RU166446U1 - STEPPING DRILLING RIG - Google Patents
STEPPING DRILLING RIG Download PDFInfo
- Publication number
- RU166446U1 RU166446U1 RU2016126893/03U RU2016126893U RU166446U1 RU 166446 U1 RU166446 U1 RU 166446U1 RU 2016126893/03 U RU2016126893/03 U RU 2016126893/03U RU 2016126893 U RU2016126893 U RU 2016126893U RU 166446 U1 RU166446 U1 RU 166446U1
- Authority
- RU
- Russia
- Prior art keywords
- working body
- truss
- drilling rig
- supports
- trolley
- Prior art date
Links
- 238000005553 drilling Methods 0.000 claims abstract description 24
- 210000001061 forehead Anatomy 0.000 claims abstract 2
- 238000009434 installation Methods 0.000 description 12
- 238000005065 mining Methods 0.000 description 8
- 229910052500 inorganic mineral Inorganic materials 0.000 description 5
- 230000007246 mechanism Effects 0.000 description 5
- 239000011707 mineral Substances 0.000 description 5
- 238000005070 sampling Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 206010054107 Nodule Diseases 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000003415 peat Substances 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/02—Travelling-gear, e.g. associated with slewing gears
- E02F9/04—Walking gears moving the dredger forward step-by-step
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/024—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting having means for adapting to inclined terrain; having means for stabilizing the vehicle while drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/12—Underwater drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C49/00—Obtaining peat; Machines therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C50/00—Obtaining minerals from underwater, not otherwise provided for
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Earth Drilling (AREA)
Abstract
Шагающая буровая установка, включающая ферму, опоры с платформами, телескопические штанги, рабочий орган, систему управления, отличающаяся тем, что ферма выполнена из двух параллельных труб с продольными направляющими и снабжена серьгами, шарнирно соединенными с платформами опор, при этом концы труб жестко связаны между собой поперечными балками с размещенными на них блоками, а рабочий орган выполнен в виде тележки с роликами, взаимодействующими с продольными направляющими фермы, с жестко закрепленными на ней буровым станком и двумя лебедками, снабженными гибкими тяговыми элементами, например, тросами, охватывающими блоки поперечных балок, один конец которых закреплен на барабане лебедки, а другой - на тележке рабочего органа.A walking drilling rig, including a truss, supports with platforms, telescopic rods, a working body, a control system, characterized in that the truss is made of two parallel pipes with longitudinal guides and equipped with earrings pivotally connected to the platforms of the supports, while the ends of the pipes are rigidly connected between by transverse beams with blocks placed on them, and the working body is made in the form of a trolley with rollers interacting with the longitudinal guides of the truss, with a drilling rig rigidly fixed on it and two foreheads feeders equipped with flexible traction elements, for example, cables covering blocks of transverse beams, one end of which is mounted on the winch drum, and the other on the trolley of the working body.
Description
Полезная модель относится к горному делу, в частности к устройствам для геологоразведочного бурения при разведке полезных ископаемых на морском дне. Устройство может быть использовано также для геологоразведочных изысканий, бурения горных пород при сложном рельефе месторождения, освоения торфяных месторождений.The utility model relates to mining, in particular to devices for exploration drilling in the exploration of minerals on the seabed. The device can also be used for geological exploration, drilling rocks with a complex relief of the field, development of peat deposits.
Известны устройства для перемещения добычных рабочих органов под водой с помощью канатов или тележек гусеничного, колесного и шнекового типа (Шагающие машины для освоения ресурсов морского дна. Л., 1987 г., с. 12-17).Known devices for moving mining working bodies under water using ropes or caterpillars of caterpillar, wheel and screw type (Walking machines for the development of the resources of the seabed. L., 1987, p. 12-17).
Недостатками этих устройств являются сложность обеспечения требуемых траекторий движения рабочих органов при системах сплошной разработки полезных ископаемых, а также нарушение экологии при оставлении следов гусениц, колес и шнеков.The disadvantages of these devices are the difficulty in providing the required trajectories of the movement of the working bodies with continuous mining of minerals, as well as environmental damage while leaving tracks of tracks, wheels and screws.
