FR3109785A1 - equipment for shoring prefabricated floors - Google Patents

equipment for shoring prefabricated floors Download PDF

Info

Publication number
FR3109785A1
FR3109785A1 FR2004303A FR2004303A FR3109785A1 FR 3109785 A1 FR3109785 A1 FR 3109785A1 FR 2004303 A FR2004303 A FR 2004303A FR 2004303 A FR2004303 A FR 2004303A FR 3109785 A1 FR3109785 A1 FR 3109785A1
Authority
FR
France
Prior art keywords
shoring
tube
equipment according
carriage
telescopic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR2004303A
Other languages
French (fr)
Other versions
FR3109785B1 (en
Inventor
Xavier Le Tallec
Didier DONGE
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to FR2004303A priority Critical patent/FR3109785B1/en
Publication of FR3109785A1 publication Critical patent/FR3109785A1/en
Application granted granted Critical
Publication of FR3109785B1 publication Critical patent/FR3109785B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G25/06Shores or struts; Chocks telescopic with parts held together by positive means
    • E04G25/061Shores or struts; Chocks telescopic with parts held together by positive means by pins
    • E04G25/063Shores or struts; Chocks telescopic with parts held together by positive means by pins with safety devices to avoid the accidental loss or unlocking of the pin, e.g. chains attaching the pin to the prop
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/50Girders, beams, or the like as supporting members for forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G2025/003Supports therefor, e.g. tripods
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G2025/047Shores or struts; Chocks telescopic which telescoping action effected by a piston

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

L’invention a pour objet un équipement pour l’étaiement d’un élément de construction, tel qu’un plancher préfabriqué, comportant au moins un chariot d’étaiement (1) présentant au moins un module porteur (3) pourvu d’au moins une face horizontale (4) d’appui contre ledit élément de construction et relié, par des moyens de montage en translation verticale, à une embase roulante (2). Il est caractérisé en ce que ladite embase roulante (2) est formée de deux cadres (7) s’étendant l’un en face de l’autre dans des plans parallèles verticaux et reliés entre eux par un longeron (8) supportant des moyens de roulement (9), tandis que lesdits moyens de montage en translation verticale comportent au moins deux poteaux télescopiques (12) solidaires chacun d’un des cadres (7) et du module porteur (3) Figure pour l’abrégé : Fig. 1 The subject of the invention is equipment for the shoring of a building element, such as a prefabricated floor, comprising at least one shoring carriage (1) having at least one carrier module (3) provided with at least one horizontal face (4) bearing against said construction element and connected, by means of mounting in vertical translation, to a rolling base (2). It is characterized in that said rolling base (2) is formed of two frames (7) extending one opposite the other in vertical parallel planes and interconnected by a spar (8) supporting means. bearing (9), while said means for mounting in vertical translation comprise at least two telescopic poles (12) each secured to one of the frames (7) and to the carrier module (3) Figure for the abstract: Fig. 1

Description

équipement pour l’étaiement de planchers préfabriquésequipment for shoring up precast floors

La présente invention concerne le domaine du bâtiment et a pour objet un équipement pour l’étaiement de planchers en béton préfabriqués, permettant la pose des prédalles ou des dalles alvéolaires puis le bétonnage de la dalle de compression.The present invention relates to the field of construction and relates to equipment for shoring up precast concrete floors, allowing the laying of pre-slabs or alveolar slabs then the concreting of the compression slab.

De manière connue, les nombreux avantages, notamment d’ordre économique, liés à la mise en œuvre d’éléments en béton préfabriqués pour édifier des bâtiments à vocation diverses, collectifs ou individuels, ont conduit à une expansion continue de ce mode de construction et de la branche d’activité correspondante, au cours des dernières décennies.As is well known, the many advantages, particularly of an economic nature, linked to the implementation of prefabricated concrete elements to build buildings for various purposes, collective or individual, have led to a continuous expansion of this method of construction and of the corresponding branch of activity in recent decades.

Afin d’accompagner cette croissance, de nombreux développements ont été effectués au fur et à mesure et ont permis d’élargir progressivement la gamme de produits offerts, d’améliorer les procédés de fabrication mais également d’optimiser les opérations de pose et les travaux sur chantiers.In order to support this growth, many developments have been made over time and have made it possible to gradually expand the range of products offered, to improve manufacturing processes but also to optimize installation operations and work. on building sites.

A ce propos, il est notoire que la mise en œuvre d’éléments de construction préfabriqués impose de mobiliser un matériel de manutention important, adapté au transport et à l’érection de structures souvent volumineuses et très lourdes, ce matériel comprenant entre autres des équipements d’étaiement.In this regard, it is well known that the implementation of prefabricated construction elements requires the mobilization of significant handling equipment, suitable for the transport and erection of often bulky and very heavy structures, this equipment including, among other things, equipment shoring.

En ce qui concerne plus particulièrement l’étaiement des planchers en béton préfabriqués, la pratique actuelle consiste à recourir à des tours d'étaiement, spécifiquement conçues pour à la fois permettre des reprises de charge appropriées et garantir la sécurité des ouvriers, et entre lesquelles sont installées des poutrelles sur lesquelles viennent reposer les planchers.With regard more particularly to the shoring of precast concrete floors, the current practice consists in using shoring towers, specifically designed to both allow appropriate load bearings and guarantee the safety of the workers, and between which beams are installed on which the floors rest.

De manière classique, les tours d’étaiement présentent une structure modulaire et sont composées d’une pluralité de cadres, de diagonales, de planchers de travail, d’éléments de gardes corps, et de vérins, assemblés entre eux sur site, en vue d’atteindre la hauteur attendue, pouvant s’étendre suivant les modèles, entre 2 et 12 mètres au-dessus du sol.Conventionally, shoring towers have a modular structure and are composed of a plurality of frames, diagonals, work floors, guardrail elements, and jacks, assembled together on site, in view to reach the expected height, which can extend according to the models, between 2 and 12 meters above the ground.

En d’autres termes, la mise en œuvre de ces tours suppose une étape préalable de montage sur chantier, au cours de laquelle leurs éléments constitutifs sont assemblés entre eux jusqu’à atteindre la hauteur de structure nécessaire pour permettre l’étaiement.In other words, the implementation of these towers supposes a preliminary stage of assembly on site, during which their constituent elements are assembled together until reaching the height of structure necessary to allow shoring.

