EP4278136A1 EP22703244.8A EP22703244A EP4278136A1 EP 4278136 A1 EP4278136 A1 EP 4278136A1 EP 22703244 A EP22703244 A EP 22703244A EP 4278136 A1 EP4278136 A1 EP 4278136A1
Authority
EP
European Patent Office
Prior art keywords
building space
ventilation
hvac system
building
outdoor air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP22703244.8A
Other languages
German (de)
French (fr)
Inventor
Bhavesh Gupta
Manish Sharma
Prabhat Ranjan
Balaji Krishnasamy
Vishwanath Gupta
Banuprakash BALAKRISHNA
Surjayan GHOSH
Navneet Kumar
Deepika Sandeep
Shubham KHANDELWAL
Kanchan AGGARWAL
Harsha Mathur
Yashwanth VELLALA
Jagadeesh Brahmajosyula
Rohil PAL
Rahul Pandey
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honeywell International Inc
Original Assignee
Honeywell International Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US17/571,009 external-priority patent/US20220228756A1/en
Application filed by Honeywell International Inc filed Critical Honeywell International Inc
Publication of EP4278136A1 publication Critical patent/EP4278136A1/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/0001Control or safety arrangements for ventilation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/46Improving electric energy efficiency or saving
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/65Electronic processing for selecting an operating mode
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/72Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
    • F24F11/74Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/20Humidity
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/50Air quality properties
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2120/00Control inputs relating to users or occupants
    • F24F2120/10Occupancy
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2140/00Control inputs relating to system states
    • F24F2140/40Damper positions, e.g. open or closed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2140/00Control inputs relating to system states
    • F24F2140/60Energy consumption

