FR2921098A1 - Drill rig setting method for e.g. sea bed, involves placing connection unit between barge and rig to permit transfer of energy, people, materials and liquid between barge and rig so as to carry out drilling operations - Google Patents

Drill rig setting method for e.g. sea bed, involves placing connection unit between barge and rig to permit transfer of energy, people, materials and liquid between barge and rig so as to carry out drilling operations Download PDF

Info

Publication number
FR2921098A1
FR2921098A1 FR0706409A FR0706409A FR2921098A1 FR 2921098 A1 FR2921098 A1 FR 2921098A1 FR 0706409 A FR0706409 A FR 0706409A FR 0706409 A FR0706409 A FR 0706409A FR 2921098 A1 FR2921098 A1 FR 2921098A1
Authority
FR
France
Prior art keywords
barge
platform
drilling
rig
interface means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR0706409A
Other languages
French (fr)
Other versions
FR2921098B1 (en
Inventor
Jean Claude Bourdon
Dominique Michel
Bernard Casteran
Laurent Darros
Frederik Nilsson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dolfines SA
Original Assignee
Dietswell Engineering SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dietswell Engineering SA filed Critical Dietswell Engineering SA
Priority to FR0706409A priority Critical patent/FR2921098B1/en
Priority to PCT/FR2008/001281 priority patent/WO2009090321A2/en
Priority to CN2008801126781A priority patent/CN102137973A/en
Priority to KR1020107008058A priority patent/KR20100087094A/en
Publication of FR2921098A1 publication Critical patent/FR2921098A1/en
Application granted granted Critical
Publication of FR2921098B1 publication Critical patent/FR2921098B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/003Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting very large loads, e.g. offshore structure modules
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B75/00Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • E02B2017/0047Methods for placing the offshore structure using a barge

Landscapes

  • Engineering & Computer Science (AREA)
  • Transportation (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The method involves installing a tanker barge to place an emerged portion (21) of a platform (20) between branches (1a, 1b) of the barge. An interface unit and a drill rig (10) are lowered and installed on the portion of the platform by ballasting the barge. A space is covered between the branches by deployment of a portfolio bridge so as to have a large deck area for drilling operations. A connection unit e.g. footbridge, is placed between the barge and the rig, to permit transfer of energy, people, materials and liquid between the barge and the rig so as to carry out the operations.

Description

10 La présente invention concerne un procédé de mise en place d'un appareil de forage totalement équipé sur une plateforme posée ou ancrée sur le fond marin ou lacustre et comportant une partie émergée, et de préparation à un forage en mer, à l'aide d'une barge semi-submersible ravitailleur. 15 On connaît plusieurs procédés pour exécuter un forage dans des eaux peu profondes, typiquement jusqu'à 300 m ou au-delà. Dans l'un de ces procédés, on a recours à une structure en forme de tour posée sur le fond marin ou plateforme, généralement métallique et appelée jacket ou well head 20 platform . Elle comporte une partie émergée au sommet de laquelle on trouve les têtes de puit et sur laquelle repose un appareil de forage composé d'une sous-structure, d'un derrick et d'équipements de forage, par exemple un Blow Out Preventer (BOP), un treuil de manutention des tiges de forage et une cabine pour abriter les appareils de mesure ; un tel appareil de forage est 25 connu sous le nom de derrick set ou rig et sa masse est généralement comprise entre 600 et 800 tonnes. La plateforme est mise en place sur le champ de forage avant l'opération de forage proprement dite, sans l'appareil de forage. Le premier problème posé consiste donc à installer l'appareil de forage sur la plateforme de la façon la plus économique et sans provoquer de 30 détérioration. -2 Par ailleurs, une opération de forage nécessite de nombreuses autres installations, notamment pour recevoir le personnel, fournir l'énergie, accueillir et stocker les équipements de forage tels que des tubes de forage ou des usines à boues de forage par exemple. Ces installations représentent des surfaces et des volumes très importants constitués par exemple de locaux techniques, de locaux d'habitation, de réservoirs de fluides et d'une plateforme d'atterrissage d'hélicoptère. L'ensemble, qui peut représenter plusieurs milliers de tonnes, trouve place sur un support différent de la plateforme et il y a donc des opérations préparatoires au forage à mener, tel que relier la plateforme à ce second support de façon à ce qu'il puisse fournir tout le soutien nécessaire à ce forage. The present invention relates to a method of setting up a fully equipped drilling rig on a platform placed or anchored on the seabed or lake and having an emergent part, and preparation for drilling at sea, using a semi-submersible barge tanker. Several methods are known for drilling in shallow waters, typically up to 300 m or beyond. In one of these methods, a tower-like structure is used on the seabed or platform, generally metal and called jacket or well head platform. It has an emergent part at the top of which one finds the heads of well and on which rests a rig composed of a substructure, a derrick and drilling equipment, for example a Blow Out Preventer (BOP ), a winch for handling drill pipes and a cabin to house the measuring devices; such a drilling rig is known as a derrick set or rig and its mass is generally between 600 and 800 tons. The platform is placed on the drilling field before the drilling operation itself, without the drilling rig. The first problem is therefore to install the rig on the platform in the most economical way and without causing deterioration. -2 Moreover, a drilling operation requires many other facilities, in particular to receive personnel, supply energy, and host and store drilling equipment such as drill pipes or drilling mud plants, for example. These installations represent very large areas and volumes consisting for example of technical rooms, living quarters, fluid tanks and a helicopter landing platform. The assembly, which can represent several thousand tons, is located on a different support platform and there is therefore preparatory operations to drilling, such as connecting the platform to the second support so that it can provide all the support necessary for this drilling.

Une solution connue est d'avoir recours à une plateforme du type barge auto-élévatrice posée sur le fond à proximité de la plateforme et de taille suffisante pour accueillir les locaux et les équipements nécessaires au forage. L'appareil de forage repose sur des poutres en porte à faux solidaires de ladite barge et est posé d'un seul tenant sur la plateforme. Il s'agit d'une solution chère et délicate sur le plan mécanique. A known solution is to use a platform type self-elevating barge placed on the bottom near the platform and of sufficient size to accommodate the premises and equipment required for drilling. The drilling rig rests on cantilevered beams integral with said barge and is placed in one piece on the platform. It is an expensive and delicate solution on the mechanical level.

Une autre solution connue consiste à utiliser une barge ou un navire de soutien appelé tender qui reste amarré à proximité de la plateforme pendant toute l'opération de forage. Les équipements constituant l'appareil de forage sont livrés par la barge de soutien à l'aide de ses moyens de levage par colis de 30 tonnes environ, posés et montés sur la plateforme. Il s'agit d'une opération délicate et longue donc coûteuse car elle nécessite des conditions météo parfaites. Another known solution is to use a barge or a support vessel called a tender that remains docked near the platform during the entire drilling operation. The equipment constituting the drilling rig is delivered by the support barge using its lifting means in packages of about 30 tonnes, placed and mounted on the platform. This is a delicate operation and therefore expensive because it requires perfect weather conditions.

