RU187429U1 - Power supply control device for the energy district with distributed generation sources during a short circuit in the section of the reserved line - Google Patents

Power supply control device for the energy district with distributed generation sources during a short circuit in the section of the reserved line Download PDF

Info

Publication number
RU187429U1
RU187429U1 RU2018143713U RU2018143713U RU187429U1 RU 187429 U1 RU187429 U1 RU 187429U1 RU 2018143713 U RU2018143713 U RU 2018143713U RU 2018143713 U RU2018143713 U RU 2018143713U RU 187429 U1 RU187429 U1 RU 187429U1
Authority
RU
Russia
Prior art keywords
input
inputs
starting
voltage
outputs
Prior art date
Application number
RU2018143713U
Other languages
Russian (ru)
Inventor
Павел Владимирович Илюшин
Александр Леонидович Куликов
Original Assignee
Павел Владимирович Илюшин
Александр Леонидович Куликов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Павел Владимирович Илюшин, Александр Леонидович Куликов filed Critical Павел Владимирович Илюшин
Priority to RU2018143713U priority Critical patent/RU187429U1/en
Application granted granted Critical
Publication of RU187429U1 publication Critical patent/RU187429U1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H9/00Emergency protective circuit arrangements for limiting excess current or voltage without disconnection
    • H02H9/04Emergency protective circuit arrangements for limiting excess current or voltage without disconnection responsive to excess voltage
    • H02H9/06Emergency protective circuit arrangements for limiting excess current or voltage without disconnection responsive to excess voltage using spark-gap arresters
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/16Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to fault current to earth, frame or mass

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

Полезная модель относится к автоматике электрических сетей и может быть использована для обеспечения надежного электроснабжения потребителей промышленного энергорайона с источниками распределенной генерации. Требуемый технический результат, заключающийся в расширении функциональных возможностей и повышении надежности бесперебойного электроснабжения промышленного энергорайона, достигается в устройстве, содержащем пусковой орган по напряжению, пусковой орган по частоте, элемент ИЛИ, первый и второй элементы И, выходы которых соединены, соответственно, с первым и вторым входами элемента ИЛИ, блок определения уставок пусковых органов и блок памяти оптимальных вариантов автоматического ввода резерва, выход которого соединен со входом блока определения уставок пусковых органов, при этом первый и второй выходы блока определения уставок пусковых органов соединены с первыми входами, соответственно, первого и второго элементов И, третий и четвертый выходы блока определения уставок пусковых органов соединены, соответственно, с первым входом пускового органа по напряжению и с первым входом пускового органа по частоте, выполненных с возможностью подачи на их вторые входы сигнала от датчика напряжения резервируемой линии, а выходы пускового органа по напряжению и пускового органа по частоте соединены со вторыми входами, соответственно, первого и второго элементов И. 8 ил.The utility model relates to the automation of electric networks and can be used to ensure reliable power supply to consumers of the industrial energy district with sources of distributed generation. The required technical result, which consists in expanding the functionality and increasing the reliability of uninterrupted power supply to the industrial energy district, is achieved in a device containing a voltage trigger, a frequency trigger, an OR element, the first and second AND elements, the outputs of which are connected, respectively, with the first and the second inputs of the OR element, the unit for determining the settings of the starting organs and the memory block of the optimal options for automatic input of the reserve, the output of which is connected to the input of the block the distribution of the settings of the starting organs, while the first and second outputs of the unit for determining the settings of the starting organs are connected to the first inputs, respectively, of the first and second elements And, the third and fourth outputs of the unit for determining the settings of the starting organs are connected, respectively, to the first input of the starting body for voltage and with the first input of the starting body in frequency, made with the possibility of applying to their second inputs of the signal from the voltage sensor of the reserved line, and the outputs of the starting body in voltage and starting body in frequency are connected to the second inputs, respectively, of the first and second elements I. 8 ill.

Description

Полезная модель относится к автоматике электрических сетей и может быть использована для обеспечения надежного электроснабжения потребителей промышленного энергорайона с источниками распределенной генерации.The utility model relates to the automation of electric networks and can be used to ensure reliable power supply to consumers of the industrial energy district with sources of distributed generation.

Известен блок автоматического включения резерва электропитания устройств [RU №111364, H02J 9/06, Н02В 1/00, 14.09.2011], который содержит вводы фидеров электроснабжения, к каждому из них подключены внутренние устройства защиты от импульсных и коммутационных помех и перенапряжений, которые связаны с устройствами контроля качества электроэнергии для каждого ввода электроснабжения и устройством коммутации вводов, со схемой логики управления коммутацией вводов электроснабжения, которая, в свою очередь, управляет работой устройства коммутации вводов электроснабжения, схемой индикации состояния блока, которая подключена к устройству передачи диагностической информации в системы диспетчерского контроля.A known unit for automatically turning on the power supply reserve of devices [RU No. 111364, H02J 9/06, Н02В 1/00, 09/14/2011], which contains inputs of feeders for power supply, internal protection devices against impulse and switching interference and overvoltage are connected to each of them, which connected with power quality control devices for each power supply input and input switching device, with a circuit of control logic for switching power supply inputs, which, in turn, controls the operation of the switching device for input ele power supply, a block status indication circuitry that is connected to a device for transmitting diagnostic information to supervisory control systems.

