KR101136991B1 - Concrete distributor and crane comprising master - Google Patents

Concrete distributor and crane comprising master Download PDF

Info

Publication number
KR101136991B1
KR101136991B1 KR1020090135888A KR20090135888A KR101136991B1 KR 101136991 B1 KR101136991 B1 KR 101136991B1 KR 1020090135888 A KR1020090135888 A KR 1020090135888A KR 20090135888 A KR20090135888 A KR 20090135888A KR 101136991 B1 KR101136991 B1 KR 101136991B1
Authority
KR
South Korea
Prior art keywords
concrete
crane
master
connection head
distributor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
KR1020090135888A
Other languages
Korean (ko)
Other versions
KR20110078957A (en
Inventor
이범수
Original Assignee
서보산업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 서보산업 주식회사 filed Critical 서보산업 주식회사
Priority to KR1020090135888A priority Critical patent/KR101136991B1/en
Publication of KR20110078957A publication Critical patent/KR20110078957A/en
Application granted granted Critical
Publication of KR101136991B1 publication Critical patent/KR101136991B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/16Discharge means, e.g. with intermediate storage of fresh concrete
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/16Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements

Landscapes

  • Chemical & Material Sciences (AREA)
  • Dispersion Chemistry (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

본 발명은 콘크리트 분배기와 크레인이 공유되는 마스터에 관한 것으로, 고층 작업을 하는 콘크리트 분배기와 크레인을 하나의 마스터에 선택적으로 설치하여 마스터를 공유함으로써 제한된 건축 현장의 공간활용도를 높이고 자재를 줄일 수 있는 것이다.The present invention relates to a master to share a concrete distributor and a crane, by installing a concrete distributor and a crane for high-rise work selectively to one master to share the master to increase the space utilization of the limited construction site and reduce the material .

본 발명에 의한 콘크리트 분배기와 크레인이 공유되는 마스터는, 콘크리트를 공급하는 콘크리트 공급관(210), 연결헤드(240), 상기 연결헤드에 장착되는 회전구동부, 상기 회전구동부에 연쇄적으로 절첩 가능하게 연결되는 다수의 붐, 상기 연결헤드에서부터 상기 붐들에 걸쳐 장착되며 상기 콘크리트 공급관으로부터 콘크리트를 공급받아 송출하는 송출관(230)으로 구성된 콘크리트 분배기(200)와; 연결헤드(340), 상기 연결헤드에 장착되는 회전구동부, 상기 회전구동부에 연쇄적으로 절첩 가능하게 연결되는 다수의 붐, 상기 붐에 설치되며 자재가 수용되는 윈치(330)로 이루어진 크레인(300) 중 어느 하나가 선택적으로 결합되는 것으로서, 상기 마스터는 콘크리트 건축물의 건축 현장에 일정 높이로 설치되며, 상단부에 형성되어 상기 콘크리트 분배기의 연결헤드(240) 또는 크레인의 연결헤드(340)가 연결되는 연결부(130)가 포함되며, 상기 연결부에는 고정편(131)이 형성되며, 상기 콘크리트 분배기와 크레인의 연결헤드에는 각각 상기 고정편에 체결구(400)를 통해 고정되는 고정편(241,341)이 형성되어 상기 콘크리트 분배기 또는 크레인이 선택적으로 결합되어 사용된다.The master shared concrete distributor and crane according to the present invention, the concrete supply pipe 210 for supplying the concrete, the connection head 240, the rotary drive unit mounted on the connection head, the foldable connection to the rotary drive chain A plurality of booms, which are mounted over the booms from the connection heads and are configured to have a concrete distributor (200) comprising a discharge pipe (230) for receiving and supplying concrete from the concrete supply pipe; Crane (300) consisting of a connection head 340, a rotary drive unit mounted to the connection head, a plurality of booms connected to the rotary drive unit in a foldable manner, the winch 330 is installed on the boom to accommodate material Any one of which is selectively coupled, the master is installed at a predetermined height in the building site of the concrete building, is formed in the upper end connection portion 240 is connected to the connection head 240 of the concrete distributor or the connection head 340 of the crane 130 is included, and the fixing portion 131 is formed on the connection portion, and the fixing heads 241 and 341 which are fixed to the fixing piece through the fastener 400 are formed on the connection heads of the concrete distributor and the crane, respectively. The concrete distributor or crane is optionally used in combination.

콘크리트 건축물, 분배기, 크레인, 마스터 Concrete Structure, Divider, Crane, Master

Description

콘크리트 분배기와 크레인이 공유되는 마스터{CONCRETE DISTRIBUTOR AND CRANE COMPRISING MASTER }CONCRETE DISTRIBUTOR AND CRANE COMPRISING MASTER}

본 발명은 콘크리트 분배기와 크레인이 공유되는 마스터에 관한 것으로, 더욱 상세하게는 하나의 마스터에 고층 작업을 하는 콘크리트 분배기와 크레인을 선택적으로 설치하여 마스터를 공용할 수 있는 콘크리트 분배기와 크레인이 공유되는 마스터에 관한 것이다.The present invention relates to a master shared concrete distributor and a crane, and more specifically, a concrete distributor and a crane that can share a master by selectively installing a concrete distributor and a crane for high-rise work in one master, and a master shared a crane. It is about.

일반적으로 고층건물 등을 건설할 때 콘크리트를 높은 곳으로 운반하기 위한 장치로서 콘크리트 펌프카가 많이 사용되고 있다.In general, a concrete pump car is widely used as a device for transporting concrete to high places when constructing high-rise buildings.

종래의 콘크리트 펌프카는 콘크리트 펌프와 다단상으로 절첩되는 플레이싱 붐이 구비되어 있으므로 고층건물을 건설할 때 자체적으로 콘크리트를 펌핑하여 높은 곳까지 운반, 공급할 수 있는 이점이 있는 반면에 부피가 매우 크기 때문에 장소를 많이 차지하는 단점과 운전비가 비싼 단점이 있으며, 특히 상기한 콘크리트 펌프카에 구비된 플레이싱 붐은 그 기립상태의 길이가 한정되어 있기 때문에 플레 이싱 붐의 길이보다 높은 고층건물의 경우에는 사용할 수 없는 것이 단점으로 지적되고 있다.Conventional concrete pump cars are equipped with a placer boom that is folded in multiple stages with a concrete pump, so when constructing a high-rise building, there is an advantage in that it can pump and supply concrete to a high place, while its volume is very large. There are disadvantages in that it takes up a lot of space and expensive operation costs. Especially, the placing boom provided in the above concrete pump car cannot be used in a high-rise building higher than the length of the placing boom because the length of the standing boom is limited. It is pointed out as a disadvantage.

또한 콘크리트 펌프를 이용하여 콘크리트를 운반, 공급하는 방법이 있으나, 이는 건축되는 건물을 층수에 따라 콘크리트 펌프 자체를 다음 층으로 옮기는 작업이 매우 힘들고 시간이 많이 소요되는 문제점이 있다.In addition, there is a method of transporting and supplying concrete using a concrete pump, but this has a problem that it is very difficult and time consuming to move the concrete pump itself to the next floor according to the number of floors to be built.