La présente invention a pour but d'apporter une solution avantageuse à ce problème grâce à un procédé de mise en place, en une seule fois, d'un appareil de forage totalement équipé sur une plateforme, et de préparation au forage, grâce à l'emploi d'une barge semi-submersible. Le procédé est également applicable à une plateforme ancrée sur le fond marin, par exemple du type Spar , l'important étant que ladite plateforme ne soit pas soumise à des mouvements de piilonnement créés par la houle. The object of the present invention is to provide an advantageous solution to this problem by means of a method of placing, in one go, a fully equipped drilling rig on a platform, and of preparation for drilling, thanks to the use of a semi-submersible barge. The method is also applicable to a platform anchored to the seabed, for example of the Spar type, the important thing being that said platform is not subjected to movements of wedging created by the swell.

A cet effet, elle propose un procédé de mise en place d'un appareil de forage sur une plateforme ancrée ou posée sur un fond marin ou lacustre et comportant une partie émergée et de préparation au forage, ledit appareil de forage comprenant une sous-structure, un derrick et des équipements de forage solidaires de ladite sous-structure, ledit procédé utilisant une barge semi- submersible ravitailleur dont la coque comprend deux excroissances ou branches, sensiblement parallèles et prolongeant l'un des ponts de la barge, ladite barge comportant des moyens de ballastage et déballastage. Le procédé comporte les étapes suivantes : 1) Le chargement à quai de moyens d'interface sur le pont de la barge au niveau des branches de ladite barge, For this purpose, it proposes a method of setting up a drilling rig on a platform anchored or placed on a seabed or lacustrine and comprising an emergent part and preparation for drilling, said drilling rig comprising a substructure , a derrick and drilling equipment integral with said substructure, said method using a semi-submersible barge tanker whose hull comprises two protrusions or branches, substantially parallel and extending one of the barge's bridges, said barge including means of ballasting and deballasting. The method comprises the following steps: 1) docking interface means on the deck of the barge at the branches of said barge,

2) Le chargement à quai d'un appareil de forage sur lesdits moyens d'interface, 3) Le transit de la barge ravitailleur jusqu'à proximité de la plateforme avec l'appareil de forage solidaire des moyens d'interface, 4) Quand la barge est arrivée à proximité de ladite plateforme, l'élévation 25 des moyens d'interface et de l'appareil de forage par déballastage de ladite barge, 5) La manoeuvre de la barge ravitailleur de façon à placer la partie émergée de ladite plateforme entre les deux branches de la barge 30 ravitailleur et sous les moyens d'interface et l'appareil de forage,20 -4 6) La descente et la pose sur la partie émergée de ladite plateforme des moyens d'interface et de l'appareil de forage, par ballastage de la barge ravitailleur, et/ou 7) L'éloignement de la barge de la plateforme et son positionnement à proximité de ladite plateforme, et/ou 2) the docking of a drilling rig on said interface means, 3) the transit of the supply barge to the vicinity of the platform with the drilling rig integral with the interface means, 4) When the barge has come close to said platform, the elevation of the interface means and the drilling rig by deballasting of said barge, 5) The maneuvering of the barge supplying vessel so as to place the emergent part of said platform between the two branches of the barge 30 and the feeder under the interface means and the drilling rig, 20 -4 6) The descent and laying on the emergent part of said platform means of interface and the apparatus drilling, by ballasting of the barge, and / or 7) The removal of the barge from the platform and its positioning in the vicinity of said platform, and / or

8) La couverture de l'espace compris entre les deux branches de la barge par déploiement d'un dispositif escamotable de façon à disposer d'une vaste surface de pont pour les opérations de forage, et/ou 8) Covering the space between the two branches of the barge by deploying a retractable device so as to have a large deck area for the drilling operations, and / or

9) La disposition de moyens de raccordement entre ladite barge et l'appareil de forage en vue de permettre le transfert notamment d'énergie, de personnes, de matériels et de liquides entre la barge ravitailleur et l'appareil de forage de façon à effectuer l'opération de forage. 9) The provision of means of connection between said barge and the drilling rig in order to allow the transfer of particular energy, people, materials and liquids between the barge and the drilling rig so as to perform the drilling operation.

Dans la première étape, on installe sur le pont de la barge, au niveau de ses branches, des moyens qui seront utilisés comme interface entre la barge et l'appareil de forage, la barge étant par exemple à quai dans une installation portuaire, en utilisant des moyens de levage tels que des grues de manutention du quai ou de la barge. In the first stage, means are installed on the deck of the barge, at its branches, which will be used as interface between the barge and the drilling rig, the barge being for example docked in a port facility, in using lifting means such as handling cranes of the dock or the barge.

Lors de la seconde étape, l'appareil de forage est disposé sur des moyens d'interface par l'intermédiaire de sa sous-structure, en une ou plusieurs fois en utilisant des moyens de levage tels que des grues de manutention du quai ou de la barge. In the second step, the drilling apparatus is disposed on interface means via its substructure, one or more times using lifting means such as dock handling cranes or the barge.

Dans la cinquième étape du procédé, lorsque la barge arrive à proximité immédiate de la plateforme, l'appareil de forage et les moyens d'interface sont élevés par déballastage de la barge, de façon à ce que les moyens d'interface soient en position plus haute que la partie supérieure de partie émergée de la plateforme qui comporte les têtes de puits. In the fifth step of the method, when the barge arrives in the immediate vicinity of the platform, the drilling apparatus and the interface means are raised by deballasting the barge, so that the interface means are in position. higher than the upper part of the emerged part of the platform which comprises the wellheads.

Dans l'étape suivante, la barge manoeuvre de façon à se rapprocher de la plateforme et à placer la partie émergée de ladite plateforme entre ses branches. De façon à ne pas risquer d'endommager la plateforme, la barge aura au préalable procédé à son ancrage, soit en utilisant des ancres, soit par positionnement dynamique, soit par une combinaison des deux. La manoeuvre s'effectue donc en jouant sur ses lignes de mouillage et/ou son positionnement dynamique. In the next step, the barge maneuver to move closer to the platform and to place the raised portion of said platform between its branches. In order not to risk damaging the platform, the barge will have previously anchored, either using anchors or by dynamic positioning, or a combination of both. The maneuver is therefore performed by playing on its anchor lines and / or its dynamic positioning.

L'appareil de forage et les moyens d'interface sont ensuite descendus et posés sur le sommet de la partie émergée de la plateforme par ballastage rapide de la barge. The drilling rig and the interface means are then lowered and placed on the top of the emergent part of the platform by rapid ballast of the barge.