Недостатком устройства является относительно узкие функциональные возможности, поскольку известное устройство предназначено только для организации электропитания устройств низковольтных потребителей электроэнергии от однофазных источников переменного тока.The disadvantage of this device is the relatively narrow functionality, since the known device is intended only to organize the power supply of low-voltage consumers of electricity from single-phase AC sources.

Наиболее близким по технической сущности к предложенному является устройство автоматического включения резервного электропитания потребителей [RU 2447565, C1, H02J 9/06, 10.04.2012], содержащее вводные выключатели основного и резервного источников питания, секционный выключатель, трансформаторы напряжения на шинах основного и резервного источников, трансформаторы токов на вводах основного и резервного источников, аналого-цифровые преобразователи тока и напряжения, блоки определения минимального тока ввода каждой секции, быстродействующее пусковое устройство, выход которого подключен через блок управления к вводным и секционному выключателям, причем, быстродействующее пусковое устройство дополнительно снабжено блоком формирования линейных напряжений основного и резервного источника и блоком определения направления мощности в фазах ввода основного и резервного источника, три входа блока формирования линейных напряжений основного источника соединены с соответствующими выходами аналого-цифровых преобразователей напряжения на шинах основного источника, и четвертый вход соединен с соответствующим выходом блока формирования линейных напряжений резервного источника, а выходы связаны с тремя соответствующими входами блока определения направления мощности в фазах основного источника и входом блока формирования линейных напряжений резервного источника, три входа блока формирования линейных напряжений резервного источника соединены с соответствующими выходами аналого-цифровых преобразователей напряжения на шинах резервного источника, а выходы связаны с тремя соответствующими входами блока определения направления мощности в фазах резервного источника, три входа блока определения направления мощности в фазах основного источника соединены с соответствующими выходами аналого-цифровых преобразователей тока основного источника, а три выхода соединены с соответствующими входами трех логических элементов «И» основного источника, и три остальных выхода соединены с тремя соответствующими входами логических элементов «И» резервного источника, три входа блока определения направления мощности в фазах резервного источника соединены с соответствующими выходами аналого-цифровых преобразователей тока резервного источника, а три выхода соединены с соответствующими входами трех логических элементов «И» резервного источника, и три остальных выхода соединены с тремя соответствующими входами логических элементов «И» основного источника, выходы трех логических элементов «И» основного источника соединены с тремя входами первого логического элемента «ИЛИ» основного источника, а выходы соединены с соответствующим входом второго логического элемента «ИЛИ» основного источника, выходы трех логических элементов «И», резервного источника соединены с тремя входами первого логического элемента «ИЛИ» резервного источника, а выходы соединены с соответствующим входом второго логического элемента «ИЛИ» резервного источника, вход блока определения минимального тока ввода основного источника связан с соответствующими выходами аналого-цифровых преобразователей тока основного источника, а один выход соединен с входом четвертого логического элемента «И» основного источника, и второй выход соединен с соответствующим входом четвертого логического элемента «И» резервного источника, вход блока определения минимального тока ввода резервного источника связан с соответствующими выходами аналого-цифровых преобразователей тока резервного источника, а один выход соединен с входом четвертого логического элемента «И» резервного источника, и второй выход соединен с соответствующим входом четвертого логического элемента «И» основного источника, второй вход второго логического элемента «ИЛИ» основного источника соединен с соответствующим выходом четвертого логического элемента «И» основного источника, а выход соединен с соответствующим входом пятого логического элемента «И» основного источника, второй вход второго логического элемента «ИЛИ» резервного источника соединен с соответствующим выходом четвертого логического элемента «И» резервного источника, а выход соединен с соответствующим входом пятого логического элемента «И» резервного источника, на второй вход пятого логического элемента «И» основного и резервного источника подают блокирующие сигналы от релейной защиты, а выход соединен с входами блока управления.The closest in technical essence to the proposed is a device for automatically turning on the backup power supply to consumers [RU 2447565, C1, H02J 9/06, 04/10/2012], containing input switches of the main and backup power sources, a section switch, voltage transformers on the buses of the main and backup sources , current transformers at the inputs of the main and backup sources, analog-to-digital current and voltage converters, blocks for determining the minimum input current of each section, high-speed starts e device, the output of which is connected through the control unit to the input and section switches, moreover, the high-speed starting device is additionally equipped with a unit for generating linear voltages of the main and standby sources and a unit for determining the direction of power in the phases of input of the main and standby sources, three inputs of the unit for generating linear voltages of the main the source is connected to the corresponding outputs of the analog-to-digital voltage converters on the buses of the main source, and the fourth input is dinene with the corresponding output of the unit for forming the linear voltage of the backup source, and the outputs are connected to the three corresponding inputs of the unit for determining the direction of power in the phases of the main source and the input of the unit for forming the linear voltage of the backup source, the three inputs of the unit for forming the linear voltage of the backup source are connected to the corresponding outputs of analog-digital voltage converters on the buses of the backup source, and the outputs are connected to the three corresponding inputs of the determination unit power directions in the phases of the backup source, the three inputs of the power direction determining unit in the phases of the main source are connected to the corresponding outputs of the analog-to-digital current converters of the main source, and the three outputs are connected to the corresponding inputs of the three logical elements “AND” of the main source, and the other three outputs are connected with three corresponding inputs of logical elements “AND” of the backup source, the three inputs of the unit for determining the direction of power in the phases of the backup source are connected to the existing outputs of the analog-to-digital current converters of the backup source, and the three outputs are connected to the corresponding inputs of the three logical elements “AND” of the backup source, and the other three outputs are connected to the three corresponding inputs of the logical elements “AND” of the main source, the outputs of the three logical elements “AND” the main source connected to the three inputs of the first logical element "OR" of the main source, and the outputs are connected to the corresponding input of the second logical element "OR" of the main source, the outputs of the three logical elements "AND", the backup source is connected to the three inputs of the first logical element "OR" of the backup source, and the outputs are connected to the corresponding input of the second logic element "OR" of the backup source, the input of the unit for determining the minimum input current of the main source is connected with the corresponding outputs analog-digital current converters of the main source, and one output is connected to the input of the fourth logical element "AND" of the main source, and the second output is connected to the corresponding the input of the fourth logical element "AND" of the backup source, the input of the unit for determining the minimum input current of the backup source is connected to the corresponding outputs of the analog-to-digital converters of current of the backup source, and one output is connected to the input of the fourth logical element "AND" of the backup source, and the second output is connected to the corresponding input of the fourth logical element "AND" of the main source, the second input of the second logical element "OR" of the main source is connected to the corresponding output of the four of the logical element "AND" of the main source, and the output is connected to the corresponding input of the fifth logical element "AND" of the main source, the second input of the second logical element "OR" of the backup source is connected to the corresponding output of the fourth logical element "AND" of the backup source, and the output is connected with the corresponding input of the fifth logical element "AND" of the backup source, blocking signals from the relay protection are fed to the second input of the fifth logical element "AND" of the main and backup source, and the output q is connected to the inputs of the control unit.