Известно добычное шагающее устройство для подводной разработки полезных ископаемых способное переносить рабочие органы по определенным траекториям (авторское свидетельство SU №1027343, E02F 3/88, опубл. 07.07.1983 г.), включающее ферму, установленную на двух опорах с тяговой тележкой и механизмом поворота.Known mining walking device for underwater mining of minerals capable of transporting working bodies along certain trajectories (copyright certificate SU No. 1027343, E02F 3/88, publ. 07/07/1983), including a farm mounted on two supports with a towing cart and a turning mechanism .
Недостатком добычного шагающего устройства является то, что для обеспечения перемещения устройства требуется специальная тяговая тележка с грузом, механизм ограничения поворота представляет собой упоры на концах консолей фермы, а опоры выполнены в виде дуг. Такое исполнение значительно усложняет конструкцию, создает дополнительные сопротивления при повороте устройства, снижает устойчивость конструкции.The disadvantage of the mining walking device is that to ensure the movement of the device requires a special traction trolley with a load, the rotation restriction mechanism is an emphasis at the ends of the truss consoles, and the supports are made in the form of arcs. This design significantly complicates the design, creates additional resistance when turning the device, reduces the stability of the structure.
Известна установка для разработки конкреций илов и россыпей со дна морей и океанов (авторское свидетельство SU №1099081, E21C 45/00, опубл. 23.06.84), у которой рама снабжена механизмом поперечного заноса одного конца относительно другого.A known installation for the development of nodules of silts and placers from the bottom of the seas and oceans (copyright certificate SU No. 1099081, E21C 45/00, publ. 23.06.84), in which the frame is equipped with a mechanism for the transverse drift of one end relative to the other.
Недостатком установки является несущая рама, опирающаяся на две лыжи, которые создают дополнительные сопротивления повороту установки в горизонтальной плоскости и не позволяют вести сплошную разработку морского дна с целью определения запасов полезного ископаемого, так как значительно ограничена зона возможного перемещения установки.The disadvantage of the installation is the supporting frame, supported by two skis, which create additional resistance to the rotation of the installation in the horizontal plane and do not allow continuous development of the seabed in order to determine mineral reserves, since the zone of possible movement of the installation is significantly limited.
Известна шагающая установка для взятия проб со дна морей и океанов (авторское свидетельство SU №1151675, E21C 45/00, опубл. 23.04.85), содержащая рабочий орган, ферму, тяговую тележку рабочего органа с возможностью продольного возвратно-поступательного движения, два опорных стола с вертикальными и горизонтальными шарнирами и механизмы поворота.Known walking installation for sampling from the bottom of the seas and oceans (copyright certificate SU No. 1151675, E21C 45/00, publ. 04.23.85), containing a working body, a farm, a traction trolley of the working body with the possibility of longitudinal reciprocating motion, two supporting tables with vertical and horizontal hinges and rotation mechanisms.
Недостатком устройства является наличие поплавка, что значительно усложняет механизм шагания и ограничивает область применения установки (только под водой), кроме того рабочий орган не позволяет производить отбор проб с необходимой закономерностью.The disadvantage of this device is the presence of a float, which greatly complicates the walking mechanism and limits the scope of the installation (only under water), in addition, the working body does not allow sampling with the necessary regularity.
Известно добычное шагающее устройство для подводной разработки полезных ископаемых (авторское свидетельство SU №471452, E02f 3/88, опубл. 25.05.75), принятое за прототип, включающее ферму, установленную на двух опорах, состоящих из платформы и телескопических штанг, рабочий орган и систему управления. Ферма подвешена к нижней поверхности платформ опор и шарнирно с ними связана, снабжена кронштейнами с роликами, взаимодействующими с кулаками, установленными на платформах опор подвижно, а рабочий орган снабжен тяговой тележкой для перемещения его по ферме.Known mining walking device for underwater mining (copyright certificate SU No. 471452,
Недостаток данного устройства заключается в том, что рабочий орган, позволяет брать отбор проб только с поверхности морского дна и вести добычу полезного ископаемого только на участке, ограниченном положением опор, что снижает производительность установки в целом.The disadvantage of this device is that the working body allows you to take samples only from the surface of the seabed and mine only in the area limited by the position of the supports, which reduces the performance of the installation as a whole.
Техническим результатом является упрощение конструкции устройства, обеспечение перемещения рабочего органа буровой установки по всей длине фермы, а так же создания возможности отбора проб на различной глубине поверхности морского дна.The technical result is to simplify the design of the device, to ensure the movement of the working body of the drilling rig along the entire length of the farm, as well as creating the possibility of sampling at different depths of the surface of the seabed.
