RU2016103376A - MILLING HEAD OF MINING MACHINE - Google Patents
MILLING HEAD OF MINING MACHINE Download PDFInfo
- Publication number
- RU2016103376A RU2016103376A RU2016103376A RU2016103376A RU2016103376A RU 2016103376 A RU2016103376 A RU 2016103376A RU 2016103376 A RU2016103376 A RU 2016103376A RU 2016103376 A RU2016103376 A RU 2016103376A RU 2016103376 A RU2016103376 A RU 2016103376A
- Authority
- RU
- Russia
- Prior art keywords
- head
- base
- head according
- side wall
- region
- Prior art date
Links
- 238000003801 milling Methods 0.000 title 1
- 230000005641 tunneling Effects 0.000 claims 5
- 238000005065 mining Methods 0.000 claims 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
- E21D9/122—Working or loading platforms
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C27/00—Machines which completely free the mineral from the seam
- E21C27/20—Mineral freed by means not involving slitting
- E21C27/24—Mineral freed by means not involving slitting by milling means acting on the full working face, i.e. the rotary axis of the tool carrier being substantially parallel to the working face
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C35/00—Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
- E21C35/20—General features of equipment for removal of chippings, e.g. for loading on conveyor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
- E21D9/126—Loading devices or installations
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Chutes (AREA)
- Component Parts Of Construction Machinery (AREA)
- Analysing Materials By The Use Of Radiation (AREA)
Claims (21)
1. Загребающая головка (117) горнопроходческой машины, устанавливаемая на переднем конце (102) горнопроходческой машины (100), при этом головка (117) имеет передний конец (301) и задний конец (205), причем задний конец (205) предназначен для расположения рядом с горнопроходческой машиной (100), при этом головка (117) содержит:
1. The rake head (117) of the tunneling machine mounted on the front end (102) of the tunneling machine (100), while the head (117) has a front end (301) and a rear end (205), and the rear end (205) is designed to location next to the tunneling machine (100), while the head (117) contains:
2. Головка по п.1, дополнительно содержащая пару боковых фланцев (121), при этом каждый фланец (121) подвижно установлен на наружной области соответствующей боковой стенки (120) и способен выступать вперед от соответствующей боковой стенки (120).
2. The head according to claim 1, additionally containing a pair of side flanges (121), with each flange (121) movably mounted on the outer region of the corresponding side wall (120) and is able to protrude forward from the corresponding side wall (120).
3. Головка по п.2, в которой каждый фланец (121) установлен на соответствующей боковой стенке (120) посредством по меньшей мере одного поворотного крепления (204) и по меньшей мере одного направляющего элемента (200) для удерживания и направления поворотного движения каждого фланца (121) относительно каждой боковой стенки (120).
3. The head according to claim 2, in which each flange (121) is mounted on the corresponding side wall (120) by means of at least one pivot mount (204) and at least one guide element (200) for holding and directing the pivot movement of each flange (121) relative to each side wall (120).
4. Головка по п.2 или 3, в которой каждый фланец (121) сужается внутрь и наружу по существу с одним и тем же углом, что и боковые поверхности (304), так что контактная поверхность (303) фланца для контакта с материалом, собираемым головкой (117), находится по существу в одной плоскости с каждой соответствующей боковой поверхностью (304).
4. The head according to claim 2 or 3, in which each flange (121) tapers inward and outward with essentially the same angle as the side surfaces (304), so that the contact surface (303) of the flange for contact with the material collected by the head (117), is essentially in the same plane with each corresponding side surface (304).
5. Головка по любому предшествующему пункту, дополнительно содержащая транспортер (122), имеющий ленту, выступающую назад от полка (118), при этом передний конец (310) транспортера (122) продолжается в область (119) основания в направлении по ширине между боковыми стенками (120).
5. The head according to any preceding paragraph, further comprising a conveyor (122) having a belt protruding back from the shelf (118), while the front end (310) of the conveyor (122) extends into the base region (119) in the width direction between the side walls (120).
6. Головка по п.5, в которой уровень высоты поверхности (324) основания находится на уровне выше ленты, обеспечивая, чтобы материал имел возможность падать вниз с поверхности (324) основания на ленту.