Une fois l'appareil de forage déposé sur la plateforme et la barge éloignée de la plateforme, il est avantageux de couvrir l'espace entre les branches de la coque de la barge à l'aide d'un dispositif amovible ou escamotable, du type pont portefeuille ou panneau de cale articulé. On augmente ainsi considérablement la surface de pont disponible pour disposer du matériel de forage, par exemple des tiges de forage, et faciliter la conduite les opérations de forage. Ce dispositif, une fois déployé, peut également contribuer à la rigidité de la structure de la barge. Once the drilling rig is deposited on the platform and the barge remote from the platform, it is advantageous to cover the space between the branches of the hull of the barge with the aid of a removable or retractable device of the type deck bridge or articulated bilge panel. This considerably increases the available bridge area for drilling equipment, such as drill pipe, and facilitates drilling operations. This device, once deployed, can also contribute to the rigidity of the structure of the barge.

Enfin on installe des moyens de raccordement entre la barge et la plateforme munie du système de forage, par exemple une passerelle pour le personnel, des lignes électriques et des conduites de fluide. Les gros matériels de forage, par exemple les tiges de forage, sont livrés sur la plateforme par l'intermédiaire des grues de manutention qui équipent la barge.30 Dans certains cas, la hauteur à laquelle la barge peut élever l'appareil de forage en jouant uniquement sur son déballastage, lors de la quatrième étape du procédé, est insuffisante. Dans ce cas, la barge comporte sur ses branches des moyens de levage, consistant par exemple en des tours de levage munies de moyens de levage. Dans ce cas, lors de la première étape, les moyens d'interface sont disposés sur lesdites tours de levage et non directement sur le pont de la barge. Dans la troisième étape de transit, les moyens de levage sont généralement placés en position basse pour gagner en stabilité. Finally, connecting means are installed between the barge and the platform provided with the drilling system, for example a gangway for the personnel, electrical lines and fluid lines. Large drilling equipment, such as drill pipe, is delivered to the platform via the handling cranes fitted to the barge.30 In some cases, the height at which the barge can raise the rig in playing only on deballasting, in the fourth step of the process, is insufficient. In this case, the barge comprises on its branches lifting means, consisting for example of lifting towers provided with lifting means. In this case, during the first step, the interface means are disposed on said lifting towers and not directly on the deck of the barge. In the third transit stage, the lifting means are generally placed in the low position to gain stability.

Dans la quatrième étape, l'appareil de forage et les moyens d'interface sont élevés en jouant également sur les tours de levage sur lesquels ils reposent et plus uniquement sur le déballastage de la barge. Ils peuvent ainsi atteindre plus facilement une hauteur suffisante pour être placés au-dessus de la partie émergée de la plateforme. In the fourth step, the drilling rig and the interface means are elevated by also acting on the lifting towers on which they rest and more only on deballasting of the barge. They can thus more easily reach a height sufficient to be placed above the emergent part of the platform.

Inversement, dans la sixième étape, l'appareil de forage et les moyens d'interface sont descendus de façon à reposer sur la plateforme en jouant sur les tours de levage sur lesquels ils reposent et sur un ballastage rapide. Conversely, in the sixth step, the drilling rig and the interface means are lowered so as to rest on the platform by playing on the lifting towers on which they rest and on a fast ballast.

Dans certains cas, la plateforme n'est pas assez résistante pour supporter le poids d'un appareil de forage complet et de ses moyens d'interface, par exemple quand elle est ancienne et partiellement corrodée. Dans ce cas, il est avantageux de faire en sorte que le transfert du poids de l'appareil de forage sur la plateforme soit partiel, c'est-à-dire que son poids reste réparti sur la barge et sur la plateforme. Un asservissement est nécessaire pour compenser les inévitables mouvements de la barge, verticaux et horizontaux, ainsi que de roulis, tangage et lacet. Dans ce cas, pour l'opération de forage, ladite barge reste positionnée de façon à ce que la plateforme reste entre ses branches et les étapes sept et huit n'ont pas lieu. 2921098 -7 Les moyens d'interface peuvent être constitués d'une structure comportant par exemple deux poutres sensiblement parallèles, entretoisées, disposées lors de la seconde étape sensiblement orthogonalement à l'axe longitudinal de la barge et reposant à leur extrémité sur les branches de la barge. 5 Dans une variante du procédé, l'appareil de forage est directement posé sur les poutres d'interface pendant tout le déroulement du procédé. Dans cette variante, les poutres d'interface restent sur la plateforme à l'issue du procédé, l'appareil de forage reposant entièrement sur lesdites poutres. Ceci présente 10 l'avantage que l'appareil de forage peut être ultérieurement enlevé de façon très rapide avec une barge du même type en déroulant le procédé dans l'ordre inverse des étapes, et par exemple déposé sur une autre plateforme. Cependant lesdites poutres ont une longueur au moins égale à l'écartement intérieur des branches de la barge et sont donc nettement plus longues que le côté de la 15 plateforme et, si elles restent en place, risquent de gêner les manoeuvres ultérieures de la barge. De plus, les poutres constituent alors une masse inutile sur la plateforme. In some cases, the platform is not strong enough to support the weight of a complete drilling rig and its interface means, for example when it is old and partially corroded. In this case, it is advantageous to ensure that the transfer of the weight of the rig to the platform is partial, that is to say that its weight remains distributed on the barge and on the platform. Servo control is necessary to compensate for the inevitable barge movements, vertical and horizontal, as well as roll, pitch and yaw. In this case, for the drilling operation, said barge remains positioned so that the platform remains between its branches and steps seven and eight do not take place. The interface means may consist of a structure comprising for example two substantially parallel, braced beams arranged in the second step substantially orthogonal to the longitudinal axis of the barge and resting at their ends on the branches of the barge. the barge. In a variant of the method, the drilling apparatus is directly placed on the interface beams during the entire course of the process. In this variant, the interface beams remain on the platform at the end of the process, the drilling apparatus resting entirely on said beams. This has the advantage that the drilling rig can be subsequently removed very quickly with a barge of the same type by unrolling the process in the reverse order of the steps, and for example deposited on another platform. However, said beams have a length at least equal to the inner spacing of the branches of the barge and are therefore considerably longer than the side of the platform and, if they remain in place, may hinder the subsequent maneuvers of the barge. In addition, the beams then constitute a useless mass on the platform.

Il peut donc être avantageux de prévoir que chaque poutre comporte une 20 portion démontable à chaque extrémité, solidarisée pendant les étapes une à six du procédé par exemple par éclissage, puis démontées en utilisant les moyens de levage de la barge. It may therefore be advantageous to provide that each beam has a removable portion at each end, secured during steps one to six of the method for example by bolting, and then dismounted using the lifting means of the barge.

