[go: up one dir, main page]

KR20090042393A - Construction method and device for compacting ground using hydraulic hammer for pile driving on crane - Google Patents

Construction method and device for compacting ground using hydraulic hammer for pile driving on crane Download PDF

Info

Publication number
KR20090042393A
KR20090042393A KR1020070108112A KR20070108112A KR20090042393A KR 20090042393 A KR20090042393 A KR 20090042393A KR 1020070108112 A KR1020070108112 A KR 1020070108112A KR 20070108112 A KR20070108112 A KR 20070108112A KR 20090042393 A KR20090042393 A KR 20090042393A
Authority
KR
South Korea
Prior art keywords
ground
compaction
crane
hydraulic hammer
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
KR1020070108112A
Other languages
Korean (ko)
Other versions
KR100927324B1 (en
Inventor
진창곡
이창균
Original Assignee
진창곡
이창균
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 진창곡, 이창균 filed Critical 진창곡
Priority to KR1020070108112A priority Critical patent/KR100927324B1/en
Publication of KR20090042393A publication Critical patent/KR20090042393A/en
Application granted granted Critical
Publication of KR100927324B1 publication Critical patent/KR100927324B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/046Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/22Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for consolidating or finishing laid-down unset materials
    • E01C19/23Rollers therefor; Such rollers usable also for compacting soil
    • E01C19/28Vibrated rollers or rollers subjected to impacts, e.g. hammering blows
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • E02D7/10Power-driven drivers with pressure-actuated hammer, i.e. the pressure fluid acting directly on the hammer structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Architecture (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

본 발명은 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 공법 및 장치에 관한 것으로, 더욱 상세하게는 개선된 크레인 공법과 개량된 다짐판을 이용하여, 종래의 다짐 공정 시 진흙이나 수분이 함유된 토사지반 및 준설토 다짐 작업시에 발생하는 다짐부 주변 진흙이나 모래 및 수분이 비산하고 다짐부 내부에는 수막이나 압력이 발생하여 작업 위치 이동을 통한 다짐 작업의 반복시에 지반이 제대로 다져지지 못하고 효율성이 떨어지는 문제를 효과적으로 처리할 수 있는 것으로, 수분 배출이 용이하고, 다짐 판의 낙하와 지면 마찰시에 발생하는 내ㆍ외부의 공기 저항을 현저하게 줄일 수 있는 개선된 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 공법 및 장치에 관한 것이다.The present invention relates to a method and apparatus for compacting the ground by using a hydraulic hammer for pile driving on a crane, and more specifically, by using an improved crane method and an improved compaction plate, mud or water is contained during a conventional compaction process. Mud, sand, and water around the compaction part scattered during compaction of the soil and dredged soil, and water film or pressure is generated inside the compaction part. The hydraulic hammer for pile driving can be applied to an improved crane which can effectively deal with this falling problem and can easily reduce moisture and significantly reduce the internal and external air resistance generated during the falling of the compaction plate and the ground friction. It relates to a method and apparatus for compacting the ground using.

이를 위하여 본 발명에 의한 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 장치는 토사지반이나 준설토의 다짐 작업을 위하여 구동수단으로 카터필라(caterpilla)를 마련하고 그와 연동하는 복수의 휠을 사용하여 이동 및 회전하며 지반작업이 가능하도록 내부에 중량체가 마련되는 크레인을 이용한 유압해머장치에 있어서, 지반에 대한 다짐 공정을 위해 크레인이 마련되고, 상기 크레인의 구동부 몸체의 일 측으로 경사지게 마련되는 프레임으로 구성된 붐과 상기 붐의 상부 끝단에 수직 상으로 체결 구비되는 지주대와, 상기 지주대와 체결되며 유압장치에 의해 상승 및 하강 작동이 가능한 구조로 충격에너지를 발생하기 위해 마련되는 유압해머장치와, 상기 유압해머장치의 하단에 마련되어 지면의 안착고정된 후 다짐작 업을 하는 다짐판과, 다짐작업시에 지반에 충격에너지를 제공하는 유압해머장치와 다짐판을 통하여 지면에 발생하는 압력과 소음을 감소시키고 수분의 배출을 용이하게 하기 위하여 다짐판에 형성되는 복수의 통공 홀을 포함하여 이루어지는 것을 특징으로 하는 것이다.To this end, a device for compacting the ground by using the hydraulic hammer for pile driving on the crane according to the present invention provides a caterpillar (caterpilla) as a driving means for compaction of the soil ground or dredged soil, and uses a plurality of wheels interlocked with it. In the hydraulic hammer device using a crane that is provided with a weight in the interior so as to move and rotate the ground work, the crane is provided for the compaction process for the ground, the frame is provided to be inclined toward one side of the drive body of the crane A holding brace and a support stand vertically fastened to the upper end of the boom, and a hydraulic hammer device provided to generate impact energy in a structure that is fastened to the support stand and is capable of being moved up and down by a hydraulic device, The compaction work is provided at the bottom of the hydraulic hammer device is fixed to the ground after the compaction operation And a plurality of through holes formed in the compaction plate to reduce pressure and noise generated on the ground and to facilitate the discharge of water through a hydraulic hammer device that provides impact energy to the ground during compaction operation, and a compaction plate. It is characterized by consisting of.

Description

크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 공법 및 장치{The footer structure of a oil pressure hammer apparatus by crane and thereof the method of construction for lay the foundation }The footer structure of a oil pressure hammer apparatus by crane and approximately the method of construction for lay the foundation}

본 발명은 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 공법 및 장치에 관한 것으로서, 유압에 의해 동작하는 다짐 판을 구비하는 해머장치와 상기 해머장치가 배설된 크레인을 통하여 지반을 다지기 위한 다짐 공법을 제공하는 것을 특징으로 한다.The present invention relates to a method and apparatus for compacting ground by using a hydraulic hammer for pile driving on a crane, the compaction apparatus for compacting ground through a hammer provided with a compaction plate operated by hydraulic pressure and a crane provided with the hammer device. It is characterized by providing a method.

일반적으로 낮은 평야지대·삼각주·골짜기 등을 형성하고 있는 충적지(沖積地)는 건조물의 기초가 되는 바닥이 지지력이 없는 지반으로서 연약지반(軟弱地盤)이라 한다.In general, alluvial lands, which form low plains, deltas, and valleys, are grounds with no bearing capacity, which are the basis of the building, and are called soft grounds.

이러한 연약지반 위에 건축물을 지으면 건물의 하중에 의해 지반이 파괴되거나 압밀침하(壓密沈下)가 발생 되는데 이를 방지하도록 지반을 직접 또는 간접적으로 강화, 안정화시키는 지반개량(地盤改良)을 하게 된다.If the building is built on such a soft ground, the ground is destroyed or consolidation settlement occurs due to the load of the building, and the ground is improved to stabilize or stabilize the ground directly or indirectly to prevent it.

