[go: up one dir, main page]

ES2666018A1 - PROCEDURE FOR THE FORMATION OF STONE BLOCKS IN QUARRY THROUGH HORIZONTAL EXTRACTION (Machine-translation by Google Translate, not legally binding) - Google Patents

PROCEDURE FOR THE FORMATION OF STONE BLOCKS IN QUARRY THROUGH HORIZONTAL EXTRACTION (Machine-translation by Google Translate, not legally binding) Download PDF

Info

Publication number
ES2666018A1
ES2666018A1 ES201631387A ES201631387A ES2666018A1 ES 2666018 A1 ES2666018 A1 ES 2666018A1 ES 201631387 A ES201631387 A ES 201631387A ES 201631387 A ES201631387 A ES 201631387A ES 2666018 A1 ES2666018 A1 ES 2666018A1
Authority
ES
Spain
Prior art keywords
quarry
blocks
bank
formation
translation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
ES201631387A
Other languages
Spanish (es)
Other versions
ES2666018B1 (en
Inventor
Manuel SANCHEZ MARIN
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Areniscas Rosal S A
Areniscas Rosal Sa
Original Assignee
Areniscas Rosal S A
Areniscas Rosal Sa
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Areniscas Rosal S A, Areniscas Rosal Sa filed Critical Areniscas Rosal S A
Priority to ES201631387A priority Critical patent/ES2666018B1/en
Publication of ES2666018A1 publication Critical patent/ES2666018A1/en
Application granted granted Critical
Publication of ES2666018B1 publication Critical patent/ES2666018B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/26Methods of surface mining; Layouts therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

Process of forming stone blocks in the quarry itself, comprising the steps of forming a horizontal quarry bank at one end of a work zone; performing at least a first longitudinal vertical cut on said quarry bank at a distance from the edge of the quarry bank that corresponds to the width of the blocks to be formed, making a plurality of transversal vertical cuts on the quarry bench with a distance between said transverse vertical cuts corresponds to the length of the blocks to be formed, making a longitudinal horizontal cut on the quarry bench at a distance from the edge of the quarry bench that corresponds to the height of the blocks to be shaped and to extract the blocks of stone from the quarry. quarry conformed. (Machine-translation by Google Translate, not legally binding)

Description

imagen1image 1

imagen2image2

imagen3image3

imagen4image4

imagen5image5

En este caso, se prefiere que el corte horizontal longitudinal realizado tenga una profundidad que se corresponde con al menos el ancho de los bloques de piedra de cantera a conformar. In this case, it is preferred that the longitudinal horizontal cut made has a depth that corresponds to at least the width of the quarry stone blocks to be formed.

Así, finalmente, quedan conformados los bloques de piedra a partir de los cortes realizados sobre el banco de cantera. Posteriormente, en la etapa e), dichos bloques conformados son extraídos de la zona de trabajo. Thus, finally, the stone blocks are formed from the cuts made on the quarry bench. Subsequently, in step e), said shaped blocks are extracted from the work area.

En una primera realización, las etapas de la b) a la e) se repiten para cada banco de cantera conformado en la etapa a) en toda la extensión de la zona de trabajo. En otras palabras, en la zona de trabajo conformada a un determinado nivel de extracción, la retirada de los bloques de piedra conformados con el material rocoso de un banco de cantera conlleva volver a la etapa a), es decir, se vuelve a conformar un nuevo banco de cantera, sobre el cual, se repiten las acciones de las etapas de la b) a la e) para la conformación de nuevos bloques de cantera; y así, las etapas de la b) a la e) se repiten sucesivamente hasta haber conformado bloques de piedra con todo el material rocoso de dicha zona de trabajo, para entonces, pasar a explotar un nuevo nivel de extracción inferior de la cantera, el cual, se inicia con la aplicación de las acciones de la sub-etapa a.2) o a.3) para la conformación del banco de cantera horizontal en dicho nivel de explotación inferior. In a first embodiment, the steps from b) to e) are repeated for each quarry bank formed in stage a) throughout the extension of the work area. In other words, in the work area conformed to a certain level of extraction, the removal of the stone blocks formed with the rocky material of a quarry bank entails returning to stage a), that is, a new new quarry bank, on which, the actions of the stages from b) to e) are repeated for the formation of new quarry blocks; and thus, the steps from b) to e) are repeated successively until they have formed blocks of stone with all the rocky material of said work area, by then, to explode a new level of lower extraction of the quarry, the which begins with the application of the actions of sub-stage a.2) or a.3) for the formation of the horizontal quarry bank at said lower exploitation level.

