KR20060076993A - Connection Slab Dowel Bar Installation Structure of Bridge - Google Patents
Connection Slab Dowel Bar Installation Structure of Bridge Download PDFInfo
- Publication number
- KR20060076993A KR20060076993A KR1020040115624A KR20040115624A KR20060076993A KR 20060076993 A KR20060076993 A KR 20060076993A KR 1020040115624 A KR1020040115624 A KR 1020040115624A KR 20040115624 A KR20040115624 A KR 20040115624A KR 20060076993 A KR20060076993 A KR 20060076993A
- Authority
- KR
- South Korea
- Prior art keywords
- fastening
- frame
- rectangular
- cap
- dowel bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000009434 installation Methods 0.000 title claims abstract description 17
- 239000000463 material Substances 0.000 claims abstract description 11
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 8
- 238000004078 waterproofing Methods 0.000 claims abstract description 4
- 230000002787 reinforcement Effects 0.000 claims description 2
- 230000001737 promoting effect Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 10
- 230000003014 reinforcing effect Effects 0.000 abstract description 9
- 239000010426 asphalt Substances 0.000 description 8
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000007787 solid Substances 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 230000008602 contraction Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000009931 harmful effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/16—Reinforcements
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
본 발명은 교대 후방 상부에 접속 슬래브를 연결 시공시 이를 기존 다웰바에 비해 신속 용이하게 이룰 수 있어, 시공 편의성과 공기를 대폭 단축시킬 수 있도록 하고, 또한, 교대와 접속 슬래브간의 연결 결속을 견고히 이룰 수 있도록 한 교량의 접속 슬래브 다웰바 설치구조에 관한 것이다.According to the present invention, when the connecting slab is connected to the upper part of the alternating rear, it can be quickly and easily achieved in comparison with the existing dowel bar, so that construction convenience and air can be greatly reduced, and the connection between the alternating and connecting slabs can be firmly achieved. The installation slab dowel bar installation structure of a bridge.
특히, 교대의 후방 상부에 삽입 고정되되, 하부 외주연에는 걸림턱이 형성되어 있고, 상부 외주연에는 나사면이 형성되어 있는 고정 앵커와; 사방으로 연장된 형태를 취하고 있되, 하부 중앙에는 상기, 고정 앵커를 체결할 수 있는 나사공이 형성되어 있고, 연장된 각 부위의 측면에는 장공이 관통 형성되어 있으며, 외측에는 탄성 스프링이 연결 설치되어 있는 사방형 체결틀과; 상기, 사방형 체결틀을 하부로 삽입 취부할 수 있는 형태를 취하고 있되, 하단에는 지수용 고무재가 마감 부착되어 있고, 사방으로 연장된 각 부위의 측면에는 상기 사방형 체결틀에 형성되어 있는 장공과 연통을 취할 수 있는 체결홀이 형성되어 있으며, 외측 상하부에는 연결홈이 형성되어 있는 상부 체결캡과; 상기, 사방에 위치한 각 체결홀과 장공을 관통 위치하여 상부 체결캡과 사방형 체결틀의 결속을 이룰 수 있되, 내측에 지수링을 구비하여 결속시 체결홀의 방수를 도모할 수 있도록 하는 체결볼트와; 상기, 상부 체결캡의 외측 상,하부에 형성되어 있는 연결홈을 이용하여 연결 위치되는 외부보강틀을 일체로 포함하여 구성됨을 특징으로 한다.In particular, the fixing anchor is inserted into the rear upper portion of the shift, the locking jaw is formed on the lower outer periphery, the screw anchor is formed on the upper outer periphery; It has a shape extending in all directions, the lower center is formed with a screw hole for fastening the fixing anchor, a long hole is formed through the side of each extended portion, the elastic spring is connected to the outside Rectangular fastening frame; The rectangular fastening frame has a shape that can be inserted into the lower part, but a rubber material for water is attached to the lower end of the rectangular fastening frame, and communication with the long hole formed in the rectangular fastening frame is provided on the side of each part extending in all directions. A fastening hole which can be taken is formed, and an upper fastening cap having a connection groove formed on the outer upper and lower parts thereof; The fastening bolts may be formed to penetrate each of the fastening holes and the long holes located in all directions to form a fastening cap and a rectangular fastening frame, but having an index ring on the inner side thereof to allow waterproofing of the fastening holes during the fastening; The outer reinforcing cap is configured to include an outer reinforcing frame integrally connected by using a connection groove formed on the outer upper and lower portions of the upper fastening cap.