그 예로서, 연약지반 위에 도로·철도 등을 만들 경우, 흙쌓기를 가장 많이 실시하는데 흙쌓기의 기초가 되는 연약지반의 개량은 주로 샌드 드레인 공법으로 점토층을 압밀탈수(壓密脫水)시켜 토질의 강도를 증가시킨다.For example, when roads and railroads are made on soft grounds, the most of the piles are piled up. The improvement of soft grounds, which is the basis of piles, is mainly carried out by sand-draining the clay layer by consolidating and dehydrating clay layers. Increase strength.

또한, 근래에는 샌드 드레인에 각종 고결약제(固結藥劑)를 가하여 주위 지반을 화학적으로 경화시키거나 샌드 드레인을 강하게 다져 점토층의 압밀탈수와 샌드드레인의 강화를 꾀한 것 등 샌드 드레인의 아류공법(亞流工法)이 사용되고 있다.In addition, in recent years, various types of high binders have been added to sand drains to chemically harden the surrounding ground, or the sand drains can be hardened to consolidate the clay layer and reinforce the sand drain.流 工 法) is used.

이 같은 지반개량작업은 주로 흙쌓기에 많이 적용되며, 대부분은 지반개량을 하지 않고 콘크리트 파일 등을 타입하여 기초지반을 지지하는 방법을 취하고 있다.The ground improvement work is mainly applied to the pile up, and most of them take a method of supporting the foundation ground by type of concrete piles without ground improvement.

또한, 이미 설치된 구조물의 기초지반이 여러 가지 원인으로 약화되거나 인접 지반의 굴착 등으로 인해 그 피해가 예상될 때는 콘크리트 파일 등을 직접 타입하여 보강할 수는 없는 상태에서 지반 자체를 강화해야 할 경우, 주입공법이 사용된다.In addition, when the foundation ground of an already installed structure is weakened due to various reasons, or when the damage is expected due to the excavation of adjacent ground, it is necessary to reinforce the ground itself in the state that it is not possible to directly reinforce the concrete pile. Injection method is used.

이 주입공법은 시멘트와 약액(藥液)을 높은 압력으로 지반 속에 주입하여 안정화시키는 것인데, 모래지반에는 효과가 있으나 주입이 곤란한 점토나 실트질(質)의 세립토(細粒土) 지반에는 그 효과가 없다.This injection method is to stabilize cement by injecting cement and chemical liquid into the ground at high pressure, but it is effective in the sandy ground but it is difficult to inject clay or silty fine ground of silt. There is no.

특히, 점토지반에 유효한 방법은 지반에 직류전압을 가하여 탈수와 전기화학적인 안정을 기하는 전기침투공법과, 지반 속에 연기통로를 굴착하고 그 주위를 높은 열로 용융 고화시키는 소결공법(燒結工法) 등이 있으나 잘 쓰이지 않고 있다.Particularly effective methods for clay ground include electroporation method for applying dehydration and electrochemical stability by applying DC voltage to the ground, and sintering method for excavating smoke passages in the ground and melting and solidifying the surroundings with high heat. This is but not used well.

한편, 이러한 방법 이외에 표층을 직접 압력을 줌으로써, 입자 사이의 공극을 줄여 지반을 강화하고 안정화시키는 다짐 공법을 사용하게 된다.On the other hand, in addition to this method, by pressing the surface directly, it is used a compaction method to strengthen and stabilize the ground by reducing the gap between the particles.

이러한 다짐 공법은 사질지반(砂質地盤)의 밀도를 크게 하고 안정성을 높이기 위해 지반을 단단하게 다지는 것으로서, 이 공법에 사용하는 장치 내지는 기계를 다짐 기계(다짐장비:tamping machine)라 한다.This compacting method is to compact the ground in order to increase the density of the sandy ground and increase the stability, and the apparatus or machine used in this method is called a compacting machine (tamping machine).

이 공법에 사용되는 다짐 기계는 로드 롤러·탠덤 롤러·다짐 롤러·진동 롤러(振動roller) 등 롤러 계통과 진동 콤팩터·래머·탬퍼와 같은 것이 있다.Compaction machines used in this process include roller systems such as road rollers, tandem rollers, compaction rollers and vibration rollers, and vibration compactors, rammers and tampers.

로드 롤러는 도로공사 현장 등에서 흔히 볼 수 있는 것으로서 포장면(鋪裝面)의 마무리나 기초공사의 다짐에 쓰이고, 다짐 롤러는 롤러 부분에 돌기(突起)가 많이 있는 것으로 성토(盛土)를 다지는 데 쓰인다.Road rollers are commonly found in road construction sites, and are used for finishing pavement and foundation work. Compaction rollers are used for compacting soil with many protrusions on the roller part. Used.

또한, 진동 롤러는 롤러 부분의 진동에 의해서 다짐효과를 내는 것인데, 2∼4t의 비교적 경량(輕量)일지라도 그 효과는 15t급의 롤러와 맞먹고, 진동 콤팩터는 진동하는 부분이 평판상(平板狀)으로 되어 있다.In addition, the vibrating roller is a compacting effect by the vibration of the roller portion, although the effect is comparable to that of the 15t roller, even if it is a relatively light weight of 2 to 4t, the vibrating compactor is a flat plate (平板 狀).

한편, 입도가 크고 거친 쇄석을 이용하여 기초를 다지는데 사용되는 진동 콤팩터·래머·탬퍼는 다짐을 하는 최종 부위에 철륜이나 타격판 자체중량 이외 기계적인 힘을 추가하여 다지므로 다짐성능이 효율적이나 각 부위를 구조적으로 튼튼하게 만들어야 함과 동시에, 작업장치를 제외한 타 부위에 진동이 전달되지 않도록 완충장치를 구비해서 내구성을 형상시키도록 설치되어 있다.On the other hand, vibratory compactors, rammers, and tampers, which are used to lay foundations using large grains of coarse grain, are compacted by adding mechanical forces other than the steel wheels or the weight of the striking plate to the final part to be compacted. At the same time, the structural parts are made to be strong, and at the same time, the shock absorber is installed to form durability so that vibration is not transmitted to other parts except the working device.

진동 콤팩터는 기진 장치에 의해 발생된 진동을 다짐장비인 둥근 원통의 철륜이나 타격판이나 진동판, 다짐판 등을 진동시켜 다짐작업을 하는 기계로서 진동수, 진폭, 지진력이 전달되는 철륜이나 타격판의 중량과 기진력에 의해 다짐능력이 가변되도록 되어있다.Vibration compactor is a machine for compacting by vibrating a round cylindrical iron wheel, blow plate, vibrating plate, compaction plate, etc., which is the vibration generated by the vibrating device. Compaction capacity is variable by weight and vibration force.