6. The head according to claim 5, in which the level of the surface height (324) of the base is at a level above the tape, ensuring that the material has the ability to fall down from the surface (324) of the base onto the tape.
7. Головка по п.5 или 6, дополнительно содержащая первый набор подающих пластин (306) транспортера, расположенных между и наклоненных вниз от поверхности (324) основания к ленте.
7. The head according to claim 5 or 6, further comprising a first set of conveyor feed plates (306) located between and inclined downward from the base surface (324) to the belt.
8. Головка по любому одному из пп.5-7, дополнительно содержащая второй набор подающих пластин (308) транспортера, расположенных между и сужающихся внутрь от задней пластины (124) в направлении ленты.
8. The head according to any one of claims 5 to 7, further comprising a second set of conveyor feed plates (308) located between and tapering inward from the back plate (124) in the direction of the belt.
9. Головка по любому одному из пп.5-8, в которой передний конец (310) транспортера (122) расположен по существу в области переднего края (311) основания (119) и/или заднего края (302) полка (118).
9. The head according to any one of claims 5 to 8, in which the front end (310) of the conveyor (122) is located essentially in the region of the front edge (311) of the base (119) and / or the rear edge (302) of the shelf (118) .
10. Головка по любому предшествующему пункту, в которой основание (119) содержит две пластины (119) основания, продолжающиеся внутрь от каждой соответствующей боковой стенки (120).
10. A head according to any preceding claim, wherein the base (119) comprises two base plates (119) extending inward from each respective side wall (120).
11. Головка по п.10, в которой задняя пластина (124) содержит две задние пластины (124), продолжающиеся внутрь от каждой соответствующей боковой стенки (120) и вверх от каждой соответствующей задней пластины (124).
11. The head of claim 10, in which the rear plate (124) contains two rear plates (124) extending inward from each respective side wall (120) and upward from each corresponding rear plate (124).
12. Головка по любому предшествующему пункту, в которой поверхность (324) основания является по существу плоской и не содержит препятствий, обеспечивая возможность беспрепятственного прохождения материала, собираемого головкой (117).
12. The head according to any preceding paragraph, in which the surface (324) of the base is substantially flat and free of obstructions, allowing unhindered passage of the material collected by the head (117).
13. Головка по любому предшествующему пункту, не содержащая вращающихся крутящихся лап, установленных в основании (119).
13. The head according to any preceding paragraph, not containing rotating rotating paws installed in the base (119).
14. Головка по любому предшествующему пункту, в которой расстояние, на которое основание (119) продолжается по ширине между передним (301) и задним (205) концами, меньше чем высота головки (117) между самой нижней (323) и самой верхней (322) областью боковых стенок (120).
14. The head according to any preceding paragraph, in which the distance over which the base (119) extends in width between the front (301) and rear (205) ends is less than the height of the head (117) between the lowest (323) and the highest ( 322) the area of the side walls (120).
15. Горнопроходческая машина (100) или горнопроходческая машина (100) непрерывного действия, содержащая загребающую головку (117) по любому предшествующему пункту.
15. A mining tunneling machine (100) or a continuous mining tunneling machine (100) comprising a rake head (117) according to any preceding claim.