사방형 체결틀,상부 체결캡,외부 보강틀 Rectangular fastening frame, upper fastening cap, external reinforcing frame
Description
도 1은 본 발명에 따른 교량의 접속 슬래브 다웰바 설치구조의 구성 상태를 도시한 분해 사시도.1 is an exploded perspective view showing the configuration of the connecting slab dowel bar installation structure of the bridge according to the present invention.
도 2는 본 발명에 따른 교량의 접속 슬래브 다웰바 설치구조의 설치 상태를 도시한 단면도.2 is a cross-sectional view showing an installation state of the connecting slab dowel bar installation structure of the bridge according to the present invention.
도 3은 본 발명에 따른 교량의 접속 슬래브 다웰바 설치구조의 사용 상태를 도시한 단면도.3 is a cross-sectional view showing a state of use of the connecting slab dowel bar installation structure of the bridge according to the present invention.
도 4는 종래 교량의 접속 슬래브 다웰바 설치구조를 도시한 단면도.Figure 4 is a cross-sectional view showing a connecting slab dowel bar installation structure of a conventional bridge.
<도면중 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
1 : 교대 2 : 상판 슬래브1: shift 2: slab slabs
3 : 교좌장치 4 : 다웰바3: teaching device 4: dowel bar
5 : 접속 슬래브 6 : 내부 강봉5: connecting slab 6: internal steel bar
7 : 외부 커버 8 : 아스팔트 충진홀7: outer cover 8: asphalt filling hole
9 : 아스팔트 10 : 부속철자재9: Asphalt 10: Attached iron material
20 : 고정앵커 22 : 걸림턱20: fixed anchor 22: locking jaw
24 : 나사면 26 : 나사공24: screw surface 26: screw hole
28 : 장공 30 : 탄성 스프링28: long hole 30: elastic spring
32 : 사방형 체결틀 34 : 지수용 고무재32: rectangular fastening frame 34: water rubber material
36 : 체결홀 38 : 연결홈36: fastening hole 38: connection groove
40 : 상부 체결캡 42 : 지수링40: upper fastening cap 42: index ring
44 : 체결볼트 46 : 외부 보강틀44: fastening bolt 46: external reinforcement frame
본 발명은 교량의 접속 슬래브 다웰바 설치구조에 관한 것으로, 더욱 상세하게는 교대 후방 상부에 접속 슬래브를 연결 시공시 이를 기존 다웰바에 비해 신속 용이하게 이룰 수 있어, 시공 편의성과 공기를 대폭 단축시킬 수 있도록 하고, 또한, 교대와 접속 슬래브간의 연결 결속을 견고히 이룰 수 있도록 한 교량의 접속 슬래브 다웰바 설치구조에 관한 것이다. The present invention relates to a connecting slab dowel bar installation structure of the bridge, and more particularly, when connecting the connecting slab to the upper portion of the rear shift can be achieved quickly and easily compared to the existing dowel bar, it is possible to significantly shorten the construction convenience and air The present invention also relates to a connecting slab dowel bar mounting structure of a bridge, which is capable of achieving a solid connection between the shift and the connecting slab.
일반적으로 포장의 공용성과 포장 파손 등을 고려할 때 시멘트 콘크리트 포장에서 조인트가 차지하는 비중은 매우 크다고 할 수 있다. In general, the joint portion of cement concrete pavement is very large in consideration of pavement commonity and pavement breakage.
도로포장의 경우에는 다년간의 연구, 설계 및 시공경험을 바탕으로 조인트의 적용에 대한 기준이 정립되어 있다고 할 수 있다. In the case of road pavement, it can be said that the standards for joint application are established based on many years of research, design and construction experience.
콘크리트 슬래브에서 온도와 수분함 량의 변화는 포장의 팽창과 수축 및 휨의 원인이 되며, 이로 인하여 현저한 응력이 발생하게 된다. Changes in temperature and water content in concrete slabs cause pavement expansion, contraction and warpage, which results in significant stresses.