래머는 내연기관의 폭발에너지를 이용하여 기계 자체가 도약했다가 자유 낙하될 때 발생되는 낙하중량에 의해 다짐작업을 하도록 구비된 것으로서 도약시키는 동력을 얻기 위한 내연기관의 한계와 기체를 인력으로 지탱하기 위한 무게의 한계 가 있음으로써 소형으로 제작하여 협소한 장소의 다짐작업 및 이동에 용이하게 되어 있다.The rammer is equipped to use the explosive energy of the internal combustion engine to compact the work by falling weight generated when the machine itself leaps and falls freely. Due to the weight limit, it is made compact and easy to compact and move in narrow places.

탬퍼는 내연기관 크랭크축의 회전운동을 커넥팅 로드의 상하운동에 의해 피스톤이 상하 직선운동 하는 가운데 상부에 부착된 스프링이 신장하면서 진동을 발생시키고, 하부에 있는 스프링의 신축에 의해 기체가 도약했다가 최고점에서 자유낙하 하는 충격력이 타격판에 전달됨과 동시에 상부 스프링의 신축과 하부 스프링 신장을 교대로 반복시켜 튀어 오름과 진동을 연속해서 진동과 충격을 도시에 타격판으로 전달시켜 다짐작업을 하도록 되어 있다.The tamper generates the vibration as the spring attached to the upper part expands while the piston moves up and down linearly by the up and down motion of the connecting rod, and the gas jumps by the expansion and contraction of the lower spring. At the same time, the free fall impact force is transmitted to the striking plate, and at the same time, the expansion and contraction of the upper spring and the lower spring are repeated alternately, so that the vibration and shock are transmitted to the striking plate to the striking plate continuously.

이러한 다짐 기계를 이용하여 지반을 다지는 공법은 통상적으로 층 다짐 공법과 동 다짐 공법, 대형 진동 해머 다짐 공법 등이 있다.Ground compaction method using such a compaction machine is a conventional compaction method, copper compaction method, large vibration hammer compaction method and the like.

본 출원인의 등록특허 제472697호는 상기와 같은 기술분야에 관한 특허로서 "진동해머를 이용한 다짐 공법 및 그 장치"에 관한 출원이며, 이는 하단이 평평한 다짐판과 소정의 길이로 돌출된 다짐봉이 형성된 다짐판을 이용하여 반복하여 교대로 지면을 다지도록 함으로써 지반 내의 자갈이나 호박 돌 및 석괴 그리고 건설 폐기물 등이 부서지면서 지면을 형성하고 있는 토사와 암석들 사이의 공 극이 줄어들도록 다짐으로써, 연약한 지반을 효율적으로 다지는 가운데 발생하는 진동과 소음을 줄일 수 있도록 하고, 아울러 진동 해머를 높이가 낮은 리더를 갖는 기중기에 장착하여 연약지반 내로의 장비의 진입과 이동을 신속하게 할 수 있도록 하면서 공사중 불어오는 바람의 영향을 적게 받도록 하여 공사기간의 단축과 공사비용을 줄 일 수 있도록 하는 효과를 가지는 것이었다.Patent No. 472697 of the present applicant is a patent related to the technical field as described above, and the application for "a compaction method using a vibration hammer and its device", which has a flat bottom plate and a compacting rod protruding to a predetermined length. Soft ground by repeatedly compacting the ground using a compaction plate to reduce the voids between the soil and rocks that form the ground as the gravel, amber stones, stones and construction wastes in the ground break down. To reduce vibrations and noises generated while compacting efficiently, and to mount the vibration hammer on a crane with a low height leader to quickly enter and move equipment into the soft ground. To reduce the construction period and reduce the cost of construction And it was having.

또한, 타인의 공개특허 제2003-42594호 "유압식 해머를 이용한 지반 다짐 공법 및 그 장치"가 개시된바 있으며, 이는 유압식 해머를 이용한 지반 다짐에 있어 크레인이 아닌 굴삭기를 이용하는 것으로 1회당 발생하는 다짐 에너지가 기존 다짐 공법에 비해 상당히 작으므로 방진 홀 같은 부수적인 장치 없이 진동에 의한 주변 구조물 및 지반의 피해를 최소화할 수 있고 개량 층의 두께가 얇은 곳에도 적용성이 좋으며 지하수위 위치에 따른 다짐의 영향이 적어 지하수위가 높은 현장에서 시공해도 시공성의 저하가 현저히 발생하지 않는 이점이 있다.In addition, another Patent Publication No. 2003-42594 "ground compaction method using a hydraulic hammer and its device" has been disclosed, which is a compaction energy generated by using an excavator rather than a crane in the ground compaction using a hydraulic hammer. Is considerably smaller than the conventional compaction method, so it is possible to minimize the damage of surrounding structures and ground caused by vibration without any additional devices such as dustproof holes, and it is also applicable to the thickness of the improved layer and the effect of compaction according to the groundwater level It is advantageous in that the construction performance is not remarkably reduced even when the construction is performed at a site having a low groundwater level.

상기 배경기술과 같은 다짐 공법에 이용되는 유압식 해머는 지반을 다지는 데에 있어 모두 저중심형 기중기나 굴삭기, 불도저 등에 장착되어 있어 모두 소규모 작업만이 가능하고, 지반 내부에 다짐작업을 수행하는 다짐 판이 획일적으로 폐쇄된 평판형태를 취하고 있어 지반 내에 자갈이나 호박돌 및 석괴 그리고, 건설 폐기물 등이 있을 경우, 다짐작업을 하더라도 암석 등의 사이에 있는 공극이 완전히 메워지지 않은 상태에서 다짐작업이 완료됨으로써 다짐 시공이 끝난 후, 도로 또는 활주로로 사용하는 과정에서 계절의 변화 등에 의해 지반이 내려앉게 되거나 균열이 발생할 뿐만 아니라, 다짐 시공이 완료된 지반 위에 건물을 짖게 되면 건물의 하중에 의해 지반이 파괴되거나 압밀침하의 발생으로 건물에 균열이 발생하거나 심지어 붕괴되는 등의 문제점이 있었다.The hydraulic hammers used in the compaction method, such as the background art, are all equipped with a low center of gravity crane, an excavator, a bulldozer, etc. in compacting the ground, so that only a small work can be performed, and the compaction plate for compacting the ground is uniform. In the case of gravel, amber stone, lump, and construction waste in the ground, the compaction work is completed by the compaction work being completed without filling the voids between the rocks. After finishing, the ground falls or cracks due to seasonal changes in the process of using it as a road or a runway, and when the building barks on the ground where compaction construction is completed, the ground is destroyed by the load of the building or consolidation settlement occurs. Such as cracks or even collapses in buildings There was a problem.

이러한 문제를 일부 개선하기 위하여 다짐판의 저면으로 돌기를 교체형으로 구비하는 다짐판이 마련되어 암석을 파쇄하면서 다짐작업이 전면에 걸쳐 균일하게 진행될 수 있도록 하는 것이 출원인에 의해 제공된 바 있다.In order to alleviate some of these problems, it has been provided by the applicant that a compaction plate having a projection as a replacement type at the bottom of the compaction plate is provided so that the compaction operation can be uniformly spread over the entire surface while crushing the rock.

