EP4001538B1 - Floor or wall panel and method of producing a floor or wall panel - Google Patents
Floor or wall panel and method of producing a floor or wall panel Download PDFInfo
- Publication number
- EP4001538B1 EP4001538B1 EP20020534.2A EP20020534A EP4001538B1 EP 4001538 B1 EP4001538 B1 EP 4001538B1 EP 20020534 A EP20020534 A EP 20020534A EP 4001538 B1 EP4001538 B1 EP 4001538B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- joists
- shield
- slurry
- cement
- clearance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/02—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
- E04C2/04—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
- E04C2/049—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres completely or partially of insulating material, e.g. cellular concrete or foamed plaster
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/10—Load-carrying floor structures formed substantially of prefabricated units with metal beams or girders, e.g. with steel lattice girders
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/12—Load-carrying floor structures formed substantially of prefabricated units with wooden beams
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/14—Load-carrying floor structures formed substantially of prefabricated units with beams or girders laid in two directions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/30—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
- E04C2/34—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure composed of two or more spaced sheet-like parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/30—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
- E04C2/34—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure composed of two or more spaced sheet-like parts
- E04C2002/3488—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure composed of two or more spaced sheet-like parts spaced apart by frame like structures
Definitions
- Light gauge steel frame construction is a reliable construction method which is broadly used in building construction. Light gauge steel frame construction may be used for constructing load-bearing elements, such as walls and floors, but may also be used for non-structural framing, such as interior partitions or to support external cladding. It offers several advantages such as low weight, buildability, strength, design flexibility and sustainability.
- Light gauge steel frame elements are manufactured from structural steel sheet that is cold formed to obtain various kinds of profiles, e.g., C or U or Z or S shapes, which are able to support heavy loads.
- a steel frame is manufactured from several steel frame elements, and the steel frame is then clad with dry sheeting on both sides to form a floor or wall panel.
- plasterboard helps to keep the temperature on the steel down in a fire. After a period of time, the board will break up and fall away, exposing the next board. Once the steel is directly exposed, temperatures will rise very rapidly and the joists will deflect and fail. Once temperatures exceed 250°C, the steel starts to lose structural capacity. Above 500°C failure is normally likely soon after.
- Plasterboard if applied in several layers onto light gauge steel frame elements for achieving acceptable fire resistance, substantially increases the weight of such frame elements, thereby counteracting the original advantage of light gauge steel construction. Plasterboard is typically applied in site environments where control of quality can be an issue, which is a problem for such a performance critical element.
- at least 2 hours of fire resistance shall be achieved under the test standards laid down in the norm BS EN 1365-2: 2014. For buildings up to 18 meters, 60 minutes are required.
- the invention provides a floor or wall panel comprising
- the fire side of the panel refers to the side of the panel that is expected to be exposed to a fire. Therefore, the fire side of the joists refers to the side of the joist that faces towards the fire side of the panel.
- the hardened mineral foam provides for an effective fire protection, wherein the mineral foam fills both, the voids between the joists and the clearance arranged between the fire side of the joists and the shield as defined by the spacer elements.
- the mineral foam that is arranged in the clearance functions as an insulation, i.e., it acts as an insulator preventing excessive heat from the fire side reaching the joists forming the structure.
- the mineral foam that is arranged between the joists functions as a heat sink to reduce the temperature build-up within the structural elements of the panel.
- the shield acts as a heat shield.
- the shield may also provide some structural contribution during fire by creating composite action.
- spacer elements create a longer thermal path, again reducing the amount of excess heat reaching the base of the joists.
- the joists may be configured as studs.
- every reference in the instant disclosure to joists also includes studs.
- the hardened mineral foam has a density of 50-200 kg/m 3 , preferably 75-175 kg/m 3 .
- the mineral foam may be produced by separately preparing a slurry of cement and an aqueous foam, contacting the slurry of cement with the aqueous foam to obtain the slurry of foamed cement and allowing the slurry of foamed cement to set and harden.
- the shield that is arranged as a heat shield on the fire side of the panel preferably extends over the entire fire side surface of the panel.
- the shield may preferably be designed as a profiled sheet, preferably having a trapezoidal profile.
- the spacer elements may be longitudinal elements extending transverse, in particular perpendicular, to the span of the joists.
- the longitudinal spacer elements may preferably be made of profiled sheet metal, in particular slotted sheet metal.
