JP2018172197A - Climbing crane mast, climbing crane and building construction method - Google Patents

Climbing crane mast, climbing crane and building construction method Download PDF

Info

Publication number
JP2018172197A
JP2018172197A JP2017071370A JP2017071370A JP2018172197A JP 2018172197 A JP2018172197 A JP 2018172197A JP 2017071370 A JP2017071370 A JP 2017071370A JP 2017071370 A JP2017071370 A JP 2017071370A JP 2018172197 A JP2018172197 A JP 2018172197A
Authority
JP
Japan
Prior art keywords
mast
building
crane
wall surface
fixing member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017071370A
Other languages
Japanese (ja)
Other versions
JP6953161B2 (en
Inventor
昌芳 野島
Masayoshi Nojima
昌芳 野島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kitagawa Corp
Original Assignee
Kitagawa Iron Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kitagawa Iron Works Co Ltd filed Critical Kitagawa Iron Works Co Ltd
Priority to JP2017071370A priority Critical patent/JP6953161B2/en
Publication of JP2018172197A publication Critical patent/JP2018172197A/en
Application granted granted Critical
Publication of JP6953161B2 publication Critical patent/JP6953161B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To construct a building at low cost in a short period of time.SOLUTION: A mast of a climbing crane includes a mast body 1 installed along an outer wall surface of a building whose height is extendible/contractible, a core base 2 supporting a lower part of the mast body 1, and a mast fixing member 3 being attached to be movable in a vertical direction along the mast body 1 and fixing the mast body 1 to the outer wall surface.SELECTED DRAWING: Figure 1

Description

本発明は、クライミングクレーンのマスト、クライミングクレーンおよび建築物の工法に関する。   The present invention relates to a climbing crane mast, a climbing crane, and a construction method of a building.

クライミングクレーンのクライミング方式は、フロアクライミング方式と、マストクライミング方式と、に大別される。フロアクライミング方式は、建築物の中央に形成した開口(「ダメ穴」と称される場合もある)にマストを通過させ、建築物の床の反力を利用してクレーン全体を上層階にせり上げていく方式である。   The climbing method of the climbing crane is roughly divided into a floor climbing method and a mast climbing method. In the floor climbing method, the mast is passed through an opening formed in the center of the building (sometimes called a “drilled hole”) and the entire crane is moved to the upper floor using the reaction force of the building floor. It is a method to raise.

より具体的には、まず、図5の(a)に示すように、建築物の最頂部にクレーンcを設置して昇降フレームを固定し、ベース架台bの基礎ボルトを開放する。次に、図5の(b)に示すように、昇降装置の油圧シリンダーを作動させてマストmを引き上げ、ベース架台bを途中階に固定する。次に、図5の(c)に示すように、昇降装置の油圧シリンダーを作動させて、クレーンcの旋回体部分をマストmの最上部までクライミングさせる。以上の図5の(a)〜(c)に示す各工程を必要回数繰り返し、図5の(d)に示すように建築物を建築していく。   More specifically, first, as shown in FIG. 5A, a crane c is installed at the top of the building to fix the lifting frame, and the base bolt of the base gantry b is released. Next, as shown in FIG. 5 (b), the hydraulic cylinder of the lifting device is operated to raise the mast m, and the base mount b is fixed to the middle floor. Next, as shown in FIG. 5 (c), the hydraulic cylinder of the lifting device is operated to climb the swivel part of the crane c to the top of the mast m. The steps shown in FIGS. 5A to 5C are repeated as many times as necessary, and a building is constructed as shown in FIG. 5D.

一方、マストクライミング方式は、地上にベース架台bを設置し、建築済みの階層における最頂部の位置に合せてマストmを順次継ぎ足しながらクレーンcの本体部分をせり上げていく方式である。より具体的には、例えば、図5の(e)に示すように、マストmを順次継ぎ足しながらクレーンcの本体部分をせり上げていく。   On the other hand, the mast climbing method is a method in which the base pedestal b is installed on the ground, and the main part of the crane c is lifted up while mast m is sequentially added in accordance with the position of the topmost part in the already constructed level. More specifically, for example, as shown in FIG. 5 (e), the main body portion of the crane c is lifted while the mast m is sequentially added.

しかしながら、上述したフロアクライミング方式では、建築物の中央に開口を形成する必要があり、この開口をクレーンが上昇した後で塞ぐ必要があり、クレーン解体時にはクライミングクレーンのクレーン本体とは別に該クレーン本体を解体するための解体用のクレーンを組み立てる必要があるため、建築物の工期が延びてしまうという問題点がある。   However, in the above-mentioned floor climbing method, it is necessary to form an opening in the center of the building, and it is necessary to close this opening after the crane has been lifted. Since it is necessary to assemble a crane for dismantling the building, there is a problem that the construction period of the building is extended.

