RU2079618C1 - Method of erection of cast-in-situ buildings - Google Patents

Method of erection of cast-in-situ buildings Download PDF

Info

Publication number
RU2079618C1
RU2079618C1 RU96108555A RU96108555A RU2079618C1 RU 2079618 C1 RU2079618 C1 RU 2079618C1 RU 96108555 A RU96108555 A RU 96108555A RU 96108555 A RU96108555 A RU 96108555A RU 2079618 C1 RU2079618 C1 RU 2079618C1
Authority
RU
Russia
Prior art keywords
formwork
forms
concreting
floor
concrete
Prior art date
Application number
RU96108555A
Other languages
Russian (ru)
Other versions
RU96108555A (en
Inventor
В.Е. Починалин
О.А. Васильев
Original Assignee
Акционерное общество закрытого типа "Монолит"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Акционерное общество закрытого типа "Монолит" filed Critical Акционерное общество закрытого типа "Монолит"
Priority to RU96108555A priority Critical patent/RU2079618C1/en
Application granted granted Critical
Publication of RU2079618C1 publication Critical patent/RU2079618C1/en
Publication of RU96108555A publication Critical patent/RU96108555A/en

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

FIELD: construction technology; applicable in erection of cast-in-situ buildings with use of prefabricated mobile tunnel forms. SUBSTANCE: the offered method includes manufacture of supporting rings with its division into sections, installation of forms, arrangement of wall reinforcements, wall concreting, curing of concrete in forms up to setting. Prior to installation of forms, scaffolds are mounted over the entire perimeter of the building erected floor. Embedded parts in form of separately made concrete crosses corresponding to wall thickness and height of floor and service lines are mounted. After installation of forms in form of semi-tunnels, floor reinforcement is arranged and semi-tunnels are set to the design position in vertical and horizontal planes. Floor concreting is accomplished after concreting of walls. After dismantling of forms on the preceding section, it is shifted and installed on the next section. EFFECT: reduced terms of erection of cast-in-situ buildings, reduced number of auxiliary technological operations and higher quality of cast walls of building.

Description

Изобретение относится к строительной технологии и может быть использовано при возведении монолитных зданий с применением объемно-переставной туннельной опалубки. The invention relates to construction technology and can be used in the construction of monolithic buildings with the use of volumetric-permissible tunnel formwork.

Из патентной литературы известны конструкции туннельной опалубки, работа которых основана на технологии возведения монолитных зданий [1-4]
Из технической литературы известна технология возведения монолитных зданий с применением объемно-переставной туннельной опалубки [5]
Из патентной литературы известна блочная переставная опалубка, работа с которой основана на способе возведения монолитных зданий, включающий изготовление опорных венцов с разбивкой на захватки, установку опалубки, размещение арматуры стен, бетонирование стен, выдержку бетона в опалубке до затвердевания, демонтаж опалубки и повторение технологического цикла. Описанная технология является ближайшим аналогом [6]
Целью изобретения является сокращение сроков возведения монолитных зданий, уменьшение количества вспомогательных технологических операций и повышение качества изготавливаемых стен.
From the patent literature, tunnel formwork designs are known whose work is based on the technology of erecting monolithic buildings [1-4]
From the technical literature known technology for the construction of monolithic buildings using volumetric-permissible tunnel formwork [5]
Block transitional formwork is known from the patent literature, the work with which is based on the method of erecting monolithic buildings, including the production of support crowns broken down into grips, installation of formwork, placement of wall reinforcement, concrete walling, concrete curing in the formwork before hardening, dismantling of formwork and repeating the technological cycle . The described technology is the closest analogue [6]
The aim of the invention is to reduce the time of construction of monolithic buildings, reducing the number of auxiliary technological operations and improving the quality of the walls.

Это достигается тем, что предлагаемая технология возведения монолитных зданий с применением объемно-переставной опалубки включает изготовление опорных венцов с разбивкой на захватки, установку опалубки, размещение арматуры стен, бетонирование стен, выдержку бетона в опалубке до затвердения демонтаж опалубки и повторение технологического цикла До установки опалубки монтируют подмости по всему периметру возводимого этажа здания, размещают закладные детали в виде изготовленных отдельно по толщине стены и высоте перекрытия бетонных крестов и монтируют коммуникационные сети, а после установки опалубки в виде полутуннелей размещают арматуру перекрытия и выставляют в проектное положение полутуннели по вертикали и горизонтали, при этом бетонирование перекрытия осуществляют после бетонирования стен, а после демонтажа опалубки на предыдущей захватке ее перемещают и устанавливают на последующей захватке. This is achieved by the fact that the proposed technology for the construction of monolithic buildings using volumetric climbing formwork includes the production of support crowns broken down into grips, installation of formwork, placement of wall reinforcement, concrete concreting, concrete curing in the formwork before hardening, dismantling of the formwork and repetition of the formwork Before installing the formwork they install scaffolds around the entire perimeter of the floor of the building being built, place embedded parts in the form of walls made separately according to the thickness of the wall and the height of the concrete floors tests and install communication networks, and after installing the formwork in the form of half-tunnels, place the floor reinforcement and put in the design position half-tunnels vertically and horizontally, while concreting the ceiling is carried out after concreting the walls, and after dismantling the formwork on the previous grab, it is moved and installed on the subsequent grab .