이러한 단점을 해결하기 위하여 마스터를 통해 플레이싱 붐을 결합하여 건축 현장에 설치하여 사용될 수 있는 콘크리트 분배기가 제안된 바 있다.In order to solve this drawback, a concrete distributor that can be installed and used on a building site by combining the placing boom through the master has been proposed.

종래 기술에 따른 콘크리트 분배기는 단위 마스트들의 결합에 의해 이루어지며 건축 현장에 설치되는 마스터와; 상기 마스터에 분리 가능하게 결합되는 플레이싱 붐으로 구성된다. 상기 플레이싱 붐은 상기 마스터에 회전 가능하게 결합되는 회전체, 상기 회전체에 설치되며 서로 절첩되는 다수의 붐, 상기 플레이싱 붐의 전복을 막기 위한 웨이트 밸런스 등을 포함한다.Concrete distributor according to the prior art is made by the combination of the unit mast and the master is installed on the building site; It is composed of a placing boom detachably coupled to the master. The placement boom includes a rotating body rotatably coupled to the master, a plurality of booms installed on the rotating body and folded to each other, and a weight balance for preventing overturning of the placing boom.

상기 마스터는 고층건물에 반드시 구축되는 엘리베이터 설치공간에 장착가능하게 함과 동시에 단계적으로 구축되는 건물의 층수에 따라 한 층씩 상승시킬 수 있도록 구성되기도 한다.The master may be configured to be mounted in an elevator installation space that is necessarily built in a high-rise building, and at the same time, it may be configured to increase by one floor according to the number of floors of a building to be built in stages.

전술한 종래 기술의 콘크리트 붐에 의하면 다음과 같은 문제점이 있다.According to the concrete boom of the prior art described above has the following problems.

플레이싱 붐의 붐들이 펼쳐진 상태에서 콘크리트를 분배할 때 붐들의 길이에 따른 저항, 콘크리트 분배 압력 등에 의해 플레이싱 붐이 마스터에서 파단 이탈되거나 전복될 수 있으므로 이를 방지하기 위하여 별도의 웨이트 밸런스를 사용하여야 하는 단점이 있다. When distributing concrete while the booms of the boom are unfolded, a separate weight balance should be used to prevent the boom from being broken or rolled over from the master due to the resistance along the length of the booms and the concrete distribution pressure. There is a disadvantage.

한편, 고층 건물의 건축시 각종 자재를 운반하기 위하여 크레인이 사용된다.On the other hand, cranes are used to transport various materials in the construction of high-rise buildings.

종래 크레인은 단위 마스트들의 결합에 의해 건축물의 높이로 세워지며, 유압식 등이 있다.Conventional crane is built to the height of the building by the combination of the unit mast, there is a hydraulic or the like.

이상에서 설명한 바와 같이, 콘크리트 건축물의 건축시 특히 고층 건축물의 건축시 콘크리트 분배기와 크레인 모두가 함께 사용되고 있다.As described above, both concrete distributors and cranes are used together in the construction of concrete buildings, particularly in the construction of high-rise buildings.

그러나, 종래 콘크리트 분배기와 크레인은 각각의 마스터를 통해 서로 다른 곳에 설치될 수밖에 없기 때문에 공간의 제약이 많은 문제점이 있다. 예를 들어, 콘크리트 분배기가 엘리베이터 공간에 설치되면 크레인은 다른 곳(건축물의 둘레부)에 설치되어야 한다. 즉, 콘크리트 분배기와 크레인은 각각의 마스터를 통해 설치되므로 마스터의 설치를 위한 공간 확보가 필수적이다.However, conventional concrete distributors and cranes have a lot of space limitations because they have to be installed in different places through each master. For example, if a concrete distributor is installed in an elevator space, the crane must be installed elsewhere (perimeter of the building). That is, concrete distributors and cranes are installed through each master, so it is essential to secure space for installation of the master.

본 발명은 상기와 같은 문제점을 해결하기 위한 것으로, 콘크리트 고층 건축물의 건축시 사용되는 콘크리트 분배기와 크레인을 같은 장소 예를 들어 건축물의 엘리베이터 설치 공간에 하나의 마스터만을 통해 선택적으로 설치할 수 있는 콘크리트 분배기와 크레인이 공유되는 마스터를 제공하는데 그 목적이 있다. The present invention is to solve the above problems, concrete distributors and cranes used in the construction of concrete high-rise buildings and concrete distributors that can be selectively installed in the same place, for example, only one master in the elevator installation space of the building The purpose is to provide a master that the crane is shared with.

전술한 바와 같은 목적을 달성하기 위한 본 발명에 의한 콘크리트 분배기와 크레인이 공유되는 마스터는, 콘크리트를 공급하는 콘크리트 공급관, 연결헤드, 상기 연결헤드에 장착되는 회전구동부, 상기 회전구동부에 연쇄적으로 절첩 가능하게 연결되는 다수의 붐, 상기 연결헤드에서부터 상기 붐들에 걸쳐 장착되며 상기 콘크리트 공급관으로부터 콘크리트를 공급받아 송출하는 송출관으로 구성된 콘크리트 분배기와; 연결헤드, 상기 연결헤드에 장착되는 회전구동부, 상기 회전구동부에 연쇄적으로 절첩 가능하게 연결되는 다수의 붐, 상기 붐에 설치되며 자재가 수용되는 윈치로 이루어진 크레인 중 어느 하나가 선택적으로 결합되는 것으로서, 상기 마스터는 콘크리트 건축물의 건축 현장에 일정 높이로 설치되며, 상단부에 형성되어 상기 콘크리트 분배기의 연결헤드 또는 크레인의 연결헤드가 연결되는 연결부가 포함되며, 상기 연결부에는 고정편이 형성되며, 상기 콘크리트 분배기와 크레인의 연결헤드에는 각각 상기 고정편에 체결구를 통해 고정되는 고정편이 형성되어 상기 콘크리트 분배기 또는 크레인이 선택적으로 결합되어 사용되는 것을 특징으로 한다.The master shared concrete distributor and crane according to the present invention for achieving the above object is, a concrete supply pipe for supplying concrete, a connection head, a rotary drive unit mounted on the connection head, the rotary drive unit is folded in series A concrete distributor configured to include a plurality of booms connected to each other, and a discharge pipe mounted over the booms from the connection head and configured to supply and receive concrete from the concrete supply pipe; Any one of a connection head, a rotary drive unit mounted on the connection head, a plurality of booms connected to the rotary drive unit in a foldable connection, a crane consisting of a winch installed on the boom is accommodated selectively , The master is installed at a predetermined height in the building site of the concrete building, is formed in the upper portion includes a connection portion is connected to the connection head of the concrete distributor or the connection head of the crane, the connection portion is formed with a fixed piece, the concrete distributor And the connection head of the crane is fixed to each of the fixing piece through a fastener is formed is characterized in that the concrete splitter or the crane is selectively used in combination.