En raison du nombre souvent élevé de pièces à assembler, cette étape de montage a pour inconvénient de présenter un caractère particulièrement fastidieux et chronophage, qui monopolise une main d’œuvre importante, et se révèle ainsi peu compatible avec les fortes contraintes budgétaires des entreprises du bâtiment, d’autant plus qu’elle suppose souvent l’intervention d’ouvriers expérimentés à même de faire preuve de la dextérité nécessaire.Due to the often high number of parts to be assembled, this assembly step has the disadvantage of being particularly tedious and time-consuming, which monopolizes a large workforce, and thus proves to be incompatible with the strong budgetary constraints of companies in the building, especially since it often requires the intervention of experienced workers capable of demonstrating the necessary dexterity.

Par ailleurs, la manutention répétée des multiples profilés, cadres, tubes, poutrelles, etc, nécessaires à l’érection de telles tours d’étaiement, pesant souvent chacun une quinzaine de kilogrammes, n’est pas sans conséquence pour les ouvriers et est susceptible d’entraîner à plus ou moins court terme des troubles musculosquelettiques à l’origine d’arrêts de travail intempestifs, voire de situations d’invalidité. D’autre part, au fur et à mesure du montage de telles tours, puis de l’installation des poutrelles entre les différentes tours, les ouvriers sont amenés à exécuter les travaux correspondants à des hauteurs parfois assez élevées, par conséquent non dépourvues de risques.Furthermore, the repeated handling of the multiple sections, frames, tubes, beams, etc., necessary for the erection of such shoring towers, each often weighing about fifteen kilograms, is not without consequences for the workers and is likely lead to more or less short-term musculoskeletal disorders leading to untimely work stoppages, or even disability situations. On the other hand, as such towers are erected, then the beams are installed between the various towers, the workers are required to carry out the corresponding work at heights that are sometimes quite high, and therefore not without risk. .

Également, des problèmes de logistique sont souvent à déplorer, dans la mesure où les éléments constitutifs de ces tours d’étaiement sont fournis, puis conservés en cas d’absence d’utilisation, sous forme de pièces détachées, dans des paniers non seulement pénibles à déplacer mais qui encombrent également de manière intempestive les chantiers en construction. De plus, de telles pièces détachées sont régulièrement égarées, et peuvent alors faire défaut pour obtenir une structure de tour complète ou lors d’un montage ultérieur de celle-ci sur un nouveau site.Also, logistical problems are often to be deplored, insofar as the constituent elements of these shoring towers are supplied, then kept in the event of absence of use, in the form of spare parts, in baskets that are not only painful to be moved but which also inadvertently clutter construction sites. In addition, such spare parts are regularly misplaced, and can then fail to obtain a complete tower structure or during subsequent assembly of the latter on a new site.

Par ailleurs, chaque déplacement d’une tour d’étaiement d’un site d’utilisation vers un autre, par exemple d’un étage d’un bâtiment en cours de construction vers l’étage supérieur, ou entre différents chantiers, suppose son démontage au moins partiel, voire intégral pour son transport avant un nouveau montage sur le site de destination, et par conséquent une répétition des nombreuses difficultés d’ores et déjà évoquées.Moreover, each movement of a shoring tower from one site of use to another, for example from one floor of a building under construction to the upper floor, or between different worksites, implies its at least partial, or even complete, disassembly for its transport before re-assembly on the destination site, and consequently a repetition of the numerous difficulties already mentioned.

Le but de la présente invention est par conséquent de proposer une solution alternative aux tours d’étaiement classiquement utilisées lors de la pose de planchers préfabriqués, permettant d’éviter l’ensemble des inconvénients cités ci-dessus.The object of the present invention is therefore to propose an alternative solution to the shoring towers conventionally used when laying prefabricated floors, making it possible to avoid all the drawbacks mentioned above.

En somme, la présente invention a pour objectif de fournir un équipement pour l’’étaiement de planchers préfabriqués d’un nouveau type, permettant de s’affranchir des opérations répétées de montage/démontage de ses éléments constitutifs et de les limiter aux phases de livraisons et de repli de matériel, cet équipement présentant un nombre réduit d’éléments constitutifs de sorte que lesdites opérations de montage/démontage nécessitent une main d’œuvre limitée, et autorisent une cadence plus soutenue pour des délais de chantiers raccourcis.In short, the present invention aims to provide equipment for shoring up prefabricated floors of a new type, making it possible to dispense with the repeated assembly/disassembly operations of its constituent elements and to limit them to the phases of delivery and withdrawal of equipment, this equipment having a reduced number of constituent elements so that said assembly/disassembly operations require limited manpower, and allow a more sustained rate for shorter construction times.

Par ailleurs, un autre but de l’invention est de proposer un équipement d’étaiement dont l’intégralité du montage s’effectue à hauteur d’homme, depuis le sol, et permet par conséquent d’éviter tout travail en hauteur, potentiellement dangereux.Furthermore, another object of the invention is to provide shoring equipment the entire assembly of which is carried out at a man's height, from the ground, and consequently makes it possible to avoid any work at height, potentially dangerous.

En parallèle, un but supplémentaire de l’invention est de proposer un équipement d’étaiement de planchers préfabriqués dont la stabilité est assurée quelle que soit la hauteur à atteindre, et qui soit résistant aux contraintes mécaniques rencontrées, bien que présentant une structure allégée en termes de nombre d’éléments constitutifs.At the same time, an additional object of the invention is to provide equipment for shoring up prefabricated floors whose stability is ensured regardless of the height to be reached, and which is resistant to the mechanical stresses encountered, although having a lightened structure in terms of number of constituent elements.

A cet effet, la présente invention a pour objet un équipement pour l’étaiement d’un élément de construction, tel qu’un plancher préfabriqué, comportant au moins un chariot d’étaiement présentant au moins un module porteur pourvu d’au moins une face horizontale d’appui contre ledit élément de construction et relié, par des moyens de montage en translation verticale, à une embase roulante, caractérisé en ce que ladite embase roulante est formée de deux cadres s’étendant l’un en face de l’autre dans des plans parallèles verticaux et reliés entre eux par un longeron supportant des moyens de roulement, tandis que lesdits moyens de montage en translation verticale comportent au moins deux poteaux télescopiques solidaires chacun d’un des cadres et du module porteur.To this end, the subject of the present invention is equipment for shoring up a construction element, such as a prefabricated floor, comprising at least one shoring carriage having at least one carrying module provided with at least one horizontal face bearing against the said construction element and connected, by means of assembly in vertical translation, to a rolling base, characterized in that the said rolling base is formed of two frames extending one in front of the another in vertical parallel planes and interconnected by a spar supporting rolling means, while said means for mounting in vertical translation comprise at least two telescopic posts each integral with one of the frames and the carrier module.

