JP7560265B2 - Mobile jig and construction method using the mobile jig - Google Patents

Mobile jig and construction method using the mobile jig Download PDF

Info

Publication number
JP7560265B2
JP7560265B2 JP2020064231A JP2020064231A JP7560265B2 JP 7560265 B2 JP7560265 B2 JP 7560265B2 JP 2020064231 A JP2020064231 A JP 2020064231A JP 2020064231 A JP2020064231 A JP 2020064231A JP 7560265 B2 JP7560265 B2 JP 7560265B2
Authority
JP
Japan
Prior art keywords
main body
moving
unit
caster
jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020064231A
Other languages
Japanese (ja)
Other versions
JP2021161742A (en
Inventor
南夏子 藤浪
数典 仁部
貴洋 南野
孝 佐竹
友香 松井
哲平 林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP2020064231A priority Critical patent/JP7560265B2/en
Publication of JP2021161742A publication Critical patent/JP2021161742A/en
Application granted granted Critical
Publication of JP7560265B2 publication Critical patent/JP7560265B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Handcart (AREA)

Description

本発明は、移動用治具及び移動用治具を用いた施工方法に係り、特に、重量物を床上で移動させるための移動用治具及び移動用治具を用いた施工方法に関する。 The present invention relates to a moving jig and a construction method using the moving jig, and in particular to a moving jig for moving a heavy object on a floor and a construction method using the moving jig.

従来から、施工現場での施工作業を効率化すべく、重量物となる内装ユニット(例えばユニットバス)を工場で予め組み立てておき、組み立てられた内装ユニットを施工現場へ搬入し、搬入された内装ユニットを吊り上げ装置に掛け止めされたスリングによって吊り上げて、吊り上げられた内装ユニットを建物の躯体内部の所定位置に据え付ける施工方法が知られている。
このとき、上記内装ユニットを所定位置に据え付ける工程では、工事の進捗状況によって、あるいは内装ユニットを据え付ける専門業者の不在によって、内装ユニットを所定位置にそのまま据え付けることができない場合がある。そうした場合には、吊り上げられた内装ユニットを躯体内部の別位置に仮置きしておき、内装ユニットが据え付け可能となった後に、仮置きされた内装ユニットを躯体内部の所定位置まで移動させるといった作業が必要となる。
そのため、内装ユニットを仮置きするとともに、仮置きした内装ユニットを床から浮かせた状態で移動させることが可能な移動用治具が知られている(例えば、特許文献1、2参照)。
Conventionally, in order to improve the efficiency of construction work at a construction site, a construction method has been known in which a heavy interior unit (e.g., a modular bath) is preassembled in a factory, the assembled interior unit is transported to the construction site, the transported interior unit is lifted by a sling hooked to a lifting device, and the lifted interior unit is installed in a designated position inside the building's structure.
At this time, in the process of installing the interior unit in a predetermined position, depending on the progress of the construction or the absence of a professional contractor to install the interior unit, it may not be possible to install the interior unit in the predetermined position as it is. In such a case, it is necessary to temporarily place the lifted interior unit in another position inside the structure, and then move the temporarily placed interior unit to the predetermined position inside the structure after the interior unit can be installed.
For this reason, a moving jig is known that can temporarily place an interior unit and move the temporarily placed interior unit while it is lifted off the floor (see, for example, Patent Documents 1 and 2).

特許文献1に記載の空間ユニットの移動用治具は、空間ユニットの下端部にあるベースフレームに着脱可能に固定され、空間ユニットを昇降させる複数の油圧ジャッキと、空間ユニットの下方位置に差し込まれ、空間ユニットを下方から支持する複数の移動台車と、から主に構成されている。
上記構成により、空間ユニットを床から浮かせた状態で仮置きするとともに、仮置きした空間ユニットを浮かせたまま所定位置まで移動させることができる。
また、油圧ジャッキによって空間ユニットを上昇させることで、空間ユニットの下方位置に移動台車を差し込むことができる。
The jig for moving the spatial unit described in Patent Document 1 is mainly composed of a number of hydraulic jacks that are detachably fixed to a base frame at the lower end of the spatial unit and raise and lower the spatial unit, and a number of mobile carts that are inserted into a lower position of the spatial unit and support the spatial unit from below.
With the above-described configuration, the spatial unit can be temporarily placed in a state where it is suspended above the floor, and the temporarily placed spatial unit can be moved to a predetermined position while being suspended.
In addition, by raising the spatial unit with a hydraulic jack, the mobile trolley can be inserted into a position below the spatial unit.

特許文献2に記載の物品の搬送装置は、装置本体部と、装置本体部よりも下方位置に設けられ、床上を移動する車輪と、装置本体部の外側面から突出し、物品の貫通穴に挿入される支持軸と、装置本体の内部に設けられ、支持軸を昇降移動させる油圧ジャッキと、から主に構成されている。
上記構成により、物品を床から浮かせた状態で床上を移動させることができる。
The item transport device described in Patent Document 2 is mainly composed of a main body of the device, wheels that are located below the main body of the device and move on the floor, a support shaft that protrudes from the outer surface of the main body of the device and is inserted into a through hole in the item, and a hydraulic jack that is located inside the main body of the device and moves the support shaft up and down.
With the above-mentioned configuration, an article can be moved along the floor while being lifted off the floor.

特開2000-320011号公報JP 2000-320011 A 特開2000-103548号公報JP 2000-103548 A

ところで、特許文献1、2のような移動用治具では、重量物を昇降移動させるために油圧ジャッキ等の消耗品を用いていることから、当該消耗品の劣化に伴って交換作業やメンテンナンス作業が必要とされていた。また、比較的大型な移動用治具になってしまう虞があった。
そのため、シンプルな構成で、重量物を床から浮かせることができ、当該重量物を床上で移動させることが可能な移動用治具が求められていた。
However, in the moving jigs as described in Patent Documents 1 and 2, consumables such as hydraulic jacks are used to raise and lower heavy objects, and therefore replacement or maintenance work is required as the consumables deteriorate. Also, there is a risk that the moving jigs will become relatively large.
Therefore, there has been a demand for a moving tool that can lift a heavy object off the floor and move the heavy object across the floor with a simple configuration.

また、重量物となる内装ユニット(例えば、ユニットバス)を床から浮かせた状態で仮置きするとともに、内装ユニットを床から浮かせたまま好適に移動させることが可能な移動用治具が求められていた。
さらに、工場(施工現場以外の場所)で予め組み立てられた内装ユニットを建物の躯体内部に好適に設置することが可能な移動用治具を用いた施工方法が求められていた。
There was also a need for a moving tool that could temporarily place a heavy interior unit (e.g., a modular bath) raised above the floor, and that could conveniently move the interior unit while keeping it raised above the floor.
Furthermore, there has been a demand for a construction method using a movable jig that enables interior units preassembled in a factory (a location other than the construction site) to be suitably installed inside the framework of a building.

本発明は、上記の課題に鑑みてなされたものであり、本発明の目的は、シンプルな構成で、重量物を床から浮かせることができ、当該重量物を床上で移動させることが可能な移動用治具及び移動用治具を用いた施工方法を提供することにある。
また、本発明の他の目的は、内装ユニットを床から浮かせた状態で仮置きするとともに、内装ユニットを好適に移動させることが可能な移動用治具及び移動用治具を用いた施工方法を提供することにある。
The present invention has been made in consideration of the above-mentioned problems, and an object of the present invention is to provide a moving jig that has a simple configuration and is capable of lifting a heavy object off the floor and moving the heavy object across the floor, and a construction method using the moving jig.
Another object of the present invention is to provide a moving jig and a construction method using the moving jig that can temporarily place an interior unit in a state where it is raised above the floor and can move the interior unit in a suitable manner.

前記課題は、本発明の移動用治具によれば、重量物を床上で移動させるための移動用治具であって、該移動用治具の本体となる本体部と、該本体部よりも下方位置に設けられ、床上を移動するためのキャスター部と、前記本体部よりも上方位置に設けられ、前記重量物に設けられた被保持部を側方から保持するための保持部と、前記本体部と前記保持部を連結し、前記本体部に対して前記保持部の高さ位置を変更可能な状態で取り付けられる高さ調整部材と、を備え、前記保持部は、前記重量物の底部に設けられた前記被保持部を側方から挟み込むように保持し、前記高さ調整部材は、前記本体部の中央部分に配置され、前記キャスター部は、前記高さ調整部材を囲むように複数設けられていること、により解決される。
上記構成により、シンプルな構成で、重量物を床から浮かせることができ、当該重量物を床上で移動させることが可能な移動用治具を実現することができる。
詳しく述べると、上記移動用治具は、本体部に対して保持部の高さ位置を変更可能な状態で取り付けられる高さ調整部材を備えており、従来のように油圧ジャッキ等の消耗品を使用することがなく、シンプルな構成で保持部の高さ調整を可能としている。
また、高さ調整部材は、本体部の中央部分に配置され、キャスター部は、高さ調整部材を囲むように複数設けられており、高さ調整部材が安定して取り付けられるため、高さ調整部材を介して取り付けられる保持部が重量物を好適に保持することができる。
The above problem is solved by the mobile jig of the present invention, which provides a mobile jig for moving a heavy object across a floor, comprising a main body portion that forms the main body of the mobile jig, caster portions that are located below the main body portion and are used for moving across the floor, a holding portion that is located above the main body portion and is used to hold a held portion provided on the heavy object from the side, and a height adjustment member that connects the main body portion and the holding portion and is attached in a state in which the height position of the holding portion can be changed relative to the main body portion, wherein the holding portion holds the held portion provided on the bottom of the heavy object by clamping it from the side, the height adjustment member is located in the central part of the main body portion, and a plurality of caster portions are provided to surround the height adjustment member .
With the above-described configuration, it is possible to realize a moving jig that can lift a heavy object off the floor and move the heavy object across the floor with a simple configuration.
In detail, the moving jig is equipped with a height adjustment member that can be attached in a state in which the height position of the holding part can be changed relative to the main body, and makes it possible to adjust the height of the holding part with a simple configuration without using consumables such as hydraulic jacks as in the past.
In addition, the height adjustment member is positioned in the central part of the main body, and multiple caster parts are provided surrounding the height adjustment member, so that the height adjustment member is stably attached and the holding part attached via the height adjustment member can hold heavy objects appropriately.

また前記課題は、本発明の移動用治具によれば、重量物を床上で移動させるための移動用治具であって、該移動用治具の本体となる本体部と、該本体部よりも下方位置に設けられ、床上を移動するためのキャスター部と、前記本体部よりも上方位置に設けられ、前記重量物に設けられた被保持部を側方から保持するための保持部と、前記本体部と前記保持部を連結し、前記本体部に対して前記保持部の高さ位置を変更可能な状態で取り付けられる高さ調整部材と、を備え、前記高さ調整部材は、前記本体部の中央部分に配置され、前記本体部のうち、前記保持部と上下方向で重なる部分には、前記保持部との干渉を避けるための逃げ穴が形成されていること、により解決される。
上記のように逃げ穴を形成することで、移動用治具を極力小型化できる。
Furthermore, the above problem is solved by the moving jig of the present invention, which is a moving jig for moving a heavy object across a floor, comprising a main body portion that forms the main body of the moving jig, caster portions that are located below the main body portion and are used for moving across the floor, a holding portion that is located above the main body portion and is used to hold a held portion provided on the heavy object from the side, and a height adjustment member that connects the main body portion and the holding portion and is attached in a state in which the height position of the holding portion can be changed relative to the main body portion, wherein the height adjustment member is located in the central portion of the main body portion, and a relief hole is formed in the portion of the main body portion that overlaps with the holding portion in the vertical direction to avoid interference with the holding portion.
By forming the escape hole as described above, the moving jig can be made as small as possible.