이러한 응력에 의한 유해한 영향을 줄이고 균열을 최소화하기 위해서는 조인 트를 이용함으로써 미리 정해진 규격으로 슬래브를 구획하여 포장을 분할하여야 한다. To reduce the harmful effects of these stresses and to minimize cracking, the slabs should be partitioned to predetermined dimensions by using joints.
조인트는 온도와 습도변화에 의한 콘크리트의 수축팽창을 허용하고, 온도와 습도 차에 의한 와핑과 컬링 응력(warping and curling stress)을 완화시켜주며, 시공시 다른 시기에 포설된 콘크리트를 종횡으로 분리하기 위하여 필요하다. Joints allow shrinkage and expansion of concrete due to temperature and humidity changes, relieve warping and curling stress caused by temperature and humidity differences, and separate longitudinally and laterally installed concrete at different times in construction. Is necessary.
참고로, 포장 조인트는 사용되는 기능에 따라서 분류되며 크게 팽창, 시공 및 수축 조인트와 같은 세종류로 대별된다. For reference, pavement joints are classified according to the functions used and are roughly classified into three types: expansion, construction, and contraction joints.
여기서, 팽창 조인트는 교차하는 포장을 분리하며 포장으로부터 다른 구조물을 분리하는 기능을 하는데 대략 다웰형과 두꺼운단부형 두 가지가 있다. Here, the expansion joint separates the intersecting pavement and separates other structures from the pavement, which are roughly dowel type and thick end type.
이중, 다웰형은 무거운 하중, 심한 교통량, 낮은 강도의 기초와 같은 불리한 조건에서 바람직한 조인트에 사용된다. The double, dowel type is used for the desired joints under adverse conditions such as heavy loads, heavy traffic, low strength foundations.
그리고, 이 조인트는 팽창 이음재가 설치되며 하중 전달을 위해 다웰바가 필요하다. The joints are then equipped with expansion joints and require dowel bars for load transfer.
여기서, 상기 다웰바(4)는 도 4a와 도 4b에 도시된 바와 같이 교대(1)에 상판 슬래브(2)가 교좌장치(3)를 매개로 안착하고, 그, 후방에 접속 슬래브(5)를 연결 형성할 때 이용되는 바, 참고로 접속 슬래브(5)가 없는 경우, 상판 슬래브(2)와 연접되는 도로면이 하부로 침하되는 문제점이 발생된다.Here, the dowel bar (4) is the upper slab (2) is seated on the alternator (1) via the alternating device (3) as shown in Figures 4a and 4b, the connecting slab (5) in the rear When used to form a bar, for reference, when there is no
이를 좀더 구체적으로 설명하면 상기, 다웰바(4)는 내부 강봉(6)을 설치 후 외부 커버(7)를 씌우고 내부에 아스팔트 충진홀(8)을 통해 아스팔트(9)를 충진하며, 외부에 진동 충격력에 대해 콘크리트 구조물을 보강하여 콘크리트 구조물의 수 명을 연장시키기 위한 띠형태의 부속철자재(10)를 설치하는 방식으로 설치된다.In more detail, the
그러므로, 기존 다웰바는 시공시 아스팔트 충진을 이뤄야 함에 따른 양생 기간이 필요하므로 공기를 상당히 지연시키고, 이러한 아스팔트 양생시 불량이 발생할 경우 내부 강봉의 결속을 견고히 이룰 수 없어 교대와 접속 슬래브간의 연결상태를 효과적으로 유지하지 못하여 설치 상태의 변형을 야기하는 문제점이 있었다.Therefore, the existing dowel bar requires a curing period due to the asphalt filling during construction, which significantly delays the air, and when such asphalt curing occurs, the connection between the shift and the connecting slab cannot be secured. There was a problem causing the deformation of the installation state can not be effectively maintained.
또한, 자체의 구조만으로는 접속 슬래브와의 결속을 견고히 이룰 수 없어 별도의 부속철자재를 이용하여야 함에 따른 번거로운 문제점이 있었다.In addition, the structure alone is not able to achieve a solid bond with the connection slab, there was a cumbersome problem of using a separate accessory steel material.