뿐만 아니라 종래의 저중심형 기중기나 굴삭기, 불도저 등과는 별도로 크레인에 의한 자유낙하 식 진동 해머를 이용한 다짐 공법 및 장치가 제시된 바 있으나, 크레인에 연결된 와이어와 다짐판을 구비하는 진동해머를 연결하고 자유낙하 식으로 동작하는 동 다짐 공법하에서는 진동이 과도하게 발생되며, 높이에 따른 높은 충격에너지를 발생하기 위하여 아암부의 높이가 높게 고려되고 와이어에 매달 린 다짐장치가 바람의 영향을 받을 수 있어 작업이 효율적이지 못함은 물론 다짐 작업의 반복실시과정이나 다짐 시간이 진척되어 공사기간과 인건비 상승의 문제가 대두되고 있는 실정이다.In addition, a compaction method and a device using a free fall type vibration hammer by a crane have been presented separately from a conventional low center type crane, an excavator, a bulldozer, etc., but a free fall is performed by connecting a vibration hammer having a wire and a compaction plate connected to the crane. Under the compaction method operating in this way, vibration is excessively generated, and in order to generate high impact energy according to the height, the height of the arm is considered high and the compaction device suspended on the wire can be affected by the wind, making the work more efficient. Not only that, but the repetitive process of compaction work or the progress of compaction time is progressing, so the problem of construction period and labor cost is on the rise.

이처럼 크레인을 이용한 진동장치 및 이를 이용한 다짐 공법은 소정의 길이를 갖는 다수의 빔이 하나로 연결되어 크레인의 일 측에 고정설치되어 있고, 높낮이는 와이어 권취부에 감겨진 와이어에 의해 조절되도록 되어 있으며, 다짐부에 구비된 진동해머와 연결된 아암부의 상단을 경유하여 수직으로 늘어져 있는 와이어의 단 부에 설치된 걸고리에 연결 고정되어 있는 것으로 진동 해머와 결합된 폐쇄형 다짐판은은 진흙이나 수분이 함유된 토사 지반이나 준설토에 다짐 작업을 하는 경우 다짐부위에서 발생하는 진흙이나 수분을 효과적으로 제거하지 못하여 다짐시에 내부 압력이 발생하거나 주변부에 발생된 수분이 비산되고 다시 위치를 달리하여 다짐작업시 원래의 위치에 스며듦으로써 기존의 다짐 판으로는 지반이 제대로 다져지지 못하는 수분 배출 곤란의 문제와, 과도한 주변부 진동 및 낙하 후 다짐판이 지반속으로 파고들어 지반과 압착됨으로써, 다짐판을 지반으로부터 이탈시키기가 곤란한 문제 등이 개선되지 못하고 있는 실정이다.As described above, the vibration device using the crane and the compaction method using the same have a plurality of beams having a predetermined length connected to one, which is fixed to one side of the crane, and the height is adjusted by a wire wound on the wire winding part. It is connected to the hook installed at the end of the wire which is vertically stretched through the upper end of the arm part connected to the vibratory hammer provided in the compaction part. The closed compaction plate combined with the vibratory hammer is the soil containing mud or water. When compacting on ground or dredged soil, mud or moisture generated at the compacted area cannot be removed effectively, and internal pressure is generated during compaction or moisture generated at the periphery is scattered. By soaking the ground can not be properly Whereby discharge of difficult problems and, after the excess peripheral vibration and drop plate compaction example, coming into the ground soil and pressed the situation that has not been improved, the problem is to release the plate from the ground compaction it is difficult and the like.

본 발명은 상기와 같은 문제점을 해결하기 위하여 안출된 것으로서, 진동 해머에 의한 주변부 지반진동과 소음 발생의 문제를 극복하기 위해 진동해머를 교체하는 유압식 해머가 제공되며, 다짐 공정에서 발생하는 낙하와 지면 마찰시의 공기저항을 최소화하며 수분배출을 용이하고 준설토 및 일반다짐시와 쇄석 다짐용으로 의 전환이 용이하고, 다짐 후 지반 내부의 공기저항에 의한 밀착으로 다짐판이 지반 내부로부터 빠지지 못하는 문제를 해결할 수 있는 다짐판의 구조를 제시하며, 단위시간당 다짐작업의 고속화 및 공정 면적의 대형화 추세에 맞게 리더를 사용하는 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 공법 및 장치을 제공하는 것에 그 목적이 있는 것이다. The present invention has been made to solve the above problems, it is provided with a hydraulic hammer to replace the vibration hammer to overcome the problems of the ground vibration and noise generated by the vibration hammer, falling and ground generated in the compaction process It minimizes air resistance during friction, facilitates water discharge, and is easy to switch to dredged soil, general compaction, and crushed stone compaction. The purpose of the present invention is to provide a construction method and a device for compacting the ground by using a hydraulic hammer for pile driving to a crane using a leader in accordance with the trend of speeding up compaction work per unit time and increasing the size of the process area per unit time. It is.

이와 같이 본 발명은 지반의 다양한 내부 구성과 성질에 따라 또는 주변부 환경조건을 고려하여 효과적으로 다짐 작업을 수행할 수 있는 공법과 이를 구현하는 크레인을 이용한 유압해머장치의 다짐판 구조를 제공함으로써, 조속한 다짐작업을 완료하여 그 효율성을 배가시킬 뿐만 아니라 구조와 장비의 이동 용이성을 배가하고 토사와 수분이 함유된 지반의 수분배출을 용이하게 하며, 다짐작업시 주변부 지반 진동과 대기 중 소음 발생을 감소시키고 수막현상에 의한 저항이나 내부 공기압력을 최소화하는 다짐 공법 및 장치를 제공하는 것이다. As described above, the present invention provides a method for effectively compacting work according to various internal configurations and properties of the ground or considering environmental conditions of the ground, and provides a compaction board structure of a hydraulic hammer device using a crane that implements the compaction process. It not only doubles the efficiency by completing the work, but also increases the ease of movement of the structure and equipment, facilitates the discharge of moisture from the soil containing soil and moisture, and reduces the vibration of surrounding ground and noise in the atmosphere during compaction. It is to provide a compaction method and apparatus that minimizes the resistance or the internal air pressure caused by the phenomenon.

또한, 단위시간당 다짐작업의 고속화 및 공정 면적의 대형화를 구현하기 위한 리더를 사용하는 크레인과 그에 연동하는 유압식 해머의 다짐판 구조를 마련하여 그 효율성이 극대화될 수 있도록 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 공법 및 장치를 제공하는 것이다.In addition, a crane using a leader to realize high speed of compaction work and a large process area per unit time and a compaction board structure of a hydraulic hammer interlocked with it are provided with a hydraulic hammer for pile driving to the crane to maximize the efficiency. It is to provide a method and apparatus for compacting the ground by using.

상기와 같은 목적을 달성하기 위한 본 발명에 의한 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 공법 및 장치의 바람직한 실시 예와 구조를 첨부 된 도면을 참조하여 상세하기로 한다.With reference to the accompanying drawings, preferred embodiments and structures of the method and apparatus for compacting the ground using a pile hammer hydraulic hammer in the crane according to the present invention for achieving the above object will be described in detail.