一方、建築物の外側にマストを立てるマストクライミング方式では、建築物の最上階にクレーンが届く高さまでのマストの継ぎ足しが必要となるので、建築費用が嵩むという問題点がある。   On the other hand, in the mast climbing system in which a mast is set up outside the building, it is necessary to add the mast up to a height at which the crane reaches the top floor of the building, which increases the construction cost.

本発明は、以上の問題点に鑑みて為されたものであり、その目的は、建築物を短期間かつ低コストで建築することができるクライミングクレーンのマストなどを提供することにある。   The present invention has been made in view of the above problems, and an object of the present invention is to provide a climbing crane mast capable of building a building in a short period of time and at a low cost.

上記の課題を解決するために、本発明の一態様に係るクライミングクレーンのマストは、建築物の外壁面に沿って設置され、自身の高さを伸縮可能なマスト本体と、上記マスト本体の下部を支えるコアベースと、上記マスト本体に沿って上下方向に移動可能に取り付けられ、上記マスト本体を上記外壁面に固定するマスト固定部材と、を備えることを特徴としている。   In order to solve the above problems, a mast of a climbing crane according to one aspect of the present invention is installed along an outer wall surface of a building and can expand and contract its own height, and a lower portion of the mast body And a mast fixing member attached to the mast body so as to be movable in the vertical direction and fixing the mast body to the outer wall surface.

上記構成によれば、マスト本体は、建築物の外壁面に沿って設置される。このため、建築物の中央に開口を形成する必要がない。また、上記構成によれば、コアベースおよびマスト固定部材の固定位置を下方に移動させることで、クレーン本体の設置位置を下方に変更させることが可能となる。これにより、建築物の完成時に、クレーン本体をそのまま建築物の外壁面に沿って地上に降下させることが可能であるため、クレーン本体とは別に該クレーン本体を解体するための解体用のクレーンを組立てる必要がない。このため、建築物を短期間で建築することができる。   According to the said structure, a mast main body is installed along the outer wall surface of a building. For this reason, it is not necessary to form an opening in the center of the building. Moreover, according to the said structure, it becomes possible to change the installation position of a crane main body by moving the fixing position of a core base and a mast fixing member below. As a result, when the building is completed, the crane body can be lowered to the ground along the outer wall surface of the building as it is. Therefore, a dismantling crane for disassembling the crane body separately from the crane body is provided. There is no need to assemble. For this reason, a building can be constructed in a short period of time.

また、上記構成によれば、マスト本体は、自身の高さを伸縮させることが可能になっている。これにより、コアベースおよびマスト固定部材の上方への移動と、マスト本体の伸縮とを繰り返すことで、クレーン本体を建築物の上層階にせり上げていくことができる。このため、建築物の最上階にクレーンが届く高さから地上までの全長においてマストが存在するようにマストを継ぎ足すことは不要となる。これにより、建築物を低コストで建築することができる。以上により、本発明の一態様に係るクライミングクレーンのマストによれば、建築物を短期間かつ低コストで建築することができる。   Moreover, according to the said structure, the mast main body can be expanded-contracted now. Thereby, the crane main body can be raised to the upper floor of the building by repeating the upward movement of the core base and the mast fixing member and the expansion and contraction of the mast main body. For this reason, it is not necessary to add the mast so that the mast exists in the entire length from the height at which the crane reaches the top floor of the building to the ground. Thereby, a building can be constructed at low cost. As described above, according to the climbing crane mast according to one aspect of the present invention, a building can be constructed in a short period of time and at a low cost.

また、本発明の一態様に係るクライミングクレーンのマストは、上記マスト固定部材が、当該マスト固定部材に対して上下方向に移動可能であり、当該マスト固定部材を上記外壁面に固定するマストバンドを備えていても良い。上記構成によれば、マストバンドは、マスト固定部材に対して上下方向に移動可能になっている。このため、水平方向の応力に対して鉛直方向に沿って弱い部分と強い部分とのムラがマスト本体にあるような場合でも、マスト固定部材に対するマストバンドの位置を調整することで、マスト本体の水平方向の応力に対して強い部分を用いて外壁面にマスト本体を固定することが可能になる。   Further, the mast of the climbing crane according to one aspect of the present invention includes a mast band for fixing the mast fixing member to the outer wall surface, wherein the mast fixing member is movable in the vertical direction with respect to the mast fixing member. You may have. According to the said structure, the mast band can move to an up-down direction with respect to a mast fixing member. For this reason, even when the mast body has unevenness between the weak part and the strong part along the vertical direction with respect to the stress in the horizontal direction, by adjusting the position of the mast band with respect to the mast fixing member, It becomes possible to fix the mast body to the outer wall surface using a portion that is strong against the stress in the horizontal direction.

また、本発明の一態様に係るクライミングクレーンは、上記マストを備えることが好ましい。上記構成によれば、建築物を短期間かつ低コストで建築することができるクライミングクレーンを実現できる。   Moreover, it is preferable that the climbing crane which concerns on 1 aspect of this invention is provided with the said mast. According to the said structure, the climbing crane which can build a building for a short time and low cost is realizable.