Изобретение осуществляется следующим образом. В практике способа возведения монолитных зданий за основу берется захватка. Размеры захватки определяются конфигурацией и периметром здания. Обычно секция (блок) здания размером до 30 м в длину делится на две захватки. Поэтому комплект опалубки со всеми вспомогательными элементами изготавливается исключительно под площадь бетонирования захватки. The invention is as follows. In the practice of the method of erecting monolithic buildings, a capture is taken as a basis. The dimensions of the grip are determined by the configuration and perimeter of the building. Usually a section (block) of a building measuring up to 30 m in length is divided into two captures. Therefore, the formwork kit with all auxiliary elements is made exclusively for the area of concreting of the gripper.

Предлагаемый скоростной способ возведения монолитных зданий заключается в следующем. Разбивка здания на две захватки остается, но комплект опалубки изготавливается из комплекта опалубки одной захватки плюс дополнительное устройство в виде выкатных подмостей, т.е. выкатные подмости и навесные подмости изготавливаются на весь периметр здания, это позволяет во второй половине дня установить подмости на второй захватке, то есть подготовиться к монтажу опалубки, ставя ее сразу на место, не опуская на землю. The proposed high-speed method for the construction of monolithic buildings is as follows. The breakdown of the building into two grips remains, but the formwork kit is made from the formwork kit of one gripper plus an additional device in the form of withdrawable scaffolds, i.e. roll-out scaffolds and hinged scaffolds are made on the entire perimeter of the building, this allows you to install scaffolds on the second grab in the afternoon, that is, prepare for the installation of the formwork, putting it immediately in place, without lowering it to the ground.

В качестве закладных деталей по предлагаемому изобретению используют бетонные кресты, которые изготавливают в специальной опалубке из бетона марки 300 и поставляют готовыми на объект. Бетонный крест имеет строгие геометрические размеры, по ширине равные толщине стены, по высоте равные высоте перекрытия. Кресты выставляют одновременно с монтажом и на каждую стену выставляют два креста. Расход крестов составляет 25 штук на захватку. После того, как опалубка и арматура выставлены, производится бетонирование захватки, бетонные кресты остаются в бетоне. Таким образом, исчезает ненужная дополнительная операция, ускоряется монтаж и, главное, повышается качество бетонной поверхности стен. As embedded parts according to the invention, concrete crosses are used, which are made in a special formwork made of concrete grade 300 and delivered ready to the site. The concrete cross has strict geometric dimensions, equal in width to the thickness of the wall, in height equal to the height of the ceiling. Crosses are placed simultaneously with the installation and two crosses are placed on each wall. The consumption of crosses is 25 pieces per grip. After the formwork and reinforcement are exposed, the gripping is concreted, the concrete crosses remain in the concrete. Thus, unnecessary additional operation disappears, installation is accelerated and, most importantly, the quality of the concrete surface of the walls is increased.

Таким образом, на возведение одного этажа уходит два дня, а на девятиэтажный дом (плюс подвал, технический этаж, чердак; итого необходимо вылить 12 этажей) по предлагаемому изобретению требуется 24 дня. Thus, the construction of one floor takes two days, and a nine-story house (plus a basement, technical floor, attic; total, it is necessary to pour 12 floors) according to the invention, 24 days are required.

Claims (1)

Способ возведения монолитных зданий с применением объемно-переставной туннельной опалубки, включающий изготовление опорных венцов с разбивкой на захватки, установку опалубки, размещение арматуры стен, бетонирование стен, выдержку бетона в опалубке до затвердения, демонтаж опалубки и повторение технологического цикла, отличающийся тем, что до установки опалубки монтируют подмости по всему периметру возводимого этажа здания, размещают закладные детали в виде изготовленных отдельно по толщине стен и высоте перекрытия бетонных крестов и монтируют коммуникационные сети, а после установки опалубки в виде полутуннелей размещают арматуру перекрытия и выставляют в проектное положение полутуннели по вертикали и горизонтали, при этом бетонирование перекрытия осуществляют после бетонирования стен, а после демонтажа опалубки на предыдущей захватке ее перемещают и устанавливают на последующей захватке. The method of erecting monolithic buildings using volumetric tunnel tunnel formwork, including the manufacture of support crowns broken down into grips, installation of formwork, placement of wall reinforcement, concrete concreting, concrete curing in the formwork before hardening, dismantling of formwork and repeating the technological cycle, characterized in that before formwork installations mount the scaffolds around the entire perimeter of the building's erected floor, place embedded parts in the form of walls made separately according to the thickness of the walls and the height of the overlap of concrete crosses mounted communication network, and after the formwork is placed in a polutunneley valve overlap and exhibit a design position polutunneli vertically and horizontally, the overlap concreting performed after concreting the wall, and after removal of formwork of the previous-bay it is moved and installed at a later-bay.
RU96108555A 1996-04-25 1996-04-25 Method of erection of cast-in-situ buildings RU2079618C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU96108555A RU2079618C1 (en) 1996-04-25 1996-04-25 Method of erection of cast-in-situ buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU96108555A RU2079618C1 (en) 1996-04-25 1996-04-25 Method of erection of cast-in-situ buildings