Недостатком устройства является относительно узкие функциональные возможности, поскольку, хотя оно и предназначено для осуществления автоматического включения резервного электропитания потребителей, но не позволяет осуществлять управление электроснабжением энергорайона с источниками распределенной генерации при коротком замыкании на участке резервируемой линии. Это сужает арсенал технических средств, которые позволяют осуществлять управление электроснабжением энергорайона.The disadvantage of this device is the relatively narrow functionality, since although it is designed to automatically turn on the backup power supply of consumers, it does not allow controlling the power supply of the energy district with distributed generation sources during a short circuit in the section of the reserved line. This narrows the arsenal of technical tools that allow you to manage the power supply of the energy district.

Задачей, которая решается в полезной модели, является создание устройства, обладающего более широкими функциональными возможностями и расширяющего арсенал технических средств, которые могут быть использованы для управления электроснабжением промышленного энергорайона с источниками распределенной генерации при возможных коротких замыканиях на участках резервируемых линий, и обеспечивающего надежный сетевой автоматический ввод резерва промышленного энергорайона с источниками распределенной генерации, обеспечивающего его срабатывание при коротком замыкании на участке резервируемой линии.The problem, which is solved in a utility model, is to create a device with wider functionality and expanding the arsenal of technical means that can be used to control the power supply of an industrial energy district with distributed generation sources during possible short circuits on sections of redundant lines, and providing reliable network automatic input of the reserve of the industrial energy district with sources of distributed generation, ensuring its triggering vanie short-circuit at the site redundant line.

Требуемый технический результат заключается в расширении функциональных возможностей и расширении, на этой основе, арсенала технических средств, которые могут быть использованы для управления электроснабжением промышленного энергорайона с источниками распределенной генерации при возможных коротких замыканиях на участках резервируемых линий, и повышении надежности бесперебойного электроснабжения промышленного энергорайона с источниками распределенной генерации при возможных коротких замыканиях на участке резервируемой линии.The required technical result consists in expanding the functionality and expanding, on this basis, an arsenal of technical means that can be used to control the power supply of the industrial energy district with sources of distributed generation with possible short circuits on sections of redundant lines, and increase the reliability of uninterrupted power supply of the industrial energy district with sources distributed generation with possible short circuits in the section of the reserved line.