また、本発明の一態様に係る建築物の工法は、建築物の外壁面に沿って設置され、自身の高さを伸縮可能なマスト本体と、上記マスト本体の下部を支えるコアベースと、上記マスト本体に沿って上下方向に移動可能に取り付けられ、上記マスト本体を上記外壁面に固定するマスト固定部材と、上記マスト本体の上部に設置されたクレーン本体と、を備えるクライミングクレーンを用いる建築物の工法であって、建築物において建築済みの階層に係る外壁面に、上記コアベースおよび上記マスト固定部材を固定した後、上記マスト本体を伸長させることにより、上記クレーン本体を上方に移動させることを特徴としている。   A construction method for a building according to an aspect of the present invention includes a mast body that is installed along an outer wall surface of the building and that can expand and contract its own height, a core base that supports a lower portion of the mast body, and A building using a climbing crane that is movably mounted in a vertical direction along the mast body and includes a mast fixing member that fixes the mast body to the outer wall surface, and a crane body installed on the upper part of the mast body. In the construction method, after fixing the core base and the mast fixing member to the outer wall surface related to the already constructed level in the building, the crane body is moved upward by extending the mast body. It is characterized by.

上記方法では、マスト本体は、建築物の外壁面に沿って設置される。このため、建築物の中央に開口を形成する必要がない。また、上記方法では、コアベースおよびマスト固定部材の固定位置を下方に移動させることで、クレーン本体の設置位置を下方に変更させることが可能となる。これにより、建築物の完成時に、クレーン本体をそのまま建築物の外壁面に沿って地上に降下させることが可能であるため、クレーン本体とは別に該クレーン本体を解体するための解体用のクレーンを組立てる必要がない。このため、建築物を短期間で建築することができる。   In the said method, a mast main body is installed along the outer wall surface of a building. For this reason, it is not necessary to form an opening in the center of the building. Moreover, in the said method, it becomes possible to change the installation position of a crane main body by moving the fixing position of a core base and a mast fixing member below. As a result, when the building is completed, the crane body can be lowered to the ground along the outer wall surface of the building as it is. Therefore, a dismantling crane for disassembling the crane body separately from the crane body is provided. There is no need to assemble. For this reason, a building can be constructed in a short period of time.

また、上記方法では、建築物において建築済みの階層に係る外壁面に、コアベースおよびマスト固定部材を固定した後、マスト本体を伸長させることにより、クレーン本体を上方に移動させることが可能になっている。これにより、コアベースおよびマスト固定部材の上方への移動と、マスト本体の伸縮とを繰り返すことで、クレーン本体を建築物の上層階にせり上げることができる。このため、建築物の最上階にクレーンが届く高さから地上までの全長においてマストが存在するようにマストを継ぎ足すことは不要となる。これにより、建築物を低コストで建築することができる。以上により、本発明の一態様に係る建築物の工法によれば、建築物を短期間かつ低コストで建築することができる。   In the above method, the crane base can be moved upward by extending the mast body after fixing the core base and the mast fixing member to the outer wall surface related to the already constructed level in the building. ing. Thereby, a crane main body can be lifted to the upper floor of a building by repeating upward movement of a core base and a mast fixing member, and expansion and contraction of a mast main body. For this reason, it is not necessary to add the mast so that the mast exists in the entire length from the height at which the crane reaches the top floor of the building to the ground. Thereby, a building can be constructed at low cost. As described above, according to the building construction method according to one aspect of the present invention, a building can be constructed in a short period of time and at a low cost.

本発明の一態様に係るクライミングクレーンのマストによれば、建築物を短期間かつ低コストで建築することができるという効果を奏する。   According to the climbing crane mast according to the aspect of the present invention, there is an effect that a building can be constructed in a short period of time and at low cost.

本発明の実施の一形態に係るタワークレーンの構造を示す側面図である。It is a side view which shows the structure of the tower crane which concerns on one Embodiment of this invention. 本発明の実施の一形態に係る建築物の工法(前半部)を説明するための図である。It is a figure for demonstrating the construction method (first half part) of the building which concerns on one Embodiment of this invention. 上記建築物の工法(後半部)を説明するための図である。It is a figure for demonstrating the construction method (second half part) of the said building. (a)は、ベル受け架台の構造を示す上面図であり、(b)は、マストバンドの構造を示す上面図であり、(c)は、伸縮架台の構造を示す上面図であり、(d)は、コアベースおよびベース脚の構造を示す上面図である。(A) is a top view which shows the structure of a bell receiving stand, (b) is a top view which shows the structure of a mast band, (c) is a top view which shows the structure of a telescopic mount, d) is a top view showing a structure of a core base and a base leg. (a)は、従来のフロアクライミング方式の工法を説明するための図であり、(b)は、従来のマストクライミング方式の工法を説明するための図である。(A) is a figure for demonstrating the construction method of the conventional floor climbing system, (b) is a figure for demonstrating the construction method of the conventional mast climbing system.