このとき、前記保持部は、前記高さ調整部材の外側面側に取り付けられ、前記移動用治具の高さ方向とは直交する方向に延びている側壁部と、該側壁部の上端部及び下端部からそれぞれ前記高さ調整部材側とは反対側に突出している上壁部及び底壁部と、を有し、前記保持部は、前記上壁部及び前記底壁部によって、前記重量物の底部に設けられた前記被保持部を上下方向で挟み込むように保持すると良い。
上記構成により、保持部は、側壁部と、上壁部及び底壁部とを有し、内装ユニットのベースフレームを上下方向で挟み込むように保持しているため、移動用治具が内装ユニットをより安定して保持できる。
このとき、前記移動用治具は、前記重量物となる内装ユニットを移動させるための治具であって、前記保持部は、前記内装ユニットの底面に設けられたベースフレームを側方から挟み込むように保持し、前記高さ調整部材は、前記本体部の中央部分に配置され、前記キャスター部は、前記高さ調整部材を囲むように複数設けられていると良い。
上記構成により、内装ユニットを床から浮かせた状態で仮置きするとともに、内装ユニットを好適に移動させることができる。詳しく述べると、保持部は、内装ユニットの底面にあるベースフレームを側方から挟み込むように保持しているため、移動用治具が内装ユニットを安定して保持し易くなる。
このとき、前記本体部は、プレート状の本体プレートであって、前記キャスター部は、それぞれ前記本体プレートの角部又は角部周辺に取り付けられ、かつ、前記本体プレートの中央部分から略等しい間隔を空けて3つ配置され、前記保持部は、互いに隣り合う第1キャスター部及び第2キャスター部の間に配置され、かつ、平面視において前記第1キャスター部と前記第2キャスター部を結ぶ仮想線上に配置され、前記本体プレートの中央部分に対して第3キャスター部側とは反対側の位置に配置され、かつ、前記本体プレートの中央部分と前記第3キャスター部を結ぶ仮想線の延長上に配置されていると良い。
上記構成により、シンプルな構成で大型化を抑制しながらも、内装ユニットを安定して保持することができる。また、キャスター部がバランス良く配置されるため、内装ユニットを好適に移動させることができる。
特に、移動用治具を小型化することで、移動用治具と、内装ユニットの底面にある脚ボルトとが接触してしまうことを避けることができる。
In this case, the holding portion is attached to the outer surface side of the height adjustment member and has a side wall portion extending in a direction perpendicular to the height direction of the moving jig, and an upper wall portion and a bottom wall portion protruding from the upper and lower ends of the side wall portion respectively on the opposite side to the height adjustment member side, and the holding portion preferably holds the held portion provided at the bottom of the heavy object by clamping it in the vertical direction with the upper wall portion and the bottom wall portion.
With the above configuration, the holding portion has a side wall portion, an upper wall portion and a bottom wall portion, and holds the base frame of the interior unit by clamping it in the vertical direction, allowing the moving jig to hold the interior unit more stably.
In this case, the moving jig is a jig for moving the heavy interior unit, the holding portion holds the base frame provided on the bottom surface of the interior unit by clamping it from the sides, the height adjustment member is positioned in the central part of the main body portion, and multiple caster portions are provided to surround the height adjustment member.
With the above-mentioned configuration, the interior unit can be temporarily placed in a state where it is raised above the floor, and the interior unit can be moved suitably. More specifically, the holding portion holds the base frame on the bottom surface of the interior unit by sandwiching it from the sides, so that the moving jig can easily hold the interior unit stably.
In this case, the main body portion is a plate-shaped main body plate, the caster portions are each attached to a corner or the periphery of a corner of the main body plate, and three are arranged at approximately equal intervals from the central portion of the main body plate, and the holding portion is arranged between the adjacent first caster portion and second caster portion, and is arranged on an imaginary line connecting the first caster portion and the second caster portion in a planar view, and is arranged at a position opposite the third caster portion side with respect to the central portion of the main body plate, and is arranged on an extension of the imaginary line connecting the central portion of the main body plate and the third caster portion.
With the above-mentioned configuration, the interior unit can be stably held while suppressing an increase in size with a simple configuration. In addition, since the caster parts are arranged in a well-balanced manner, the interior unit can be moved suitably.
In particular, by making the moving jig smaller, it is possible to prevent the moving jig from coming into contact with the leg bolts on the bottom surface of the interior unit.

このとき、前記本体部は、プレート状の本体プレートであって、前記高さ調整部材は、前記本体プレートに設けられた組み付け穴を通じて組み付けられ、上下方向に長尺な固定ボルトと、該固定ボルトの軸部分に対して螺合される高さ調整ナットと、を有し、該高さ調整ナットの螺合位置を調整することで、前記保持部の高さ位置を変更可能となるように構成されていると良い。
上記構成により、従来のように油圧ジャッキ等を使用することなく、シンプルな構成で保持部の高さ調整機能を備えた移動用治具を実現することができる。
In this case, the main body portion is a plate-shaped main body plate, and the height adjustment member is assembled through an assembly hole provided in the main body plate, and has a fixing bolt that is long in the vertical direction and a height adjustment nut that is screwed onto the shaft portion of the fixing bolt, and is configured so that the height position of the holding portion can be changed by adjusting the screwing position of the height adjustment nut.
With the above-described configuration, it is possible to realize a moving jig having a height adjustment function for the holding portion with a simple configuration, without using a hydraulic jack or the like as in the conventional case.

また前記課題は、上記移動用治具を用いた施工方法であって、重量物となる内装ユニットを組み立てるユニット組み立て工程と、組み立てられた前記内装ユニットを施工現場へ搬入するユニット搬入工程と、搬入された前記内装ユニットを吊り上げ装置に掛け止めされたスリング部材によって吊り上げるユニット吊り上げ工程と、吊り上げられた前記内装ユニットを建物の躯体内部に床から浮かせた状態で仮置きするユニット仮置き工程と、仮置きされた前記内装ユニットを躯体内部の所定位置まで移動させるユニット移動工程と、前記内装ユニットを躯体内部の所定位置に設置するユニット設置工程と、を含み、前記ユニット仮置き工程では、前記内装ユニットの底面に設けられたベースフレームに対し前記移動用治具を複数取り付け、前記ユニット移動工程では、躯体内部の所定位置まで移動させた前記内装ユニットから前記移動用治具を取り外すことを特徴とする移動用治具を用いた施工方法によっても解決される。
上記構成により、工場で予め組み立てられた内装ユニットを建物の躯体内部に好適に設置することが可能な移動用治具を用いた施工方法を実現することができる。
The above problem can also be solved by a construction method using the above-mentioned moving jig, which includes a unit assembly process for assembling a heavy interior unit, a unit delivery process for transporting the assembled interior unit to a construction site, a unit lifting process for lifting the delivered interior unit with a sling member hooked to a lifting device, a unit temporary placement process for temporarily placing the lifted interior unit inside the structure of a building in a floating state above the floor, a unit moving process for moving the temporarily placed interior unit to a predetermined position inside the structure, and a unit installation process for installing the interior unit at a predetermined position inside the structure, wherein in the unit temporary placement process, a plurality of moving jigs are attached to a base frame provided on the bottom surface of the interior unit, and in the unit moving process, the moving jigs are removed from the interior unit that has been moved to the predetermined position inside the structure.
The above-described configuration makes it possible to realize a construction method using a movable jig that enables an interior unit preassembled in a factory to be suitably installed inside the framework of a building.

本発明の移動用治具及び移動用治具を用いた施工方法によれば、シンプルな構成で、重量物を床から浮かせることができ、当該重量物を床上で移動させることが可能となる。
また、特に内装ユニットを床から浮かせた状態で仮置きするとともに、内装ユニットを好適に移動させることが可能となる。
また、工場で予め組み立てられた内装ユニットを建物の躯体内部に好適に設置することが可能となる。
According to the moving jig and construction method using the moving jig of the present invention, a heavy object can be lifted off the floor with a simple configuration, and the heavy object can be moved across the floor.
In particular, the interior unit can be temporarily placed in a state where it is raised above the floor, and the interior unit can be moved in an appropriate manner.
Also, it becomes possible to suitably install the interior unit preassembled in a factory inside the framework of a building.

本実施形態の施工システムSを示す図であって、吊り天秤及び吊り治具を用いて内装ユニットを吊り上げた状態を示す説明図である。FIG. 2 is a diagram showing the construction system S of the present embodiment, and is an explanatory diagram showing the state in which the interior unit is lifted using a lifting balance and a lifting jig. 施工システムSを示す図であって、移動用治具を用いて内装ユニットを仮置きした状態を示す説明図である。FIG. 13 is a diagram showing the construction system S, and is an explanatory diagram showing the state in which an interior unit is temporarily placed using a moving jig. 図1の要部拡大図であって、スリング部材及び吊り天秤を示す斜視図である。FIG. 2 is an enlarged view of a main portion of FIG. 1, showing a sling member and a hoisting balance. 図1の要部拡大図であって、スリング部材、ベルト部材及び内装ユニットを示す斜視図である。FIG. 2 is an enlarged view of a main portion of FIG. 1, showing a sling member, a belt member, and an interior unit. 図1の要部拡大図であって、スリング部材、吊り治具及び内装ユニットを示す斜視図である。FIG. 2 is an enlarged view of a main portion of FIG. 1, and is a perspective view showing a sling member, a hanging jig, and an interior unit. 図2の要部拡大図であって、移動用治具及び内装ユニットを示す斜視図である。FIG. 3 is an enlarged view of a main portion of FIG. 2, showing a moving jig and an interior unit; 吊り天秤が「展開位置」にあって固定された状態を示す平面図である。FIG. 13 is a plan view showing the state in which the hanging balance is fixed in the "deployed position." 吊り天秤が「展開位置」にあって折り畳み可能な状態を示す平面図である。FIG. 13 is a plan view showing the hanging balance in the "deployed position" and ready to be folded. 吊り天秤が「折り畳み位置」にある状態を示す平面図である。FIG. 13 is a plan view showing the state in which the hanging balance is in the "folded position." 吊り治具の斜視図である。FIG. 移動用治具の斜視図である。FIG. 移動用治具の平面図である。FIG. 移動用治具の高さ調整部材を示す分解図である。FIG. 4 is an exploded view showing a height adjustment member of the moving jig. 移動用治具が内装ユニットのベースフレームに取り付けられた状態を示す図である。13 is a diagram showing a state in which the moving jig is attached to a base frame of the interior unit. FIG. 移動用治具を用いた施工方法を示す工程図である。FIG. 11 is a process diagram showing a construction method using a moving jig.

以下、本発明の実施形態について図1-図14を参照して説明する。
本実施形態は、内装ユニットを床から浮かせたまま床上で移動させるための移動用治具であって、移動用治具の本体となる本体部と、本体部よりも下方位置に設けられ、床上を移動するためのキャスター部と、本体部よりも上方位置に設けられ、内装ユニットの底面に設けられたベースフレームを側方から保持するための保持部と、本体部と保持部を連結し、本体部に対して保持部の高さ位置を変更可能な状態で取り付けられる高さ調整部材と、を備えていることを特徴とする移動用治具の発明に関するものである。また、当該移動用治具を用いた施工方法の発明に関するものである。
Hereinafter, an embodiment of the present invention will be described with reference to FIGS.
This embodiment relates to a moving jig for moving an interior unit on a floor while keeping it above the floor, the moving jig including a main body portion that is the main body of the moving jig, caster portions that are located below the main body portion and move the interior unit on the floor, a holding portion that is located above the main body portion and holds a base frame that is located on the bottom surface of the interior unit from the side, and a height adjustment member that connects the main body portion and the holding portion and is attached in a state in which the height position of the holding portion can be changed relative to the main body portion. The present embodiment also relates to an invention of a construction method using the moving jig.