도 1 은 본 발명에 의한 다짐 공법의 절차를 도시한 블록도로서, 도면에서 보는 바와 같이 본 발명에 의한 크레인(1)과 유압해머장치(9)를 이용한 다짐 공법은 크레인(1)을 동작하여 지주대(7)에 장착된 유압해머장치(9)를 지면보다 높게 들어올리는 제 1 단계와, 카터필라(caterpilla)(3)에 의해 구동되는 휠(4)을 이동하여 다짐작업을 실시할 지반 위로 이동하는 제 2 단계와, 유압해머장치(9)에 마련된 다짐판(8)을 지면에 밀착시키는 제 3 단계와, 유압해머장치(9)를 구동하여 내부에 마련된 중량체를 지상으로 상승시키는 제 4 단계와, 상승된 중량체를 낙하시켜 다짐판(8)에 충격에너지를 전달하는 제 5 단계로 이루어지는 것으로, 지반을 개량 다짐하는 과정에서 상기 단계가 순차적으로 한 사이클을 이루면서 진행되며 한번에 다짐이 완성되지 않는 경우, 상기 중량체의 상승 및 낙하 단계를 반복 시행하여 지반에 대한 개량 다짐 공정이 이루어지도록 하는 것을 특징으로 하는 것이다.1 is a block diagram showing the procedure of the compaction method according to the present invention, the compaction method using the crane (1) and the hydraulic hammer device 9 according to the present invention as shown in the drawing to operate the crane (1) Ground for carrying out compaction work by the first step of lifting the hydraulic hammer device 9 mounted on the support base 7 higher than the ground, and by moving the wheel 4 driven by the caterpillar 3. A second step of moving upward, a third step of bringing the compaction plate 8 provided in the hydraulic hammer device 9 into close contact with the ground, and driving the hydraulic hammer device 9 to lift the weight provided therein to the ground It consists of a fourth step and a fifth step of transferring the impact energy to the compaction plate 8 by dropping the elevated weight body, the step proceeds to form a cycle sequentially in the process of compacting the ground compacted at once If it is not complete, of the above It is characterized in that the improved compaction process for the ground is carried out by repeatedly performing the ascending and falling steps of the polymer.

상기 유압해머장치(9)는 구동부(5)의 일 측에 마련되는 제어장치인 해머 파워 팩(18)에 의해 파워(전원)가 공급되면 유압해머장치(9)의 내부에 마련된 중량체가 유압실린더에 의해 일정높이 이상 상승하고 유압이 바이패스되면 하중에 의해 중량체가 자유낙하 하여 다짐판(8)을 타격하게 되는 원리로 당해 분야에서 통상적인 구조를 가지는 것이라 할 수 있다.When the hydraulic hammer device 9 is supplied with power (power) by the hammer power pack 18, which is a control device provided on one side of the driving unit 5, the weight body provided in the hydraulic hammer device 9 is a hydraulic cylinder. As a result of rising above a certain height and bypassing the hydraulic pressure, the weight falls freely by the load and strikes the compaction plate 8, which may be referred to as having a conventional structure in the art.

또한 본 발명에 의한 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 공법은, 상기 다짐판을 지면에 밀착시키는 단계는 이를 진행하는 과정에서 선행적으로 다짐판 플레이트(12)의 하부에 파쇄 봉(15)을 장착하는 단계가 배가되는 것이 포함될 수 있을 것이다.In addition, the method of compacting the ground by using the hydraulic hammer for pile driving on the crane according to the present invention, the step of contacting the compaction plate to the ground in advance in the process of proceeding the crushing rod in the lower part of the compaction plate 12 It may include multiplying the mounting of 15.

다른 실시 예로 본 발명에 의한 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 공법은, 상기 다짐판(8)을 지면에 밀착시키는 단계는 이를 진행하는 과정에서 후행적으로 다짐판(8)의 상부에 흡수재를 삽입하는 단계가 배가되는 것이 포함될 수 있을 것이다.In another embodiment, a method of compacting the ground by using a hydraulic hammer for pile driving on a crane according to the present invention, the step of bringing the compaction plate 8 into close contact with the ground may be followed by the process of proceeding with the compaction plate 8. The step of inserting the absorbent material on top may include multiplication.

도 2 는 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 장치의 전체적인 구성을 도시한 측면도로서, 본 발명에 의한 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 장치는 토사지반이나 준설토의 다짐 작업을 위하여 구동수단으로 카터필라(caterpilla)(3)를 마련하고 그와 연동하는 복수의 휠(4)을 사용하여 이동 및 회전하며 지반작업이 가능하도록 내부에 중량체가 마련되는 크레인(1)을 이용한 유압해머장치(9)에 있어서, 유압해머장치(9)에 의한 다짐 공법을 보인 사용 상태도인 도 5에서와 같이 지반에 대한 다짐 공정을 위해 크레인이 마련되고, 상기 크레인(1)의 구동부(5)의 엔진룸 일 측으로 경사지게 마련되는 프레임으로 구성된 붐(6)과 윈치 와이어(2)를 통하여 지지되는 상기 붐(6)의 상부 끝단에 수직 상으로 체결 구비되는 지주대(7)와, 상기 지주대(7)와 체결되며 유압장치에 의해 상승 및 하강 작동이 가능한 구조로 충격에너지를 발생하기 위해 마련되는 유압해머장치(9)와, 상기 유압해머장치(9)의 하단에 마련되어 지면의 안착고정된 후 유압해머장치의 중량체의 자유낙하에 의해 타격되어 다짐작업을 하는 다짐판(8)과, 상기 유압해머장치(9)의 충격에너지를 전달받기 위해 다짐판(8)의 상부에 마련되는 타격판(17) 및 압력이 전달되는 지지봉(10)과, 상기 지지봉(10)의 변형을 잡아주기 위해 지지봉(10) 외주면으로 배설되는 복수의 보강 리브(13)와, 다짐작업시에 지반에 충격에너지를 제공하는 유압해머장치(9)와 다짐판(8)을 통하여 지면에 발생하는 압력과 소음을 감소시키고 수분의 배출을 용이하게 하기 위하여 다짐판(8)의 플레이트(12)에 형성되는 복수의 통공 홀(11)을 포함하여 이루어지는 것을 특징으로 하는 것이다.Figure 2 is a side view showing the overall configuration of the apparatus for compacting the ground by using the hydraulic hammer for pile driving on the crane, the apparatus for compacting the ground by using the hydraulic hammer for pile driving in the crane according to the present invention A crane (1) provided with a caterpillar (caterpilla) (3) as a driving means for compaction work, a weight body is provided therein to move and rotate by using a plurality of wheels (4) interlocked with it and to enable ground work. In the hydraulic hammer device 9 using a crane, a crane is provided for the compaction process on the ground as shown in Fig. 5 which is a state diagram showing the compaction method by the hydraulic hammer device 9, the drive unit of the crane (1) Is provided with a fastening vertically to the upper end of the boom (6) consisting of a frame provided to be inclined toward one side of the engine room (5) and the boom (6) supported through the winch wire (2) The hydraulic hammer device 9 and the hydraulic hammer device 9 which are fastened to the support base 7 and provided to generate impact energy in a structure capable of raising and lowering operation by a hydraulic device, and the hydraulic hammer device 9 The compaction plate 8 and the compaction plate to be compacted by hitting the free fall of the weight of the hydraulic hammer device after being fixed to the ground of the hydraulic hammer device, and the compaction plate to receive the impact energy of the hydraulic hammer device 9 A striking plate 17 provided at an upper portion of the 8 and a supporting rod 10 through which pressure is transmitted, and a plurality of reinforcing ribs 13 disposed on an outer circumferential surface of the supporting rod 10 to catch deformation of the supporting rod 10. And, through the hydraulic hammer device (9) and the compaction plate (8) to provide impact energy to the ground during the compaction operation, the compaction plate (8) to reduce the pressure and noise generated on the ground and to facilitate the discharge of water A plurality of through holes 11 formed in the plate 12 of the Is characterized in that W is made.