Технический результат достигается тем, что ферма выполнена из двух параллельных труб с продольными направляющими и снабжена серьгами шарнирно соединенными с платформами опор, при этом концы труб жестко связаны между собой поперечными балками с размещенными на них блоками, а рабочий орган выполнен в виде тележки с роликами, взаимодействующими с продольными направляющими фермы, с жестко закрепленными на ней буровым станком и двумя лебедками, снабженными гибкими тяговыми элементами (например, тросами), охватывающими блоки поперечных балок, один конец которых закреплен на барабане лебедки, а другой на тележке рабочего органа.The technical result is achieved by the fact that the truss is made of two parallel pipes with longitudinal guides and equipped with earrings pivotally connected to the support platforms, while the ends of the pipes are rigidly interconnected by transverse beams with blocks placed on them, and the working body is made in the form of a cart with rollers, interacting with the longitudinal guides of the farm, with a drilling rig rigidly fixed on it and two winches equipped with flexible traction elements (for example, cables), covering blocks of transverse balls to, one end of which is fixed on the drum of the winch, and the other on the trolley of the working body.
Шагающая буровая установка поясняется следующими фигурами:Walking rig is illustrated by the following figures:
фиг. 1 - общий вид буровой установки;FIG. 1 - general view of the drilling rig;
фиг. 2 - вид сверху на буровую установку;FIG. 2 is a top view of a drilling rig;
фиг. 3-сечение А-А по опоре;FIG. 3-section AA on the support;
фиг. 4 - вид Б на рабочий орган;FIG. 4 - view B of the working body;
фиг. 5 - положение установки в начале цикла;FIG. 5 - installation position at the beginning of the cycle;
фиг. 6 - вид сверху на буровую установку в начале цикла;FIG. 6 is a plan view of a drilling rig at the beginning of a cycle;
фиг. 7 - положение установки в вертикальной плоскости (рабочий орган на правой консоли);FIG. 7 - installation position in a vertical plane (working body on the right console);
фиг. 8 - положение установки в горизонтальной плоскости (рабочий орган на правой консоли);FIG. 8 - installation position in the horizontal plane (working body on the right console);
фиг. 9 - положение установки в вертикальной плоскости (рабочий орган на левой консоли);FIG. 9 - installation position in a vertical plane (working body on the left console);
фиг. 10 - положение установки в горизонтальной плоскости (рабочий орган на левой консоли), где:FIG. 10 - installation position in the horizontal plane (working body on the left console), where:
1 - несущая ферма;1 - carrier farm;
2 - опора;2 - support;
3 - рабочий орган;3 - working body;
4 - труба;4 - pipe;
5 - продольная направляющая;5 - longitudinal guide;
6 - серьга;6 - earring;
7 - поперечная балка;7 - transverse beam;
8 - блок;8 - block;
9 - прямолинейный участок фермы;9 - a straight section of the farm;
10 - консоль;10 - console;
11 - тележка;11 - trolley;
12 - ролик;12 - roller;
13 - проушина;13 - eye;
14 - буровой станок;14 - drilling rig;
15 - лебедка правого хода;15 - winch right;
16 - лебедка левого хода;16 - left winch;
17 - гибкий тяговый элемент;17 - flexible traction element;
18 - опорный стол;18 - supporting table;
19 - телескопическая штанга;19 - telescopic rod;
20 - опорный башмак;20 - supporting shoe;
21 - платформа;21 - platform;
22 - вилка;22 - a fork;
23 - цилиндрический ролик;23 - a cylindrical roller;
24 - вертикальная ось;24 - vertical axis;
25 - привод платформы;25 - platform drive;
26 - шестерня;26 - gear;
27 - зубчатое колесо;27 - a gear wheel;
28 - ось;28 - axis;
29 - буровой став.29 - drilling rig.