본 발명에 따른 콘크리트 분배기와 크레인이 공유되는 마스터에 의하면, 하나의 마스터에 콘크리트 분배기와 크레인을 선택적으로 설치하여 즉, 콘크리트 타설시에는 마스터에 콘크리트 분배기를 설치하고 자재 운반시에는 마스터에 크레인을 설치하여 작업을 함으로써 건축 현장에 하나의 마스터만을 설치하므로 공간활용도를 높일 수 있고, 특히, 엘리베이터 설치공간이 1개소만 설계된 건축물의 공사시 엘리베이터 설치공간에 하나의 마스터만을 설치하여 콘크리트 분배기와 크레인을 사용할 수 있으므로 매우 효과적이다.According to the master shared concrete distributor and crane according to the present invention, by selectively installing a concrete distributor and a crane in one master, that is, when the concrete is installed in the concrete distributor and concrete installation in the master when the crane in the material transport Since only one master is installed on the construction site, the space utilization can be increased.In particular, when only one elevator installation space is constructed, only one master is installed in the elevator installation space to use concrete distributors and cranes. Can be very effective.

또한, 콘크리트 분배기와 크레인을 위한 각각의 마스터를 준비하지 않으므로 공사비용을 절감하고 작업공수를 줄일 수 있는 효과도 있다.In addition, it does not prepare each master for the concrete distributor and the crane, there is an effect that can reduce the construction cost and labor.

도 1에서 보이는 바와 같이, 본 발명에 의한 콘크리트 분배기와 크레인이 공유되는 마스터는, 콘크리트 건축물의 건축 현장에 일정 높이로 설치되는 마스터(100)에 콘크리트 분배기(200)와 크레인(300)이 선택적으로 장착되어 사용되는 것이다.As shown in Figure 1, the concrete distributor and the crane is shared master according to the present invention, the concrete distributor 200 and the crane 300 is selectively installed in the master 100 is installed at a certain height in the construction site of the concrete building It is mounted and used.

마스터(100)는 예를 들어 원통형, 사각형 등의 단위 마스트가 다수개 결합되어 이루어질 수도 있고, 다르게는 다수의 스틸 봉 등이 결합되어 이루어지는 등 다양한 구조일 수 있으며, 도면에서는 원통형을 예로 들어 도시하였다. For example, the master 100 may be formed by combining a plurality of unit masts, such as a cylinder and a quadrangle, or may be formed in various ways, such as a plurality of steel rods, etc., which are illustrated in the drawing as a cylindrical example. .

마스터(100)는 건축물의 공사 층수에 맞춰 이동 설치되는 것으로, 지상 3층까지는 통상의 펌프카를 사용하여 콘크리트를 분배할 수 있으므로 지상 4층부터 사용될 수 있으며, 건축물에 설치된 상태에서 유동이 발생되지 않도록 다수(도면에서는 2개를 예로 도시함)의 원통형 마스트가 결합되어 이루어지는 것이 바람직하다. 즉, 제1마스트(110)가 엘리베이터 공간부에 삽입된 상태로 고정되어 지지기반을 확보하며, 제2마스트(120)에 플레이싱 붐(200)이 결합되는 것이다. 제1마스트(110)는 2개층의 높이로 이루어지고, 제2마스트(120)는 1개 층의 높이로 이루어질 수 있다.The master 100 is installed to move in accordance with the number of floors of the building, and can be used from the fourth floor above the ground because the concrete can be distributed using a conventional pump car to the third floor above the ground. It is preferred that a plurality of cylindrical masts (in the drawing show two as examples) are combined. That is, the first mast 110 is fixed while being inserted into the elevator space to secure the support base, and the placement boom 200 is coupled to the second mast 120. The first mast 110 may have a height of two layers, and the second mast 120 may have a height of one layer.

마스터(100)의 제1,2마스트(110,120)는 마주하는 단부에 각각 플랜지가 각각 외향 형성되어, 이 플랜지가 면접촉된 상태에서 다수의 체결구를 통해 체결 고정된 다. 상기 체결구는 볼트와 너트로 이루어질 수 있다.The first and second masts 110 and 120 of the master 100 are respectively formed with outwardly facing flanges, and are fastened and fixed through a plurality of fasteners in a state where the flanges are in surface contact. The fastener may be made of a bolt and a nut.

마스터(100)의 상부측에는 작업자의 작업 공간을 제공하는 작업대가 갖추어질 수 있다.The upper side of the master 100 may be equipped with a workbench to provide a work space of the worker.

콘크리트 분배기(200)는 예를 들어, 콘크리트 공급관(210), 플레이싱 붐(220), 송출관(230)으로 구성된다.Concrete distributor 200 is composed of, for example, a concrete supply pipe 210, the placement boom 220, the discharge pipe 230.

콘크리트 공급관(210)은 콘크리트 공급부(미도시)로부터 콘크리트를 공급받는 관으로서, 마스터(100)에 설치된다.The concrete supply pipe 210 is a pipe receiving concrete from a concrete supply unit (not shown) and is installed in the master 100.

콘크리트 공급관(210)은 크레인(300)에는 사용되지 않는 것이므로, 콘크리트 분배기(200)를 사용할 때에만 설치되고 크레인(300)의 사용시에는 탈거될 수 있도록 구성되는 것이 바람직하며, 예를 들어, 마스터(100)의 둘레부에는 콘크리트 공급관(210)을 고정하는 하나 이상의 클램프(211)가 설치된다. 클램프(211)는 2개의 반원형 편이 체결구에 의해 고정되는 방식 등 다양한 것이 사용 가능하다.Since the concrete supply pipe 210 is not used in the crane 300, it is preferable that the concrete supply pipe 210 is installed only when the concrete distributor 200 is used and configured to be removed when the crane 300 is used. For example, the master ( One or more clamps 211 for fixing the concrete supply pipe 210 are installed at the circumference of the 100. The clamp 211 can be used in a variety of ways, such as the two semi-circular piece is fixed by the fastener.

플레이싱 붐(220)은 서로 힌지를 통해 연쇄적으로 연결되는 다수의 단위 붐(붐의 수량은 도면에 도시된 것에 한정되지 않는다)(221,222)으로 구성된다. 플레이싱 붐(220)은 유압실린더(223,224) 등을 통해 절첩된다.The placement boom 220 is composed of a plurality of unit booms (number of booms are not limited to those shown in the figures) 221, 222 connected in series via a hinge to each other. Placed boom 220 is folded through hydraulic cylinders (223, 224) and the like.

플레이싱 붐(220)은 연결헤드를 통해 마스터(100)에 장착되며, 이에 대해서는 하기에서 구체적으로 설명한다.The placement boom 220 is mounted to the master 100 via a connection head, which will be described in detail below.