本実施形態の移動用治具300を含む施工システムSは、図1-図6に示すように、施工現場での組立作業及び設置作業を効率化すべく、工場で予め組み立てられた内装ユニットUを吊り上げ装置Lによって吊り上げて、建物の躯体内部の所定位置にそのまま据え付けるために用いられる施工システムである。
詳しく述べると、施工システムSでは、吊り上げ装置Lによって内装ユニットUを吊り上げる際にそれぞれ用いられ、吊り上げ装置Lに掛け止めされたスリング部材1と、スリング部材1の吊り位置を保持するための吊り天秤100及び吊り治具200と、を備えている。また、吊り上げられた内装ユニットUを建物内部に床から浮かせた状態で仮置きする際に用いられ、かつ、仮置きされた内装ユニットUを建物内部の所定位置まで移動させる際にも用いられる移動用治具300をさらに備えている。
The construction system S including the mobile jig 300 of this embodiment is a construction system used to lift an interior unit U preassembled in a factory using a lifting device L and install it directly in a designated position inside the structure of a building, in order to streamline assembly and installation work at a construction site, as shown in Figures 1 to 6.
More specifically, the construction system S includes a sling member 1 hooked to the lifting device L, and a lifting balance 100 and a lifting jig 200 for holding the lifted position of the sling member 1. The construction system S further includes a moving jig 300 that is used when temporarily placing the lifted interior unit U inside the building in a state where it is suspended above the floor, and is also used when moving the temporarily placed interior unit U to a predetermined position inside the building.

内装ユニットUは、図1、図5、図6に示すように、建物内部に設置される各種設備をユニット化し、そのまま据え付け可能となるように組み立てられたものであって、ユニットバス、ユニットトイレ、ユニットキッチン等の各種ユニット品を含むものである。
内装ユニットUは、箱状のユニット本体U1と、ユニット本体U1の底面に取り付けられる矩形枠状のベースフレームU2と、ベースフレームU2の底面から下方に突出している複数の脚部材U3と、から主に構成されている。
内装ユニットUは、工場から施工現場へ搬入する工程から建物内部に設置する工程までの間、シート状のユニットカバーU4によって上方から被覆されている。
As shown in Figures 1, 5, and 6, the interior unit U is a unit that is assembled so that various facilities to be installed inside a building can be unitized and installed as is, and includes various unit items such as a unit bath, a unit toilet, and a unit kitchen.
The interior unit U is mainly composed of a box-shaped unit body U1, a rectangular frame-shaped base frame U2 attached to the bottom surface of the unit body U1, and a plurality of leg members U3 protruding downward from the bottom surface of the base frame U2.
The interior unit U is covered from above with a sheet-like unit cover U4 from the process of transporting it from the factory to the construction site to the process of installing it inside the building.

ベースフレームU2は、断面四角形状の長尺な角パイプ部材から形成されており、建物の躯体上に内装ユニットUを据え付けるためのフレーム部材である。
また、ベースフレームU2は、内装ユニットUを床上で移動させるときに移動用治具300を取り付けるための部材としても機能する。
脚部材U3は、上下方向に延びている軸状の脚部材であって、建物内部の床パネル上に接着剤を用いて固定される部材である。
また、脚部材U3は、内装ユニットUを吊り上げるときに吊り治具200を取り付けるための部材としても機能する。
ユニットカバーU4は、図1に示すように、防水性を有する養生カバーであって、ユニットカバーU4の幅方向の一端面には、内装ユニットUを取り出し可能にするためのカバー開閉部U4aが形成されている。カバー開閉部U4aは、線状ファスナーによって開閉可能に構成されている。
The base frame U2 is formed from a long rectangular pipe member having a square cross section, and is a frame member for installing the interior unit U on the framework of the building.
The base frame U2 also functions as a member for attaching a moving jig 300 when moving the interior unit U on the floor.
The leg member U3 is a shaft-shaped leg member extending in the vertical direction, and is fixed onto a floor panel inside the building using an adhesive.
The leg member U3 also functions as a member for attaching the lifting jig 200 when lifting the interior unit U.
1, the unit cover U4 is a waterproof protective cover, and a cover opening/closing part U4a is formed on one end surface in the width direction of the unit cover U4 to enable removal of the interior unit U. The cover opening/closing part U4a is configured to be openable and closable by a linear fastener.

スリング部材1は、図1-図5に示すように、ナイロン製の長尺なベルトスリングであって、吊り上げ装置Lの吊り上げ部L1に一端が掛け止めされ、他端が吊り天秤100に取り付けられる吊りスリング10と、吊り天秤100に上端が掛け止めされ、下端が吊り治具200に取り付けられる支持スリング20と、から主に構成されている。
吊りスリング10、支持スリング20の長尺方向の両端部には、それぞれ環状の環状部11、12、環状部21、22が形成されており、吊りスリング10の中央部には、環状のべろ部23が別途取り付けられている。
As shown in Figures 1 to 5, the sling member 1 is a long belt sling made of nylon, and is mainly composed of a lifting sling 10 having one end hooked to the lifting section L1 of the lifting device L and the other end attached to a lifting balance 100, and a support sling 20 having an upper end hooked to the lifting balance 100 and a lower end attached to a lifting jig 200.
Annular portions 11, 12 and 21, 22 are formed at both ends of the suspension sling 10 and the support sling 20 in the longitudinal direction, respectively, and a ring-shaped tongue portion 23 is separately attached to the central portion of the suspension sling 10.

詳しく述べると、吊りスリング10の環状部11は、公知なシャックルを介して吊り上げ部L1に掛け止めされており、環状部12は、吊り天秤100の四隅に設けられたスリング取り付け部112に直接取り付けられている。
支持スリング20の環状部21は、公知なシャックルを介して吊り天秤100の四隅に設けられたスリング取り付け穴114に掛け止めされており、環状部22は、内装ユニットUの脚部材U3に吊り治具200を介して取り付けられている。
支持スリング20のべろ部23は、ユニット本体U1を囲むように延びている胴ベルト30を挿通させて、当該胴ベルト30を支持する部分である。
なお、胴ベルト30は、ユニット本体U1の外側面に沿って延びているナイロン製の長尺ベルトであって、吊り上げ時に内装ユニットUの転倒を防止する機能を果たす。
In detail, the loop portion 11 of the lifting sling 10 is hooked to the lifting part L1 via a known shackle, and the loop portion 12 is directly attached to the sling attachment parts 112 provided at the four corners of the lifting balance 100.
The annular portion 21 of the support sling 20 is hooked to sling mounting holes 114 provided at the four corners of the hoisting balance 100 via a known shackle, and the annular portion 22 is attached to the leg member U3 of the interior unit U via a hanging jig 200.
The tongue portion 23 of the support sling 20 is a portion through which the waist belt 30 extending to surround the unit main body U1 is inserted and which supports the waist belt 30.
The waist belt 30 is a long nylon belt that extends along the outer surface of the unit body U1 and serves to prevent the interior unit U from tipping over when being lifted.

施工システムSでは、図1に示すように、内装ユニットUを吊り上げるために、長尺な4本の吊りスリング10と、4本の支持スリング20とが用いられている。
4本の吊りスリング10が、吊り上げ部L1から吊り天秤100の四隅に向かってそれぞれ延びており、矩形枠状の吊り天秤100を吊り上げている。
また、4本の支持スリング20が、吊り天秤100の四隅から内装ユニットUを挟み込むように下方に延びて、内装ユニットUの下端部の四隅に設けられた吊り治具200にそれぞれ取り付けられている。
上記構成によって、内装ユニットUが吊りスリング10、支持スリング20、胴ベルト30によって保持された上で、吊り上げ装置Lによって吊り上げられることになる。
In the construction system S, as shown in FIG. 1, four long lifting slings 10 and four support slings 20 are used to lift the interior unit U.
Four lifting slings 10 extend from the lifting section L1 toward the four corners of the lifting balance 100, respectively, and lift the rectangular frame-shaped lifting balance 100.
In addition, four support slings 20 extend downward from the four corners of the hoisting balance 100 so as to sandwich the interior unit U, and are each attached to a hoisting jig 200 provided at the four corners of the lower end of the interior unit U.
With the above-described configuration, the interior unit U is held by the lifting sling 10, the support sling 20, and the waist belt 30, and then lifted by the lifting device L.

吊り天秤100は、図1、図3に示すように、スリング部材1の内装ユニットU側への食い込みを抑制し、スリング部材1の吊り位置を保持する部材であって、上下方向において吊り上げ部L1と内装ユニットUの間に配置されている。
吊り天秤100は、図8A-図8Bに示すように、スリング部材1の吊り位置を保持するために、矩形枠状に展開された「展開位置」と、吊り天秤100を収納するために、「展開位置」から折り畳まれた「折り畳み位置」との間で切り替え可能となっている。
As shown in Figures 1 and 3, the lifting balance 100 is a member that prevents the sling member 1 from digging into the interior unit U and maintains the lifting position of the sling member 1, and is positioned between the lifting section L1 and the interior unit U in the vertical direction.
As shown in Figures 8A-8B, the hanging balance 100 is switchable between an "expanded position" in which it is expanded into a rectangular frame shape to maintain the hanging position of the sling member 1, and a "folded position" in which it is folded from the "expanded position" to store the hanging balance 100.

吊り天秤100は、図7に示すように、水平方向において所定の間隔を空けて設けられ、互いに対向しながら延びている一対の長尺部材110と、長尺部材110の延出方向において所定の間隔を空けて設けられ、一対の長尺部材110を連結する一対の連結部材120と、から主に構成されている。
一対の連結部材120は、一方の長尺部材110Aに対して他方の長尺部材110Bを水平回転可能となるように取り付けられている。
As shown in Figure 7, the hanging balance 100 is mainly composed of a pair of elongated members 110 that are arranged at a predetermined interval in the horizontal direction and extend opposite each other, and a pair of connecting members 120 that are arranged at a predetermined interval in the extension direction of the elongated members 110 and connect the pair of elongated members 110.
The pair of connecting members 120 are attached to one elongated member 110A so that the other elongated member 110B can be horizontally rotated relative to the other elongated member 110A.

長尺部材110は、角パイプ部材が加工された長尺体からなり、枠状に展開された吊り天秤100の2辺を構成する部材である。
長尺部材110は、長尺に延びている断面四角形状の本体部111と、本体部111の延出方向の両端部からそれぞれ外側に突出し、吊りスリング10を取り付けるためのT字形状のスリング取り付け部112と、から主に構成されている。
The long member 110 is made of a long body processed from a square pipe member, and constitutes two sides of the hanging balance 100 that is unfolded into a frame shape.
The long member 110 is mainly composed of a main body 111 which extends over a long length and has a rectangular cross-section, and T-shaped sling attachment portions 112 which protrude outward from both ends of the main body 111 in the extension direction and are used to attach the suspension sling 10.

スリング取り付け部112の外側面には、連結部材120を連結するための連結穴113と、長尺部材110の延出方向において連結穴113よりも外側に設けられ、支持スリング20を掛け止めるためのスリング取り付け穴114とがそれぞれ形成されている。 The outer surface of the sling attachment portion 112 is provided with a connection hole 113 for connecting the connecting member 120, and a sling attachment hole 114 for hanging the support sling 20, which is provided outside the connection hole 113 in the extension direction of the elongated member 110.