Conformément à une variante de réalisation avantageuse de cet équipement, chaque poteau télescopique du chariot d’étaiement comporte un tube fixe solidaire d’un des cadres, un tube bas, mobile entre une position escamotée à l’intérieur du tube fixe et une position déployée, et un tube haut, solidaire du module porteur, mobile entre une position escamotée à l’intérieur du tube bas et une position déployée, ainsi que des moyens de réglage et de blocage en position du tube bas par rapport au tube fixe et du tube haut par rapport au tube bas.According to an advantageous embodiment of this equipment, each telescopic post of the shoring carriage comprises a fixed tube integral with one of the frames, a low tube, movable between a retracted position inside the fixed tube and an extended position , and a top tube, integral with the carrier module, movable between a retracted position inside the bottom tube and an extended position, as well as means for adjusting and locking the bottom tube in position relative to the fixed tube and the tube top relative to the bottom tube.

De plus, dans ce cas, l’invention a prévu que les moyens de réglage et de blocage en position peuvent comporter d’une part une série d’orifices formés dans les tubes fixe, bas et haut, lesdits orifices s’étendant parallèlement à l’axe du poteau, de manière alignée entre eux dans la position déployée des tubes bas et haut, et d’autre part deux ensembles formés chacun d’une broche double imperdable en forme de « U » dont les branches sont conçues aptes à traverser chacune à la fois un orifice du tube fixe et un orifice du tube bas ou un orifice du tube bas et un orifice du tube haut ainsi qu’un loquet de verrouillage de la broche double.In addition, in this case, the invention has provided that the means for adjusting and locking in position may comprise on the one hand a series of orifices formed in the fixed, bottom and top tubes, said orifices extending parallel to the axis of the post, aligned with each other in the extended position of the lower and upper tubes, and on the other hand two sets each formed of a captive double pin in the shape of a "U" whose branches are designed to cross each with both a fixed tube port and a low tube port or a low tube port and a high tube port as well as a double pin locking latch.

Par ailleurs, les moyens de réglage et de blocage en position peuvent encore comporter un système de manchon à vis solidaire de chaque poteau télescopique et permettant d’assurer un réglage fin de la hauteur de chaque poteau.Furthermore, the means for adjusting and locking in position can also comprise a screw sleeve system secured to each telescopic post and making it possible to ensure fine adjustment of the height of each post.

Une caractéristique additionnelle de l’équipement selon l’invention est définie par le fait qu’il comporte en outre des moyens de déplacement des tubes bas et haut des poteaux du chariot d’étaiement entre leur position escamotée et leur position déployée.An additional characteristic of the equipment according to the invention is defined by the fact that it also comprises means for moving the bottom and top tubes of the posts of the shoring trolley between their retracted position and their deployed position.

Selon une option envisageable, ces moyens de déplacement des tubes bas et haut peuvent comporter un cric du type télescopique à manivelle, à câble ou à crémaillère, destiné à être relié à l’embase roulante et au module porteur du chariot d’étaiement.According to a possible option, these means of moving the lower and upper tubes may include a jack of the telescopic type with crank, cable or rack, intended to be connected to the rolling base and to the carrier module of the shoring trolley.

Conformément à une autre option, les moyens de déplacement peuvent comporter un chariot de levage mobile comportant au moins un bras de levage télescopique, conçu apte à se déplacer entre une position rétractée et une position déployée, muni de moyens de préhension du module porteur du chariot d’étaiement, ainsi qu’un ensemble de vérins électriques ou de treuils conçus aptes à provoquer le déplacement du bras de levage entre ses positions déployée et rétractée.According to another option, the moving means may comprise a mobile lifting carriage comprising at least one telescopic lifting arm, designed capable of moving between a retracted position and an extended position, provided with means for gripping the carrier module of the carriage shoring, as well as a set of electric jacks or winches designed to cause the lifting arm to move between its extended and retracted positions.

Par ailleurs, les moyens de déplacement en translation des tubes bas et haut entre leur position escamotée et leur position déployée peuvent également comporter au moins une câblette de levage reliée à des moyens de fixation que comporte le module porteur du chariot d’étaiement et conçue aptes à permettre une préhension par un engin de levage tel qu’une grue.Furthermore, the means for moving the bottom and top tubes in translation between their retracted position and their deployed position may also comprise at least one lifting cable connected to fastening means which the carrier module of the shoring carriage comprises and designed to to allow gripping by a lifting device such as a crane.

Une caractéristique supplémentaire de l’équipement selon l’invention est définie par le fait que lesdits cadres du chariot d’étaiement intègrent chacun une paire de vérins conçus aptes à placer ledit chariot d’étaiement de niveau en position de reprise de charge.An additional characteristic of the equipment according to the invention is defined by the fact that said frames of the shoring carriage each incorporate a pair of cylinders designed to place said shoring carriage level in the load-bearing position.

A ce propos, chaque vérin peut en outre être avantageusement solidaire d’une platine conçue apte à permettre sa fixation au sol.In this regard, each actuator can also advantageously be attached to a plate designed to allow its fixing to the ground.

L’équipement selon l’invention est encore caractérisé en ce que ledit module porteur du chariot d’étaiement peut être défini par au moins une poutre de section en I présentant une paroi supérieure destinée à venir en appui contre ledit élément de construction, une paroi inférieure parallèle à la paroi supérieure, présentant une face inférieure solidaire du tube haut de chaque poteau, ainsi qu’une paroi transversale reliant entre elles les parois supérieure et inférieure.The equipment according to the invention is further characterized in that said carrying module of the shoring carriage can be defined by at least one I-section beam having an upper wall intended to bear against said construction element, a wall bottom parallel to the top wall, having a bottom face integral with the top tube of each post, as well as a transverse wall connecting the top and bottom walls together.

Conformément à une variante de réalisation préférentielle, la poutre comporte au moins un ergot disposé sur la face inférieure de sa paroi inférieure à proximité de chacune de ses extrémités.According to a preferred embodiment variant, the beam comprises at least one lug arranged on the underside of its lower wall close to each of its ends.

D’autres caractéristiques et avantages de l’invention ressortiront de la description détaillée qui va suivre, se rapportant à un exemple de réalisation du présent dispositif donné uniquement à titre indicatif et non limitatif.Other characteristics and advantages of the invention will emerge from the detailed description which follows, relating to an embodiment of the present device given solely by way of indication and not limitation.