도 3 은 본 발명에 의한 다짐 판의 전체적인 구성을 도시한 사시도이고, 도 4 는 본 발명에 의한 다짐 판의 다른 구조를 도시한 단면도로서, 상기 다짐판(8)은 측면 둘레가 상부로 갈수록 좁아지도록 테이퍼지는 형태로 마련되어 이루어질 수 있으며, 저면 바닥의 형상이 도 6에서와 같이 원형(a), 사각형(b), 팔각형(c) 및 돌출형(d) 등으로 마련되는 것이 가능할 뿐만 아니라 상기 다짐판 플레이트(12)를 관통하여 형성된 통공 홀(11)은 다짐판 플레이트(12) 하부에 별도의 파쇄 봉(15)을 장착할 수 있도록 내부에 카운터 보링이 이루어지는 단 턱(14)이 마련될 수 있으며, 평상시 통공 홀(11)은 공기와 소음 감소 및 지반 충격시의 마찰면 수분 배출을 용이하게 하기 위하여 파쇄봉(15)을 제거하고 사용되나 상기 파쇄 봉(15)은 결합부재(16)에 의해 다짐판(8) 플레이트(12)와 체결되어 사용될 수 있는 것이다.Figure 3 is a perspective view showing the overall configuration of the compaction plate according to the present invention, Figure 4 is a cross-sectional view showing another structure of the compaction plate according to the present invention, the compaction plate 8 is narrower as the side circumference toward the top It may be provided in a tapered form, and the bottom of the bottom may be formed in a circular shape (a), a square (b), an octagon (c), and a protrusion (d) as shown in FIG. The through hole 11 formed through the plate plate 12 may be provided with a stepped jaw 14 in which counter boring is formed therein so that a separate crushing rod 15 may be mounted below the compaction plate 12. In general, the through hole 11 is used to remove the crushing rod 15 in order to reduce the air and noise and to facilitate the discharge of the friction surface water during the ground impact, but the crushing rod 15 is connected to the coupling member 16. By compaction plate (8) plate (12) To which can be fastened.

또한, 본 발명에 의한 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 공법 및 장치하에서는 상기 다짐판(8) 플레이트(12)에 형성된 통공 홀(11)의 상부에 다짐작업에 따라 토출된 수분의 배출이나 처리가 용이하도록 별도의 흡수재를 별도로 배가하여 다짐 공정 및 장치가 마련되는 것이 고려될 수 있을 것이다.In addition, under the method and apparatus for compacting the ground by using the hydraulic hammer for pile driving on the crane according to the present invention, the water discharged by the compacting operation on the upper part of the through hole 11 formed in the compaction plate 8 plate 12. It may be considered that the compacting process and apparatus are prepared by doubling the separate absorbent material so as to facilitate the discharge or treatment.

이상에서와 같이 본 발명은 지반의 다양한 내부 구성과 성질에 따라 또는 주변부 환경조건을 고려하여 효과적으로 다짐 작업을 수행할 수 있는 공법과 이를 구현하는 크레인을 이용한 유압해머장치의 다짐판 구조를 제공함으로써, 조속한 다짐작업을 완료하여 그 효율성을 배가시킬 뿐만 아니라 구조와 장비의 이동 용이성을 배가하고 토사와 수분이 함유된 지반의 수분배출을 용이하게 하며, 진동과 소음을 감소시키고 공기저항을 최소화하는 다짐작업이 이루어질 수 있도록 하여 현장에서의 그 산업상 이용가능성이 매우 뛰어나다 할 것이다.As described above, the present invention provides a compaction structure of a hydraulic hammer device using a crane that implements a construction method and a method that can effectively compact the work according to various internal configurations and properties of the ground or considering the surrounding environmental conditions, Not only does it improve the efficiency by completing the compaction process quickly, it also doubles the ease of movement of the structure and equipment, facilitates the discharge of moisture from the soil and soil-containing ground, reduces vibration and noise, and minimizes air resistance. It would be possible to make this happen so that its industrial availability in the field would be very good.

또한 본 발명은 기재된 구체 예에 대해서만 상세히 설명되었지만 본 발명의 기술 사상 범위 내에서 다양한 변형 및 수정 가능함은 당업자에게 있어서 당연한 것이며, 이러한 변형 및 수정이 첨부된 특허청구범위를 변화시키지 아니함은 당연한 것이다.In addition, although the present invention has been described in detail only with respect to the described embodiments, it will be apparent to those skilled in the art that various changes and modifications can be made within the spirit of the present invention, and that such changes and modifications do not change the appended claims.

도 1 은 본 발명에 의한 다짐 공법의 절차를 도시한 블록도.1 is a block diagram showing the procedure of the compaction method according to the present invention.

도 2 는 본 발명의 크레인을 이용하여 지반 다짐장치의 구성을 보인 정면도.Figure 2 is a front view showing the configuration of the ground compaction apparatus using a crane of the present invention.

도 3 은 본 발명의 준설토 및 일반 다짐시의 다짐판 구조를 도시한 사시도.Figure 3 is a perspective view showing the structure of the compaction plate at the time of dredged soil and general compaction of the present invention.

도 4 는 본 발명의 쇄석 다짐용 다짐판의 구조를 도시한 단면도.Figure 4 is a cross-sectional view showing the structure of the compaction plate for crushed stone of the present invention.

도 5 는 본 발명에 의한 유압해머장치에 의한 다짐 공법을 보인 사용상태도.Figure 5 is a use state showing the compaction method by the hydraulic hammer device according to the present invention.