Поставленная задача решается, а требуемый технический результат достигается тем, что, в устройство, содержащее пусковой орган по напряжению, пусковой орган по частоте, а также элемент ИЛИ и первый и второй элементы И, выходы которых соединены, соответственно, с первым и вторым входами элемента ИЛИ, согласно полезной модели, введены блок определения уставок пусковых органов, выполненный с возможностью подачи на его группу сигнальных входов сигналов напряжений в узлах и токов в ветвях энергорайона и на его вход телесигнализации сигналов о положении секционирующих выключателей резервируемой линии, и блок памяти оптимальных вариантов автоматического ввода резерва, выход которого соединен со входом блока определения уставок пусковых органов, при этом, первый и второй выходы блока определения уставок пусковых органов соединены с первыми входами, соответственно, первого и второго элементов И, третий и четвертый выходы блока определения уставок пусковых органов соединены, соответственно, с первым входом пускового органа по напряжению и с первым входом пускового органа по частоте, выполненных с возможностью подачи на их вторые входы сигнала от датчика напряжения резервируемой линии, а выходы пускового органа по напряжению и пускового органа по частоте соединены со вторыми входами, соответственно, первого и второго элементов И.The problem is solved, and the required technical result is achieved by the fact that, in a device containing a trigger element for voltage, a trigger element for frequency, as well as an OR element and the first and second elements AND, the outputs of which are connected, respectively, with the first and second inputs of the element OR, according to the utility model, a unit for determining the settings of the starting organs is introduced, configured to supply voltage signals in the nodes and currents in the branches of the energy district to its group of signal inputs and te-signaling signals the positioning of the sectionalizing switches of the redundant line, and the memory block of the optimal options for automatic input of the reserve, the output of which is connected to the input of the block for determining the settings of the starting organs, while the first and second outputs of the block for determining the settings of the starting organs are connected to the first inputs, respectively, of the first and second elements , the third and fourth outputs of the unit for determining the settings of the starting organs are connected, respectively, with the first input of the starting body for voltage and with the first input of the starting body for one hour the totem made with the possibility of supplying to their second inputs a signal from the voltage sensor of the redundant line, and the outputs of the starting voltage element and the starting frequency element are connected to the second inputs of the first and second elements I.

На чертеже представлены:The drawing shows:

на фиг. 1 - электрическая структурная схема устройства управления электроснабжением энергорайона с источниками распределенной генерации при коротком замыкании на участке резервируемой линии совместно с примером расчетной схемы автоматического включения резерва при электроснабжении энергорайона с источниками распределенной генерации.in FIG. 1 is an electrical block diagram of a power supply control device for an energy district with distributed generation sources during a short circuit in a section of a redundant line, together with an example of a design scheme for automatically switching on a reserve when power is supplied to an energy district with distributed generation sources.

на фиг. 2 - иллюстрация схемно-режимных условий срабатывания АВР при аварийном снижении напряжения;in FIG. 2 - illustration of the circuit-operational conditions for the operation of the ATS during emergency voltage reduction;

на фиг. 3-8 - примеры переходных процессов для всех зон аварийных режимов, представленных на фиг. 2. (фигурам соответствуют следующие параметры: фиг. 3 - область Al, d=60%, р=30%; фиг. 4 - область А2, d=60%, р=50%; фиг. 5 - область C1, d=0, p=100%; фиг. 6 - область С2, d=20%, р=70%; фиг. 7 - область С3, точка С31, d=60%, р=70%; фиг. 8 -область С3, точка С32, d=0%, р=30%);in FIG. 3-8 are examples of transients for all emergency zones shown in FIG. 2. (the figures correspond to the following parameters: Fig. 3 - region Al, d = 60%, p = 30%; Fig. 4 - region A2, d = 60%, p = 50%; Fig. 5 - region C1, d = 0, p = 100%; Fig. 6 - region C2, d = 20%, p = 70%; Fig. 7 - region C3, point C3 1 , d = 60%, p = 70%; Fig. 8 - region C3, point C3 2 , d = 0%, p = 30%);

На фиг. 1 обозначены:In FIG. 1 marked:

1 - блок определения уставок пусковых органов;1 - block determining the settings of the launching bodies;

2 - датчик напряжения резервируемой линии;2 - voltage sensor of the reserved line;

3 - пусковой орган по напряжению:3 - starting voltage element:

4 - пусковой орган по частоте;4 - trigger body in frequency;

5 - первый 51 и второй 52 элементы И;5 - the first 5 1 and the second 5 2 elements And;

6 - элемент ИЛИ,6 - element OR,

7 - блок памяти оптимальных вариантов автоматического ввода резерва;7 - memory block optimal options for automatic reserve input;

8 - блок автоматического ввода резерва (АВР);8 - block automatic input reserve (ABP);

9 - асинхронные двигатели (АД);9 - asynchronous motors (HELL);

10 - генерирующие установки (ГУ);10 - generating installations (PG);

11 - резистор (R);11 - resistor (R);

12 - выключатель В1;12 - switch B1;

13 - выключатель В2;13 - switch B2;

14 - выключатель В3;14 - switch B3;

15-16 - шины «бесконечной мощности» (ШБМ).15-16 - tires of "infinite power" (BWM).