Definitions

  • HVAC Heating, Ventilating and Air Conditioning
  • HVAC systems provide conditioned air for heating and cooling the interior of a building. Some HVAC systems also can provide fresh air ventilation into the building while exhausting an equivalent amount of inside air. Such fresh air ventilation is useful in reducing contaminates produced in the building.
  • there are often costs involved in conditioning the fresh air before it can be deployed in the building For example, in the winter, the fresh air must typically be heated by the HVAC system, and in some cases, humidity must be added. Likewise, in the summer, the fresh air must typically be cooled by the HVAC system, and in some cases, humidity must be removed.
  • a method provides dynamic ventilation for a building space serviced by a Heating, Ventilating and Air Conditioning (HVAC) system with one or more components including an outdoor air ventilation damper.
  • the method includes selecting a ventilation mode from a plurality of ventilation modes.
  • the ventilation modes include a health ventilation mode that when selected attempts to maximize ventilation to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space.
  • the ventilation modes include an energy savings ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined energy savings limits.
  • a method includes controlling one or more components of the HVAC system, including the outdoor air ventilation damper, in accordance with the selected ventilation mode.
  • HVAC Heating, Ventilating and Air Conditioning
  • a method provides dynamic ventilation for a building space serviced by a Heating, Ventilating and Air Conditioning (HVAC) system with one or more components including an outdoor air ventilation damper.
  • the method includes selecting a ventilation mode from a plurality of ventilation modes.
  • the plurality of ventilation modes include a first ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space while maintaining one or more IAQ contaminants in the building space below one or more corresponding first predetermined limits.
  • the plurality of ventilation modes includes a second ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space while maintaining one or more IAQ contaminants in the building space below one or more corresponding second predetermined limits, wherein at least one of the second predetermined limits is below a corresponding one of the first predetermined limits.
  • the method includes controlling one or more components of the HVAC system, including the outdoor air ventilation damper, in accordance with the selected ventilation mode.
  • a method provides dynamic ventilation for a building space serviced by a Heating, Ventilating and Air Conditioning (HVAC) system with an outdoor air ventilation damper.
  • HVAC Heating, Ventilating and Air Conditioning
  • the method includes developing a building model for the building space, the building model including a non-linear representation of how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation under a plurality of different operating conditions.
  • a current operating condition is identified.
  • a linear approximation of the non-linear building model at the current operating condition is determined, wherein the linear approximation approximates how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation at the current operating condition.
  • the method includes controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Predictive Control (PC) using the determined linear approximation of the non-linear building model.
  • PC Predictive Control
  • Figure 1 is a schematic block diagram of an illustrative HVAC control system
  • Figure 2 is a flow diagram showing an illustrative method of providing a maximum allowed ventilation for a building space
  • Figure 3 is a flow diagram showing an illustrative method of providing a maximum allowed ventilation for a building space
  • Figure 4 is a flow diagram showing an illustrative method of providing a maximum allowed ventilation for a building space
  • Figure 5 is a flow diagram showing an illustrative method of providing a dynamic ventilation rate for a building space
  • FIG. 1 is a schematic block diagram of an illustrative HVAC control system 10.
  • a building space 12 includes a controller 14 that is configured to control at least some features and operations of an HVAC system 16.
  • the building space 12 may represent the interior of an entire building, or only part of a building.
  • the controller 14 may control operation of a damper 18 that is part of the HVAC system 16 and that functions to control the relative flow of fresh outside air into the building space 12 through the ductwork (not shown) that provides conditioned air to various parts of the building space 12.
  • the controller 14 may control other features and components of the HVAC system 16 as well.
  • the controller 14 may operate in accordance with various HVAC standards such as but not limited to ASHRAE 62.1 to provide appropriate volumes of fresh air to the building space 12.
  • the illustrative controller 14 includes an input 20 for receiving one or more interior environmental conditions within the building space 12 as well as for receiving one or more exterior environmental conditions outside of the building space 12.
  • the input 20 may also receive one or more operating conditions of the HVAC system 16 over time.
  • the controller 14 includes a processor 22 that is operatively coupled to the input 20 such that the processor 22 can track over time one or more environmental conditions within the building space 12 and also track over time one or more exterior environmental conditions outside of the building space 12.
  • the processor 22 may also track one or more operating conditions of the HVAC system 16 over time, and correlate in time the one or more operating conditions of the HVAC system 16 with the one or more environmental conditions within the building space 12, the one or more exterior environmental conditions outside of the building space 12, and/or any other suitable conditions or parameters. While a single processor 22 is shown, it will be appreciated that the controller 14 may include two, three or more distinct processors 22.
  • the functionality of the controller 14 may be divided between the two, three or more distinct processors 22, and in some cases, may be distributed amount a plurality of different locations.
  • the processor 22 may be configured to learn an environmental model for the building space 12 based at least in part on the tracked one or more interior environmental conditions within the building space 12 and the one or more exterior environmental conditions outside of the building space 12 during operation of the HVAC system 16.
  • the learned environmental model is configured to predict an environmental state of the building space 12 in response to operation of the HVAC system 16 under various interior and exterior environmental conditions.
  • the processor 22 may be configured to determine a dynamic ventilation rate for the HVAC system 16 of the building space 12 based at least in part on inputting to the environmental model of the building space 12 one or more current interior environmental conditions and one or more current exterior environmental conditions.
  • the illustrative controller 14 further includes an output 24 for sending the determined dynamic ventilation rate to the HVAC system 16 for controlling the outdoor air ventilation damper 18 of the HVAC system 16.
  • the processor 22 is configured to predict a current maximum allowed ventilation rate that can be achieved without causing the HVAC system 26 to compromise on any of one or more comfort conditions of the building space.
  • the HVAC system 16 may control the outdoor air ventilation damper 18 to provide ventilation up to or at the current maximum allowed ventilation rate.
  • the building space 12 may include one or more sensors 26, individually labeled as 26a and 26b. While two sensors 26 are shown, it will be appreciated that this is merely illustrative, as the building space 12 may include any number of sensors 26, and may include only one sensor 26 or may include three, four, five or even substantially more sensors 26. At least some of the sensors 26 may be hard-wired to the input 20. At least some of the sensors 26 may be wirelessly coupled to the input 20. The sensors 26 may represent any of a variety of different types of sensors. The sensors 26 may be configured to provide signals representing one or more interior environmental conditions to the input 20.
  • the sensors 26 may include temperature sensors, humidity sensors, CO2 sensors and sensors configured to detect other indoor pollutants such as particulate matter (PM), volatile organic compounds (VOCs) and the like.
  • the sensors 26 may include occupancy sensors, such as motion sensors, video camera sensors coupled with video analytics that in some cases can identify and maintain a count and/or density of people in the building space, a time of flight (e.g. LIDAR) sensor that can detect and in some cases maintain a count and/or density of people in the building space, a milli-meter wave sensor (e.g. Radar) that can detect and in some cases maintain a count and/or density of people in the building space, and/or any other suitable sensor as desired. People are known to produce contaminates in the building space.
  • the illustrative HVAC control system 10 also includes one or more sensors 28 that are disposed outside of the building space 12 in order to provide signals representing one or more exterior environmental conditions to the input 20. At least some of the sensors 28 may be hard-wired to the input 20. At least some of the sensors 28 may be wirelessly coupled to the input 20. In some cases, the sensors 28 are accessed from a weather service via a suitable Application Programming Interface (API). These are just examples.
  • the sensors 28 may include temperature sensors, humidity sensors, CO 2 sensors and sensors configured to detect other pollutants such as particulate matter (PM), volatile organic compounds (VOCs) and the like.
  • the controller 14 may communicate with a remote server 30.
  • the remote server 30 may be a cloud-based server, for example.
  • An edge controller 32 may provide a go-between between the controller 14 and the remote server 30.
  • the controller 14 may provide data to the remote server 30 for performance monitoring, for example.
  • the processor 22 within the controller 14 receives various inputs from the interior sensors 26 and the exterior sensors 28, and may receive various inputs such as HVAC operational conditions from the HVAC system 16.
  • the processor 22 may use these various inputs to learn an environmental model for the building space 12, sometimes using Artificial Intelligence and/or Machine Learning. In other cases, the processor 22 may simply receive the various inputs from the input 20 and forward the information to the output 24 for transmission to either the edge controller 32 itself or ultimately the remote server 30 for processing.
  • the processing power that monitors the various inputs and creates and maintains the learned environmental model for the building space 12 may reside within the edge controller 32.
  • the edge controller 32 may include one or more containers in which the processing power is manifested.
  • the edge controller 32 merely functions as a gateway, providing the information to the remote server 30, where the processing power that monitors the various inputs and creates and maintains the learned environmental model for the building space 12 resides.
  • the processing power that monitors the various inputs and creates and maintains the learned environmental model for the building space 12 is distributed throughout the HVAC control system 10, the edge controller 32 and/or the remote server 30. These are just examples.
  • the learned environmental model is not static, but is repeatedly updated to account for changes in the HVAC control system 10.
  • These changes can include normal changes resulting from components of the HVAC control system 10 aging.
  • An example is a filter that allows a decreasing air flow as the filter becomes clogged.
  • Another example may be a variation in fan speed caused by a belt that drives the fan stretching as it ages.
  • Heat exchangers can lose efficiency over time.
  • the building space 12 itself may change over time. For example, windows may start to leak additional air as weather stripping on the windows ages and contracts. Alternatively, window efficiency may increase if old windows are replaced. HVAC system efficiency may increase when particular parts of the HVAC system are replaced.
  • FIG. 2 is a flow diagram showing an illustrative method 40 for providing a maximum allowed ventilation rate for a building space (such as the building space 12) while not compromising on one or more comfort conditions in the building space using a Heating, Ventilating and/or Air Conditioning (HVAC) system that includes an outdoor air ventilation damper (such as the HVAC system 16) of the building space.
  • HVAC Heating, Ventilating and/or Air Conditioning
  • the illustrative method 40 includes tracking one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system, as indicated at block 42.
  • the one or more interior environmental conditions may include indoor air temperature.
  • the one or more interior environmental conditions may include indoor humidity.
  • the one or more interior environmental conditions may include concentrations of one or more indoor pollutants such as but not limited to CO 2 , particular matter (PM 2.5 and PM 10) and volatile organic compounds (VOCs).
  • the one or more interior environmental conditions may include occupancy such as a people count and/or a people density in the building.
  • the one or more exterior environmental conditions may include outdoor air temperature.
  • the one or more exterior environmental conditions may include outdoor humidity.
  • the one or more exterior environmental conditions may include one or more outdoor pollutants.
  • the environmental model is learned using Artificial Intelligence and/or Machine Learning.
  • the learned environmental model is configured to an environmental state of the building space in response to operation of the HVAC system under various interior and exterior environmental conditions.
  • a current maximum allowed ventilation rate that can be achieved without causing the HVAC system to compromise on any of the one or more comfort conditions of the building space as indicated at block 46.
  • determining the current maximum allowed ventilation rate includes inputting to the learned environmental model of the building space one or more current comfort parameters of the building space, one or more current interior environmental conditions and one or more current exterior environmental conditions.
  • determining the current maximum allowed ventilation rate may include inputting to the learned environmental model one or more of a temperature setpoint schedule, a current humidity setpoint, a current temperature within the building space, a current fan status of a fan of the HVAC system, a current valve status of a valve of the HVAC system, and/or a current load on the HVAC system. These are just examples.
  • the outdoor air ventilation damper 18 of the HVAC system 16 is then controlled to provide ventilation up to and/or at the current maximum allowed ventilation rate, as indicated at block 48.
  • the learned environmental model may be configured to predict a current heating capacity of the HVAC system, a current cooling capacity of the HVAC system, a load on the HVAC system, and/or any other suitable parameters.
  • FIG. 3 is a flow diagram showing an illustrative method 60 for providing a maximum allowed ventilation rate for a building space (such as the building space 12) while maintaining adherence to comfort parameters during a proscribed period of time using a Heating, Ventilating and/or Air Conditioning (HVAC) system (such as the HVAC system 16) of the building space.
  • HVAC Heating, Ventilating and/or Air Conditioning
  • the illustrative method 60 includes tracking one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system, as indicated at block 62.
  • the one or more interior environmental conditions may include indoor air temperature.
  • the one or more interior environmental conditions may include indoor humidity.
  • the one or more interior environmental conditions may include concentrations of one or more indoor pollutants such as but not limited to CO 2 , particular matter (PM 2.5 and PM 10) and volatile organic compounds (VOCs).
  • the one or more interior environmental conditions may include occupancy such as a people count and/or people density in the building.
  • the one or more exterior environmental conditions may include outdoor air temperature.
  • the one or more exterior environmental conditions may include outdoor humidity.
  • the one or more exterior environmental conditions may include one or more outdoor pollutants. These are just examples.
  • occupancy data may be tracked over time, as indicated at block 64. Tracking occupancy data over time may include using video analytics to analyze one or more video streams in order to ascertain occupancy.
  • the video streams can come from security cameras, for example.
  • Tracking occupancy data over time may include using sensors to detect occupancy within a zone of the building space.
  • tracking occupancy data over time may include using sensors to detect individuals entering a zone of the building space and to detect individuals exiting a zone of the building space.
  • a time of flight (e.g. LIDAR) sensor may be used to detect and maintain a count of people in the zone of the building space. From the people count, and using the size of zone, a measure of people density for the zone can be estimated.
  • a milli-meter wave sensor e.g. Radar
  • Person are known to produce contaminates in the building space.
  • One or more interior environmental conditions change in conjunction with changes in occupancy may be tracked, as indicated at block 66. For example, temperature, humidity, CO2, PM, VOCs and/or other parameters may be tracked.
  • An environmental model for the building space is learned over time based at least in part on the tracked one or more interior environmental conditions within the building space and the one or more exterior environmental conditions outside of the building space during operation of the HVAC system under various conditions, as well as based at least in part on the tracked occupancy data and how the one or more interior environmental conditions changes in conjunction with changes in occupancy, as indicated at block 68.
  • the learned environmental model is configured to predict an environmental state of the building space in response to operation of the HVAC system under various interior and exterior environmental conditions.
  • FIG. 4 is a flow diagram showing an illustrative method 80 for providing a maximum allowed ventilation rate for a building space (such as the building space 12) while not compromising on one or more comfort conditions in the building space using a Heating, Ventilating and/or Air Conditioning (HVAC) system that includes an outdoor air ventilation damper (such as the HVAC system 16) of the building space.
  • HVAC Heating, Ventilating and/or Air Conditioning
  • the illustrative method 80 includes tracking one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system, as indicated at block 82.
  • the one or more interior environmental conditions may include indoor air temperature.
  • the one or more interior environmental conditions may include indoor humidity.
  • the one or more interior environmental conditions may include concentrations of one or more indoor pollutants such as but not limited to CO2, particular matter (PM 2.5 and PM 10) and volatile organic compounds (VOCs).
  • the one or more interior environmental conditions may include occupancy and/ a people count in the building.
  • the one or more exterior environmental conditions may include outdoor air temperature.
  • the one or more exterior environmental conditions may include outdoor humidity.
  • the one or more exterior environmental conditions may include one or more outdoor pollutants. These are just examples.
  • An environmental model for the building space is learned over time based at least in part on the tracked one or more interior environmental conditions within the building space and the one or more exterior environmental conditions outside of the building space during operation of the HVAC system, as indicated at block 84.
  • a current maximum allowed ventilation rate that allows adherence to one or more comfort parameters of the building space is determined as indicated at block 86. This may include inputting to the environmental model of the building space one or more current comfort parameters associated with the one or more comfort conditions of the building space, one or more current interior environmental conditions and one or more current exterior environmental conditions. In some cases, determining the current maximum allowed ventilation rate may include inputting to the environmental model one or more of a temperature setpoint schedule, a current temperature within the building space and a current building space occupancy.
  • the learned environmental model may be configured to predict a current heating capacity of the HVAC system, a current cooling capacity of the HVAC system, a load on the HVAC system, and/or any other suitable parameters. These parameters may be considered intermediate parameters that are used when determining the current maximum allowed ventilation rate.
  • the outdoor air ventilation damper of the HVAC system is then controlled to provide ventilation at the current maximum allowed ventilation rate, as indicated at block 88.
  • the method 80 may include initiating a purge period in which the HVAC system provides a ventilation rate that is above the current maximum allowed ventilation rate for a period of time. In some cases, the purge period may provide a complete or a substantially complete air replacement within the building space.
  • the HVAC system is allowed to compromise on one or more of the one or more comfort conditions of the building space during at least part of the purge period.
  • the HVAC system may not condition incoming fresh air during at least part of the purge period.
  • the purge period may end at a time prior to a start of a proscribed period of time sufficient to permit the HVAC system to condition the building space and reach a comfort setting prior to the start of the proscribed period of time.
  • the purge period is performed at night when occupancy is not expected. In a movie theater, the purge period may be performed between shows. These are just examples.
  • FIG. 5 is a flow diagram showing an illustrative method 100 for providing a dynamic ventilation rate for a building space using a Heating, Ventilating and/or Air Conditioning (HVAC) system.
  • HVAC Heating, Ventilating and/or Air Conditioning
  • the illustrative method 100 includes tracking over time one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system, as indicated at block 102.
  • the one or more interior environmental conditions may include indoor air temperature.
  • the one or more interior environmental conditions may include indoor humidity.
  • the one or more interior environmental conditions may include concentrations of one or more indoor pollutants such as but not limited to CO 2 , particular matter (PM 2.5 and PM 10) and volatile organic compounds (VOCs).
  • the one or more interior environmental conditions may include occupancy and/ a people count in the building.
  • the one or more exterior environmental conditions may include outdoor air temperature.
  • the one or more exterior environmental conditions may include outdoor humidity.
  • the one or more exterior environmental conditions may include one or more outdoor pollutants. These are just examples.
