[go: up one dir, main page]

KR20000056397A - Gentry crane having improved capacity - Google Patents

Gentry crane having improved capacity Download PDF

Info

Publication number
KR20000056397A
KR20000056397A KR1019990005683A KR19990005683A KR20000056397A KR 20000056397 A KR20000056397 A KR 20000056397A KR 1019990005683 A KR1019990005683 A KR 1019990005683A KR 19990005683 A KR19990005683 A KR 19990005683A KR 20000056397 A KR20000056397 A KR 20000056397A
Authority
KR
South Korea
Prior art keywords
trolley
spreader
hook
hoist
boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
KR1019990005683A
Other languages
Korean (ko)
Other versions
KR100306296B1 (en
Inventor
한만엽
손승요
Original Assignee
한만엽
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한만엽 filed Critical 한만엽
Priority to KR1019990005683A priority Critical patent/KR100306296B1/en
Priority to JP2000599684A priority patent/JP2003528783A/en
Priority to CN99816466A priority patent/CN1337918A/en
Priority to AU10822/00A priority patent/AU1082200A/en
Priority to DE19983937T priority patent/DE19983937T1/en
Priority to PCT/KR1999/000682 priority patent/WO2000048937A1/en
Publication of KR20000056397A publication Critical patent/KR20000056397A/en
Application granted granted Critical
Publication of KR100306296B1 publication Critical patent/KR100306296B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • B66C19/002Container cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Control And Safety Of Cranes (AREA)
  • Ship Loading And Unloading (AREA)
  • Jib Cranes (AREA)

Abstract

처리능력이 향상된 갠트리크레인에 관한 본 발명은, 이동가능한 주탑기둥과; 상기 주탑기둥의 일정높이에 수평으로 설치된 붐과; 상기 붐에 이동 가능하도록 설치된 적어도 하나 이상의 트롤리와; 상기 트롤리의 저면에 대해서 착탈 가능하여, 트롤리의 이동시에는 트롤리와 결합하고, 콘테이너를 집기위해서는 트롤리와 분리되어 하강하는 스프레더와; 상기 트롤리를 수직으로 관통하여 승강운동 함으로써, 스프레더와 결합 및 분리 할 수 있어, 콘테이너를 집기위해 상기 스프레더와 결합하여 하강하는 후크와; 붐에 이동가능하도록 설치되어 후크를 승강운동시키는 호이스트를 포함하는 것을 특징으로 한다. 이러한 갠트리크레인은, 트롤리가 붐을 따라 계속적으로 순환하며 콘테이너를 하역하므로 하역속도가 매우 빠르며 처리효율이 높다. 또한 트롤리의 이동시 스프레더가 트롤리의 저면에 결합하므로, 트롤리가 스프레더를 늘어뜨린채로 이동하지 않아, 트롤리의 이동속도 변화에 따른 스프레더의 흔들림이 없어 위치선정이 신속 정확하며, 특히 스프레더가 콘테이너를 집은 상태로 이동하더라도 흔들림이 없어 트롤리의 이동속도를 빠르게 하여 하역을 신속하고 안정적으로 수행할 수 있다는 이점이 있다.The present invention relates to a gantry crane with improved processing capacity; A boom horizontally installed at a predetermined height of the pylon; At least one trolley mounted to the boom to be movable; A spreader detachable from the bottom of the trolley, coupled to the trolley when the trolley moves, and separated from the trolley to descend the container; A hook which can be coupled to and detached from the spreader by vertically penetrating the trolley to move up and down, and coupled to the spreader to lower the container; It is installed to be movable to the boom is characterized in that it comprises a hoist for lifting the hook. This gantry crane has a very fast unloading speed and a high processing efficiency because the trolley continuously circulates along the boom and unloads the container. In addition, when the trolley moves, the spreader is coupled to the bottom of the trolley, so that the trolley does not move with the spreader hanging down, and there is no shaking of the spreader due to the change in the speed of the trolley. There is no shaking even when moving to a state, there is an advantage that the unloading can be performed quickly and stably by increasing the moving speed of the trolley.

Description

처리능력이 향상된 갠트리크레인{Gentry crane having improved capacity}Gentry crane having improved capacity

본 고안은 주로 콘테이너를 하역하는 장치인 순환식 갠트리크레인에 관한 것으로서, 보다 상세하게는 다수의 트롤리가 설치되어 처리능력이 향상된 갠트리크레인에 관한 것이다.The present invention mainly relates to a circulating gantry crane which is a device for unloading a container, and more particularly, to a gantry crane having improved handling capacity by installing a plurality of trolleys.

콘테이너에 의한 화물 수송은 1957년에 Sea-Land Service사가 최초로 시작하였으며, 1958년에 Matson Navigation사가 대서양 노선에 콘테이너 수송을 시작하면서부터 본격화되기 시작하였다. 오늘날에는 액체, 분말의 화물을 제외한 화물 수송의 80% 이상을 콘테이너 수송이 차지하고 있으며, 이러한 비중은 앞으로도 더욱 커질 것으로 판단되고 있다. 이와같은 콘테이너의 사용 급증에 따라 콘테이너 크레인의 처리 능력도 구동모터의 용량 증가와 트롤리 및 스프레더의 개조, 자동제어 시스템의 도입 등으로 초기에 비하여 그 처리 능력이 향상되고 있다.Container shipments began for the first time by Sea-Land Service in 1957, and in 1958 when Matson Navigation began shipping containers on the Atlantic. Today, more than 80% of cargo transportation, excluding liquid and powder cargo, is accounted for, and this proportion is expected to increase. With such a rapid increase in the use of containers, the processing capacity of container cranes has also improved in capacity compared to the early days due to the increase in capacity of driving motors, the modification of trolleys and spreaders, and the introduction of automatic control systems.

종래에 사용되어 오던 갠트리 크레인은, 도 1에 도시한 바와 같이 주탑기둥(12)에 붐(14)이 수평으로 결합되어 있고, 붐(14)에는 기계실(16) 및 스프레더(24)가 구비된 트롤리(22)가 왕복운동 할 수 있도록 장치되어 있다. 상기와 같은 구조를 갖는 종래의 갠트리크레인은 트롤리(22)에 설치된 스프레더(24)가 하강하여 콘테이너(18)를 집은 상태로, 트롤리(22)가 붐(14)을 이동하면서 가령 부두에서 선박으로 또는 선박에서 부두로 콘테이너(18)를 하역하는 동작을 한다.In the conventional gantry crane, as shown in FIG. 1, the boom 14 is horizontally coupled to the main column pillar 12, and the boom 14 is provided with a machine room 16 and a spreader 24. The trolley 22 is equipped to reciprocate. In the conventional gantry crane having the structure as described above, the spreader 24 installed in the trolley 22 is lowered to pick up the container 18, while the trolley 22 moves the boom 14, for example, at a pier. The container 18 is operated to unload the container 18 from the vessel to the pier.