Устройство управления электроснабжением энергорайона с источниками распределенной генерации при коротком замыкании на участке резервируемой линии содержит пусковой орган 3 по напряжению, пусковой орган 4 по частоте, а также элемент ИЛИ 6 и первый 51 и второй 52 элементы И, выходы которых соединены, соответственно, с первым и вторым входами элемента ИЛИ 6.The power supply control device for the energy district with distributed generation sources during a short circuit in the section of the reserved line contains a trigger element 3 in voltage, a trigger element 4 in frequency, and also an OR element 6 and the first 5 1 and second 5 2 And elements, the outputs of which are connected, respectively, with the first and second inputs of the element OR 6.

Устройство управления электроснабжением энергорайона с источниками распределенной генерации при коротком замыкании на участке резервируемой линии также содержит блок 1 определения уставок пусковых органов, выполненного с возможностью подачи на его группу сигнальных входов сигналов напряжений в узлах и токов в ветвях энергорайона и на его вход телесигнализации сигналов о положении секционирующих выключателей резервируемой линии, и блок 7 памяти оптимальных вариантов автоматического ввода резерва, выход которого соединен со входом блока 1 определения уставок пусковых органов.The control device for power supply of the energy district with distributed generation sources during a short circuit in the section of the reserved line also contains a unit 1 for determining the settings of the starting organs, configured to supply voltage signal nodes and currents in the branches of the energy district to its group of signal signals and position signals sectioning switches of the redundant line, and the memory unit 7 of the optimal options for automatic input of the reserve, the output of which is connected to the input b Lock 1 determine the settings of the starting bodies.

В устройстве первый и второй выходы блока 1 определения уставок пусковых органов соединены с первыми входами, соответственно, первого 51 и второго 52 элементов И, третий и четвертый выходы блока 1 определения уставок пусковых органов соединены, соответственно, с первым входом пускового органа 3 по напряжению и с первым входом пускового органа 4 по частоте, выполненных с возможностью подачи на их вторые входы сигнала от датчика 2 напряжения резервируемой линии, а выходы пускового органа 3 по напряжению и пускового органа 4 по частоте соединены со вторыми входами, соответственно, первого 51 и второго 52 элементов И.In the device, the first and second outputs of the block 1 for determining the settings of the trigger elements are connected to the first inputs, respectively, of the first 5 1 and second 5 2 elements And, the third and fourth outputs of the block 1 for determining the settings of the trigger bodies are connected, respectively, with the first input of the trigger 3 voltage and with the first input of the starting body 4 in frequency, made with the possibility of applying to their second inputs a signal from the sensor 2 voltage of the reserved line, and the outputs of the starting body 3 in voltage and the starting body 4 in frequency are connected with second inputs, respectively, of the first 5 1 and second 5 2 elements I.

Кроме того, в устройстве выходы первого 51 и второго 52 элементов И через элемент ИЛИ 6 подключены к управляющему входу выключателя, обеспечивающему срабатывание сетевого АВР.In addition, in the device, the outputs of the first 5 1 and second 5 2 elements AND through the element OR 6 are connected to the control input of the switch, which ensures the operation of the network ABP.

Приведем примеры совместного и раздельного применения пусковых органов по напряжению и частоте в различных схемно-режимных условиях работы промышленного энергорайона (см. фиг. 2):Here are examples of the joint and separate application of the trigger elements for voltage and frequency in various circuit-operating conditions of the industrial energy district (see Fig. 2):

- в области А1 - обеспечивается нормальное срабатывание АВР - используется только пусковой орган по напряжению;- in the area A1 - the normal operation of the ATS is ensured - only the starting voltage element is used;

- в области А2 - фиксируется увеличение времени срабатывания АВР - используется только пусковой орган по напряжению, но с контролем допустимой длительности снижения напряжения (уставка по времени);- in the area A2 - an increase in the response time of the ATS is recorded - only the starting voltage element is used, but with control of the permissible duration of the voltage reduction (time setting);