송출관(230)은 플레이싱 붐(220)에 설치되며 콘크리트 공급관(210)에 관이음되어 콘크리트 공급관(210)으로부터 공급되는 콘크리트를 송출한다.The delivery pipe 230 is installed in the placement boom 220 and piped to the concrete supply pipe 210 to send the concrete supplied from the concrete supply pipe 210.

플레이싱 붐(220)은 회전구동부(회전모터, 동력전달수단)를 통해 회전 가능 하게 설치되며, 상기 회전구동부는 기존에 사용되고 있는 것과 동일하므로 구체적인 설명을 생략한다.Placed boom 220 is rotatably installed through a rotary drive (rotary motor, power transmission means), and the rotary drive is the same as that used in the past, so a detailed description thereof will be omitted.

전술한 콘크리트 분배기(200)는 일예를 설명한 것일 뿐이며, 마스터(100)에 장착되어 콘크리트를 분배할 수 있는 모든 구조가 적용 가능하다.The above-described concrete splitter 200 is only an example, and any structure that can be mounted on the master 100 to distribute concrete is applicable.

크레인(300)은 예를 들어 다수(도면에는 2개로 도시됨)의 붐(310,320)이 유압실린더(311,321)에 의해 절첩 가능하게 구성되고 자재를 운반할 수 있는 윈치(330), 붐(310,320)을 회전시키는 회전구동부가 포함된다. 크레인(300)은 예를 들어 설명한 것일 뿐 현재 사용되고 있는 모든 방식이 가능한 것이다.The crane 300 includes, for example, a winch 330 and a boom 310 and 320 in which a plurality of booms 310 and 320 are configured to be folded by the hydraulic cylinders 311 and 321 and to carry materials. Rotation driving unit for rotating the included. The crane 300 is just described, for example, and all the methods currently used are possible.

이하, 콘크리트 분배기(200) 및 크레인(300)을 마스터(100)에 장착하는 구조에 대해 설명한다.Hereinafter, a structure for mounting the concrete distributor 200 and the crane 300 to the master 100 will be described.

<실시예 1>&Lt; Example 1 >

도 2에서 보이는 바와 같이, 마스터(100)의 제2마스트(120)의 상단부에는 연결부(130)가 구성된다.As shown in FIG. 2, the connection part 130 is configured at the upper end of the second mast 120 of the master 100.

연결부(130)는 제2마스트(120)의 상단부에 외향 플랜지의 형태로 넓게 형성되어 지지력을 확보할 수 있으며, 둘레부에 하나 이상의 고정편(131)이 형성된다. 고정편(131)은 판상이면서 하나 이상의 체결공(131a)이 형성된다.The connecting portion 130 may be widely formed in the form of an outward flange at the upper end of the second mast 120 to secure the supporting force, and at least one fixing piece 131 is formed at the circumference thereof. The fixing piece 131 has a plate shape and at least one fastening hole 131a is formed.

콘크리트 분배기(200)와 크레인(300)은 각각 연결헤드(240,340)가 구비된다.The concrete distributor 200 and the crane 300 are provided with connection heads 240 and 340, respectively.

콘크리트 분배기(200)의 연결헤드(240)는 원통형일 수 있으며 내부에 상기 회전구동부가 탑재될 수 있고, 스윙 프레임(250)을 매개로 하여 플레이싱 붐(220) 이 장착될 수 있다.The connection head 240 of the concrete distributor 200 may have a cylindrical shape, the rotary driving unit may be mounted therein, and the placement boom 220 may be mounted via the swing frame 250.

크레인(300)의 연결헤드(340)는 원통형일 수 있으며, 내부에 상기 회전구동부가 탑재될 수 있다.The connection head 340 of the crane 300 may be cylindrical, and the rotation driving unit may be mounted therein.

연결헤드(240,340)는 전술한 것에 한정되지 않으며, 단, 마스터(100)의 연결부(130)에 안정적으로 안착되도록 저면이 평평할 수 있고, 고정편(131)에 체결구(400)로 체결되는 고정편(241,341)이 형성된다.The connection heads 240 and 340 are not limited to the above, but the bottom surface may be flat to be stably seated on the connection part 130 of the master 100, and may be fastened to the fixing piece 131 by the fastener 400. Fixing pieces 241 and 341 are formed.

고정편(241,341)은 연결헤드(240,340)의 둘레부에 돌출되도록 형성되어 마스터(100)의 고정편(131)에 고정된다.The fixing pieces 241 and 341 are formed to protrude from the circumferences of the connection heads 240 and 340 and are fixed to the fixing pieces 131 of the master 100.

도 3은 마스터(100)에 콘크리트 분배기(200)가 설치된 도면이고, 도 4는 마스터(100)에 크레인(300)이 설치된 도면으로, 건축물의 건축시 마스터(100)를 건축 현장 예를 들어 엘리베이터 설치공간에 설치한 후, 콘크리트를 타설할 경우 콘크리트 분배기(200)를 설치하고, 크레인(300)을 사용할 경우 콘크리트 분배기(200)를 탈거한 후 마스터(100)에 크레인(300)을 설치한다.3 is a view in which the concrete distributor 200 is installed in the master 100, and FIG. 4 is a view in which the crane 300 is installed in the master 100. In the construction of a building, the master 100 is a construction site, for example, an elevator. After installing in the installation space, when the concrete is poured concrete distributor 200 is installed, when using the crane 300 remove the concrete distributor 200 and then install the crane 300 in the master 100.

<실시예 2><Example 2>

도 5에서 보이는 것처럼, 본 실시예에서는 마스터(100)의 고정편(132)이 홈을 갖는 구조인 것을 특징으로 한다.As shown in FIG. 5, in the present embodiment, the fixing piece 132 of the master 100 is characterized by having a groove.

즉, 고정편(132)의 홈에 연결헤드(240,340)의 고정편(241,341)이 삽입됨으로써 연결헤드(240,340)의 위치를 쉽게 잡을 수 있고 체결구(400)의 체결이 용이하다.That is, the fixing pieces 241 and 341 of the connection heads 240 and 340 are inserted into the grooves of the fixing piece 132 to easily position the connection heads 240 and 340 and to fasten the fastener 400 easily.

고정편(132)은 홈을 갖는 박스형일 수도 있고, 2개의 편이 일정 간격(홈)을 두고 이격된 구조일 수 있다.Fixing piece 132 may be a box-type having a groove, the two pieces may be a structure spaced apart at a predetermined interval (groove).

<실시예 3><Example 3>

도 6a와 도 6b에서 보이는 것처럼, 본 실시예는, 마스터(100)의 제2마스트(120)의 상부에는 판상의 연결부(130)가 형성되며, 연결헤드(240)의 하부에는 마스터(100)의 연결부(130)에 면접촉되는 플랜지(242)가 형성되고, 연결부(130)와 플랜지(242)에는 다수의 체결구(400)가 관통 체결된다.6A and 6B, in the present embodiment, a plate-shaped connecting portion 130 is formed on an upper portion of the second mast 120 of the master 100, and a master 100 is disposed below the connecting head 240. The flange 242 is in surface contact with the connection portion 130 is formed, a plurality of fasteners 400 are fastened through the connection portion 130 and the flange 242.