連結部材120は、軸部材が加工された長尺体からなり、枠状に展開された吊り天秤100の残りの2辺を構成する部材である。
連結部材120は、長尺に延びている軸状の本体部121と、本体部121の延出方向の両端部からそれぞれ連続して、連結部材120の延出方向とは交差する方向に屈曲して延びている第1屈曲部122及び第2屈曲部123と、から主に構成されている。
第1屈曲部122と第2屈曲部123は、連結部材120の延出方向とは交差する方向において互いに反対側に延びており、それぞれ長尺部材110(連結穴113)を貫通している。
The connecting member 120 is made of a long body formed by processing an axial member, and is a member that constitutes the remaining two sides of the hanging balance 100 that is unfolded into a frame shape.
The connecting member 120 is mainly composed of a long, axially extending main body portion 121, and a first bent portion 122 and a second bent portion 123 which are continuous with both ends of the main body portion 121 in the extension direction and extend bent in a direction intersecting the extension direction of the connecting member 120.
The first bent portion 122 and the second bent portion 123 extend in opposite directions in a direction intersecting the extending direction of the connecting member 120, and each penetrates the elongated member 110 (connecting hole 113).

連結部材120の延出方向において第1屈曲部122及び第2屈曲部123よりも外側に位置する両端部には、連結穴113よりも幅広となるように形成された板状の抜け防止部124がそれぞれ形成されている。
抜け防止部124は、長尺部材110から連結部材120が抜けることを防止する機能を果たし、また内装ユニットUを吊り上げるときに吊りスリング10(環状部12)を内側から支持する機能を果たす。
At both ends of the connecting member 120 located outside the first bent portion 122 and the second bent portion 123 in the extension direction, a plate-shaped anti-slip portion 124 is formed so as to be wider than the connecting hole 113.
The anti-slip portion 124 functions to prevent the connecting member 120 from slipping out of the elongated member 110, and also functions to support the lifting sling 10 (annular portion 12) from the inside when lifting the interior unit U.

連結部材120の延出方向において一方の長尺部材110Aに設けられた連結穴113よりも内側に位置する一端部分には、当該一端部分の外側面から第1屈曲部122の屈曲方向と同じ向きに突出する第1突起部125が形成されている。
また、連結部材120の延出方向において他方の長尺部材110Bに設けられた連結穴113よりも内側に位置する他端部分には、当該他端部分の外側面から第2屈曲部123の屈曲方向と同じ向きに突出する第2突起部126が成されている。
すなわち、第1突起部125と第2突起部126は、互いに反対側に突出している。
第1突起部125、第2突起部126は、吊り天秤100が図7に示す「展開位置」にいるときに、これら突起部125、126の外側面と、長尺部材110の内側面とがそれぞれ当接することで、吊り天秤100の形状を保持する機能を果たす。
また、吊り天秤100が図9Bに示す「折り畳み位置」にいるときに、これら突起部125、126の突出面と、長尺部材110の内側面とがそれぞれ当接することで、吊り天秤100の折り畳み形状を保持する機能を果たす。
At one end portion located more inward than the connecting hole 113 provided in one of the elongated members 110A in the extension direction of the connecting member 120, a first protrusion portion 125 is formed which protrudes from the outer surface of the one end portion in the same direction as the bending direction of the first bending portion 122.
In addition, the other end portion, which is located more inward than the connecting hole 113 provided in the other elongated member 110B in the extension direction of the connecting member 120, has a second protrusion portion 126 that protrudes from the outer surface of the other end portion in the same direction as the bending direction of the second bending portion 123.
That is, the first protrusion 125 and the second protrusion 126 protrude in opposite directions.
When the hanging balance 100 is in the "deployed position" shown in Figure 7, the outer surfaces of the first protrusion 125 and the second protrusion 126 abut against the inner surface of the elongated member 110, respectively, thereby maintaining the shape of the hanging balance 100.
In addition, when the hanging balance 100 is in the "folded position" shown in Figure 9B, the protruding surfaces of these protrusions 125, 126 abut against the inner surfaces of the elongated member 110, respectively, thereby maintaining the folded shape of the hanging balance 100.

上記構成において、図8A-図8Bに示すように、吊り天秤100は、一対の長尺部材110と一対の連結部材120とで矩形枠状に展開された「展開位置」と、「展開位置」から一方の長尺部材110Aに対して他方の長尺部材110Bを水平回転させることで、他方の長尺部材110Bを一方の長尺部材110A側に折り畳んだ「折り畳み位置」との間で切り替え可能となっている。
詳しく述べると、連結部材120A、120Bの第1屈曲部122が、長尺部材110Aの連結穴113に沿って移動し、かつ、連結部材120A、120Bの第2屈曲部123が、長尺部材110Bの連結穴113に沿って移動することで、長尺部材110Bを一方向に水平回転させることができる。
In the above configuration, as shown in Figures 8A and 8B, the hanging balance 100 can be switched between an "expanded position" in which the pair of elongated members 110 and the pair of connecting members 120 are expanded into a rectangular frame shape, and a "folded position" in which the other elongated member 110B is folded toward the one elongated member 110A by horizontally rotating the other elongated member 110B relative to the one elongated member 110A from the "expanded position."
In detail, the first bent portion 122 of the connecting members 120A, 120B moves along the connecting hole 113 of the elongated member 110A, and the second bent portion 123 of the connecting members 120A, 120B moves along the connecting hole 113 of the elongated member 110B, thereby allowing the elongated member 110B to be rotated horizontally in one direction.

また上記構成において、連結部材120は、一対の長尺部材110に対して連結部材120の延出方向に沿った軸周りに回動可能となるように取り付けられている。
そのため、吊り天秤100が「展開位置」にいるときに、一対の連結部材120が上記軸周りにおいて互いに異なる回動位置に配置されることで、吊り天秤100が枠状のまま固定される。
例えば、図7に示すように、一方の連結部材120Aが、第1屈曲部122及び第2屈曲部123を上下方向に向かせた回動位置に配置され、かつ、他方の連結部材120Bが、第1屈曲部122及び第2屈曲部123を水平方向に向かせた回動位置に配置されることで、吊り天秤100が水平回転することができず、枠状のまま固定されることになる。
In the above configuration, the connecting member 120 is attached to the pair of elongated members 110 so as to be rotatable about an axis along the extending direction of the connecting member 120 .
Therefore, when the hanging balance 100 is in the "deployed position", the pair of connecting members 120 are disposed at different rotational positions about the above-mentioned axis, thereby fixing the hanging balance 100 in a frame-like shape.
For example, as shown in Figure 7, one connecting member 120A is arranged in a rotated position with the first bent portion 122 and the second bent portion 123 facing vertically, and the other connecting member 120B is arranged in a rotated position with the first bent portion 122 and the second bent portion 123 facing horizontally, so that the hanging balance 100 cannot rotate horizontally and remains fixed in a frame-like shape.

また上記構成において、吊り天秤100が「展開位置」にいるときに、一対の連結部材120が軸周りにおいて同じ回動位置に配置されることで、吊り天秤100が折り畳み可能となる。
例えば、図8Aに示すように、一方の連結部材120Aが、第1屈曲部122及び第2屈曲部123を水平方向に向かせた回動位置に配置され、かつ、他方の連結部材120Bが、第1屈曲部122及び第2屈曲部123を水平方向に向かせた回動位置に配置されることで、吊り天秤100が水平回転することができ、折り畳むことが可能となる。
In the above configuration, when the hanging balance 100 is in the "deployed position", the pair of connecting members 120 are disposed at the same rotational position about the axis, thereby making the hanging balance 100 foldable.
For example, as shown in FIG. 8A, one connecting member 120A is arranged in a rotation position in which the first bent portion 122 and the second bent portion 123 are oriented horizontally, and the other connecting member 120B is arranged in a rotation position in which the first bent portion 122 and the second bent portion 123 are oriented horizontally, thereby allowing the hanging balance 100 to rotate horizontally and be folded.

吊り治具200は、図1、図5に示すように、スリング部材1(支持スリング20)の内装ユニットU側への食い込みを抑制し、スリング部材1の吊り位置を保持する部材であって、内装ユニットUの下端部における四隅に配置されている。
詳しく述べると、吊り治具200は、支持スリング20の吊り位置を保持するために、内装ユニットUの脚部材U3に側方から掛け止めされ、脚部材U3から内装ユニットUの外側に向かって側方に突出した位置で支持スリング20(環状部22)と連結されている。
As shown in Figures 1 and 5, the hanging jig 200 is a member that prevents the sling member 1 (support sling 20) from biting into the interior unit U and maintains the hanging position of the sling member 1, and is arranged at the four corners at the lower end of the interior unit U.
In detail, in order to maintain the hanging position of the support sling 20, the hanging jig 200 is hooked laterally onto the leg member U3 of the interior unit U, and is connected to the support sling 20 (annular portion 22) at a position protruding laterally from the leg member U3 toward the outside of the interior unit U.

吊り治具200は、図9に示すように、複数の板状部材を繋ぎ合わせて加工された部材となっている。
吊り治具200は、長尺に延びている治具本体部210と、治具本体部210の長さ方向の一端部に設けられ、脚部材U3に対して着脱可能に掛け止めされる掛け止め部220と、治具本体部210の他端部に設けられ、支持スリング20(環状部22)を取り付けるためのスリング取り付け部230と、治具本体部210の上面に設けられ、弾性を有する第1弾性部材240及び第2弾性部材250と、から主に構成されている。
As shown in FIG. 9, the hanging jig 200 is a member processed by joining together a plurality of plate-like members.
The hanging jig 200 is mainly composed of a jig main body portion 210 which extends over a long length, a hanging portion 220 which is provided at one end in the longitudinal direction of the jig main body portion 210 and is removably hung on the leg member U3, a sling attachment portion 230 which is provided at the other end of the jig main body portion 210 and for attaching the support sling 20 (annular portion 22), and a first elastic member 240 and a second elastic member 250 which are provided on the upper surface of the jig main body portion 210 and have elasticity.

治具本体部210は、上下方向に所定の間隔を空けて形成され、吊り治具200の長尺方向に延びている上壁部211及び底壁部212と、上下方向に延びて、上壁部211及び底壁部212を連結する連結壁部213と、上壁部211の延出方向の他端部から、上壁部211から離れるように上方に傾斜しながら突出している突出壁部214と、から主に構成されている。 The jig body 210 is mainly composed of an upper wall 211 and a bottom wall 212 that are formed at a predetermined interval in the vertical direction and extend in the longitudinal direction of the hanging jig 200, a connecting wall 213 that extends in the vertical direction and connects the upper wall 211 and the bottom wall 212, and a protruding wall 214 that protrudes from the other end of the upper wall 211 in the extension direction while slanting upward so as to move away from the upper wall 211.

上壁部211と底壁部212は、互いに対向しながら延びており、連結壁部213は、上壁部211の幅方向の中央部分と、底壁部212の中央部分とを連結している。
上壁部211、底壁部212それぞれのうち、連結壁部213が連結された部分と異なる位置には、掛け止め部220が形成されている。
上壁部211のうち、連結壁部213が連結された部分の上面には、第1弾性部材240及び第2弾性部材250が並ぶように取り付けられている。
The upper wall portion 211 and the bottom wall portion 212 extend facing each other, and the connecting wall portion 213 connects a central portion in the width direction of the upper wall portion 211 to a central portion of the bottom wall portion 212 .
A latch portion 220 is formed on each of the upper wall portion 211 and the bottom wall portion 212 at a position different from the portion to which the connecting wall portion 213 is connected.
A first elastic member 240 and a second elastic member 250 are attached to the upper surface of the portion of the upper wall portion 211 to which the connecting wall portion 213 is connected, so as to be aligned side by side.