La compréhension de cette description sera facilitée en se référant aux dessins ci-joints dans lesquels :The understanding of this description will be facilitated by referring to the attached drawings in which:

illustre une vue en perspective d’une variante de réalisation du chariot d’étaiement que comporte l’équipement selon l’invention, dans laquelle les poteaux télescopiques sont placés en position basse, illustrates a perspective view of an alternative embodiment of the shoring trolley that includes the equipment according to the invention, in which the telescopic poles are placed in the low position,

représente une élévation du chariot d’étaiement de la figure 1, shows an elevation of the shoring carriage of Figure 1,

est une élévation du chariot d’étaiement de la figure 1 montrant deux positions possibles des poteaux télescopiques, is an elevation of the shoring trolley of figure 1 showing two possible positions of the telescopic poles,

est une vue agrandie du détail B de la figure 2, is an enlarged view of detail B of figure 2,

est une vue d’un appareil de levage mobile que peut comporter l’équipement selon l’invention, montrant une première position de son bras télescopique, is a view of a mobile lifting device that the equipment according to the invention may include, showing a first position of its telescopic arm,

est une vue de l’appareil de levage de la figure 5, montrant une seconde position de son bras télescopique, is a view of the lifting device of Figure 5, showing a second position of its telescopic arm,

, [Fig. 8], [Fig. 9], [Fig. 10], [Fig. 11] illustrent les différentes étapes de mise en œuvre de l’équipement selon l’invention comportant le chariot d’étaiement de la figure 1 et le chariot de levage de la figure 5, et , [Fig. 8], [Fig. 9], [Fig. 10], [Fig. 11] illustrate the various stages of implementation of the equipment according to the invention comprising the shoring carriage of FIG. 1 and the lifting carriage of FIG. 5, and

illustre la mise en œuvre d’un accessoire de type « diable » que comporte l’équipement selon l’invention pour déplacer le chariot d’étaiement de la figure 1 entre des surfaces s’étendant à des niveaux différents. illustrates the implementation of an accessory of the “sack truck” type included in the equipment according to the invention to move the shoring carriage of FIG. 1 between surfaces extending at different levels.

En référence aux figures, dans la variante de réalisation illustrée, l’équipement selon l’invention destiné à l’étaiement d’un élément de construction tel qu’un plancher préfabriqué, comporte un chariot d’étaiement 1 formé d’une embase roulante 2 supportant une poutre métallique 3, réglable en hauteur.With reference to the figures, in the variant embodiment illustrated, the equipment according to the invention intended for the shoring of a construction element such as a prefabricated floor, comprises a shoring carriage 1 formed of a rolling base 2 supporting a metal beam 3, adjustable in height.

Cette dernière présente ici une section en I, et comporte une paroi supérieure 4 destinée à recevoir ledit élément de construction, une paroi inférieure 5 parallèle à la paroi supérieure 4, ainsi qu’une paroi transversale 6 reliant entre elles les parois supérieure 3 et inférieure 4.The latter here has an I-section, and comprises an upper wall 4 intended to receive said construction element, a lower wall 5 parallel to the upper wall 4, as well as a transverse wall 6 interconnecting the upper 3 and lower walls 4.

L’embase roulante 2, quant à elle, est formée de deux cadres 7, comportant chacun deux montants 70 reliés par deux traverses 71, s’étendant l’un en face de l’autre dans des plans parallèles verticaux, et reliés entre eux par un longeron 8 d’axe parallèle à l’axe de la poutre 3. Le longeron 8 supporte deux paires de roues 9 pourvues de freins, et préférentiellement conçues aptes à être télescopées d’un côté de l’embase 2 afin d’améliorer la stabilité du chariot d’étaiement 1, notamment lorsqu’il roule en configuration haute sur une dalle rugueuse. De plus, chaque montant 70 du cadre 7 intègre un vérin 72 muni d’une platine 73 destinée à reposer au sol lors de la mise en œuvre du chariot d’étaiement 1 et munie d’un orifice 74 permettant sa fixation au sol si nécessaire. En somme, les vérins 72 permettent de placer le chariot d’étaiement 1 de niveau en position de reprise de charge.The rolling base 2, for its part, is formed of two frames 7, each comprising two uprights 70 connected by two crosspieces 71, extending one in front of the other in vertical parallel planes, and connected together by a spar 8 with an axis parallel to the axis of the beam 3. The spar 8 supports two pairs of wheels 9 provided with brakes, and preferably designed capable of being telescoped on one side of the base 2 in order to improve the stability of the shoring carriage 1, in particular when it rolls in the high configuration on a rough slab. In addition, each upright 70 of the frame 7 incorporates a jack 72 provided with a plate 73 intended to rest on the ground during the implementation of the shoring carriage 1 and provided with an orifice 74 allowing it to be fixed to the ground if necessary. . In short, the jacks 72 make it possible to place the level shoring carriage 1 in the load recovery position.

Conformément à l’invention, le chariot d’étaiement 1 comporte en outre deux poteaux télescopiques 12, solidaires chacun d’un des cadres 7 et de la poutre 3, et définissant des moyens de montage en translation verticale de cette dernière sur l’embase roulante 2.According to the invention, the shoring carriage 1 further comprises two telescopic posts 12, each integral with one of the frames 7 and the beam 3, and defining means for mounting in vertical translation of the latter on the base rolling 2.

Plus précisément, chaque poteau 12 permet un double télescopage et comporte un tube fixe 13 solidaire des traverses 71 d’un cadre 7, un tube bas 14, mobile entre une position escamotée à l’intérieur du tube fixe 13 et une position déployée, et un tube haut 15, solidaire de la poutre 3, mobile entre une position escamotée à l’intérieur du tube bas 14 et une position déployée.More specifically, each post 12 allows double telescoping and comprises a fixed tube 13 secured to the crosspieces 71 of a frame 7, a low tube 14, movable between a retracted position inside the fixed tube 13 and an extended position, and a top tube 15, secured to the beam 3, movable between a retracted position inside the bottom tube 14 and an extended position.

A ce stade, il convient de noter que la structure de l’embase roulante 2 est par ailleurs renforcée par une barre filante horizontale 10 s’étendant entre les deux cadres 7 et reliée au longeron 8 au moyen de deux entretoises 11. Tel qu’illustré aux figures, dans la variante de réalisation illustrée du chariot d’étaiement 1, les tubes fixes 13 des deux poteaux télescopiques 12 sont également solidaires à la fois de la barre filante 10 et d’une entretoise 11.At this stage, it should be noted that the structure of wheel base 2 is also reinforced by a horizontal running bar 10 extending between the two frames 7 and connected to the side member 8 by means of two spacers 11. illustrated in the figures, in the variant embodiment illustrated of the shoring carriage 1, the fixed tubes 13 of the two telescopic posts 12 are also secured both to the running bar 10 and to a spacer 11.