- the slots in the spacer elements act as interruptions in the thermal path towards the joists.
- a method of producing a floor or wall panel comprising the steps of:
- the slurry of foamed cement is prepared by
- Portland cement as used for the production of the slurry of foamed cement may be any type of Portland cement, whatever its chemical composition is, and in particular whatever its alkaline content is. Therefore, one of the advantages is not having to select a specific type of Portland cement.
- the Portland cement used in the invention is selected from the cements readily available on the market.
- thickening agent is generally to be understood as any compound making it possible to maintain the heterogeneous physical phases in equilibrium or facilitate this equilibrium.
- suitable thickening agents are preferably gums, cellulose or its derivatives, for example cellulose ethers or carboxy methyl cellulose, starch or its derivatives, gelatine, agar, carrageenan or bentonite clays.
- the cement slurry used to produce the mineral foam may further comprise mineral particles.
- the cement slurry used to produce the mineral foam may comprise 0 to 500 of mineral particles, more preferably from 5 to 400, most preferably from 5 to 350, the percentages being expressed by mass relative to the mass of slurry of foamed cement.
- the voids 6 can also be seen in the cross-sectional view according to Fig. 2 . Further, the voids 6 are filed with hardened mineral foam, i.e. the mineral foam fills the entire space that is present between adjoining joists 5 and between the joists 5 and the sides 4 of the frame 2.
- the joists 5 are each made of a C-shaped profile.
- the spacer elements 11 may be seen in the cross-section view according to Fig. 4 as well as in the enlarged view according to Fig. 5 .
- the spacer elements 11 are arranged within the clearance 10 between the joists 5 and the shield 8.
- the spacer elements 11, on one side thereof, are connected to the fire side of the joists 5 and, on the opposite side thereof, are connected to the shield 8.
- Welding, riveting, bolting or screwing may be used for connecting the spacer elements 11 to the joists 5 and the shield 8, respectively.
- composition of the mineral foam used for filing the voids and the clearance of the panels shown in Fig. 1 to 5 was produced from an aqueous foam and from a cement slurry as given in the following table.
- Mix design for 1 m 3 of mineral foam Aqueous foam Water (aqueous foam) Tap water 42.7 kg/m 3
- MapeAIR L/LA is a foaming agent sold by Mapei.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Building Environments (AREA)
Description
- The invention refers to a floor or wall panel and to a method of producing a floor or wall panel.
- Known floor or wall panels, such as, e.g., the one described in
WO2016/033429A1 , comprise a frame made of profiled metal or timber sheet, joists made of profiled metal or timber sheet that connect opposite sides of the frame, wherein voids are present between the joists, a shield spaced apart from a fire side of the joists, wherein a clearance is defined between a fire side of the joists and the shield, spacer elements arranged within the clearance between the joists and the shield, and a foam. - Light gauge steel frame construction is a reliable construction method which is broadly used in building construction. Light gauge steel frame construction may be used for constructing load-bearing elements, such as walls and floors, but may also be used for non-structural framing, such as interior partitions or to support external cladding. It offers several advantages such as low weight, buildability, strength, design flexibility and sustainability.
- Light gauge steel frame elements are manufactured from structural steel sheet that is cold formed to obtain various kinds of profiles, e.g., C or U or Z or S shapes, which are able to support heavy loads. A steel frame is manufactured from several steel frame elements, and the steel frame is then clad with dry sheeting on both sides to form a floor or wall panel.
- One disadvantage of floor and wall panels made from light gauge steel frames is that light framed structures allow the passage of sound more readily than the more solid masonry or concrete construction. The main disadvantage is that light gauge steel loses structural capacity as temperatures rise in a fire. Therefore, without protection it will lose structural capacity in <15 minutes.
- Conventionally light gauge steel frames and joists have been protected by special types of plasterboard. Typically, one board gives 30 minutes, 2 boards 60 minutes, 3 boards (12.5mm) 90 minutes and 3 thicker (15mm)
boards 120 minutes fire resistance. Plasterboard helps to keep the temperature on the steel down in a fire. After a period of time, the board will break up and fall away, exposing the next board. Once the steel is directly exposed, temperatures will rise very rapidly and the joists will deflect and fail. Once temperatures exceed 250°C, the steel starts to lose structural capacity. Above 500°C failure is normally likely soon after. - An additional effect is that large temperature gradients develop across the steel, which causes the hot side to bow towards the heat. Particularly in a wall fire test, this bowing effect can cause a steel member to fail at temperatures lower than might be expected.