그리고, 기간이 경과하면 상기 아스팔트 충진홀을 통해 유입되는 누수에 의해 충진된 아스팔트의 화학적 변형이 초래되는 문제점이 있었다.In addition, when the period elapses, there is a problem in that chemical deformation of the asphalt filled by the leakage flowing through the asphalt filling hole is caused.
또한, 상기 다웰바가 단순히 교대와 접속 슬래브 사이에 연결 고정되어 있어 접속 슬래브로 부터 다소 강한 하중이 전가되어 올시 이에 효과적인 이완 동작을 이룰 수 없어 다웰바 자체는 물론이고, 교대와 접속 슬래브가 다웰바에 의해 부분적인 파손이 초래되는 문제점이 있었다.In addition, the dowel bar is simply connected and fixed between the alternating and connecting slab, so that when a strong load is transferred from the connecting slab, the effective relaxation operation cannot be achieved. Therefore, the dowel bar itself and the alternating and connecting slab are formed by the dowel bar. There was a problem that caused partial breakage.
본 발명은 상술한 바와 같은 종래의 문제들을 감안하여 이를 해결하고자 안출한 것으로, 그 목적은 교대 후방 상부에 접속 슬래브를 연결 시공시 이를 기존 다웰바에 비해 신속 용이하게 이룰 수 있어, 시공 편의성과 공기를 대폭 단축시킬 수 있도록 하고, 또한, 교대와 접속 슬래브간의 연결 결속을 견고히 이룰 수 있도록 한 교량의 접속 슬래브 다웰바 설치구조를 제공하는데 있다.The present invention has been made in view of the conventional problems as described above, the object is to achieve a quick and easy construction compared to the existing dowel bar when connecting the connecting slab to the upper part of the alternating back, the construction convenience and air The present invention provides a bridge connecting slab dowel bar mounting structure that can greatly shorten and securely establish a connection bond between a shift and a connecting slab.
상기의 목적을 달성하기 위한 본 발명의 구체적인 수단은, Specific means of the present invention for achieving the above object,
교대의 후방에 접속 슬래브를 연결 시공시 사용되는 다웰바에 있어서, In the dowel bar used when connecting the connecting slab to the rear of the shift,
교대의 후방 상부에 삽입 고정되되, 하부 외주연에는 걸림턱이 형성되어 있고, 상부 외주연에는 나사면이 형성되어 있는 고정 앵커와;A fixed anchor inserted into and fixed to the rear upper portion of the shift, the locking jaw being formed at the lower outer periphery, and the screw surface being formed at the upper outer periphery;
사방으로 연장된 형태를 취하고 있되, 하부 중앙에는 상기, 고정 앵커를 체결할 수 있는 나사공이 형성되어 있고, 연장된 각 부위의 측면에는 장공이 관통 형성되어 있으며, 외측에는 탄성 스프링이 연결 설치되어 있는 사방형 체결틀과;It has a shape extending in all directions, the lower center is formed with a screw hole for fastening the fixing anchor, a long hole is formed through the side of each extended portion, the elastic spring is connected to the outside Rectangular fastening frame;
상기, 사방형 체결틀을 하부로 삽입 취부할 수 있는 형태를 취하고 있되, 하단에는 지수용 고무재가 마감 부착되어 있고, 사방으로 연장된 각 부위의 측면에는 상기 사방형 체결틀을 취부시 상기 사방형 체결틀에 형성되어 있는 장공과 연통을 이룰 수 있는 체결홀이 형성되어 있으며, 외측 상하부에는 연결홈이 형성되어 있는 상부 체결캡과; The rectangular fastening frame has a shape that can be inserted into the lower portion, but a rubber material for water is attached to the lower end of the rectangular fastening frame, and the rectangular fastening frame is attached to the rectangular fastening frame when the rectangular fastening frame is attached to the side of each part extending in all directions. A fastening hole is formed to communicate with the formed long hole, the upper and lower outer fastening caps having connection grooves formed therein;
상기, 사방에 위치한 각 체결홀과 장공을 관통 위치하여 상부 체결캡과 사방형 체결틀의 결속을 이룰 수 있되, 내측에 지수링을 구비하여 결속시 체결홀의 방수를 도모할 수 있도록 하는 체결볼트와; The fastening bolts may be formed to penetrate each of the fastening holes and the long holes located in all directions to form a fastening cap and a rectangular fastening frame, but having an index ring on the inner side thereof to allow waterproofing of the fastening holes during the fastening;
상기, 상부 체결캡의 외측 상,하부에 형성되어 있는 연결홈을 이용하여 연결 위치되는 외부보강틀을 일체로 포함하여 구성됨을 특징으로 한다.The outer reinforcing cap is configured to include an outer reinforcing frame integrally connected by using a connection groove formed on the outer upper and lower portions of the upper fastening cap.