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP13175084.6A EP2821590A1 (en) | 2013-07-04 | 2013-07-04 | Mining machine gathering head |
| EP13175084.6 | 2013-07-04 | ||
| PCT/EP2014/062914 WO2015000711A2 (en) | 2013-07-04 | 2014-06-19 | Mining machine gathering head |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| RU2016103376A true RU2016103376A (en) | 2017-08-10 |
| RU2646259C2 RU2646259C2 (en) | 2018-03-02 |
Family
ID=48703338
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| RU2016103376A RU2646259C2 (en) | 2013-07-04 | 2014-06-19 | Mining machine gathering head |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20160146006A1 (en) |
| EP (1) | EP2821590A1 (en) |
| CN (1) | CN204283436U (en) |
| AU (1) | AU2014286454B2 (en) |
| RU (1) | RU2646259C2 (en) |
| WO (1) | WO2015000711A2 (en) |
| ZA (1) | ZA201509094B (en) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9903202B2 (en) * | 2015-09-28 | 2018-02-27 | Joy Mm Delaware, Inc. | Shield for sumping frame of mining machine |
| RU168978U1 (en) * | 2016-03-29 | 2017-03-01 | Владислав Александрович Лукьяненко | Roadheader |
| RU185540U1 (en) * | 2017-07-14 | 2018-12-10 | Общество С Ограниченной Ответственностью "Корум Майнинг" | MINING EXECUTIVE BODY |
| RU2708130C1 (en) * | 2018-09-10 | 2019-12-04 | Андрей Александрович Рубцов | Platform-lining jack system |
| RU196501U1 (en) * | 2019-07-01 | 2020-03-03 | Акционерное Общество "Копейский Машиностроительный Завод" | LOADING TABLE OF SHIELD TYPE OF MINING COMBINE |
| CN112049633A (en) * | 2020-07-29 | 2020-12-08 | 义煤集团永兴工程有限责任公司 | Colliery entry driving machine that security performance is high |
| CN118087836B (en) * | 2024-04-26 | 2024-07-16 | 山西方山金晖凯川煤业有限公司 | Underground movable lifting maintenance platform for coal mine |
Family Cites Families (25)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US291A (en) | 1837-07-22 | Improvement in self-adjusting temples for weaving-looms | ||
| US3860A (en) | 1844-12-16 | F archibald ivieting | ||
| DE880576C (en) * | 1951-07-26 | 1953-06-22 | Eickhoff Maschinenfabrik Geb | Loading shovel for picking up debris in paddle chutes |
| US3169797A (en) * | 1962-10-17 | 1965-02-16 | Goodman Mfg Co | Material collecting means for continuous mining machine |
| US3417851A (en) * | 1967-01-12 | 1968-12-24 | Westinghouse Air Brake Co | Loading head |
| US3680920A (en) * | 1970-10-07 | 1972-08-01 | Lee Norse Co | Material collecting means for mining machines |
| SU376579A1 (en) * | 1971-03-31 | 1973-04-05 | LOADING ORGAN OF THE MOUNTAIN MACHINE | |
| US3860291A (en) | 1973-11-05 | 1975-01-14 | Dresser Ind | Continuous cutting and gathering apparatus for a continuous mining machine |
| US4056189A (en) * | 1975-12-23 | 1977-11-01 | National Mine Service Company | Material gathering device for a mining machine |
| US4159055A (en) * | 1976-12-29 | 1979-06-26 | Dresser Industries, Inc. | Gathering head |
| US4277105A (en) | 1979-08-07 | 1981-07-07 | Taylor John C | Conveyor system for a continuous mining machine |
| US4296856A (en) * | 1980-01-03 | 1981-10-27 | National Mine Service Company | Material gathering device for a mining machine |
| DE3015319A1 (en) * | 1980-04-22 | 1981-10-29 | Deilmann-Haniel GmbH, 4600 Dortmund | Mine gallery face debris removal machine - has shovel and swivelling conveyor belt on tracks below working platform |
| DE3626986A1 (en) * | 1986-08-08 | 1988-03-10 | Salzgitter Maschinen Ag | MOUNTAIN PITCHING OR EXTRACTING CUTTING MACHINE |
| US4865390A (en) * | 1987-09-04 | 1989-09-12 | Consolidation Coal Company | Continuous mining machine with roof supporting apparatus and method for anchoring crossbeam supports |
| US4952000A (en) | 1989-04-24 | 1990-08-28 | Thin Seam Miner Patent B.V., The Netherlands | Method and apparatus for increasing the efficiency of highwall mining |
| US5228552A (en) * | 1990-01-12 | 1993-07-20 | Voest-Alpine Berftechnik Gesellschaft M.B.H. | Loading device for mining |