Dans une autre variante du procédé, lors de la seconde étape, l'appareil de 25 forage est porté par les poutres d'interface par l'intermédiaire de sa sous-structure de façon démontable ; la sous-structure en est rendue solidaire par des moyens connus tels que boulonnage, clavetage, éclissage ou autre. Elle s'en désolidarise au cours de la sixième étape, lorsque l'appareil de forage est posé sur la plateforme par l'intermédiaire de sa sous-structure. 30 -8 Dans cette variante avantageuse du procédé, les poutres d'interface sont conçues pour rester sur la barge après dépose de l'appareil de forage, par exemple en étant démontables et/ou articulés. In another variant of the method, in the second step, the drilling apparatus is carried by the interface beams via its substructure removably; the substructure is made integral by known means such as bolting, keying, splinting or other. It dissociates in the sixth step, when the rig is placed on the platform through its substructure. In this advantageous variant of the method, the interface beams are designed to remain on the barge after removal of the drilling rig, for example by being removable and / or articulated.

Dans cette variante du procédé, il est nécessaire que la poutre qui est la plus en arrière par rapport à l'axe longitudinal de la barge s'efface pour que la barge puisse s'éloigner de la plateforme. Elle est donc par exemple réalisée en deux tronçons pivotants qui sont solidarisés pendant les étapes une à six du procédé, puis qui pivotent à l'issue de la sixième étape. In this variant of the method, it is necessary for the beam that is furthest back from the longitudinal axis of the barge to be erased so that the barge can move away from the platform. It is for example made in two pivoting sections which are secured during steps one to six of the process, and which pivot at the end of the sixth step.

Le procédé sera mieux compris à la lecture de la description qui va suivre et à la lumière des figures annexées dans lesquelles : The method will be better understood on reading the description which follows and in the light of the appended figures in which:

Les figures 1A et 1B sont deux vues en perspective d'une barge 15 utilisée pour la mise en oeuvre du procédé, FIGS. 1A and 1B are two perspective views of a barge used for the implementation of the method,

La figure 2 est une vue de côté d'un appareil de forage équipé, posé sur des poutres d'interface, destiné à être installé sur une plateforme, FIG. 2 is a side view of an equipped drilling rig, placed on interface beams, intended to be installed on a platform,

Les figures 3A à 3N sont des vues latérales de la barge représentant schématiquement les étapes du procédé, FIGS. 3A to 3N are side views of the barge schematically showing the steps of the method,

La figure 4 est une vue latérale d'une poutre d'interface, FIG. 4 is a side view of an interface beam,

La figure 5 est une vue en perspective d'un exemple de barge utilisée par le procédé. Figure 5 is a perspective view of an example of a barge used by the method.

La coque de la barge semi-submersible représentée en figure lA comporte à sa 30 poupe deux branches 1 a et lb, qui prolongent l'un des ponts de la barge et qui délimitent un espace 2 de taille suffisante pour que la partie émergée d'une 20 25 plateforme puise venir y prendre place, par exemple de l'ordre de 30 x 40 m. Ces branches sont suffisamment résistantes pour supporter le poids d'un appareil de forage totalement équipé qui sera décrit en figure 2. La barge comporte également des locaux techniques 3a et 3b, une plateforme d'atterrissage d'hélicoptère 4, des quartiers d'habitation 5, une grue principale 6a et une grue auxiliaire 6b. Elle comporte des moyens de ballastage et de déballastage, par exemple des corps creux au sein de sa structure, pouvant être remplis et vidés d'eau de mer ou de tout autre fluide à l'aide de pompes (non représentés) permettant de faire varier le franc-bord de façon importante. The hull of the semi-submersible barge shown in FIG. 1A comprises, at its stern, two branches 1a and 1b, which extend one of the decks of the barge and which delimit a space 2 of sufficient size that the exposed portion of a platform can come to take place, for example of the order of 30 x 40 m. These branches are strong enough to support the weight of a fully equipped drilling rig which will be described in Figure 2. The barge also comprises technical rooms 3a and 3b, a helicopter landing platform 4, living quarters 5, a main crane 6a and an auxiliary crane 6b. It comprises means for ballasting and deballasting, for example hollow bodies within its structure, which can be filled and emptied with seawater or any other fluid using pumps (not shown) to vary the freeboard importantly.

La barge est représentée avec quatre tours de levage, 7a et 7b reposant sur la branche la, 7c et 7d reposant sur la branche lb. Ces tours de levage ont une hauteur typiquement de dix à quinze mètres, elles comportent des supports de levage sur lesquels peut reposer l'appareil de levage et sont munies par exemple de treuils hydrauliques puissants ou de tout autre système d'élévation. Elles sont nécessaires lorsque l'appareil de forage doit être élevé d'une hauteur supérieure à ce que permet le déballastage de la plateforme. The barge is shown with four lifting towers, 7a and 7b resting on the branch la, 7c and 7d resting on the leg lb. These lifting towers have a height typically of ten to fifteen meters, they include lifting brackets on which can stand the hoist and are equipped for example with powerful hydraulic winches or any other elevation system. They are necessary when the drilling rig needs to be elevated to a height greater than the deballasting of the platform.

Dans cette vue, le pont portefeuille 8 est plié et l'espace 2 compris entre les branches la et lb de la coque est donc ouvert. Sur la figure 1B le pont portefeuille 8 a été déployé et des équipements de forage tels que des tiges de forage y ont été disposés. In this view, the wallet bridge 8 is folded and the space 2 between the branches 1a and 1b of the shell is thus open. In FIG. 1B, the deck bridge 8 has been deployed and drilling equipment such as drill pipes have been placed therein.

La barge de la figure 1 est représentée sans moyen de propulsion, mais il est évident qu'elle peut être auto-propulsée. Elle comporte des moyens de positionnement dynamique, par exemple des propulseurs orientables, non représentés. Elle comporte un axe longitudinal A-A'. The barge of Figure 1 is shown without means of propulsion, but it is obvious that it can be self-propelled. It comprises dynamic positioning means, for example steerable thrusters, not shown. It has a longitudinal axis A-A '.

La figure 2 représente un appareil de forage équipé destiné à être installé sur 30 une plateforme. 11 comporte une sous-structure 11, un derrick 12, et des équipements de forage tels qu'un BOP 13 et d'autres équipements 14. -10- Les figures 3A à 3N illustrent les différentes étapes du procédé. Dans les figures 3A à 3E, l'appareil de forage 10 et des moyens d'interface 15 sont installés sur les branches de la barge dans une installation portuaire en 5 sous- étapes ; le nombre de sous-étapes peut être variable en fonction par exemple de la capacité des moyens de levage disponibles et/ou du temps à quai de la barge. Dans l'exemple illustré, l'appareil de forage 10 est disposé sur les supports de levage en position basse des tours de levage 7a, 7b, 7c et 7d de la barge. Figure 2 shows a rig equipped for installation on a platform. 11 comprises a substructure 11, a derrick 12, and drilling equipment such as a BOP 13 and other equipment 14. FIGS. 3A to 3N illustrate the various steps of the method. In FIGS. 3A to 3E, the drilling apparatus 10 and interface means 15 are installed on the branches of the barge in a port facility in 5 sub-steps; the number of sub-steps may be variable depending, for example, on the capacity of the available lifting means and / or the time at the quay of the barge. In the illustrated example, the drilling apparatus 10 is disposed on the lifting supports in the low position of the lifting towers 7a, 7b, 7c and 7d of the barge.