本発明の実施の形態について図1〜図4に基づいて説明すれば、次の通りである。以下、説明の便宜上、ある項目にて説明した構成と同一の機能を有する構成については、他の項目においても同一の符号を付記し、その説明を省略する場合がある。   The embodiment of the present invention will be described with reference to FIGS. Hereinafter, for convenience of explanation, components having the same functions as those described in a certain item may be denoted by the same reference numerals in other items, and the description thereof may be omitted.

〔タワークレーンの構造〕
図1は、本発明の実施の一形態に係るタワークレーン(クライミングクレーン)10の構造を示す側面図である。同図に示すようにタワークレーン10は、マスト本体1、コアベース2、マスト固定部材3、伸縮架台4、電動チェーンブロック5、ベル受け架台6、およびクレーン本体7を備える。
[Structure of tower crane]
FIG. 1 is a side view showing a structure of a tower crane (climbing crane) 10 according to an embodiment of the present invention. As shown in FIG. 1, the tower crane 10 includes a mast main body 1, a core base 2, a mast fixing member 3, a telescopic base 4, an electric chain block 5, a bell receiving base 6, and a crane main body 7.

タワークレーン10は、建築物の高さの増加に伴ってそれ自身の機構によってクライミングを行うクライミングクレーンである。マスト本体1は、タワークレーン10を支える柱であり、建築物BLの外壁面に沿って設置され、自身の高さを伸縮することが可能になっている。マスト本体1を伸縮させる方法としては、例えば、マストを継ぎ足しして伸縮させる方法が考えられる。その他、マスト本体1に上部昇降フレームと、下部昇降フレームとを設け、上部昇降フレームと下部昇降フレームとの間をメインシリンダー(油圧シリンダー)で接続することでマスト本体1を伸縮可能とする方法が考えられる。   The tower crane 10 is a climbing crane that performs climbing by its own mechanism as the height of the building increases. The mast main body 1 is a pillar that supports the tower crane 10 and is installed along the outer wall surface of the building BL, and can expand and contract its own height. As a method of expanding and contracting the mast body 1, for example, a method of expanding and contracting by adding a mast can be considered. In addition, there is a method in which an upper elevating frame and a lower elevating frame are provided on the mast main body 1 and the mast main body 1 can be expanded and contracted by connecting the upper elevating frame and the lower elevating frame with a main cylinder (hydraulic cylinder). Conceivable.

コアベース2は、マスト本体1の下部を支えるための架台であり、複数のベース脚2aを有している。マスト固定部材3は、マスト本体1を包囲する形状であり、マスト本体1に沿って上下方向に移動可能に取り付けられ、マスト本体1を建築物BLの外壁面に固定する部材である。マスト固定部材3は、マスト支え3aおよびマストバンド3bを備えている。マスト支え3aは、クレーン稼働時の水平力を支えるものであり、マスト本体1に対して上下方向に自由に移動することが可能になっている。   The core base 2 is a frame for supporting the lower part of the mast body 1 and has a plurality of base legs 2a. The mast fixing member 3 has a shape surrounding the mast main body 1 and is attached to the mast main body 1 so as to be movable in the vertical direction, and is a member that fixes the mast main body 1 to the outer wall surface of the building BL. The mast fixing member 3 includes a mast support 3a and a mast band 3b. The mast support 3a supports a horizontal force when the crane is operating, and can move freely in the vertical direction with respect to the mast body 1.

マストバンド3bは、マスト固定部材3(マスト支え3a)に対して上下方向に移動可能であり、マスト支え3aを外壁面に固定するものである。上記構成によれば、マストバンド3bは、マスト固定部材3(マスト支え3a)に対して上下方向に移動可能になっている。このため、水平方向の応力に対して鉛直方向に沿って弱い部分と強い部分とのムラがマスト本体1にあるような場合でも、マスト固定部材3に対するマストバンド3bの位置を調整することで、マスト本体1の水平方向の応力に対して強い部分を用いて外壁面にマスト本体1を固定することが可能になる。なお、本実施形態のマストバンド3bを備える形態は、マスト本体1がトラスまたはラティス構造などの場合に、有効な形態であるが、マスト本体1が水平方向の応力に対する強さに鉛直方向に沿ってムラがない構造の場合には、マストバンド3bを必ずしも備える必要はない。   The mast band 3b is movable in the vertical direction with respect to the mast fixing member 3 (mast support 3a), and fixes the mast support 3a to the outer wall surface. According to the said structure, the mast band 3b can move to an up-down direction with respect to the mast fixing member 3 (mast support 3a). For this reason, by adjusting the position of the mast band 3b relative to the mast fixing member 3 even when the mast body 1 has unevenness between the weak part and the strong part along the vertical direction with respect to the stress in the horizontal direction, It becomes possible to fix the mast main body 1 to the outer wall surface using a portion strong against the horizontal stress of the mast main body 1. In addition, although the form provided with the mast band 3b of this embodiment is an effective form when the mast main body 1 is a truss or a lattice structure, etc., the mast main body 1 follows a vertical direction to the strength with respect to the stress of a horizontal direction. In the case of a structure having no unevenness, the mast band 3b is not necessarily provided.