En una segunda realización, la etapa b), adicionalmente, incluye realizar una pluralidad de segundos cortes verticales longitudinales, paralelos al primer corte vertical longitudinal, en toda la extensión de la zona de trabajo, donde, el primer y los segundos cortes verticales longitudinales a realizar se distancian entre sí en correspondencia con el ancho de los bloques de piedra de cantera a conformar. En otras palabras, se realizan una pluralidad de cortes verticales longitudinales, distanciados entre sí según el ancho de los bloques de piedra a conformar, distribuidos en toda la extensión de la zona de trabajo. In a second embodiment, step b), additionally, includes making a plurality of second longitudinal vertical cuts, parallel to the first longitudinal vertical cut, over the entire length of the work area, where, the first and second longitudinal vertical cuts a perform distance from each other in correspondence with the width of the quarry stone blocks to be shaped. In other words, a plurality of longitudinal vertical cuts are made, spaced apart from each other according to the width of the stone blocks to be formed, distributed throughout the length of the work area.

Por otro lado, en esta segunda realización, adicionalmente, los cortes verticales transversales a realizar en la etapa c) se prolongan desde el canto del banco de cantera conformado en la etapa a) a toda la extensión de la zona de trabajo. On the other hand, in this second embodiment, additionally, the vertical transversal cuts to be made in step c) extend from the edge of the quarry bench formed in step a) to the entire extension of the work area.

Así, toda la extensión de la zona de trabajo del nivel de extracción en cuestión queda dividida por una pluralidad de cortes verticales longitudinales y cortes verticales transversales que se entrecruzan, definiendo las caras laterales de los bloques de piedra de cantera a conformar, estos últimos, manteniéndose unidos al macizo rocoso tan solo por sus bases. Thus, the entire extension of the work area of the extraction level in question is divided by a plurality of longitudinal vertical cuts and cross-sectional vertical cuts, defining the lateral faces of the quarry stone blocks to be formed, the latter, staying united to the rocky massif only by its bases.

7 7

Posteriormente, en esta segunda realización, se llevan a cabo las etapas d) y e), lo cual, como se ha comentado, conlleva la conformación de un nuevo banco de cantera en el extremo de la zona de trabajo, sobre el cual, se repiten las acciones de las etapas d) y e) para la conformación de nuevos bloques de cantera; y así, dichas etapas d) y e) se repiten sucesivamente hasta haber conformado bloques de piedra con todo el material rocoso de la zona de trabajo, para entonces, pasar a explotar un nuevo nivel de extracción inferior de la cantera, el cual, se inicia con la aplicación de las acciones de la sub-etapa a.2) o a.3) para la conformación del banco de cantera horizontal en dicho nivel de explotación inferior. Subsequently, in this second embodiment, steps d) and e) are carried out, which, as mentioned, involves the formation of a new quarry bank at the end of the work area, over which, they are repeated the actions of stages d) and e) for the formation of new quarry blocks; and thus, said stages d) and e) are repeated successively until they have formed blocks of stone with all the rocky material of the work area, by then, to start exploiting a new level of lower extraction of the quarry, which, starts with the application of the actions of sub-stage a.2) or a.3) for the formation of the horizontal quarry bank at said lower exploitation level.

En ambas realizaciones, los bloques de piedra de cantera extraídos pasan a ser almacenados, estando listos para su comercialización según se demande. In both embodiments, the quarried stone blocks removed are stored, being ready for commercialization as required.

Puede entenderse que la conformación y extracción de los bloques de piedra se realiza íntegramente de forma directa del macizo rocoso de la cantera, donde, el corte horizontal y los cortes verticales realizados determinan las medidas finales de los bloques de piedra conformados. Por tanto, es importante que dichos cortes se realicen debidamente escuadrados entre sí y correctamente nivelados, así como, a las distancias previamente establecidas. It can be understood that the shaping and extraction of the stone blocks is carried out entirely directly from the rocky massif of the quarry, where, the horizontal cut and the vertical cuts made determine the final measurements of the shaped stone blocks. Therefore, it is important that these cuts are made properly squared together and correctly leveled, as well as, at the distances previously established.