- Plasterboard, if applied in several layers onto light gauge steel frame elements for achieving acceptable fire resistance, substantially increases the weight of such frame elements, thereby counteracting the original advantage of light gauge steel construction. Plasterboard is typically applied in site environments where control of quality can be an issue, which is a problem for such a performance critical element.
- It would thus be desirable to look for alternative solutions for improving the fire resistance of panels made of light gauge steel frames.
- Therefore, it is an object of the invention to provide improved floor and wall panels, that are light in weight, provide sufficient strength for being used as load-bearing elements and that have a sufficient fire resistance. In particular, in the United Kingdom, for buildings over 30 meters height, at least 2 hours of fire resistance shall be achieved under the test standards laid down in the norm BS EN 1365-2: 2014. For buildings up to 18 meters, 60 minutes are required.
- In order to solve these objectives, the invention provides a floor or wall panel comprising
- a frame made of profiled metal or timber sheet,
- joists made of profiled metal or timber sheet that connect opposite sides of the frame, wherein voids are present between the joists,
- a shield spaced apart from a fire side of the joists, wherein a clearance is defined between a fire side of the joists and the shield,
- spacer elements arranged within the clearance between the joists and the shield,
- a hardened mineral foam that fills the voids between the joists and that fills the clearance.
- As used herein, the fire side of the panel refers to the side of the panel that is expected to be exposed to a fire. Therefore, the fire side of the joists refers to the side of the joist that faces towards the fire side of the panel.
- The hardened mineral foam provides for an effective fire protection, wherein the mineral foam fills both, the voids between the joists and the clearance arranged between the fire side of the joists and the shield as defined by the spacer elements. In this way, the mineral foam that is arranged in the clearance functions as an insulation, i.e., it acts as an insulator preventing excessive heat from the fire side reaching the joists forming the structure.
- Further, the mineral foam that is arranged between the joists functions as a heat sink to reduce the temperature build-up within the structural elements of the panel.
- Further, the shield acts as a heat shield. The shield may also provide some structural contribution during fire by creating composite action.
- The shield and the spacer elements act compositely with the fire side of joists to maintain the overall structural integrity of the joists, even with temperatures being above a critical point where structural integrity would otherwise be gone.
- The hardened mineral foam does also provide support to the panel overall, even though it might be a weak material, by virtue of the fact that it is applying a small force over a large area.
- Further, the spacer elements create a longer thermal path, again reducing the amount of excess heat reaching the base of the joists.
- In combination, the shield, the spacer elements and the mineral foam within the clearance and the mineral foam between the joists act together to keep the temperature of the joists below the critical temperature required to maintain the structural integrity of the panel during fire.
- In case of panels that are used for building external walls of a building, mineral foam is arranged to cover the fire side of the joists as well as the non-fire side opposite thereof.
- Further, in case of panels that are used for building external walls of a building, the joists may be configured as studs. Thus, every reference in the instant disclosure to joists also includes studs.
- Preferably, the mineral foam fills the entire volume of the voids between the joists and the entire volume of the clearance arranged between the fire side of the joists and the shield. An additional advantage here is that no voids are left within the panel, which removes the need to close cavities to prevent the spread of fire, smoke or hot gases via voids in the panel. In contrast prior art cassette panels, being hollow, potentially allow the passage of smoke and hot gases. Because of this risk, prior art cassette floors need to be closed around the edges with cavity barriers to prevent smoke spreading between fire compartments.
- The hardened mineral foam is a lightweight construction element that has a relatively low density due to its pores or empty spaces, thereby adding minimal weight to the light gauge steel construction of the panel. The low mass of the hardened mineral foam also results in very significantly lower embodied CO2.
- Further, the hardened mineral foam is completely fire resistant due to its chemically inert property and therefore virtually non-combustible. Mineral foam also has a slow rate of heat transfer, which means that it acts as a fire shield, while maintaining its structural integrity despite exposure to intense heat.
- Preferably, the hardened mineral foam has a density of 50-200 kg/m3, preferably 75-175 kg/m3.