突出壁部214は、上壁部211、底壁部212及び連結壁部213それぞれの他端部を連結し、上方に傾斜しながら突出している第1突出壁部214aと、第1突出壁部214aの突出端部から連続して上方に屈曲し、真上(ほぼ真上)に突出している第2突出壁部214bと、を有している。
突出壁部214のうち、第2突出壁部214bの側面には、スリング取り付け部230が形成されている。
The protruding wall portion 214 has a first protruding wall portion 214a that connects the other ends of the upper wall portion 211, the bottom wall portion 212, and the connecting wall portion 213, and protrudes while inclining upward, and a second protruding wall portion 214b that bends upward continuously from the protruding end portion of the first protruding wall portion 214a and protrudes directly upward (almost directly upward).
Of the protruding wall portions 214, a sling attachment portion 230 is formed on a side surface of the second protruding wall portion 214b.

掛け止め部220は、図9に示すように、略L字形状の掛け止め溝であって、上壁部211の一端部に形成された第1掛け止め部220Aと、底壁部212の一端部に形成された第2掛け止め部220Bと、を有している。
第1掛け止め部220Aと第2掛け止め部220Bは上面視で互いに重なる位置に配置されている。また、脚部材U3の形状(やや先細り形状)に対応させて、第1掛け止め部220Aは、第2掛け止め部220Bよりも幅広の溝となるように形成されている。
As shown in Figure 9, the hook portion 220 is a hook groove having an approximately L-shape, and has a first hook portion 220A formed at one end of the upper wall portion 211 and a second hook portion 220B formed at one end of the bottom wall portion 212.
The first and second hook portions 220A and 220B are disposed so as to overlap each other when viewed from above. In addition, the first and second hook portions 220A and 220B are formed to have a groove that is wider than the second hook portion 220B in accordance with the shape (slightly tapered shape) of the leg member U3.

掛け止め部220A、220Bは、治具本体部210の幅方向の一端部から他端部側へ向かって切り欠かれた第1溝部221と、第1溝部221から連続して形成され、治具本体部210の長さ方向においてスリング取り付け部230側とは反対側に向かって切り欠かれた第2溝部222と、を有している。
掛け止め部220A、220Bは、第1溝部221から第2溝部222へ脚部材U3を導き入れることで、脚部材U3に対して着脱可能に掛け止めされる。
The hanging retaining portions 220A, 220B have a first groove portion 221 cut out from one end of the jig main body portion 210 in the width direction toward the other end, and a second groove portion 222 formed continuously from the first groove portion 221 and cut out toward the opposite side to the sling attachment portion 230 in the longitudinal direction of the jig main body portion 210.
The hook portions 220A and 220B are detachably hooked to the leg member U3 by guiding the leg member U3 from the first groove portion 221 to the second groove portion 222.

第2掛け止め部220Bの開口部の周辺部分には、当該開口部を閉じた状態にする「閉鎖位置」と、当該開口部を開いた状態にする「開口位置」の間で移動する移動部材223が取り付けられている。
移動部材223は、掛け止め部220に掛け止めされた脚部材U3が掛け止め部220から抜けることを防止するための抜け防止部材である。
A movable member 223 is attached to the peripheral portion of the opening of the second retaining portion 220B, which moves between a "closed position" in which the opening is closed and an "open position" in which the opening is open.
The moving member 223 is a member for preventing the leg member U3 hooked to the hook portion 220 from coming off the hook portion 220.

詳しく述べると、移動部材223は、底壁部212の上面において第2掛け止め部220Bの開口部に近接した位置に取り付けられ、上下方向に延びている回動軸223aと、底壁部212に対して回動軸223aを中心として「閉鎖位置」と「開口位置」の間で水平方向に回動するフック状の移動フック223bと、回動軸223aの外周面に巻き付けられ、移動フック223bを「開口位置」側から「閉鎖位置」側へ付勢する付勢バネ223cと、を有している。
移動フック223bは、「閉鎖位置」にいるときに、第2掛け止め部220B(第1溝部221)の開口部を跨ぐように配置されている。
また、移動フック223bは、「開口位置」にいるときに、脚部材U3を第1溝部221の開口部から第2溝部222の延出端部へ導き入れる経路を形成するように、第2溝部222側へ寄らせて配置されている。
In detail, the movable member 223 is attached to the upper surface of the bottom wall portion 212 at a position close to the opening of the second hook portion 220B, and has a rotating shaft 223a extending in the vertical direction, a hook-shaped movable hook 223b that rotates horizontally between a ``closed position'' and an ``open position'' around the rotating shaft 223a relative to the bottom wall portion 212, and a biasing spring 223c that is wrapped around the outer peripheral surface of the rotating shaft 223a and biases the movable hook 223b from the ``open position'' side to the ``closed position'' side.
The moving hook 223b is disposed so as to straddle the opening of the second latch portion 220B (first groove portion 221) when in the "closed position".
In addition, the movable hook 223b is positioned toward the second groove portion 222 so as to form a path for guiding the leg member U3 from the opening of the first groove portion 221 to the extended end portion of the second groove portion 222 when in the "open position".

スリング取り付け部230は、図9に示すように、支持スリング20(環状部22)を公知なシャックルを介して取り付けるための取り付け穴であって、第1掛け止め部220A及び第2掛け止め部220Bよりも上方位置に配置されている。
また、スリング取り付け部230は、第1弾性部材240及び第2弾性部材250よりも上方位置に配置されている。
As shown in Figure 9, the sling attachment portion 230 is an attachment hole for attaching the support sling 20 (annular portion 22) via a known shackle, and is located at a higher position than the first hook portion 220A and the second hook portion 220B.
In addition, the sling attachment portion 230 is disposed at a position above the first elastic member 240 and the second elastic member 250 .

第1弾性部材240、第2弾性部材250は、直方体形状のクッション材であって、内装ユニットUの吊り上げ時にベースフレームU2と接触した場合であっても、吊り治具200の揺動を抑制するための部材である。
第1弾性部材240、第2弾性部材250は、治具本体部210から上面に接着剤で取り付けられており、治具本体部210から上方に突出している。
The first elastic member 240 and the second elastic member 250 are rectangular shaped cushioning materials that are intended to suppress the swinging of the lifting jig 200 even if they come into contact with the base frame U2 when the interior unit U is lifted.
The first elastic member 240 and the second elastic member 250 are attached to the upper surface of the jig body 210 with an adhesive, and protrude upward from the jig body 210.

第1弾性部材240は、治具本体部210の長さ方向において掛け止め部220側に配置されており、第2弾性部材250は、スリング取り付け部230側に配置されている。
また、第2弾性部材250は、第1弾性部材240よりも大きく、第1弾性部材240よりも上方に突出している。
そのため、第1弾性部材240、第2弾性部材250は、各種内装ユニットUのベースフレームU2の形状に対応して、内装ユニットUの吊り上げ時にベースフレームU2と接触させることが可能となっている。
The first elastic member 240 is disposed on the hook portion 220 side in the longitudinal direction of the jig body 210 , and the second elastic member 250 is disposed on the sling attachment portion 230 side.
Furthermore, the second elastic member 250 is larger than the first elastic member 240 and protrudes upward beyond the first elastic member 240 .
Therefore, the first elastic member 240 and the second elastic member 250 are capable of contacting the base frame U2 when the interior unit U is lifted in accordance with the shape of the base frame U2 of various interior units U.

上記構成により、吊り上げ時に内装ユニットUに対して吊り治具200が接触する場合があったとしても、内装ユニットUの変形や損傷を抑制することができる。また、吊り治具200が揺動し、スリング部材1の吊り姿勢が不安定になることを抑制できる。 The above configuration can prevent deformation or damage to the interior unit U even if the lifting jig 200 comes into contact with the interior unit U during lifting. It can also prevent the lifting jig 200 from swinging and causing the sling member 1 to become unstable.

移動用治具300は、図2、図6に示すように、内装ユニットUを床から浮かせた状態で仮置きする際に用いられ、かつ、内装ユニットUを床上で移動させる際にも用いられる治具であって、内装ユニットUの下端部における四隅に配置されている。
詳しく述べると、移動用治具300は、内装ユニットUのベースフレームU2に対して着脱可能に取り付けられ、脚部材U3を床Fからやや浮かせた状態で内装ユニットUを保持したまま移動することができ、また、ジャッキのように内装ユニットUの高さ位置を調整することができる。
As shown in Figures 2 and 6, the moving jig 300 is used when temporarily placing the interior unit U in a state where it is raised above the floor, and is also used when moving the interior unit U on the floor, and is positioned at the four corners of the lower end of the interior unit U.
In detail, the moving jig 300 is removably attached to the base frame U2 of the interior unit U, and can move the interior unit U while holding it with the leg member U3 slightly raised above the floor F, and can also adjust the height position of the interior unit U like a jack.

移動用治具300は、図10-図13に示すように、移動用治具300の本体となる本体部310と、本体部310よりも下方位置に設けられ、床上を移動するためのキャスター部320と、本体部310よりも上方位置に設けられ、内装ユニットUのベースフレームU2を側方から保持するための保持部330と、本体部310と保持部330を連結し、本体部310に対して保持部330の高さ位置を変更可能な状態で取り付けられる高さ調整部材340と、から主に構成されている。 As shown in Figures 10 to 13, the moving jig 300 is mainly composed of a main body 310 which is the main body of the moving jig 300, caster parts 320 which are located below the main body 310 and are used for moving on the floor, a holding part 330 which is located above the main body 310 and is used for holding the base frame U2 of the interior unit U from the side, and a height adjustment member 340 which connects the main body 310 and the holding part 330 and is attached in a state where the height position of the holding part 330 relative to the main body 310 can be changed.

本体部310は、三角形状のプレート体からなる本体プレートであって、水平な平面を有している。
本体部310の上面には、本体部310の中央部分に形成され、高さ調整部材340を組み付けるための組み付け穴311と、本体部310の角部に形成され、キャスター部320を取り付けるための取り付け穴312と、保持部330と上下方向で重なる部分に形成され、保持部330との干渉を避けるための逃げ穴313とがそれぞれ形成されている。
逃げ穴313は、保持部330の外形に対応させて形成された略矩形状の切り欠き穴である。
The main body 310 is a main body plate made of a triangular plate body and has a horizontal flat surface.
The upper surface of the main body portion 310 is provided with an assembly hole 311 formed in the central portion of the main body portion 310 for assembling the height adjustment member 340, an attachment hole 312 formed in the corner portion of the main body portion 310 for attaching the caster portion 320, and an escape hole 313 formed in a portion that overlaps with the holding portion 330 in the vertical direction for avoiding interference with the holding portion 330.
The relief hole 313 is a substantially rectangular cutout hole formed to correspond to the outer shape of the holding portion 330 .

キャスター部320は、図10に示すように、自在に向きを変えて回転可能な球状の回転体であって、本体部310において高さ調整部材340を囲むように複数設けられている。
詳しく述べると、キャスター部320は、平面視において高さ調整部材340から略等しい間隔を空けて3つ配置されており、第1キャスター部320Aと、第2キャスター部320Bと、第3キャスター部320Cと、を有している。
As shown in FIG. 10 , the caster parts 320 are spherical rotating bodies that can freely change direction and rotate, and a plurality of caster parts 320 are provided on the main body part 310 so as to surround the height adjustment member 340 .
In detail, the caster parts 320 are arranged in three parts at approximately equal intervals from the height adjustment member 340 in a plan view, and include a first caster part 320A, a second caster part 320B, and a third caster part 320C.