D’autre part, tel que visible à la figure 3, chaque poteau télescopique 12 comporte une série d’orifices 16 régulièrement répartis, par exemple tous les 10 cm, dans les tubes fixe 13, bas 14 et haut 15, s’étendant parallèlement à l’axe du poteau 12 et de manière alignée entre eux dans la position déployée des tubes bas 14 et haut 15. Ces orifices 16 permettent d’assurer un réglage et un blocage en position du tube bas 14 par rapport au tube fixe 13 et du tube haut 15 par rapport au tube bas 14. A cet effet il est en outre fait appel à deux ensembles formés chacun d’une broche double imperdable 17 en forme de « U », dont les branches sont conçues aptes à traverser chacune à la fois un orifice 16 du tube fixe 13 et un orifice 16 du tube bas 14 ou un orifice 16 du tube bas 14 et un orifice 16 du tube haut 15, ainsi qu’un loquet de verrouillage automatique 18 permettant d’assurer le maintien en position de la broche double 17.On the other hand, as seen in Figure 3, each telescopic post 12 comprises a series of orifices 16 regularly distributed, for example every 10 cm, in the fixed tubes 13, bottom 14 and top 15, extending parallel to the axis of the post 12 and aligned with each other in the deployed position of the bottom 14 and top 15 tubes. of the top tube 15 with respect to the bottom tube 14. For this purpose, use is also made of two assemblies each formed of a captive double pin 17 in the shape of a "U", the branches of which are designed capable of crossing each at the both an orifice 16 of the fixed tube 13 and an orifice 16 of the lower tube 14 or an orifice 16 of the lower tube 14 and an orifice 16 of the upper tube 15, as well as an automatic locking latch 18 enabling it to be held in position of the double pin 17.

Par ailleurs, un système de manchon à vis 19 (cf. vue agrandie en fig. 4), relié à chaque poteau télescopique 12 permet d’assurer un réglage fin de la hauteur des poteaux 12, en l’occurrence au millimètre près, après avoir placé la poutre 3 à la hauteur voulue en déployant plus ou moins le tube haut 15 et/ou le tube bas 14.Furthermore, a screw sleeve system 19 (cf. enlarged view in fig. 4), connected to each telescopic post 12, makes it possible to ensure fine adjustment of the height of the posts 12, in this case to the nearest millimeter, after having placed the beam 3 at the desired height by deploying more or less the top tube 15 and/or the bottom tube 14.

De plus, le chariot d’étaiement 1 comporte encore deux montants verticaux 110 reliant chacun le longeron 8 et la barre filante 10 à une entretoise 11. Ces montants 110 servent de support à des câblettes 200 (cf. fig. 7 et 8) mises en œuvre pendant les déplacements du chariot d’étaiement 1 et contribuent en outre à conférer à ce dernier une raideur permettant d’en empiler plusieurs les uns sur les autres et par conséquent de réduire leur encombrement pendant les périodes de stockage et de livraison.In addition, the shoring carriage 1 further comprises two vertical uprights 110 each connecting the spar 8 and the running bar 10 to a spacer 11. These uprights 110 serve as support for cables 200 (cf. fig. 7 and 8) placed implemented during the movements of the shoring carriage 1 and also contribute to conferring on the latter a stiffness making it possible to stack several of them on top of each other and consequently to reduce their size during the storage and delivery periods.

Tel que visible notamment à la figure 1, chaque poteau télescopique 12 est muni de poignées 26 facilitant le déplacement manuel du chariot d’étaiement 1 par les opérateurs. De plus, comme illustré à la figure 12, l’équipement selon l’invention est préférentiellement complété d’un accessoire 27 de type « diable » permettant un changement aisé de niveau horizontal du chariot d’étaiement 1, tel que notamment une descente ou une montée de marche 28.As seen in particular in Figure 1, each telescopic post 12 is provided with handles 26 facilitating the manual movement of the shoring carriage 1 by the operators. In addition, as illustrated in FIG. 12, the equipment according to the invention is preferably supplemented with an accessory 27 of the “sack truck” type allowing an easy change of horizontal level of the shoring carriage 1, such as in particular a lowering or a step climb 28.

Conformément à une caractéristique supplémentaire, l’équipement d’étaiement selon l’invention comporte en outre des moyens de déplacement des tubes bas 14 et haut 15 entre leur position escamotée et leur position déployée.In accordance with an additional feature, the shoring equipment according to the invention further comprises means for moving the bottom 14 and top 15 tubes between their retracted position and their deployed position.

A ce propos, il peut être fait appel à un cric du type télescopique à manivelle, à câble ou à crémaillère (non illustré), indépendant et manuportable, destiné à être relié à des positionneurs que comportent à cet effet l’embase roulante 2 et la poutre 3.In this regard, use may be made of a jack of the telescopic type with a crank, a cable or a rack (not shown), independent and manuportable, intended to be connected to positioners which the rolling base 2 comprises for this purpose and beam 3.

De manière alternative, le changement de hauteur de la poutre 3 peut s’effectuer au moyen d’une grue accrochant des câblettes de levage 200, fixées à demeure sur des crochets de levage 20 que comporte la poutre 3, et qui servent également au déplacement du chariot d’étaiement 1 dans son intégralité, par exemple d’un étage d’un bâtiment vers l’étage supérieur, également au moyen d’un engin de levage.Alternatively, the height of the beam 3 can be changed by means of a crane hooking lifting ropes 200, permanently fixed to the lifting hooks 20 that comprise the beam 3, and which are also used to move of the shoring carriage 1 in its entirety, for example from one floor of a building to the upper floor, also by means of a lifting device.

Par ailleurs, le changement de hauteur de la poutre 3 peut encore être opéré au moyen d’un chariot de levage 21 (cf. figures 5 et 6) spécifiquement conçu dans le cadre de l’invention et comportant un châssis monté sur roues, supportant un bras de levage télescopique 22 muni d’un plateau de préhension 23 de la poutre 3 et dont un ensemble de vérins électriques 24 permet le déplacement entre une position rétractée (fig. 5) et une position déployée (fig. 6).Furthermore, the change in height of the beam 3 can also be operated by means of a lifting carriage 21 (cf. FIGS. 5 and 6) specifically designed within the framework of the invention and comprising a frame mounted on wheels, supporting a telescopic lifting arm 22 provided with a plate 23 for gripping the beam 3 and of which a set of electric cylinders 24 allows movement between a retracted position (fig. 5) and an extended position (fig. 6).

Une fois la poutre 3 positionnée à la hauteur voulue, des étais supplémentaires (non illustrés) peuvent le cas échéant être disposés sous ses extrémités libres, dans le cas où la poutre 3 présente une longueur telle que celles-ci s’étendent en porte à faux par rapport à l’embase roulante 2. A ce propos, la face inférieure 50 de la paroi inférieure 5 de la poutre comporte un ou plusieurs ergots 51 disposé(s) à proximité de chacune de ses extrémités, et conçus aptes à interagir avec des poteaux d’étaiement indépendants.Once the beam 3 has been positioned at the desired height, additional props (not shown) can, if necessary, be arranged under its free ends, in the case where the beam 3 has a length such that they extend door-to-door. false with respect to the rolling base 2. In this regard, the lower face 50 of the lower wall 5 of the beam comprises one or more lugs 51 arranged near each of its ends, and designed capable of interacting with independent shoring posts.

