EP3816083A1 - Procedure for a descending assembly of elevation systems and a pre-tensioned mast - Google Patents

Procedure for a descending assembly of elevation systems and a pre-tensioned mast Download PDF

Info

Publication number
EP3816083A1
EP3816083A1 EP20204161.2A EP20204161A EP3816083A1 EP 3816083 A1 EP3816083 A1 EP 3816083A1 EP 20204161 A EP20204161 A EP 20204161A EP 3816083 A1 EP3816083 A1 EP 3816083A1
Authority
EP
European Patent Office
Prior art keywords
mast
elevation
sections
descending
tensioned
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP20204161.2A
Other languages
German (de)
French (fr)
Inventor
Javier Rejas Pericas
Beatriz Olano Lanseros
José Ignacio Sancho Alonso
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Motto Elevation SL
Original Assignee
Motto Elevation SL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Motto Elevation SL filed Critical Motto Elevation SL
Publication of EP3816083A1 publication Critical patent/EP3816083A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B9/00Kinds or types of lifts in, or associated with, buildings or other structures
    • B66B9/16Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure
    • B66B9/187Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure with a liftway specially adapted for temporary connection to a building or other structure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators

Definitions

  • This description relates, as its title indicates, to a procedure for the descending assembly of a rack-and-pinion elevation system that may be equipped with a pre-tensioned mast, of the personnel and goods lift type, goods hoist, transport platform or work platform, used as auxiliary elements to access descending spaces such as pits or any type of worksite where the machine must grow in shape.
  • the aforesaid procedure that is the subject matter of this invention comprises a descending installation, with the installation of a bracing device, a step of assembling sections of the elevation system and elevation elements, a step of anchoring the sections of mast and elevation elements, the elevation system at that moment being left in an operative state.
  • a descending extension phase which includes adding new mast sections and new bracings and, where appropriate, installing reinforcement profiles.
  • the masts are pre-tensioned.
  • the invention relates to the field of elevation machinery with rack and pinion technology and to its installation in descending spaces such as pits or any type of worksite in which the machine has to grow downwards.
  • bracing devices are used to secure structures to the pit walls, as described for example, in patents ES0092450 "Bracing tie for tubular structures", ES1050969 “Perfected bracing device for tubular scaffolding” and ES0228761 "Perfected structure for worksite goods hoist", however these bracing devices and the procedures for their use only enable them to be assembled from the bottom of the pit, not allowing any other possibility.
  • the assembly process for descending spaces differs from the conventional, in that instead of constructing from the bottom up (ascending), construction is carried out top to bottom (descending). Frequently, the length of the mast needs to be extended as the space gets deeper.
  • the procedure for the descending assembly of an elevator that is the subject matter of the present invention, consists of adding sections of mast at the top part so that, by unlocking the bracings, it is possible to lower the whole unit to the height required, by sliding the mast along them. This solution does not require carrying out any operations from the bottom of descending spaces, such as pits and parts located below the worksite level.
  • This invention applies to elevation machinery with rack and pinion technology.
  • a first step of the descending assembly process requires installing, at the top level or "0" level, a top bracing that consists of a special structure that is reinforced since it is going to be the main support for the elevator unit. On occasions it supports the total weight of the mast and the set of elevator elements.
  • the elevator unit is prepared on the outside. It consists of, at least, a mast or support structure, a base, a traction carriage, and a cabin and, optionally, an enclosure.
  • a crane, hoist or similar equipment supports the elevator-mast unit, the top bracing step is initiated by loosening the anchoring systems; once positioned on the top bracing, the elevation system unit is lowered with the crane, hoist or similar to the required position.
  • a second step is the lowering and securing to the wall and mast anchoring of all of the lower bracings that are required for the elevation system to work with the necessary efficacy and safety.
  • the mast grows downward, from top to bottom. This means that the mast must be supported by bracings without necessarily having to be supported at the lowest part. It could be considered that the mast "hangs" from the bracings. This means that the mast sections work under traction.
  • the mast used is a standard design, calculated to work under compression.
  • Working under traction in descending spaces such as pits and parts located below worksite level produces greater forces on the joints of the mast sections than those that are permitted, and can lead to their breakage in the case of certain lengths and loads.
  • a solution is proposed for the mast, in which the said mast is assembled in portions and the assembly of each portion is pre-tensioned. This allows the sections of the mast to be pre-compressed so that when installed in the pit, the tensile forces are neutralised, and standard masts can be used.
  • the pre-assembly of the sections of the mast of the elevator is carried out by pre-tensioning. It consists of placing a top pre-tensioner and a bottom pre-tensioner between several sections of the mast. Between these two pre-tensioners located at the ends, there are several cables clamped to the bottom pre-tensioner and joined to the top pre-tensioner with thread and nut devices, and the tensioning of the cables is carried out by means of a torque wrench on the thread and nut devices.