그러나, 상기와 같은 종래의 갠트리크레인은 트롤리(22)가 붐(14)을 따라 이동함과 동시에 강선(20)을 늘어뜨려 스프레더(24)를 하강시킴으로서, 스프레더(24)가 콘테이너(18)의 상부에 정확히 위치하기 위한 시간이 길어지게 되어 작업이 지체되고, 아울러 콘테이너를 집은 상태로 트롤리(22)가 이동하면서 스프레더(24)가 승강운동함으로 동작이 불안하며, 콘테이너가 흔들려 선박에 콘테이너를 적층시에 정확한 장소에 콘테이너를 위치시키기 불편하여 결국 하역속도 및 하역효율이 매우 떨어지는 문제가 있다.However, in the conventional gantry crane as described above, as the trolley 22 moves along the boom 14, the steel wire 20 is laid down and the spreader 24 is lowered, so that the spreader 24 of the container 18 is moved. The operation time is delayed because it takes longer to be accurately positioned at the upper part, and the motion of the spreader 24 moves up and down as the trolley 22 moves while the container is picked up. It is inconvenient to place the container in the correct place at the time of lamination, and thus there is a problem in that the unloading speed and the unloading efficiency are very low.

본 발명은 상기 문제점을 해소하고자 창출한 것으로서, 콘테이너의 하역시 콘테이너의 흔들림이 발생하지 않아 하역이 신속 정확하며, 특히 복수의 트롤리 및 스프레더를 설치하여 운용함으로서 작업이 신속한 처리능력이 향상된 갠트리크레인을 제공함에 목적이 있다.The present invention was created to solve the above problems, the container unloading during the unloading of the container unloading is quick and accurate, especially by installing a plurality of trolleys and spreaders to operate the gantry crane with improved processing capacity The purpose is to provide.

도 1은 종래의 갠트리 크레인을 도시한 도면.1 is a view showing a conventional gantry crane.

도 2는 본 발명의 일 실시예에 따른 처리능력이 향상된 갠트리크레인의 구성을 개략적으로 도시한 도면.2 is a view schematically showing the configuration of the gantry crane with improved processing capacity according to an embodiment of the present invention.

도 3a 및 도 3b는 본 발명의 일 실시예에 따른 처리능력이 향상된 갠트리크레인의 작동을 설명하기 위하여 부분 도시한 도면.3A and 3B are partial views illustrating the operation of an improved gantry crane according to an embodiment of the present invention.

도 4는 도 2의 평면도.4 is a plan view of FIG.

〈도면의 주요 부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>

10:갠트리크레인 12:주탑기둥10: Gantry crane 12: Pylon pillar

14,100,120:붐 16:기계실14,100,120: boom 16: machine room

18:콘테이너 20:강선18: container 20: steel wire

22,102:트롤리 24,104:스프레더22,102: Trolley 24,104: Spreader

106:육상측호이스트 108:해상측호이스트106: land side hoist 108: offshore side hoist

110:호이스트모터 112:호이스트휠110: hoist motor 112: hoist wheel

114:강선 116:후크114: steel wire 116: hook

120:콘테이너후크 122:결합구120: container hook 122: connector

123:지면 124,125:걸이수단123: ground 124,125: hook means

126:트롤리구멍 128:후크구멍126: Trolley hole 128: Hook hole

130:선박 132:도르래130: Ship 132: pulley

140:바퀴140: wheels

상기 목적을 달성하기 위하여 본 발명은, 이동가능한 주탑기둥과; 상기 주탑기둥의 일정높이에 수평으로 설치된 붐과; 상기 붐에 이동 가능하도록 설치된 적어도 하나 이상의 트롤리와; 상기 트롤리의 저면에 대해서 착탈 가능하여, 트롤리의 이동시에는 트롤리와 결합하고, 콘테이너를 집기위해서는 트롤리와 분리되어 하강하는 스프레더와; 상기 트롤리를 수직으로 관통하여 승강운동 함으로써, 스프레더와 결합 및 분리 할 수 있어, 콘테이너를 집기위해 상기 스프레더와 결합하여 하강하는 후크와; 붐에 이동가능하도록 설치되어 후크를 승강운동시키는 호이스트를 포함하는 것을 특징으로 한다.In order to achieve the above object, the present invention provides a movable pillar column; A boom horizontally installed at a predetermined height of the pylon; At least one trolley mounted to the boom to be movable; A spreader detachable from the bottom of the trolley, coupled to the trolley when the trolley moves, and separated from the trolley to descend the container; A hook which can be coupled to and detached from the spreader by vertically penetrating the trolley to move up and down, and coupled to the spreader to lower the container; It is installed to be movable to the boom is characterized in that it comprises a hoist for lifting the hook.

또한, 상기 트롤리 및 후크의 저면에는 각각 적어도 네 개 이상의 걸이수단이 구비되며, 스프레더의 상면에는 트롤리의 걸이수단 및 후크의 걸이수단과 결합하도록, 각 걸이수단의 위치에 대응하는 트롤리구멍 및 후크구멍이 형성되어 장탈착이 가능하고, 상기 호이스트는 후크와 스프레더와의 결합시 스프레더와 트롤리와의 결합을 해제하고, 스프레더와 트롤리의 결합시 후크와 스프레더의 결합을 해제하는 것을 특징으로 한다.Further, at least four hooking means are provided on the bottom of the trolley and the hook, respectively, and a trolley hole and a hook hole corresponding to the positions of the hooking means are coupled to the hooking means of the trolley and the hooking means of the hook on the upper surface of the spreader. It is formed is possible to be detachable, the hoist is characterized in that the coupling between the spreader and the trolley when the hook and the spreader is coupled, characterized in that the coupling between the spreader and the trolley release the hook and the spreader.

아울러, 상기 후크는 호이스트내의 호이스트모터와 강선에 연결되어, 호이스트의 작동에 따라 강선의 길이가 조절됨으로서 후크의 승강운동이 이루어지며, 붐에 설치된 호이스트는 육상측에 위치한 육상측호이스트와 해상측에 위치한 해상측호이스트로 구성되며, 상기 트롤리는 호이스트와 별도로 구성되어, 트롤리와 호이스트는 붐에서 상호 독립적으로 이동할 수 있는 것을 특징으로 한다.In addition, the hook is connected to the hoist motor and the steel wire in the hoist, the length of the steel wire is adjusted according to the operation of the hoist, and the lifting movement of the hook is made, the hoist installed on the boom is located on the land side hoist and the marine side located on the land side It is composed of a located offshore side hoist, the trolley is configured separately from the hoist, characterized in that the trolley and the hoist can move independently from each other in the boom.

또한, 상기 트롤리 및 후크의 저면에는 각각 적어도 네 개 이상의 걸이수단이 형성되며, 스프레더의 상면에는 트롤리의 걸이수단 및 후크의 걸이수단과 결합하도록 각 걸이수단의 위치에 대응하는 트롤리구멍 및 후크구멍이 형성되고, 상기 호이스트는 후크와 스프레더와의 결합시 스프레더와 트롤리와의 결합을 해제하고, 스프레더와 트롤리의 결합시 후크와 스프레더의 결합을 해제하며, 상기 후크는 호이스트내의 호이스트모터와 강선에 의해 연결되어, 호이스트의 작동에 따라 강선의 길이가 조절됨으로서 승강운동이 이루어지며, 붐에 설치된 호이스트는 육상측에 위치한 육상측호이스트와 해상측에 위치한 해상측호이스트로 구성된다. 아울러 상기 호이스트는 호이스트모터와, 호이스트모터와 연결된 강선을 후크측으로 가이드하는 호이스트휠을 포함하며 붐에 대해 직선운동이 가능하고, 상기 붐은 트롤리가 붐을 따라 순환운동 할 수 있도록 하나의 폐루프를 이루도록 구성된다.In addition, at least four hooking means are formed on the bottom of the trolley and the hook, respectively, and a trolley hole and a hook hole corresponding to the positions of the hooking means are coupled to the hooking means of the trolley and the hooking means of the hook. And the hoist releases the coupling of the spreader and the trolley when the hook and the spreader are coupled, and releases the coupling of the hook and the spreader when the spreader and trolley are coupled, and the hook is connected by the hoist motor and the steel wire in the hoist. As the length of the steel wire is adjusted according to the operation of the hoist, the lifting movement is made, and the hoist installed on the boom is composed of the land side hoist located on the land side and the sea side hoist located on the sea side. In addition, the hoist includes a hoist motor and a hoist wheel for guiding the steel wire connected to the hoist motor to the hook side, and enables linear movement with respect to the boom, and the boom has one closed loop to allow the trolley to circulate along the boom. Configured to achieve.

이하, 본 발명을 첨부된 도면을 참조하여 보다 상세하게 설명하기로 한다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings.

도 2는 본 발명의 일 실시예에 따른 처리능력이 향상된 갠트리크레인의 구성을 도시한 도면이다.2 is a view showing the configuration of the gantry crane with improved processing capacity according to an embodiment of the present invention.

도시한 바와 같이, 본 실시예에 따른 갠트리크레인(10)은 지면(123)에 대해 이동가능한 주탑기둥(12)과, 상기 주탑기둥(12)에 수평으로 설치된 붐(boom,100)과, 상기 붐(100)을 따라 이동하며 콘테이너(18)를 하역장소로 이송하는 트롤러(102)와, 붐(100)의 상측부에 설치되어 후크(116)를 승강운동시키는 육상측호이스트(106) 및 해상측호이스트(108)를 포함한다.As shown, the gantry crane 10 according to the present embodiment is a pylon column 12 movable with respect to the ground 123, a boom (boom, 100) horizontally installed on the pylon pillar 12, and It moves along the boom 100 and transports the container 18 to the unloading place, and the land side hoist 106 and the marine side hoist installed in the upper portion of the boom 100 to elevate the hook 116 Side hoist 108.

상기 각 요소들의 규모는 항구의 접안용량 및 하역수준에 따라 달라지며, 붐(100)을 안정되게 지지하도록 필요에 따라 보강부재를 추가할 수 있음은 물론이다. 또한 주탑기둥(12)의 하부에는 하역할 콘테이너(18)가 미리 도착하여 대기할 수 있도록 공간이 마련되어 있다.The size of each of the elements is dependent on the docking capacity and loading level of the port, it is of course possible to add a reinforcement member as necessary to support the boom 100 stably. In addition, a space is provided below the main column pillar 12 so that the container 18 to be unloaded arrives in advance and waits.

상기 주탑기둥(12)의 일정높이에 위치하는 붐(100)은 수평으로 위치하되, 본 실시예에서는 도 4에 도시한 바와 같이, 하나의 폐루프(closed loop)를 이루어 복수의 트롤리(102)가 붐(100)을 따라 계속적으로 순환하며 하역을 수행 할 수 있도록 구성되어 있다. 아울러 상기 붐의 구조는 폐루프를 이루는한에 있어서 다양한 형상을 가질 수 있으며, 본 출원인에 의해 공지된 선발명(특허등록번호 제143699호)에 따른 수직순환식 갠트리크레인 및 선발명(특허등록번호 제134235)호)에 따른 수평순환식 겐트리크레인에 적용된 붐을 사용할 수 있음은 물론이다.The boom 100 located at a predetermined height of the main column pillar 12 is positioned horizontally, as shown in FIG. 4 in this embodiment, a plurality of trolleys 102 by forming a closed loop (closed loop) Is circulated along the boom 100 is configured to perform the unloading. In addition, the structure of the boom may have a variety of shapes as long as it forms a closed loop, and the vertical circulation gantry crane and the selection (patent registration number) according to the selection (patent registration number 143699) known by the applicant Of course, it is possible to use a boom applied to the horizontal circulation gantry crane according to (134235).

상기 붐(100)의 상측부에는 두 개의 호이스트(106,108)가 설치된다. 상기 호이스트(106,108)는 육상측에 위치한 육상측호이스트(106)와 해상측에 위치한 해상측호이스트(108)로 이루어진다. 상기 육상측호이스트(106) 및 해상측호이스트(108)는 위치조절의 필요시 각기 붐(100)에 대해서 화살표 a방향의 운동이 가능하며, 내부에는 호이스트모터(110)와 호이스트휠(112)을 포함함과 아울러 변전장비와 같은 각종 전기시설(미도시) 및 각종 제어수단(미도시)등을 포함한다. 특히 해상측호이스트(108)는 콘테이너(18)를 넓은 하역장소의 적소에 내려놓을 수 있도록 왕복운동의 범위가 육상측호이스트(106)에 비해 상대적으로 넓도록 함이 바람직하다. 상기 호이스트(106,108) 내부에는 호이스트(106,108)자체의 왕복운동을 위한 모터(미도시)가 설치되어 있음은 물론이다.Two hoists 106 and 108 are installed on the upper side of the boom 100. The hoists 106 and 108 consist of a land side hoist 106 located on the land side and a sea side hoist 108 located on the sea side. The land side hoist 106 and the sea side hoist 108 is capable of movement in the direction of arrow a with respect to the boom 100, respectively, when position adjustment is necessary, and the hoist motor 110 and the hoist wheel 112 therein. In addition, it includes various electrical facilities such as substation equipment (not shown) and various control means (not shown). In particular, the marine side hoist 108 is preferably such that the range of the reciprocating motion relative to the land side hoist 106 so that the container 18 can be lowered in place in a wide unloading place. Of course, the hoists 106 and 108 are provided with motors (not shown) for reciprocating the hoists 106 and 108 themselves.

상기와 같이 구성되어 있는 호이스트(106,108)에 있어서, 호이스트휠(112)을 제외한 장치들을 호이스트(106,108)로부터 독립된 별도의 기계실(미도시)을 만들어 내장하여 구성할 수 도 있다. 이 경우 각 호이스트(106,108)내부에는 호이스트휠(112)만이 설치되어 호이스트(106,108)의 이동이 신속하고 가볍다.In the hoists 106 and 108 configured as described above, devices other than the hoist wheels 112 may be constructed by forming a separate machine room (not shown) independent of the hoists 106 and 108. In this case, only the hoist wheel 112 is installed inside each hoist 106 and 108, so that the hoist 106 and 108 can be moved quickly and lightly.

호이스트(106,108)의 내부에 설치되어 있는 호이스트휠(112)은 강선(114)에 의해 후크(116)와 연결되어 있다. 상기 강선(114)은 호이스트모터(110)에 의해 호이스트휠(112)에 감겨 하단에 매달려있는 후크(116)를 승강시키며, 충분한 길이를 가져 콘테이너(18)를 선박(도 3b의 130)의 밑바닥까지 하강시킬 수 있다. 또한 호이스트모터(110)를 구동하여 후크(116)를 최대한 상승시키면 후크(116)가 호이스트(106,108)의 저면까지 상승하여 위치된다. 따라서, 트롤리(102)는 붐(100)을 순환하여 호이스트(106,108)의 하부를 지나치더라도, 후크(116)와 부딪히지 않고, 후크(116)의 하부를 통과할 수 있는 것이다.The hoist wheel 112 installed in the hoists 106 and 108 is connected to the hook 116 by the steel wire 114. The steel wire 114 is hoisted by the hoist motor 110, the hoist wheel 112 is wound up to lift the hook 116, and has a sufficient length to bring the container 18 to the bottom of the vessel (130 in Fig. 3b) Can be lowered. In addition, when the hoist motor 110 is driven to raise the hook 116 as much as possible, the hook 116 is raised to the bottom of the hoists 106 and 108 to be positioned. Thus, even if the trolley 102 circulates the boom 100 and passes through the lower portions of the hoists 106 and 108, the trolley 102 may pass through the lower portion of the hook 116 without hitting the hook 116.

상기 후크(116)는 후술할 스프레더(104)와 결합하여 스프레더(104)를 상부로 지지하는 요소로서, 저면에는 스프레더(104)의 상면에 형성한 후크구멍(도 3a의 128)에 삽입되는 걸이수단(도 3a의 125)이 형성되어 있고, 상부에는 강선(114)이 감기는 도르래(132)가 설치되어 있다. 따라서 후크(116)는 스프레더(104)와 결합한 상태로 강선(114)에 매달려 호이스트모터(110)에 의해 승강운동을 할 수 있다.The hook 116 is an element that supports the spreader 104 to the upper side in combination with the spreader 104 to be described later, and the hook is inserted into the hook hole (128 in FIG. 3A) formed on the upper surface of the spreader 104. The means (125 of FIG. 3A) is formed, and the pulley 132 by which the steel wire 114 is wound is provided in the upper part. Therefore, the hook 116 can be lifted and lifted by the hoist motor 110 hanging on the steel wire 114 in a state coupled with the spreader 104.

한편, 붐(100)을 따라 이동하는 다수의 트롤리(102)는, 내부에 바퀴(140) 및 상기 바퀴(140)를 구동하는 모터(미도시)가 내장되어, 붐(100)을 따라 순환 운동한다. 상기 트롤리(102)의 구동은 별도의 운전실(미도시)에서 원격으로 조종된다.On the other hand, the plurality of trolleys (102) moving along the boom 100, the wheel 140 and a motor (not shown) for driving the wheel 140 therein, the circular movement along the boom 100 do. The drive of the trolley 102 is remotely controlled in a separate cab (not shown).

상기 트롤리(102)의 저면에는 걸이수단(124)이 형성되어 스프레더(104)의 상면에 형성한 트롤리구멍(도 3a의 126)과 결합하여 스프레더(104)를 매단상태로 이동가능하다. 그러므로 결국 스프레더(104)의 상면에는, 후크(116)와 결합하는 후크구멍(128)과, 트롤리(102)와 결합하는 트롤리구멍(126)이 형성되어 있다. 아울러 후술하겠거니와 상기 트롤리(102)는 콘테이너(18)를 하역하기 위하여 육상측호이스트(106)의 하부에서 한 번 정지하고, 해상측호이스트(108)의 하부에서 한 번 정지한다.A hook means 124 is formed at the bottom of the trolley 102 to engage the trolley hole (126 in FIG. 3A) formed on the upper surface of the spreader 104 to move the spreader 104 in a suspended state. Therefore, a hook hole 128 that engages with the hook 116 and a trolley hole 126 that engages with the trolley 102 are formed on the upper surface of the spreader 104. In addition, as will be described later, the trolley 102 stops once at the bottom of the land side hoist 106 and once at the bottom of the marine side hoist 108 to unload the container 18.

상기 트롤리(102)와 스프레더(104)와의 결합 및 후크(116)와 스프레더(104)와의 결합은 동시에 이루어지지 않고, 공지의 여러 제어수단에 의해 선택적으로 이루어지도록 구성한다. 선택적인 결합이라 함은 스프레더(104)와 후크(116)가 새로이 결합하면, 결합하고 있던 트롤리(102)와 스프레더(104)와의 결합이 해제되고, 반대로 스프레더(104)가 트롤리(102)에 결합하면, 결합하고 있던 후크(104)와 스프레더(104)와의 결합이 해제되는 결합을 의미한다. 상기와 같은 선택적인 결합을 공지의 여러 가지 기구학적 장치로 얼마든지 다양하게 구현할 수 있다.The combination of the trolley 102 and the spreader 104 and the hook 116 and the spreader 104 are not made at the same time, and are configured to be selectively made by various known control means. Selective coupling means that when the spreader 104 and the hook 116 are newly engaged, the coupling between the trolley 102 and the spreader 104 that is being coupled is released, and the spreader 104 is coupled to the trolley 102. In other words, the coupling means that the coupling of the hook 104 and the spreader 104 which are engaged is released. Such selective combination may be variously implemented by various known kinematic devices.

아울러, 상기한 스프레더와 트롤리의 결합 및 스프레더와 후크와의 결합 메카니즘은 본 발명의 순환식 겐트리크레인에만 적용하는 것이 아니라, 야적장이나 기타 물류기지 등에 설치되어 사용되는 트랜스퍼크레인을 포함하는 다양한 종류의 크레인에 적용할 수 있음은 물론이다.In addition, the coupling mechanism of the spreader and the trolley and the coupling mechanism of the spreader and the hook are not only applied to the circulating gantry crane of the present invention, but also various kinds of transfer cranes that are installed and used in a yard or other logistics base. Of course, it can be applied to the crane.

도 3a 및 도 3b는 본 발명의 일 실시예에 따른 갠트리크레인의 콘테이터 하역을 위한 동작을 설명하기 위하여 개략적으로 도시한 도면으로서, 도 3a는 육상측호이스트(106)의 하부에 도착한 트롤리(102) 및 스프레더(104)의 동작을 도시한 도면이고, 도 3b는 해상측호이스트(108)의 하부에 도착한 트롤리 및 스프레더의 동작을 도시한 도면이다. 아울러 설명의 편의를 위해, 각 호이스트(106,108)를 여러 개 도시하였지만, 육상측호이스트(106)와 해상측호이스트(108)는 각각 한 개가 설치됨은 상기한 바와 같다.3A and 3B are schematic views for explaining an operation for unloading containers of a gantry crane according to an embodiment of the present invention, and FIG. 3A is a trolley 102 arriving at the bottom of the land side hoist 106. ) And the spreader 104, and FIG. 3B is a view showing the operation of the trolley and the spreader arriving at the bottom of the marine side hoist 108. In addition, for the sake of convenience, although several hoists 106 and 108 are shown in the drawings, the land side hoist 106 and the sea side hoist 108 are each provided as described above.

상기한 도면부호와 동일한 도면부호는 동일한 기능의 동일한 부재를 가리킨다.The same reference numerals as the above reference numerals denote the same members having the same function.

도시한 바와 같이, 별도의 운전실(미도시)로부터 원격으로 가동되어 붐(100)을 따라 화살표 b의 방향으로 이동하는 트롤리(102) 및 트롤리(102)의 저면에 결합된 스프레더(104)는 육상측호이스트(106)의 하부에 도착하여 일시정지 한다. 상기한 바와 같이, 스프레더(104)의 상면에 형성한 트롤리구멍(126)에 트롤리(102)의 저면에 형성한 걸이수단(124)이 삽입되어 걸려있으므로 트롤리(102)의 이동속도에 변화가 있더라도 스프레더(104)는 트롤리(102)의 하부에서 흔들리지 않고 안정되이 위치한다.As shown, the trolley 102 and the spreader 104 coupled to the bottom of the trolley 102, which are remotely operated from separate cabs (not shown) and move along the boom 100 in the direction of arrow b, It arrives at the lower part of the side hoist 106, and pauses. As described above, since the hook means 124 formed on the bottom surface of the trolley 102 is inserted into the trolley hole 126 formed on the upper surface of the spreader 104, the movement speed of the trolley 102 changes. The spreader 104 is positioned stably without shaking at the bottom of the trolley 102.

상기 육상측호이스트(106)는 콘테이너(18)의 연직 상부에 미리 위치하여 대기하고 있으며, 이 때 후크(116)는 육상측호이스트(106)의 저면으로 당겨져 최대한 상승한 위치를 유지하고 있다. 상기 호이스트(106)를 적소에 위치시키는 방법으로서, 각 호이스트(106,108)에 별도의 조종실(미도시)을 마련하여, 운전원으로 하여금 호이스트(106,108)의 위치를 조절하게 할 수 있으며, 이와 달리 상기 호이스트(106,108)의 운전을 트롤리(102)에서와 같이 원격조정을 통하여 수행할 수 도 있다.The land side hoist 106 is positioned in the vertical upper portion of the container 18 in advance, and the hook 116 is pulled to the bottom of the land side hoist 106 to maintain the ascending position. As a method of positioning the hoist 106 in place, a separate cockpit (not shown) may be provided in each hoist 106, 108 to allow an operator to adjust the position of the hoist 106, 108. Operation of the 106 and 108 may be performed through remote control as in the trolley 102.

육상측호이스트(106)의 바람직스런 대기 위치는 콘테이너(18)의 연직상부이며, 해상측호이스트(108)의 바람직스런 대기위치는 선박(도 3b의 130)의 콘테이너 적재위치의 연직상부이다. 따라서 콘테이너 운송트럭에 실려 붐의 하부에 위치한 콘테이너의 위치에 대응하도록 육상측호이스트(106)의 위치가 미리 조절되어야 하며, 해상측호이스트(108)는 콘테이너의 하역위치의 상부에 미리 위치되어야 함이 바람직하다.The preferred standby position of the land side hoist 106 is vertically above the container 18, and the preferred standby position of the marine side hoist 108 is vertically above the container loading position of the vessel (130 in FIG. 3B). Therefore, the position of the land side hoist 106 should be pre-adjusted so as to correspond to the position of the container located on the lower part of the boom loaded on the container transport truck, and the marine side hoist 108 should be positioned in advance above the unloading position of the container desirable.

도 3a에 도시한 바와 같이, 일정장소에 대기하고 있는 육상측호이스트(106)의 하측부에 트롤리(102)가 도착하면, 육상측호이스트(106)가 동작하여 상부로 최대한 당겨져 있는 후크(116)가 하강하기 시작한다. 상기 후크(116)는 하강하여, 붐(100)에 바퀴(140)가 걸려 지지되고 있는 트롤리(102)를 수직으로 관통하고 스프레더(104)에 도달함과 동시에 결합을 이룬다. 이러한 결합은, 상기한 바와 같이 후크(116)의 저면에 형성되어 있는 걸이수단(125)이 스프레더(104)의 상면에 형성되어 있는 후크구멍(128)에 삽입됨으로서 수행되는 것이다. 상기 결합과 동시에 스프레더(104)의 상면에 형성한 트롤리구멍(126)으로부터 트롤리(102)의 걸이수단(124)이 이탈되어 트롤리(102)와 스프레더(104)와의 결합은 해제된다. 스프레더(104)를 매달아 올리는 지지력은 트롤리(102)로부터 후크(116)로 전환되며, 이 때 스프레더(104)는 같은 높이를 계속적으로 유지한다. 상기와 같은 지지력의 전환은 공지의 여러 가지 기구학적인 다양한 방법으로 구현될 수 있음은 상기한 바와 같다. 예를 들어, 트롤리구멍(126)과 후크구멍(128)사이에 임의의 신호전달선(미도시)을 설치하여, 트롤리구멍(126)에 걸이수단(124)이 삽입되어 록킹(locking)이 수행되는 순간, 후크구멍(128)측으로 신호가 전달되어, 후크구멍(128)에 삽입되어 록킹되어 있던 걸이수단(125)이 해제(unlocking)되도록 하며, 이와 반대로 후크구멍(128)에 걸이수단(125)이 삽입되어 록킹이 수행되는 순간, 트롤리구멍(126)에 삽입되어 있던 걸이수단(124)이 분리되도록 할 수 있는 것이다. 상기 걸이수단(124,125)역시 공지의 여러 가지 걸쇠를 포함한다.As shown in FIG. 3A, when the trolley 102 arrives at the lower side of the land side hoist 106 waiting at a certain place, the land side hoist 106 is operated and the hook 116 is pulled as far as it can be. Begins to descend. The hook 116 is lowered, penetrates vertically through the trolley 102 on which the wheels 140 are supported by the boom 100 and reaches the spreader 104 to form an engagement. This coupling is performed by inserting the hook means 125 formed on the bottom surface of the hook 116 as described above into the hook hole 128 formed on the upper surface of the spreader 104. At the same time as the above coupling, the hook means 124 of the trolley 102 is detached from the trolley hole 126 formed on the upper surface of the spreader 104 so that the coupling between the trolley 102 and the spreader 104 is released. The bearing force for hanging up the spreader 104 is switched from the trolley 102 to the hook 116, where the spreader 104 continues to maintain the same height. As described above, the conversion of the bearing capacity can be implemented by various known kinematic methods. For example, an arbitrary signal transmission line (not shown) is provided between the trolley hole 126 and the hook hole 128, and the hooking means 124 is inserted into the trolley hole 126 to perform locking. At the moment, the signal is transmitted to the hook hole 128, and the hook means 125 inserted into the hook hole 128 is unlocked, and on the contrary, the hook means 125 is hooked to the hook hole 128. When the locking is performed, the hook means 124 inserted into the trolley hole 126 may be separated. The hook means 124 and 125 also include various known latches.

상기한 바와 같이, 후크(116)가 하강함으로서 후크(116)와 스프레더(104)가 결합하면, 동시에 트롤리(102)와 스프레더(104)와의 결합이 해제되고 호이스트모터(도 2의 110) 및 호이스트휠(112)의 계속적 작동에 따라 후크(116)가 스프레더(104)를 매단채 하부에 위치해 있는 콘테이너(18)측으로 하강한다. 후크(116)의 상부에는 도르래(132)가 설치되어 강선(114)걸려 지지되고, 호이스트모터(110)의 구동에 의해 강선(114)이 풀려 하강이 이루어지는 것이다.As described above, when the hook 116 and the spreader 104 are engaged by the lowering of the hook 116, the coupling between the trolley 102 and the spreader 104 is released and the hoist motor (110 in FIG. 2) and the hoist are simultaneously released. As the wheel 112 continues to operate, the hook 116 lowers the spreader 104 toward the container 18, which is located under the hook. Pulley 132 is installed on the upper portion of the hook 116 is supported by the steel wire 114, the steel wire 114 is released by the hoist motor 110 is driven to descend.

한편, 스프레더(104)의 저면에는 콘테이너후크(120)가 형성되어 있으며, 콘테이터(18)의 상면에는 상기 콘테이너후크(120)와 결합하는 공지의 결합구(122)가 형성되어 있다.On the other hand, a container hook 120 is formed on the bottom of the spreader 104, and a known coupling tool 122 is formed on the top surface of the container 18 to engage with the container hook 120.

스프레더(104)가 하강하여 콘테이너(18)에 도달하면, 콘테이너(18)의 상면에 형성되어 있는 결합구(122)에 스프레더(104)의 콘테이너후크(120)가 삽입되어 록킹이 이루어진다. 이 상태로 후크(116)를 상승시키면, 스프레더(104)가 콘테이너(18)를 집은 상태로 후크(116)에 끌려 상승한다. 스프레더(104)가 트롤리(102)의 저면에 근접하면, 트롤리(102) 저면의 걸이수단(124)이 스프레더(104)의 트롤리구멍(126)에 삽입되어, 트롤리(102)에 스프레더(104)가 장착된다. 이 순간 후크(116)는 스프레더(104)로부터 분리되고 계속 상승하여 육상측호이스트(106)의 저면에 위치하여 대기한다. 결국 붐(100)에 지지되어 이동하는 트롤리(102)의 하부에 스프레더(104) 및 콘테이너(18)가 결합하게 되어, 트롤리(102)의 이동에 의해 콘테이너(18)가 화살표 c의 방향으로 이동할 수 있도록 되는 것이다.When the spreader 104 descends to reach the container 18, the container hook 120 of the spreader 104 is inserted into the coupling hole 122 formed on the upper surface of the container 18 to perform locking. When the hook 116 is raised in this state, the spreader 104 is pulled up by the hook 116 while picking up the container 18. When the spreader 104 is close to the bottom of the trolley 102, the hooking means 124 of the bottom of the trolley 102 is inserted into the trolley hole 126 of the spreader 104, and the spreader 104 is inserted into the trolley 102. Is fitted. At this moment, the hook 116 is detached from the spreader 104 and continues to rise and stand on the bottom of the land side hoist 106. Eventually, the spreader 104 and the container 18 are coupled to the lower portion of the trolley 102 that is supported by the boom 100 and moves, so that the container 18 moves in the direction of the arrow c by the movement of the trolley 102. It will be possible.

계속하여 도 3b를 참조하면, 화살표 c의 방향으로 이동하는 콘테이너(18)는, 하역지점에 미리 위치하여 있는 해상측호이스트(108)의 하부에 도달하여 정지한다. 상기 해상측호이스트(108)는 호이스트(108)에 구비된 조종실(미도시)에 탑승한 운전자에 의해 하역지짐으로 미리 이동할 수 있어, 하역장소의 넓이에 관계하지 않고 적소에 콘테이너를 하역할 수 있다. 해상측호이스트(108)도 육상측호이스트(106)와 마찬가지로 별도의 운전실로부터 원격조종 할 수 있음은 물론이다.Subsequently, referring to FIG. 3B, the container 18 moving in the direction of the arrow c reaches the lower portion of the marine side hoist 108, which is pre-positioned at the unloading point, and stops. The marine side hoist 108 can be moved to the loading stop in advance by the driver in the cockpit (not shown) provided in the hoist 108, so that the container can be unloaded in place regardless of the area of the loading place. . The marine side hoist 108 can also be remotely controlled from a separate cab, similar to the land side hoist 106.

해상측호이스트(108)의 하부에 트롤리(102)가 도착하여, 스프레더(104) 및 콘테이너(18)가 위치하면, 호이스트휠(112)의 작동에 의해 대기상태에 있던 후크(116)가 하강하여 스프레더(104)와 결합을 이룬다. 상기 도 3a에서 설명한 바와 같이, 후크(116)가 스프레더(104)와 결합하면 트롤리(102)와 스프레더(104)와의 결합은 해제되고, 이 상태로 후크(116)가 계속 하강하면 스프레더(104)와 트롤리(102)는 이격되어 콘테이너(18)가 가령 선박(130)과 같은 적재장소로 하강한다.When the trolley 102 arrives at the bottom of the marine side hoist 108 and the spreader 104 and the container 18 are positioned, the hook 116 in the standby state is lowered by the operation of the hoist wheel 112. In combination with the spreader 104. As described with reference to FIG. 3A, when the hook 116 is engaged with the spreader 104, the coupling between the trolley 102 and the spreader 104 is released. When the hook 116 is continuously lowered in this state, the spreader 104 is released. The trolley 102 is spaced apart and the container 18 is lowered to a loading place such as the vessel 130, for example.

하역장소에 도달한 콘테이너(18)는 공지의 방법으로 스프레더(104)로부터 분리되어 적재되고, 스프레더(104)는 다시 연직방향으로 상승하여 트롤리(102)와 결합한다. 이와 동시에 후크(116)는 스프레더(104)로부터 분리되어 해상측호이스트(108)측으로 상승하여 대기한다. 후크(116)가 빠져나간 트롤리(102)와 상기 트롤리(102)에 결합한 스프레더(104)는, 해상측호이스트(108)를 통과하여 붐(100)을 따라 화살표 d의 방향으로 운동하여 처음의 위치로 이동한다. 이 때 해상측호이스트(108)는 붐(100)을 따라 계속 이송되어오는 다음 콘테이너를 내려놓을 하역위치로 이동하여 대기한다.The container 18, which has reached the unloading place, is separated from the spreader 104 by a known method, and the spreader 104 rises in the vertical direction again to engage with the trolley 102. At the same time, the hook 116 is detached from the spreader 104 and raised to the marine side hoist 108 side to stand by. The trolley 102 with the hook 116 pulled out and the spreader 104 coupled to the trolley 102 pass through the marine side hoist 108 and move along the boom 100 in the direction of arrow d to the initial position. Go to. At this time, the marine side hoist 108 is moved to the unloading position to put down the next container that continues to be transported along the boom 100 to wait.

도 4는 도 2의 평면도로서 본 발명의 일 실시예에 따른 처리능력이 향상된 갠트레크레인의 붐 구조의 일 예를 도시한 도면이다.4 is a plan view of FIG. 2 showing an example of a boom structure of a gantre crane with improved processing capacity according to an embodiment of the present invention.

상기한 도면부호와 동일한 도면부호는 동일한 기능의 동일한 부재를 가리킨다.The same reference numerals as the above reference numerals denote the same members having the same function.

도시한 바와 같이 본 실시예에 적용되는 붐은 평면상의 폐곡선을 이루어 폐곡선을 따라 트롤리(102)가 이동하여 계속적으로 순환하도록 구성되어 있다. 도시한 바와 같이, 트롤리(102)가 붐을 따라 계속적으로 순환하므로 콘테이너의 하역이 연속적으로 이루어지며 처리능력이 매우 빠르다.As shown in the figure, the boom applied to this embodiment forms a closed curve on a plane, and is configured to continuously circulate the trolley 102 along the closed curve. As shown, since the trolley 102 continuously circulates along the boom, the container is unloaded continuously and the processing capacity is very fast.

이상 본 발명을 구체적인 실시예를 통하여 상세하게 설명하였으나, 본 발명은 상기 실시예에 한정되지 않고 본 발명의 기술적 사상의 범위내에서 통상의 지식을 가진 자에 의하여 여러 가지 변형이 가능하다.Although the present invention has been described in detail through specific embodiments, the present invention is not limited to the above embodiments, and various modifications may be made by those skilled in the art within the scope of the technical idea of the present invention.

상기와 같이 이루어진 본 발명의 처리능력이 향상된 갠트리크레인은, 트롤리가 붐을 따라 계속적으로 순환하며 콘테이너를 하역하므로 하역속도가 매우 빠르며 처리효율이 높다. 또한 트롤리의 이동시 스프레더가 트롤리의 저면에 결합하므로, 트롤리가 스프레더를 늘어뜨린채로 이동하지 않아, 트롤리의 이동속도 변화에 따른 스프레더의 흔들림이 없어 위치선정이 신속 정확하며, 특히 스프레더가 콘테이너를 집은 상태로 이동하더라도 흔들림이 없어 트롤리의 이동속도를 빠르게 하여 하역을 신속하고 안정적으로 수행할 수 있다는 효과가 있다.The improved gantry crane of the present invention made as described above, the trolley continuously circulates along the boom and unloads the container, so the unloading speed is very fast and the processing efficiency is high. In addition, when the trolley moves, the spreader is coupled to the bottom of the trolley, so that the trolley does not move with the spreader hanging down, and there is no shaking of the spreader due to the change in the speed of the trolley. There is no shaking even when moving to the state, the trolley speed of movement has the effect that can be carried out quickly and stably.

Claims (4)

이동가능한 주탑기둥(12)과;A movable pillar column 12; 상기 주탑기둥(12)의 일정높이에 수평으로 설치된 붐(100)과;A boom 100 installed horizontally at a predetermined height of the main column pillar 12; 상기 붐(100)에 이동 가능하도록 설치된 적어도 하나 이상의 트롤리(102)와;At least one trolley (102) installed to be movable on the boom (100); 상기 트롤리(102)의 저면에 대해서 착탈 가능하여, 트롤리(102)의 이동시에는 트롤리(102)와 결합하고, 콘테이너(18)를 집기위해서는 트롤리(102)와 분리되어 하강하는 스프레더(104)와;A spreader 104 detachable from the bottom of the trolley 102, coupled with the trolley 102 when the trolley 102 moves, and separated from the trolley 102 to lower the container 18; 상기 트롤리(102)를 수직으로 관통하여 승강운동 함으로써, 스프레더(104)와 결합 및 분리 할 수 있어, 콘테이너를 집기위해 상기 스프레더(104)와 결합하여 하강하는 후크(116)와;A hook 116 which can be coupled to and separated from the spreader 104 by vertically penetrating the trolley 102, and is coupled with the spreader 104 to pick up a container; 붐(100)에 이동가능하도록 설치되어 후크(116)를 승강운동시키는 호이스트(106,108)를 포함하는 것을 특징으로 하는 처리능력이 향상된 갠트리크레인.Gantry crane with improved processing capacity, characterized in that it comprises a hoist (106, 108) installed to be movable on the boom (100) for lifting and lowering the hook (116). 제 1항에 있어서, 상기 트롤리(102) 및 후크(116)의 저면에는 각각 적어도 네 개 이상의 걸이수단(124,125)이 구비되며, 스프레더(104)의 상면에는 트롤리의 걸이수단(124) 및 후크의 걸이수단(125)과 결합하도록, 각 걸이수단(124,125)의 위치에 대응하는 트롤리구멍(126) 및 후크구멍(128)이 형성되어 장탈착이 가능하고, 상기 호이스트(106,108)는 후크(116)와 스프레더(104)와의 결합시 스프레더(104)와 트롤리(102)와의 결합을 해제하고, 스프레더(104)와 트롤리(102)의 결합시 후크(116)와 스프레더(104)의 결합을 해제하는 것을 특징으로 하는 처리능력이 향상된 갠트리크레인.According to claim 1, wherein the bottom of the trolley 102 and the hook 116 is provided with at least four hook means (124, 125), respectively, the upper surface of the spreader 104 of the hook means 124 and hook of the trolley The trolley hole 126 and the hook hole 128 corresponding to the positions of the respective hook means 124 and 125 are formed so as to engage with the hook means 125, so that the hoist 106 and 108 may be detachably attached to the hook 116. And the disengagement of the spreader 104 and the trolley 102 when engaging the spreader 104 and the disengagement of the hook 116 and the spreader 104 when the spreader 104 and the trolley 102 are engaged. Characterized by improved gantry cranes. 제 2항에 있어서, 상기 후크(116)는 호이스트(106,108)내의 호이스트모터(110)와 강선(114)에 연결되어, 호이스트(106,108)의 작동에 따라 강선(114)의 길이가 조절됨으로서 후크(116)의 승강운동이 이루어지며, 붐(100)에 설치된 호이스트(106,108)는 육상측에 위치한 육상측호이스트(106)와 해상측에 위치한 해상측호이스트(108)로 구성된 것을 특징으로 하는 처리능력이 향상된 갠트리크레인.According to claim 2, The hook 116 is connected to the hoist motor 110 and the steel wire 114 in the hoist (106, 108), the length of the steel wire 114 is adjusted by the operation of the hoist (106, 108), so that the hook ( 116, the lifting movement is made, the hoist (106, 108) installed on the boom 100 is characterized in that the processing capacity is characterized by consisting of the land side hoist 106 located on the land side and the sea side hoist 108 located on the sea side Enhanced gantry cranes. 제 1항에 있어서, 상기 트롤리(102)는 호이스트(106,108)와 별도로 구성되어, 트롤리(102)와 호이스트(106,108)는 붐(100)에서 상호 독립적으로 이동할 수 있는 것을 특징으로 하는 처리능력이 향상된 갠트리 크레인.The method of claim 1, wherein the trolley (102) is configured separately from the hoists (106, 108), the trolley (102) and the hoist (106, 108) can be moved independently from each other in the boom 100 is improved processing capacity Gantry crane.
KR1019990005683A 1999-02-20 1999-02-20 Gentry crane having circulating trolley Expired - Fee Related KR100306296B1 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
KR1019990005683A KR100306296B1 (en) 1999-02-20 1999-02-20 Gentry crane having circulating trolley
JP2000599684A JP2003528783A (en) 1999-02-20 1999-11-12 Gantry crane with recirculating trolley
CN99816466A CN1337918A (en) 1999-02-20 1999-11-12 Gantray crane having circulating trolleys
AU10822/00A AU1082200A (en) 1999-02-20 1999-11-12 Gantry crane having circulating trolleys
DE19983937T DE19983937T1 (en) 1999-02-20 1999-11-12 Gantry crane with all-round trolleys
PCT/KR1999/000682 WO2000048937A1 (en) 1999-02-20 1999-11-12 Gantry crane having circulating trolleys