- в области С1 - фиксируется незначительное снижение напряжения и частоты, которые выше критических значений - используются совместно пусковые органы по напряжению и частоте (одна группа уставок по напряжению и частоте);- in the area C1 - a slight decrease in voltage and frequency is recorded, which are higher than critical values - trigger elements for voltage and frequency are used together (one group of settings for voltage and frequency);

- в области С2 - фиксируется незначительное снижение напряжения, которое ограничено допустимой продолжительностью форсировки возбуждения ГУ, и значительное снижение частоты - используются совместно пусковые органы по напряжению и частоте (другая группа уставок по напряжению и частоте);- in the area C2 - an insignificant decrease in voltage is recorded, which is limited by the permissible duration of forcing the excitation of the PG, and a significant decrease in frequency - the trigger organs for voltage and frequency are used together (another group of settings for voltage and frequency);

- в области С3 - фиксируется глубокое снижение напряжения - используется пусковой орган по напряжению с контролем положения секционирующих включателей на резервируемой линии, обеспечивая срабатывание АВР без выдержки времени.- in the area C3 - a deep voltage drop is recorded - a voltage trigger is used to control the position of the sectionalizing switches on the redundant line, ensuring the automatic transfer switch trips without a time delay.

Устройство управления электроснабжением энергорайона с источниками распределенной генерации при коротком замыкании на участке резервируемой линии работает следующим образом.The control device for power supply of the energy district with sources of distributed generation during a short circuit in the section of the redundant line works as follows.

Предварительно выполняются расчеты или имитационное моделирование для определения вариантов функционирования АВР в различных (нормальных и аварийных) режимах работы энергорайона с источниками распределенной генерации и резервируемой линией. Результаты предварительных расчетов или имитационного моделирования заносятся в блок 7 памяти для последующего выбора оптимального варианта функционирования АВР в конкретном аварийном режиме работы энергорайона с источниками распределенной генерации и резервируемой линии.Preliminarily, calculations or simulation are performed to determine the options for the operation of the ATS in various (normal and emergency) modes of operation of the energy district with sources of distributed generation and a reserved line. The results of preliminary calculations or simulation are entered into the memory unit 7 for the subsequent selection of the optimal option for the operation of the ATS in a particular emergency operation of the energy district with sources of distributed generation and a reserved line.

Для мониторинга текущего режима функционирования энергорайона и резервируемой линии в блок 1 подается информация о токах в ветвях и напряжениях в узлах энергорайона. Дополнительно на его вход поступают данные о положениях коммутационных аппаратов системы электроснабжения энергорайона и резервируемой линии, определяющие состояние («отключено»/«в работе») электрооборудования (источников распределенной генерации, линий электропередачи, трансформаторов, электроприемников потребителей и др.). В каждый момент времени на основе входной информации блок 1 определяет текущий режим работы энергорайона. Исходя из текущего режима работы энергорайона блок 1 использует информацию, хранящуюся в блоке 7 памяти для аналогичной (или близкой к таковой) схемно-режимной ситуации, и для которой рассчитаны или получены в результате предварительных расчетов или имитационного моделирования оптимальные варианты АВР, что позволяет определить наилучшие текущие уставки, которые из блока 1 поступают на первые входы пусковых органов по напряжению 3 и по частоте 4. На вторые входы пусковых органов 3, 4 от цепей измерения напряжения энергорайона через датчик 2 напряжения поступает информация, необходимая для их функционирования. В пусковом органе по частоте 4 на основе, например, мгновенных значений напряжения определяется частота энергорайона, требуемая для функционирования АВР. При превышении текущими значениями напряжения и частоты уставочных значений пусковых органов на их выходах формируются управляющие сигналы, которые поступают на вторые входы элементов И 51 и 52.To monitor the current operating mode of the energy district and the reserved line, block 1 provides information on currents in the branches and voltages in the nodes of the energy district. Additionally, it receives data on the positions of the switching devices of the power supply system of the energy district and the redundant line, which determine the status (“off” / “in operation”) of the electrical equipment (distributed generation sources, power lines, transformers, consumer electric receivers, etc.). At each moment in time, based on the input information, block 1 determines the current operating mode of the energy district. Based on the current operating mode of the energy district, block 1 uses the information stored in memory block 7 for a similar (or close to that) circuit-mode situation, and for which the optimal ATS options are calculated or obtained as a result of preliminary calculations or simulation modeling, which makes it possible to determine the best the current settings, which from block 1 are supplied to the first inputs of the starting organs by voltage 3 and by frequency 4. To the second inputs of the starting organs 3, 4 from the voltage measurement circuits of the energy district through a 2 n sensor information receives the information necessary for their functioning. In the starting organ, at a frequency of 4, based on, for example, instantaneous voltage values, the frequency of the energy district required for the operation of the ATS is determined. When current values of the voltage and frequency exceed the set values of the starting elements, control signals are generated at their outputs, which are fed to the second inputs of the elements And 5 1 and 5 2 .