キャスター部320は、本体部310の取り付け穴312を貫通して軸支され、上下方向に延びているキャスター軸321と、本体部310に対してキャスター軸321を中心として水平方向に回動可能なキャスター本体322と、キャスター本体322を貫通して軸支され、キャスター軸321とは直交方向に延びている車軸323と、キャスター本体322に対して車軸323を中心として回動可能な球状の車輪324と、から主に構成されている。
上記構成により、移動用治具300は、キャスター部320を旋回させながら回転させることで床上を自在に移動することができる。
The caster section 320 is mainly composed of a caster axle 321 that is journaled through the mounting hole 312 of the main body section 310 and extends in the vertical direction, a caster body 322 that can rotate horizontally around the caster axle 321 relative to the main body section 310, an axle 323 that is journaled through the caster body 322 and extends in a direction perpendicular to the caster axle 321, and a spherical wheel 324 that can rotate around the axle 323 relative to the caster body 322.
With the above-described configuration, the moving jig 300 can be freely moved on the floor by rotating the caster parts 320 while swiveling.

保持部330は、図10、図11に示すように、板状部材をC字形状に折り曲げて形成されており、内装ユニットUのベースフレームU2を上下方向で挟み込むように保持する部分である。
保持部330は、互いに隣り合う第1キャスター部320A及び第2キャスター部320Bの間に配置されており、かつ、平面視において第1キャスター部320Aと第2キャスター部320Bを結ぶ仮想線A上に配置されている。
また、保持部330は、本体部310の中央部分に対して第3キャスター部320C側とは反対側の位置に配置され、かつ、本体部310の中央部分と第3キャスター部320Cを結ぶ仮想線Bの延長上に配置されている。
As shown in Figs. 10 and 11, the holding portion 330 is formed by bending a plate-like member into a C-shape, and is a portion that holds the base frame U2 of the interior unit U by sandwiching it in the vertical direction.
The holding portion 330 is disposed between the adjacent first caster portion 320A and second caster portion 320B, and is disposed on an imaginary line A connecting the first caster portion 320A and the second caster portion 320B in a plan view.
In addition, the holding portion 330 is positioned on the opposite side of the central portion of the main body portion 310 from the third caster portion 320C, and is positioned on an extension of an imaginary line B connecting the central portion of the main body portion 310 and the third caster portion 320C.

保持部330は、高さ調整部材340の外側面に取り付けられ、移動用治具300の高さ方向とは直交する方向に延びている側壁部331と、側壁部331の上端部及び下端部からそれぞれ高さ調整部材340側とは反対側に突出している上壁部332及び底壁部333と、を有している。
保持部330は、上壁部332及び底壁部333によって、内装ユニットUのベースフレームU2を上下方向で挟み込むように保持する。
The holding portion 330 is attached to the outer surface of the height adjustment member 340 and has a side wall portion 331 extending in a direction perpendicular to the height direction of the moving jig 300, and an upper wall portion 332 and a bottom wall portion 333 which protrude from the upper and lower ends of the side wall portion 331 respectively on the side opposite the height adjustment member 340.
The holding portion 330 holds the base frame U2 of the interior unit U by sandwiching it in the vertical direction with the upper wall portion 332 and the bottom wall portion 333.

保持部330において上壁部332、底壁部333それぞれの上面には、上下方向に貫通した締結穴334、335が形成されており、締結穴334と締結穴335は、上面視において互いに重なる位置に配置されている。
図13に示すように、保持部330がベースフレームU2を挟み込んだときに、保持部330の締結穴335と、ベースフレームU2に設けられた締結穴U2dとが連通した状態で締結ボルト336が下方から締結されることで、移動用治具300がベースフレームU2に取り付けられる。
あるいは、締結穴334と、ベースフレームU2に設けられた締結穴U2cとが連通した状態で締結ボルト336が上方から締結されることで、移動用治具300がベースフレームU2に取り付けられる。
In the holding portion 330, fastening holes 334, 335 that penetrate in the vertical direction are formed in the upper surfaces of the upper wall portion 332 and the bottom wall portion 333, respectively, and the fastening holes 334 and 335 are positioned so as to overlap each other when viewed from above.
As shown in Figure 13, when the holding portion 330 clamps the base frame U2, the fastening hole 335 of the holding portion 330 and the fastening hole U2d provided in the base frame U2 are in communication with each other, and the fastening bolt 336 is fastened from below, thereby attaching the moving jig 300 to the base frame U2.
Alternatively, the moving jig 300 is attached to the base frame U2 by fastening the fastening bolt 336 from above with the fastening hole 334 communicating with a fastening hole U2c provided in the base frame U2.

高さ調整部材340は、図10、図12に示すように、本体部310の底面に設けられた固定ナット341と、本体部310(組み付け穴311)を貫通して固定ナット341に固定され、上下方向に長尺な固定ボルト342と、固定ボルト342に対して螺合される高さ調整ナット343と、固定ボルト342に取り付けられ、高さ調整ナット343の螺合位置を調整することで、高さ位置を変更可能に移動する移動ブラケット344と、固定ボルト342の上端に取り付けられ、移動ブラケット344の移動を規制する規制ナット345と、から主に構成されている。 As shown in Figures 10 and 12, the height adjustment member 340 is mainly composed of a fixed nut 341 provided on the bottom surface of the main body 310, a fixed bolt 342 that is long in the vertical direction and passes through the main body 310 (assembly hole 311) and is fixed to the fixed nut 341, a height adjustment nut 343 that is screwed onto the fixed bolt 342, a movable bracket 344 that is attached to the fixed bolt 342 and can be moved to change the height position by adjusting the screwing position of the height adjustment nut 343, and a restricting nut 345 that is attached to the upper end of the fixed bolt 342 and restricts the movement of the movable bracket 344.

移動ブラケット344は、固定ボルト342を挿通させた状態で、上下方向において規制ナット345と高さ調整ナット343の間に配置されており、高さ調整ナット343によって下方から支持されている。すなわち、高さ調整ナット343の上面に当接している。
詳しく述べると、移動ブラケット344は、規制ナット345及び高さ調整ナット343の間に配置され、固定ボルト342を挿通可能な第1中空部344aと、高さ調整ナット343及び本体部310の間に配置され、固定ボルト342を挿通可能な第2中空部344bと、第1中空部344a及び第2中空部344bの外側面に取り付けられ、保持部330を取り付けるための連結部344cと、を有している。
The movable bracket 344 is disposed between the restricting nut 345 and the height adjusting nut 343 in the vertical direction with the fixing bolt 342 inserted therethrough, and is supported from below by the height adjusting nut 343. In other words, the movable bracket 344 abuts against the upper surface of the height adjusting nut 343.
In detail, the movable bracket 344 has a first hollow portion 344a arranged between the regulating nut 345 and the height adjustment nut 343, through which the fixing bolt 342 can be inserted, a second hollow portion 344b arranged between the height adjustment nut 343 and the main body portion 310, through which the fixing bolt 342 can be inserted, and a connecting portion 344c attached to the outer surfaces of the first hollow portion 344a and the second hollow portion 344b for attaching the retaining portion 330.

上記構成において、固定ボルト342に対する高さ調整ナット343の螺合位置を調整することで、移動ブラケット344が、高さ調整ナット343の螺合位置に応じた高さ位置に移動することができる。その結果、移動ブラケット344に取り付けられた保持部330が昇降することができる。
なお、移動ブラケット344(第1中空部344a)が規制ナット345に当接したときの高さ位置が、保持部330が最も上昇した高さ位置(最上昇位置)となる。
また、移動ブラケット344(第2中空部344b)が本体部310に当接したときの高さ位置が、保持部330が最も下降した高さ位置(最下降位置)となる。
In the above configuration, by adjusting the screwing position of the height adjustment nut 343 relative to the fixing bolt 342, the movable bracket 344 can be moved to a height position corresponding to the screwing position of the height adjustment nut 343. As a result, the holding part 330 attached to the movable bracket 344 can be raised and lowered.
The height position when the moving bracket 344 (first hollow portion 344a) abuts against the restricting nut 345 is the height position (maximum raised position) at which the holding portion 330 is raised to the highest position.
Furthermore, the height position when the moving bracket 344 (second hollow portion 344b) abuts against the main body portion 310 is the height position (lowest position) to which the holding portion 330 is lowered to the lowest.

上記構成により、図2に示すように、移動用治具300は、内装ユニットUのベースフレームU2に対して着脱可能に取り付けられ、脚部材U3を床Fからやや浮かせた状態で内装ユニットUを保持したまま移動することができ、また、ジャッキのように内装ユニットUの高さ位置を調整することができる。 As shown in FIG. 2, with the above configuration, the moving jig 300 is removably attached to the base frame U2 of the interior unit U, and can move the interior unit U while holding it with the leg member U3 slightly raised above the floor F, and can also adjust the height position of the interior unit U like a jack.

<移動用治具を用いた施工方法>
次に、吊り天秤100、吊り治具200、移動用治具300を用いた内装ユニットUの施工方法について、図14に基づいて説明する。
まずは、作業者(例えば、メーカー施工者)が、内装ユニットUを事前に組み立てる「ユニット組み立て工程」(ステップS1)から始まる。
<Construction method using a moving jig>
Next, a method for constructing the interior unit U using the hoist 100, the hoisting jig 200, and the moving jig 300 will be described with reference to FIG.
First, the process begins with a "unit assembly process" (step S1) in which a worker (e.g., a manufacturer's installer) assembles the interior unit U in advance.

その後、作業者が、組み立てられた内装ユニットUを施工現場へ搬入する「ユニット搬入工程」を行う(ステップS2)。
このとき、内装ユニットUは、ユニットカバーU4によって被覆され、胴ベルト30を巻き付けた状態でトラックによって搬入される。
Thereafter, a worker carries in the assembled interior unit U to the construction site (step S2), which is called a "unit carrying-in process."
At this time, the interior unit U is covered with the unit cover U4 and transported by truck with the waist belt 30 wound around it.

その後、作業者が、搬入された内装ユニットUを吊り上げ装置Lに掛け止めされたスリング部材1によって吊り上げる「ユニット吊り上げ工程」を行う(ステップS3)。
詳しく述べると、ユニット吊り上げ工程では、図1に示すように、枠状に展開された吊り天秤100によって吊りスリング10及び支持スリング20の吊り位置を保持することと(ステップS3-1)、内装ユニットUの脚部材U3に対して吊り治具200(掛け止め部220)を掛け止めすることと(ステップS3-2)、支持スリング20の下端部に対して吊り治具200(スリング取り付け部230)を取り付けることと(ステップS3-3)、を行った上で、内装ユニットUを吊り上げる(ステップS3-4)。
なお、ステップS3-1からステップS3-3までの作業については、いずれの順番で行われても良い。
Thereafter, a worker performs a "unit lifting process" in which the delivered interior unit U is lifted by the sling member 1 hooked to the lifting device L (step S3).
In detail, in the unit lifting process, as shown in FIG. 1, the lifting positions of the lifting sling 10 and the support sling 20 are maintained by the frame-shaped lifting balance 100 (step S3-1), the lifting jig 200 (hanging portion 220) is hung on the leg member U3 of the interior unit U (step S3-2), and the lifting jig 200 (sling mounting portion 230) is attached to the lower end of the support sling 20 (step S3-3), and then the interior unit U is lifted (step S3-4).
The steps S3-1 to S3-3 may be performed in any order.