La figure 3G illustre le transit auto-propulsé de la barge portant l'appareil de forage vers la plateforme ; elle peut être également remorquée. Figure 3G illustrates the self-propelled transit of the barge carrying the rig to the platform; it can also be towed.

Sur la figure 3H la barge commence à manoeuvrer pour se rapprocher de la plateforme 20, en se présentant par l'arrière de façon à placer la partie émergée 21 de la plateforme entre les branches la et lb de la barge. Les manoeuvres sont réalisées en jouant sur des lignes de mouillage (non représentées) et/ou ses moyens d'ancrage dynamique. Les ancres peuvent avoir été disposées à l'avance ou mises en place par la barge elle-même. In Figure 3H the barge begins to maneuver to approach the platform 20, coming from the rear so as to place the emerged portion 21 of the platform between the branches and lb lb of the barge. The maneuvers are performed by playing on mooring lines (not shown) and / or its dynamic anchoring means. Anchors may have been arranged in advance or put in place by the barge itself.

Sur la figure 31, la barge s'est rapprochée de la plateforme 20 et élève l'appareil de forage 10 de façon à ce que la partie inférieure de sa sous-structure 11 ou les moyens d'interface 15 soit plus hauts que le sommet de la partie émergée 21 de la plateforme 20. Cette élévation peut s'effectuer par déballastage de la barge ou en actionnant les tours de levage 7 ou par une combinaison des cieux. In FIG. 31, the barge has approached the platform 20 and raises the drilling apparatus 10 so that the lower part of its substructure 11 or the interface means 15 is higher than the top of the emergent part 21 of the platform 20. This elevation can be done by deballasting the barge or by operating the lifting towers 7 or by a combination of the heavens.

Dans l'étape suivante représentée à la figure 3J, la barge a manoeuvré de façon à placer la partie émergée 21 de la plateforme entre les branches la et lb de la coque. La figure 3K est une vue en élévation de la barge et de l'appareil de forage 10 dans la même situation. L'appareil de forage 10 est posé sur des 2921098 -11- poutres 15a et 15b (non visible), en position haute des moyens de levage 7a et 7c, et la partie émergée 21 de la plateforme se trouve entre les branches la et lb de la barge. In the next step shown in FIG. 3J, the barge has maneuvered so as to place the exposed portion 21 of the platform between the branches 1a and 1b of the hull. Figure 3K is an elevational view of the barge and rig 10 in the same situation. The drilling apparatus 10 is placed on the beams 15a and 15b (not visible), in the raised position of the lifting means 7a and 7c, and the emergent portion 21 of the platform is located between the branches 1a and 1b. from the barge.

5 Comme représenté en figure 3L, l'appareil de forage 10 est lentement abaissé de façon à le faire reposer sur la partie émergée 21 de la plateforme 20, soit en ballastant soit en actionnant à la baisse les tours de levage 7 soit par une combinaison des deux. Des amortisseurs (non représentés) sont disposés entre la sous-structure 11 de l'appareil de forage 10 ou les moyens d'interface 15 et 10 la partie supérieure 21 de la plateforme 20 de façon à éviter d'endommager la plateforme 20 par un contact trop brutal avec l'appareil de forage 10 à cause des mouvements de pilonnement de la barge. Une fois le contact établi, la barge continue de déballaster pour se dégager de l'appareil de forage. As shown in FIG. 3L, the drilling rig 10 is slowly lowered so as to rest it on the emergent part 21 of the platform 20, either by ballasting or by driving the lifting towers 7 downwards or by a combination both. Shocks (not shown) are disposed between the substructure 11 of the drilling apparatus 10 or the interface means 15 and the upper portion 21 of the platform 20 so as to avoid damage to the platform 20 by a too brutal contact with the drill rig 10 because of heave movements of the barge. Once the contact is established, the barge continues to unpack to clear the rig.

15 Dans la dernière étape du procédé représentée en figure 3N, la barge s'immobilise à proximité de la plateforme 20 supportant l'appareil de forage 10, grâce à des lignes de mouillage (non représentées) et/ou ses moyens d'ancrage dynamique. Le pont portefeuille 8 est déplié de façon à couvrir l'espace compris entre les branches la et lb de la barge ; des équipements de 20 forage y sont avantageusement disposés. In the last step of the process shown in FIG. 3N, the barge stops in the vicinity of the platform 20 supporting the drilling rig 10, by means of wetting lines (not shown) and / or its dynamic anchoring means. . The deck bridge 8 is unfolded so as to cover the space between the branches 1a and 1b of the barge; drilling equipment is advantageously arranged.

Enfin, des moyens de raccordement 22 tels que passerelle, conducteurs électriques et tuyauteries sont mis en place entre la barge et la plateforme 20 de façon à permettre les opérations de forage.Finally, connecting means 22 such as gangway, electrical conductors and pipes are placed between the barge and the platform 20 so as to allow drilling operations.

25 La figure 4 représente l'une des poutres d'interface 15b (respectivement 15a) reposant sur la partie émergée 21 de la plateforme, qui comporte deux portions démontables 15c et 15d (respectivement 15e et 15f), maintenues solidaires du corps de la poutre par exemple par éclissage et qui sont démontées une fois 30 l'appareil de forage posé sur la plateforme, en utilisant par exemple les grues 6a et 6b de la barge. 2921098 - 12 - La figure 5 représente un exemple de barge utilisée par le procédé. Sa coque comporte à son arrière deux branches la et lb qui délimitent un espace 2 dans lequel peut venir prendre place la partie émergée 21 d'une plateforme 20. Les 5 pontons 30a et 30b et les parties verticales 31a et 31b comportent des volumes creux qui sont utilisés comme ballasts. La structure 32 accueille des locaux techniques et des locaux d'habitation. FIG. 4 represents one of the interface beams 15b (respectively 15a) resting on the emergent part 21 of the platform, which comprises two demountable portions 15c and 15d (respectively 15e and 15f), held integral with the body of the beam for example by bolting and which are disassembled once the drilling rig placed on the platform, using for example the cranes 6a and 6b of the barge. Figure 5 shows an example of a barge used by the method. Its hull has at its rear two branches la and lb which define a space 2 in which can take place the emerged portion 21 of a platform 20. The 5 pontoons 30a and 30b and the vertical portions 31a and 31b comprise hollow volumes which are used as ballasts. Structure 32 hosts technical premises and living quarters.