- The hardened mineral foam has excellent thermal properties, and in particular very low thermal conductivity. In particular, the thermal conductivity of the hardened mineral foam may be from 0.030 to 0.150 W/m.K, preferably from 0.030 to 0.060 W/m.K, more preferably from 0.030 to 0.055 W/m.K.
- Preferably, the hardened mineral foam comprises a hydraulic binder, in particular Portland cement.
- Hardened mineral foam may be produced by providing a slurry of cement, which is a mixture of a hydraulic binder and water, foaming the slurry of cement, i.e. introducing air bubbles into the slurry, and allowing the slurry of foamed cement to set and harden.
- Preferably, the mineral foam may be produced by separately preparing a slurry of cement and an aqueous foam, contacting the slurry of cement with the aqueous foam to obtain the slurry of foamed cement and allowing the slurry of foamed cement to set and harden.
- Methods for producing a mineral foam are described in
WO 2013/150148 A1 . - The shield that is arranged as a heat shield on the fire side of the panel preferably extends over the entire fire side surface of the panel. In order to enhance the stability of the panel, the shield may preferably be designed as a profiled sheet, preferably having a trapezoidal profile.
- According to another preferred embodiment, the spacer elements may be longitudinal elements extending transverse, in particular perpendicular, to the span of the joists.
- The longitudinal spacer elements may preferably be made of profiled sheet metal, in particular slotted sheet metal. When having a slotted design, the slots in the spacer elements act as interruptions in the thermal path towards the joists.
- A sheathing board may preferably be fixed to the surface of the panel facing away from the fire side. The joists and the sheathing board act together to provide additional structural performance to the panel.
- Tests have revealed that the panel of the invention does not require plasterboard for fire protection. Testing to a recognised standard (BS EN 1365-2: 2014) has shown that the panel of the invention achieves over 2 hours fire performance, without any reliance on plasterboard. When the test was stopped after the proscribed 2 hour period the floor was not exhibiting any signs of distress in terms of load-bearing capacity or rate of deflection, suggesting that a considerably longer performance was possible.
- According to a further aspect of the invention, a method of producing a floor or wall panel is provided, comprising the steps of:
- providing a frame made of profiled metal or timber sheet, wherein joists made of profiled metal or timber sheet connect opposite sides of the frame with voids being formed between the joists,
- providing a shield made of a metal or timber sheet in a spaced apart relationship from a fire side of the joists, wherein a clearance is defined between a fire side of the joists and the shield, and spacer elements being arranged within the clearance between the joists and the shield, and
- filling the voids between the joists and filling the clearance with a slurry of foamed cement,
- allowing the slurry of foamed cement to set and harden.
- Filling the voids and the clearance with the slurry of foamed cement is preferably performed by pouring the slurry into the cavities of the panel, so that the slurry fills all voids within the panel, thereby resulting in a panel that does not contain any unfilled spaces. The slurry of foamed cement typically has a good flowability during pouring that is compatible with small cavities due to the crossing of the different frame elements.
- Preferably, the slurry of foamed cement is prepared by
- (i) separately preparing a slurry of cement and an aqueous foam, wherein the cement slurry comprises water and Portland cement,
- (ii) contacting the slurry of cement with the aqueous foam to obtain the slurry of foamed cement.
- The generated aqueous foam has air bubbles with a D50, which is less than or equal to 400 pm, preferably from 100 to 400 pm, more preferably from 150 to 300 µm. Preferably, the generated aqueous foam has air bubbles with a D50 which is 250 µm.
- In step (ii), the cement slurry may be homogenized with the aqueous foam by any means to obtain a slurry of foamed cement. Preferably, step (ii) of the process according to the invention may comprise the introduction of the cement slurry and the aqueous foam into a static mixer to obtain a slurry of foamed cement.
- Portland cement as used for the production of the slurry of foamed cement may be any type of Portland cement, whatever its chemical composition is, and in particular whatever its alkaline content is. Therefore, one of the advantages is not having to select a specific type of Portland cement. Advantageously, the Portland cement used in the invention is selected from the cements readily available on the market.
- The suitable cements used in step (i) of the invention are preferably the cements described according to the European NF EN 197-1 Standard of April 2012 or mixtures thereof, preferably cement of the types CEM I, CEM II, CEM III, CEM IV or CEM V.
- According to a preferred embodiment of the invention, the Portland cement has a specific surface (Blaine) of 3000 - 10000 cm2/g, preferably 3500 - 6000 cm2/g.
