RU2183260C2 - Process of development of oil field at late stage of its operation - Google Patents
Process of development of oil field at late stage of its operation Download PDFInfo
- Publication number
- RU2183260C2 RU2183260C2 RU99126054/03A RU99126054A RU2183260C2 RU 2183260 C2 RU2183260 C2 RU 2183260C2 RU 99126054/03 A RU99126054/03 A RU 99126054/03A RU 99126054 A RU99126054 A RU 99126054A RU 2183260 C2 RU2183260 C2 RU 2183260C2
- Authority
- RU
- Russia
- Prior art keywords
- wells
- injection
- field
- late stage
- oil
- Prior art date
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Description
Изобретение относится к нефтедобывающей промышленности, а именно способам разработки многопластового нефтяного месторождения с неравномерной степенью колекторских свойств вмещающих пород в поздней стадии его эксплуатации. The invention relates to the oil industry, and in particular to methods of developing a multilayer oil field with an uneven degree of reservoir properties of the host rocks in the late stage of its operation.
Известен способ выравнивания профиля приемистости нагнетательной скважины, являющийся более близким к заявленному, где предлагается через трещины в призабойной зоне закачивать в пласт изоляционный материал - тампонажный цементный раствор (патент России 95100154, Е 21 В 43/20). There is a method of alignment of the injectivity profile of an injection well, which is closer to the claimed one, where it is proposed to inject insulating material — cement slurry — through cracks in the bottomhole zone (Russian patent 95100154, Е 21 В 43/20).
Недостатком этого метода по сравнению с заявляемым является то, что цементным раствором представляется возможным тампонировать лишь призабойную зону пласта в случаях, если эта зона характеризуется трещиноватостью. Этим способом удается выравнивать профиль приемистости скважин только в призабойной зоне. Соответственно становится возможным увеличить давление нагнетаемых сточных вод на вмещающие породы с низкими коллекторскими свойствами только в пределах этой зоны. Следует ожидать, что через короткое время эксплуатации месторождения восстановится та гидродинамика пласта, какой она была до тампонажных работы с прежними показателями добычи нефти. The disadvantage of this method compared with the claimed one is that it is possible to cement only the bottom-hole zone of the formation with cement mortar in cases where this zone is characterized by fracturing. In this way, it is possible to align the injectivity profile of wells only in the bottomhole zone. Accordingly, it becomes possible to increase the pressure of injected wastewater on the host rocks with low reservoir properties only within this zone. It should be expected that in a short time the field’s hydrodynamics will be restored, as it was before the grouting work with the previous indicators of oil production.
Целью настоящего изобретения является повышение степени извлечения остаточной нефти из отложений с низкими коллекторскими свойствами на поздней стадии эксплуатации месторождения. Поставленная задача достигается методом площадных тампонажных работ по промытым пластам между нагнетательными и эксплуатационными скважинами на всей территории месторождения путем закачки в пласт глинисто-цементной суспензии. Соотношение применяемых компонентов (глины, цемента и сточной воды) определяется лабораторным путем в зависимости от необходимой и достаточной степени жесткости тампонажных работ и обеспечения вымываемости закачанных материалов через несколько лет работы скважины. Суспензия закачивается через все нагнетательные скважины месторождения, где обводненность реагирующих эксплуатационных скважин достигает более 50%, и также когда высокая премистость нагнетательных скважин (более 400 м3/сут). 3акачка производится под давлением, соответствующим давлению на нагнетательной линии, после чего все скважины в радиусе возможного реагирования закрывают на 2-3 суток - на время увеличения вязкости и уплотнения суспензии в пластовых условиях.The aim of the present invention is to increase the degree of extraction of residual oil from sediments with low reservoir properties at a late stage of field operation. The task is achieved by the method of areal grouting of washed formations between injection and production wells throughout the field by injecting clay-cement slurry into the formation. The ratio of the components used (clay, cement and wastewater) is determined by laboratory methods, depending on the necessary and sufficient degree of rigidity of the grouting operations and ensuring the leachability of the injected materials after several years of well operation. The suspension is pumped through all the injection wells of the field, where the water cut of the reacting production wells reaches more than 50%, and also when the injection wells are highly premium (more than 400 m 3 / day). The pumping is performed under pressure corresponding to the pressure on the injection line, after which all wells in the radius of a possible response are closed for 2-3 days - during the increase in viscosity and suspension compaction in reservoir conditions.