| DE4103544C1 (en) * | 1991-02-06 | 1992-04-09 | Paurat Gmbh, 4223 Voerde, De | Deep mining heading-winning machine - has tracked propulsion system and slewing and ranging boom |
| US5522647A (en) * | 1994-10-25 | 1996-06-04 | Mining Technologies, Inc. | Continuous highwall mining machine with armless conveyor |
| US5553926A (en) * | 1994-11-22 | 1996-09-10 | Mining Technologies, Inc. | Self-propelled mining apparatus and method for cutting arched opening |
| US5590754A (en) * | 1995-05-01 | 1997-01-07 | Lowery; Sterling W. | Blade feeder conveyor system |
| AT406892B (en) | 1996-07-18 | 2000-10-25 | Voest Alpine Bergtechnik | METHOD FOR CONTROLLING THE CUTTING PROCESS AND DEVICE FOR DETECTING THE DROP-IN DEPTH OF CUTTING TOOLS |
| RU2131030C1 (en) * | 1997-09-10 | 1999-05-27 | Шахтинский институт Новочеркасского государственного технического университета | Tunneling machine |
| WO2011040806A1 (en) | 2009-09-29 | 2011-04-07 | Superior Highwall Miners B.V. | Segments and apparatus for high wall mining including fluid feed |
| RU115409U1 (en) * | 2010-06-30 | 2012-04-27 | Открытое акционерное общество "Копейский машиностроительный завод" | LOADING MACHINE LOADING DEVICE |
-
2013
- 2013-07-04 EP EP13175084.6A patent/EP2821590A1/en not_active Withdrawn
-
2014
- 2014-06-19 RU RU2016103376A patent/RU2646259C2/en not_active IP Right Cessation
- 2014-06-19 AU AU2014286454A patent/AU2014286454B2/en not_active Expired - Fee Related
- 2014-06-19 WO PCT/EP2014/062914 patent/WO2015000711A2/en not_active Ceased
- 2014-06-19 US US14/900,543 patent/US20160146006A1/en not_active Abandoned
- 2014-07-04 CN CN201420369166.6U patent/CN204283436U/en not_active Expired - Fee Related
-
2015
- 2015-12-14 ZA ZA2015/09094A patent/ZA201509094B/en unknown
Also Published As
| Publication number | Publication date |
|---|---|
| AU2014286454A1 (en) | 2015-12-24 |
| WO2015000711A3 (en) | 2015-09-24 |
| ZA201509094B (en) | 2019-06-26 |
| WO2015000711A2 (en) | 2015-01-08 |
| CN204283436U (en) | 2015-04-22 |
| EP2821590A1 (en) | 2015-01-07 |
| AU2014286454B2 (en) | 2018-02-15 |
| RU2646259C2 (en) | 2018-03-02 |
| US20160146006A1 (en) | 2016-05-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| RU2016103376A (en) | MILLING HEAD OF MINING MACHINE | |
| RU2019116664A (en) | SEED DELIVERY DEVICE | |
| RU2008136320A (en) | CONVEYOR GRID WITH EXTENDED FORM | |
| RU2014130791A (en) | BEAM, METHOD AND SYSTEM FOR ITS MANUFACTURE | |
| CN108328240B (en) | Goods shelf transfer device of conveying system | |
| RU2016122922A (en) | DRAINAGE ASSEMBLY | |
| US9718086B2 (en) | Rake systems for additive manufacturing systems | |
| CN205366196U (en) | Intermittent type boxing machine | |
| BR102018071411B1 (en) | HARVEST HEAD, AND, METHOD FOR SUPPORTING A CANVAS BELT OF A HARVEST HEAD | |
| CN204675345U (en) | A kind of reverse distributing device of all amounts for two sieving machine pan feedings | |
| CN209739926U (en) | feeding slideway | |
| CN204568698U (en) | Sheet material transportation guide device | |
| JP3196079U (en) | Conveyor belt cleaner | |
| BR102016023319B1 (en) | ROW UNIT FOR A CORN PLATFORM | |
| JP2017533107A5 (en) | ||
| CN203854060U (en) | Adjustable locating device of timber sawing machine | |
| RU143509U1 (en) | SOIL PROFILING DEVICE | |
| US3113923A (en) | Self-propelled brushes for reciprocating sieves | |
| CN205634028U (en) | Shield constructs dregs conveyer belt damping cleaning shoe device | |
| WO2019228062A1 (en) | Shelf transition device for conveying system | |
| CN210756608U (en) | Be used for fixed device of keeping silent of using of sawing machine processing | |
| CN203831230U (en) | Single-movement mechanism intermittent feeding device of magnetic material grinding machine | |
| CN205221779U (en) | Blade cleaning equipment conveys chain belt | |
| CN204123477U (en) | A kind of straight flange machine being applicable to bamboo and wood products | |
| CN204560830U (en) | A kind of conveying anti-shedding mechanism of ice cream rod inserting machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20190620 |