마스터(100)와 연결헤드(240)의 기준위치를 설정할 수 있도록 기준위치설정수단이 더 갖추어질 수 있다. 상기 기준위치설정수단은 마스터(100)와 연결헤드(240)의 결합시 서로 끼워 결합되는 돌기와 홈 형태일 수 있으며, 예를 들어, 마스터(100)의 연결부(130) 상면에 돌출 형성되는 다수개의 위치설정돌기(133) 및 연결헤드(240)의 플랜지(242) 저면에 형성되어 위치설정돌기(133)가 삽입되는 위치설정홈(243)으로 이루어진다.Reference positioning means may be further provided to set the reference position of the master 100 and the connection head 240. The reference positioning means may be in the form of protrusions and grooves that are fitted to each other when the master 100 and the connection head 240 are coupled to each other, for example, a plurality of protrusions protruding from the upper surface of the connection portion 130 of the master 100 The positioning protrusion 133 is formed on the bottom surface of the flange 242 of the connection head 240 and is formed of the positioning groove 243 into which the positioning protrusion 133 is inserted.

그리고, 연결헤드(240)와 마스터(100)간의 연결부가 바람의 영향, 콘크리트 분배 압력 등으로 인하여 파단되어 연결헤드(240)와 함께 플레이싱 붐(220)이 마스터(100)에서 이탈될 수 있으므로 이를 방지하기 위하여 연결헤드(240)의 저부에는 마스터(100)의 제2마스트(120)에 삽입되는 관형 삽입부(244)가 더 형성된다. 삽입부(244)는 마스터(100)의 제2마스트(120)에 형성되어 연결헤드(240)의 내부에 삽입되는 구조일 수도 있다.In addition, since the connection between the connection head 240 and the master 100 is broken due to the influence of wind, concrete distribution pressure, etc., the placement boom 220 together with the connection head 240 may be separated from the master 100. In order to prevent this, a tubular insert 244 inserted into the second mast 120 of the master 100 is further formed at the bottom of the connection head 240. The insertion part 244 may be formed in the second mast 120 of the master 100 to be inserted into the connection head 240.

도면에서는 마스터(100)와 콘크리트 분배기(200)의 결합구조에 대해서만 설명하였으나, 크레인(300)도 전술한 구조와 동일한 방식으로 마스터(100)에 장착되 며, 즉, 크레인(300)의 연결헤드(340)도 콘크리트 분배기(200)의 연결헤드(240)에 적용된 삽입부(244) 등이 구비된다.In the drawings, only the coupling structure of the master 100 and the concrete distributor 200 has been described, but the crane 300 is also mounted to the master 100 in the same manner as the above-described structure, that is, the connection head of the crane 300 ( 340 is also provided with an insertion portion 244 applied to the connection head 240 of the concrete distributor 200.

<실시예 4><Example 4>

도 7a와 도 7b에서 보이는 것처럼, 연결헤드(240)의 플랜지(242)에는 한 쌍의 보스(245,246)가 구멍을 사이에 두고 돌출 형성되며, 마스터(100)의 제2마스트(120)의 연결부(130) 상면에는 보스(245,246) 사이의 구멍을 통해 삽입되어 보스(245,246)의 사이에 배치되는 보스(134)가 형성되고, 이들 보스(134,245,246)의 체결공에 체결구(4000)가 체결되어 연결헤드(240)와 마스터(100)가 결합된다.As shown in FIGS. 7A and 7B, a pair of bosses 245 and 246 protrude from the flange 242 of the connection head 240 with a hole interposed therebetween, and a connection portion of the second mast 120 of the master 100. (130) The boss 134 is inserted into the upper surface through the hole between the bosses (245, 246) are disposed between the bosses (245, 246), the fastener (4000) is fastened to the fastening hole of these bosses (134, 245, 246) The connection head 240 and the master 100 are combined.

도면에서는 마스터(100)와 콘크리트 분배기(200)의 결합구조에 대해서만 설명하였으나, 크레인(300)도 전술한 구조와 동일한 방식으로 마스터(100)에 장착되며, 즉, 크레인(300)의 연결헤드(340)도 콘크리트 분배기(200)의 연결헤드(240)에 적용된 보스 등이 구비된다.In the drawings, only the coupling structure of the master 100 and the concrete distributor 200 has been described, but the crane 300 is also mounted to the master 100 in the same manner as the above-described structure, that is, the connection head of the crane 300 ( 340 is also provided with a boss or the like applied to the connection head 240 of the concrete distributor 200.

본 발명에 의한 콘크리트 분배기와 크레인이 공유되는 마스터에 따르면, 건축물 예를 들어 3층의 철근 콘크리트 골조가 세워지면 엘리베이터 공간에 고정장치를 통해 마스터(100)를 설치한다. 마스터(100)의 고정장치는 공지된 것이므로 구체적인 설명은 생략한다.According to the master shared concrete distributor and crane according to the present invention, when the reinforced concrete framework of the building, for example, three floors is erected, the master 100 is installed through a fixing device in the elevator space. Since the fixing device of the master 100 is known, a detailed description thereof will be omitted.

마스터(100)는 3층 이상의 4층이나 5층의 골조를 건축하기 위한 높이로 세워질 수 있다.The master 100 may be erected at a height for building a framework of four or five floors of three or more floors.

4층 골조의 콘크리트를 타설할 경우 마스터(100)의 연결부(130)에 콘크리트 분배기(200)를 설치한다. 즉, 별도의 크레인을 통해 콘크리트 분배기(200)를 마스터(100)의 연결부(130)에 올린 후 전술한 실시예들의 결합구조를 통해 연결한다. 또한, 콘크리트 공급관(210)을 마스터(100)에 설치하고, 콘크리트 공급관(210)과 송출관(230)을 관이음한다.When placing the concrete of the four-story frame is installed concrete distributors 200 in the connection portion 130 of the master (100). That is, the concrete distributor 200 is raised to the connecting portion 130 of the master 100 through a separate crane and then connected through the coupling structure of the above-described embodiments. In addition, the concrete supply pipe 210 is installed in the master 100, the concrete supply pipe 210 and the discharge pipe 230 is piped.

콘크리트 분배기(200)의 송출관(230)에 콘크리트를 공급하여 4층 골조의 거푸집안에 콘크리트를 타설한다. By supplying concrete to the discharge pipe 230 of the concrete distributor 200, the concrete is poured into the formwork of the four-story frame.

콘크리트 타설이 완료되고 자재의 운반이 필요한 경우 콘크리트 분배기(200)를 마스터(100)에서 분리하고, 크레인(300)을 마스터(100)에 결합한다.When the concrete pouring is completed and the transport of the material is necessary, the concrete distributor 200 is separated from the master 100, and the crane 300 is coupled to the master 100.

탈거된 콘크리트 분배기(200)는 건축 현장에 보관되고, 크레인(300)을 구동하여 자재를 운반한다.The stripped concrete distributor 200 is stored in the building site, and drives the crane 300 to transport the material.