  • An environmental model for the building space is learned over time based at least in part on the tracked one or more interior environmental conditions within the building space and the one or more exterior environmental conditions outside of the building space during operation of the HVAC system.
  • the learned environmental model may be configured to predict an environmental state of the building space in response to operation of the HVAC system under various interior and exterior environmental conditions, as indicated at block 104.
  • a dynamic ventilation rate for the HVAC system of the building space is determined based at least in part on inputting to the environmental model of the building space one or more current interior environmental conditions and one or more current exterior environmental conditions, as indicated at block 106.
  • the environmental model may predict a current heating capacity of the HVAC system.
  • the environmental model may predict a current cooling capacity of the HVAC system.
  • the environmental model may predict a current and/or expected load on the HVAC system.
  • the environmental model may predict the HVAC systems capacity to cool/heat the outdoor air given the predicted load and outside weather conditions.
  • a maximum ventilation parameter is determined that is representative of a rate of outside air having the one or more exterior environmental conditions that can be conditioned by the measure of current unused heating and/or cooling capacity of the HVAC system while still maintaining the one or more comfort conditions for the building space.
  • the dynamic ventilation rate may then be based at least in part on the maximum ventilation parameter.
  • the dynamic ventilation rate may be capped at by the maximum ventilation parameter, where the maximum ventilation parameter may be representative of a maximum ventilation rate that can be achieved given the HVAC systems current capacity to cool/heat the outdoor air given the predicted load and outside weather conditions. In some cases, a certain capacity margin may be in-built into the maximum ventilation parameter.
  • the tracking step (block 102), the learning step (block 104) and the determining step (block 106) may be performed at a remote location remote from the building space (e.g. at server 30 of Figure 1), while the controlling step (block 108) may be performed by the HVAC system (e.g. HVAC system 16 of Figure 1) of the building space.
  • FIG. 6 is a flow diagram showing an illustrative method 120 for providing a dynamic ventilation rate for a building space using a Heating, Ventilating and/or Air Conditioning (HVAC) system.
  • the illustrative method 120 includes tracking over time one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system, as indicated at block 122.
  • the one or more interior environmental conditions may include indoor air temperature.
  • the one or more interior environmental conditions may include indoor humidity.
  • the one or more interior environmental conditions may include concentrations of one or more indoor pollutants such as but not limited to CO2, particular matter (PM 2.5 and PM 10) and volatile organic compounds (VOCs).
  • the one or more interior environmental conditions may include occupancy and/ a people count in the building.
  • the one or more exterior environmental conditions may include outdoor air temperature.
  • the one or more exterior environmental conditions may include outdoor humidity.
  • the one or more exterior environmental conditions may include one or more outdoor pollutants.
  • the environmental model may be configured to predict an environmental state of the building space in response to operation of the HVAC system under various interior and exterior environmental conditions, as indicated at block 124.
  • a current occupancy count and/or density of the building space may be maintained by counting occupants entering and existing the building space, as indicated at block 126.
  • Tracking occupancy data over time may include using video analytics to analyze one or more video streams in order to ascertain occupancy.
  • the video streams can come from security cameras, for example.
  • Tracking occupancy data over time may include using sensors to detect occupancy within a zone of the building space.
  • tracking occupancy data over time may include using sensors to detect individuals entering a zone of the building space and to detect individuals exiting a zone of the building space.
  • a dynamic ventilation rate for the HVAC system of the building space is determined based at least in part on inputting to the environmental model of the building space one or more current interior environmental conditions and one or more current exterior environmental conditions. The dynamic ventilation rate may be compensated based on the current occupancy count and/or density of the building space, as indicated at block 128.
  • FIG. 7 is a flow diagram showing an illustrative method 140 for providing a dynamic ventilation rate for a building space using a Heating, Ventilating and/or Air Conditioning (HVAC) system.
  • HVAC Heating, Ventilating and/or Air Conditioning
  • the illustrative method 140 includes tracking over time one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system, as indicated at block 142.
  • the one or more interior environmental conditions may include indoor air temperature.
  • the one or more interior environmental conditions may include indoor humidity.
  • the one or more interior environmental conditions may include concentrations of one or more indoor pollutants such as but not limited to CO 2 , particular matter (PM 2.5 and PM 10) and volatile organic compounds (VOCs).
  • the one or more interior environmental conditions may include occupancy and/ a people count in the building.
  • the one or more exterior environmental conditions may include outdoor air temperature.
  • the one or more exterior environmental conditions may include outdoor humidity.
  • the one or more exterior environmental conditions may include one or more outdoor pollutants, for example.
  • the environmental model is configured to predict an environmental state of the building space in response to operation of the HVAC system under various interior and exterior environmental conditions, as indicated at block 144.
  • a dynamic ventilation rate for the HVAC system of the building space is determined based at least in part on inputting to the environmental model of the building space one or more current interior environmental conditions and one or more current exterior environmental conditions, as indicated at block 146.
  • the outdoor air ventilation damper of the HVAC system is then controlled to provide ventilation to the building space at the determined dynamic ventilation rate, as indicated at block 148.
  • the method 140 may include initiating a purge period outside of a proscribed period of time in which the HVAC system provides a ventilation rate that is above the dynamic ventilation rate for a period of time.
  • the purge period may provide a complete or a substantially complete air replacement within the building space.
  • the HVAC system is allowed to compromise on one or more of the one or more comfort conditions of the building space during at least part of the purge period.
  • the HVAC system may not condition incoming fresh air during at least part of the purge period.
  • the purge period may end at a time prior to a start of a proscribed period of time sufficient to permit the HVAC system to condition the building space and reach a comfort setting prior to the start of the proscribed period of time.
  • the purge period is performed at night when occupancy is not expected. In a movie theater, the purge period may be performed between shows. These are just examples.
  • FIG. 8 is a schematic block diagram showing an illustrative HVAC ventilation control system 160.
  • the ventilation control system 160 includes an illustrative computational algorithm 162 that receives a number of real or near-real time data inputs 164 and a number of user configurations 166 and provides a control output 168.
  • the real time data inputs 164 include one or more of inside temperature, inside humidity, inside PM2.5 (particulate matter), TVOC (total volatile organic compounds), outdoor temperature, outdoor humidity, outdoor pollutants, occupancy density and the area of a particular indoor space.
  • the user configurations 166 include one or more of temperature setpoints, schedules and mode selection.
  • the mode selection may be selected from, for example, a pandemic mode calling for a maximum allowed ventilation rate while not compromising on one or more comfort conditions in the building space (e.g. still maintaining adherence to comfort parameters), and a normal operating mode calling for a minimum ventilation rate while still adequately ventilating the building given the current contaminates or expected contaminates in the building.
  • the control output 168 can include not only ventilation control, but in some instances can identify anomalies in the HVAC system. An anomaly may be detected when the HVAC system behaves in a manner that is different or even substantially different from what is expected.
  • the control output 168 may include a message to a user alerting the user of the anomaly and may include one or more possible causes for the anomaly.
  • the illustrative computational algorithm 162 may be used in part to create, edit or update the environmental model. Accordingly, the illustrative computational algorithm 162 may have a variety of inputs such as but not limited to one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system.
  • Block 170 of Figure 9 provides additional examples of possible data sources.
  • Data sources may include environmental parameters, air quality values, building data and equipment type data.
  • Block 172 of Figure 9 provides for the algorithm understanding the data. This may include a quantitative definition of Contaminants of Concern (CoC) as well as a definition of comfort standards. Data understanding may also include understanding the capacity and efficiency of the HVAC equipment, for example.
  • Block 174 of Figure 9 pertains to data collection. Data collection may include all of the sources listed in the block 170. Data collection may include ground truth (reference) information for CoC, comfort and possible anomalies. In some cases, data collection may span a period of at least one year, in order to capture seasonal variations.
  • the illustrative computational algorithm 162 has a Step One, as indicated at block 176 of Figure 9.
  • Step One the illustrative computational algorithm 162, particularly when in pandemic mode, has a goal of maximizing ventilation (or minimizing CoC concentration in the building) while meeting comfort requirements and staying within the capabilities and efficiencies of the HVAC system.
  • the illustrative computational algorithm 162 may have a goal, particularly when not in pandemic mode, of providing an appropriate dynamic ventilation rate such as to minimize the ventilation rate while still adequately ventilating the building given the current contaminates or expected contaminates in the building.
  • Step Two indicated at block 178, has objectives that include deriving performance metrics for acceptable CoC values.
  • Step Two includes paying attention to comfort requirements, test data sets for validation, model prediction accuracies and model real time deployment requirements.
  • the illustrative computational algorithm 162 has a Step Three, as indicated at block 180.
  • Step Three involves data preparation. This may include data quality or pre-processing steps in order to check for missing data, unusual or unexpected values, and the like.
  • a Step Four as indicated at block 182, involves anomaly detection. For example, statistical and/or model-based approaches may be used to detect sensor faults, equipment failures, clogged filters and the like.
  • Step Five indicated at block 184 of Figure 9, includes feature engineering. This may include selecting variables of interest. This may include correlation studies for CoC and variables that can or have been found to influence CoC values.
  • the illustrative computational algorithm 162 has a Step Six, as indicated at block 186.
  • Step Six involves model building.
  • Model building may, for example, include one or more regression models that aim to predict CoC as a function of air quality, environmental parameters and building data.
  • Model building may include a dynamic ML (machine learning) model that aims to predict appropriate outdoor air intake into the building as a function of equipment data, building data and environmental parameters.
  • Step Seven indicated at block 188, pertains to model validation. This may include cross-validation of model accuracy with respect to the objectives defined in Step Two (block 178).
  • Step Eight indicated at block 190, pertains to continuous learning by the illustrative computational algorithm 162.
  • Step Three Block 180
  • Step Four block 182
  • Batch mode learning and model updating based on Step Six block 186) may also occur.
  • the illustrative computational algorithm 162 may reside within the controller 14, the edge controller 32 and/or the cloud-based server 30, for example.
  • the HVAC system 16 ( Figure 1) may be operated in accordance with a selected mode out of a plurality of modes.
  • the HVAC system 16 may be operated in accordance with a Health mode, which prioritizes providing as much fresh air as is feasible to maximize air quality parameters while maintaining comfort in the building space.
  • the Health mode may be selected during a pandemic, for example.
  • the ventilation protocols described herein with respect to Figures 2 through 9 may be considered as being applicable to a Health mode.
  • the HVAC system 16 may be operated in accordance with an Energy mode, which prioritizes minimizing energy costs for running the HVAC system while maintaining comfort and air quality parameters.
  • the HVAC system 16 may be operated in accordance with a Productivity mode, which prioritizes minimizing energy while reaching higher air quality limits than those required by the Energy mode, as it has been found that reaching particular air quality limits above those required for safety of building occupants can generate improvement in employee productivity.
  • a goal may be to maximize outdoor air intake without compromising thermal comfort requirements within the building space 12, or within a zone within the building space 12.
  • zone level indoor air quality is not directly constrained with respect to CO2 concentration, PM2.5 concentration and TVOC (total volatile organic compound) concentration.
  • cost function term for air flow rate including being able to maximize airflow into a particular AHU (air handling unit) as well as being able to maximize airflow into a particular zone.
  • cost function term for temperature that only penalizes the cost function when zone temperature constraints are not met.
  • the cost function term for temperature involves slack variables.
  • cost function term for energy that only penalizes the cost function once the AHU has met maximum airflow requirements.
  • the cost function term for temperature and the cost function term for energy are weighted, and the problem can be formulated in two different ways, based on how the cost function term for energy is weighted in the optimization function.
  • FIG. 10 An illustrative cost function for a Formulation 1 of the Health mode is given below: ⁇ where: This term represents the the airflow rate at the AHU level; This term represents the air flowrate at the zone level and normalizes the airflow rate; This term represents the cost associated with energy expenditure; This term represents the cost associated with thermal comfort violations; and i s a weighting term that gives a transition from a low weight at the start to a high value on satisfying a threshold.
  • Figure 10 is a graph showing energy penalty weight (ranging from 0 to -1) versus air flow rate. As can be seen, the energy penalty weight remains at or close to zero until the air flow rate approaches a maximum air flow rate.
  • ⁇ ⁇ ⁇ ⁇ ⁇ ⁇ ⁇ + ⁇ ⁇ ⁇ ⁇ ⁇ ⁇ ⁇ ⁇ ⁇ , ⁇ ⁇ ⁇ ⁇ , ⁇ ⁇ ⁇ O ⁇ ( ) ⁇ ⁇ ⁇ ⁇ ⁇ ⁇ ⁇ ⁇ ⁇ ⁇ ⁇ ⁇ ⁇ , ⁇ ⁇ ⁇ ⁇ + ⁇ ⁇ ⁇ ⁇ ⁇ ⁇ , ⁇ ⁇ ⁇ ⁇ ⁇ w here: ⁇ ⁇ T his term is representative of the air flow rates at the AHU level; T his term is representative of the air flow rates at the zone level; ⁇ T his term is representative of the cost associated with energy expenditure; This term is representative of the cost associated with thermal comfort violations; and ⁇ LV ⁇ D ⁇ E LQDU ⁇ YDOXH ⁇ WKDW takes the value of one (1) when the fresh air flow rate at the AHU level is at maximum
  • control of the fresh air intake is coupled with zone occupancy. Directly sensing occupancy provides a more immediate indication
  • Ventilation strategies are evaluated to meet the IAQ requirements when there is least impact on energy consumption and it is most favorable for equipment life expectancy. For example, it may be better to bring in additional fresh air when a building is not occupied, if the outdoor air is cooler and thus requires minimal conditioning in order to meet comfort requirements.
  • ventilation strategies are evaluated to minimize the cost of energy that is consumed by each of the components of the HVAC system 16.
  • a thermal comfort band may be used as a constraint, with a penalty on the thermal comfort violation by using a slack variable on the zone temperature.
  • IAQ concentrations may be used as constraints.
  • a penalty may be placed on the IAQ bound violation by using a slack variable on IAQ variables (CO2, PM2.5 and TVOC) in the zone.
  • zone-wise IAQ concentrations are maintained at least to the levels defined by ASHRAE. It is known that productivity of occupants of a building may increase with lower IAQ concentrations.
  • zone-wise control for IAQ levels means considering zone-wise occupancy levels, environmental factors and optimizing energy consumption. For example, if a first zone is unoccupied while a second zone is at capacity, the second zone will receive more fresh air, if not substantially more fresh air, relative to the first zone. In some cases, IAQ concentrations within the zones may be measured and used as another control feature.
  • An illustrative cost function for the productivity mode is as follows: w here: This term pertains to meeting IAQ thresholds within each zone as per the set IAQ standards in the productivity mode, where the IAQ thresholds adjust dynamically as o ccupancy changes; This term pertains to minimizing energy cost expenditure as the cumulative IAQ measures in various zones reaches close to the threshold IAQ.
  • Figure 11 is a graph of energy penalty weight (ranging from 0 to -1) versus cumulative IAQ concentrations. As can be seen, the energy penalty weight remains at or close to zero until the cumulative IAQ concentration becomes high.
  • the function h(.) could also be expressed as a function of the IAQ concentrations in the return air duct (e.g.
  • the building space 12 may switch between modes. This can be done as a hard switch or a soft switch. A hard switch involves switching directly from a first mode to a second mode, with no intervening positions or mode.
  • a hard switch can damage equipment such as actuators over time if the specifications of the first mode and the second mode are substantially different.
  • a soft switch means switching from the first mode to the second mode over a number of intermediate control steps. This provides a smoother transition between the first mode and the second mode, and can thus increase the life of building equipment such as actuators. [0095] Soft switching involves switching from one mode to the other in a smoother manner by implementing intermediate MPC (model predictive control) over a number of control steps.
  • FIG. 13 is a flow diagram showing an illustrative method 200 for providing dynamic ventilation for a building space (such as the building space 12) serviced by a Heating, Ventilating and Air Conditioning (HVAC) system (such as the HVAC system 16) with one or more components including an outdoor air ventilation damper (such as the damper 18).
  • HVAC Heating, Ventilating and Air Conditioning
  • the method 200 includes selecting a ventilation mode from a plurality of ventilation modes, as indicated at block 202.
  • the plurality of ventilation modes include a health ventilation mode that when selected attempts to maximize ventilation to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space, as indicated at block 202a.
  • the plurality of ventilation modes include an energy savings ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined energy savings limits, as indicated at block 202b.
  • the method 200 includes controlling one or more components of the HVAC system, including the outdoor air ventilation damper, in accordance with the selected ventilation mode, as indicated at block 204.
  • the plurality of ventilation modes includes a productivity ventilation mode that when selected attempts to control ventilation to the building space to maintain IAQ contaminants in the building space below predetermined productively limits subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space.
  • at least one of the predetermined productively limits is below a corresponding one of the predetermined energy savings limits.
  • controlling the one or more components of the HVAC system includes minimizing an overall cost associated with a ventilation term for maximizing outdoor air ventilation to the building space, an energy term for minimizing energy associated with outdoor air ventilation to the building space, and a comfort term for penalizing a deviation from one or more comfort conditions in the building space.
  • controlling the outdoor air ventilation damper includes minimizing an overall cost associated with an energy term for minimizing energy associated with outdoor air ventilation to the building space, a comfort term that penalizes a deviation from one or more comfort conditions in the building space, and an Indoor Air Quality (IAQ) term that penalizes violations of one or more predetermined IAQ limits.
  • IAQ Indoor Air Quality
  • FIG. 14 is a flow diagram showing an illustrative method 206 for providing dynamic ventilation for a building space (such as the building space 12) serviced by a Heating, Ventilating and Air Conditioning (HVAC) system (such as the HVAC system 16) with one or more components including an outdoor air ventilation damper (such as the damper 18).
  • HVAC Heating, Ventilating and Air Conditioning
  • the method 206 includes selecting a ventilation mode from a plurality of ventilation modes, as indicated at block 208.
  • the ventilation mode may be selected by an operator.
  • the ventilation mode may be automatically selected in accordance with a programmed schedule.
  • the plurality of ventilation modes includes a first ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space while maintaining one or more IAQ contaminants in the building space below one or more corresponding first predetermined limits, as indicated at block 208a.
  • the plurality of ventilation modes includes a second ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space while maintaining one or more IAQ contaminants in the building space below one or more corresponding second predetermined limits, wherein at least one of the second predetermined limits is below a corresponding one of the first predetermined limits, as indicated at block 208b.
  • the method 206 includes controlling one or more components of the HVAC system, including the outdoor air ventilation damper, in accordance with the selected ventilation mode, as indicated at block 210.
  • FIG. 15 is a flow diagram showing an illustrative method 212 for providing dynamic ventilation for a building space (such as the building space 12) serviced by a Heating, Ventilating and Air Conditioning (HVAC) system (such as the HVAC system 16) with an outdoor air ventilation damper (such as the damper 18).
  • HVAC Heating, Ventilating and Air Conditioning
  • the method 212 includes developing a building model for the building space, the building model including a non-linear representation of how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation under a plurality of different operating conditions, as indicated at block 214.