Por ello, se prefiere que dichos cortes se realicen con medios de aserrado, para garantizar la exactitud en la realización de los cortes. Therefore, it is preferred that said cuts be made with sawing means, to ensure accuracy in making the cuts.

Igualmente, para garantizar la exactitud de las dimensiones de los bloques de piedra a conformar, preferiblemente, los cortes realizados en las etapas b) y c) son previamente acotados y marcados sobre el banco de cantera conformado en la etapa a) o sobre toda la extensión de la zona de trabajo, según la realización que corresponda. Likewise, to guarantee the accuracy of the dimensions of the stone blocks to be formed, preferably, the cuts made in stages b) and c) are previously bounded and marked on the quarry bank formed in stage a) or over the entire length of the work area, according to the corresponding implementation.

La aplicación del procedimiento genera muy poca cantidad de estériles o desperdicios del material rocoso, los cuales, pueden ser depositados en zonas aledañas a donde se realiza la explotación que hayan sido deterioradas con anterioridad, ayudando a la restauración de dichas zonas afectadas. The application of the procedure generates very little amount of sterile or waste of the rocky material, which can be deposited in surrounding areas where the exploitation that has been deteriorated previously is carried out, helping to restore said affected areas.

8 8

Claims (1)

imagen1image 1 imagen2image2
ES201631387A 2016-10-28 2016-10-28 PROCEDURE FOR CONFORMING STONE BLOCKS IN QUARRY THROUGH HORIZONTAL EXTRACTION Active ES2666018B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ES201631387A ES2666018B1 (en) 2016-10-28 2016-10-28 PROCEDURE FOR CONFORMING STONE BLOCKS IN QUARRY THROUGH HORIZONTAL EXTRACTION

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ES201631387A ES2666018B1 (en) 2016-10-28 2016-10-28 PROCEDURE FOR CONFORMING STONE BLOCKS IN QUARRY THROUGH HORIZONTAL EXTRACTION

Publications (2)

Publication Number Publication Date
ES2666018A1 true ES2666018A1 (en) 2018-04-30
ES2666018B1 ES2666018B1 (en) 2019-02-05

Family

ID=62003526

Family Applications (1)

Application Number Title Priority Date Filing Date
ES201631387A Active ES2666018B1 (en) 2016-10-28 2016-10-28 PROCEDURE FOR CONFORMING STONE BLOCKS IN QUARRY THROUGH HORIZONTAL EXTRACTION

Country Status (1)

Country Link
ES (1) ES2666018B1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2111872A (en) * 1933-11-06 1938-03-22 Walter C Rea Method of and apparatus for quarrying and shaping rock and stone
BE541467A (en) * 1954-10-12 1955-10-15 Soc. D'echanges Industriels Et Commerciaux S.E.I.C. METHOD AND DEVICE FOR THE EXTRACTION OF TAILIOR STONES FROM LIVE ROCK
US6102483A (en) * 1991-07-16 2000-08-15 Cacique; Geraldo Antunes Process for preparing the exposed surface of a rock formation to permit the extraction of parallelepiped shaped blocks of rock ready for final processing, and process and extractor for extracting such blocks
WO2008031524A1 (en) * 2006-09-12 2008-03-20 Saipem S.P.A. Transportation of sulphur from solid sulphur deposits, in blocks of large dimensions
EP2280809A1 (en) * 2008-04-30 2011-02-09 Aros S.r.l. A process for reinforcing blocks or slabs of stone material