이하, 본 발명의 구성을 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, the configuration of the present invention in detail with reference to the drawings.
도 1은 본 발명에 따른 교량의 접속 슬래브 다웰바 설치구조의 구성 상태를 도시한 분해 사시도이고, 도 2는 본 발명에 따른 교량의 접속 슬래브 다웰바 설치 구조의 설치 상태를 도시한 단면도이다.1 is an exploded perspective view showing the configuration of the connection slab dowel bar installation structure of the bridge according to the present invention, Figure 2 is a cross-sectional view showing the installation state of the connection slab dowel bar installation structure of the bridge according to the present invention.
참고로, 본 발명을 설명함에 있어 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단될 경우에는 그 상세한 설명을 생략하였다.For reference, in describing the present invention, when it is determined that a detailed description of related known functions or configurations may unnecessarily obscure the gist of the present invention, the detailed description thereof is omitted.
또한, 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자와 운영자의 의도 또는 관례 등에 따라 달라질 수 있다.In addition, terms to be described below are terms defined in consideration of functions in the present invention, which may vary according to intentions or customs of users and operators.
그러므로, 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.Therefore, the definition should be made based on the contents throughout the specification.
도시된 바와 같이 교대(1)의 후방 상부에 삽입 고정되어 있되, 하부 외주연에는 걸림턱(22)이 형성되어 있고, 상부 외주연에는 나사면(24)이 형성되어 있는 고정 앵커(20)가 구비되어 있고, 상기 고정 앵커(20)의 상부에는 사방으로 연장된 형태를 취하고 있되, 연장된 각 부위의 측면에는 장공(28)이 관통 형성되어 있고, 외측에는 탄성 스프링(30)이 연결 설치되어 있는 사방형 체결틀(32)이 하부 중앙에 형성된 나사공(26)을 통해 체결 위치해 있다. As shown, the
그리고, 상기 사방형 체결틀(32)의 외측에는 지수용 고무재(34)가 하단에 마감 부착되어 있고, 사방으로 연장된 각 부위의 측면에는 상기 장공(28)과 연통을 이룰 수 있는 체결홀(36)이 형성되어 있으며, 외측 상하부에는 연결홈(38)이 형성되어 있는 상부 체결캡(40)이 씌어져 있고, 상기, 사방에 위치한 각 체결홀(36)에는 이 체결홀(36)과 장공(28)을 관통 위치하여 상부 체결캡(40)과 사방형 체결틀(32)의 결속을 이룰 수 있되, 내측에 지수링(42)을 구비하여 결속시 체결홀(36)의 방수를 도모할 수 있도록 하는 체결볼트(44)가 설치되어 있다, And, the outer side of the
또한, 상기, 상부 체결캡(40)의 외측 상,하부에 형성되어 있는 연결홈(38)에는 외부 보강틀(46)이 설치 구성되어 있다. In addition, the outer reinforcing
다음은 상술한 기술적 구성 요소를 도면을 참조하여 본 발명의 작용효과를 설명한다. Next, the operational effects of the present invention will be described with reference to the accompanying drawings.
도 3은 본 발명에 따른 교량의 접속 슬래브 다웰바 설치구조의 사용 상태를 도시한 단면도이다.3 is a cross-sectional view showing a state of use of the connecting slab dowel bar installation structure of the bridge according to the present invention.