- The water/cement ratio (wt/wt ratio) of the cement slurry prepared in step (i) is preferably from 0.25 to 0.5, more preferably from 0.28 to 0.35, in particular 0.29. The water/cement ratio may vary, for example due to the water demand of the mineral particles when these are used. The water/cement ratio is defined as being the ratio by mass of the quantity of water (W) to the dry Portland cement mass (C) .
- The cement slurry prepared in step (i) may comprise a water reducer, such as a plasticiser or a super-plasticiser. A water reducer makes it possible to reduce the amount of mixing water for a given workability by typically 10-150. By way of example of water reducers, mention may be made of lignosulphonates, hydroxycarboxylic acids, carbohydrates, and other specific organic compounds, for example glycerol, polyvinyl alcohol, sodium alumino-methyl-siliconate, sulfanilic acid and casein as described in the Concrete Admixtures Handbook, Properties Science and Technology, V.S. Ramachandran, Noyes Publications, 1984.
- By way of example of a super-plasticiser, the PCP super-plasticisers without an anti-foaming agent may be noted. The term "PCP" or "polyoxy polycarboxylate" is to be understood according to the present invention as a copolymer of acrylic acids or methacrylic acids and their esters of polyoxy ethylene (POE).
- Preferably, the cement slurry comprises 0.05 to 1%, more preferably 0.05 to 0.50 of a water reducer, a plasticiser or a super-plasticiser, percentage expressed by mass relative to the dry cement mass.
- Preferably, the cement slurry does not comprise an anti-foaming agent, or any agent having the property of destabilizing an air/liquid emulsion. Certain commercial super-plasticisers may contain anti-foaming agents and consequently these super-plasticisers are not preferred for the cement slurry used to produce the mineral foam according to the invention.
- Preferably, the cement slurry used to produce the mineral foam comprises 0.05 to 2.5 wt.-% of an accelerator, expressed as dry mass relative to dry cement mass.
- According to an embodiment, other additives may be added to the cement slurry or the aqueous foam. Such additives may be thickening agents, viscosifying agents, air entraining agents, setting retarders, coloured pigments, hollow glass beads, film forming agents, hydrophobic agents or de-polluting agents (for example zeolites or titanium dioxide), latex, organic or mineral fibres, mineral additions or their mixtures. Preferably, the additives do not comprise any defoaming agents.
- The expression "thickening agent", is generally to be understood as any compound making it possible to maintain the heterogeneous physical phases in equilibrium or facilitate this equilibrium. The suitable thickening agents are preferably gums, cellulose or its derivatives, for example cellulose ethers or carboxy methyl cellulose, starch or its derivatives, gelatine, agar, carrageenan or bentonite clays.
- According to an embodiment, the cement slurry used to produce the mineral foam may further comprise mineral particles. Preferably, the cement slurry used to produce the mineral foam may comprise 0 to 500 of mineral particles, more preferably from 5 to 400, most preferably from 5 to 350, the percentages being expressed by mass relative to the mass of slurry of foamed cement.
- The suitable mineral particles are selected from calcium carbonate, silica, ground glass, solid or hollow glass beads, glass granules, expanded glass powders, silica aerogels, silica fume, slags, ground sedimentary siliceous sands, fly ash or pozzolanic materials or mixtures thereof.