Способность суспензии на основе сточных вод транспортировать глинисто-цементные частицы как можно дальше от нагнетательной скважины обеспечит площадной характер выполняемых работ. The ability of a suspension based on wastewater to transport clay-cement particles as far as possible from the injection well will ensure the areal nature of the work performed.
Объем закачиваемой суспензии определяется соразмерно объему пористости пород от нагнетательной до реагирующей эксплуатационных скважин, что может быть ориентировочно определено по результатам промыслово-геофизических и промыслово-лабораторных исследований керна. The volume of injected suspension is determined in proportion to the volume of porosity of the rocks from injection to reactive production wells, which can be roughly determined by the results of field geophysical and field laboratory tests of the core.
После широкомасштабного применения заявляемой технологии на месторождении изменится направление движения нагнетаемых сточных вод, что в свою очередь приведет к более интенсивному вовлечению в разработку застоявшихся запасов нефти в малопродуктивных и глинистых коллекторах. After the large-scale application of the claimed technology at the field, the direction of movement of injected wastewater will change, which in turn will lead to more intensive involvement in the development of stagnant oil reserves in unproductive and clay reservoirs.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU99126054/03A RU2183260C2 (en) | 1999-12-06 | 1999-12-06 | Process of development of oil field at late stage of its operation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU99126054/03A RU2183260C2 (en) | 1999-12-06 | 1999-12-06 | Process of development of oil field at late stage of its operation |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| RU99126054A RU99126054A (en) | 2001-10-27 |
| RU2183260C2 true RU2183260C2 (en) | 2002-06-10 |
Family
ID=20227962
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| RU99126054/03A RU2183260C2 (en) | 1999-12-06 | 1999-12-06 | Process of development of oil field at late stage of its operation |
Country Status (1)
| Country | Link |
|---|---|
| RU (1) | RU2183260C2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103740349A (en) * | 2013-12-31 | 2014-04-23 | 东营泰尔石油技术有限公司 | Anti-high temperature consolidation type plugging agent |
| CN107575183A (en) * | 2017-09-12 | 2018-01-12 | 中国海洋石油总公司 | A kind of conciliation combination operation process method for water injection well |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2016958C1 (en) * | 1993-04-02 | 1994-07-30 | Башкирский государственный научно-исследовательский и проектный институт нефтяной промышленности | Method for erecting antiseepage screen |
| RU2068947C1 (en) * | 1991-02-25 | 1996-11-10 | Кобрушко Анатолий Тимофеевич | Method for exploitation layered oil strata inhomogeneous in permeability |
| RU2096594C1 (en) * | 1996-07-05 | 1997-11-20 | Акционерное общество открытого типа "Ноябрьскнефтегаз" | Method for development of nonuniform strata oil deposit |
| RU2113590C1 (en) * | 1996-06-06 | 1998-06-20 | Акционерное общество "Татнефть" | Method for development of multi-bed oil deposits |
| RU2136862C1 (en) * | 1999-01-05 | 1999-09-10 | Мамедов Борис Абдулович | Method of increase of oil recovery from oil fields developed by flooding |
-
1999
- 1999-12-06 RU RU99126054/03A patent/RU2183260C2/en not_active IP Right Cessation
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2068947C1 (en) * | 1991-02-25 | 1996-11-10 | Кобрушко Анатолий Тимофеевич | Method for exploitation layered oil strata inhomogeneous in permeability |