伸縮架台4(または折り畳み架台、もしくは取付け架台)は、マスト本体1と建築物BLとの間に設置され、マスト本体1の延伸方向に対して略垂直な方向に伸縮可能な架台であり、タワークレーン10の鉛直荷重と水平力を支えるものである。   The telescopic gantry 4 (or the folding gantry or the mounting gantry) is a gantry that is installed between the mast main body 1 and the building BL, and can extend and contract in a direction substantially perpendicular to the extending direction of the mast main body 1. It supports the vertical load and horizontal force of the crane 10.

電動チェーンブロック5は、マスト支え3aに接続されたチェーン5aを巻き上げたり、伸ばしたりすることでマスト支え3a(マスト固定部材3)を上下方向に移動可能させるものである。なお、本実施形態では、マスト支え3aを上下方向に移動させるのに、電動チェーンブロック5を用いる形態について説明したが、この他、シリンダーやラック、ワイヤ等を使用してマスト支え3aを上下方向に移動させても良い。   The electric chain block 5 is configured to move the mast support 3a (mast fixing member 3) in the vertical direction by winding up or extending the chain 5a connected to the mast support 3a. In the present embodiment, the mode in which the electric chain block 5 is used to move the mast support 3a in the vertical direction has been described. However, in addition, the mast support 3a is moved in the vertical direction using a cylinder, a rack, a wire, or the like. It may be moved to.

ベル受け架台6は、クレーンのクライミング時にクレーン本体7を建築物に支持させるための架台であり、クレーンのクライミング時に鉛直荷重と水平力を支えるものである。クレーン本体7は、マスト本体1の頂部に設けられ、ジブ、巻き上げ装置および旋回装置などを備えている。   The bell receiving frame 6 is a frame for supporting the crane body 7 on the building when the crane is climbed, and supports vertical load and horizontal force when the crane is climbed. The crane body 7 is provided at the top of the mast body 1 and includes a jib, a hoisting device, a turning device, and the like.

上記構成によれば、マスト本体1は、建築物BLの外壁面に沿って設置される。このため、建築物BLの中央に開口を形成する必要がない。また、上記構成によれば、コアベース2およびマスト固定部材3の固定位置を下方に移動させることで、クレーン本体7の設置位置を下方に変更させることが可能となる。これにより、建築物BLの完成時に、クレーン本体7をそのまま建築物BLの外壁面に沿って地上に降下させることが可能であるため、クレーン本体7とは別にクレーン本体7を解体するための解体用のクレーンを組立てる必要がない。このため、建築物BLを短期間で建築することができる。   According to the said structure, the mast main body 1 is installed along the outer wall surface of the building BL. For this reason, it is not necessary to form an opening in the center of the building BL. Moreover, according to the said structure, it becomes possible to change the installation position of the crane main body 7 below by moving the fixing position of the core base 2 and the mast fixing member 3 below. Thus, when the building BL is completed, the crane body 7 can be lowered as it is along the outer wall surface of the building BL, so that the crane body 7 is disassembled separately from the crane body 7. There is no need to assemble a special crane. For this reason, the building BL can be constructed in a short period of time.

また、上記構成によれば、マスト本体1は、自身の高さを伸縮させることが可能になっている。これにより、コアベース2およびマスト固定部材3の上方への移動と、マスト本体1の伸縮とを繰り返すことで、クレーン本体7を建築物BLの上層階にせり上げていくことができる。このため、建築物BLの最上階にクレーンが届く高さから地上までの全長においてマストが存在するようにマストを継ぎ足すことは不要となる。これにより、建築物BLを低コストで建築することができる。以上により、タワークレーン10(または、そのマスト)によれば、建築物BLを短期間かつ低コストで建築することができる。   Moreover, according to the said structure, the mast main body 1 can expand-contract its own height. Thereby, the crane main body 7 can be raised to the upper floor of the building BL by repeating the upward movement of the core base 2 and the mast fixing member 3 and the expansion and contraction of the mast main body 1. For this reason, it is not necessary to add the mast so that the mast exists in the entire length from the height at which the crane reaches the top floor of the building BL to the ground. Thereby, building BL can be constructed at low cost. As described above, according to the tower crane 10 (or its mast), the building BL can be constructed in a short period of time and at a low cost.

