RU2099488C1 - Method of production of columns - Google Patents

Method of production of columns Download PDF

Info

Publication number
RU2099488C1
RU2099488C1 RU95107783A RU95107783A RU2099488C1 RU 2099488 C1 RU2099488 C1 RU 2099488C1 RU 95107783 A RU95107783 A RU 95107783A RU 95107783 A RU95107783 A RU 95107783A RU 2099488 C1 RU2099488 C1 RU 2099488C1
Authority
RU
Russia
Prior art keywords
pipe
bag
concrete
concrete mixture
filling
Prior art date
Application number
RU95107783A
Other languages
Russian (ru)
Other versions
RU95107783A (en
Inventor
В.Е. Меркин
Н.В. Смирнов
В.М. Васькин
В.М. Смолянский
Б.И. Яцков
Г.М. Богомолов
А.Н. Ермаков
Original Assignee
Акционерное общество открытого типа Научно-исследовательский институт транспортного строительства (ЦНИИС)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Акционерное общество открытого типа Научно-исследовательский институт транспортного строительства (ЦНИИС) filed Critical Акционерное общество открытого типа Научно-исследовательский институт транспортного строительства (ЦНИИС)
Priority to RU95107783A priority Critical patent/RU2099488C1/en
Publication of RU95107783A publication Critical patent/RU95107783A/en
Application granted granted Critical
Publication of RU2099488C1 publication Critical patent/RU2099488C1/en

Links

Images

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

FIELD: production of columns for underground railway stations. SUBSTANCE: the column has a metal pipe with a concrete core inside it and a separating layer between them. The metal pipe is installed vertically, a bag of polymeric film is lowered inside the pipe the upper part of the bag is fastened on the upper end of the pipe, the pipe space is filled with concrete mix. EFFECT: enhanced reliability. 2 cl, 2 dwg

Description

Изобретение относится к способам изготовления конструкций строительных элементов, в частности к способам изготовления колонн, которые могут использоваться для строительства станций метрополитенов. The invention relates to methods for manufacturing structures of building elements, in particular to methods for manufacturing columns that can be used for the construction of subway stations.

Известен способ изготовления колонны, заключающийся в том, что устанавливают металлическую трубу вертикально и заполняют ее бетонной смесью (см. труды Всесоюзного научно-исследовательского института транспортного строительство "Исследование бетона и железобетонных конструкций транспортных сооружений" под редакцией О.Я. Берга, М. "Трансжелдориздат", 1960 г. с. 120-121). A known method of manufacturing a column, which consists in installing a metal pipe vertically and filling it with concrete mixture (see the proceedings of the All-Union Scientific Research Institute of Transport Construction "Study of concrete and reinforced concrete structures of transport structures" edited by O.Ya. Berg, M. " Transzheldorizdat ", 1960 p. 120-121).

Технический результат изобретения экономия металла за счет повышения несущей способности колонны путем исключения трения между бетонным ядром и трубой. The technical result of the invention saving metal by increasing the bearing capacity of the column by eliminating friction between the concrete core and the pipe.

Для достижения указанного технического результата в способе изготовления колонны, заключающемся в том, что устанавливают металлическую трубу вертикально и заполняют ее бетонной смесью, перед заполнением трубы бетонной смесью внутрь, опускают мешок из полимерной пленки, на верхнем конце трубы закрепляют верхнюю часть мешка, а заполнение трубы бетонной смесью производят путем подачи ее в мешок. To achieve the specified technical result in the method of manufacturing the column, which consists in installing a metal pipe vertically and filling it with concrete mixture, before filling the pipe with concrete mixture inside, lower the bag from the polymer film, fix the upper part of the bag on the upper end of the pipe, and fill the pipe concrete mixture is produced by feeding it into a bag.

Кроме этого, бетонную смесь послойно уплотняют, а перед вертикальной установкой трубы размещаемый внизу конец ее закрывают заглушкой. In addition, the concrete mixture is compacted layer by layer, and before vertical installation of the pipe, the bottom end placed is closed with a plug.

На фиг. 1 изображена колонна в продольном сечении. На фиг. 2 то же, вид сверху. In FIG. 1 shows a column in longitudinal section. In FIG. 2 same, top view.

Колонна содержит металлическую трубу 1, внутри которой находится бетонное ядро 2. Между трубой 1 и ядром 2 расположен разделительный слой, образованный, по меньшей мере, одним слоем полимерной пленки 3, которая создает наилучшие условия для снижения сил трения между стенкой трубы 1 и бетонным ядром 2. The column contains a metal pipe 1, inside of which there is a concrete core 2. Between the pipe 1 and the core 2 there is a separation layer formed by at least one layer of polymer film 3, which creates the best conditions for reducing friction between the wall of the pipe 1 and the concrete core 2.

Колонну изготавливают следующим образом. The column is made as follows.