| RU2016958C1 (en) * | 1993-04-02 | 1994-07-30 | Башкирский государственный научно-исследовательский и проектный институт нефтяной промышленности | Method for erecting antiseepage screen |
| RU2113590C1 (en) * | 1996-06-06 | 1998-06-20 | Акционерное общество "Татнефть" | Method for development of multi-bed oil deposits |
| RU2096594C1 (en) * | 1996-07-05 | 1997-11-20 | Акционерное общество открытого типа "Ноябрьскнефтегаз" | Method for development of nonuniform strata oil deposit |
| RU2136862C1 (en) * | 1999-01-05 | 1999-09-10 | Мамедов Борис Абдулович | Method of increase of oil recovery from oil fields developed by flooding |
Non-Patent Citations (1)
| Title |
|---|
| ТРАХТМАН Г.И. и др. Новое в технологии добычи и ремонте скважин за рубежом. Обзорная информация. Серия "Нефтепромысловое дело". Вып. 21. - М.: ВНИИОЭНГ, 1989, с. 17-18. * |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103740349A (en) * | 2013-12-31 | 2014-04-23 | 东营泰尔石油技术有限公司 | Anti-high temperature consolidation type plugging agent |
| CN103740349B (en) * | 2013-12-31 | 2016-08-17 | 东营泰尔石油技术有限公司 | High temperature resistance consolidation type sealing agent |
| CN107575183A (en) * | 2017-09-12 | 2018-01-12 | 中国海洋石油总公司 | A kind of conciliation combination operation process method for water injection well |
| CN107575183B (en) * | 2017-09-12 | 2019-07-23 | 中国海洋石油总公司 | Process is made in a kind of tune-uncoupling for water injection well |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111255428B (en) | Casing horizontal well shaft reconstruction repeated fracturing method | |
| CN110529089B (en) | Repeated fracturing method for open hole horizontal well | |
| CN114233258A (en) | A Fracturing Method for Refractory Reservoir of Difficult-to-Leach Sandstone Uranium Ore | |
| US10611952B2 (en) | Fracturing a formation with mortar slurry | |
| CN106761548A (en) | A method of using fracturing to inject plugging agent into thick oil layer to plug strong water washing strip | |
| RU2057898C1 (en) | Process of pumping treatment mortars down borehole | |
| Chizhov et al. | Hydraulically perfect modes of injection of grouting mixtures when isolating absorbing formations | |
| US20190323329A1 (en) | Fracturing a formation with mortar slurry | |
| US20190353020A1 (en) | Fracturing a formation with mortar slurry | |
| RU2183260C2 (en) | Process of development of oil field at late stage of its operation | |
| AU2017386380A1 (en) | Fracturing a formation lying below an aquifer | |
| RU2768785C1 (en) | Method for restoring destroyed oil fields | |
| CN111827949A (en) | A method for accurate production of remaining oil in ultra-low permeability sandstone reservoir | |
| RU2223387C1 (en) | Process plugging casing string in well | |
| RU2392418C1 (en) | Method for insulation of water productions and thief zones in well | |
| US20190353021A1 (en) | Fracturing a formation with mortar slurry | |
| WO2020139167A1 (en) | Method for increasing oil recovery from a carbonaceous oil formation by building up formation pressure | |
| US20240271028A1 (en) | Methods for preventing or mitigating wellbore screen out conditions using acid blends | |
| AU2017386385A1 (en) | Environmentally improved fracturing of a formation | |
| Coulter et al. | How to select the correct sand control system for your well | |
| Harding et al. | Design and performance of a water disposal well stimulation treatment in a high porosity and permeability sand | |
| US20210131252A1 (en) | Fracturing a formation with mortar slurry | |
| US20190353019A1 (en) | Fracturing a formation with mortar slurry | |
| CN112267867A (en) | Deep coal bed gas well volume acidizing fracturing method | |
| Heinz | Mining Grouting: A Rational Approach |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20041207 |