Claims (10)

Revendicationsclaims 1. Procédé de mise en place d'un appareil de forage (10) sur une plateforme (20) ancrée ou posée sur un fond marin ou lacustre et comportant une partie émergée (21) et de préparation au forage, ledit appareil de forage (10) comprenant une sous-structure (11), un derrick (12) et des équipements de forage (13, 14) solidaires de ladite sous-structure (11), ledit procédé utilisant une barge semi-submersible ravitailleur dont la coque comprend deux excroissances ou branches (la, lb), sensiblement parallèles et prolongeant l'un des ponts de la barge, ladite barge comportant des moyens de ballastage et déballastage, caractérisé en ce qu'il comporte les étapes suivantes : 1) Le chargement à quai de moyens d'interface (15) sur le pont de la barge au niveau des branches (la, lb) de ladite barge, A method of placing a drilling rig (10) on a platform (20) anchored or resting on a seabed or lake and having an emergent portion (21) and drilling preparation, said rig ( 10) comprising a substructure (11), a derrick (12) and drilling equipment (13, 14) integral with said substructure (11), said method using a semi-submersible barge with a hull comprising two protrusions or branches (1a, 1b), substantially parallel and extending one of the decks of the barge, said barge comprising means for ballasting and deballasting, characterized in that it comprises the following steps: 1) the loading at the quay of interface means (15) on the deck of the barge at the branches (la, lb) of said barge, 2) Le chargement à quai d'un appareil de forage (10) sur lesdits moyens d'interface (15), 2) docking a drilling apparatus (10) on said interface means (15), 3) Le transit de la barge ravitailleur jusqu'à proximité de la plateforme (20) avec l'appareil de forage (10) solidaire des moyens d'interface (15), 3) The transit of the barge to the vicinity of the platform (20) with the drilling apparatus (10) secured to the interface means (15), 4) Quand la barge est arrivée à proximité de ladite plateforme (20), l'élévation des moyens d'interface (15) et de l'appareil de forage (10) par déballastage de ladite barge, 4) When the barge has arrived near said platform (20), raising the interface means (15) and the drilling apparatus (10) by deballasting said barge, 5) La manoeuvre de la barge ravitailleur de façon à placer la partie émergée (21) de ladite plateforme (20) entre les deux branches (la, lb) de la barge ravitailleur et sous les moyens d'interface (15) et l'appareil de forage (10), 5) The maneuver of the barge refueler so as to place the emergent part (21) of said platform (20) between the two branches (la, lb) of the barge and under the interface means (15) and the drilling rig (10), 6) La descente et la pose sur la partie émergée (21) de ladite plateforme (20) des moyens d'interface (15) et de l'appareil de forage (10), par ballastage de la barge ravitailleur, et/ou 6) the descent and the laying on the emergent part (21) of said platform (20) of the interface means (15) and the drilling rig (10), by ballasting of the barge, and / or 7) L'éloignement de la barge de la plateforme (20) et son positionnement à proximité de ladite plateforme, et/ou 2921098 -14- 7) The distance of the barge from the platform (20) and its positioning near said platform, and / or 2921098 -14- 8) La couverture de l'espace (2) compris entre les deux branches (la, lb) de la barge par déploiement d'un dispositif escamotable (8) de façon à disposer d"une vaste surface de pont pour les opérations de forage, et/ou 5 8) Covering the space (2) between the two legs (1a, 1b) of the barge by deploying a retractable device (8) so as to have a large deck area for the drilling operations , and / or 5 9) La disposition de moyens de raccordement (22) entre ladite barge et l'appareil de forage (10) en vue de permettre le transfert notamment d'énergie, de personnes, de matériels et de liquides entre la barge ravitailleur et l'appareil de forage de façon à effectuer l'opération de forage. 10 2. Procédé selon la revendication 1, caractérisé en ce que : • Ledit procédé fait intervenir une barge ravitailleur dans laquelle l'un des ponts comporte au niveau de chaque branche (la, lb) au moins un 15 moyen de levage (7a, 7b, 7c, 7d), et en ce que: • Dans la première étape, les moyens d'interface (15) sont disposés sur les moyens de levage (7a, 7b, 7c, 7d) associés à chaque branche (la, lb) de ladite barge, 20 • Dans la quatrième étape, l'élévation des moyens d'interface et de l'appareil de forage s'effectue par déballastage de la barge et/ou par montée des moyens de levage (7a, 7b, 7c, 7d), • Dans la sixième étape, la descente et la pose des moyens d'interface (15) et de l'appareil de forage (10) sur la partie émergée (21) de ladite 25 plateforme s'effectue par ballastage de la barge et/ou descente des moyens de levage (7a, 7b, 7c, 7d). 3. Procédé selon l'une des revendications 1 ou 2, caractérisé en ce que, dans la sixième étape, le transfert du poids des moyens 30 d'interface (15) et de l'appareil de forage (10) sur la partie émergée (21) de ladite plateforme (20) est partiel de manière à ce que ledit poids soit réparti sur- 15 - ladite plateforme et sur ladite barge de façon à limiter les efforts subis par ladite plateforme (20), en ce que des moyens d'asservissement permettent de compenser les mouvements de la barge selon ses six degrés de liberté, et en ce que les étapes 7 et 8 n'ont pas lieu. 4. Procédé selon l'une quelconque des revendications précédentes, caractérisé en ce que lesdits moyens d'interface (15) prennent la forme d'une structure comportant au moins deux poutres (15a, 15b) entretoisées, et en ce que : • Lors de la seconde étape, lesdites poutres (15a, 15b) sont disposées sensiblement orthogonalement à l'axe longitudinal (A-A') de la barge, une première poutre (15a) la plus en avant et une seconde poutre (15b) la plus en arrière selon ledit axe longitudinal. 5. Procédé selon la revendication 4, caractérisé en ce que : • Dans la seconde étape, l'appareil de forage (10) est posé sur lesdites poutres (15a, 15b), • Dans la sixième étape, les poutres (15a, 15b) sont posées sur la partie 20 émergée (21) de ladite plateforme, l'appareil de forage (10) reposant sur lesdites poutres. 6. Procédé selon la revendication 4, caractérisé en ce que chaque poutre (15a, 15b) comporte une portion 25 déconnectable (15c, 15d, 15e, 15f) à chaque extrémité, solidaire desdites poutres pendant les étapes une à six du procédé, et en ce que le procédé comporte une étape supplémentaire : • Déconnexion d'au moins une desdites portions démontables (15c, 15d, 15e, 15f). 30 2921098 -16- 7. Procédé selon la revendication 4, caractérisé en ce que : • Dans la seconde étape, l'appareil de forage (10) est rendu solidaire desdites poutres (15a, 15b) par des moyens de liaison déconnectables, 5 • Dans la sixième étape, l'appareil de forage (10) est posé sur la partie émergée (21) de ladite plateforme, puis les poutres (15a, 15b) sont désolidarisées de l'appareil de forage (10) de façon qu'elles restent posées sur la barge. 