  • a current operating condition is identified, as indicated at block 216.
  • a linear approximation of the non-linear building model at the current operating condition is determined, wherein the linear approximation approximates how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation at the current operating condition, as indicated at block 218.
  • One or more components of the HVAC system, including the outdoor air ventilation damper are controlled via Predictive Control (PC) using the determined linear approximation of the non-linear building model, as indicated at block 220.
  • PC Predictive Control
  • the method 2112 may further include subsequently identifying a new operating condition.
  • a new linear approximation of the non-linear building model at the new operating condition is determined, wherein the linear approximation approximates how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation at the new operating condition, as indicated at block 224.
  • One or more components of the HVAC system, including the outdoor air ventilation damper, are controlled via Predictive Control (PC) using the determined new linear approximation of the non-linear building model, as indicated at block 226.
  • PC Predictive Control
  • controlling the outdoor air ventilation damper via Model Predictive Control further includes predicting a future value for one or more Indoor Air Quality (IAQ) parameters in the building space using the determined linear approximation of the non-linear building model, and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, to control the one or more IAQ parameters in the building space in accordance with one or more thresholds.
  • the one or more thresholds may include an ASHRAE standard threshold for each of the one or more IAQ parameters.
  • the one or more thresholds may include a determined value for each of the one or more IAQ parameters that is expected to produce an enhanced productivity level of occupants in the building space.
  • controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Predictive Control (PC) using the determined linear approximation of the non-linear building model includes selecting a ventilation mode out of a plurality of ventilation modes, each ventilation mode having a different cost function, identifying the cost function for the selected ventilation mode, and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Model Predictive Control (MPC), wherein the MPC minimized the identified cost function when controlling the one or more components of the HVAC system.
  • PC Predictive Control
  • MPC Model Predictive Control
  • one of the plurality of ventilation modes includes a health ventilation mode in which the Predictive Control (PC) maximizes ventilation to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space.
  • the cost function for the health ventilation mode includes minimizing an overall cost associated with a ventilation term for maximizing outdoor air ventilation to the building space, an energy term for minimizing energy associated with outdoor air ventilation to the building space, and a comfort term for penalizing a deviation from the one or more comfort conditions in the building space.
  • one of the plurality of ventilation modes includes an energy savings ventilation mode in which the Predictive Control (PC) attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined energy savings limits.
  • the cost function for the energy savings ventilation mode includes minimizing an overall cost associated with an energy term for minimizing energy associated with outdoor air ventilation to the building space, a comfort term that penalizes a deviation from one or more comfort conditions in the building space, and an indoor air quality (IAQ) term that penalizes violations of one or more predetermined IAQ limits.
  • one of the plurality of ventilation modes includes a productivity ventilation mode in which the Predictive Control (PC) attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined productively limits, wherein at least one of the predetermined productively limits is below a corresponding one of the predetermined energy savings limits.
  • FIG 16 is a schematic view of an illustrative MPC architecture 230 for building control.
  • the MPC architecture 230 may be used in controlling a variety of functions within a building 232.
  • the building 232 may represent the building space 12, for example.
  • a building model 234 is built to represent the building 232, and can be used via MPC control to model how the building 232 will respond to various inputs.
  • the inputs can include control inputs to various building systems, such as but not limited to the HVAC system 16.
  • the inputs can also include the environmental conditions outside the building 232, such as but not limited to wind, outdoor temperature, solar load, outdoor humidity, outdoor AIQ concentrations, and the like.
  • the building model 234 may not be static, but instead may be dynamic such that the building model 234 can be updated over time in order to represent and model changing conditions and parameters for the building 232.
  • the model structure of the building model 234 may remain fixed, but the model parameters may evolve over time.
  • the model parameters of the building model 234 may be updated using machine learning and/or artificial intelligence.
  • the building model 234 is included in the MPC formulation as part of the constraints, namely the system dynamics show below: [0111] It will be appreciated that the MPC architecture 230 includes a cost function block 236, representing the cost functions described herein with respect to health mode, energy mode and productivity mode, for example.
  • a constraints block 238 represents and accounts for the various constraints described herein with respect to the constraints that accompanied each of the cost functions.
  • a Disturbances block 240 represents changes (W) that can impact the building 232 and the building model 234.
  • the illustrative MPC architecture 230 further includes a Future Predictions block 242 that predicts the next iterative state, an Optimization block 244 that optimizes the cost function 236, an Inputs block 246 for providing inputs determined by the optimization block 244 to the HVAC system, and an Estimator block 248 for estimating the current state (x) of the HVAC system based on the inputs (u) and the outputs (y) of the HVAC system.
  • an online optimization problem is solved by the Optimization block 244 to obtain an optimal control input trajectory over a fixed future horizon.
  • the first control input (u k ) from the predicted trajectory is implemented.
  • Figure 17 is a graphical representation of how a building model may include a non-linear representation of how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation under a plurality of different operating conditions.
  • temperature is plotted versus time along a plot line 250. It can be seen that the plot line 250 is non-linear.
  • a linear approximation to the non-linear building model can be utilized. Say that the current temperature is indicated at a graph point 252.
  • a linear approximation 254 which for example may be considered as being a tangent line drawn through the graph point 252, may be used for enabling MPC control because MPC control requires a linear model. As the temperature changes, an updated linear approximation is selected that corresponds to the updated temperature. Additional Examples [0113] Example 1.
  • a method for providing up to a maximum ventilation for a building space while not compromising on one or more comfort conditions in the building space using a Heating, Ventilating and/or Air Conditioning (HVAC) system that includes an outdoor air ventilation damper comprising: tracking one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system; learning an environmental model for the building space over time based at least in part on the tracked one or more interior environmental conditions within the building space and the one or more exterior environmental conditions outside of the building space during operation of the HVAC system, wherein the environmental model predicts an environmental state of the building space in response to operation of the HVAC system under various interior and exterior environmental conditions; predicting a current maximum allowed ventilation rate that can be achieved without causing the HVAC system to compromise on any of the one or more comfort conditions of the building space, wherein predicting the current maximum allowed ventilation rate comprises inputting to the environmental model of the building space one or more comfort parameters associated with the one or more comfort conditions of the building space, one or more current interior environmental conditions and one or
  • Example 2 The method of example 1, wherein the one or more interior environmental conditions include one or more of indoor air temperature, indoor humidity and concentrations of one or more indoor pollutants.
  • Example 3 The method of any one of examples 1 or 2, wherein the one or more exterior environmental conditions include one or more of outdoor temperature, outdoor humidity and one or more outdoor pollutants.
  • Example 4 The method of any one of examples 1 to 3, further comprising: tracking occupancy of the building space over time; tracking how one or more interior environmental conditions change in conjunction with changes in occupancy; and learning the environmental model for the building space over time based at least in part on the tracked occupancy of the building space and how the one or more interior environmental conditions changes in conjunction with changes in occupancy. [0117] Example 5.
  • Example 4 wherein tracking occupancy of the building space over time comprises using one or more of video analytics to analyze one or more video streams to ascertain occupancy of the building space, using sensors to detect occupancy within a zone of the building space, and using sensors to detect individuals entering and/or exiting a zone of the building space.
  • Example 6 The method of any one of examples 1 to 5, further comprises using the environmental model for the building space to predict how the one or more comfort conditions in the building space is expected to respond to a change in a ventilation rate when predicting the current maximum allowed ventilation rate that can be achieved without causing the HVAC system to compromise on any of the one or more comfort conditions of the building space.
  • Example 6 wherein determining the current maximum allowed ventilation rate comprises inputting to the environmental model one or more of: a temperature setpoint schedule; a current humidity setpoint; a current temperature within the building space; a current fan status of a fan of the HVAC system; a current valve status of a valve of the HVAC system; and a current load on the HVAC system.
  • Example 8 The method of any one of examples 1 to 7, further comprising initiating a purge period in which the HVAC system provides a ventilation rate that is above the current maximum allowed ventilation rate for a period of time.
  • Example 9 The method of example 8, wherein the HVAC system is allowed to compromise on one or more of the one or more comfort conditions of the building space during at least part of the purge period.
  • Example 11 The method of any one of examples 1 to 10, wherein the environmental model determines a current heating and/or cooling capacity of the HVAC system, and wherein the environmental model uses the determined current heating and/or cooling capacity of the HVAC system to predict the current maximum allowed ventilation rate that can be achieved without causing the HVAC system to compromise on any of the one or more comfort conditions of the building space.
  • Example 13 The method of example 11, wherein the environmental model determines a current load on the HVAC system, and wherein the environmental model uses the determined current load and the determined heating and/or cooling capacity of the HVAC system to predict the current maximum allowed ventilation rate that can be achieved without causing the HVAC system to compromise on any of the one or more comfort conditions of the building space.
  • a method for providing a dynamic ventilation rate for a building space using a Heating, Ventilating and/or Air Conditioning (HVAC) system that includes an outdoor air ventilation damper comprising: tracking over time one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system; learning an environmental model for the building space over time based at least in part on the tracked one or more interior environmental conditions within the building space and the one or more exterior environmental conditions outside of the building space during operation of the HVAC system, wherein the environmental model predicts an environmental state of the building space in response to operation of the HVAC system under various interior and exterior environmental conditions; determining a dynamic ventilation rate for the HVAC system of the building space based at least in part on inputting to the environmental model of the building space one or more interior environmental conditions and one or more exterior environmental conditions, wherein the determined dynamic ventilation rate is capped to allow the HVAC system to not compromise on one or more comfort conditions in the building space; and controlling the outdoor air ventilation damper of the HVAC system to provide ventilation to the building space at the determined
  • Example 14 The method of example 13, further comprising: maintaining a measure of occupancy of the building space by counting occupants entering and exiting the building space; and determining the dynamic ventilation rate comprises compensating the dynamic ventilation rate based on the measure of occupancy of the building space.
  • Example 15 The method of example 14, wherein the measure of occupancy is determined using one or more of video feed of an entrance to the building space and a sensor capable of sensing individual occupants that are entering the building space.
  • Example 16 The method of any one of examples 13 to 15, wherein the one or more interior environmental conditions include one or more of indoor air temperature, indoor humidity, and concentrations of one or more indoor pollutants.
  • Example 18 The method of any one of examples 13 to 16, wherein the one or more exterior environmental conditions include one or more of outdoor temperature, outdoor humidity and outdoor pollutants.
  • Example 18 The method of any one of examples 13 to 17, further comprising initiating a purge period in which the HVAC system provides a ventilation rate that is above the cap of the dynamic ventilation rate for a period of time.
  • Example 19 The method of any one of examples 13 to 18, wherein the tracking, learning and determining steps are performed at a location remote from the building space, and the controlling step is performed by the HVAC system of the building space.
  • Example 20 Example 20.
  • a method for controlling an outdoor air ventilation damper of a Heating, Ventilating and/or Air Conditioning (HVAC) system serving a building space of a building comprising: receiving one or more comfort conditions for the building space, one or more exterior environmental conditions of air outside of the building, and one or more operating conditions of the HVAC system; identifying a measure of current unused heating and/or cooling capacity of the HVAC system based at least in part on the one or more operating conditions of the HVAC system; determining a maximum ventilation parameter that is representative of a rate of outside air having the one or more exterior environmental conditions that can be conditioned by the measure of current unused heating and/or cooling capacity of the HVAC system while still maintaining the one or more comfort conditions for the building space; determining a ventilation rate that is based at least in part on the maximum ventilation parameter; and sending the determined ventilation rate for use in controlling the outdoor air ventilation damper of the HVAC system.
  • HVAC Heating, Ventilating and/or Air Conditioning
  • Example 21 A method for providing dynamic ventilation for a building space serviced by a Heating, Ventilating and Air Conditioning (HVAC) system with one or more components including an outdoor air ventilation damper, the method comprising: selecting a ventilation mode from a plurality of ventilation modes, wherein the plurality of ventilation modes comprises: a health ventilation mode that when selected attempts to maximize ventilation to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space; an energy savings ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined energy savings limits; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, in accordance with the selected ventilation mode.
  • HVAC Heating, Ventilating and Air Conditioning
  • Example 22 The method of example 21, wherein the plurality of ventilation modes comprises: a productivity ventilation mode that when selected attempts to control ventilation to the building space to maintain IAQ contaminants in the building space below predetermined productively limits.
  • Example 23 The method of example 21, wherein the plurality of ventilation modes comprises: a productivity mode that when selected attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined productively limits, wherein at least one of the predetermined productively limits is below a corresponding one of the predetermined energy savings limits.
  • Example 24 Example 24.
  • controlling the one or more components of the HVAC system, including the outdoor air ventilation damper comprises minimizing an overall cost associated with: a ventilation term for maximizing outdoor air ventilation to the building space; an energy term for minimizing energy associated with outdoor air ventilation to the building space; and a comfort term for penalizing a deviation from one or more comfort conditions in the building space.
  • controlling the outdoor air ventilation damper comprises minimizing an overall cost associated with: an energy term for minimizing energy associated with outdoor air ventilation to the building space; a comfort term that penalizes a deviation from one or more comfort conditions in the building space; and an Indoor Air Quality (IAQ) term that penalizes violations of one or more predetermined IAQ limits.
  • IAQ Indoor Air Quality
  • a method for providing dynamic ventilation for a building space serviced by a Heating, Ventilating and Air Conditioning (HVAC) system with one or more components including an outdoor air ventilation damper comprising: selecting a ventilation mode from a plurality of ventilation modes, wherein the plurality of ventilation modes comprises: a first ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space while maintaining one or more IAQ contaminants in the building space below one or more corresponding first predetermined limits; a second ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space while maintaining one or more IAQ contaminants in the building space below one or more corresponding second predetermined limits, wherein at least one of the second predetermined limits is below a corresponding one of the first predetermined limits; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, in accordance with the selected ventilation mode.
  • HVAC Heating, Ventilating and Air Conditioning
  • Example 28 The method of example 27, wherein the ventilation mode is selected by an operator.
  • Example 29 The method of example 27, wherein the ventilation mode is automatically selected in accordance with a programmed schedule.
  • Example 30 A method for providing dynamic ventilation for a building space serviced by a Heating, Ventilating and Air Conditioning (HVAC) system with an outdoor air ventilation damper, the method comprising: developing a building model for the building space, the building model comprising a non-linear representation of how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation under a plurality of different operating conditions; identifying a current operating condition; determining a linear approximation of the non-linear building model at the current operating condition, wherein the linear approximation approximates how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation at the current operating condition; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Predictive Control (PC) using the determined
  • PC Predictive Control
  • Example 31 The method of example 30, further comprising: subsequently identifying a new operating condition; determining a new linear approximation of the non-linear building model at the new operating condition, wherein the linear approximation approximates how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation at the new operating condition; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Predictive Control (PC) using the determined new linear approximation of the non-linear building model.
  • PC Predictive Control
  • controlling the outdoor air ventilation damper via Model Predictive Control further comprises: predicting a future value for one or more Indoor Air Quality (IAQ) parameters in the building space using the determined linear approximation of the non-linear building model; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, to control the one or more IAQ parameters in the building space in accordance with one or more thresholds.
  • IAQ Indoor Air Quality
  • Example 33 The method of example 32, wherein the one or more thresholds comprise an ASHRAE standard threshold for each of the one or more IAQ parameters.
  • Example 35 The method of any one of examples 30 to 34, wherein controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Predictive Control (PC) using the determined linear approximation of the non-linear building model comprises: selecting a ventilation mode out of a plurality of ventilation modes, each ventilation mode having a different cost function; identifying the cost function for the selected ventilation mode; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Model Predictive Control (MPC), wherein the MPC minimized the identified cost function when controlling the one or more components of the HVAC system.
  • PC Predictive Control
  • Example 36 The method of any one of examples 30 to 35, wherein one of the plurality of ventilation modes comprises a health ventilation mode in which the Predictive Control (PC) maximizes ventilation to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space.
  • PC Predictive Control
  • Example 37 The method of example 36, wherein the cost function for the health ventilation mode includes minimizing an overall cost associated with: a ventilation term for maximizing outdoor air ventilation to the building space; an energy term for minimizing energy associated with outdoor air ventilation to the building space; and a comfort term for penalizing a deviation from the one or more comfort conditions in the building space.
  • Example 38 Example 38.
  • one of the plurality of ventilation modes comprises an energy savings ventilation mode in which the Predictive Control (PC) attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined energy savings limits.
  • PC Predictive Control
  • the cost function for the energy savings ventilation mode includes minimizing an overall cost associated with: an energy term for minimizing energy associated with outdoor air ventilation to the building space; a comfort term that penalizes a deviation from one or more comfort conditions in the building space; and an indoor air quality (IAQ) term that penalizes violations of one or more predetermined IAQ limits.
  • IAQ indoor air quality
  • one of the plurality of ventilation modes comprises a productivity ventilation mode in which the Predictive Control (PC) attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined productively limits, wherein at least one of the predetermined productively limits is below a corresponding one of the predetermined energy savings limits.
  • PC Predictive Control