크레인(300)의 사용이 끝나고 그 다음 층을 콘크리트 타설하는 경우 크레인(300)을 마스터(100)에서 탈거하고 마스터(100)에 콘크리트 분배기(200)를 설치한다. When the use of the crane 300 is finished and the next floor is to cast concrete, the crane 300 is removed from the master 100 and the concrete distributor 200 is installed on the master 100.

지금까지는 콘크리트 분배기(200)와 크레인(300)에 각각 회전구동부가 갖추어진 것으로 설명하였으나, 도 8a 내지 도 8c에서처럼, 마스터(100)에 회전구동부(500)를 형성하고, 회전구동부(500)에 의해 회전하는 스윙 프레임(510)에 콘크리트 분배기(200)와 크레인(300)이 선택적으로 연결될 수 있다.Until now, the concrete distributor 200 and the crane 300 has been described as having a rotary drive unit, respectively, as shown in Figure 8a to 8c, to form a rotary drive unit 500 in the master 100, to the rotary drive unit 500 The concrete distributor 200 and the crane 300 may be selectively connected to the swing frame 510 that rotates.

콘크리트 분배기(200)와 크레인(300)을 스윙 프레임(510)에 결합하는 구조는 예를 들어, 콘크리트 분배기(200)와 크레인(300)의 연결헤드(240,340)를 스윙 프레 임(510)에 체결구(예컨대, 볼트와 너트)를 통해 결합될 수 있고, 다르게는 콘크리트 분배기(200)와 크레인(300)의 연결헤드(240,340) 및 스윙 프레임(510)에 더브테일(dovetail) 형태의 돌기와 홈을 통해 결합될 수도 있다.The structure for coupling the concrete distributor 200 and the crane 300 to the swing frame 510 may be, for example, coupling the connection heads 240 and 340 of the concrete distributor 200 and the crane 300 to the swing frame 510. It may be coupled through a sphere (for example, bolts and nuts), and the grooves and grooves of the dovetail shape may be formed in the connection heads 240 and 340 and the swing frame 510 of the concrete distributor 200 and the crane 300. It can also be combined.

또한, 콘크리트 분배기(200)와 크레인(300)에 각각 웨이트를 형성하지 않고 스윙 프레임(510)에 웨이트(520)를 형성할 수 있다.In addition, the weights 520 may be formed on the swing frame 510 without forming weights on the concrete distributor 200 and the crane 300, respectively.

웨이트(520)는 스윙 프레임(510)에 체결구를 통해 결합되거나 더브테일 형태의 돌기와 홈을 통해 결합될 수 있다.The weight 520 may be coupled to the swing frame 510 through a fastener or through a protrusion and a groove having a dovetail shape.

도 1은 본 발명에 의한 콘크리트 분배기와 크레인이 공유되는 마스터의 분리 상태 정면도.1 is a front view of a state in which the concrete distributor and the crane according to the present invention is shared with the master.

도 2는 본 발명에 의한 콘크리트 분배기와 크레인이 공유되는 마스터에 적용된 결합구조의 제1예시도.Figure 2 is a first exemplary view of a coupling structure applied to a concrete distributor and a crane shared with the present invention.

도 3은 본 발명에 의한 콘크리트 분배기와 크레인이 공유되는 마스터로서, 마스터에 콘크리트 분배기가 설치된 도면.3 is a concrete distributor and crane according to the present invention, the master is shared, a concrete distributor installed on the master.

도 4는 본 발명에 의한 콘크리트 분배기와 크레인이 공유되는 마스터로서, 마스터에 크레인이 설치된 도면.Figure 4 is a concrete distributor and crane according to the present invention, the master is shared, the crane is installed on the master.

도 5는 본 발명에 의한 콘크리트 분배기와 크레인이 공유되는 마스터에 적용된 결합구조의 제2예시도.5 is a second exemplary view of a coupling structure applied to a concrete distributor and a crane shared by the present invention.

도 6a와 도 6b는 본 발명에 의한 콘크리트 분배기와 크레인이 공유되는 마스터에 적용된 결합구조의 제3예시도.6a and 6b is a third exemplary view of a coupling structure applied to a concrete distributor and a crane in accordance with the present invention is shared.

도 7a와 도 7b는 본 발명에 의한 콘크리트 분배기와 크레인이 공유되는 마스터에 적용된 결합구조의 제4예시도.7a and 7b is a fourth exemplary view of a coupling structure applied to the master and the concrete distributor and crane according to the present invention is shared.

도 8a 내지 도 8c는 본 발명에 의한 콘크리트 분배기와 크레인이 공유되는 마스터의 다른 예시도.8a to 8c is another exemplary view of a master shared concrete distributor and crane according to the present invention.

< 도면의 주요 부분에 대한 부호 설명><Description of Signs for Main Parts of Drawings>

100 : 마스터, 110,120 : 마스트100: master, 110,120: mast

130 : 연결부, 131,132,241,341 : 고정편130: connection portion, 131,132,241,341: fixed piece

133 : 위치설정돌기, 134,245,246 : 보스 133: positioning projection, 134,245,246: boss

200 : 콘크리트 분배기, 210 : 콘크리트 공급관200: concrete distributor, 210: concrete supply pipe

220 : 플레이싱 붐, 230 : 송출관220: placing boom, 230: delivery pipe

240,340 : 연결헤드, 400 : 체결구240,340: Connection head, 400: Fastener

500 : 회전구동부, 510 : 스윙 프레임500: rotation drive unit, 510: swing frame

520 : 웨이트,520: weight,

Claims (10)