  • structural reinforcement profiles can be added with screws all along the sides, that prevent the "pendular" movement of the mast when the machine passes.
  • the assembly process for pits that is presented differs from the conventional, as previously mentioned. It is necessary to be able to make the length of the mast grow as the descending spaces, such as pits and parts below worksite level, get deeper. This procedure consists of adding portions of mast at the top part so that, by unlocking the bracings, it is possible to lower the whole unit to the height required, sliding the mast along them with the aid of a crane, hoist or similar. This solution, as in the case of the main assembly, means that no operation has to be carried out from the bottom of the pit.
  • This procedure for the descending assembly of an elevator provides numerous advantages over the devices and procedures currently available, the most important being that it enables the whole process of assembling the elevator to be carried out from the top level of descending spaces such as pits and parts located below the worksite level, without having to carry out any operations from the bottom of the pit.
  • Another important advantage of using this assembly procedure is that it enables portions of mast to be added at the top part, so that, by unlocking the bracings, it is possible to lower the whole unit to the height required, sliding the mast along them.
  • the procedure includes a pre-tensioned assembly of the mast that allows the sections of the mast to be pre-compressed so that when it is installed in descending spaces such as pits and parts located below the worksite level, it can neutralise tensile forces, which allows standard masts to be used.
  • Another advantage of this invention is that the procedure presented enables the assembly process in the pit to be carried out in precise steps, maintaining safety at all times.
  • Another important advantage is that the procedure presented enables the assembly process to be carried out with reduced and economic assembly means.
  • the attached drawing shows a practical preferred embodiment of a bracing device used for the procedure for the descending assembly of an elevator, that is the subject matter of the invention.
  • An elevator consists of, at least, a mast (2), or support structure, elevation system (3) and optionally, in addition, an enclosure.
  • the mast (2) is anchored to the wall of the descending space by means of lower bracings (4).
  • the top bracing (1) has, preferably, a reinforced lattice structure and several clamping plates so that it can, from time to time, withstand the weight of the mast (2) complete with the set of elements of the elevator
  • a top bracing device (1) as described previously (or another of a similar configuration or operation) enables a characteristic procedure for the descending assembly of an elevator to be carried out, which, being the subject matter of this invention, comprises:
  • the stage of assembly of the top bracing device (1) comprises:
  • the stage of pre-assembly of the sections of the mast (2) of the elevator comprises
  • the enclosure is optional at this point since, depending on the worksite, the enclosure (19) may be installed at the bottom of the pit, in which case the enclosure is installed later, or anchored to the base, which involves installing it at that stage.
  • the assembly step of the different sections that form the mast (2) in the pre-assembly stage of the sections of the mast (2) of the elevator is carried out by pre-tensioning and, in turn, comprises:
  • the mast (2) used is a standard design, calculated to work under compression. Working under traction in pits, as is the case in the procedure presented, produces greater forces on the joints of sections of the mast (2) than those permitted, and can lead to their breakage depending on the lengths and loads. To avoid this, pre-tensioned assembly is carried out. This enables the sections of mast (2) to be pre-compressed so that when installed in the descending space, the tensile forces can be neutralised, and greater depths can be achieved.
  • the stage of assembly of the sections of the mast (2) of the elevator, the elevation system (3) in the descending space comprises:
  • the stage of extending the mast (2), with top bracing (1) comprises:
  • the step of assembly of the new section, to add to the mast (2) already installed, in the pre-assembly stage of the sections of the mast (2) of the elevator is carried out by means of pre-tensioning and comprises:
  • mast (2) Normally, several sections of mast (2) must be joined together depending on the desired length to be extended.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Transportation (AREA)
  • Automation & Control Theory (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Forklifts And Lifting Vehicles (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

Procedure for the descending assembly in descending spaces, such as pits and parts located below worksite level, of an elevator using bracing devices, characterised in that it comprises a stage of assembly of a top bracing device, a stage of pre-assembly of the sections of an elevator mast, of a rack-and-pinion elevation machine (work platform, transport platform, goods hoist or personnel and goods lift), a stage of assembly of the sections of the mast of the elevator and the elevation system, a stage of anchoring the mast with the top bracing device, one or several stages of installing new bracing devices, and one or several stages of extending the mast, which may be pre-tensioned.The invention presented provides the main advantage that this procedure can be applied and adapted to descending spaces, working solely from the top part, at worksite level.