〔タワークレーンを用いる建築物の工法について〕
上述した構造のタワークレーン10を用いる建築物の工法では、建築物において建築済みの階層に係る外壁面に、コアベース2およびマスト固定部材3を固定した後、マスト本体1を伸長させることにより、クレーン本体7を上方に移動させる。これにより、コアベース2およびマスト固定部材3の上方への移動と、マスト本体1の伸縮とを繰り返すことで、クレーン本体7を建築物BLの上層階にせり上げることができる。このため、建築物BLの最上階にクレーンが届く高さから地上までの全長においてマストが存在するようにマストを継ぎ足すことは不要となる。これにより、建築物BLを低コストで建築することができる。
[Construction methods for buildings using tower cranes]
In the construction method of the building using the tower crane 10 having the above-described structure, by fixing the core base 2 and the mast fixing member 3 to the outer wall surface related to the already constructed level in the building, the mast main body 1 is extended, The crane body 7 is moved upward. Thereby, the crane main body 7 can be raised to the upper floor of the building BL by repeating the upward movement of the core base 2 and the mast fixing member 3 and the expansion and contraction of the mast main body 1. For this reason, it is not necessary to add the mast so that the mast exists in the entire length from the height at which the crane reaches the top floor of the building BL to the ground. Thereby, building BL can be constructed at low cost.

次に、図2および図3に基づき、タワークレーン10を用いる建築物の工法をより具体的に説明する。まず、図2の(a)および(b)に示すように、電動チェーンブロック5を稼動させてチェーン5aを伸ばし、マスト固定部材3の位置を下方の建築済みの階層に係る外壁面の位置まで移動させる。次に、図2の(c)および(d)に示すように、マスト本体1を伸長させ、マストバンド3bを建築済みの階層に係る外壁面に固定する(マスト固定部材3を外壁面に固定する)。   Next, based on FIG. 2 and FIG. 3, the construction method of the building which uses the tower crane 10 is demonstrated more concretely. First, as shown in FIGS. 2 (a) and 2 (b), the electric chain block 5 is operated to extend the chain 5a, and the position of the mast fixing member 3 is lowered to the position of the outer wall surface related to the lower constructed level. Move. Next, as shown in FIGS. 2 (c) and 2 (d), the mast body 1 is extended and the mast band 3b is fixed to the outer wall surface according to the constructed level (the mast fixing member 3 is fixed to the outer wall surface). To do).

次に、建築物BLの上層階を建設した後、図3の(a)および(b)に示すように、電動チェーンブロック5を稼動させてチェーン5aを巻き上げ、マスト固定部材3の位置を上方に移動させ、マストバンド3bを建築済みの階層に係る外壁面に固定する(マスト固定部材3を外壁面に固定する)。   Next, after constructing the upper floor of the building BL, as shown in FIGS. 3A and 3B, the electric chain block 5 is operated to wind up the chain 5a, and the position of the mast fixing member 3 is moved upward. The mast band 3b is fixed to the outer wall surface related to the constructed level (the mast fixing member 3 is fixed to the outer wall surface).

次に、図3の(c)に示すように、コアベース2が伸縮架台4の位置に移動するように、マスト本体1を短縮させ、コアベース2を伸縮架台4に固定する。次に、図3の(d)に示すように、マスト本体1を伸長させ、クレーン本体7を上方に移動させる。   Next, as shown in FIG. 3C, the mast body 1 is shortened so that the core base 2 moves to the position of the extendable base 4, and the core base 2 is fixed to the extendable base 4. Next, as shown in FIG. 3D, the mast body 1 is extended and the crane body 7 is moved upward.

〔各種固定部材について〕
次に、図4に基づき、各種固定部材について説明する。図4の(a)は、ベル受け架台6の構造を示す上面図である。ベル受け架台6は、建設中の建築物の最上階に設置され、タワークレーン10を自らクライミング可能にするクレーン装置の一部を構成するものである。
[Various fixing members]
Next, various fixing members will be described with reference to FIG. FIG. 4A is a top view showing the structure of the bell receiving stand 6. The bell receiving stand 6 is installed on the uppermost floor of the building under construction, and constitutes a part of a crane device that enables the tower crane 10 to climb by itself.

図4の(b)は、マストバンド3bの構造を示す上面図である。マストバンド3bは、マスト固定部材3(マスト支え3a)に対して上下方向に移動可能であり、マスト支え3aを建築物の外壁面に固定するものである。   FIG. 4B is a top view showing the structure of the mast band 3b. The mast band 3b is movable in the vertical direction with respect to the mast fixing member 3 (mast support 3a), and fixes the mast support 3a to the outer wall surface of the building.

図4の(c)は、伸縮架台4の構造を示す上面図である。伸縮架台4は、マスト本体1と建築物との間に設置され、マスト本体1の延伸方向に対して略垂直な方向に伸縮可能な架台であり、クレーンの鉛直荷重と水平力を支えるものである。   FIG. 4C is a top view showing the structure of the telescopic mount 4. The telescopic mount 4 is installed between the mast main body 1 and the building and is extendable in a direction substantially perpendicular to the extending direction of the mast main body 1 and supports the vertical load and horizontal force of the crane. is there.

図4の(d)は、コアベース2およびベース脚2aの構造を示す上面図である。コアベース2は、マスト本体1の下部を支えるための架台であり、複数のベース脚2aを有している。   FIG. 4D is a top view showing the structure of the core base 2 and the base legs 2a. The core base 2 is a frame for supporting the lower part of the mast body 1 and has a plurality of base legs 2a.

〔付記事項〕
本発明は上述した各実施形態に限定されるものではなく、請求項に示した範囲で種々の変更が可能であり、異なる実施形態にそれぞれ開示された技術的手段を適宜組み合わせて得られる実施形態についても本発明の技術的範囲に含まれる。さらに、各実施形態にそれぞれ開示された技術的手段を組み合わせることにより、新しい技術的特徴を形成することができる。
[Additional Notes]
The present invention is not limited to the above-described embodiments, and various modifications are possible within the scope shown in the claims, and embodiments obtained by appropriately combining technical means disclosed in different embodiments. Is also included in the technical scope of the present invention. Furthermore, a new technical feature can be formed by combining the technical means disclosed in each embodiment.

1 マスト本体
2 コアベース
3 マスト固定部材
3b マストバンド
7 クレーン本体
10 タワークレーン(クライミングクレーン)
BL 建築物
DESCRIPTION OF SYMBOLS 1 Mast main body 2 Core base 3 Mast fixing member 3b Mast band 7 Crane main body 10 Tower crane (climbing crane)
BL building

Claims (4)

建築物の外壁面に沿って設置され、自身の高さを伸縮可能なマスト本体と、
上記マスト本体の下部を支えるコアベースと、
上記マスト本体に沿って上下方向に移動可能に取り付けられ、上記マスト本体を上記外壁面に固定するマスト固定部材と、を備えることを特徴とする、クライミングクレーンのマスト。
A mast body installed along the outer wall surface of the building and capable of expanding and contracting its own height,
A core base that supports the lower part of the mast body,
A climbing crane mast comprising: a mast fixing member which is attached to the mast main body so as to be movable in the vertical direction, and which fixes the mast main body to the outer wall surface.
上記マスト固定部材は、当該マスト固定部材に対して上下方向に移動可能であり、当該マスト固定部材を上記外壁面に固定するマストバンドを備えていることを特徴とする請求項1に記載のクライミングクレーンのマスト。   2. The climbing according to claim 1, wherein the mast fixing member is movable in the vertical direction with respect to the mast fixing member, and includes a mast band for fixing the mast fixing member to the outer wall surface. Crane mast. 請求項1または請求項2に記載のマストを備えることを特徴とするクライミングクレーン。   A climbing crane comprising the mast according to claim 1 or 2. 建築物の外壁面に沿って設置され、自身の高さを伸縮可能なマスト本体と、
上記マスト本体の下部を支えるコアベースと、
上記マスト本体に沿って上下方向に移動可能に取り付けられ、上記マスト本体を上記外壁面に固定するマスト固定部材と、
上記マスト本体の上部に設置されたクレーン本体と、を備えるクライミングクレーンを用いる建築物の工法であって、
建築物において建築済みの階層に係る外壁面に、上記コアベースおよび上記マスト固定部材を固定した後、上記マスト本体を伸長させることにより、上記クレーン本体を上方に移動させることを特徴とする、建築物の工法。
A mast body installed along the outer wall surface of the building and capable of expanding and contracting its own height,
A core base that supports the lower part of the mast body,
A mast fixing member attached to the mast body so as to be movable in the vertical direction, and fixing the mast body to the outer wall surface;
A construction method of a building using a climbing crane provided with a crane body installed on top of the mast body,
In the building, after fixing the core base and the mast fixing member to an outer wall surface related to a built level in a building, the crane body is moved upward by extending the mast body. Method of construction.
JP2017071370A 2017-03-31 2017-03-31 Climbing crane masts, climbing cranes and building construction methods Active JP6953161B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017071370A JP6953161B2 (en) 2017-03-31 2017-03-31 Climbing crane masts, climbing cranes and building construction methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017071370A JP6953161B2 (en) 2017-03-31 2017-03-31 Climbing crane masts, climbing cranes and building construction methods

Publications (2)

Publication Number Publication Date
JP2018172197A true JP2018172197A (en) 2018-11-08
JP6953161B2 JP6953161B2 (en) 2021-10-27

Family

ID=64107867

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017071370A Active JP6953161B2 (en) 2017-03-31 2017-03-31 Climbing crane masts, climbing cranes and building construction methods

Country Status (1)

Country Link
JP (1) JP6953161B2 (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3366251A (en) * 1965-10-23 1968-01-30 Link Belt Co Climbing crane
FR2081296A1 (en) * 1970-03-13 1971-12-03 Potain Sa
JPS5771183U (en) * 1980-10-15 1982-04-30
CN2133563Y (en) * 1992-05-27 1993-05-19 建设部长沙建筑机械研究所 External climbing tower crane
JPH0537876U (en) * 1991-10-09 1993-05-21 大成建設株式会社 Tower crane climbing jig
JPH06156982A (en) * 1992-11-13 1994-06-03 Shimizu Corp Crane equipment
KR20040003299A (en) * 2002-07-02 2004-01-13 삼성물산 주식회사 An installation beam of tower-crane for an outer wall
JP2006009421A (en) * 2004-06-25 2006-01-12 Sumitomo Mitsui Construction Co Ltd Building construction method using tower crane
JP2009220901A (en) * 2008-03-13 2009-10-01 Shimizu Corp Supporting structure and installation method of tower crane
JP2010265107A (en) * 2009-05-18 2010-11-25 Shimizu Corp Tower crane support structure and climbing method
CN103896165A (en) * 2014-02-28 2014-07-02 中建钢构有限公司 Suspension type outside climbing tower crane supporting system and turnover using method thereof
CN105858501A (en) * 2016-06-12 2016-08-17 上海市机械施工集团有限公司 Self-attaching tower crane provided with foundation underpinning device and construction method thereof
WO2016157181A1 (en) * 2015-04-01 2016-10-06 Sky-Line Cranes & Technologies Ltd. Modular, adaptable and foldable apparatus for a climbing crane

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3366251A (en) * 1965-10-23 1968-01-30 Link Belt Co Climbing crane
FR2081296A1 (en) * 1970-03-13 1971-12-03 Potain Sa
JPS5771183U (en) * 1980-10-15 1982-04-30
JPH0537876U (en) * 1991-10-09 1993-05-21 大成建設株式会社 Tower crane climbing jig
CN2133563Y (en) * 1992-05-27 1993-05-19 建设部长沙建筑机械研究所 External climbing tower crane
JPH06156982A (en) * 1992-11-13 1994-06-03 Shimizu Corp Crane equipment
KR20040003299A (en) * 2002-07-02 2004-01-13 삼성물산 주식회사 An installation beam of tower-crane for an outer wall
JP2006009421A (en) * 2004-06-25 2006-01-12 Sumitomo Mitsui Construction Co Ltd Building construction method using tower crane
JP2009220901A (en) * 2008-03-13 2009-10-01 Shimizu Corp Supporting structure and installation method of tower crane
JP2010265107A (en) * 2009-05-18 2010-11-25 Shimizu Corp Tower crane support structure and climbing method
CN103896165A (en) * 2014-02-28 2014-07-02 中建钢构有限公司 Suspension type outside climbing tower crane supporting system and turnover using method thereof
WO2016157181A1 (en) * 2015-04-01 2016-10-06 Sky-Line Cranes & Technologies Ltd. Modular, adaptable and foldable apparatus for a climbing crane
CN105858501A (en) * 2016-06-12 2016-08-17 上海市机械施工集团有限公司 Self-attaching tower crane provided with foundation underpinning device and construction method thereof

Also Published As

Publication number Publication date
JP6953161B2 (en) 2021-10-27

Similar Documents

Publication Publication Date Title
JP6655840B2 (en) Crane equipment used at the construction site of reinforced concrete buildings
CN104627849A (en) Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
JP5365854B2 (en) Tower crane support structure and climbing method
US10392233B2 (en) Crane tower
JP7678803B2 (en) Extendable lattice crane boom and method of operating a crane including an extendable boom
JP5825864B2 (en) Tower crane mast support structure and tower crane support method
JP6257317B2 (en) Structure construction method and structure disassembly method
JP2014001561A (en) Demolition method and demolition auxiliary device
JP2015055062A (en) Lift type work scaffold device of tower crane
JP6953161B2 (en) Climbing crane masts, climbing cranes and building construction methods
JP2020090806A (en) Construction method of dome-like material net with linear member
JP6976887B2 (en) How to build a building
JP2009286531A (en) Dismantling method of tower crane
JP6736226B2 (en) Structure and construction method of the structure constructed on the tower-shaped building
JP6318076B2 (en) Steel tower dismantling method and steel tower dismantling apparatus
JP3708060B2 (en) Construction method of roof structure
JP5402508B2 (en) Lift-up method, tower-like structure construction method, building construction method, lift-up device
JP2004339854A (en) Building method for cable dome roof
JP7266460B2 (en) Temporary gantry for foundation frame of climbing crane
JP2016216134A (en) Crane installation structure
JP2004059321A (en) Climbing crane and its climbing method
JP4352219B2 (en) Crane equipment
JP7037911B2 (en) How to lift the mount, climbing crane and crane body
JP2009007129A (en) Climbing crane
JP2008075340A (en) Tower structure construction method, and tower structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200210

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20201130

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20201222

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210217

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210406

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210603

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210907

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210929

R150 Certificate of patent or registration of utility model

Ref document number: 6953161

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250