※ 도면의 주요부분에 대한 부호의 설명 ※※ Explanation of code about main part of drawing ※

1. 크레인 2. 윈치 와이어1. Crane 2. Winch Wire

3. 카터필라 4. 휠3. Caterpillar 4. Wheel

5. 구동부(엔진룸) 6. 붐5. Drive section (engine room) 6. Boom

7. 지주대 8. 다짐판7. Shoring Base 8. Compaction Board

9. 유압해머장치 10. 지지봉9. Hydraulic hammer device 10. Support rod

11. 통공 홀 12. 플레이트11.hole hole 12.plate

13. 보강 리브 14. 단 턱13. Reinforcement rib 14. Short jaw

15. 파쇄 봉 16. 결합부재 15. Crushing rod 16. Coupling member

17. 타격판 18. 해머 파워 팩17. Strike Plate 18. Hammer Power Pack

Claims (7)

구동수단으로 카터필라(caterpilla)를 마련하고 그와 연동하는 복수의 휠을 사용하여 이동 및 회전하며 지반작업이 가능하도록 내부에 중량체가 마련되는 크레인을 이용한 지반 다짐 장치에 있어서,In the ground compaction apparatus using a crane to provide a caterpillar (caterpilla) as a drive means and to move and rotate using a plurality of wheels interlocked with it and to have a weight in the ground to enable ground work, 크레인(1)에 형성된 붐(6)의 상부 끝단에 수직 상으로 체결 구비되는 지주대(7);A support base 7 fastened vertically to an upper end of the boom 6 formed in the crane 1; 상기 지주대(7) 하단에 다짐작업을 위해 마련되는 유압해머장치(9);Hydraulic hammer device (9) is provided for the compaction work at the bottom of the support (7); 상기 유압해머장치의 자유낙하에 의해 타격되어 다짐작업을 하는 다짐판(8);A compaction plate 8 which is hit by the free fall of the hydraulic hammer device to compact the work; 상기 유압해머장치(9)의 충격에너지를 전달받기 위해 다짐판(8)의 상부에 마련되는 타격판(17); 및 압력이 전달되는 지지봉(10);A blow plate (17) provided on an upper portion of the compaction plate (8) to receive the impact energy of the hydraulic hammer device (9); And a support rod 10 through which pressure is transmitted; 상기 지지봉(10)을 통한 충격에너지가 지반에 전달되도록 다짐판(8)의 하부에 마련되는 다짐판 플레이트(12);A compaction plate 12 provided below the compaction plate 8 so that the impact energy through the support rod 10 is transmitted to the ground; 상기 지지봉(10)에 변형을 잡아주기 위해 지지봉(10) 외주 면으로 배설되는 복수의 보강 리브(13);A plurality of reinforcing ribs 13 disposed on an outer circumferential surface of the supporting rod 10 to hold the deformation to the supporting rod 10; 다짐판(8)의 플레이트(12)에 형성되는 복수의 통공 홀(11);A plurality of through holes 11 formed in the plate 12 of the compacting plate 8; 을 포함하는 것을 특징으로 하는 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 장치.Device for compacting the ground by using a hydraulic hammer for the pile driving on the crane comprising a. 청구항 1에 있어서,The method according to claim 1, 상기 다짐판은 측면 둘레가 상부로 갈수록 좁아지도록 테이퍼지는 형태로 마련되어 이루어지는 것을 특징으로 하는 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 장치.The compaction plate is a device for compacting the ground using a hydraulic hammer for pile driving to the crane, characterized in that the side circumference is provided in a tapered form so that the narrower toward the top. 청구항 1에 있어서,The method according to claim 1, 상기 다짐판의 플레이트를 관통하여 형성된 통공 홀은 카운터 보링된 단 턱(14);이 마련되어 이루어지는 것을 특징으로 하는 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 장치.The through hole formed through the plate of the compaction plate has a counter bored end jaw (14); The device for compacting the ground using a hydraulic hammer for pile driving on the crane, characterized in that is provided. 청구항 1에 있어서,The method according to claim 1, 상기 다짐판은 저면 바닥의 형상이 원형, 사각형, 팔각형 및 돌출형의 어느 하나를 선택적으로 포함하는 것을 특징으로 하는 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 장치.The compaction plate is a device for compacting the ground using a hydraulic hammer for pile driving to the crane, characterized in that the bottom of the bottom selectively comprises any one of a circular, square, octagonal and protruding. 청구항 1에 있어서,The method according to claim 1, 상기 다짐판 플레이트(12)에 형성된 통공 홀(11)에 쇄석 다짐을 위해 다짐판 하부에 별도의 파쇄 봉(15)이 장착된 것을 특징으로 하는 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 장치.Crushing the ground using a hydraulic hammer for pile driving on the crane, characterized in that a separate crushing rod 15 is installed in the bottom of the compaction plate for compacting the crushed stone in the through hole 11 formed in the compaction plate plate 12 Device. 크레인을 동작하여 지주대에 장착된 유압해머장치와 다짐판을 지면보다 높게 들어올리는 단계와;Operating a crane to lift the hydraulic hammer device and the compaction plate mounted on the holding table higher than the ground; 카터필라(caterpilla)에 의해 구동되는 휠을 이동하여 다짐작업을 실시할 지반 위로 이동하는 단계와;Moving the wheel driven by caterpillar to the ground to be compacted; 유압해머장치에 마련된 다짐판을 지면에 밀착시키는 단계와;Bringing the compaction plate provided in the hydraulic hammer device into close contact with the ground; 유압해머장치를 구동하여 내부에 마련된 중량체를 지상으로 상승시키는 단계와;Driving the hydraulic hammer device to raise the weight provided therein to the ground; 상승된 중량체를 낙하시켜 다짐판에 충격에너지를 전달하는 단계와;Dropping the elevated weight to transfer impact energy to the compaction plate; 상기 중량체의 상승 및 낙하 단계를 반복 시행하는 단계;를 통하여 지반에 대한 개량 다짐 공정이 이루어지는 것을 특징으로 하는 크레인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 공법.The method of compacting the ground using a hydraulic hammer for pile driving, characterized in that the improved compaction process for the ground through the step of repeatedly performing the rising and falling steps of the weight body. 청구항 6에 있어서,The method according to claim 6, 상기 다짐판을 지면에 밀착시키는 단계는 이를 진행하는 과정에서 선행적으로 다짐판의 하부에 파쇄 봉을 장착하는 단계가 배가되는 것을 특징으로 하는 크레 인에 말뚝 항타용 유압해머를 이용하여 지반을 다지는 공법.The step of bringing the compaction plate into close contact with the ground may be carried out by mounting the crushing rod in the lower portion of the compaction plate in advance in the process of carrying out the compaction of the ground by using the hydraulic hammer for pile driving on the crane. Method.
KR1020070108112A 2007-10-26 2007-10-26 Construction method and device for compacting ground using hydraulic hammer for pile driving on crane Expired - Fee Related KR100927324B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070108112A KR100927324B1 (en) 2007-10-26 2007-10-26 Construction method and device for compacting ground using hydraulic hammer for pile driving on crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070108112A KR100927324B1 (en) 2007-10-26 2007-10-26 Construction method and device for compacting ground using hydraulic hammer for pile driving on crane