Аналогично при повреждении и отключении участка резервируемой линии (возникновении аварийной ситуации), информация об отключении секционирующего выключателя (выключателей) поступает на вход телесигнализации блока 1 и после определения оптимальных уставок для соответствующей схемно-режимной ситуации задействуются выходные управляющие сигналы пусковых органов 3, 4 АВР. При этом на первые входы элементов И 51 и 52 от блока 1 поступают сигналы, предназначенные для реализации совместного или раздельного функционирования пусковых органов 3, 4 по напряжению и по частоте, а элемент ИЛИ 6 выполняет передачу управляющих сигналов от элементов И 51 и 52 на выключатель, обеспечивающий срабатывание сетевого АВР.Similarly, if a section of the redundant line is damaged and disconnected (an emergency occurs), information about the disconnection of the sectioning switch (s) is fed to the telesignal input of unit 1 and, after determining the optimal settings for the corresponding circuit-mode situation, the output control signals of the starting organs 3, 4 of the ATS are activated. In this case, the first inputs of the elements And 5 1 and 5 2 from block 1 receive signals intended for the implementation of the joint or separate functioning of the starting organs 3, 4 in voltage and frequency, and the element OR 6 transmits control signals from the elements And 5 1 and 5 2 on the switch providing operation of network automatic transfer switch.

Таким образом, по данным предварительных расчетов или имитационного моделирования, а также анализа текущего режима функционирования энергорайона производится управление электроснабжением промышленного энергорайона с источниками распределенной генерации, в том числе в аварийных ситуациях при коротком замыкании на участке резервируемой линии, что обеспечивает достижение требуемого технического результата, заключающегося в расширении функциональных возможностей и расширении, на этой основе, арсенала технических средств, которые могут быть использованы для управления электроснабжением промышленного энергорайона с источниками распределенной генерации при возможных коротких замыканиях на участках резервируемых линий, и повышении надежности бесперебойного электроснабжения промышленного энергорайона.Thus, according to preliminary calculations or simulation, as well as analysis of the current mode of operation of the energy district, the power supply of the industrial energy district with distributed generation sources is controlled, including in emergency situations when a short circuit occurs on the section of the reserved line, which ensures the achievement of the required technical result, which consists in in expanding the functionality and expanding, on this basis, an arsenal of technical means that can They can be used to control the power supply of the industrial energy district with sources of distributed generation in case of possible short circuits on the sections of redundant lines, and increase the reliability of uninterrupted power supply of the industrial energy district.

Claims (1)

Устройство управления электроснабжением энергорайона с источниками распределенной генерации при коротком замыкании на участке резервируемой линии, содержащее пусковой орган по напряжению, пусковой орган по частоте, а также элемент ИЛИ и первый и второй элементы И, выходы которых соединены, соответственно, с первым и вторым входами элемента ИЛИ, отличающееся тем, что введены блок определения уставок пусковых органов, выполненный с возможностью подачи на его группу сигнальных входов сигналов напряжений в узлах и токов в ветвях энергорайона и на его вход телесигнализации сигналов о положении секционирующих выключателей резервируемой линии, и блок памяти оптимальных вариантов автоматического ввода резерва, выход которого соединен со входом блока определения уставок пусковых органов, при этом первый и второй выходы блока определения уставок пусковых органов соединены с первыми входами, соответственно, первого и второго элементов И, третий и четвертый выходы блока определения уставок пусковых органов соединены, соответственно, с первым входом пускового органа по напряжению и с первым входом пускового органа по частоте, выполненных с возможностью подачи на их вторые входы сигнала от датчика напряжения резервируемой линии, а выходы пускового органа по напряжению и пускового органа по частоте соединены со вторыми входами, соответственно, первого и второго элементов И.A power supply control device for an energy district with distributed generation sources during a short circuit in a section of a reserved line, containing a voltage trigger, a frequency trigger, and also an OR element and first and second AND elements, the outputs of which are connected, respectively, with the first and second inputs of the element OR, characterized in that a block for determining the settings of the starting organs is introduced, configured to supply voltage signals in nodes and currents in the branches of the energy burner to its group of signal inputs it and to its input of the signaling signal of the position of the sectionalizing switches of the redundant line, and the memory block of the optimal options for automatic input of the reserve, the output of which is connected to the input of the block for determining the settings of the starting organs, while the first and second outputs of the block for determining the settings of the starting organs are connected to the first inputs respectively, of the first and second elements And, the third and fourth outputs of the block for determining the settings of the starting bodies are connected, respectively, with the first input of the starting body for voltage eniyu and the first input of the trigger body at a frequency adapted to supply a signal at their second inputs of redundant line voltage sensor, and outputs the trigger body voltage and frequency starting body are connected to second inputs, respectively, first and second elements I.
RU2018143713U 2018-12-11 2018-12-11 Power supply control device for the energy district with distributed generation sources during a short circuit in the section of the reserved line RU187429U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2018143713U RU187429U1 (en) 2018-12-11 2018-12-11 Power supply control device for the energy district with distributed generation sources during a short circuit in the section of the reserved line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2018143713U RU187429U1 (en) 2018-12-11 2018-12-11 Power supply control device for the energy district with distributed generation sources during a short circuit in the section of the reserved line