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2111872A (en) * 1933-11-06 1938-03-22 Walter C Rea Method of and apparatus for quarrying and shaping rock and stone
BE541467A (en) * 1954-10-12 1955-10-15 Soc. D'echanges Industriels Et Commerciaux S.E.I.C. METHOD AND DEVICE FOR THE EXTRACTION OF TAILIOR STONES FROM LIVE ROCK
US6102483A (en) * 1991-07-16 2000-08-15 Cacique; Geraldo Antunes Process for preparing the exposed surface of a rock formation to permit the extraction of parallelepiped shaped blocks of rock ready for final processing, and process and extractor for extracting such blocks
WO2008031524A1 (en) * 2006-09-12 2008-03-20 Saipem S.P.A. Transportation of sulphur from solid sulphur deposits, in blocks of large dimensions
EP2280809A1 (en) * 2008-04-30 2011-02-09 Aros S.r.l. A process for reinforcing blocks or slabs of stone material

Also Published As

Publication number Publication date
ES2666018B1 (en) 2019-02-05

Similar Documents

Publication Publication Date Title
EA201992615A1 (en) METHODS FOR ISOLATING CELLS WITHOUT USING TRANSGENIC MARKER SEQUENCES
AR092459A1 (en) STRUCTURES POLYCYSTALLINE SELECTIVELY LIXIVIATED FOR CUTTING ELEMENTS OF DRILLING BARRELS
AR108960A1 (en) A MODULE FOR A STRUCTURE
AR102461A1 (en) INVESTMENT IMPROVEMENT GEOLOGICAL ADDRESS USING FORWARD AND SURROUNDING ELECTROMAGNETIC TOOL
CL2015000674A1 (en) Apparatus for cutting volumes of expanded polystyrene foam or similar obtaining double curvature surfaces, comprising a first pair of linear guides on which two pairs of plates connected by a horizontal beam are moved, where said plates and said beams allow to hold and fix a block of expanded polystyrene foam material or the like for cutting.
MX2017004417A (en) METHOD FOR HYDRAULIC COMMUNICATION WITH THE OBJECTIVE WELL FROM THE RELIEF WELL.
CO2019002969A2 (en) Concrete roof, equipment to produce a concrete roof and method to produce a concrete roof
PE20160646A1 (en) LAMINATED AND FOLDED LIP AND MANUFACTURING METHOD
ES2666018A1 (en) PROCEDURE FOR THE FORMATION OF STONE BLOCKS IN QUARRY THROUGH HORIZONTAL EXTRACTION (Machine-translation by Google Translate, not legally binding)
GT201400176A (en) MATRICES OF CONFORMING OF CONTAINERS AND METHODS OF ELABORATION OF THE SAME
MX366797B (en) Prefabricated footing for wind turbines.
CL2020001537A1 (en) Thin stabilized segmental wall blocks, soil reinforcement system and methods.
RU2012145290A (en) METHOD FOR TRANSPORT-FREE TRANSPORT Trench
RU2011149932A (en) METHOD FOR OPEN-UNDERGROUND DEVELOPMENT OF A POWERFUL GAYING COAL PLASTIC
RU2012112768A (en) METHOD FOR DEVELOPING STEAPALLY ORE BODIES WITH UNSTABLE ORE
RU2012143532A (en) REINFORCED SAND PILLOW WITH A CURVED SOLE
RU2017146316A (en) The method of dismantling the pipeline for decommissioning or in order to repair it
CO2017009098A2 (en) Method of building a road
AR092803A1 (en) SUBMURATION AND RECALCE METHOD
ES2724407T3 (en) Procedure for extracting natural materials, mainly from rocks
RU2013111577A (en) INTEGRATED METHOD FOR PRELIMINARY DEGASATION OF THE WORKING COAL LAYER, THE SPACE AND SURGEONS AND MANAGED HEAVY ROOF DAMAGE
RU2015115098A (en) METHOD FOR MINING TECHNICAL RECULTIVATION OF ANTI-EROSION DUMPS OF HIGH ECOLOGICAL CAPACITY
UA128454U (en) METHOD OF DEVELOPMENT OF POWERFUL ORE DEPOSITS WITH SUSTAINABLE SURFACE BREEDS
ES113736A1 (en) Procedure of nailing or sinking of shoring or inlay pipes, to mold the concrete stakes in the ground.
MX2017009361A (en) IMPROVED FOAM RESIN.

Legal Events

Date Code Title Description
FG2A Definitive protection

Ref document number: 2666018

Country of ref document: ES

Kind code of ref document: B1

Effective date: 20190205