Устанавливают металлическую трубу 1 вертикально, внутрь трубы 1 опускают мешок из полимерной пленки 3, на верхнем конце трубы закрепляют верхнюю часть мешка и в мешок подают бетонную смесь, заполняя полость трубы 1. Вместо мешка можно использовать цилиндрическую обечайку из полимерной пленки, нижняя часть которой либо запаяна, либо имеет дно. Мешок или оболочка могут быть образованы из одно- двухслойной полимерной пленки. В процессе заполнения трубы 1 бетонной смесью возможно послойное уплотнение этой смеси различными способами в зависимости от марки бетона. Кроме этого, размещаемый внизу при вертикальной установке конец трубы 1 закрывают металлической заглушкой 4, приваривая ее по периметру к трубе. The metal pipe 1 is installed vertically, a bag of polymer film 3 is lowered inside the pipe 1, the upper part of the bag is fixed at the upper end of the pipe and concrete mixture is fed into the bag, filling the cavity of pipe 1. Instead of the bag, you can use a cylindrical shell made of polymer film, the lower part of which sealed, or has a bottom. The bag or casing may be formed from a single or double layer polymer film. In the process of filling the pipe 1 with concrete mixture, it is possible to layer-by-layer consolidation of this mixture in various ways, depending on the brand of concrete. In addition, placed at the bottom of a vertical installation, the end of the pipe 1 is closed with a metal plug 4, welding it around the perimeter to the pipe.

Положительный эффект от предлагаемой трубобетонной колонны и способа ее изготовления подтвержден экспериментально и состоит в повышении ее несущей способности на 25-50% в зависимости от прочности бетонного ядра. The positive effect of the proposed pipe-concrete columns and the method of its manufacture is confirmed experimentally and consists in increasing its bearing capacity by 25-50%, depending on the strength of the concrete core.

Claims (2)

1. Способ изготовления колонны, заключающийся в установке металлической трубы вертикально и заполнении ее бетонной смесью, отличающийся тем, что перед вертикальной установкой трубы нижний ее конец закрывают заглушкой, а перед заполнением трубы бетонной смесью внутрь трубы опускают мешок из полимерной пленки, на верхнем конце трубы закрепляют верхнюю часть мешка, а заполнение трубы бетонной смесью производят путем подачи ее в мешок. 1. A method of manufacturing a column, which consists in installing a metal pipe vertically and filling it with concrete mixture, characterized in that before the vertical installation of the pipe, its lower end is closed with a plug, and before filling the pipe with concrete mixture, a bag of polymer film is lowered at the upper end of the pipe fix the upper part of the bag, and filling the pipe with concrete mixture is carried out by feeding it into the bag. 2. Способ по п.1, отличающийся тем, что бетонную смесь послойно уплотняют. 2. The method according to claim 1, characterized in that the concrete mixture is compacted layer by layer.
RU95107783A 1995-05-15 1995-05-15 Method of production of columns RU2099488C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU95107783A RU2099488C1 (en) 1995-05-15 1995-05-15 Method of production of columns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU95107783A RU2099488C1 (en) 1995-05-15 1995-05-15 Method of production of columns

Publications (2)

Publication Number Publication Date
RU95107783A RU95107783A (en) 1997-04-20
RU2099488C1 true RU2099488C1 (en) 1997-12-20

Family

ID=20167741

Family Applications (1)

Application Number Title Priority Date Filing Date
RU95107783A RU2099488C1 (en) 1995-05-15 1995-05-15 Method of production of columns

Country Status (1)

Country Link
RU (1) RU2099488C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2167985C1 (en) * 1999-12-24 2001-05-27 Ульяновский государственный технический университет Pre-stressed tubular-concrete member with fan reinforcement

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Исследование бетона и железобетонных конструкций транспортных сооружений, Труды Всесоюзного научно-исследовательского института транспортного строительства. - М.: Трансжелдориздат, 1960, с. 120 - 121. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2167985C1 (en) * 1999-12-24 2001-05-27 Ульяновский государственный технический университет Pre-stressed tubular-concrete member with fan reinforcement

Also Published As

Publication number Publication date
RU95107783A (en) 1997-04-20

Similar Documents

Publication Publication Date Title
US10125487B2 (en) Thermal insulation element
CA2928063A1 (en) Device and method for the thermal decoupling of concrete building parts
CN110439612A (en) A mold bag retaining wall and its construction method
CN105927243A (en) Device and method for supporting downhole surrounding rock faults
NL1010001A1 (en) Method and casing for the production of a ground column for absorbing the pressure of construction and traffic works.
CN210341902U (en) Can resist miniature pile foundation of bad engineering characteristic of inflation soil foundation
RU2099488C1 (en) Method of production of columns
CA1247384A (en) Support member
JPH0222811B2 (en)
KR101075273B1 (en) Construction Method of Centrifugally Concrete Filled Hollow Core Tube Column with Pre-reinforced Double Skin Panel Zone
US4639168A (en) Hollow foundation body and method of making a foundation
CN1083925C (en) Construction method of arched structure
JP2665805B2 (en) Ground improvement method
KR940008307B1 (en) Concrete flooring base and construction method thereof
CN214696829U (en) Connecting node structure of basement unilateral formwork support based on SMW construction method pile
CN114592533B (en) Rammed broken stone micro pile photovoltaic foundation and construction method thereof
JPS58127822A (en) Liquefaction preventive structure of foundation ground
JP2010043503A (en) Underground space part filling method
CN208219625U (en) A kind of tubular pole
SU1090854A1 (en) Method of forming gravel filter in wells
SU1271974A1 (en) Tunnel lining of pressed concrete
CN116695701A (en) Large-diameter pressure type anti-floating anchor rod, basement bottom plate reinforcing structure and method
JPH0726547A (en) Improvement work for weak ground
JPH06134429A (en) Final disposal of industrial waste
SU1539321A1 (en) Method of constructing solid-moulded lining of a tunnel