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Fluid Mechanics (AREA)
  • Air Conditioning Control Device (AREA)
  • Ventilation (AREA)

Abstract

Appropriate ventilation for a building space while maintaining building comfort includes tracking one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system. An environmental model for the building space is learned over time based at least in part on these tracked environmental conditions, where the environmental model predicts an environmental response of the building space to operation of the HVAC system under various interior and exterior environmental conditions. An appropriate ventilation rate that maintains adherence to one or more comfort parameters of the building space is determined by using the environmental model of the building space. The outdoor air ventilation damper of the HVAC system is controlled to provide appropriate ventilation.

Description

DYNAMIC VENTILATION CONTROL FOR A BUILDING Related Applications [0001] This application claims the benefit of priority under 35 U.S.C. §119 to U.S. Provisional Application Serial No. 63/137,526, filed January 14, 2021, the entirety of which is incorporated herein by reference, U.S. Utility Application Serial No.17/571,009, filed January 7, 2022 and U.S. Utility Application Serial No. 17/570,978, filed January 7, 2022, both applications are incorporated herein by reference Technical Field [0002] The present disclosure relates generally to control of Heating, Ventilating and Air Conditioning (HVAC) systems. More particularly, the present disclosure relates to methods and systems of determining ventilation rates for an HVAC system. Background [0003] HVAC systems provide conditioned air for heating and cooling the interior of a building. Some HVAC systems also can provide fresh air ventilation into the building while exhausting an equivalent amount of inside air. Such fresh air ventilation is useful in reducing contaminates produced in the building. However, there are often costs involved in conditioning the fresh air before it can be deployed in the building. For example, in the winter, the fresh air must typically be heated by the HVAC system, and in some cases, humidity must be added. Likewise, in the summer, the fresh air must typically be cooled by the HVAC system, and in some cases, humidity must be removed. Thus, to reduce operating costs, it is often desirable to minimize the ventilation rate while still adequately ventilating the building given the current contaminates or expected contaminates in the building. [0004] Under some conditions, such as during a pandemic, it may be desirable to prioritize an increased ventilation rate over energy costs to help reduce the spread of pathogens within the building. Under these conditions, if the ventilation rate is set too high, given the current indoor and outdoor conditions, the HVAC system may lack the heating and/or cooling capacity to adequately condition the incoming fresh air while still maintaining occupant comfort in the building. [0005] What would be desirable are methods and systems for automatically determining a ventilation rate for a building, given the current indoor and outdoor conditions, and dynamically controlling the HVAC system in accordance with the determined ventilation rate. Summary [0006] The present disclosure relates to methods of determining ventilation rates for an HVAC system using a learned model. In one example, a method provides dynamic ventilation for a building space serviced by a Heating, Ventilating and Air Conditioning (HVAC) system with one or more components including an outdoor air ventilation damper. The method includes selecting a ventilation mode from a plurality of ventilation modes. The ventilation modes include a health ventilation mode that when selected attempts to maximize ventilation to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space. The ventilation modes include an energy savings ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined energy savings limits. The method includes controlling one or more components of the HVAC system, including the outdoor air ventilation damper, in accordance with the selected ventilation mode. [0007] In another example, a method provides dynamic ventilation for a building space serviced by a Heating, Ventilating and Air Conditioning (HVAC) system with one or more components including an outdoor air ventilation damper. The method includes selecting a ventilation mode from a plurality of ventilation modes. The plurality of ventilation modes include a first ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space while maintaining one or more IAQ contaminants in the building space below one or more corresponding first predetermined limits. The plurality of ventilation modes includes a second ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space while maintaining one or more IAQ contaminants in the building space below one or more corresponding second predetermined limits, wherein at least one of the second predetermined limits is below a corresponding one of the first predetermined limits. The method includes controlling one or more components of the HVAC system, including the outdoor air ventilation damper, in accordance with the selected ventilation mode. [0008] In another example, a method provides dynamic ventilation for a building space serviced by a Heating, Ventilating and Air Conditioning (HVAC) system with an outdoor air ventilation damper. The method includes developing a building model for the building space, the building model including a non-linear representation of how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation under a plurality of different operating conditions. A current operating condition is identified. A linear approximation of the non-linear building model at the current operating condition is determined, wherein the linear approximation approximates how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation at the current operating condition. The method includes controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Predictive Control (PC) using the determined linear approximation of the non-linear building model. [0009] The preceding summary is provided to facilitate an understanding of some of the innovative features unique to the present disclosure and is not intended to be a full description. A full appreciation of the disclosure can be gained by taking the entire specification, claims, figures, and abstract as a whole. Brief Description of the Figures [0010] The disclosure may be more completely understood in consideration of the following description of various examples in connection with the accompanying drawings, in which: [0011] Figure 1 is a schematic block diagram of an illustrative HVAC control system; [0012] Figure 2 is a flow diagram showing an illustrative method of providing a maximum allowed ventilation for a building space; [0013] Figure 3 is a flow diagram showing an illustrative method of providing a maximum allowed ventilation for a building space; [0014] Figure 4 is a flow diagram showing an illustrative method of providing a maximum allowed ventilation for a building space; [0015] Figure 5 is a flow diagram showing an illustrative method of providing a dynamic ventilation rate for a building space; [0016] Figure 6 is a flow diagram showing an illustrative method of providing a dynamic ventilation rate for a building space; [0017] Figure 7 is a flow diagram showing an illustrative method of providing a dynamic ventilation rate for a building space; [0018] Figure 8 is a schematic block diagram showing an illustrative HVAC control system; [0019] Figure 9 is a schematic block diagram of an illustrative algorithm forming part of the illustrative HVAC control system of Figure 8; [0020] Figure 10 is a graph showing an example of energy penalty weighting relative to air flow rate; [0021] Figure 11 is a graph showing an example of energy penalty weighting relative to cumulative IAQ concentration; [0022] Figure 12 is a graph showing an example of a Heaviside function; [0023] Figure 13 is a flow diagram showing an illustrative method; [0024] Figure 14 is a flow diagram showing an illustrative method; [0025] Figure 15 is a flow diagram showing an illustrative method; [0026] Figure 16 is a schematic view of an illustrative MPC architecture for building control; and [0027] Figure 17 is a graphical representation of how a building model may include a non-linear representation of how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation under a plurality of different operating conditions. [0028] While the disclosure is amenable to various modifications and alternative forms, specifics thereof have been shown by way of example in the drawings and will be described in detail. It should be understood, however, that the intention is not to limit the disclosure to the particular examples described. On the contrary, the intention is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the disclosure. Description [0029] The following description should be read with reference to the drawings, in which like elements in different drawings are numbered in like fashion. The drawings, which are not necessarily to scale, depict examples that are not intended to limit the scope of the disclosure. Although examples are illustrated for the various elements, those skilled in the art will recognize that many of the examples provided have suitable alternatives that may be utilized. [0030] All numbers are herein assumed to be modified by the term “about”, unless the content clearly dictates otherwise. The recitation of numerical ranges by endpoints includes all numbers subsumed within that range (e.g., 1 to 5 includes 1, 1.5, 2, 2.75, 3, 3.80, 4, and 5). [0031] As used in this specification and the appended claims, the singular forms “a”, “an”, and “the” include the plural referents unless the content clearly dictates otherwise. As used in this specification and the appended claims, the term “or” is generally employed in its sense including “and/or” unless the content clearly dictates otherwise. [0032] It is noted that references in the specification to “an embodiment”, “some embodiments”, “other embodiments”, etc., indicate that the embodiment described may include a particular feature, structure, or characteristic, but every embodiment may not necessarily include the particular feature, structure, or characteristic. Moreover, such phrases are not necessarily referring to the same embodiment. Further, when a particular feature, structure, or characteristic is described in connection with an embodiment, it is contemplated that the feature, structure, or characteristic is described in connection with an embodiment, it is contemplated that the feature, structure, or characteristic may be applied to other embodiments whether or not explicitly described unless clearly stated to the contrary. [0033] Figure 1 is a schematic block diagram of an illustrative HVAC control system 10. In the example shown, a building space 12 includes a controller 14 that is configured to control at least some features and operations of an HVAC system 16. The building space 12 may represent the interior of an entire building, or only part of a building. The controller 14 may control operation of a damper 18 that is part of the HVAC system 16 and that functions to control the relative flow of fresh outside air into the building space 12 through the ductwork (not shown) that provides conditioned air to various parts of the building space 12. The controller 14 may control other features and components of the HVAC system 16 as well. The controller 14 may operate in accordance with various HVAC standards such as but not limited to ASHRAE 62.1 to provide appropriate volumes of fresh air to the building space 12. Providing fresh air can provide the interior of the building space 12 with healthier air that contains relatively less of various contaminants than the interior air in the building space 12 would otherwise have, as outdoor air can be substantially cleaner than indoor air. Providing fresh air can also help with comfort, such as if the building space 12 is currently warmer than a temperature setpoint but the outside air is cool enough that it can be used to help cool the building space 12 down to its temperature setpoint. This is just an example. [0034] The illustrative controller 14 includes an input 20 for receiving one or more interior environmental conditions within the building space 12 as well as for receiving one or more exterior environmental conditions outside of the building space 12. The input 20 may also receive one or more operating conditions of the HVAC system 16 over time. In the example shown, the controller 14 includes a processor 22 that is operatively coupled to the input 20 such that the processor 22 can track over time one or more environmental conditions within the building space 12 and also track over time one or more exterior environmental conditions outside of the building space 12. The processor 22 may also track one or more operating conditions of the HVAC system 16 over time, and correlate in time the one or more operating conditions of the HVAC system 16 with the one or more environmental conditions within the building space 12, the one or more exterior environmental conditions outside of the building space 12, and/or any other suitable conditions or parameters. While a single processor 22 is shown, it will be appreciated that the controller 14 may include two, three or more distinct processors 22. In cases where the controller 14 includes multiple processors 22, the functionality of the controller 14 may be divided between the two, three or more distinct processors 22, and in some cases, may be distributed amount a plurality of different locations. [0035] In the example shown, the processor 22 may be configured to learn an environmental model for the building space 12 based at least in part on the tracked one or more interior environmental conditions within the building space 12 and the one or more exterior environmental conditions outside of the building space 12 during operation of the HVAC system 16. The learned environmental model is configured to predict an environmental state of the building space 12 in response to operation of the HVAC system 16 under various interior and exterior environmental conditions. The processor 22 may be configured to determine a dynamic ventilation rate for the HVAC system 16 of the building space 12 based at least in part on inputting to the environmental model of the building space 12 one or more current interior environmental conditions and one or more current exterior environmental conditions. The illustrative controller 14 further includes an output 24 for sending the determined dynamic ventilation rate to the HVAC system 16 for controlling the outdoor air ventilation damper 18 of the HVAC system 16. [0036] In some cases, the processor 22 is configured to predict a current maximum allowed ventilation rate that can be achieved without causing the HVAC system 26 to compromise on any of one or more comfort conditions of the building space. The HVAC system 16 may control the outdoor air ventilation damper 18 to provide ventilation up to or at the current maximum allowed ventilation rate. [0037] In the example shown, the building space 12 may include one or more sensors 26, individually labeled as 26a and 26b. While two sensors 26 are shown, it will be appreciated that this is merely illustrative, as the building space 12 may include any number of sensors 26, and may include only one sensor 26 or may include three, four, five or even substantially more sensors 26. At least some of the sensors 26 may be hard-wired to the input 20. At least some of the sensors 26 may be wirelessly coupled to the input 20. The sensors 26 may represent any of a variety of different types of sensors. The sensors 26 may be configured to provide signals representing one or more interior environmental conditions to the input 20. The sensors 26 may include temperature sensors, humidity sensors, CO2 sensors and sensors configured to detect other indoor pollutants such as particulate matter (PM), volatile organic compounds (VOCs) and the like. The sensors 26 may include occupancy sensors, such as motion sensors, video camera sensors coupled with video analytics that in some cases can identify and maintain a count and/or density of people in the building space, a time of flight (e.g. LIDAR) sensor that can detect and in some cases maintain a count and/or density of people in the building space, a milli-meter wave sensor (e.g. Radar) that can detect and in some cases maintain a count and/or density of people in the building space, and/or any other suitable sensor as desired. People are known to produce contaminates in the building space. [0038] The illustrative HVAC control system 10 also includes one or more sensors 28 that are disposed outside of the building space 12 in order to provide signals representing one or more exterior environmental conditions to the input 20. At least some of the sensors 28 may be hard-wired to the input 20. At least some of the sensors 28 may be wirelessly coupled to the input 20. In some cases, the sensors 28 are accessed from a weather service via a suitable Application Programming Interface (API). These are just examples. The sensors 28 may include temperature sensors, humidity sensors, CO2 sensors and sensors configured to detect other pollutants such as particulate matter (PM), volatile organic compounds (VOCs) and the like. [0039] In some instances, the controller 14 may communicate with a remote server 30. The remote server 30 may be a cloud-based server, for example. An edge controller 32 may provide a go-between between the controller 14 and the remote server 30. The controller 14 may provide data to the remote server 30 for performance monitoring, for example. As discussed thus far, the processor 22 within the controller 14 receives various inputs from the interior sensors 26 and the exterior sensors 28, and may receive various inputs such as HVAC operational conditions from the HVAC system 16. The processor 22 may use these various inputs to learn an environmental model for the building space 12, sometimes using Artificial Intelligence and/or Machine Learning. In other cases, the processor 22 may simply receive the various inputs from the input 20 and forward the information to the output 24 for transmission to either the edge controller 32 itself or ultimately the remote server 30 for processing. In some cases, the processing power that monitors the various inputs and creates and maintains the learned environmental model for the building space 12 may reside within the edge controller 32. In such cases, the edge controller 32 may include one or more containers in which the processing power is manifested. In some cases, the edge controller 32 merely functions as a gateway, providing the information to the remote server 30, where the processing power that monitors the various inputs and creates and maintains the learned environmental model for the building space 12 resides. In some cases, the processing power that monitors the various inputs and creates and maintains the learned environmental model for the building space 12 is distributed throughout the HVAC control system 10, the edge controller 32 and/or the remote server 30. These are just examples. [0040] In some cases, the learned environmental model is not static, but is repeatedly updated to account for changes in the HVAC control system 10. These changes can include normal changes resulting from components of the HVAC control system 10 aging. An example is a filter that allows a decreasing air flow as the filter becomes clogged. Another example may be a variation in fan speed caused by a belt that drives the fan stretching as it ages. Heat exchangers can lose efficiency over time. The building space 12 itself may change over time. For example, windows may start to leak additional air as weather stripping on the windows ages and contracts. Alternatively, window efficiency may increase if old windows are replaced. HVAC system efficiency may increase when particular parts of the HVAC system are replaced. These are just examples of situations in which the learned environmental model is updated to account for changes in the environment. [0041] Figure 2 is a flow diagram showing an illustrative method 40 for providing a maximum allowed ventilation rate for a building space (such as the building space 12) while not compromising on one or more comfort conditions in the building space using a Heating, Ventilating and/or Air Conditioning (HVAC) system that includes an outdoor air ventilation damper (such as the HVAC system 16) of the building space. The illustrative method 40 includes tracking one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system, as indicated at block 42. The one or more interior environmental conditions may include indoor air temperature. The one or more interior environmental conditions may include indoor humidity. The one or more interior environmental conditions may include concentrations of one or more indoor pollutants such as but not limited to CO2, particular matter (PM 2.5 and PM 10) and volatile organic compounds (VOCs). The one or more interior environmental conditions may include occupancy such as a people count and/or a people density in the building. The one or more exterior environmental conditions may include outdoor air temperature. The one or more exterior environmental conditions may include outdoor humidity. The one or more exterior environmental conditions may include one or more outdoor pollutants. These are just examples. [0042] An environmental model for the building space is learned over time based at least in part on the tracked one or more interior environmental conditions within the building space and the one or more exterior environmental conditions outside of the building space during operation of the HVAC system, as indicated at block 44. In some cases, the environmental model is learned using Artificial Intelligence and/or Machine Learning. The learned environmental model is configured to an environmental state of the building space in response to operation of the HVAC system under various interior and exterior environmental conditions. A current maximum allowed ventilation rate that can be achieved without causing the HVAC system to compromise on any of the one or more comfort conditions of the building space as indicated at block 46. In some cases, determining the current maximum allowed ventilation rate includes inputting to the learned environmental model of the building space one or more current comfort parameters of the building space, one or more current interior environmental conditions and one or more current exterior environmental conditions. In some cases, determining the current maximum allowed ventilation rate may include inputting to the learned environmental model one or more of a temperature setpoint schedule, a current humidity setpoint, a current temperature within the building space, a current fan status of a fan of the HVAC system, a current valve status of a valve of the HVAC system, and/or a current load on the HVAC system. These are just examples. The outdoor air ventilation damper 18 of the HVAC system 16 is then controlled to provide ventilation up to and/or at the current maximum allowed ventilation rate, as indicated at block 48. [0043] In some cases, the learned environmental model may be configured to predict a current heating capacity of the HVAC system, a current cooling capacity of the HVAC system, a load on the HVAC system, and/or any other suitable parameters. These parameters may be considered intermediate parameters that are used when determining the current maximum allowed ventilation rate. [0044] Figure 3 is a flow diagram showing an illustrative method 60 for providing a maximum allowed ventilation rate for a building space (such as the building space 12) while maintaining adherence to comfort parameters during a proscribed period of time using a Heating, Ventilating and/or Air Conditioning (HVAC) system (such as the HVAC system 16) of the building space. The illustrative method 60 includes tracking one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system, as indicated at block 62. The one or more interior environmental conditions may include indoor air temperature. The one or more interior environmental conditions may include indoor humidity. The one or more interior environmental conditions may include concentrations of one or more indoor pollutants such as but not limited to CO2, particular matter (PM 2.5 and PM 10) and volatile organic compounds (VOCs). The one or more interior environmental conditions may include occupancy such as a people count and/or people density in the building. The one or more exterior environmental conditions may include outdoor air temperature. The one or more exterior environmental conditions may include outdoor humidity. The one or more exterior environmental conditions may include one or more outdoor pollutants. These are just examples. [0045] In some cases, occupancy data may be tracked over time, as indicated at block 64. Tracking occupancy data over time may include using video analytics to analyze one or more video streams in order to ascertain occupancy. The video streams can come from security cameras, for example. Tracking occupancy data over time may include using sensors to detect occupancy within a zone of the building space. In some instances, tracking occupancy data over time may include using sensors to detect individuals entering a zone of the building space and to detect individuals exiting a zone of the building space. For example, a time of flight (e.g. LIDAR) sensor may be used to detect and maintain a count of people in the zone of the building space. From the people count, and using the size of zone, a measure of people density for the zone can be estimated. Likewise, a milli-meter wave sensor (e.g. Radar) may be used to detect and maintain a count of people in the zone of the building space. These are just examples. People are known to produce contaminates in the building space. [0046] How one or more interior environmental conditions change in conjunction with changes in occupancy may be tracked, as indicated at block 66. For example, temperature, humidity, CO2, PM, VOCs and/or other parameters may be tracked. An environmental model for the building space is learned over time based at least in part on the tracked one or more interior environmental conditions within the building space and the one or more exterior environmental conditions outside of the building space during operation of the HVAC system under various conditions, as well as based at least in part on the tracked occupancy data and how the one or more interior environmental conditions changes in conjunction with changes in occupancy, as indicated at block 68. [0047] The learned environmental model is configured to predict an environmental state of the building space in response to operation of the HVAC system under various interior and exterior environmental conditions. A current maximum allowed ventilation rate that can be achieved without causing the HVAC system to compromise on any of the one or more comfort conditions of the building space as indicated at block 70. This may include inputting to the learned environmental model of the building space one or more current comfort parameters associated with the one or more comfort conditions of the building space, one or more current interior environmental conditions (sometimes including current occupancy) and one or more current exterior environmental conditions. In some cases, determining the current maximum allowed ventilation rate may include inputting to the learned environmental model one or more of a temperature setpoint schedule, a current temperature within the building space and a current building space occupancy. The outdoor air ventilation damper of the HVAC system is then controlled to provide ventilation up to or at the current maximum allowed ventilation