- The invention will now be described in more detail by reference to exemplary embodiments shown in the figures, wherein:
-
Fig. 1 shows a plan view of a wall panel of the invention, -
Fig. 2 shows a cross section along the line II-II of the panel ofFig. 1 , -
Fig. 3 shows a detailed view of the cross section ofFig. 2 , -
Fig. 4 shows a cross section along the line IV-IV of the panel ofFig. 1 , -
Fig. 5 shows a detailed view of the cross section ofFig. 4 , -
Fig. 6 shows a graph of the thermocouple temperatures versus time on the fire side of the joists, and -
Fig. 7 shows a graph of the thermocouple temperatures on the cool, non-fire side of the joists versus time. -
Fig. 1 shows an exemplary floor orwall panel 1 in a plan view. Thepanel 1 comprises arectangular frame 2 made of profiled sheet metal having two oppositeshort sides 3 and two oppositelong sides 4. Further,joists 5 are provided that are made of profiled sheet metal and that connectopposite sides 3 of theframe 2. Thejoists 5 are fixed to thesides 3 of theframe 2 by suitable connection means, such as by welding, by riveting, by bolts or by screws. Due to the spaced apart relationship of thejoists 5, voids 6 are each formed between adjoiningjoists 5 and between the joists and thesides 4 of theframe 2, saidvoids 6 extending over substantially theentire length 12 of theframe 2. - The
voids 6 can also be seen in the cross-sectional view according toFig. 2 . Further, thevoids 6 are filed with hardened mineral foam, i.e. the mineral foam fills the entire space that is present between adjoiningjoists 5 and between thejoists 5 and thesides 4 of theframe 2. - In
Fig. 2 , the fire side of thepanel 1 is depicted byarrow 7, which means that thepanel 1 would be exposed to fire that is coming from the fire side according toarrow 7. On the fire side of the joists 5 ashield 8 is provided that is spaced apart from thejoists 5, wherein aclearance 10 is defined between the fire side of thejoists 5 and theshield 8. As will be seen later, spacer elements are arranged within theclearance 10 between thejoists 5 and theshield 8. Further, a hardened mineral foam that fills theclearance 10 is provided. Theshield 8 may be profiled, such as having a trapezoidal profile, as illustrated inFig. 2 . Further, acover board 9 is shown inFig. 2 that covers the non-fire side of theframe 2 and thejoists 5. - As can be seen in more detail in the enlarged view according to
Fig. 3 , thejoists 5 are each made of a C-shaped profile. - The
spacer elements 11 may be seen in the cross-section view according toFig. 4 as well as in the enlarged view according toFig. 5 . Thespacer elements 11 are arranged within theclearance 10 between thejoists 5 and theshield 8. Thespacer elements 11, on one side thereof, are connected to the fire side of thejoists 5 and, on the opposite side thereof, are connected to theshield 8. Welding, riveting, bolting or screwing may be used for connecting thespacer elements 11 to thejoists 5 and theshield 8, respectively. - The composition of the mineral foam used for filing the voids and the clearance of the panels shown in
Fig. 1 to 5 was produced from an aqueous foam and from a cement slurry as given in the following table.Mix design for 1 m3 of mineral foam Aqueous foam Water (aqueous foam) Tap water 42.7 kg/m3 Foaming agent MapeAIR L/LA 1.067 kg/m3 Air 905.6 L/m3 Cement slurry Cement Cookstown CEM II 42.5N (General Purpose) 80.6 kg/m3 Water (slurry) Tap water 25.1 kg/m3 Superplasticiz er 85 wt.-% Dynamon NRG 1022 0.343 kg/m3 15 wt.-% Dynamon SW Stabilizer Floquat ASL diluted at 50% 2.877 kg/m3 Accelerator ChrysoXel CBP 0.876 kg/m3 MapeAIR L/LA is a foaming agent sold by Mapei.
Cookstown CEM II 42.5N (General Purpose) is a Portland cement produced at the Lafarge plant of Cookstone, in Ireland.
Dynamon NRG 1022 and Dynamon SW are two super-plasticizers sold by Mapei.
Floquat ASL is an aqueous solution of aluminium sulphate sold by SNF. It is here diluted at 50 wt.-%, in tap water. - The panel shown in
Fig. 1-5 was subjected to a fire resistance test according to the specifications of the standard BS EN 1365 - 2:2014 - Thermocouples were installed at several positions within the panel in order to measure the temperature of the joists on their fire side ("hot side") and on their side facing away of the fire side ("cold side").
-
Fig. 6 shows graphs of the thermocouple temperatures versus time on the fire side of the joists. - Within ~10 minutes all thermocouples on the hot side of the joists had reached ~100°C. The pure insulation effect of the hardened mineral foam is therefore not that large. However, between 10 and 47 minutes, temperatures remained on a plateau of around 100°C, suggesting that there is a secondary insulation effect occurring.
- This initial rise in temperature is correlated with the initial deflection of the shield, which reached an initial peak of 12mm after 12 minutes, with the deflection remaining constant until after 47 minutes.
- The test observations note a release of steam at 47 minutes, which coincides with the point that temperatures start to rise significantly in TC233 and 231, followed by TC225, 226, 237. These thermocouples go onto reach higher temperatures by the end of the test (750 to 800°C).
