[go: up one dir, main page]

FR2846979B1 - METHOD OF JAMMING RAILWAYS - Google Patents

METHOD OF JAMMING RAILWAYS

Info

Publication number
FR2846979B1
FR2846979B1 FR0213936A FR0213936A FR2846979B1 FR 2846979 B1 FR2846979 B1 FR 2846979B1 FR 0213936 A FR0213936 A FR 0213936A FR 0213936 A FR0213936 A FR 0213936A FR 2846979 B1 FR2846979 B1 FR 2846979B1
Authority
FR
France
Prior art keywords
ballast
vehicle
line
target
situated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
FR0213936A
Other languages
French (fr)
Other versions
FR2846979A1 (en
Inventor
Jean Paul Courraud
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUD OUEST TRAVAUX
Original Assignee
SUD OUEST TRAVAUX
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUD OUEST TRAVAUX filed Critical SUD OUEST TRAVAUX
Priority to FR0213936A priority Critical patent/FR2846979B1/en
Priority to DE60302417T priority patent/DE60302417T2/en
Priority to AT03292675T priority patent/ATE310850T1/en
Priority to EP03292675A priority patent/EP1418273B1/en
Priority to ES03292675T priority patent/ES2253651T3/en
Publication of FR2846979A1 publication Critical patent/FR2846979A1/en
Application granted granted Critical
Publication of FR2846979B1 publication Critical patent/FR2846979B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B35/00Applications of measuring apparatus or devices for track-building purposes
    • E01B35/06Applications of measuring apparatus or devices for track-building purposes for measuring irregularities in longitudinal direction
    • E01B35/08Applications of measuring apparatus or devices for track-building purposes for measuring irregularities in longitudinal direction for levelling
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/16Guiding or measuring means, e.g. for alignment, canting, stepwise propagation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Control Of Linear Motors (AREA)
  • Control Of Position, Course, Altitude, Or Attitude Of Moving Bodies (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)

Abstract

The ballast vehicle is driven along the working railway line, and its outlets are computer controlled to deliver ballast to the track. A series of measuring gauges (7.1 - 7.n) which are capable of tracking a target (P1, P2) situated on the ballast vehicle, and continuously calculating position and transmitting this information to a processor mounted on the ballast vehicle. This is linked to the computer system. The procedure for carrying out works on railway lines includes filling the line with ballast. The ballast vehicle is driven along the line requiring work, and its outlets are controlled by a computerized system which compares a theoretical model of the line with the real topographical data derived from the line under maintenance. This includes the use of a series of measuring gauges (7.1 - 7.n) which are capable of tracking a target (P1, P2) situated on the ballast vehicle, and continuously calculating the topographical position of the target, and continuously transmitting this information to a processor mounted on the ballast vehicle. This is interfaced with the computer system which controls the output of ballast. The targets (P1, P2) may consist of front and rear prisms, co-operating successively with at least three automatic theodolite stations situated along the length of the track to measure the advance of the vehicle.
FR0213936A 2002-11-07 2002-11-07 METHOD OF JAMMING RAILWAYS Expired - Fee Related FR2846979B1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
FR0213936A FR2846979B1 (en) 2002-11-07 2002-11-07 METHOD OF JAMMING RAILWAYS
DE60302417T DE60302417T2 (en) 2002-11-07 2003-10-27 Tamping Method
AT03292675T ATE310850T1 (en) 2002-11-07 2003-10-27 TRACK PLUGING METHOD
EP03292675A EP1418273B1 (en) 2002-11-07 2003-10-27 Method of tamping railway tracks
ES03292675T ES2253651T3 (en) 2002-11-07 2003-10-27 PROCEDURE OF BATEADO DE VIAS FERREAS.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR0213936A FR2846979B1 (en) 2002-11-07 2002-11-07 METHOD OF JAMMING RAILWAYS

Publications (2)

Publication Number Publication Date
FR2846979A1 FR2846979A1 (en) 2004-05-14
FR2846979B1 true FR2846979B1 (en) 2005-01-28

Family

ID=32104526

Family Applications (1)

Application Number Title Priority Date Filing Date
FR0213936A Expired - Fee Related FR2846979B1 (en) 2002-11-07 2002-11-07 METHOD OF JAMMING RAILWAYS

Country Status (5)