En pratique, la mise en œuvre de l’équipement selon l’invention, décrite en relation avec les figures 7 à 11 consiste à réaliser les étapes suivantes :In practice, the implementation of the equipment according to the invention, described in relation to Figures 7 to 11 consists in carrying out the following steps:

– amenée du chariot d’étaiement 1 sur le plancher de travail au moyen d’une grue reliée aux câblettes de levage 200 (fig. 7), à ce stade les tubes bas 14 et haut 15 sont placés dans leurs positions escamotées respectives,– bringing the shoring trolley 1 onto the work floor by means of a crane connected to the lifting cables 200 (fig. 7), at this stage the bottom 14 and top 15 tubes are placed in their respective retracted positions,

– mise en position de reprise de charge du chariot d’étaiement 1 par un réglage des vérins 72 au moyen d’une clé à cliquet ou d’une boulonneuse, avec vérification des niveaux au moyen de niveaux à bulle 25 solidaire de la barre filante 10 (fig. 8) et des traverses 71,– placing the shoring carriage 1 in the load take-up position by adjusting the cylinders 72 using a ratchet or a bolter, with verification of the levels by means of spirit levels 25 attached to the running bar 10 (fig. 8) and crosspieces 71,

– amenée du chariot de levage 21 au centre de la poutre 3, et enlèvement des broches doubles imperdables 17 bloquant en position le tube haut 15, après déverrouillage des loquets 18 (fig. 9),– bringing the lifting carriage 21 to the center of the beam 3, and removing the captive double pins 17 locking the top tube 15 in position, after unlocking the latches 18 (fig. 9),

– hissage de la poutre 3, du tube haut 15 et du tube bas 14 au moyen du chariot de levage 21 puis blocage en position du tube haut 15 par rapport au tube bas 14 par réinsertion des broches doubles 17 dans les orifices 16 correspondants et verrouillage automatique des broches 17 au moyen du loquet 18 (fig. 10),– hoisting of the beam 3, the top tube 15 and the bottom tube 14 by means of the lifting carriage 21 then locking in position of the top tube 15 relative to the bottom tube 14 by reinsertion of the double pins 17 into the corresponding holes 16 and locking automatic pin 17 by means of the latch 18 (fig. 10),

- enlèvement des broches doubles imperdables 17 bloquant en position le tube bas 14, après déverrouillage des loquets 18, hissage de la poutre 3, du tube haut 15 et du tube bas 14 au moyen du chariot de levage 21 puis blocage en position du tube bas 14 par rapport au tube fixe 13 par réinsertion des broches doubles 17 dans les orifices 16 correspondants et verrouillage automatique au moyen du loquet 18 (fig. 11), retrait du chariot de levage 21, et réglage fin de la hauteur des poteaux 12 au moyen d’une clé à cliquet agissant sur le manchon à vis 19.- removal of the captive double pins 17 locking the bottom tube 14 in position, after unlocking the latches 18, hoisting the beam 3, the top tube 15 and the bottom tube 14 by means of the lifting carriage 21 then locking the bottom tube in position 14 with respect to the fixed tube 13 by reinsertion of the double pins 17 in the corresponding holes 16 and automatic locking by means of the latch 18 (fig. 11), removal of the lifting carriage 21, and fine adjustment of the height of the posts 12 by means of of a ratchet acting on the screw sleeve 19.

Tel qu’il ressort clairement de ce qui précède l’équipement d’étaiement selon l’invention permet d’atteindre les objectifs indiqués en préambule.As is clear from the foregoing, the shoring equipment according to the invention makes it possible to achieve the objectives indicated in the preamble.

Il est constitué de peu d’éléments structurels et ne suppose aucune manutention de poutrelles de la part des opérateurs, contrairement aux tours d’étaiement classiquement utilisées. De plus, l’assemblage du chariot d’étaiement s’effectue depuis le sol et évite aux ouvriers tout travail en hauteur.It is made up of few structural elements and requires no handling of the beams by the operators, unlike the shoring towers conventionally used. In addition, the assembly of the shoring trolley is carried out from the ground and avoids workers having to work at height.

Par ailleurs, le chariot d’étaiement de l’équipement selon l’invention est facile à déplacer, indépendamment de tout démontage préalable, et sa structure permet de s’affranchir des problèmes de pertes de pièces et de gestion de paniers de stockage traditionnels. Il est également peu encombrant et occupe un faible volume en période de stockage comme en zone de travail.Furthermore, the shoring trolley of the equipment according to the invention is easy to move, independently of any prior dismantling, and its structure makes it possible to overcome the problems of loss of parts and management of traditional storage baskets. It is also compact and occupies a small volume during storage and in the work area.

En somme, l’équipement selon l’invention permet un gain de main d’œuvre, et des cadences de travail améliorées, ainsi qu’une baisse de la pénibilité des tâches à accomplir par les opérateurs.In short, the equipment according to the invention allows a gain in manpower, and improved work rates, as well as a reduction in the difficulty of the tasks to be performed by the operators.

Claims (12)