- In 3 other thermocouples, TC229, 235, 238, the plateau at ~100°C continues for a further 18 minutes, before a similar rate of temperature increase begins. The peak temperatures reached are also lower at <700°C.
- The longer plateau effect and lower final temperatures are very probably linked to a differing build-up of mineral foam and steel sheet below these thermocouples.
- The end joists, TC223, 241 are significantly cooler throughout all stages of the test.
-
Fig. 7 shows graphs of thermocouple temperatures on the cool, non-fire side of the joists versus time. - Temperatures remained at ambient levels of ~20°C, for 20 minutes. Temperatures then rise steadily in 6 thermocouples TC 222, 239, 227, 228, 224, 234, until they reach the 100°C plateau after ~45 minutes.
- Three other thermocouples, TC230, 236, 240 take longer to reach the steady state plateau, but these are not linked to the delayed hot-side thermocouple positions.
Claims (9)
- A floor or wall panel (1) comprising- a frame (2) made of profiled metal or timber sheet,- joists (5) made of profiled metal or timber sheet that connect opposite sides (3,4) of the frame (2), wherein voids (6) are present between the joists (5),- a shield (8) spaced apart from a fire side (7) of the joists (5), wherein a clearance (10) is defined between a fire side (7) of the joists (5) and the shield (8),- spacer elements (11) arranged within the clearance (10) between the joists (5) and the shield (8),characterized in that the shield (8) is made of a metal or timber sheet, and that the panel (1) comprises- a hardened mineral foam that fills the voids (6) between the joists (5) and that fills the clearance (10) and that optionally covers the fire side (7) of the joists (5) as well as the non-fire side opposite thereof.
- A panel according to claim 1, wherein the shield (8) is a profiled sheet, preferably having a trapezoidal profile.
- A panel according to claim 1 or 2, wherein the hardened mineral foam has a density of 50-200 kg/m3, preferably 75-175 kg/m3.
- A panel according to claim 1, 2 or 3, wherein the hardened mineral foam comprises a hydraulic binder, in particular Portland cement.
- A panel according to any one of claims 1 to 4, wherein the spacer elements (11) are longitudinal elements extending transverse, in particular perpendicular, to the span of the joists (5).
- A panel according to any one of claims 1 to 5, wherein the longitudinal spacer elements (11) are made of profiled sheet metal, in particular slotted sheet metal.
- A method of producing a floor or wall panel (1), comprising the steps of:- providing a frame (2) made of profiled metal or timber sheet, wherein joists (5) made of profiled metal or timber sheet connect opposite sides (3,4) of the frame (2) with voids (6) being formed between the joists (5),- providing a shield (8) in a spaced apart relationship from a fire side (7) of the joists (5), wherein a clearance (10) is defined between a fire side (7) of the joists (5) and the shield (8), and spacer elements (11) being arranged within the clearance (10) between the joists (5) and the shield (8),characterized in that the shield (8) is made of a metal or timber sheet, and that the method comprises- filling the voids (6) between the joists (5) and filling the clearance (10) with a slurry of foamed cement, and optionally covering the fire side (7) of the joists (5) as well as the non-fire side opposite thereof with the slurry of foamed cement,- allowing the slurry of foamed cement to set and harden.
- A method according to claim 7, wherein the slurry of foamed cement is prepared by(i) separately preparing a slurry of cement and an aqueous foam, wherein the cement slurry comprises water and Portland cement,(ii) contacting the slurry of cement with the aqueous foam to obtain the slurry of foamed cement.