삭제delete 콘크리트를 공급하는 콘크리트 공급관(210), 연결헤드(240), 상기 연결헤드에 장착되는 회전구동부, 상기 회전구동부에 연쇄적으로 절첩 가능하게 연결되는 다수의 붐, 상기 연결헤드에서부터 상기 붐들에 걸쳐 장착되며 상기 콘크리트 공급관으로부터 콘크리트를 공급받아 송출하는 송출관(230)으로 구성된 콘크리트 분배기(200)와; 연결헤드(340), 상기 연결헤드에 장착되는 회전구동부, 상기 회전구동부에 연쇄적으로 절첩 가능하게 연결되는 다수의 붐, 상기 붐에 설치되며 자재가 수용되는 윈치(330)로 이루어진 크레인(300) 중 어느 하나가 선택적으로 결합되는 마스터로서,Concrete supply pipe 210 for supplying concrete, the connection head 240, a rotary drive unit mounted to the connection head, a plurality of booms connected to the rotary drive in a series foldable, mounted from the connection head to the booms And the concrete distributor 200 consisting of a discharge pipe 230 for receiving the concrete is supplied from the concrete supply pipe; Crane (300) consisting of a connection head 340, a rotary drive unit mounted to the connection head, a plurality of booms connected to the rotary drive unit in a foldable manner, the winch 330 is installed on the boom to accommodate material As any one of which is optionally combined 상기 마스터는 콘크리트 건축물의 건축 현장에 일정 높이로 설치되며, 상단부에 형성되어 상기 콘크리트 분배기의 연결헤드(240) 또는 크레인의 연결헤드(340)가 연결되는 연결부(130)가 포함되며, The master is installed at a certain height in the building site of the concrete building, is formed on the upper end includes a connection portion 130 is connected to the connection head 240 of the concrete distributor or the connection head 340 of the crane, 상기 연결부에는 고정편(131)이 형성되며, 상기 콘크리트 분배기와 크레인의 연결헤드에는 각각 상기 고정편에 체결구(400)를 통해 고정되는 고정편(241,341)이 형성되어 상기 콘크리트 분배기 또는 크레인이 선택적으로 결합되어 사용되는 것을 특징으로 하는 콘크리트 분배기와 크레인이 공유되는 마스터.A fixing piece 131 is formed in the connection portion, and fixing pieces 241 and 341 which are fixed to the fixing piece through the fastener 400 are respectively formed in the connection heads of the concrete distributor and the crane. The shared concrete distributor and crane, characterized in that used in combination with the master. 청구항 2에 있어서, 상기 마스터의 고정편(131)은 상기 콘크리트 분배기와 크레인의 고정편이 삽입되는 홈을 갖는 것을 특징으로 하는 콘크리트 분배기와 크레인이 공유되는 마스터.The master of claim 2, wherein the fixing piece (131) of the master has a groove into which the fixing piece of the concrete distributor and the crane is inserted. 콘크리트를 공급하는 콘크리트 공급관(210), 연결헤드(240), 상기 연결헤드에 장착되는 회전구동부, 상기 회전구동부에 연쇄적으로 절첩 가능하게 연결되는 다수의 붐, 상기 연결헤드에서부터 상기 붐들에 걸쳐 장착되며 상기 콘크리트 공급관으로부터 콘크리트를 공급받아 송출하는 송출관(230)으로 구성된 콘크리트 분배기(200)와; 연결헤드(340), 상기 연결헤드에 장착되는 회전구동부, 상기 회전구동부에 연쇄적으로 절첩 가능하게 연결되는 다수의 붐, 상기 붐에 설치되며 자재가 수용되는 윈치(330)로 이루어진 크레인(300) 중 어느 하나가 선택적으로 결합되는 마스터로서,Concrete supply pipe 210 for supplying concrete, the connection head 240, a rotary drive unit mounted to the connection head, a plurality of booms connected to the rotary drive in a series foldable, mounted from the connection head to the booms And the concrete distributor 200 consisting of a discharge pipe 230 for receiving the concrete is supplied from the concrete supply pipe; Crane (300) consisting of a connection head 340, a rotary drive unit mounted to the connection head, a plurality of booms connected to the rotary drive unit in a foldable manner, the winch 330 is installed on the boom to accommodate material As any one of which is optionally combined 상기 마스터는 콘크리트 건축물의 건축 현장에 일정 높이로 설치되며 상단부에 형성되어 상기 콘크리트 분배기의 연결헤드(240) 또는 크레인의 연결헤드(340)가 연결되는 연결부(130)가 포함되며, The master is installed at a predetermined height in the building site of the concrete building and is formed at the upper end includes a connection portion 130 is connected to the connection head 240 of the concrete distributor or the connection head 340 of the crane, 상기 콘크리트 분배기와 크레인의 연결헤드의 저부에 형성되는 플랜지(242)에는 구멍을 사이에 두고 한 쌍의 보스(245,246)가 돌출 형성되고, 상기 마스터의 연결부의 상면에는 상기 구멍을 통해 상기 보스(245,246) 사이에 끼워지는 보스(134)가 돌출 형성되며, 상기 보스(245,234,246)에 체결구(400)가 체결되어 고정되는 것을 특징으로 하는 콘크리트 분배기와 크레인이 공유되는 마스터.A pair of bosses 245 and 246 are formed to protrude from the flange 242 formed at the bottom of the connection head of the concrete distributor and the crane, and the bosses 245 and 246 through the holes on the upper surface of the connection part of the master. The boss 134 is sandwiched between the protrusion is formed, the fastener 400 is fastened to the boss (245, 234, 246) is fixed, characterized in that the master is shared with the concrete distributor. 청구항 4에 있어서, 상기 콘크리트 분배기와 크레인의 연결헤드의 하부에 각각 돌출 형성되며 상기 마스터의 내부에 삽입되어 상기 연결헤드들과 마스터간의 결속을 증대하는 삽입부가 포함되는 것을 특징으로 하는 콘크리트 분배기와 크레인이 공유되는 마스터.The concrete distributor and the crane of claim 4, wherein the concrete distributor and the crane are respectively formed to protrude from a lower portion of the connection head of the crane and are inserted into the master to increase the coupling between the connection head and the master. This is a shared master. 청구항 5에 있어서, 상기 마스터의 연결부 상면에는 기준위치설정돌기(133)가 형성되고, 상기 콘크리트 분배기와 크레인의 연결헤드의 플랜지(242) 저부에는 상기 기준위치설정돌기가 삽입되는 기준위치설정홈(243)이 형성된 것을 특징으로 하는 콘크리트 분배기와 크레인이 공유되는 마스터.The reference positioning groove 133 of claim 5, wherein the reference positioning projection 133 is formed on an upper surface of the connection portion of the master, and the reference positioning groove is inserted into the bottom of the flange 242 of the connection head of the concrete distributor and the crane. 243) is a concrete distributor and crane, characterized in that the shared master. 콘크리트를 공급하는 콘크리트 공급관(210), 연결헤드(240), 상기 연결헤드에 장착되는 회전구동부, 상기 회전구동부에 연쇄적으로 절첩 가능하게 연결되는 다수의 붐, 상기 연결헤드에서부터 상기 붐들에 걸쳐 장착되며 상기 콘크리트 공급관으로부터 콘크리트를 공급받아 송출하는 송출관(230)으로 구성된 콘크리트 분배기(200)와; 연결헤드(340), 상기 연결헤드에 장착되는 회전구동부, 상기 회전구동부에 연쇄적으로 절첩 가능하게 연결되는 다수의 붐, 상기 붐에 설치되며 자재가 수용되는 윈치(330)로 이루어진 크레인(300) 중 어느 하나가 선택적으로 결합되는 마스터로서,Concrete supply pipe 210 for supplying concrete, the connection head 240, a rotary drive unit mounted to the connection head, a plurality of booms connected to the rotary drive in a series foldable, mounted from the connection head to the booms And the concrete distributor 200 consisting of a discharge pipe 230 for receiving the concrete is supplied from the concrete supply pipe; Crane (300) consisting of a connection head 340, a rotary drive unit mounted to the connection head, a plurality of booms connected to the rotary drive unit in a foldable manner, the winch 330 is installed on the boom to accommodate material As any one of which is optionally combined 상기 마스터는 콘크리트 건축물의 건축 현장에 일정 높이로 설치되며 상단부에 장착되는 회전구동부(500) 및 상기 회전구동부에 의해 회전하며 상기 콘크리트 분배기의 연결헤드(240) 또는 상기 크레인의 연결헤드(340)가 선택적으로 연결되면서 체결구로 체결되는 스윙 프레임(510)이 포함되어, 상기 콘크리트 분배기 또는 크레인이 선택적으로 결합되어 사용되는 것을 특징으로 하는 콘크리트 분배기와 크레인이 공유되는 마스터.The master is installed at a predetermined height in the building site of the concrete building and rotates by the rotary drive unit 500 and the rotary drive unit is mounted on the upper end and the connection head 240 of the concrete distributor or the connection head 340 of the crane is A swing frame 510 is selectively connected to each other and is fastened by fasteners, and the concrete splitter and the crane are shared by the concrete splitter or crane. 청구항 7에 있어서, 상기 스윙 프레임에 설치되는 웨이트(520)가 포함된 것을 특징으로 하는 콘크리트 분배기와 크레인이 공유되는 마스터.8. The master of claim 7, wherein a weight distributor is installed on the swing frame. 5. 삭제delete 청구항 7 또는 청구항 8에 있어서, 상기 콘크리트 분배기와 크레인의 연결헤드는 각각 상기 스윙 프레임에 더브테일 형태의 돌기와 홈을 통해 결합되는 것을 콘크리트 분배기와 크레인이 공유되는 마스터.The master according to claim 7 or 8, wherein the connection heads of the concrete distributor and the crane are respectively coupled to the swing frame through protrusions and grooves having a dovetail shape.
KR1020090135888A 2009-12-31 2009-12-31 Concrete distributor and crane comprising master Active KR101136991B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090135888A KR101136991B1 (en) 2009-12-31 2009-12-31 Concrete distributor and crane comprising master