Equipement pour l’étaiement d’un élément de construction, tel qu’un plancher préfabriqué, comportant au moins un chariot d’étaiement (1) présentant au moins un module porteur (3) pourvu d’au moins une face horizontale (4) d’appui contre ledit élément de construction et relié, par des moyens de montage en translation verticale, à une embase roulante (2), caractérisé en ce que ladite embase roulante (2) est formée de deux cadres (7) s’étendant l’un en face de l’autre dans des plans parallèles verticaux et reliés entre eux par un longeron (8) supportant des moyens de roulement (9), tandis que lesdits moyens de montage en translation verticale comportent au moins deux poteaux télescopiques (12) solidaires chacun d’un des cadres (7) et du module porteur (3).Equipment for shoring up a construction element, such as a prefabricated floor, comprising at least one shoring carriage (1) having at least one carrier module (3) provided with at least one horizontal face (4) bearing against the said construction element and connected, by means of assembly in vertical translation, to a rolling base (2), characterized in that the said rolling base (2) is formed of two frames (7) extending one facing the other in vertical parallel planes and interconnected by a spar (8) supporting rolling means (9), while said means for mounting in vertical translation comprise at least two telescopic posts (12) each integral with one of the frames (7) and the carrier module (3). Equipement selon la revendication 1, caractérisé en ce que chaque poteau télescopique (12) comporte un tube fixe (13) solidaire d’un des cadres (7), un tube bas (14) mobile entre une position escamotée à l’intérieur du tube fixe (13) et une position déployée, un tube haut (15), solidaire du module porteur (3), mobile entre une position escamotée à l’intérieur du tube bas (14) et une position déployée, ainsi que des moyens de réglage et de blocage en position du tube bas (14) par rapport au tube fixe (13) et du tube haut (15) par rapport au tube bas (14).Equipment according to Claim 1, characterized in that each telescopic post (12) comprises a fixed tube (13) integral with one of the frames (7), a lower tube (14) movable between a retracted position inside the tube fixed (13) and a deployed position, a top tube (15), secured to the carrier module (3), movable between a retracted position inside the bottom tube (14) and a deployed position, as well as adjustment means and locking in position of the bottom tube (14) relative to the fixed tube (13) and of the top tube (15) relative to the bottom tube (14). Equipement selon la revendication 2, caractérisé en ce que lesdits moyens de réglage et de blocage en position comportent d’une part une série d’orifices (16) formés dans les tubes fixe (13), bas (14) et haut (15), lesdits orifices (16) s’étendant parallèlement à l’axe du poteau (12) et de manière alignée entre eux dans la position déployée des tubes bas (14) et haut (15), et d’autre part deux ensembles formés chacun d’une broche double imperdable (17) en forme de « U » dont les branches sont conçues aptes à traverser chacune à la fois un orifice (16) du tube fixe (13) et un orifice (16) du tube bas (14) ou un orifice (16) du tube bas (14) et un orifice (16) du tube haut (15) ainsi qu’un loquet de verrouillage (18) de la broche double (17).Equipment according to Claim 2, characterized in that the said means for adjusting and locking in position comprise on the one hand a series of orifices (16) formed in the fixed (13), bottom (14) and top (15) tubes , said orifices (16) extending parallel to the axis of the post (12) and aligned with one another in the deployed position of the bottom (14) and top (15) tubes, and on the other hand two sets each formed a captive double pin (17) in the shape of a "U" whose branches are each designed capable of passing through both an orifice (16) of the fixed tube (13) and an orifice (16) of the lower tube (14) or an orifice (16) of the lower tube (14) and an orifice (16) of the upper tube (15) as well as a latch (18) for locking the double pin (17). Equipement selon l’une quelconque des revendications 2 ou 3, caractérisé en ce que les moyens de réglage et de blocage en position comportent un système de manchon à vis (19) solidaire de chaque poteau télescopique (12).Equipment according to any one of claims 2 or 3, characterized in that the means for adjusting and locking in position comprise a screw sleeve system (19) secured to each telescopic post (12). Equipement selon l’une quelconque des revendications 2 à 4, caractérisé en ce qu’il comporte en outre des moyens de déplacement des tubes bas (14) et haut (15) des poteaux télescopiques (12) du chariot d’étaiement (1) entre leur position escamotée et leur position déployée.Equipment according to any one of claims 2 to 4, characterized in that it further comprises means for moving the bottom (14) and top (15) tubes of the telescopic posts (12) of the shoring trolley (1) between their stowed position and their deployed position. Equipement selon la revendication 5, caractérisé en ce que lesdits moyens de déplacement comportent un cric du type télescopique à manivelle, à câble ou à crémaillère, destiné à être relié à l’embase roulante (2) et au module porteur (3) du chariot d’étaiement (1).Equipment according to Claim 5, characterized in that the said displacement means comprise a jack of the telescopic type with crank, cable or rack, intended to be connected to the rolling base (2) and to the carrier module (3) of the trolley shoring (1). Equipement selon l’une quelconque des revendications 5 ou 6, caractérisé en ce que les moyens de déplacement comportent un chariot de levage (21) comportant au moins un bras de levage télescopique (22), conçu apte à se déplacer entre une position rétractée et une position déployée, muni de moyens de préhension (23) du module porteur (3) du chariot d’étaiement (1), ainsi qu’un ensemble de vérins électriques (24) ou de treuils conçus aptes à provoquer le déplacement du bras de levage (22) entre ses positions déployée et rétractée.Equipment according to any one of Claims 5 or 6, characterized in that the means of movement comprise a lifting carriage (21) comprising at least one telescopic lifting arm (22), designed capable of moving between a retracted position and a deployed position, provided with means (23) for gripping the carrier module (3) of the shoring carriage (1), as well as a set of electric jacks (24) or winches designed capable of causing the movement of the arm of lift (22) between its extended and retracted positions. Equipement selon l’une quelconque des revendication 5 à 7, caractérisé en ce que les moyens de déplacement comportent au moins une câblette de levage (20) reliée à des moyens de fixation que comporte le module porteur (3) du chariot d’étaiement (1) et conçues aptes à permettre leur préhension par un engin de levage tel qu’une grue.Equipment according to any one of Claims 5 to 7, characterized in that the means of movement comprise at least one lifting rope (20) connected to fixing means which comprise the carrier module (3) of the shoring carriage ( 1) and designed to allow them to be gripped by a lifting device such as a crane. Equipement selon l’une quelconque des revendications précédentes, caractérisé en ce que lesdits cadres (7) du chariot d’étaiement (1) intègrent chacun une paire de vérins (72) conçus aptes à placer ledit chariot d’étaiement (1) de niveau en position de reprise de charge.Equipment according to any one of the preceding claims, characterized in that the said frames (7) of the shoring carriage (1) each incorporate a pair of cylinders (72) designed to place the said shoring carriage (1) level in the load recovery position. Equipement selon la revendication 9, caractérisé en ce que chaque vérin (72) est solidaire d’une platine (73) conçue apte à permettre sa fixation au sol.Equipment according to claim 9, characterized in that each cylinder (72) is secured to a plate (73) designed to allow its fixing to the ground. Equipement selon l’une quelconque des revendications 2 à 10, caractérisé en ce que ledit module porteur (3) du chariot d’étaiement (1) est défini par une poutre (3) de section en I présentant une paroi supérieure (4) d’appui contre ledit élément de construction, une paroi inférieure (5) parallèle à la paroi supérieure (4), présentant une face inférieure (50) solidaire du tube haut (15) de chaque poteau (12), ainsi qu’une paroi transversale (6) reliant entre elles les parois supérieure (4) et inférieure (5).Equipment according to any one of Claims 2 to 10, characterized in that the said carrying module (3) of the shoring carriage (1) is defined by a beam (3) of I-section having an upper wall (4) of bearing against said construction element, a lower wall (5) parallel to the upper wall (4), having a lower face (50) integral with the top tube (15) of each post (12), as well as a transverse wall (6) interconnecting the upper (4) and lower (5) walls. Equipement selon la revendication 11, caractérisé en ce que la poutre (3) comporte au moins un ergot (51) disposé sur la face inférieure (50) de sa paroi inférieure (5) à proximité de chacune de ses extrémités.Equipment according to Claim 11, characterized in that the beam (3) comprises at least one lug (51) arranged on the lower face (50) of its lower wall (5) close to each of its ends.
FR2004303A 2020-04-30 2020-04-30 equipment for propping up precast floors Active FR3109785B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR2004303A FR3109785B1 (en) 2020-04-30 2020-04-30 equipment for propping up precast floors