Publications (2)

Publication Number Publication Date
RU2079618C1 true RU2079618C1 (en) 1997-05-20
RU96108555A RU96108555A (en) 1997-07-20

Family

ID=20180016

Family Applications (1)

Application Number Title Priority Date Filing Date
RU96108555A RU2079618C1 (en) 1996-04-25 1996-04-25 Method of erection of cast-in-situ buildings

Country Status (1)

Country Link
RU (1) RU2079618C1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2119026C1 (en) * 1997-07-11 1998-09-20 Олег Антонович Васильев Method for erection of monolithic buildings and set of extending, displaceable, tunnel-shape shuttering for realization of method
RU2192522C2 (en) * 2000-11-02 2002-11-10 Анпилов Сергей Михайлович Process of manufacture of monolithic floor panels and gear for its realization
RU2208083C2 (en) * 2001-09-13 2003-07-10 Открытое акционерное общество "Научно-исследовательский институт транспортного строительства" Process of encasement of monolithic reinforced concrete building structure extended in area in concrete
RU2211892C2 (en) * 2001-09-13 2003-09-10 Открытое акционерное общество "Научно-исследовательский институт транспортного строительства" Process of laying concrete on monolithic reinforced concrete building structures extended in area
WO2011078734A1 (en) * 2009-12-21 2011-06-30 Semenov Dahir Kurmanbievich Method for erecting a building having a cast-in-place frame and decorative outer finish

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. FR, патент, 24332073, кл. E 04 G 11/02, 1980. 2. FR, патент, 2504580, кл. E 04 G 11/02, 1982. 3. DE, патент, 2426126, кл. E 04 G 11/02, 1975. 4. DE, патент, 2530756, кл. E 04 G 11/02, 1977. 5. Шмит О.Н. Опалубки для монолитного бетона. - М.: Стройиздат, 1987, с. 151, рис.3.10. 6. SU, авторское свидетельство, 1740592, кл. E 04 G 11/20, 1992. *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2119026C1 (en) * 1997-07-11 1998-09-20 Олег Антонович Васильев Method for erection of monolithic buildings and set of extending, displaceable, tunnel-shape shuttering for realization of method
RU2192522C2 (en) * 2000-11-02 2002-11-10 Анпилов Сергей Михайлович Process of manufacture of monolithic floor panels and gear for its realization
RU2208083C2 (en) * 2001-09-13 2003-07-10 Открытое акционерное общество "Научно-исследовательский институт транспортного строительства" Process of encasement of monolithic reinforced concrete building structure extended in area in concrete
RU2211892C2 (en) * 2001-09-13 2003-09-10 Открытое акционерное общество "Научно-исследовательский институт транспортного строительства" Process of laying concrete on monolithic reinforced concrete building structures extended in area
WO2011078734A1 (en) * 2009-12-21 2011-06-30 Semenov Dahir Kurmanbievich Method for erecting a building having a cast-in-place frame and decorative outer finish

Similar Documents

Publication Publication Date Title
US20020059763A1 (en) Pre-fabricated bathroom
GB1451611A (en) Building construction
US3239990A (en) Multi-storey buildings
RU2079618C1 (en) Method of erection of cast-in-situ buildings
CN112049237B (en) Vertical penetration construction method for high-rise building
CN217758964U (en) Basement outer wall post-cast strip closed structure
RU2105849C1 (en) Method for erection of box-type monolithic garages by flow-line procedure
RU2079617C1 (en) Method of erection of three-dimensional cast-in-situ structures
RU2057865C1 (en) Method for erecting buildings of monolithic concrete and reinforced concrete with monolithic facing
RU96108555A (en) METHOD FOR CONSTRUCTION OF MONOLITHIC BUILDINGS
RU2097513C1 (en) Process of erection of superstructure of building
RU97104281A (en) METHOD FOR THREADED CONSTRUCTION OF BOXING TYPE MONOLITHIC GARAGES
SU1557295A1 (en) Method of erecting multistorey building by method of storey lifting
RU2078180C1 (en) A set of prefabricated travelling tunnel-type forms
SU1079785A1 (en) Method of constructing a multistorey building by adding floors from below
CN219992537U (en) A construction device for removing and temporarily replacing supporting piles, anchor cables and waist beams
SU977644A1 (en) Method for erecting cast-in-place buildings
RU97112079A (en) METHOD FOR CONSTRUCTION OF MONOLITHIC BUILDINGS AND A SET OF SLIDING, VOLUME-CROSSING, TUNNEL FORMWORK FOR ITS IMPLEMENTATION
CN210659252U (en) Lintel cement formwork
RU2101436C1 (en) Method for adding storeys to dwelling and public buildings
SU614202A1 (en) Falsework for coverings
SU1004576A1 (en) Method of erecting a building
SU1189966A1 (en) Method of constructing building skeleton
RU2087650C1 (en) House-building combine
SU844732A1 (en) Method of constructing multistorey building in slide form

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees