KR102561159B1 - 전기전도성이 향상된 버스바의 결합 구조체, 결합 방법 및 이를 이용한 배전반 - Google Patents
전기전도성이 향상된 버스바의 결합 구조체, 결합 방법 및 이를 이용한 배전반 Download PDFInfo
- Publication number
- KR102561159B1 KR102561159B1 KR1020210084188A KR20210084188A KR102561159B1 KR 102561159 B1 KR102561159 B1 KR 102561159B1 KR 1020210084188 A KR1020210084188 A KR 1020210084188A KR 20210084188 A KR20210084188 A KR 20210084188A KR 102561159 B1 KR102561159 B1 KR 102561159B1
- Authority
- KR
- South Korea
- Prior art keywords
- bus bar
- end surface
- subsidy
- indium
- coupling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R25/00—Coupling parts adapted for simultaneous co-operation with two or more identical counterparts, e.g. for distributing energy to two or more circuits
- H01R25/16—Rails or bus-bars provided with a plurality of discrete connecting locations for counterparts
- H01R25/161—Details
- H01R25/162—Electrical connections between or with rails or bus-bars
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01B—CABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
- H01B1/00—Conductors or conductive bodies characterised by the conductive materials; Selection of materials as conductors
- H01B1/02—Conductors or conductive bodies characterised by the conductive materials; Selection of materials as conductors mainly consisting of metals or alloys
- H01B1/026—Alloys based on copper
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R4/00—Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
- H01R4/28—Clamped connections, spring connections
- H01R4/38—Clamped connections, spring connections utilising a clamping member acted on by screw or nut
- H01R4/42—Clamping area to one side of screw only
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/20—Bus-bar or other wiring layouts, e.g. in cubicles, in switchyards
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Installation Of Bus-Bars (AREA)
Abstract
Description
도 2는 본 발명의 제1실시예에 따른 버스바 결합 방법의 순서도,
도 3은 본 발명의 제1실시예에 따른 버스바 결합 방법의 과정도,
도 4는 본 발명의 제2실시예에 따른 버스바 결합 방법의 과정도.
10 : 제1버스바, 11 : 제1요철, 12 : 제1요홈,
20 : 제2버스바, 21 : 제2요철, 22 : 제2요홈,
30 : 보조금속,
40 : 체결부재.
Claims (8)
- 구리로 이루어진 제1버스바와 제2버스바를 준비하는 준비단계와;
미세한 요철 및 요홈이 각각 형성된 상기 제1버스바의 일단 일면과 상기 제2버스바의 일단 일면 각각에 구리보다 용융점이 낮은 재질의 보조금속을 배치하는 보조금속배치단계와;
열을 가하여 상기 제1버스바와 제2버스바의 일면에 각각에 놓인 상기 보조금속을 융용시켜, 상기 제1버스바의 일면에 형성된 요홈과 상기 제2버스바의 일면에 형성된 요홈에 각각의 보조금속을 충진시키는 용융단계와;
용융된 보조금속을 건조시켜 일면에 상기 보조금속이 결합된 상기 제1버스바와 일면에 상기 보조금속이 결합된 제2버스바를 각각 얻는 건조단계와;
각각의 상기 보조금속이 용융되어 결합된 상기 제1버스바의 일단 일면과 상기 제2버스바의 일단 일면을 서로 마주보게 결합시키는 결합단계;를 포함하여 이루어지되,
상기 용융단계에서는 용융되어 상기 요홈에 충진되는 상기 보조금속의 높이가 상기 요철의 높이와 동일하도록 하고,
상기 결합단계에 의해 상기 제1버스바의 일단 일면과 상기 제2버스바의 일단 일면이 서로 접하였을 때, 상기 제1버스바의 제1요철과 상기 제2버스바의 제2요철은 서로 접촉하면서 상기 제1버스바와 제2버스바의 직접적인 연결을 통한 높은 전기전도성을 갖는 통전이 그대로 이루어지고, 상기 제1버스바에 형성된 요홈에 충진된 보조금속과 상기 제2버스바에 형성된 요홈에 충진된 보조금속은 서로 면접촉하면서 넓은 면적을 통한 추가적인 통전이 이루어지는 것을 특징으로 하는 전기전도성이 향상된 버스바의 결합 방법. - 청구항1에 있어서,
상기 용융단계에 의해 상기 제1버스바와 제2버스바 각각의 상부에 배치된 보조금속은 열이 가해짐에 따라 용융되면서 그 높이가 점점 낮아지게 되고,
검측장비를 이용하여 용융된 보조금속의 높이를 측정하고, 이렇게 측정된 보조금속의 높이가 상기 요철의 최고높이와 동일하게 될 때까지 열을 가하도록 하며,
용융된 보조금속은 상기 요홈에 충진된 후 나머지는 흘러 낙하되어 회수되는 것을 특징으로 하는 전기전도성이 향상된 버스바의 결합 방법. - 청구항1에 있어서,
상기 보조금속은 인듐시트로 이루어지되,
상기 보조금속배치단계에서는 인듐시트를 상기 제1버스바의 일단 일면과 상기 제2버스바의 일단 일면 각각에 올려 놓고,
상기 용융단계에서는 상기 제1버스바의 일단 일면과 상기 제2버스바의 일단 일면 각각에 올려진 인듐시트에 열을 가하여 인듐시트를 용융시킴으로서 상기 요홈에 인듐이 충진되도록 하는 것을 특징으로 하는 전기전도성이 향상된 버스바의 결합 방법. - 청구항1에 있어서,
상기 보조금속은 인듐분말로 이루어지되,
상기 보조금속배치단계에서는 인듐분말을 상기 제1버스바의 일단 일면과 상기 제2버스바의 일단 일면에 각각에 도포하고,
상기 용융단계에서는 상기 제1버스바의 일단 일면과 상기 제2버스바의 일단 일면 각각에 도포된 인듐분말에 열을 가하여 인듐분말을 용융시킴으로서 상기 요홈에 인듐이 충진되도록 하는 것을 특징으로 하는 전기전도성이 향상된 버스바의 결합 방법. - 구리로 이루어진 제1버스바와; 구리로 이루어지고, 일단이 상기 제1버스바의 일단의 상부에 적층되어 배치되는 제2버스바와; 상하방향으로 적층된 상기 제1버스바의 일단 일면과 상기 제2버스바의 일단 일면 사이에 배치되는 보조금속과; 상기 제1버스바와 제2버스바를 관통하여 체결하는 체결부재;를 포함하여 이루어지되,
청구항1 내지 청구항4 중 어느 한 항의 결합 방법에 의해 생성되는 전기전도성이 향상된 버스바의 결합 구조체. - 삭제
- 삭제
- 청구항5의 버스바의 결합 구조체가 적용된 것을 특징으로 하는 배전반.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020210084188A KR102561159B1 (ko) | 2021-06-28 | 2021-06-28 | 전기전도성이 향상된 버스바의 결합 구조체, 결합 방법 및 이를 이용한 배전반 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020210084188A KR102561159B1 (ko) | 2021-06-28 | 2021-06-28 | 전기전도성이 향상된 버스바의 결합 구조체, 결합 방법 및 이를 이용한 배전반 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| KR20230001391A KR20230001391A (ko) | 2023-01-04 |
| KR102561159B1 true KR102561159B1 (ko) | 2023-07-27 |
Family
ID=84925182
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020210084188A Active KR102561159B1 (ko) | 2021-06-28 | 2021-06-28 | 전기전도성이 향상된 버스바의 결합 구조체, 결합 방법 및 이를 이용한 배전반 |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR102561159B1 (ko) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000251960A (ja) | 1999-02-25 | 2000-09-14 | Yuasa Corp | 導電部材の接続方法 |
| CN103066475A (zh) * | 2013-01-07 | 2013-04-24 | 郭瑞 | 基于低熔点金属及其氧化物降低接触电阻的方法 |
| CN104917025A (zh) | 2015-07-08 | 2015-09-16 | 北京依米康科技发展有限公司 | 一种电缆导电连接的方法 |
| JP6302142B2 (ja) * | 2015-07-07 | 2018-03-28 | 日立オートモティブシステムズ株式会社 | 半導体装置、力学量測定装置および半導体装置の製造方法 |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS58118125A (ja) * | 1982-01-05 | 1983-07-14 | Tatsumo Kk | 基板の搬送装置 |
| KR101581444B1 (ko) | 2014-04-10 | 2015-12-31 | 오석환 | 전기단자의 연결접속부재 및 그 가공방법 |
-
2021
- 2021-06-28 KR KR1020210084188A patent/KR102561159B1/ko active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000251960A (ja) | 1999-02-25 | 2000-09-14 | Yuasa Corp | 導電部材の接続方法 |
| CN103066475A (zh) * | 2013-01-07 | 2013-04-24 | 郭瑞 | 基于低熔点金属及其氧化物降低接触电阻的方法 |
| JP6302142B2 (ja) * | 2015-07-07 | 2018-03-28 | 日立オートモティブシステムズ株式会社 | 半導体装置、力学量測定装置および半導体装置の製造方法 |
| CN104917025A (zh) | 2015-07-08 | 2015-09-16 | 北京依米康科技发展有限公司 | 一种电缆导电连接的方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| KR20230001391A (ko) | 2023-01-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101389250B1 (ko) | 퓨즈 유닛 | |
| KR102639357B1 (ko) | 전도성 버스바에서 사용하기 위한 구조적 장치 | |
| JP2021526306A (ja) | ターミナルバスバー | |
| KR102561159B1 (ko) | 전기전도성이 향상된 버스바의 결합 구조체, 결합 방법 및 이를 이용한 배전반 | |
| US20130335188A1 (en) | Safety Fuse Arrangement | |
| KR20190063531A (ko) | 부스바 및 이를 구비하는 부스덕트 | |
| KR100883223B1 (ko) | 보강된 구조를 갖는 단자대 | |
| CN201355752Y (zh) | 用于配电线路的绝缘导线带电剥皮支架 | |
| CN210607163U (zh) | 一种高电压大电流熔断器 | |
| CN105186346A (zh) | 一种低压式配电柜的制作工艺 | |
| KR20180125651A (ko) | 부스덕트 시스템 | |
| CN102510163A (zh) | 大电流风电出线盒结构 | |
| CN105140784A (zh) | 一种开关柜内三相母线 | |
| CN209692626U (zh) | 逆变器柜体底部t形汇流母线装置以及逆变器柜 | |
| CN212301633U (zh) | 一种4000a高压开关柜温升试验用母排支架 | |
| CN107749601A (zh) | 一种树脂浇注终端母线 | |
| CN106532280A (zh) | 水电站发电机机压矩形母线连接方法 | |
| CN209045480U (zh) | 一种熔断器触头 | |
| CN213879208U (zh) | 一种密集型母线槽 | |
| CN113923859A (zh) | 一种耐大电流高电压的电气线路行线板及其制作工艺 | |
| KR101169555B1 (ko) | 알루미늄 형강의 부스바를 배치한 배전반 | |
| CN222940238U (zh) | 低熔点材料降低电气接头温升装置 | |
| CN106207915A (zh) | 一种全封闭复合树脂浇注母线槽 | |
| CN217822647U (zh) | 一种可拆式的光伏熔断器 | |
| CN201312058Y (zh) | 高压开关柜的主母线转换装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| D13-X000 | Search requested |
St.27 status event code: A-1-2-D10-D13-srh-X000 |
|
| D14-X000 | Search report completed |
St.27 status event code: A-1-2-D10-D14-srh-X000 |
|
| PG1501 | Laying open of application |
St.27 status event code: A-1-1-Q10-Q12-nap-PG1501 |
|
| E902 | Notification of reason for refusal | ||
| PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
| E13-X000 | Pre-grant limitation requested |
St.27 status event code: A-2-3-E10-E13-lim-X000 |
|
| P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
| P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R14-asn-PN2301 |
|
| P14-X000 | Amendment of ip right document requested |
St.27 status event code: A-5-5-P10-P14-nap-X000 |
|
| P16-X000 | Ip right document amended |
St.27 status event code: A-5-5-P10-P16-nap-X000 |
|
| Q16-X000 | A copy of ip right certificate issued |
St.27 status event code: A-4-4-Q10-Q16-nap-X000 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R14-asn-PN2301 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| R11 | Change to the name of applicant or owner or transfer of ownership requested |
Free format text: ST27 STATUS EVENT CODE: A-5-5-R10-R11-ASN-PN2301 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R14-asn-PN2301 |
|
| R14 | Transfer of ownership recorded |
Free format text: ST27 STATUS EVENT CODE: A-5-5-R10-R14-ASN-PN2301 (AS PROVIDED BY THE NATIONAL OFFICE) |