10 8. Procédé selon la revendication 7, caractérisé en ce que ladite seconde poutre (15b) comporte deux tronçons de poutre articulés autour d'un axe horizontal orthogonal à l'axe de la poutre ou d'un axe vertical, qui sont rendus solidaires pendant les étapes 1 à 6, lesdits tronçons de poutre pivotant à l'issue de la sixième étape de façon à permettre à 15 la barge de s'éloigner de la plateforme alors que ladite seconde poutre reste sur la barge. 9. Procédé selon l'une quelconque des revendications précédentes, caractérisé en ce que des moyens d'amortissement sont disposés entre la partie émergée (21) de ladite plateforme (20) et les moyens d'interface (15) ou la sous-structure (11) de l'appareil de forage (10), de façon, lors de la sixième étape du procédé, à permettre la pose sans choc dudit appareil de forage (10). 9) The provision of connecting means (22) between said barge and the drilling apparatus (10) to allow the transfer including energy, people, materials and liquids between the barge and the device drilling to perform the drilling operation. 2. Method according to claim 1, characterized in that: • Said method involves a barge refueler in which one of the bridges comprises at each branch (la, lb) at least one lifting means (7a, 7b, 7c, 7d), and in that: • In the first step, the interface means (15) are arranged on the lifting means (7a, 7b, 7c, 7d) associated with each branch (1a, 1b). In the fourth step, the elevation of the interface means and the drilling rig is effected by deballasting the barge and / or by raising the lifting means (7a, 7b, 7c). , 7d), • In the sixth step, the descent and installation of the interface means (15) and the drilling rig (10) on the emergent part (21) of said platform is carried out by ballasting of the barge and / or descent of the lifting means (7a, 7b, 7c, 7d). 3. Method according to one of claims 1 or 2, characterized in that, in the sixth step, the transfer of the weight of the interface means (15) and the drilling rig (10) on the emergent part (21) of said platform (20) is partial so that said weight is distributed on said platform and on said barge so as to limit the forces undergone by said platform (20), in that means Servo control compensates for the barge's movements according to its six degrees of freedom, and that steps 7 and 8 do not take place. 4. Method according to any one of the preceding claims, characterized in that said interface means (15) take the form of a structure comprising at least two beams (15a, 15b) braced, and that: • When in the second step, said beams (15a, 15b) are disposed substantially orthogonal to the longitudinal axis (A-A ') of the barge, a first foremost beam (15a) and a second beam (15b) the most back along said longitudinal axis. 5. Method according to claim 4, characterized in that: • In the second step, the drilling apparatus (10) is placed on said beams (15a, 15b), • In the sixth step, the beams (15a, 15b ) are placed on the emergent portion (21) of said platform, the drilling apparatus (10) resting on said beams. 6. A method according to claim 4, characterized in that each beam (15a, 15b) has a disconnectable portion (15c, 15d, 15e, 15f) at each end, secured to said beams during steps one to six of the method, and in that the method comprises an additional step: • Disconnection of at least one of said removable portions (15c, 15d, 15e, 15f). 7. A method according to claim 4, characterized in that: • In the second step, the drilling apparatus (10) is secured to said beams (15a, 15b) by disconnectable connection means, • In the sixth step, the drilling rig (10) is placed on the emergent part (21) of said platform, then the beams (15a, 15b) are separated from the drilling rig (10) so that they stay on the barge. 8. Method according to claim 7, characterized in that said second beam (15b) comprises two beam sections hinged about a horizontal axis orthogonal to the axis of the beam or a vertical axis, which are made integral. during steps 1 to 6, said beam sections pivoting at the end of the sixth step so as to allow the barge to move away from the platform while said second beam remains on the barge. 9. Method according to any one of the preceding claims, characterized in that damping means are arranged between the emerging part (21) of said platform (20) and the interface means (15) or the substructure (11) of the drilling apparatus (10), so as to, in the sixth step of the method, to allow the non-shocking installation of said drilling apparatus (10). 10. Procédé selon l'une quelconque des revendications précédentes, caractérisé en ce qu'elle met en oeuvre une barge constituée de deux pontons creux (30a, 30b) sensiblement parallèles, comportant une étrave pointue, lesdits pontons étant surmontés chacun d'une structure creuse (3la, 3 lb) sensiblement verticale et qui s'étend depuis l'arrière desdits pontons jusqu'à proximité de l'étrave desdits pontons, lesdites structures verticales (3la, 3 lb) étant réunies à leur sommet par une structure (32) sensiblement horizontale, 2921098 -17- qui s'étend sur la partie avant desdites structures verticales (31a, 3 lb) de façon à délimiter deux branches (la, lb) à l'arrière de ladite barge. 10. Method according to any one of the preceding claims, characterized in that it implements a barge consisting of two hollow pontoons (30a, 30b) substantially parallel, having a pointed bow, said pontoons being each surmounted by a structure hollow (31a, 3b) substantially vertical and extending from the rear of said pontoons to near the bow of said pontoons, said vertical structures (31a, 3b) being joined at their apex by a structure (32 ) substantially horizontal, 2921098 -17- which extends on the front part of said vertical structures (31a, 3 lb) so as to delimit two branches (la, lb) at the rear of said barge.
FR0706409A 2007-09-13 2007-09-13 METHOD FOR ESTABLISHING A DRILLING APPARATUS AT SEA AND DRILLING PREPARATION Expired - Fee Related FR2921098B1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
FR0706409A FR2921098B1 (en) 2007-09-13 2007-09-13 METHOD FOR ESTABLISHING A DRILLING APPARATUS AT SEA AND DRILLING PREPARATION
PCT/FR2008/001281 WO2009090321A2 (en) 2007-09-13 2008-09-12 Method for installing a drilling apparatus on a rig and for preparing drilling operations
CN2008801126781A CN102137973A (en) 2007-09-13 2008-09-12 Method of setting drilling equipment in place on a platform and preparing it for drilling operations
KR1020107008058A KR20100087094A (en) 2007-09-13 2008-09-12 Method for installing a drilling apparatus on a rig and for preparing drilling operations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR0706409A FR2921098B1 (en) 2007-09-13 2007-09-13 METHOD FOR ESTABLISHING A DRILLING APPARATUS AT SEA AND DRILLING PREPARATION