その後、作業者が、吊り上げられた内装ユニットUを建物の躯体内部に床から浮かせた状態で仮置きする「ユニット仮置き工程」を行う(ステップS4)。
詳しく述べると、ユニット仮置き工程では、図2に示すように、内装ユニットUのベースフレームU2に対して移動用治具300を複数取り付けることと(ステップS4-1)、内装ユニットUを床から浮かせた状態で仮置きすることと(ステップS4-2)、内装ユニットUから吊り治具200を取り外すことと(ステップS4-3)、を行う。
なお、仮置きされた内装ユニットUは、例えば、工事の進捗状況に応じて所定の間、建物内部の別の位置に保管される。あるいは、内装ユニットUのメーカー施工者が到着するまでの間、建物内部の別の位置に保管される。
Thereafter, a worker performs a "unit temporary placement process" in which the lifted interior unit U is temporarily placed inside the building frame in a state where it is suspended above the floor (step S4).
More specifically, in the unit temporary placement process, as shown in FIG. 2, multiple moving jigs 300 are attached to the base frame U2 of the interior unit U (step S4-1), the interior unit U is temporarily placed in a state where it is suspended above the floor (step S4-2), and the hanging jig 200 is removed from the interior unit U (step S4-3).
The temporarily placed interior unit U is stored at another position inside the building for a predetermined period of time depending on the progress of the construction work, for example. Alternatively, the interior unit U is stored at another position inside the building until a manufacturer/constructor of the interior unit U arrives.

その後、作業者が、仮置きされた内装ユニットUを躯体内部の所定位置まで移動させる「ユニット移動工程」を行う(ステップS5)。
詳しく述べると、ユニット移動工程では、建物の躯体内部の所定位置まで内装ユニットUを移動させることと(ステップS5-1)、内装ユニットUから移動用治具300を取り外すことと(ステップS5-2)、を行う。
なお、図2に示すように、建物の躯体内部にある床F(パネル床F)の上面には、躯体に対し床Fを固定するための固定用穴F1が所定の間隔を空けて形成されている。そうすると、移動用治具300のキャスター部320が固定用穴F1内部に落下する虞がある。そのため、移動用治具300が固定用穴F1に落下する場合を想定して、移動用治具300が3つのキャスター部320を備えている。
Thereafter, a worker performs a "unit moving process" in which the temporarily placed interior unit U is moved to a predetermined position inside the framework (step S5).
More specifically, the unit moving process involves moving the interior unit U to a predetermined position inside the building frame (step S5-1) and removing the moving jig 300 from the interior unit U (step S5-2).
As shown in Fig. 2, fixing holes F1 for fixing the floor F to the building frame are formed at a predetermined interval on the upper surface of the floor F (panel floor F) inside the building frame. In this case, there is a risk that the caster part 320 of the moving jig 300 will fall into the fixing hole F1. Therefore, assuming that the moving jig 300 will fall into the fixing hole F1, the moving jig 300 is provided with three caster parts 320.

その後、作業者が、内装ユニットUを躯体内部の所定位置に設置する「ユニット設置工程」を行う(ステップS6)。
詳しく述べると、内装ユニットUの高さ合わせ及び位置調整を行い、内装ユニットUの脚部材U3を床F上に接着剤を用いて固定し、内装ユニットUの配管作業を行う。
上記ステップS6の工程を終えて、一連の作業工程を終了する。
Thereafter, a worker performs a "unit installation process" in which the interior unit U is installed at a predetermined position inside the framework (step S6).
More specifically, the height and position of the interior unit U are adjusted, the leg members U3 of the interior unit U are fixed onto the floor F using an adhesive, and the piping work for the interior unit U is performed.
When the above step S6 is completed, the series of work steps is completed.

上記施工方法であれば、工場で予め組み立てられた内装ユニットUを建物の躯体内部に好適に設置することが可能な施工方法を実現することができる。
特に、移動用治具300を用いることで、内装ユニットUを床から浮かせた状態で仮置きするとともに、内装ユニットUを好適に移動させることが可能となる。
The above construction method makes it possible to realize a construction method that enables the interior unit U preassembled in a factory to be suitably installed inside the framework of a building.
In particular, by using the moving jig 300, it is possible to temporarily place the interior unit U in a state where it is raised above the floor, and to move the interior unit U in an appropriate manner.

<その他の実施形態>
上記実施形態では、図2に示すように、移動用治具300は、内装ユニットUを仮置きし、また内装ユニットUを床上で移動させる際に用いられるが、特に限定されることなく変更可能である。
例えば、箱状の重量物を仮置きし、移動させる際に用いられても良いし、重量物以外の吊り対象物を仮置きし、移動させる際に用いられても良い。
<Other embodiments>
In the above embodiment, as shown in FIG. 2, the moving jig 300 is used to temporarily place the interior unit U and to move the interior unit U on the floor, but this can be modified without being particularly limited.
For example, it may be used when temporarily placing and moving a heavy box-like object, or when temporarily placing and moving a suspended object other than a heavy object.

上記実施形態では、図10に示すように、移動用治具300が、3つのキャスター部320を備えているが、特に限定されることなく変更可能である。
例えば、よりコンパクトな形状にすべく、移動用治具300が1つのキャスター部320を備えた構成としても良い。
また例えば、建物内の床(パネル床)上を好適に移動させるべく、移動用治具300が4つ以上のキャスター部320を備えていても良い。
In the above embodiment, as shown in FIG. 10, the moving jig 300 includes three caster parts 320, but this is not particularly limited and can be modified.
For example, in order to achieve a more compact shape, the moving jig 300 may be configured to include a single caster portion 320 .
Also, for example, the moving jig 300 may be provided with four or more caster parts 320 in order to facilitate movement on a floor (panel floor) within a building.

上記実施形態では、図12に示すように、移動用治具300が、固定ボルト342及び高さ調整ナット343から構成される高さ調整手段を備えているが、当該高さ調整手段について特に限定されることなく変更可能である。
例えば、高さ調整部材340が、上下方向に間隔を空けて形成された複数の係合凹部を外側面に有し、上下方向に長尺なベース部と、係合凹部に係合可能な係合凸部を有し、ベース部に対して上下方向に移動(スライド移動)するスライド部と、から構成されても良い。そうすれば、所定の係合凹部に係合凸部を係合させることで、スライド部の高さ位置を変更し、スライド部に取り付けられた保持部の高さ位置を変更することができる。
そのほか、公知な組み付け構造からなる高さ調整手段を採用しても良い。
In the above embodiment, as shown in FIG. 12, the moving jig 300 is provided with a height adjustment means composed of a fixing bolt 342 and a height adjustment nut 343, but the height adjustment means can be modified without any particular limitation.
For example, the height adjustment member 340 may be composed of a base portion having a plurality of engagement recesses formed at intervals in the vertical direction on its outer surface and elongated in the vertical direction, and a slide portion having engagement protrusions that can engage with the engagement recesses and that moves (slides) in the vertical direction relative to the base portion. In this way, by engaging the engagement protrusions with predetermined engagement recesses, the height position of the slide portion can be changed, and the height position of the holding portion attached to the slide portion can be changed.
Alternatively, a height adjustment means having a known assembly structure may be used.

上記実施形態では、主として本発明に係る移動用治具及び移動用治具を備えた施工方法に関して説明した。
ただし、上記の実施形態は、本発明の理解を容易にするための一例に過ぎず、本発明を限定するものではない。本発明は、その趣旨を逸脱することなく、変更、改良され得ると共に、本発明にはその等価物が含まれることは勿論である。
In the above embodiment, the moving jig and the construction method including the moving jig according to the present invention have been mainly described.
However, the above embodiment is merely an example for facilitating understanding of the present invention, and does not limit the present invention. The present invention can be modified and improved without departing from the spirit of the present invention, and the present invention naturally includes equivalents thereof.

S 施工システム
U 内装ユニット
U1 ユニット本体
U2 ベースフレーム
U2c、U2d 締結穴
U3 脚部材
U4 ユニットカバー
U4a カバー開閉部
1 スリング部材
10 吊りスリング
11、12 環状部
20 支持スリング
21、22 環状部
23 べろ部
30 胴ベルト
100 吊り天秤
110(110A、110B) 長尺部材
111 本体部
112 スリング取り付け部
113 連結穴
114 スリング取り付け穴
120(120A、120B) 連結部材
121 本体部
122 第1屈曲部
123 第2屈曲部
124 抜け防止部
125 第1突起部
126 第2突起部
200 吊り治具
210 治具本体部
211 上壁部
212 底壁部
213 連結壁部
214 突出壁部
214a 第1突出壁部
214b 第2突出壁部
220 掛け止め部
220A 第1掛け止め部
220B 第2掛け止め部
221 第1溝部
222 第2溝部
223 移動部材
223a 回動軸
223b 移動フック
223c 付勢バネ
230 スリング取り付け部
240 第1弾性部材
250 第2弾性部材
300 移動用治具
310 本体部
311 組み付け穴
312 取り付け穴
313 逃げ穴
320 キャスター部
320A 第1キャスター部
320B 第2キャスター部
320C 第3キャスター部
321 キャスター軸
322 キャスター本体
323 車軸
324 車輪
330 保持部
331 側壁部
332 上壁部
333 底壁部
334、335 締結穴
336 締結ボルト
340 高さ調整部材
341 固定ナット
342 固定ボルト
343 高さ調整ナット
344 移動ブラケット
344a 第1中空部
344b 第2中空部
344c 連結部
345 規制ナット
L 吊り上げ装置
L1 吊り上げ部
F 床(パネル床)
F1 固定用穴
S Construction system U Interior unit U1 Unit body U2 Base frame U2c, U2d Fastening hole U3 Leg member U4 Unit cover U4a Cover opening/closing section 1 Sling member 10 Suspension sling 11, 12 Annular section 20 Support sling 21, 22 Annular section 23 Tongue section 30 Waist belt 100 Suspension balance 110 (110A, 110B) Long member 111 Main body 112 Sling attachment section 113 Connection hole 114 Sling attachment hole 120 (120A, 120B) Connection member 121 Main body 122 First bent section 123 Second bent section 124 Slip-out prevention section 125 First protrusion 126 Second protrusion 200 Suspension jig 210 Jig main body 211 Upper wall section 212 Bottom wall section 213 Connection wall section 214 Protruding wall section 214a First protruding wall portion 214b Second protruding wall portion 220 Hook portion 220A First hook portion 220B Second hook portion 221 First groove portion 222 Second groove portion 223 Moving member 223a Rotating shaft 223b Moving hook 223c Urging spring 230 Sling mounting portion 240 First elastic member 250 Second elastic member 300 Moving jig 310 Main body portion 311 Assembly hole 312 Mounting hole 313 Relief hole 320 Caster portion 320A First caster portion 320B Second caster portion 320C Third caster portion 321 Caster shaft 322 Caster main body 323 Axle 324 Wheel 330 Holding portion 331 Side wall portion 332 Upper wall portion 333 Bottom wall portion 334, 335 Fastening hole 336 Fastening bolt 340 Height adjustment member 341 Fixing nut 342 Fixing bolt 343 Height adjustment nut 344 Moving bracket 344a First hollow portion 344b Second hollow portion 344c Connection portion 345 Restriction nut L Lifting device L1 Lifting portion F Floor (panel floor)
F1 Fixing hole

Claims (7)