rate, as indicated at block 72. In some cases, and as indicated at block 74, the learned environmental model may be used to ascertain how the building space is predicted to respond to a change in the ventilation rate in order to determine the current maximum allowed ventilation rate. [0048] Figure 4 is a flow diagram showing an illustrative method 80 for providing a maximum allowed ventilation rate for a building space (such as the building space 12) while not compromising on one or more comfort conditions in the building space using a Heating, Ventilating and/or Air Conditioning (HVAC) system that includes an outdoor air ventilation damper (such as the HVAC system 16) of the building space. The illustrative method 80 includes tracking one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system, as indicated at block 82. The one or more interior environmental conditions may include indoor air temperature. The one or more interior environmental conditions may include indoor humidity. The one or more interior environmental conditions may include concentrations of one or more indoor pollutants such as but not limited to CO2, particular matter (PM 2.5 and PM 10) and volatile organic compounds (VOCs). The one or more interior environmental conditions may include occupancy and/ a people count in the building. The one or more exterior environmental conditions may include outdoor air temperature. The one or more exterior environmental conditions may include outdoor humidity. The one or more exterior environmental conditions may include one or more outdoor pollutants. These are just examples. [0049] An environmental model for the building space is learned over time based at least in part on the tracked one or more interior environmental conditions within the building space and the one or more exterior environmental conditions outside of the building space during operation of the HVAC system, as indicated at block 84. A current maximum allowed ventilation rate that allows adherence to one or more comfort parameters of the building space is determined as indicated at block 86. This may include inputting to the environmental model of the building space one or more current comfort parameters associated with the one or more comfort conditions of the building space, one or more current interior environmental conditions and one or more current exterior environmental conditions. In some cases, determining the current maximum allowed ventilation rate may include inputting to the environmental model one or more of a temperature setpoint schedule, a current temperature within the building space and a current building space occupancy. In some cases, the learned environmental model may be configured to predict a current heating capacity of the HVAC system, a current cooling capacity of the HVAC system, a load on the HVAC system, and/or any other suitable parameters. These parameters may be considered intermediate parameters that are used when determining the current maximum allowed ventilation rate. The outdoor air ventilation damper of the HVAC system is then controlled to provide ventilation at the current maximum allowed ventilation rate, as indicated at block 88. [0050] In some instances, as indicated at block 90, the method 80 may include initiating a purge period in which the HVAC system provides a ventilation rate that is above the current maximum allowed ventilation rate for a period of time. In some cases, the purge period may provide a complete or a substantially complete air replacement within the building space. In some cases, the HVAC system is allowed to compromise on one or more of the one or more comfort conditions of the building space during at least part of the purge period. For example, the HVAC system may not condition incoming fresh air during at least part of the purge period. In some cases, the purge period may end at a time prior to a start of a proscribed period of time sufficient to permit the HVAC system to condition the building space and reach a comfort setting prior to the start of the proscribed period of time. In some cases, such as in an office building, the purge period is performed at night when occupancy is not expected. In a movie theater, the purge period may be performed between shows. These are just examples. [0051] Figure 5 is a flow diagram showing an illustrative method 100 for providing a dynamic ventilation rate for a building space using a Heating, Ventilating and/or Air Conditioning (HVAC) system. The illustrative method 100 includes tracking over time one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system, as indicated at block 102. The one or more interior environmental conditions may include indoor air temperature. The one or more interior environmental conditions may include indoor humidity. The one or more interior environmental conditions may include concentrations of one or more indoor pollutants such as but not limited to CO2, particular matter (PM 2.5 and PM 10) and volatile organic compounds (VOCs). The one or more interior environmental conditions may include occupancy and/ a people count in the building. The one or more exterior environmental conditions may include outdoor air temperature. The one or more exterior environmental conditions may include outdoor humidity. The one or more exterior environmental conditions may include one or more outdoor pollutants. These are just examples. [0052] An environmental model for the building space is learned over time based at least in part on the tracked one or more interior environmental conditions within the building space and the one or more exterior environmental conditions outside of the building space during operation of the HVAC system. The learned environmental model may be configured to predict an environmental state of the building space in response to operation of the HVAC system under various interior and exterior environmental conditions, as indicated at block 104. A dynamic ventilation rate for the HVAC system of the building space is determined based at least in part on inputting to the environmental model of the building space one or more current interior environmental conditions and one or more current exterior environmental conditions, as indicated at block 106. The outdoor air ventilation damper of the HVAC system is then controlled to provide ventilation to the building space at the determined dynamic ventilation rate, as indicated at block 108. [0053] In some instances, the environmental model may predict a current heating capacity of the HVAC system. The environmental model may predict a current cooling capacity of the HVAC system. The environmental model may predict a current and/or expected load on the HVAC system. In some cases, the environmental model may predict the HVAC systems capacity to cool/heat the outdoor air given the predicted load and outside weather conditions. In some cases, a maximum ventilation parameter is determined that is representative of a rate of outside air having the one or more exterior environmental conditions that can be conditioned by the measure of current unused heating and/or cooling capacity of the HVAC system while still maintaining the one or more comfort conditions for the building space. The dynamic ventilation rate may then be based at least in part on the maximum ventilation parameter. For example, the dynamic ventilation rate may be capped at by the maximum ventilation parameter, where the maximum ventilation parameter may be representative of a maximum ventilation rate that can be achieved given the HVAC systems current capacity to cool/heat the outdoor air given the predicted load and outside weather conditions. In some cases, a certain capacity margin may be in-built into the maximum ventilation parameter. [0054] In some cases, the tracking step (block 102), the learning step (block 104) and the determining step (block 106) may be performed at a remote location remote from the building space (e.g. at server 30 of Figure 1), while the controlling step (block 108) may be performed by the HVAC system (e.g. HVAC system 16 of Figure 1) of the building space. However, it is contemplated that the tracking step (block 102), the learning step (block 104) and/or the determining step (block 106) may be performed on site (e.g. by the controller 14 and/or edge controller 32 of Figure 1). These are just examples. [0055] Figure 6 is a flow diagram showing an illustrative method 120 for providing a dynamic ventilation rate for a building space using a Heating, Ventilating and/or Air Conditioning (HVAC) system. The illustrative method 120 includes tracking over time one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system, as indicated at block 122. The one or more interior environmental conditions may include indoor air temperature. The one or more interior environmental conditions may include indoor humidity. The one or more interior environmental conditions may include concentrations of one or more indoor pollutants such as but not limited to CO2, particular matter (PM 2.5 and PM 10) and volatile organic compounds (VOCs). The one or more interior environmental conditions may include occupancy and/ a people count in the building. The one or more exterior environmental conditions may include outdoor air temperature. The one or more exterior environmental conditions may include outdoor humidity. The one or more exterior environmental conditions may include one or more outdoor pollutants. These are just examples. [0056] An environmental model for the building space is learned over time based at least in part on the tracked one or more interior environmental conditions within the building space and the one or more exterior environmental conditions outside of the building space during operation of the HVAC system. The environmental model may be configured to predict an environmental state of the building space in response to operation of the HVAC system under various interior and exterior environmental conditions, as indicated at block 124. In this illustrative method, a current occupancy count and/or density of the building space may be maintained by counting occupants entering and existing the building space, as indicated at block 126. [0057] Tracking occupancy data over time may include using video analytics to analyze one or more video streams in order to ascertain occupancy. The video streams can come from security cameras, for example. Tracking occupancy data over time may include using sensors to detect occupancy within a zone of the building space. In some instances, tracking occupancy data over time may include using sensors to detect individuals entering a zone of the building space and to detect individuals exiting a zone of the building space. For example, a time of flight (e.g. LIDAR) sensor may be used to detect and maintain a count of people in the zone of the building space. Likewise, a milli-meter wave sensor (e.g. Radar) may be used to detect and maintain a count of people in the zone of the building space. These are just examples. People are known to produce contaminates in the building space. [0058] A dynamic ventilation rate for the HVAC system of the building space is determined based at least in part on inputting to the environmental model of the building space one or more current interior environmental conditions and one or more current exterior environmental conditions. The dynamic ventilation rate may be compensated based on the current occupancy count and/or density of the building space, as indicated at block 128. The outdoor air ventilation damper of the HVAC system is then controlled to provide ventilation to the building space at the determined dynamic ventilation rate, as indicated at block 130. In some cases, the dynamic ventilation rate is capped to allow the HVAC system to not compromise on one or more comfort conditions in the building space. [0059] Figure 7 is a flow diagram showing an illustrative method 140 for providing a dynamic ventilation rate for a building space using a Heating, Ventilating and/or Air Conditioning (HVAC) system. The illustrative method 140 includes tracking over time one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system, as indicated at block 142. The one or more interior environmental conditions may include indoor air temperature. The one or more interior environmental conditions may include indoor humidity. The one or more interior environmental conditions may include concentrations of one or more indoor pollutants such as but not limited to CO2, particular matter (PM 2.5 and PM 10) and volatile organic compounds (VOCs). The one or more interior environmental conditions may include occupancy and/ a people count in the building. The one or more exterior environmental conditions may include outdoor air temperature. The one or more exterior environmental conditions may include outdoor humidity. The one or more exterior environmental conditions may include one or more outdoor pollutants, for example. [0060] An environmental model for the building space is learned over time based at least in part on the tracked one or more interior environmental conditions within the building space and the one or more exterior environmental conditions outside of the building space during operation of the HVAC system. The environmental model is configured to predict an environmental state of the building space in response to operation of the HVAC system under various interior and exterior environmental conditions, as indicated at block 144. [0061] A dynamic ventilation rate for the HVAC system of the building space is determined based at least in part on inputting to the environmental model of the building space one or more current interior environmental conditions and one or more current exterior environmental conditions, as indicated at block 146. The outdoor air ventilation damper of the HVAC system is then controlled to provide ventilation to the building space at the determined dynamic ventilation rate, as indicated at block 148. [0062] In some instances, as indicated at block 150, the method 140 may include initiating a purge period outside of a proscribed period of time in which the HVAC system provides a ventilation rate that is above the dynamic ventilation rate for a period of time. In some cases, the purge period may provide a complete or a substantially complete air replacement within the building space. In some cases, the HVAC system is allowed to compromise on one or more of the one or more comfort conditions of the building space during at least part of the purge period. For example, the HVAC system may not condition incoming fresh air during at least part of the purge period. In some cases, the purge period may end at a time prior to a start of a proscribed period of time sufficient to permit the HVAC system to condition the building space and reach a comfort setting prior to the start of the proscribed period of time. In some cases, such as in an office building, the purge period is performed at night when occupancy is not expected. In a movie theater, the purge period may be performed between shows. These are just examples. [0063] Figure 8 is a schematic block diagram showing an illustrative HVAC ventilation control system 160. The ventilation control system 160 includes an illustrative computational algorithm 162 that receives a number of real or near-real time data inputs 164 and a number of user configurations 166 and provides a control output 168. In this example, the real time data inputs 164 include one or more of inside temperature, inside humidity, inside PM2.5 (particulate matter), TVOC (total volatile organic compounds), outdoor temperature, outdoor humidity, outdoor pollutants, occupancy density and the area of a particular indoor space. The user configurations 166 include one or more of temperature setpoints, schedules and mode selection. The mode selection may be selected from, for example, a pandemic mode calling for a maximum allowed ventilation rate while not compromising on one or more comfort conditions in the building space (e.g. still maintaining adherence to comfort parameters), and a normal operating mode calling for a minimum ventilation rate while still adequately ventilating the building given the current contaminates or expected contaminates in the building. [0064] In this example, the control output 168 can include not only ventilation control, but in some instances can identify anomalies in the HVAC system. An anomaly may be detected when the HVAC system behaves in a manner that is different or even substantially different from what is expected. The control output 168 may include a message to a user alerting the user of the anomaly and may include one or more possible causes for the anomaly. An example of an anomaly would be expecting a current temperature to be reached at a given time, but discovering that the actual current temperature has not reached by the expected temperature. Possible causes could be a cooling valve malfunction or a heating valve malfunction. A belt driving a fan may have stretched or even broken. These are just examples. Based on the nature of the anomaly, the model may indicate one or more possible root causes for the user to investigate. [0065] The illustrative computational algorithm 162 may be used in part to create, edit or update the environmental model. Accordingly, the illustrative computational algorithm 162 may have a variety of inputs such as but not limited to one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system. Block 170 of Figure 9 provides additional examples of possible data sources. Data sources may include environmental parameters, air quality values, building data and equipment type data. Block 172 of Figure 9 provides for the algorithm understanding the data. This may include a quantitative definition of Contaminants of Concern (CoC) as well as a definition of comfort standards. Data understanding may also include understanding the capacity and efficiency of the HVAC equipment, for example. Block 174 of Figure 9 pertains to data collection. Data collection may include all of the sources listed in the block 170. Data collection may include ground truth (reference) information for CoC, comfort and possible anomalies. In some cases, data collection may span a period of at least one year, in order to capture seasonal variations. [0066] The illustrative computational algorithm 162 has a Step One, as indicated at block 176 of Figure 9. In Step One, the illustrative computational algorithm 162, particularly when in pandemic mode, has a goal of maximizing ventilation (or minimizing CoC concentration in the building) while meeting comfort requirements and staying within the capabilities and efficiencies of the HVAC system. In some cases, the illustrative computational algorithm 162 may have a goal, particularly when not in pandemic mode, of providing an appropriate dynamic ventilation rate such as to minimize the ventilation rate while still adequately ventilating the building given the current contaminates or expected contaminates in the building. Step Two, indicated at block 178, has objectives that include deriving performance metrics for acceptable CoC values. Step Two includes paying attention to comfort requirements, test data sets for validation, model prediction accuracies and model real time deployment requirements. [0067] The illustrative computational algorithm 162 has a Step Three, as indicated at block 180. Step Three involves data preparation. This may include data quality or pre-processing steps in order to check for missing data, unusual or unexpected values, and the like. A Step Four, as indicated at block 182, involves anomaly detection. For example, statistical and/or model-based approaches may be used to detect sensor faults, equipment failures, clogged filters and the like. Step Five, indicated at block 184 of Figure 9, includes feature engineering. This may include selecting variables of interest. This may include correlation studies for CoC and variables that can or have been found to influence CoC values. This may include correlation studies for comfort and various environmental parameters and equipment data values. [0068] The illustrative computational algorithm 162 has a Step Six, as indicated at block 186. Step Six involves model building. Model building may, for example, include one or more regression models that aim to predict CoC as a function of air quality, environmental parameters and building data. Model building may include a dynamic ML (machine learning) model that aims to predict appropriate outdoor air intake into the building as a function of equipment data, building data and environmental parameters. Step Seven, indicated at block 188, pertains to model validation. This may include cross-validation of model accuracy with respect to the objectives defined in Step Two (block 178). Step Eight, indicated at block 190, pertains to continuous learning by the illustrative computational algorithm 162. Data may be collected during deployment and processing, as indicated at Step Three (block 180) and Step Four (block 182). Batch mode learning and model updating based on Step Six (block 186) may also occur. The illustrative computational algorithm 162 may reside within the controller 14, the edge controller 32 and/or the cloud-based server 30, for example. In some cases, the HVAC system 16 (Figure 1) may be operated in accordance with a selected mode out of a plurality of modes. For example, the HVAC system 16 may be operated in accordance with a Health mode, which prioritizes providing as much fresh air as is feasible to maximize air quality parameters while maintaining comfort in the building space. The Health mode may be selected during a pandemic, for example. In some cases, the ventilation protocols described herein with respect to Figures 2 through 9 may be considered as being applicable to a Health mode. As another example, the HVAC system 16 may be operated in accordance with an Energy mode, which prioritizes minimizing energy costs for running the HVAC system while maintaining comfort and air quality parameters. As another example, the HVAC system 16 may be operated in accordance with a Productivity mode, which prioritizes minimizing energy while reaching higher air quality limits than those required by the Energy mode, as it has been found that reaching particular air quality limits above those required for safety of building occupants can generate improvement in employee productivity. These are just examples of contemplated ventilation modes. [0070] When in the Health mode, a goal may be to maximize outdoor air intake without compromising thermal comfort requirements within the building space 12, or within a zone within the building space 12. It will be appreciated that various constraints may be taken into account, including but not limited to HVAC equipment capacity, zone-wise occupancy levels, outdoor temperature and/or other considerations. In some cases, it may not be beneficial to bring in more outdoor air because occupant comfort may suffer and/or it energy costs associated with operating the HVAC system may substantially increase with little benefit. In other cases, when the outdoor air is at a temperature and/or humidity that requires little or no conditioning, it may be beneficial to bringing in more outdoor air to help meet temperature and other indoor comfort conditions. [0071] In some cases, when in Health mode, zone level indoor air quality is not directly constrained with respect to CO2 concentration, PM2.5 concentration and TVOC (total volatile organic compound) concentration. Rather, it is understood that these concentrations will naturally drop below IAQ limits simply by bringing in sufficient fresh air from outdoors. Of course, if the outdoor air is particularly polluted on a particular day or time of day, this may impact how much fresh air should be brought in. [0072] In order to optimize ventilation and other features of operating the HVAC system 16, there is a goal of minimizing a cost function that ties together the competing interests in operating the HVAC system 16. In the Health mode, there is a desire for as much fresh air as possible while still maintaining comfort requirements and minimizing energy consumption, all at the same time. The illustrative cost function includes terms for each of a variety of competing requirements. For example, there is a cost function term for air flow rate, including being able to maximize airflow into a particular AHU (air handling unit) as well as being able to maximize airflow into a particular zone. There is a cost function term for temperature, that only penalizes the cost function when zone temperature constraints are not met. In some cases, the cost function term for temperature involves slack variables. There is a cost function term for energy, that only penalizes the cost function once the AHU has met maximum airflow requirements. In some cases, the cost function term for temperature and the cost function term for energy are weighted, and the problem can be formulated in two different ways, based on how the cost function term for energy is weighted in the optimization function. [0073] An illustrative cost function for a Formulation 1 of the Health mode is given below: ^ where: This term represents the the airflow rate at the AHU level; This term represents the air flowrate at the zone level and normalizes the airflow rate; This term represents the cost associated with energy expenditure; This term represents the cost associated with thermal comfort violations; and is a weighting term that gives a transition from a low weight at the start to a high value on satisfying a threshold. This is illustrated in Figure 10, which is a graph showing energy penalty weight (ranging from 0 to -1) versus air flow rate. As can be seen, the energy penalty weight remains at or close to zero until the air flow rate approaches a maximum air flow rate. [0074] In particular: denotes the differential air flow rate with respect to the maximum airflow rate given by ҧ; denotes the differential air flow rate in zone “i” with respect to the maximum design flowrate for the zone given by is a function of actuator manipulations (ak) and the setpoints (rk ); the decision variables include ak and rk; denotes the energy consumed as a function of the setpoint rk and the actuator movement ak. [0075] It will be appreciated that the illustrative cost function of Formulation 1 of the Health mode is subject to a number of constraints listed below: [0076] In one example, the energy consumed at a heating coil of the HVAC system depends on the heat flows or the temperature gradient. This effect is caused as a result of heating valve movement, for example. The functional relationships among the variables are established as part of an energy model, which is based on system dynamics. [0077] It will be appreciated that is a function of the slack variable zk and is used to capture the cost related to thermal discomfort. The formulation presented here is directed to maximizing the air flow rates at the AHU as well as at the zone level, along with minimizing energy costs and thermal discomfort. [0078] An illustrative cost function for a Formulation 2 of the Health mode is given below: ேି^ ேି^ ே^ ே ^ = ^^^ ^^൫^ҧ^ െ ^^൯ + ^^^ ^^൭ ^^ ^ ^ି^ ^ ^ ^^^ ҧ^,^ െ ^^,^ ^ െ O ^ ( )^ ^ ത^തതതത ^ ^ ^^^ ^^ ^ ^ୀ^ ^ୀ^^ୀ ^^^ ^ҧ^,^ ^ୀ^ି^ ே^ + ^^ฮ^^ ^ ൫^^,^൯ฮ ^ ^ୀ^ ^ୀ^ where: ^ ^ This term is representative of the air flow rates at the AHU level; This term is representative of the air flow rates at the zone level; ^ This term is representative of the cost associated with energy expenditure; This term is representative of the cost associated with thermal comfort violations; and ^^LV^D^E LQDU\^YDOXH^WKDW takes the value of one (1) when the fresh air flow rate at the AHU level is at maximum, and is otherwise set equal to zero (0). [0079] It will be appreciated that the illustrative cost function of Formulation 2 of the Health mode is subject to a number of constraints listed below: [0080] For completeness, a description for the notations used in the illustrative cost functions is provided below:

[0081] In the energy savings mode, control of the fresh air intake is coupled with zone occupancy. Directly sensing occupancy provides a more immediate indication
that CO2 concentrations will start increasing. It will be appreciated that it takes some time for occupancy to result in increasing CO2 concentrations, hence directly measuring occupancy (rather than using CO2 concentrations as a proxy for occupancy) is more responsive. [0082] In some cases, ventilation strategies are evaluated to meet the IAQ requirements when there is least impact on energy consumption and it is most favorable for equipment life expectancy. For example, it may be better to bring in additional fresh air when a building is not occupied, if the outdoor air is cooler and thus requires minimal conditioning in order to meet comfort requirements. [0083] In some cases, ventilation strategies are evaluated to minimize the cost of energy that is consumed by each of the components of the HVAC system 16. In some cases, a thermal comfort band may be used as a constraint, with a penalty on the thermal comfort violation by using a slack variable on the zone temperature. Also, IAQ concentrations may be used as constraints. In some cases, a penalty may be placed on the IAQ bound violation by using a slack variable on IAQ variables (CO2, PM2.5 and TVOC) in the zone. [0084] An illustrative cost function for the energy savings mode is given below: where: This term is the cost associated with energy expenditure; This term represents the cost associated with thermal comfort violations; and This term represents the cost associated with IAQ variables bound violations. [0085] It will be appreciated that the illustrative cost function for the energy savings mode is subject to a number of constraints listed below: 27
[0086] In the productivity mode, zone-wise IAQ concentrations (and any other contaminants of concern) are maintained at least to the levels defined by ASHRAE. It is known that productivity of occupants of a building may increase with lower IAQ concentrations. Using zone-wise control for IAQ levels means considering zone-wise occupancy levels, environmental factors and optimizing energy consumption. For example, if a first zone is unoccupied while a second zone is at capacity, the second zone will receive more fresh air, if not substantially more fresh air, relative to the first zone. In some cases, IAQ concentrations within the zones may be measured and used as another control feature. [0087] An illustrative cost function for the productivity mode is as follows: where: This term pertains to meeting IAQ thresholds within each zone as per the set IAQ standards in the productivity mode, where the IAQ thresholds adjust dynamically as occupancy changes; This term pertains to minimizing energy cost expenditure as the cumulative IAQ measures in various zones reaches close to the threshold IAQ. This can be seen in Figure 11, which is a graph of energy penalty weight (ranging from 0 to -1) versus cumulative IAQ concentrations. As can be seen, the energy penalty weight remains at or close to zero until the cumulative IAQ concentration becomes high. Alternatively, the function h(.) could also be expressed as a function of the IAQ concentrations in the return air duct (e.g. sensed by a sensor). In some cases, however, this may result in passive control of the energy term. [0088] Moreover: This term pertains to the cost associated with energy consumption; This term pertains to the cost associated with thermal comfort violations; and This term pertains to the cost associated with IAQ variables bound violations. [0089] It will be appreciated that the illustrative cost function for the productivity mode is subject to a number of constraints listed below: [0090] It will be appreciated that the illustrative cost function for the productivity mode is subject to a number of constraints listed below:
[0091] In particular: denotes the differential between the IAQ measure and the IAQ threshold which is defined and set by the user as per the productivity mode for the zone “i”; denotes the IAQ threshold limits defined in accordance with the ASHRAE standards 62.1 and 62.2; is a function of actuator manipulations (ak) and the setpoints (rk); [0092] The functional relationships among the variables are established as part of the energy model, which is based on system dynamics. f (zk) is a function of the slack variable zk and is used to capture the cost related to thermal discomfort. o (sk) is a function of the slack variable sk and is used to capture the cost related to IAQ limit violations. As the thermal comfort and/or the IAQ contaminant concentration band starts to be violated, the cost function starts to penalize the deviation from the corresponding band. [0093] An objective is to minimize IAQ concentrations to the levels defined and set as per the productivity mode. In some cases, a cumulative sum of IAQ concentrations may be used to trigger energy minimization when the contaminants reach close to the threshold defined as per the productivity mode. Worst case IAQ levels to be met while in the productivity mode may be those as defined per the ASHRAE standards. [0094] It will be appreciated that the building space 12 may switch between modes. This can be done as a hard switch or a soft switch. A hard switch involves switching directly from a first mode to a second mode, with no intervening positions or mode. This can result in a large demand for instant control inputs. In some cases, a hard switch can damage equipment such as actuators over time if the specifications of the first mode and the second mode are substantially different. In contrast, a soft switch means switching from the first mode to the second mode over a number of intermediate control steps. This provides a smoother transition between the first mode and the second mode, and can thus increase the life of building equipment such as actuators. [0095] Soft switching involves switching from one mode to the other in a smoother manner by implementing intermediate MPC (model predictive control) over a number of control steps. Switching between the initial mode and the final mode happens XVLQJ^D^VRIW^VZLWFKLQJ^FRHIILFLHQW^EHWD^^ȕ^ that relates the input and state variables of the two modes: where, ^ ^^^ are the input and state variables, respectively, for intermediate MPC; ^^^ ^ are the input and state variables for the initial mode; ^^^ ^ are the input and state variables for the final mode. [0096] 7KH^VZLWFKLQJ^FRHIILFLHQW^EHWD^ ^LV^JLven by: where, ^(. ) is the Heaviside function, which as shown in Figure 12 is a step function that switches from 0 to 1 in the time interval W^௪; switching starts at ^^ and ends at ^^; and W^௪ = ^^-^^ is the switching interval. [0097] Figure 13 is a flow diagram showing an illustrative method 200 for providing dynamic ventilation for a building space (such as the building space 12) serviced by a Heating, Ventilating and Air Conditioning (HVAC) system (such as the HVAC system 16) with one or more components including an outdoor air ventilation damper (such as the damper 18). The method 200 includes selecting a ventilation mode from a plurality of ventilation modes, as indicated at block 202. The plurality of ventilation modes include a health ventilation mode that when selected attempts to maximize ventilation to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space, as indicated at block 202a. The plurality of ventilation modes include an energy savings ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined energy savings limits, as indicated at block 202b. The method 200 includes controlling one or more components of the HVAC system, including the outdoor air ventilation damper, in accordance with the selected ventilation mode, as indicated at block 204. [0098] In some cases, the plurality of ventilation modes includes a productivity ventilation mode that when selected attempts to control ventilation to the building space to maintain IAQ contaminants in the building space below predetermined productively limits subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space. In some cases, at least one of the predetermined productively limits is below a corresponding one of the predetermined energy savings limits. [0099] In some cases, when the health ventilation mode is selected, controlling the one or more components of the HVAC system, including the outdoor air ventilation damper, includes minimizing an overall cost associated with a ventilation term for maximizing outdoor air ventilation to the building space, an energy term for minimizing energy associated with outdoor air ventilation to the building space, and a comfort term for penalizing a deviation from one or more comfort conditions in the building space. In some instances, when the energy savings ventilation mode is selected, controlling the outdoor air ventilation damper includes minimizing an overall cost associated with an energy term for minimizing energy associated with outdoor air ventilation to the building space, a comfort term that penalizes a deviation from one or more comfort conditions in the building space, and an Indoor Air Quality (IAQ) term that penalizes violations of one or more predetermined IAQ limits. In some cases, the comfort term and the IAQ term may each include one or more slack variables. [0100] Figure 14 is a flow diagram showing an illustrative method 206 for providing dynamic ventilation for a building space (such as the building space 12) serviced by a Heating, Ventilating and Air Conditioning (HVAC) system (such as the HVAC system 16) with one or more components including an outdoor air ventilation damper (such as the damper 18). The method 206 includes selecting a ventilation mode from a plurality of ventilation modes, as indicated at block 208. In some cases, the ventilation mode may be selected by an operator. In some instances, the ventilation mode may be automatically selected in accordance with a programmed schedule. [0101] The plurality of ventilation modes includes a first ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space while maintaining one or more IAQ contaminants in the building space below one or more corresponding first predetermined limits, as indicated at block 208a. The plurality of ventilation modes includes a second ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space while maintaining one or more IAQ contaminants in the building space below one or more corresponding second predetermined limits, wherein at least one of the second predetermined limits is below a corresponding one of the first predetermined limits, as indicated at block 208b. The method 206 includes controlling one or more components of the HVAC system, including the outdoor air ventilation damper, in accordance with the selected ventilation mode, as indicated at block 210. [0102] Figure 15 is a flow diagram showing an illustrative method 212 for providing dynamic ventilation for a building space (such as the building space 12) serviced by a Heating, Ventilating and Air Conditioning (HVAC) system (such as the HVAC system 16) with an outdoor air ventilation damper (such as the damper 18). The method 212 includes developing a building model for the building space, the building model including a non-linear representation of how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation under a plurality of different operating conditions, as indicated at block 214. A current operating condition is identified, as indicated at block 216. A linear approximation of the non-linear building model at the current operating condition is determined, wherein the linear approximation approximates how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation at the current operating condition, as indicated at block 218. One or more components of the HVAC system, including the outdoor air ventilation damper, are controlled via Predictive Control (PC) using the determined linear approximation of the non-linear building model, as indicated at block 220. [0103] In some cases, and as indicated at block 222, the method 2112 may further include subsequently identifying a new operating condition. A new linear approximation of the non-linear building model at the new operating condition is determined, wherein the linear approximation approximates how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation at the new operating condition, as indicated at block 224. One or more components of the HVAC system, including the outdoor air ventilation damper, are controlled via Predictive Control (PC) using the determined new linear approximation of the non-linear building model, as indicated at block 226. [0104] In some cases, controlling the outdoor air ventilation damper via Model Predictive Control (MPC) further includes predicting a future value for one or more Indoor Air Quality (IAQ) parameters in the building space using the determined linear approximation of the non-linear building model, and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, to control the one or more IAQ parameters in the building space in accordance with one or more thresholds. In some cases, the one or more thresholds may include an ASHRAE standard threshold for each of the one or more IAQ parameters. The one or more thresholds may include a determined value for each of the one or more IAQ parameters that is expected to produce an enhanced productivity level of occupants in the building space. [0105] In some cases, controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Predictive Control (PC) using the determined linear approximation of the non-linear building model includes selecting a ventilation mode out of a plurality of ventilation modes, each ventilation mode having a different cost function, identifying the cost function for the selected ventilation mode, and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Model Predictive Control (MPC), wherein the MPC minimized the identified cost function when controlling the one or more components of the HVAC system. [0106] In some instances, one of the plurality of ventilation modes includes a health ventilation mode in which the Predictive Control (PC) maximizes ventilation to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space. The cost function for the health ventilation mode includes minimizing an overall cost associated with a ventilation term for maximizing outdoor air ventilation to the building space, an energy term for minimizing energy associated with outdoor air ventilation to the building space, and a comfort term for penalizing a deviation from the one or more comfort conditions in the building space. [0107] In some instances, one of the plurality of ventilation modes includes an energy savings ventilation mode in which the Predictive Control (PC) attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined energy savings limits. The cost function for the energy savings ventilation mode includes minimizing an overall cost associated with an energy term for minimizing energy associated with outdoor air ventilation to the building space, a comfort term that penalizes a deviation from one or more comfort conditions in the building space, and an indoor air quality (IAQ) term that penalizes violations of one or more predetermined IAQ limits. [0108] In some instances, one of the plurality of ventilation modes includes a productivity ventilation mode in which the Predictive Control (PC) attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined productively limits, wherein at least one of the predetermined productively limits is below a corresponding one of the predetermined energy savings limits. [0109] Figure 16 is a schematic view of an illustrative MPC architecture 230 for building control. The MPC architecture 230 may be used in controlling a variety of functions within a building 232. The building 232 may represent the building space 12, for example. A building model 234 is built to represent the building 232, and can be used via MPC control to model how the building 232 will respond to various inputs. The inputs can include control inputs to various building systems, such as but not limited to the HVAC system 16. The inputs can also include the environmental conditions outside the building 232, such as but not limited to wind, outdoor temperature, solar load, outdoor humidity, outdoor AIQ concentrations, and the like. Because the performance of the building 232 may vary for a variety of reasons, the building model 234 may not be static, but instead may be dynamic such that the building model 234 can be updated over time in order to represent and model changing conditions and parameters for the building 232. In some cases, the model structure of the building model 234 may remain fixed, but the model parameters may evolve over time. This may result in an Adaptive Model Predictive Control (AMPC) of the HVAC system, and in particular an Adaptive Model Predictive Control (AMPC) the ventilation provided by the HVAC system. In some cases, the model parameters of the building model 234 may be updated using machine learning and/or artificial intelligence. [0110] In some cases, the building model 234 is included in the MPC formulation as part of the constraints, namely the system dynamics show below: [0111] It will be appreciated that the MPC architecture 230 includes a cost function block 236, representing the cost functions described herein with respect to health mode, energy mode and productivity mode, for example. A constraints block 238 represents and accounts for the various constraints described herein with respect to the constraints that accompanied each of the cost functions. A Disturbances block 240 represents changes (W) that can impact the building 232 and the building model 234. The illustrative MPC architecture 230 further includes a Future Predictions block 242 that predicts the next iterative state, an Optimization block 244 that optimizes the cost function 236, an Inputs block 246 for providing inputs determined by the optimization block 244 to the HVAC system, and an Estimator block 248 for estimating the current state (x) of the HVAC system based on the inputs (u) and the outputs (y) of the HVAC system. During operation, at each time instance, an online optimization problem is solved by the Optimization block 244 to obtain an optimal control input trajectory over a fixed future horizon. The first control input (uk) from the predicted trajectory is implemented. In the next time instant, the optimization problem is re-parametrized and solved with the new state estimate (xk+1). [0112] Figure 17 is a graphical representation of how a building model may include a non-linear representation of how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation under a plurality of different operating conditions. In this particular example, temperature is plotted versus time along a plot line 250. It can be seen that the plot line 250 is non-linear. In some cases, and as referenced for example in Figure 13, once a current operating condition has been identified (temperature, in this case), a linear approximation to the non-linear building model can be utilized. Say that the current temperature is indicated at a graph point 252. A linear approximation 254, which for example may be considered as being a tangent line drawn through the graph point 252, may be used for enabling MPC control because MPC control requires a linear model. As the temperature changes, an updated linear approximation is selected that corresponds to the updated temperature. Additional Examples [0113] Example 1. A method for providing up to a maximum ventilation for a building space while not compromising on one or more comfort conditions in the building space using a Heating, Ventilating and/or Air Conditioning (HVAC) system that includes an outdoor air ventilation damper, the method comprising: tracking one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system; learning an environmental model for the building space over time based at least in part on the tracked one or more interior environmental conditions within the building space and the one or more exterior environmental conditions outside of the building space during operation of the HVAC system, wherein the environmental model predicts an environmental state of the building space in response to operation of the HVAC system under various interior and exterior environmental conditions; predicting a current maximum allowed ventilation rate that can be achieved without causing the HVAC system to compromise on any of the one or more comfort conditions of the building space, wherein predicting the current maximum allowed ventilation rate comprises inputting to the environmental model of the building space one or more comfort parameters associated with the one or more comfort conditions of the building space, one or more current interior environmental conditions and one or more current exterior environmental conditions; and controlling the outdoor air ventilation damper of the HVAC system to provide ventilation up to or at the current maximum allowed ventilation rate. [0114] Example 2. The method of example 1, wherein the one or more interior environmental conditions include one or more of indoor air temperature, indoor humidity and concentrations of one or more indoor pollutants. [0115] Example 3. The method of any one of examples 1 or 2, wherein the one or more exterior environmental conditions include one or more of outdoor temperature, outdoor humidity and one or more outdoor pollutants. [0116] Example 4. The method of any one of examples 1 to 3, further comprising: tracking occupancy of the building space over time; tracking how one or more interior environmental conditions change in conjunction with changes in occupancy; and learning the environmental model for the building space over time based at least in part on the tracked occupancy of the building space and how the one or more interior environmental conditions changes in conjunction with changes in occupancy. [0117] Example 5. The method of example 4, wherein tracking occupancy of the building space over time comprises using one or more of video analytics to analyze one or more video streams to ascertain occupancy of the building space, using sensors to detect occupancy within a zone of the building space, and using sensors to detect individuals entering and/or exiting a zone of the building space. [0118] Example 6. The method of any one of examples 1 to 5, further comprises using the environmental model for the building space to predict how the one or more comfort conditions in the building space is expected to respond to a change in a ventilation rate when predicting the current maximum allowed ventilation rate that can be achieved without causing the HVAC system to compromise on any of the one or more comfort conditions of the building space. [0119] Example 7. The method of example 6, wherein determining the current maximum allowed ventilation rate comprises inputting to the environmental model one or more of: a temperature setpoint schedule; a current humidity setpoint; a current temperature within the building space; a current fan status of a fan of the HVAC system; a current valve status of a valve of the HVAC system; and a current load on the HVAC system. [0120] Example 8. The method of any one of examples 1 to 7, further comprising initiating a purge period in which the HVAC system provides a ventilation rate that is above the current maximum allowed ventilation rate for a period of time. [0121] Example 9. The method of example 8, wherein the HVAC system is allowed to compromise on one or more of the one or more comfort conditions of the building space during at least part of the purge period. [0122] Example 10. The method of example 8, wherein the purge period ends at a time prior to a start of a proscribed period of time sufficient to permit the HVAC system to condition the building space and reach the one or more comfort conditions prior to the start of the proscribed period of time. [0123] Example 11. The method of any one of examples 1 to 10, wherein the environmental model determines a current heating and/or cooling capacity of the HVAC system, and wherein the environmental model uses the determined current heating and/or cooling capacity of the HVAC system to predict the current maximum allowed ventilation rate that can be achieved without causing the HVAC system to compromise on any of the one or more comfort conditions of the building space. [0124] Example 12. The method of example 11, wherein the environmental model determines a current load on the HVAC system, and wherein the environmental model uses the determined current load and the determined heating and/or cooling capacity of the HVAC system to predict the current maximum allowed ventilation rate that can be achieved without causing the HVAC system to compromise on any of the one or more comfort conditions of the building space. [0125] Example 13. A method for providing a dynamic ventilation rate for a building space using a Heating, Ventilating and/or Air Conditioning (HVAC) system that includes an outdoor air ventilation damper, the method comprising: tracking over time one or more interior environmental conditions within the building space and one or more exterior environmental conditions outside of the building space during operation of the HVAC system; learning an environmental model for the building space over time based at least in part on the tracked one or more interior environmental conditions within the building space and the one or more exterior environmental conditions outside of the building space during operation of the HVAC system, wherein the environmental model predicts an environmental state of the building space in response to operation of the HVAC system under various interior and exterior environmental conditions; determining a dynamic ventilation rate for the HVAC system of the building space based at least in part on inputting to the environmental model of the building space one or more interior environmental conditions and one or more exterior environmental conditions, wherein the determined dynamic ventilation rate is capped to allow the HVAC system to not compromise on one or more comfort conditions in the building space; and controlling the outdoor air ventilation damper of the HVAC system to provide ventilation to the building space at the determined dynamic ventilation rate. [0126] Example 14. The method of example 13, further comprising: maintaining a measure of occupancy of the building space by counting occupants entering and exiting the building space; and determining the dynamic ventilation rate comprises compensating the dynamic ventilation rate based on the measure of occupancy of the building space. [0127] Example 15. The method of example 14, wherein the measure of occupancy is determined using one or more of video feed of an entrance to the building space and a sensor capable of sensing individual occupants that are entering the building space. [0128] Example 16. The method of any one of examples 13 to 15, wherein the one or more interior environmental conditions include one or more of indoor air temperature, indoor humidity, and concentrations of one or more indoor pollutants. [0129] Example 17. The method of any one of examples 13 to 16, wherein the one or more exterior environmental conditions include one or more of outdoor temperature, outdoor humidity and outdoor pollutants. [0130] Example 18. The method of any one of examples 13 to 17, further comprising initiating a purge period in which the HVAC system provides a ventilation rate that is above the cap of the dynamic ventilation rate for a period of time. [0131] Example 19. The method of any one of examples 13 to 18, wherein the tracking, learning and determining steps are performed at a location remote from the building space, and the controlling step is performed by the HVAC system of the building space. [0132] Example 20. A method for controlling an outdoor air ventilation damper of a Heating, Ventilating and/or Air Conditioning (HVAC) system serving a building space of a building, the method comprising: receiving one or more comfort conditions for the building space, one or more exterior environmental conditions of air outside of the building, and one or more operating conditions of the HVAC system; identifying a measure of current unused heating and/or cooling capacity of the HVAC system based at least in part on the one or more operating conditions of the HVAC system; determining a maximum ventilation parameter that is representative of a rate of outside air having the one or more exterior environmental conditions that can be conditioned by the measure of current unused heating and/or cooling capacity of the HVAC system while still maintaining the one or more comfort conditions for the building space; determining a ventilation rate that is based at least in part on the maximum ventilation parameter; and sending the determined ventilation rate for use in controlling the outdoor air ventilation damper of the HVAC system. [0133] Example 21. A method for providing dynamic ventilation for a building space serviced by a Heating, Ventilating and Air Conditioning (HVAC) system with one or more components including an outdoor air ventilation damper, the method comprising: selecting a ventilation mode from a plurality of ventilation modes, wherein the plurality of ventilation modes comprises: a health ventilation mode that when selected attempts to maximize ventilation to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space; an energy savings ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined energy savings limits; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, in accordance with the selected ventilation mode. [0134] Example 22. The method of example 21, wherein the plurality of ventilation modes comprises: a productivity ventilation mode that when selected attempts to control ventilation to the building space to maintain IAQ contaminants in the building space below predetermined productively limits. [0135] Example 23. The method of example 21, wherein the plurality of ventilation modes comprises: a productivity mode that when selected attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined productively limits, wherein at least one of the predetermined productively limits is below a corresponding one of the predetermined energy savings limits. [0136] Example 24. The method of example 21, wherein when the health ventilation mode is selected, controlling the one or more components of the HVAC system, including the outdoor air ventilation damper, comprises minimizing an overall cost associated with: a ventilation term for maximizing outdoor air ventilation to the building space; an energy term for minimizing energy associated with outdoor air ventilation to the building space; and a comfort term for penalizing a deviation from one or more comfort conditions in the building space. [0137] Example 25. The method of example 21, wherein when the energy savings ventilation mode is selected, controlling the outdoor air ventilation damper comprises minimizing an overall cost associated with: an energy term for minimizing energy associated with outdoor air ventilation to the building space; a comfort term that penalizes a deviation from one or more comfort conditions in the building space; and an Indoor Air Quality (IAQ) term that penalizes violations of one or more predetermined IAQ limits. [0138] Example 26. The method of example 25, wherein the comfort term and the IAQ term each include one or more slack variables. [0139] Example 27. A method for providing dynamic ventilation for a building space serviced by a Heating, Ventilating and Air Conditioning (HVAC) system with one or more components including an outdoor air ventilation damper, the method comprising: selecting a ventilation mode from a plurality of ventilation modes, wherein the plurality of ventilation modes comprises: a first ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space while maintaining one or more IAQ contaminants in the building space below one or more corresponding first predetermined limits; a second ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space while maintaining one or more IAQ contaminants in the building space below one or more corresponding second predetermined limits, wherein at least one of the second predetermined limits is below a corresponding one of the first predetermined limits; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, in accordance with the selected ventilation mode. [0140] Example 28. The method of example 27, wherein the ventilation mode is selected by an operator. [0141] Example 29. The method of example 27, wherein the ventilation mode is automatically selected in accordance with a programmed schedule. [0142] Example 30. A method for providing dynamic ventilation for a building space serviced by a Heating, Ventilating and Air Conditioning (HVAC) system with an outdoor air ventilation damper, the method comprising: developing a building model for the building space, the building model comprising a non-linear representation of how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation under a plurality of different operating conditions; identifying a current operating condition; determining a linear approximation of the non-linear building model at the current operating condition, wherein the linear approximation approximates how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation at the current operating condition; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Predictive Control (PC) using the determined linear approximation of the non-linear building model. [0143] Example 31. The method of example 30, further comprising: subsequently identifying a new operating condition; determining a new linear approximation of the non-linear building model at the new operating condition, wherein the linear approximation approximates how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation at the new operating condition; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Predictive Control (PC) using the determined new linear approximation of the non-linear building model. [0144] Example 32. The method of any one of examples 30 or 31, wherein controlling the outdoor air ventilation damper via Model Predictive Control (MPC) further comprises: predicting a future value for one or more Indoor Air Quality (IAQ) parameters in the building space using the determined linear approximation of the non-linear building model; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, to control the one or more IAQ parameters in the building space in accordance with one or more thresholds. [0145] Example 33. The method of example 32, wherein the one or more thresholds comprise an ASHRAE standard threshold for each of the one or more IAQ parameters. [0146] Example 34. The method of any one of examples 32 or 33, wherein the one or more thresholds comprise a determined value for each of the one or more IAQ parameters that is expected to produce an enhanced productivity level of occupants in the building space. [0147] Example 35. The method of any one of examples 30 to 34, wherein controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Predictive Control (PC) using the determined linear approximation of the non-linear building model comprises: selecting a ventilation mode out of a plurality of ventilation modes, each ventilation mode having a different cost function; identifying the cost function for the selected ventilation mode; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Model Predictive Control (MPC), wherein the MPC minimized the identified cost function when controlling the one or more components of the HVAC system. [0148] Example 36. The method of any one of examples 30 to 35, wherein one of the plurality of ventilation modes comprises a health ventilation mode in which the Predictive Control (PC) maximizes ventilation to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space. [0149] Example 37. The method of example 36, wherein the cost function for the health ventilation mode includes minimizing an overall cost associated with: a ventilation term for maximizing outdoor air ventilation to the building space; an energy term for minimizing energy associated with outdoor air ventilation to the building space; and a comfort term for penalizing a deviation from the one or more comfort conditions in the building space. [0150] Example 38. The method of any one of examples 30 to 37, wherein one of the plurality of ventilation modes comprises an energy savings ventilation mode in which the Predictive Control (PC) attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined energy savings limits. [0151] Example 39. The method of any one of examples 30 to 38, wherein the cost function for the energy savings ventilation mode includes minimizing an overall cost associated with: an energy term for minimizing energy associated with outdoor air ventilation to the building space; a comfort term that penalizes a deviation from one or more comfort conditions in the building space; and an indoor air quality (IAQ) term that penalizes violations of one or more predetermined IAQ limits. [0152] Example 40. The method of any one of examples 30 to 39, wherein one of the plurality of ventilation modes comprises a productivity ventilation mode in which the Predictive Control (PC) attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined productively limits, wherein at least one of the predetermined productively limits is below a corresponding one of the predetermined energy savings limits. [0153] Having thus described several illustrative embodiments of the present disclosure, those of skill in the art will readily appreciate that yet other embodiments may be made and used within the scope of the claims hereto attached. It will be understood, however, that this disclosure is, in many respects, only illustrative. Changes may be made in details, particularly in matters of shape, size, arrangement of parts, and exclusion and order of steps, without exceeding the scope of the disclosure. The disclosure’s scope is, of course, defined in the language in which the appended claims are expressed.