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090135888A KR101136991B1 (en) 2009-12-31 2009-12-31 Concrete distributor and crane comprising master

Publications (2)

Publication Number Publication Date
KR20110078957A KR20110078957A (en) 2011-07-07
KR101136991B1 true KR101136991B1 (en) 2012-04-19

Family

ID=44918377

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090135888A Active KR101136991B1 (en) 2009-12-31 2009-12-31 Concrete distributor and crane comprising master

Country Status (1)

Country Link
KR (1) KR101136991B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4180170A (en) 1977-03-10 1979-12-25 Freiedrich Wilhem, Schwing GmbH Rotary tower crane for construction purposes with a distributor device for concrete
KR100638845B1 (en) 2005-05-30 2006-10-25 서보가설산업 주식회사 Concrete splitter
WO2008089620A1 (en) 2007-01-19 2008-07-31 Yuanhe Li Tower crane with a distributor device
KR20110077990A (en) * 2009-12-30 2011-07-07 서보산업 주식회사 Crane Integrated Concrete Splitter

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4180170A (en) 1977-03-10 1979-12-25 Freiedrich Wilhem, Schwing GmbH Rotary tower crane for construction purposes with a distributor device for concrete
KR100638845B1 (en) 2005-05-30 2006-10-25 서보가설산업 주식회사 Concrete splitter
WO2008089620A1 (en) 2007-01-19 2008-07-31 Yuanhe Li Tower crane with a distributor device
KR20110077990A (en) * 2009-12-30 2011-07-07 서보산업 주식회사 Crane Integrated Concrete Splitter

Also Published As

Publication number Publication date
KR20110078957A (en) 2011-07-07

Similar Documents

Publication Publication Date Title
US10202734B2 (en) Prefabricated resuable concrete pedestal element
KR100924652B1 (en) Formwork panel for construction using honeycomb member
TW202014616A (en) Auxiliary device and method for realizing a bolt connection between connecting flanges of a first and a second structure
CN103243934B (en) The Housing system of single single footing institute construction and building method thereof
CN110805289A (en) Plug-in unloading platform and construction method
CN114197325A (en) Pier shaft construction safety protection platform
US10422465B2 (en) Prefabricated reusable concrete pedestal element
CN115247498A (en) Fixed bolster of prefabricated wallboard and contain braced system of this support
KR101136991B1 (en) Concrete distributor and crane comprising master
KR101302946B1 (en) Concrete divider united with crane
KR101707037B1 (en) A structure for assembled system scaffold and erecting method thereof
CN110578338A (en) An integrally movable aluminum alloy formwork system and operation method
WO2013127102A1 (en) Combined tower base
JP3115824U (en) Concrete foundation structure for standing upright
CN102116084B (en) Hanging formwork device replacing supporting formwork for pouring concrete floor slab in multilayer building
KR100638845B1 (en) Concrete splitter
CN204691231U (en) A kind of plane construction template structure with support system
US20070096006A1 (en) Overhead beam assembly
KR200358247Y1 (en) Downward construction structure using bracket support type
JP2004308155A (en) PC board suspension method and suspension jig
CN107806264B (en) Engineering method of assembled parking frame and parking frame
CN112320561A (en) Device and method for correcting eccentric hoisting of prefabricated culvert side wall components
JP7771484B2 (en) Concrete pouring equipment and pouring methods
KR20010074319A (en) Concrete transfer and distributor
CN217500304U (en) Movable tower crane foundation

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20091231

PA0201 Request for examination
PG1501 Laying open of application
E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 20111007

Patent event code: PE09021S01D

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

Patent event code: PE07011S01D

Comment text: Decision to Grant Registration

Patent event date: 20120402

GRNT Written decision to grant
PR0701 Registration of establishment

Comment text: Registration of Establishment

Patent event date: 20120409

Patent event code: PR07011E01D

PR1002 Payment of registration fee

Payment date: 20120410

End annual number: 3

Start annual number: 1

PG1601 Publication of registration
FPAY Annual fee payment

Payment date: 20160412

Year of fee payment: 5

PR1001 Payment of annual fee

Payment date: 20160412

Start annual number: 5

End annual number: 5

FPAY Annual fee payment

Payment date: 20170410

Year of fee payment: 6

PR1001 Payment of annual fee

Payment date: 20170410

Start annual number: 6

End annual number: 6

FPAY Annual fee payment

Payment date: 20180409

Year of fee payment: 7

PR1001 Payment of annual fee

Payment date: 20180409

Start annual number: 7

End annual number: 7

FPAY Annual fee payment

Payment date: 20190603

Year of fee payment: 8

PR1001 Payment of annual fee

Payment date: 20190603

Start annual number: 8

End annual number: 8

FPAY Annual fee payment

Payment date: 20200303

Year of fee payment: 9

PR1001 Payment of annual fee

Payment date: 20200303

Start annual number: 9

End annual number: 9

PR1001 Payment of annual fee

Payment date: 20210408

Start annual number: 10

End annual number: 10

PR1001 Payment of annual fee

Payment date: 20240131

Start annual number: 13

End annual number: 13

PR1001 Payment of annual fee

Payment date: 20250331

Start annual number: 14

End annual number: 14