- Wall or floor assembly for a building, comprising floor or wall panels (1) according to any one of claims 1 to 6 that are connected with each other to form a floor or wall.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP20020534.2A EP4001538B1 (en) | 2020-11-17 | 2020-11-17 | Floor or wall panel and method of producing a floor or wall panel |
| PCT/IB2021/060642 WO2022107009A1 (en) | 2020-11-17 | 2021-11-17 | Floor or wall panel and method of producing a floor or wall panel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP20020534.2A EP4001538B1 (en) | 2020-11-17 | 2020-11-17 | Floor or wall panel and method of producing a floor or wall panel |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP4001538A1 EP4001538A1 (en) | 2022-05-25 |
| EP4001538B1 true EP4001538B1 (en) | 2024-07-03 |
Family
ID=73475843
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP20020534.2A Active EP4001538B1 (en) | 2020-11-17 | 2020-11-17 | Floor or wall panel and method of producing a floor or wall panel |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP4001538B1 (en) |
| WO (1) | WO2022107009A1 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP4628671A1 (en) * | 2024-04-02 | 2025-10-08 | Sika Technology AG | Sandwich panels filled with mineral foam, their manufacture and use |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2038057A1 (en) * | 1969-03-13 | 1971-01-08 | Entrepose | |
| US9273464B2 (en) * | 2009-09-01 | 2016-03-01 | Roger C. Roen | Structurally integrated accessible floor system |
| FR2989083B1 (en) | 2012-04-06 | 2014-04-25 | Lafarge Sa | INSULATING MINERAL FOAM |
| EP3805477B1 (en) * | 2014-08-30 | 2023-06-28 | Innovative Building Technologies, LLC | Floor and ceiling panel for use in buildings |
-
2020
- 2020-11-17 EP EP20020534.2A patent/EP4001538B1/en active Active
-
2021
- 2021-11-17 WO PCT/IB2021/060642 patent/WO2022107009A1/en not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| EP4001538A1 (en) | 2022-05-25 |
| WO2022107009A1 (en) | 2022-05-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US8070876B1 (en) | Fireproof insulating cementitious foam comprising phase change materials | |
| CN103833269A (en) | Chemical foaming self-thermal insulation building block | |
| CN110590301B (en) | Foam concrete composition for self-insulation energy-saving wallboard, foam concrete for self-insulation energy-saving wallboard and self-insulation energy-saving wallboard | |
| CA3171064C (en) | Area separation firewall system | |
| EP4001538B1 (en) | Floor or wall panel and method of producing a floor or wall panel | |
| CN113754397A (en) | Gypsum-based vitrified micro-bead insulation board for external wall internal insulation and processing method thereof | |
| CN102807386A (en) | Steel-wire-like fiber reinforced honeycomb cement self-heat-insulation filled wall and construction method thereof | |
| CN2873911Y (en) | Non-bearing light steel keel partition wall | |
| CN110642639A (en) | Inorganic heat-insulating dry powder mortar and preparation method thereof | |
| Sayanthan et al. | Development of interlocking lightweight cement blocks | |
| KR101909090B1 (en) | Structure Pannel With Insulation Function | |
| CN105198352A (en) | Preparation method for NCS-gypsum integrated self-heat conserving lightweight wall | |
| SK37898A3 (en) | Construction foam for use as a joint filler | |
| CN206829399U (en) | Overall antidetonation foam concrete wallboard | |
| CN201162305Y (en) | Component type exterior wall interior and exterior insulation decorative panels | |
| JP7393760B2 (en) | Cement paste, mortar, method for producing mortar, and fire-resistant wooden structural components | |
| CN201241422Y (en) | Heat insulation and heat preservation sound-and-fire proof light composite wall board | |
| CN100378024C (en) | Glass micro bead heat insulating fire proof grout | |
| CN110540396B (en) | Building disassembly-free heat preservation template and manufacturing method thereof | |
| KR20050015828A (en) | Pallet type light weight precast panel, using self-foaming light weight concrete having high heat insulating property and high strength to improve heat insulation, light weight, sound absorption and fire resistance | |
| CN213837168U (en) | PFC energy-saving building wall body made of solid waste raw materials | |
| EP4628671A1 (en) | Sandwich panels filled with mineral foam, their manufacture and use | |
| KR101077211B1 (en) | Construction panel | |
| CN115405013A (en) | Structure heat preservation integration walling system | |
| CN106480992A (en) | A kind of heat insulation wall structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20221121 |
|
| RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: FUSION STEEL FRAMING LIMITED Owner name: HOLCIM TECHNOLOGY LTD |
|
| RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: FERREINT, LILIAN Inventor name: GENGEMBRE, EDOUARD Inventor name: LEVER, PHILIP Inventor name: CLARK, ROBERT |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20240130 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602020033167 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20240703 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241104 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1699936 Country of ref document: AT Kind code of ref document: T Effective date: 20240703 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241104 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241003 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241004 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241103 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241003 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241003 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241003 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241103 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241004 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602020033167 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602020033167 Country of ref document: DE |
|
| 26N | No opposition filed |
Effective date: 20250404 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20241117 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20241117 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20241130 |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20241130 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240703 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20250603 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20241130 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20241117 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20241130 |
|