Publications (2)

Publication Number Publication Date
KR20090042393A true KR20090042393A (en) 2009-04-30
KR100927324B1 KR100927324B1 (en) 2009-11-19

Family

ID=40765125

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070108112A Expired - Fee Related KR100927324B1 (en) 2007-10-26 2007-10-26 Construction method and device for compacting ground using hydraulic hammer for pile driving on crane

Country Status (1)

Country Link
KR (1) KR100927324B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101043700B1 (en) * 2010-11-17 2011-06-24 초석건설산업(주) Sand drain method and sand compact pile method for high quality construction (NEW SD method, NV SCP method)
CN105544496A (en) * 2015-12-28 2016-05-04 中联重科股份有限公司 Method, device and system for evaluating working power of dynamic compactor
CN110029652A (en) * 2019-05-29 2019-07-19 中国十七冶集团有限公司 A kind of construction technology reducing collapsible loess settlement after construction
CN113373897A (en) * 2021-06-25 2021-09-10 中国五冶集团有限公司 Tamping device installed on crusher and using method thereof
CN117988315A (en) * 2024-04-07 2024-05-07 福建省泷陌贸易有限公司 Rammer compactor for building construction
CN118686147A (en) * 2024-08-26 2024-09-24 济南金曰公路工程有限公司 A deep compaction treatment equipment for widening foundation in subsidence area

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101932415B1 (en) * 2018-05-20 2018-12-26 임상훈 Construction Method of Cast-in Situ Piles Using Free-Falling Compaction Equipment
KR102239806B1 (en) 2020-07-28 2021-04-13 주식회사 대영엔지니어링 Soft ground improvement method using mechanical replacement

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030042594A (en) * 2001-11-23 2003-06-02 대덕공영주식회사 Ground Compaction Method Using The Hydraulic Impact Pile Hammer Installed Foot
KR100472697B1 (en) * 2001-12-27 2005-03-08 진창곡 The tamping method which uses the vibrating hammer and that system
KR200270250Y1 (en) * 2002-01-02 2002-03-29 (주)둔산건설 Foot for Compactor

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101043700B1 (en) * 2010-11-17 2011-06-24 초석건설산업(주) Sand drain method and sand compact pile method for high quality construction (NEW SD method, NV SCP method)
CN105544496A (en) * 2015-12-28 2016-05-04 中联重科股份有限公司 Method, device and system for evaluating working power of dynamic compactor
CN105544496B (en) * 2015-12-28 2018-05-18 中联重科股份有限公司 Method, device and system for evaluating working power of dynamic compactor
CN110029652A (en) * 2019-05-29 2019-07-19 中国十七冶集团有限公司 A kind of construction technology reducing collapsible loess settlement after construction
CN113373897A (en) * 2021-06-25 2021-09-10 中国五冶集团有限公司 Tamping device installed on crusher and using method thereof
CN117988315A (en) * 2024-04-07 2024-05-07 福建省泷陌贸易有限公司 Rammer compactor for building construction
CN117988315B (en) * 2024-04-07 2024-06-07 福建省泷陌贸易有限公司 Rammer compactor for building construction
CN118686147A (en) * 2024-08-26 2024-09-24 济南金曰公路工程有限公司 A deep compaction treatment equipment for widening foundation in subsidence area

Also Published As

Publication number Publication date
KR100927324B1 (en) 2009-11-19

Similar Documents

Publication Publication Date Title
KR100927324B1 (en) Construction method and device for compacting ground using hydraulic hammer for pile driving on crane
EP0533890B1 (en) Short aggregate piers and method and apparatus for producing same
CN1143033C (en) Short aggregate pier techniques
CN111749066B (en) A composite foundation structure of gravel piles at the base of roadbed and construction method thereof
EP2313562A2 (en) Shielded tamper and method of use for making aggregate columns
CN105714773A (en) Foundation treatment method
CN110055948A (en) A kind of big Treatment Methods of Karst Foundation of depth and device
KR100607536B1 (en) Compaction device with towing means
KR101000866B1 (en) Vibro hammber
KR100472697B1 (en) The tamping method which uses the vibrating hammer and that system
Adam et al. Rapid impact compactor—an innovative dynamic compaction device for soil improvement
RU2139975C1 (en) Method for building cast-in-place piles and fortifying their bases
KR102239806B1 (en) Soft ground improvement method using mechanical replacement
KR200362100Y1 (en) Tamper equipped with Towing device
CN116163287A (en) A soft foundation treatment method for full-scale support
KR200275179Y1 (en) The tamping machine which uses the vibrating hammer
CN114182593A (en) A kind of foundation reinforcement structure and construction method for enhancing the seismic performance of roadbed
CN113502800A (en) Construction treatment method for reinforcing deep peat soil foundation
Kakharov et al. TECHNOLOGY FOR DIVING PILES
CN205954647U (en) Miniature stake professional equipment of real airborne water high frequency compaction
CN103774638B (en) Arm pipe fusion type crawler belt dynamic replacement machine
KR20030042594A (en) Ground Compaction Method Using The Hydraulic Impact Pile Hammer Installed Foot
CN220598397U (en) Foundation reinforcing device
CN1740457A (en) Vibration process of eliminating wet foundation falling for CFG pile
CN103374907A (en) Earth ramming device

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

D13-X000 Search requested

St.27 status event code: A-1-2-D10-D13-srh-X000

D14-X000 Search report completed

St.27 status event code: A-1-2-D10-D14-srh-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-3-3-R10-R18-oth-X000

PG1501 Laying open of application

St.27 status event code: A-1-1-Q10-Q12-nap-PG1501

E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

St.27 status event code: A-1-2-D10-D21-exm-PE0902

E13-X000 Pre-grant limitation requested

St.27 status event code: A-2-3-E10-E13-lim-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

FPAY Annual fee payment

Payment date: 20121109

Year of fee payment: 4

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 4

FPAY Annual fee payment

Payment date: 20131108

Year of fee payment: 5

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 5

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

FPAY Annual fee payment

Payment date: 20141110

Year of fee payment: 6

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 6

FPAY Annual fee payment

Payment date: 20151110

Year of fee payment: 7

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 7

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

FPAY Annual fee payment

Payment date: 20161010

Year of fee payment: 8

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 8

FPAY Annual fee payment

Payment date: 20171213

Year of fee payment: 9

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 9

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P16-X000 Ip right document amended

St.27 status event code: A-5-5-P10-P16-nap-X000

Q16-X000 A copy of ip right certificate issued

St.27 status event code: A-4-4-Q10-Q16-nap-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

FPAY Annual fee payment

Payment date: 20181112

Year of fee payment: 10

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 10

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

FPAY Annual fee payment

Payment date: 20191111

Year of fee payment: 11

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 11

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 12

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R11-asn-PN2301

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 13

PC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-PC1903

Not in force date: 20221112

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

PC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-PC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 20221112