Шагающая буровая установка включает несущую ферму 1 (фиг. 1), установленную на двух опорах 2 и рабочий орган 3. Ферма 1 выполнена из двух параллельных труб 4 (фиг. 2), снабженных продольными направляющими 5 (фиг. 2, 3), имеющими форму швеллера, а в нижней части - серьгами 6 (фиг. 3). Концы труб 4 жестко связаны между собой поперечными балками 7, на которых размещены блоки 8. Ферма 1 имеет прямолинейный участок 9, а концы фермы изогнуты вверх, образуя симметричные консоли 10, левую и правую (фиг. 1, 2). Рабочий орган 3 выполнен в виде тележки 11 (фиг. 2, 3, 4) с роликами 12. В нижней части тележка 11 снабжена проушинами 13. На тележке 11 закреплен буровой станок 14 и две лебедки, правого хода 15 и левого хода 16, снабженные гибкими тяговыми элементами. 17 (тросами), охватывающими блоки 8 поперечных балок 7, один конец которых закреплен на барабане лебедки, а другой - на проушинах 13 тележки 11. Ролики 12 тележки 11 взаимодействуют с направляющими 5 несущей фермы 1 с возможностью возвратно поступательного движения рабочего органа 3 вдоль фермы. При этом обеспечена возможность перемещения рабочего органа вдоль всей длины фермы, включая консоли 10. Каждая из опор 2 (левая и правая) состоит из опорного стола 18 (фиг. 1, 3), снабженного телескопическими штангами 19 с опорными башмаками 20 и платформы 21, выполненной с вилками 22. Поворотная платформа 21 опирается на опорный стол 18 посредством цилиндрических роликов 23 и связана с ним вертикальной осью 24 с возможностью относительного поворота. На опорном столе 18 размещен привод 25 поворота платформы 21, включающий открытую зубчатую передачу, состоящую из шестерни 26 и зубчатого колеса 27, жестко связанного с вертикальной осью 24. Серьги 6 (фиг. 1, 3) связаны с вилками 22 платформ 21 при помощи осей 28, образуя шарнирное соединение фермы 1 с опорами 2.The walking drilling rig includes a supporting truss 1 (Fig. 1) mounted on two
Работа шагающей буровой установки осуществляется следующим образом. Устройство устанавливается на площадке для обуривания (фиг. 5) (например, на поверхности морского дна, уступе карьера и т.п.) и начинают процесс бурения скважин в соответствии с заданным паспортом бурения. После того как пробурена первая скважина, поднимают буровой став 29 буровой установки (фиг. 1, 5), включают привод правой лебедки 15 и перемещают рабочий орган 3 в новое положение по направляющим 5 несущей фермы 1 на расстояние S, соответствующее шагу расположения разведочных скважин. Далее опускают буровой став 29 и производят бурение следующей скважины.The work of walking rig is as follows. The device is installed on the drilling site (Fig. 5) (for example, on the surface of the seabed, pit ledge, etc.) and the drilling process begins in accordance with the specified drilling passport. After the first well has been drilled, the
Процесс продолжается до тех пор, пока рабочий орган 3 не достигнет правой консоли 10 (фиг. 7, 8). В момент достижения рабочим органом 3 конца правой консоли левая опора 2 отрывается от морского дна, происходит поворот несущей фермы 1 в вертикальной плоскости относительно оси 28 шарнира на угол φ (фиг. 7). В указанном положении включают привод 25 поворота платформы 21 (фиг. 3, 8) правой опоры 2 и осуществляют поворот фермы 1 на угол β в горизонтальной плоскости (фиг. 8). Далее включают привод левой лебедки 16 и рабочий орган 3 начинает движение в сторону левой консоли 10. Как только рабочий орган 3 смещается от конца правой консоли 10, нарушается условие равновесия системы и поднятая левая опора 2 опускается и устанавливается на морском дне в новом положении (фиг. 8). Начинают новый цикл бурения скважин последовательным перемещением рабочего органа 3 вдоль фермы 1 по направляющим 5 в соответствием с паспортом бурения. По окончании отработки очередной заходки цикл шагания повторяется перемещением рабочего органа 3 на левую консоль 10 (фиг. 9, 10).The process continues until the working
Движение шагающей буровой установки изменением положения его центра масс перемещением рабочего органа с одной консоли на другую позволяет осуществлять бурение скважин в соответствии с заданным паспортом бурения по требуемым траекториям - угловым, прямолинейным, круговым, параллельным и другим с целью определения запасов полезного ископаемого.The movement of a walking drilling rig by changing the position of its center of mass by moving the working body from one console to another allows you to drill wells in accordance with a specified drilling passport along the required paths - angular, straight, circular, parallel and others in order to determine mineral reserves.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU2016126893/03U RU166446U1 (en) | 2016-07-04 | 2016-07-04 | STEPPING DRILLING RIG |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU2016126893/03U RU166446U1 (en) | 2016-07-04 | 2016-07-04 | STEPPING DRILLING RIG |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| RU166446U1 true RU166446U1 (en) | 2016-11-27 |