重量物を床上で移動させるための移動用治具であって、
該移動用治具の本体となる本体部と、
該本体部よりも下方位置に設けられ、床上を移動するためのキャスター部と、
前記本体部よりも上方位置に設けられ、前記重量物に設けられた被保持部を側方から保持するための保持部と、
前記本体部と前記保持部を連結し、前記本体部に対して前記保持部の高さ位置を変更可能な状態で取り付けられる高さ調整部材と、を備え、
前記保持部は、前記重量物の底部に設けられた前記被保持部を側方から挟み込むように保持し、
前記高さ調整部材は、前記本体部の中央部分に配置され、
前記キャスター部は、前記高さ調整部材を囲むように複数設けられていることを特徴とする移動用治具。
A moving tool for moving a heavy object on a floor,
A main body portion that serves as a main body of the moving jig;
A caster unit provided below the main body for moving the device on a floor;
a holding portion provided at a position above the main body portion and configured to hold a held portion provided on the heavy object from a side;
a height adjustment member that connects the main body and the holding portion and is attached in a state in which a height position of the holding portion can be changed with respect to the main body,
The holding portion holds the held portion provided on the bottom of the heavy object so as to sandwich the held portion from the side,
The height adjustment member is disposed in a central portion of the main body,
The moving jig is characterized in that the caster portion is provided in plurality so as to surround the height adjustment member.
重量物を床上で移動させるための移動用治具であって、
該移動用治具の本体となる本体部と、
該本体部よりも下方位置に設けられ、床上を移動するためのキャスター部と、
前記本体部よりも上方位置に設けられ、前記重量物に設けられた被保持部を側方から保持するための保持部と、
前記本体部と前記保持部を連結し、前記本体部に対して前記保持部の高さ位置を変更可能な状態で取り付けられる高さ調整部材と、を備え、
前記高さ調整部材は、前記本体部の中央部分に配置され、
前記本体部のうち、前記保持部と上下方向で重なる部分には、前記保持部との干渉を避けるための逃げ穴が形成されていることを特徴とする移動用治具。
A moving tool for moving a heavy object on a floor,
A main body portion that serves as a main body of the moving jig;
A caster unit provided below the main body for moving the device on a floor;
a holding portion provided at a position above the main body portion and configured to hold a held portion provided on the heavy object from a side;
a height adjustment member that connects the main body and the holding portion and is attached in a state in which a height position of the holding portion can be changed with respect to the main body,
The height adjustment member is disposed in a central portion of the main body,
A moving jig, characterized in that a relief hole is formed in a portion of the main body that overlaps with the holding portion in the vertical direction to avoid interference with the holding portion.
記保持部は、前記高さ調整部材の外側面側に取り付けられ、前記移動用治具の高さ方向とは直交する方向に延びている側壁部と、該側壁部の上端部及び下端部からそれぞれ前記高さ調整部材側とは反対側に突出している上壁部及び底壁部と、を有し、
前記保持部は、前記上壁部及び前記底壁部によって、前記重量物の底部に設けられた前記被保持部を上下方向で挟み込むように保持することを特徴とする請求項1又は2に記載の移動用治具。
the holding portion is attached to an outer surface side of the height adjustment member and has a side wall portion extending in a direction perpendicular to the height direction of the moving jig, and an upper wall portion and a bottom wall portion protruding from an upper end portion and a lower end portion of the side wall portion respectively to a side opposite to the height adjustment member side,
3. The moving jig according to claim 1 , wherein the holding portion holds the held portion provided on the bottom of the heavy object by vertically sandwiching the held portion with the upper wall portion and the bottom wall portion.
前記移動用治具は、前記重量物となる内装ユニットを移動させるための治具であって、
前記保持部は、前記内装ユニットの底面に設けられたベースフレームを側方から挟み込むように保持し、
前記高さ調整部材は、前記本体部の中央部分に配置され、
前記キャスター部は、前記高さ調整部材を囲むように複数設けられていることを特徴とする請求項1乃至3のいずれか一項に記載の移動用治具。
The moving jig is a jig for moving the interior unit which is the heavy object,
The holding portion holds a base frame provided on a bottom surface of the interior unit so as to sandwich the base frame from the side,
The height adjustment member is disposed in a central portion of the main body,
4. The moving jig according to claim 1, wherein a plurality of the casters are provided so as to surround the height adjustment member.
前記本体部は、プレート状の本体プレートであって、
前記キャスター部は、それぞれ前記本体プレートの角部又は角部周辺に取り付けられ、かつ、前記本体プレートの中央部分から等しい間隔を空けて3つ配置され、
前記保持部は、
互いに隣り合う第1キャスター部及び第2キャスター部の間に配置され、かつ、平面視において前記第1キャスター部と前記第2キャスター部を結ぶ仮想線上に配置され、
前記本体プレートの中央部分に対して第3キャスター部側とは反対側の位置に配置され、かつ、前記本体プレートの中央部分と前記第3キャスター部を結ぶ仮想線の延長上に配置されていることを特徴とする請求項4に記載の移動用治具。
The main body portion is a plate-shaped main body plate,
The caster parts are attached to the corners or periphery of the corners of the main plate, and three of them are arranged at equal intervals from the center of the main plate;
The holding portion is
The caster member is disposed between a first caster portion and a second caster portion adjacent to each other, and is disposed on a virtual line connecting the first caster portion and the second caster portion in a plan view,
The moving jig described in claim 4, characterized in that it is positioned on the opposite side of the central portion of the main body plate to the third caster portion, and is positioned on an extension of an imaginary line connecting the central portion of the main body plate and the third caster portion.
前記本体部は、プレート状の本体プレートであって、
前記高さ調整部材は、
前記本体プレートに設けられた組み付け穴を通じて組み付けられ、上下方向に長尺な固定ボルトと、該固定ボルトの軸部分に対して螺合される高さ調整ナットと、を有し、
該高さ調整ナットの螺合位置を調整することで、前記保持部の高さ位置を変更可能となるように構成されていることを特徴とする請求項4又は5に記載の移動用治具。
The main body portion is a plate-shaped main body plate,
The height adjustment member is
a fixing bolt that is long in the vertical direction and is assembled through an assembly hole provided in the main body plate, and a height adjustment nut that is screwed onto a shaft portion of the fixing bolt,
6. The moving jig according to claim 4, wherein the height of the holding portion can be changed by adjusting the screwing position of the height adjustment nut.
請求項1乃至6のいずれか1項に記載の移動用治具を用いた施工方法であって、
重量物となる内装ユニットを組み立てるユニット組み立て工程と、
組み立てられた前記内装ユニットを施工現場へ搬入するユニット搬入工程と、
搬入された前記内装ユニットを吊り上げ装置に掛け止めされたスリング部材によって吊り上げるユニット吊り上げ工程と、
吊り上げられた前記内装ユニットを建物の躯体内部に床から浮かせた状態で仮置きするユニット仮置き工程と、
仮置きされた前記内装ユニットを躯体内部の所定位置まで移動させるユニット移動工程と、
前記内装ユニットを躯体内部の所定位置に設置するユニット設置工程と、を含み、
前記ユニット仮置き工程では、前記内装ユニットの底面に設けられたベースフレームに対し前記移動用治具を複数取り付け、
前記ユニット移動工程では、躯体内部の所定位置まで移動させた前記内装ユニットから前記移動用治具を取り外すことを特徴とする移動用治具を用いた施工方法。
A construction method using the moving jig according to any one of claims 1 to 6,
A unit assembly process in which heavy interior units are assembled;
a unit delivery process of delivering the assembled interior unit to a construction site;
a unit lifting process of lifting the delivered interior unit by a sling member hooked to a lifting device;
a unit temporary placement process for temporarily placing the lifted interior unit inside the framework of the building in a state where the interior unit is suspended above the floor;
a unit moving process of moving the temporarily placed interior unit to a predetermined position inside the framework;
A unit installation process of installing the interior unit at a predetermined position inside the framework,
In the unit temporary placement step, a plurality of the moving jigs are attached to a base frame provided on a bottom surface of the interior unit,
The construction method using a moving jig, wherein the unit moving step comprises removing the moving jig from the interior unit which has been moved to a predetermined position inside the structure.
JP2020064231A 2020-03-31 2020-03-31 Mobile jig and construction method using the mobile jig Active JP7560265B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020064231A JP7560265B2 (en) 2020-03-31 2020-03-31 Mobile jig and construction method using the mobile jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020064231A JP7560265B2 (en) 2020-03-31 2020-03-31 Mobile jig and construction method using the mobile jig

Publications (2)

Publication Number Publication Date
JP2021161742A JP2021161742A (en) 2021-10-11
JP7560265B2 true JP7560265B2 (en) 2024-10-02

Family

ID=78002810

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020064231A Active JP7560265B2 (en) 2020-03-31 2020-03-31 Mobile jig and construction method using the mobile jig

Country Status (1)

Country Link
JP (1) JP7560265B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170370113A1 (en) 2015-08-14 2017-12-28 Oldcastle Light Building Products, LLC Attachment and support members for modular building structures
CN107962912A (en) 2017-11-09 2018-04-27 北京无线电测量研究所 A kind of caster device and the turntable comprising the caster device
JP2019019586A (en) 2017-07-19 2019-02-07 株式会社サトコウ Auxiliary equipment for suspension of building units

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS517651Y2 (en) * 1972-06-20 1976-03-01
JPS5724747A (en) * 1980-07-23 1982-02-09 Misawa Homes Co Installation of building unit
JPS5892387U (en) * 1981-12-11 1983-06-22 グンゼ株式会社 Knitting machine conveyance device
JPS59111762U (en) * 1983-01-20 1984-07-27 株式会社大林組 Heavy goods transport trolley for construction sites
JP2587052Y2 (en) * 1991-08-27 1998-12-14 東陶機器株式会社 Suspension structure of prefabricated building

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170370113A1 (en) 2015-08-14 2017-12-28 Oldcastle Light Building Products, LLC Attachment and support members for modular building structures
JP2019019586A (en) 2017-07-19 2019-02-07 株式会社サトコウ Auxiliary equipment for suspension of building units
CN107962912A (en) 2017-11-09 2018-04-27 北京无线电测量研究所 A kind of caster device and the turntable comprising the caster device

Also Published As

Publication number Publication date
JP2021161742A (en) 2021-10-11

Similar Documents

Publication Publication Date Title
KR200456006Y1 (en) Prefabricated gantry crane with girder reinforcement support
JP7464426B2 (en) Lifting jig and construction method using the lifting jig
JP2019128034A (en) Work bench and construction method using the same
JP7560265B2 (en) Mobile jig and construction method using the mobile jig
US3744837A (en) Pipe sling
JP7493979B2 (en) Hanging balance and construction method using the hanging balance
JP3232353U (en) Material handling vehicle
JP7634409B2 (en) Mobile jig and construction method using the mobile jig
JP4505433B2 (en) Work scaffold
JP2023047948A (en) Construction method using moving jigs and moving jigs
EP3533750B1 (en) Girder beam installation and removal system and method
JP2000063094A (en) Simple lifting conveyor
JP7201885B1 (en) Robot hanging jig, robot hanging jig set, and robot installation method
KR200486390Y1 (en) A folding hoist
JP3779510B2 (en) Heavy lifting
AU2007100972A4 (en) Improvements to transportable lifting devices
JPS6219667Y2 (en)
JP2002037589A (en) Device for hoisting underground installation and working method for hoisting underground installation
JP7274364B2 (en) Attachment/detachment jig for equipment movement
JP4666750B2 (en) Elevator unit assembly method and lifting device
KR20250043787A (en) Chain block portable support for hoist rail
TWM559882U (en) Hook fixing device for crane hookhead
JPH0748784Y2 (en) Heavy load reversing device
JPH11222378A (en) Hoisting accessory used for agricultural simple gate-shaped crane
JP3811419B2 (en) Building material lifting device and building material lifting method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230228

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20231129

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240109

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240308

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240625

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240821

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240903

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240919

R150 Certificate of patent or registration of utility model

Ref document number: 7560265

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150