Claims

What is claimed is: 1. A method for providing dynamic ventilation for a building space serviced by a Heating, Ventilating and Air Conditioning (HVAC) system with one or more components including an outdoor air ventilation damper, the method comprising: selecting a ventilation mode from a plurality of ventilation modes, wherein the plurality of ventilation modes comprises: a health ventilation mode that when selected attempts to maximize ventilation to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space; an energy savings ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined energy savings limits; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, in accordance with the selected ventilation mode. 2. The method of claim 1, wherein the plurality of ventilation modes comprises: a productivity ventilation mode that when selected attempts to control ventilation to the building space to maintain IAQ contaminants in the building space below predetermined productivity limits. 3. The method of any one of claims 1 or 2, wherein the plurality of ventilation modes comprises: a productivity mode that when selected attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined productively limits, wherein at least one of the predetermined productively limits is below a corresponding one of the predetermined energy savings limits. 4. The method of claim 1, wherein when the health ventilation mode is selected, controlling the one or more components of the HVAC system, including the outdoor air ventilation damper, comprises minimizing an overall cost associated with: a ventilation term for maximizing outdoor air ventilation to the building space; an energy term for minimizing energy associated with outdoor air ventilation to the building space; and a comfort term for penalizing a deviation from one or more comfort conditions in the building space. 5. The method of claim 1, wherein when the energy savings ventilation mode is selected, controlling the outdoor air ventilation damper comprises minimizing an overall cost associated with: an energy term for minimizing energy associated with outdoor air ventilation to the building space; a comfort term that penalizes a deviation from one or more comfort conditions in the building space; and an Indoor Air Quality (IAQ) term that penalizes violations of one or more predetermined IAQ limits. 6. A method for providing dynamic ventilation for a building space serviced by a Heating, Ventilating and Air Conditioning (HVAC) system with one or more components including an outdoor air ventilation damper, the method comprising: selecting a ventilation mode from a plurality of ventilation modes, wherein the plurality of ventilation modes comprises: a first ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space while maintaining one or more IAQ contaminants in the building space below one or more corresponding first predetermined limits; a second ventilation mode that attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space while maintaining one or more IAQ contaminants in the building space below one or more corresponding second predetermined limits, wherein at least one of the second predetermined limits is below a corresponding one of the first predetermined limits; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, in accordance with the selected ventilation mode. 7. A method for providing dynamic ventilation for a building space serviced by a Heating, Ventilating and Air Conditioning (HVAC) system with an outdoor air ventilation damper, the method comprising: developing a building model for the building space, the building model comprising a non-linear representation of how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation under a plurality of different operating conditions; identifying a current operating condition; determining a linear approximation of the non-linear building model at the current operating condition, wherein the linear approximation approximates how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation at the current operating condition; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Predictive Control (PC) using the determined linear approximation of the non-linear building model. 8. The method of claim 7, further comprising: subsequently identifying a new operating condition; determining a new linear approximation of the non-linear building model at the new operating condition, wherein the linear approximation approximates how one or more environmental parameters associated with the building space is predicted to respond to changes in HVAC system operation at the new operating condition; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Predictive Control (PC) using the determined new linear approximation of the non-linear building model. 9. The method of any one of claims 7 or 8, wherein controlling the outdoor air ventilation damper via Model Predictive Control (MPC) further comprises: predicting a future value for one or more Indoor Air Quality (IAQ) parameters in the building space using the determined linear approximation of the non-linear building model; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, to control the one or more IAQ parameters in the building space in accordance with one or more thresholds. 10. The method of any one of claims 7 to 9, wherein controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Predictive Control (PC) using the determined linear approximation of the non- linear building model comprises: selecting a ventilation mode out of a plurality of ventilation modes, each ventilation mode having a different cost function; identifying the cost function for the selected ventilation mode; and controlling one or more components of the HVAC system, including the outdoor air ventilation damper, via Model Predictive Control (MPC), wherein the MPC minimized the identified cost function when controlling the one or more components of the HVAC system. 11. The method of claim 7, wherein one of the plurality of ventilation modes comprises a health ventilation mode in which the Predictive Control (PC) maximizes ventilation to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space. 12. The method of claim 11, wherein the cost function for the health ventilation mode includes minimizing an overall cost associated with: a ventilation term for maximizing outdoor air ventilation to the building space; an energy term for minimizing energy associated with outdoor air ventilation to the building space; and a comfort term for penalizing a deviation from the one or more comfort conditions in the building space. 13. The method of claim 7, wherein one of the plurality of ventilation modes comprises an energy savings ventilation mode in which the Predictive Control (PC) attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined energy savings limits. 14. The method of claim 13, wherein the cost function for the energy savings ventilation mode includes minimizing an overall cost associated with: an energy term for minimizing energy associated with outdoor air ventilation to the building space; a comfort term that penalizes a deviation from one or more comfort conditions in the building space; and an indoor air quality (IAQ) term that penalizes violations of one or more predetermined IAQ limits. 15. The method of claim 7, wherein one of the plurality of ventilation modes comprises a productivity ventilation mode in which the Predictive Control (PC) attempts to minimize energy consumed by the HVAC system to condition air supplied to the building space subject to one or more constraints including a constraint of maintaining one or more comfort conditions in the building space and a constraint to maintain IAQ contaminants in the building space below predetermined productively limits, wherein at least one of the predetermined productively limits is below a corresponding one of the predetermined energy savings limits.
EP22703244.8A 2021-01-14 2022-01-13 Dynamic ventilation control for a building Pending EP4278136A1 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US202163137526P 2021-01-14 2021-01-14
US17/571,009 US20220228756A1 (en) 2021-01-14 2022-01-07 Dynamic ventilation control for a building
US17/570,978 US11846440B2 (en) 2021-01-14 2022-01-07 Dynamic ventilation control for a building
PCT/US2022/070177 WO2022155660A1 (en) 2021-01-14 2022-01-13 Dynamic ventilation control for a building

Publications (1)

Publication Number Publication Date
EP4278136A1 true EP4278136A1 (en) 2023-11-22

Family

ID=80222336

Family Applications (1)

Application Number Title Priority Date Filing Date
EP22703244.8A Pending EP4278136A1 (en) 2021-01-14 2022-01-13 Dynamic ventilation control for a building

Country Status (3)

Country Link
EP (1) EP4278136A1 (en)
GB (1) GB2617510B (en)
WO (1) WO2022155660A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116165351A (en) * 2023-03-23 2023-05-26 江苏凯霖机电设备有限公司 Online monitoring method and system for air components
CN119879376B (en) * 2025-03-26 2025-06-03 江苏益永信医疗科技有限公司 Ventilation and purification control system based on smart operating room

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100117409A (en) * 2009-04-24 2010-11-03 성균관대학교산학협력단 Building environmental control system and method through internet network
KR101099424B1 (en) * 2009-09-08 2011-12-27 성균관대학교산학협력단 Ventilation system and control method thereof
DK2805117T3 (en) * 2012-01-18 2016-09-26 Windowmaster As A method and system for controlling the ventilation of a building

Also Published As

Publication number Publication date
WO2022155660A1 (en) 2022-07-21
GB2617510A (en) 2023-10-11
GB2617510B (en) 2025-03-12

Similar Documents

Publication Publication Date Title
US11846440B2 (en) Dynamic ventilation control for a building
US11783203B2 (en) Building energy system with energy data simulation for pre-training predictive building models
US11567490B2 (en) Predictive diagnostics system with fault detector for preventative maintenance of connected equipment
KR102628483B1 (en) Libraries, systems and methods for minimizing air pollution in enclosed structures
US11415334B2 (en) Building control system with automatic comfort constraint generation
WO2019114489A1 (en) Machine learning control of environmental systems
CN112050397A (en) Method and system for regulating and controlling temperature of machine room
US10921010B2 (en) Building management system with simulation and user action reinforcement machine learning
US20230250987A1 (en) Building management system with clean air features
EP4278136A1 (en) Dynamic ventilation control for a building
US12345436B2 (en) Dynamic ventilation control for a building
KR20240160164A (en) Systems and methods for dynamic control of HVAC components in buildings
US20230332794A1 (en) Building management system with indoor air quality management using outdoor air quality forecasting
US20240003575A1 (en) Methods and systems for operating an hvac system
US20240003576A1 (en) Methods and systems for operating an hvac system
Gunay et al. AHU Doctor: An inverse model-based software platform for commissioning controls hardware and sequences in VAV AHU systems
Taheri Energy Optimization of Heating, Ventilation, and Air Conditioning Systems
Torabi Fault detection and diagnostics in single-duct multiple-zone variable air volume air handling unit systems
Kim et al. Performance analysis of particulate matter priority control algorithm for outdoor Air-Introduced ventilation Cleaner using prediction model
Zhang et al. Robust deep reinforcement learning based optimization for energy-comfort balanced enhancement in HVAC systems
CN120969986A (en) Network control-based fresh air system, method, device and medium
Zhan et al. Implementing occupant-centric control in educational buildings: energy impact, ventilation, and AI considerations

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20230703

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20250618