Family
ID=57777168
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| RU2016126893/03U RU166446U1 (en) | 2016-07-04 | 2016-07-04 | STEPPING DRILLING RIG |
Country Status (1)
| Country | Link |
|---|---|
| RU (1) | RU166446U1 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2648365C1 (en) * | 2017-06-13 | 2018-03-26 | федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" | Walking installation for transportation and laying of oil and gas pipes on the seabed |
| RU214140U1 (en) * | 2022-07-07 | 2022-10-12 | федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" | WALKING DEVICE FOR INVESTIGATION OF THE BOTTOM SURFACE OF SUB-GLACIAL WATER BODIES |
| CN118442001A (en) * | 2024-05-31 | 2024-08-06 | 山东省鲁南地质工程勘察院(山东省地质矿产勘查开发局第二地质大队) | Portable drilling equipment for geological exploration |
-
2016
- 2016-07-04 RU RU2016126893/03U patent/RU166446U1/en not_active IP Right Cessation
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2648365C1 (en) * | 2017-06-13 | 2018-03-26 | федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" | Walking installation for transportation and laying of oil and gas pipes on the seabed |
| RU214140U1 (en) * | 2022-07-07 | 2022-10-12 | федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" | WALKING DEVICE FOR INVESTIGATION OF THE BOTTOM SURFACE OF SUB-GLACIAL WATER BODIES |
| RU214112U1 (en) * | 2022-07-27 | 2022-10-12 | федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" | WALKING DEVICE FOR INVESTIGATION OF THE BOTTOM SURFACE OF SUB-GLACIAL WATER BODIES |
| CN118442001A (en) * | 2024-05-31 | 2024-08-06 | 山东省鲁南地质工程勘察院(山东省地质矿产勘查开发局第二地质大队) | Portable drilling equipment for geological exploration |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201747390U (en) | Suspension type multifunctional tunnel operation machine | |
| CN104695871A (en) | Drilling boom device of two-boom hydraulic rock bolt drilling carriage | |
| CN103233761A (en) | Reversed loader moving-assisted large-cycle tunnel advance support bracket | |
| CN103452574A (en) | Auxiliary bracket moving device of circular self-moving advance support | |
| CN103899249A (en) | Coal mine roadway bottom board anchoring drill carriage | |
| CN1920255B (en) | Monolithic support for retreating pillar mining in room-and-pillar mining | |
| RU166446U1 (en) | STEPPING DRILLING RIG | |
| KR20190001317A (en) | Slope perforation system with a multistage boom cylinder and boring method using the same | |
| CN203223239U (en) | Roadway advance timbering support used for assisting machine to move | |
| CN103216252A (en) | Roadway advanced supporting supports capable of assisting machinery to move | |
| RU2601880C1 (en) | Legged device for underwater mining of minerals | |
| CN107448152A (en) | Combined hydraulic jumbolter workbench | |
| CN204782997U (en) | Impacted style soil layer sample rig | |
| CN202707110U (en) | Crossheading front support carrier | |
| RU2287060C1 (en) | Mechanized face-end support, which supports connection area between longwall face and drift | |
| CN105110173A (en) | Door-shaped hanger used for ships | |
| CN204532119U (en) | A kind of drill boom device of two-arm hydraulic anchor rod drill carriage | |
| RU2403391C1 (en) | Mechanised support for steep beds | |
| RU2761235C1 (en) | Walking device with adaptive supports | |
| CN207847625U (en) | Rectangular shaped roadways driving moves into covering device certainly without support repeatedly | |
| CN105064912A (en) | Self-propelling water detecting drilling machine | |
| CN105422001B (en) | A kind of coal mine hydraulic drill rig | |
| CN104948181B (en) | A kind of slip travelling development machine | |
| CN102587350A (en) | Spile device of spile machine | |
| CN202300385U (en) | Top rock bolt anchor cable drilling machine of comprehensive mechanical stone drift development machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MM1K | Utility model has become invalid (non-payment of fees) |
Effective date: 20170212 |