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019990005683A KR100306296B1 (en) 1999-02-20 1999-02-20 Gentry crane having circulating trolley

Publications (2)

Publication Number Publication Date
KR20000056397A true KR20000056397A (en) 2000-09-15
KR100306296B1 KR100306296B1 (en) 2001-09-24

Family

ID=19574671

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019990005683A Expired - Fee Related KR100306296B1 (en) 1999-02-20 1999-02-20 Gentry crane having circulating trolley

Country Status (6)

Country Link
JP (1) JP2003528783A (en)
KR (1) KR100306296B1 (en)
CN (1) CN1337918A (en)
AU (1) AU1082200A (en)
DE (1) DE19983937T1 (en)
WO (1) WO2000048937A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030006012A (en) * 2001-07-11 2003-01-23 한만엽 Gantry crane having circulating spreader

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20207072U1 (en) * 2002-05-03 2002-10-10 Noell Crane Systems GmbH, 97080 Würzburg Cat on cranes
DE10313769B4 (en) 2003-03-22 2005-10-06 Noell Crane Systems Gmbh More Katz container crane
KR100624007B1 (en) * 2004-03-08 2006-09-18 부산대학교 산학협력단 Container cranes with horizontal and vertical circulation
WO2005110908A1 (en) * 2004-05-13 2005-11-24 Weihua Huang A ship unloader for landing/unloading containers continuously
CN101880018A (en) * 2009-05-04 2010-11-10 张铁忠 Circular rail operation type container continuous handling bridge
DE102010053430B3 (en) * 2010-12-06 2012-01-19 Rainer Kapelski Container bridge for the loading of shipping containers
CN102616667A (en) * 2011-01-31 2012-08-01 上海振华重工(集团)股份有限公司 Double-upper trolley gantry crane
CN102320521B (en) * 2011-05-27 2014-03-12 上海海事大学 Continuous circular shoreside container loading bridge of port
CN103803433A (en) * 2012-11-06 2014-05-21 青岛理工大学琴岛学院 Handling device
CN103395699B (en) * 2013-07-30 2015-08-05 华电重工股份有限公司 A kind of double-deck bank bridge with vertical lift device
JP6701362B2 (en) 2015-10-27 2020-05-27 ウラジミール・ネヴシマル−ヴァイデンホッファー STS Multi Trolley Portal Gantry Container Crane
CN110877865A (en) * 2019-11-27 2020-03-13 武汉理工大学 A kind of quay crane for cyclic loading and unloading and cyclic loading and unloading method
CN113753761B (en) * 2021-08-09 2024-02-13 浙江省建设工程机械集团有限公司 Tower crane with main and auxiliary hoisting systems
CN119954048A (en) * 2023-11-07 2025-05-09 日立电梯(中国)有限公司 Conveying equipment

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3630390A (en) * 1969-02-07 1971-12-28 Hans Tax Container-loading crane arrangement
NL8302716A (en) * 1983-07-29 1985-02-18 Jongh Michiel Marnix De TRANSPORTING DEVICE FOR THE PENDANT TRANSPORT OF LOADS, SUCH AS A BRIDGE CRANE FOR THE LOADING AND UNLOADING OF CONTAINERS.
US4897012A (en) * 1987-11-06 1990-01-30 Custom Technologies, Inc. Cargo handling system
DE3816988A1 (en) * 1988-05-18 1989-11-30 Tax Ingenieurgesellschaft Mbh CONTAINER CRANE SYSTEM
NL1001548C2 (en) * 1995-11-01 1997-05-02 Iv Consult B V Container crane for ship loading

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030006012A (en) * 2001-07-11 2003-01-23 한만엽 Gantry crane having circulating spreader

Also Published As

Publication number Publication date
AU1082200A (en) 2000-09-04
JP2003528783A (en) 2003-09-30
WO2000048937A1 (en) 2000-08-24
DE19983937T1 (en) 2002-04-11
KR100306296B1 (en) 2001-09-24
CN1337918A (en) 2002-02-27

Similar Documents

Publication Publication Date Title
KR100306296B1 (en) Gentry crane having circulating trolley
US5515982A (en) Telescoping shuttle for a cargo container handling crane
CN114314306A (en) Floating spreader and power exchange equipment
KR100970818B1 (en) Buffer Straddle Crane
CN113620172A (en) Lifting and transferring device and method for freight air-rail container
US5915906A (en) Apparatus for loading and unloading a ship
CN210821972U (en) Cargo lifting structure of transport vehicle
CN108483221B (en) Marine modular unit cabin overhead hoist
US6554557B1 (en) Inter-box connector (IBC) installation and removal system
US5919022A (en) Electromagnetic positioning system for containers
JP2023544228A (en) Lift and method for lifting equipment modules
JPH04327430A (en) Method and device for loading and unloading of ship
KR101149499B1 (en) Unloading system and method of container
KR101037262B1 (en) Method for handling cargo containers by dockside buffer jib crane in cooperation with key crane
US3102642A (en) List compensating device
KR100480473B1 (en) A container crane
CN216863368U (en) Floating lifting appliance and battery replacing equipment
TWI780628B (en) Mobile lifting apparatus and method and system for transporting a component of a wind turbine
JPH03159897A (en) Heavy cargo loading device for vessel
CN117361308A (en) Intelligent telescopic lifting appliance for molten metal container
US7322786B1 (en) Mobile loader for transfer of containers between delivery vehicles and marine terminal cranes
JPH075105Y2 (en) Container crane
EP1927569A1 (en) Ship to shore container crane and method of operating such crane
JPH01209223A (en) Container receiving stand
JPH03194013A (en) Mooring facility in dam or the like and method of mooring ship

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

PG1501 Laying open of application

St.27 status event code: A-1-1-Q10-Q12-nap-PG1501

E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

St.27 status event code: A-1-2-D10-D21-exm-PE0902

T11-X000 Administrative time limit extension requested

St.27 status event code: U-3-3-T10-T11-oth-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

LAPS Lapse due to unpaid annual fee
PC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-PC1903

Not in force date: 20040808

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

PC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-PC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 20040808

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000