized in that the deflection of the tape, forming the bottom of the shell in the well the charge adjacent to the bottom of the well is perforated, lowered to the bottom of the well under the pressure of an elastic body, such as a sewer cable, a polymer tape or a charging hose, continue to press the bottom of the shell to the bottom, and gravel or pebble is poured into the well in an amount necessary and sufficient to impart material shells of negative buoyancy, the elastic body is removed from the well, and a packet of film material containing a liquid or plastic composition, for example, an aqueous solution of ammonium nitrate, water, is lowered into the well explosive-containing clay or bentonite clay with water, which, after lowering to the bottom, pressurizes the perforated part of the shell, after sealing the shell, oxidizers, for example, ammonium, calcium, sodium nitrates or their mixtures are formed into a well to form a saturated solution, and solid components of explosives, granular ammonium nitrate, are loaded , fuel and sensitizers, trotyl is preferred as the latter.
RU2001100665/03A 2001-01-11 2001-01-11 Method for charging of flooded vertical and inclined holes (modifications) RU2184344C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2001100665/03A RU2184344C1 (en) 2001-01-11 2001-01-11 Method for charging of flooded vertical and inclined holes (modifications)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2001100665/03A RU2184344C1 (en) 2001-01-11 2001-01-11 Method for charging of flooded vertical and inclined holes (modifications)

Publications (1)

Publication Number Publication Date
RU2184344C1 true RU2184344C1 (en) 2002-06-27

Family

ID=20244573

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2001100665/03A RU2184344C1 (en) 2001-01-11 2001-01-11 Method for charging of flooded vertical and inclined holes (modifications)

Country Status (1)

Country Link
RU (1) RU2184344C1 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1189585A (en) * 1967-08-15 1970-04-29 Canadian Ind Method of Blasting and a Borehole Liner for Use in said Method.
US4040330A (en) * 1974-12-30 1977-08-09 Nils Denny Matzen Method of charging drill holes and means for carrying out the method
DE2715659A1 (en) * 1977-04-07 1978-10-12 Peter Dipl Ing Dr Riegelmayer Filling blasting holes with particulate explosive - by lowering hose to bottom of holes, filling with explosive and raising hose progressively
RU2126132C1 (en) * 1997-08-19 1999-02-10 Басс Георгий Анатольевич Method of charging of flooded wells
RU2130583C1 (en) * 1998-02-03 1999-05-20 Басс Георгий Анатольевич Process of charging of boreholes
RU2131584C1 (en) * 1997-06-24 1999-06-10 Московский государственный горный университет Process of charging of descending holes with explosive
RU2159405C1 (en) * 1999-07-09 2000-11-20 Басс Георгий Анатольевич Method for charging of vertical and inclined holes

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1189585A (en) * 1967-08-15 1970-04-29 Canadian Ind Method of Blasting and a Borehole Liner for Use in said Method.
US4040330A (en) * 1974-12-30 1977-08-09 Nils Denny Matzen Method of charging drill holes and means for carrying out the method
DE2715659A1 (en) * 1977-04-07 1978-10-12 Peter Dipl Ing Dr Riegelmayer Filling blasting holes with particulate explosive - by lowering hose to bottom of holes, filling with explosive and raising hose progressively
RU2131584C1 (en) * 1997-06-24 1999-06-10 Московский государственный горный университет Process of charging of descending holes with explosive
RU2126132C1 (en) * 1997-08-19 1999-02-10 Басс Георгий Анатольевич Method of charging of flooded wells
RU2130583C1 (en) * 1998-02-03 1999-05-20 Басс Георгий Анатольевич Process of charging of boreholes
RU2159405C1 (en) * 1999-07-09 2000-11-20 Басс Георгий Анатольевич Method for charging of vertical and inclined holes

Similar Documents

Publication Publication Date Title
RU2065029C1 (en) Method for developing oil deposit of high initial water saturation
KR830006562A (en) Method and machinery for forming rigs for oil and mine development
RU2184344C1 (en) Method for charging of flooded vertical and inclined holes (modifications)
US2776010A (en) Sealing porous earth stratum
US2911046A (en) Method of increasing production of oil, gas and other wells
RU2100584C1 (en) Method for enhancing of oil well productivity
MXPA06007671A (en) Method of consolidating an underground formation.
GB1026094A (en) Method and apparatus for forming piles and buried continuous walls
JPS55155815A (en) Method and device for chemical grouting
US6886466B2 (en) Method and apparatus for sleeving a borehole
RU2084817C1 (en) Method of charge shaping in flooded well by explosive of simplest composition
ATE16296T1 (en) PILES.
RU168322U1 (en) EXPLOSIVE CHARGE FOR WATERFILLED WELLS
RU2044881C1 (en) Method for charging of inundated holes with hydrolabile granulated explosives
GB1245313A (en) Method and device for forming a hole in the soil
JPS55165317A (en) Burying method for steel-pipe sheet pile
RU224637U1 (en) Hose for loading flooded wells with low-density explosive composition
RU2159405C1 (en) Method for charging of vertical and inclined holes
CN220339228U (en) Water pressure blasting water bag for emulsion explosive
JP2000068021A (en) Forming method for bar-shaped grounding electrode
JPS55159019A (en) Method for stabilizing and solidifying sludge having hardening property at pit dug in ground
RU2818120C1 (en) Hose for charging flooded wells with low-density explosive composition
SU1346729A1 (en) Method of forming contour trench
JPS5631926A (en) Water-stop protection for landslide
RU2260689C1 (en) Method for processing face-adjacent zone of well

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20060112