Publications (1)

Publication Number Publication Date
RU187429U1 true RU187429U1 (en) 2019-03-06

Family

ID=65678949

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2018143713U RU187429U1 (en) 2018-12-11 2018-12-11 Power supply control device for the energy district with distributed generation sources during a short circuit in the section of the reserved line

Country Status (1)

Country Link
RU (1) RU187429U1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2828825C1 (en) * 2024-05-06 2024-10-21 Федеральное государственное бюджетное научное учреждение "Федеральный научный агроинженерный центр ВИМ" (ФГБНУ ФНАЦ ВИМ) Method of protecting electrical network from short circuits, including with low currents, and wire breaks

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050116547A1 (en) * 2003-12-02 2005-06-02 Hsin-An Lin Uninterruptible power system with two current conversion units
RU111364U1 (en) * 2011-09-14 2011-12-10 Сергей Петрович Сергеев AUTOMATIC TURNING BLOCK FOR POWER SUPPLY OF RAILWAY AUTOMATION AND TELEMECHANICAL DEVICES
RU2447565C1 (en) * 2011-02-17 2012-04-10 федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный исследовательский университет "МЭИ" (ФГБОУ ВПО "НИУ МЭИ") Method for automatic switching-on of backup supply for consumers and device for this method implementation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050116547A1 (en) * 2003-12-02 2005-06-02 Hsin-An Lin Uninterruptible power system with two current conversion units
RU2447565C1 (en) * 2011-02-17 2012-04-10 федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный исследовательский университет "МЭИ" (ФГБОУ ВПО "НИУ МЭИ") Method for automatic switching-on of backup supply for consumers and device for this method implementation
RU111364U1 (en) * 2011-09-14 2011-12-10 Сергей Петрович Сергеев AUTOMATIC TURNING BLOCK FOR POWER SUPPLY OF RAILWAY AUTOMATION AND TELEMECHANICAL DEVICES

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2828825C1 (en) * 2024-05-06 2024-10-21 Федеральное государственное бюджетное научное учреждение "Федеральный научный агроинженерный центр ВИМ" (ФГБНУ ФНАЦ ВИМ) Method of protecting electrical network from short circuits, including with low currents, and wire breaks

Similar Documents

Publication Publication Date Title
JP6686200B2 (en) Power control device, power control device control method, power control system, and power control system control method
WO2015090375A1 (en) Microgrid black-start
EP3042429B1 (en) Microgrid with redundant points of common coupling and control method for it, to reduce risk of microgrid's islanding
RU2447565C1 (en) Method for automatic switching-on of backup supply for consumers and device for this method implementation
EP3309922A1 (en) Power storage system, power storage device, and operation method for power storage device
JP2015136199A (en) Power supply device, moving object, and power distribution system
JP2019527013A (en) Insulator for solar cell string
TWM506411U (en) Switching selector of power source
JP7193634B2 (en) Uninterruptible power supply microgrid system
RU187429U1 (en) Power supply control device for the energy district with distributed generation sources during a short circuit in the section of the reserved line
JP6099446B2 (en) Inverter and method for measuring insulation resistance of DC power supply system
EP3215735B1 (en) Method for coordinating control of wind farm during a black start of an islanding operation
JP6666175B2 (en) Power supply system
RU2654532C1 (en) Method of fast automatic switching on the consumer secondary power supply
JP2008061351A (en) Power supply switching system
RU2733203C1 (en) Method of connecting consumers to a standby source of power supply
RU2594355C2 (en) Method of electric energy conversion installation configuring and device that implements said method
RU2694070C1 (en) Control method of electric power supply of industrial power district with sources of distributed generation at short circuit on section of reserved line
JP6572057B2 (en) Power supply system
RU2343616C1 (en) Method for inhibit of automatic switchover for voltage falls under conditions of unacceptable power surges
JP6886536B2 (en) Power supply system
CN113489134B (en) Multi-power automatic switching control system and control method
AU2015285887B2 (en) Residual current protection device and residual current protection system
Bianchini et al. Microgrid test setup and procedures implemented on a real pilot project
RU8179U1 (en) SYSTEM OF POWER SUPPLY OF THE COMPLEX OF SHIP RADIO ELECTRONIC EQUIPMENT

Legal Events

Date Code Title Description
MM9K Utility model has become invalid (non-payment of fees)

Effective date: 20191212