이는 도시된 바와 같이 교대(1)의 후방 상부에 위치하는 것으로, 먼저, 상기 고정 앵커(20)를 이 위치에 강제 삽입 고정한 후 이 고정 앵커(20)의 상부에 사방형 체결틀(32)을 체결 고정하고, 뒤이어 이 사방형 체결틀(32)의 상부로 부터 상부 체결캡(40)을 씌우듯 연결 설치하면 된다.This is located in the rear upper portion of the shift (1), as shown in the figure, first, the
그리고, 상기 상부 체결캡(40)의 사방에 위치한 각 체결홀(36)에 체결볼트(44)를 삽입 위치시켜 상부 체결캡(40)과 사방형 체결틀(32)의 결속을 취한 후 이렇게 연결 고정된 상부 체결캡(40)의 외측에 형성된 연결홈(38)에 외부 보강틀(46)을 연결 설치하면 설치가 완료된다.Then, by inserting the
이에 따라 다웰바 자체 시공을 신속 용이하게 이룰 수 있음에 따른 편의성 향상과 공기 단축은 물론이고, 뒤이어 타설 시공되는 접속 슬래브(5)와의 연계 공정을 대폭 앞당길 수 있어 전체 공기를 단축시킬 수 있게 된다.Accordingly, the construction of the dowel bar itself can be quickly and easily improved, and the air shortening, as well as the connection process with the
더불어, 누수가 예상되는 위치에 지수용 고무재(34)와 지수링(42)을 위치시켜 지수성 향상에 따른 부재의 변형을 최소화할 수 있어 장기간 설치 상태를 유지 할 수 있게 된다.In addition, by placing the
또한, 자체적으로 타설되는 접속 슬래브(5)와의 결속을 견고히 이룰 수 있어 종래의 경우처럼 별도의 부속철자재를 이용하지 않아도 된다.In addition, it is possible to achieve a solid bond with the
즉, 기존 부속철자재와 같은 기능을 상기 외부 보강틀(46)을 통해 이룰 수 있게 되기 때문이다.That is, because the same function as the existing accessory steel material can be achieved through the outer reinforcing
그리고, 상기 상부 체결캡(40)과 사방형 체결틀(32)은 소정의 전,후,좌,우 유동이 가능토록 사이에 탄성 스프링(30)을 위치시키고 있으므로 접속 슬래브(5)로 부터 다소 강한 하중이 전가되어 올시 이에 연동 이완 작동을 이뤄 이러한 하중 전가에 의해 다웰바를 구성하고 있는 상부 체결캡(40)과 사방형 체결틀(32)이 연결된 교대(1)와 접속 슬래브(5)에 부분적인 파손을 초래하는 문제를 미연에 방지할 수 있게 된다. In addition, the
참고로 본 발명은 다양하게 변형 실시될 수 있고, 여러 가지의 형태를 취할 수 있으나 상기 발명의 상세한 설명에서는 그에 따른 특별한 실시 예에 대해서만 기술하였다.For reference, the present invention may be variously modified and may take various forms. However, in the detailed description of the present invention, only specific embodiments thereof are described.
그러므로, 본 발명은 상세한 설명에서 언급되는 특별한 형태로 한정되는 것이 아닌 것으로 인정되어야 하며, 오히려 첨부된 청구범위에 의해 정의되는 본 발명의 정신과 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다. Therefore, it is to be understood that the invention is not to be limited to the specific forms referred to in the description, but rather to include all modifications, equivalents and alternatives falling within the spirit and scope of the invention as defined by the appended claims. It must be understood.
이상에서 살펴 본 바와 같이 본 발명은 교대 후방 상부에 접속 슬래브를 연 결 시공시 이를 기존 다웰바에 비해 신속 용이하게 이룰 수 있어, 시공상의 편의성과 공기를 대폭 단축시킬 수 있도록 한 효과가 있다.As described above, the present invention can be achieved quickly and easily compared to the existing dowel bar when connecting the connecting slab on the upper part of the shift, there is an effect that can greatly shorten the construction convenience and air.
그리고, 교대와 접속 슬래브간의 연결 결속을 자체적으로 견고히 이룰 수 있도록 함은 물론이고, 실사용시 접속 슬래브로부터 전가되어 오는 충격 하중으로부터 연동 이완 작용을 하여 다웰바를 구성하고 있는 상부 체결캡과 사방형 체결틀이 연결된 교대와 접속 슬래브에 부분적인 파손을 초래하는 문제 현상을 미연에 방지할 수 있도록 하여 다웰바 자체는 물론이고 이것이 연결되는 교대와 접속 슬래브의 사용 수명을 대폭 향상시켜 줄 수 있도록 한 효과 등이 있다.The upper fastening cap and the rectangular fastening frame which make up the dowel bar by interlocking and loosening action from the impact load transferred from the connecting slab as well as enabling the solid connection between the shift and the connecting slab to themselves. It is possible to prevent the problem that causes partial damage to the connected shift and the connecting slab in advance, and it is possible to greatly improve the service life of the connected shift and the connecting slab as well as the dowel bar itself. .