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR2004303A FR3109785B1 (en) 2020-04-30 2020-04-30 equipment for propping up precast floors
FR2004303 2020-04-30

Publications (2)

Publication Number Publication Date
FR3109785A1 true FR3109785A1 (en) 2021-11-05
FR3109785B1 FR3109785B1 (en) 2022-07-08

Family

ID=72088241

Family Applications (1)

Application Number Title Priority Date Filing Date
FR2004303A Active FR3109785B1 (en) 2020-04-30 2020-04-30 equipment for propping up precast floors

Country Status (1)

Country Link
FR (1) FR3109785B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116062650A (en) * 2022-11-22 2023-05-05 中建新疆建工(集团)有限公司 A Whole Jacking Compensator for Large Metal Grid Frame
CN116290914A (en) * 2023-03-22 2023-06-23 安徽省宏远建设项目管理有限公司 Intelligent assembled floor board supporting device for building
CN118065677A (en) * 2024-04-17 2024-05-24 唐帼(晋江)商贸有限公司 Energy-saving support equipment for green building construction
CN118299988A (en) * 2024-06-06 2024-07-05 国网山东省电力公司聊城供电公司 A support device for cable maintenance
CN118774380A (en) * 2024-09-06 2024-10-15 北京城建集团有限责任公司 A post-cast belt support structure
CN119332972A (en) * 2024-11-12 2025-01-21 中国五冶集团有限公司 A support frame for facilitating gluing construction of plates of different sizes and a method of using the support frame

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1414893A (en) * 1964-09-08 1965-10-22 Batimetal New construction process for concrete buildings
CN202012190U (en) * 2010-10-25 2011-10-19 山东新港国际模板工程技术有限公司 Integral bench formwork
US20130032770A1 (en) * 2009-07-17 2013-02-07 Benzing James T Mobile support apparatus
KR101691525B1 (en) * 2016-04-22 2017-01-09 신성구조이엔지 주식회사 Lego Type Cart Supporting Post
KR101894169B1 (en) * 2017-01-10 2018-08-31 백문자 A support pipe with clamp for construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1414893A (en) * 1964-09-08 1965-10-22 Batimetal New construction process for concrete buildings
US20130032770A1 (en) * 2009-07-17 2013-02-07 Benzing James T Mobile support apparatus
CN202012190U (en) * 2010-10-25 2011-10-19 山东新港国际模板工程技术有限公司 Integral bench formwork
KR101691525B1 (en) * 2016-04-22 2017-01-09 신성구조이엔지 주식회사 Lego Type Cart Supporting Post
KR101894169B1 (en) * 2017-01-10 2018-08-31 백문자 A support pipe with clamp for construction

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116062650A (en) * 2022-11-22 2023-05-05 中建新疆建工(集团)有限公司 A Whole Jacking Compensator for Large Metal Grid Frame
CN116290914A (en) * 2023-03-22 2023-06-23 安徽省宏远建设项目管理有限公司 Intelligent assembled floor board supporting device for building
CN118065677A (en) * 2024-04-17 2024-05-24 唐帼(晋江)商贸有限公司 Energy-saving support equipment for green building construction
CN118299988A (en) * 2024-06-06 2024-07-05 国网山东省电力公司聊城供电公司 A support device for cable maintenance
CN118774380A (en) * 2024-09-06 2024-10-15 北京城建集团有限责任公司 A post-cast belt support structure
CN119332972A (en) * 2024-11-12 2025-01-21 中国五冶集团有限公司 A support frame for facilitating gluing construction of plates of different sizes and a method of using the support frame

Also Published As

Publication number Publication date
FR3109785B1 (en) 2022-07-08

Similar Documents

Publication Publication Date Title
FR3109785A1 (en) equipment for shoring prefabricated floors
EP1766157B1 (en) Platform support device for lifting loads or persons the height of a structure
EP3146131B1 (en) Assembly system and method for assembling a tower for a wind generator
EP2044273B1 (en) Shoring tower
EP0132205A1 (en) Apparatus for raising masts
FR3035134A1 (en) FORMWORK, METHOD FOR DECREASING, AND METHOD FOR MANUFACTURING A PORTION OF BUILDING
EP4367344A1 (en) Scaffolding tower and scaffold and use of the tower and scaffold
EP3999413B1 (en) Method and system for manufacturing an aerostat with a rigid structure, and heavy load-carrying aerostat manufactured thereby
FR3146317A1 (en) Scaffolding tower and scaffolding and use of tower and scaffolding
EP0612899B1 (en) Scaffolding-platform and method for erecting scaffolds with such platform
KR101010499B1 (en) Loading and unloading device and method of prefabricated truck cargo
FR3001245A1 (en) Supporting stay for use in movement device of formwork platform of slab and/or balcony in building, has support head and connection elements arranged, so that head cooperates with elements and jack ensures sliding movement of elements
FR3124814A1 (en) Scaffolding and use of scaffolding
WO2016166495A1 (en) Stowing and storage device
EP2995750A1 (en) Temporary and removable floor for producing concrete slabs
CH291599A (en) Telescopic mast crane.
FR2701929A1 (en) Slidingly mounted silo and method of mounting the said silo
FR2461074A1 (en) Mobile self supporting scaffolding frame for building facades - has rectangular frame with floor and elevated platforms which fold for transport
JP2011006890A (en) Base and elevating mobile scaffold
FR3149919A1 (en) Suspended scaffolding for the production of concrete sails
FR2741862A1 (en) Scaffolding ladder rack
FR2627792A1 (en) Stand structure for sports stadium - has reinforced concrete portal structures spaced along length of stand, supporting stepped terraces and suspended roof stanchions
JP2011006891A (en) Elevating mobile scaffold
FR2948958A1 (en) System for installing scaffolding wall bracket to frontage of building, has support device with fixed supports fixed to frontage, where support device ensuring guided displacement of cradle to cantilever position of fixed supports
BE504079A (en)

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 2

PLSC Publication of the preliminary search report

Effective date: 20211105

PLFP Fee payment

Year of fee payment: 3

PLFP Fee payment

Year of fee payment: 4

PLFP Fee payment

Year of fee payment: 5

PLFP Fee payment

Year of fee payment: 6