Publications (2)

Publication Number Publication Date
FR2921098A1 true FR2921098A1 (en) 2009-03-20
FR2921098B1 FR2921098B1 (en) 2015-12-11

Family

ID=39420334

Family Applications (1)

Application Number Title Priority Date Filing Date
FR0706409A Expired - Fee Related FR2921098B1 (en) 2007-09-13 2007-09-13 METHOD FOR ESTABLISHING A DRILLING APPARATUS AT SEA AND DRILLING PREPARATION

Country Status (4)

Country Link
KR (1) KR20100087094A (en)
CN (1) CN102137973A (en)
FR (1) FR2921098B1 (en)
WO (1) WO2009090321A2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011028102A3 (en) * 2009-09-04 2011-11-03 Itrec B.V. Offshore wind turbine installation
NL2011002C2 (en) * 2013-06-18 2014-12-22 Heerema Marine Contractors Nl Drilling module.
WO2019008357A1 (en) * 2017-07-05 2019-01-10 Oil & Gas Decommissioning Limited Offshore decommissioning vessel and methods of use

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102975816B (en) * 2012-12-17 2015-05-20 中国人民解放军92941部队 Docking and locating guide method of self-elevating drilling platform and fixed sea platform
CN103158838B (en) * 2013-03-18 2016-03-30 中集海洋工程研究院有限公司 The split drilling ship of a kind of rapid-assembling and fractionation and manufacture method
CN103879523A (en) * 2014-03-03 2014-06-25 浙江海洋学院 Drilling ship
CN107719585B (en) * 2017-11-17 2023-12-29 广州碧海新能源有限公司 Ocean platform
KR102084058B1 (en) * 2017-11-29 2020-04-28 삼성중공업 주식회사 Variable top side platform
CN110389002B (en) * 2019-08-05 2024-08-06 中交上海港湾工程设计研究院有限公司 Sensor assembly for measuring docking impact force

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL93492C (en) *
GB841333A (en) * 1957-12-16 1960-07-13 Moore Corp Lee C Improvements in barge-carried oil well drilling equipment
FR2474557A2 (en) * 1979-10-05 1981-07-31 Doris Dev Richesse Sous Marine Stable configuration marine platform - includes cross-members resting on sea-bed and supports superstructure installed from barge
FR2474992A1 (en) * 1980-02-05 1981-08-07 Doris Dev Richesse Sous Marine Working float adjustable height - has vertical pillars supported on horizontal submerged containers bridged together
GB2199791A (en) * 1987-01-14 1988-07-20 Allseas Eng Bv Method and apparatus for manoeuvering a superstructure element relative to a fixed construction arranged in water
US4907912A (en) * 1988-10-05 1990-03-13 Jfp Energy, Inc. Submersible production storage barge and method for transporting and installing a jack-up rig in a body of water
US5403124A (en) * 1993-07-26 1995-04-04 Mcdermott International, Inc. Semisubmersible vessel for transporting and installing heavy deck sections offshore using quick drop ballast system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL93492C (en) *
GB841333A (en) * 1957-12-16 1960-07-13 Moore Corp Lee C Improvements in barge-carried oil well drilling equipment
FR2474557A2 (en) * 1979-10-05 1981-07-31 Doris Dev Richesse Sous Marine Stable configuration marine platform - includes cross-members resting on sea-bed and supports superstructure installed from barge
FR2474992A1 (en) * 1980-02-05 1981-08-07 Doris Dev Richesse Sous Marine Working float adjustable height - has vertical pillars supported on horizontal submerged containers bridged together
GB2199791A (en) * 1987-01-14 1988-07-20 Allseas Eng Bv Method and apparatus for manoeuvering a superstructure element relative to a fixed construction arranged in water
US4907912A (en) * 1988-10-05 1990-03-13 Jfp Energy, Inc. Submersible production storage barge and method for transporting and installing a jack-up rig in a body of water
US5403124A (en) * 1993-07-26 1995-04-04 Mcdermott International, Inc. Semisubmersible vessel for transporting and installing heavy deck sections offshore using quick drop ballast system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011028102A3 (en) * 2009-09-04 2011-11-03 Itrec B.V. Offshore wind turbine installation
US8701579B2 (en) 2009-09-04 2014-04-22 Itrec B.V. Offshore wind turbine installation
WO2014204304A1 (en) * 2013-06-17 2014-12-24 Heerema Marine Contractors Nederland Se Drilling module
NL2011002C2 (en) * 2013-06-18 2014-12-22 Heerema Marine Contractors Nl Drilling module.
WO2019008357A1 (en) * 2017-07-05 2019-01-10 Oil & Gas Decommissioning Limited Offshore decommissioning vessel and methods of use

Also Published As

Publication number Publication date
CN102137973A (en) 2011-07-27
WO2009090321A2 (en) 2009-07-23
FR2921098B1 (en) 2015-12-11
KR20100087094A (en) 2010-08-03

Similar Documents

Publication Publication Date Title
FR2921098A1 (en) Drill rig setting method for e.g. sea bed, involves placing connection unit between barge and rig to permit transfer of energy, people, materials and liquid between barge and rig so as to carry out drilling operations
US4065934A (en) Rig transport method
US20110158784A1 (en) Arm assembly and methods of passing a pipe from a first vessel to a second vessel using the arm assembly
BRPI0808590A2 (en) ELEVATORY SUPPORT VESSEL AND ITS USE "
JPS619387A (en) Mooring arrangement for ship
US6942427B1 (en) Column-stabilized floating structure with telescopic keel tank for offshore applications and method of installation
FR2852917A1 (en) SEALED COMPARTMENT RECEPTACLE AND METHOD OF PLACING IT TO RECOVER POLLUTANT EFFLUENTS FROM A EPAVE
JPH0144557B2 (en)
GB2344843A (en) Gravity securing system for offshore generating equipment
NO313130B1 (en) Device for positioning and lifting a marine structure, especially a platform tire
CA2076867C (en) System for loading at sea
FR3017595A1 (en) DEVICE FOR LIFTING RIVER OR MARITIME CRAFT
NO315111B1 (en) Löftefartöy for positioning, lifting and handling of a marine structure
US6923598B2 (en) Method and apparatus for the lifting of offshore installation jackets
RU2276226C2 (en) Method and ship for marine platform deck disassembling
EP3585679A1 (en) Device for coupling two boats
US20150023737A1 (en) Jack-up rig and method of installing the same on location of operation
EP1606160B1 (en) Device and method for stabilising and controlling the lowering or raising of a heavy structure between the surface and the bed of the sea
CN102325691B (en) Skid beam assembly for loading and transporting large structures
DK2961649T3 (en) Integrated ship for heavy cargo and logistics
FR2545437A1 (en) SUBMERSIBLE POINT MOORING DEVICE, PARTICULARLY FOR ANCHORING OIL TANKS IN ARCTIC WATERS
FR2970748A1 (en) Method for realizing maintenance operations i.e. replacement of heavier parts, of floating wind turbine device of off-shore wind energy production system, involves positioning floating wind turbine device on maintenance device
US4380406A (en) Jackup platform trailer
NO322035B1 (en) Riser protection system
US6682265B1 (en) Method of establishing and/or operating a bore well in a seabed and a drilling vessel for use in connection therewith

Legal Events

Date Code Title Description
CA Change of address
CD Change of name or company name
PLFP Fee payment

Year of fee payment: 9

PLFP Fee payment

Year of fee payment: 10

PLFP Fee payment

Year of fee payment: 11

PLFP Fee payment

Year of fee payment: 12

PLFP Fee payment

Year of fee payment: 13

ST Notification of lapse

Effective date: 20210506