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020040115624A KR20060076993A (en) | 2004-12-29 | 2004-12-29 | Connection Slab Dowel Bar Installation Structure of Bridge |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020040115624A KR20060076993A (en) | 2004-12-29 | 2004-12-29 | Connection Slab Dowel Bar Installation Structure of Bridge |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| KR20060076993A true KR20060076993A (en) | 2006-07-05 |
Family
ID=37169124
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020040115624A Abandoned KR20060076993A (en) | 2004-12-29 | 2004-12-29 | Connection Slab Dowel Bar Installation Structure of Bridge |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR20060076993A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20200100925A (en) * | 2019-02-19 | 2020-08-27 | 김용훈 | A bridge including connecting slab capable of coping with subsidence |
| WO2021098112A1 (en) * | 2019-11-18 | 2021-05-27 | 深圳市市政设计研究院有限公司 | Fork-type suspender anchoring structure |
-
2004
- 2004-12-29 KR KR1020040115624A patent/KR20060076993A/en not_active Abandoned
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20200100925A (en) * | 2019-02-19 | 2020-08-27 | 김용훈 | A bridge including connecting slab capable of coping with subsidence |
| WO2021098112A1 (en) * | 2019-11-18 | 2021-05-27 | 深圳市市政设计研究院有限公司 | Fork-type suspender anchoring structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101125549B1 (en) | Slab constructing method using truss deck plate with heat insulator | |
| JP5055028B2 (en) | Precast slab joint structure | |
| JP2009041227A (en) | Structure and method for joining precast floor slabs together | |
| KR101254043B1 (en) | Replacement method for post-placing concrete of expansion joint | |
| KR20010045640A (en) | Precast Reinforced Concrete Slab, Composite Continuous Bridge Having Such Slab, and Constructing Method thereof | |
| KR101028507B1 (en) | Extension joints for bridges that do not require finishing concrete and construction method | |
| KR100704055B1 (en) | Steel casting continuous composite bridge with precast concrete deck and construction method | |
| JP2007138467A (en) | Load bearing type expansion device of elevated road and its construction method | |
| JP4905862B2 (en) | Concrete assembly structure | |
| KR101289737B1 (en) | Anchorage distribution method for prestressed composite beam | |
| JP6068243B2 (en) | Expansion joint for road | |
| KR20170082318A (en) | Elastic recovering type expansion joint and the construction method therefor | |
| KR100427908B1 (en) | The fabricated expansion joint installation method without concrete-breaking | |
| KR102079574B1 (en) | Composite multi-cap for finishing fixtures and method for constructing prestressed concrete structures using the same | |
| KR20060076993A (en) | Connection Slab Dowel Bar Installation Structure of Bridge | |
| KR100927188B1 (en) | Connection Structure and Construction Method of Concrete Girder with Fiber Reinforced Plastic Sole with Shear Connector | |
| KR20210001147U (en) | Shear connector for steel frame structure and bridge structure with the same | |
| KR100868342B1 (en) | Repair and construction method of expansion joint device that can save futa ash and top plate for it | |
| KR100564093B1 (en) | Expansion joint structure of bridge using foam rubber | |
| KR200280748Y1 (en) | The fabricated expansion joint and installation method without concrete-breaking | |
| KR200245373Y1 (en) | Replaceable expansion and contraction joint stracture for use in bridge | |
| KR200228525Y1 (en) | Steel structure steel box of bridge preventing vibration | |
| KR101323239B1 (en) | Girder and construction method for bridge using the same | |
| KR200376197Y1 (en) | Composition structure of integral abutment bridge | |
| KR20150018366A (en) | Composite structure of concrete flange and web and method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20041229 |
|
| PA0201 | Request for examination | ||
| PG1501 | Laying open of application | ||
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20060721 |
|
| NORF | Unpaid initial registration fee | ||
| PC1904 | Unpaid initial registration fee |