Country Link
EP (1) EP1418273B1 (en)
AT (1) ATE310850T1 (en)
DE (1) DE60302417T2 (en)
ES (1) ES2253651T3 (en)
FR (1) FR2846979B1 (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7168174B2 (en) 2005-03-14 2007-01-30 Trimble Navigation Limited Method and apparatus for machine element control
RU2387561C1 (en) * 2009-03-23 2010-04-27 Открытое Акционерное Общество "Российские Железные Дороги" Opto-electronic system for monitoring spatial position of railway track
RU2424932C1 (en) * 2009-12-30 2011-07-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный университет информационных технологий, механики и оптики" Optoelectronic system to control spatial position of railway track
US8781655B2 (en) 2011-10-18 2014-07-15 Herzog Railroad Services, Inc. Automated track surveying and ballast replacement
US9051695B2 (en) 2011-10-18 2015-06-09 Herzog Railroad Services, Inc. Automated track surveying and ballast replacement
US8615110B2 (en) 2012-03-01 2013-12-24 Herzog Railroad Services, Inc. Automated track surveying and ditching
CN104215258B (en) * 2014-08-19 2017-02-15 中国科学院西安光学精密机械研究所 Vehicle-mounted theodolite angle measurement precision testing method and system
AT519739B1 (en) 2017-05-12 2018-10-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Method for controlling a track-laying machine
FR3066770B1 (en) * 2017-05-29 2019-07-26 Matisa Materiel Industriel S.A. PROCEDURE FOR ADJUSTING A GUIDE SYSTEM OF A RAIL WORKS MACHINE, METHOD AND SYSTEM FOR GUIDING THEM
CN107908200B (en) * 2017-12-25 2023-07-04 东方宏海新能源科技发展有限公司 Focusing assembly production line and production method of disc tracking system
CN109754630B (en) * 2019-02-02 2020-06-19 武汉元光科技有限公司 Method and device for determining vehicle operation line
CN117604840B (en) * 2024-01-19 2024-06-14 中国铁路设计集团有限公司 Operation common speed railway precise measurement and precise tamping operation method without control network

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0293015B1 (en) * 1985-07-02 1991-10-02 Les Fils D'auguste Scheuchzer S.A. Device for the command of a railway track levelling and aligning machine
CH683703A5 (en) * 1991-09-26 1994-04-29 Mueller J Ag Method for track surveying.
SE9202160L (en) * 1992-07-13 1994-01-14 Contractor Tools Ab Device for controlling operating units in work machines
SE9402047L (en) * 1994-06-13 1995-12-14 Contractor Tools Ab Method and apparatus for remote control of one or more working machines
ITMI981205A1 (en) * 1998-06-01 1999-12-01 Demetrio Federico STRUCTURE COMPOSED OF A LASER RADIO ISSUING-RECEIVING INSTRUMENT HOOKED AND SLIDING INSIDE A FIXED CONTAINER

Also Published As

Publication number Publication date
DE60302417T2 (en) 2006-08-10
DE60302417D1 (en) 2005-12-29
ES2253651T3 (en) 2006-06-01
FR2846979A1 (en) 2004-05-14
EP1418273A1 (en) 2004-05-12
EP1418273B1 (en) 2005-11-23
ATE310850T1 (en) 2005-12-15

Similar Documents

Publication Publication Date Title
FR2846979B1 (en) METHOD OF JAMMING RAILWAYS
US6526339B1 (en) GPS controlled multiple source material application
CN106687352B (en) Guided rail vehicle with unmanned vehicle and method
US6119353A (en) Method and apparatus for non-contact measuring of the deflection of roads or rails
US8271153B2 (en) System, method and computer readable memory medium for verifying track database information
CN113276911B (en) Method and system for detecting position of suspension type monorail vehicle section train
CA2660865A1 (en) Train control system and method of controlling a train or trains
US6058628A (en) System for distributing ballast in a track bed
EP1028325A3 (en) Method of surveying a train track
FR2856645B1 (en) DEVICE AND METHOD FOR CONTROLLING TRAINS, ESPECIALLY OF THE ERTMS TYPE
AU4292799A (en) Device for determining the contour of a road surface
EP0401260A1 (en) A method of and an equipment for determining the position of a track.
AU2011250693B2 (en) Methods and systems for continually measuring the length of a train operating in a positive train control environment
BR9909035A (en) Track top lubrication rate control by hydraulic pulse width modulation method
US20130324156A1 (en) Location system for determining the position of an object
US20190179034A1 (en) Method to Determine Clearance of a Track Obstacle Using GPS Devices
CA2520019A1 (en) Method for automatically guiding a mining machine
US11708101B2 (en) Vehicle orientation determination system
DE60133630D1 (en) DEVICE AND METHOD FOR DETECTING OBJECTS
CN110799705B (en) Procedure for controlling a guidance system of a railway working machine, associated method and associated guidance system
DE50009412D1 (en) Method and device for determining a tractive force of a track-bound, driven system
KR101196599B1 (en) Display Unit of Track Information
CN115808675A (en) Laser ranging error compensation method
Odziemczyk et al. Analysis of railway track geometry measurement methods usability
BRPI0706562A2 (en) method and device for train sequence protection

Legal Events

Date Code Title Description
CD Change of name or company name
ST Notification of lapse

Effective date: 20070731