Description

  • This description relates, as its title indicates, to a procedure for the descending assembly of a rack-and-pinion elevation system that may be equipped with a pre-tensioned mast, of the personnel and goods lift type, goods hoist, transport platform or work platform, used as auxiliary elements to access descending spaces such as pits or any type of worksite where the machine must grow in shape.
  • The aforesaid procedure that is the subject matter of this invention comprises a descending installation, with the installation of a bracing device, a step of assembling sections of the elevation system and elevation elements, a step of anchoring the sections of mast and elevation elements, the elevation system at that moment being left in an operative state. When necessary, because of the depth of access required, there is a descending extension phase, which includes adding new mast sections and new bracings and, where appropriate, installing reinforcement profiles. Likewise, when required, due to the load to be moved, the masts are pre-tensioned.
  • The subject matter of this invention is also the pre-tensioned mast referred to in the previous paragraph.
  • Field of the invention
  • The invention relates to the field of elevation machinery with rack and pinion technology and to its installation in descending spaces such as pits or any type of worksite in which the machine has to grow downwards.
  • Current State of the Art
  • Until now elevation machinery has been developed to grow "upwards", that is, the mast is supported on the ground and, to extend it, mast sections are placed one on top of the other. Its use on worksites and in constructions is essential for the vertical movement of materials, tools and personnel. References to this type of elevators can be found in patents EP2006234 "Modular elevator with self-propelled cabin on a mast''", ES1055692 "Modular elevator with self-propelled carriage" and WO2010072848 "Modular lift with self-propelled cage on support member".
  • However, when it is necessary to install an elevator in a pit, for example, having to carry out the assembly from the bottom poses a problem, given that access to the pit bottom may be problematic and costly, as well as being dangerous for workers because of the risk of flooding or gases and, indeed, due to the elevation system assembly procedure itself. This makes the use of elevators in pits complicated and economically very costly.
  • In many cases, different types of bracing devices are used to secure structures to the pit walls, as described for example, in patents ES0092450 "Bracing tie for tubular structures", ES1050969 "Perfected bracing device for tubular scaffolding" and ES0228761 "Perfected structure for worksite goods hoist", however these bracing devices and the procedures for their use only enable them to be assembled from the bottom of the pit, not allowing any other possibility.
  • Description of the invention
  • The assembly process for descending spaces, such as pits and parts located below the worksite level, differs from the conventional, in that instead of constructing from the bottom up (ascending), construction is carried out top to bottom (descending). Frequently, the length of the mast needs to be extended as the space gets deeper. The procedure for the descending assembly of an elevator that is the subject matter of the present invention, consists of adding sections of mast at the top part so that, by unlocking the bracings, it is possible to lower the whole unit to the height required, by sliding the mast along them. This solution does not require carrying out any operations from the bottom of descending spaces, such as pits and parts located below the worksite level. This invention applies to elevation machinery with rack and pinion technology.
  • A first step of the descending assembly process requires installing, at the top level or "0" level, a top bracing that consists of a special structure that is reinforced since it is going to be the main support for the elevator unit. On occasions it supports the total weight of the mast and the set of elevator elements.
  • The elevator unit is prepared on the outside. It consists of, at least, a mast or support structure, a base, a traction carriage, and a cabin and, optionally, an enclosure.
  • A crane, hoist or similar equipment supports the elevator-mast unit, the top bracing step is initiated by loosening the anchoring systems; once positioned on the top bracing, the elevation system unit is lowered with the crane, hoist or similar to the required position.
  • Once in that position, the anchorings of the top bracing are tightened. A second step is the lowering and securing to the wall and mast anchoring of all of the lower bracings that are required for the elevation system to work with the necessary efficacy and safety.
  • Until now, lifts and elevators have been developed to grow "upward", that is, the mast is supported on the ground and, to extend it, sections of mast are fitted one on top of the other. In this system the mast elements are made to work under compression.
  • On the other hand, in the process for the assembly of an elevator for pits, the mast grows downward, from top to bottom. This means that the mast must be supported by bracings without necessarily having to be supported at the lowest part. It could be considered that the mast "hangs" from the bracings. This means that the mast sections work under traction.
  • The mast used is a standard design, calculated to work under compression. Working under traction in descending spaces such as pits and parts located below worksite level, as is the case in the procedure presented, produces greater forces on the joints of the mast sections than those that are permitted, and can lead to their breakage in the case of certain lengths and loads. In order to overcome this, a solution is proposed for the mast, in which the said mast is assembled in portions and the assembly of each portion is pre-tensioned. This allows the sections of the mast to be pre-compressed so that when installed in the pit, the tensile forces are neutralised, and standard masts can be used.
  • The pre-assembly of the sections of the mast of the elevator is carried out by pre-tensioning. It consists of placing a top pre-tensioner and a bottom pre-tensioner between several sections of the mast. Between these two pre-tensioners located at the ends, there are several cables clamped to the bottom pre-tensioner and joined to the top pre-tensioner with thread and nut devices, and the tensioning of the cables is carried out by means of a torque wrench on the thread and nut devices.
  • For the first metres of the mast, structural reinforcement profiles can be added with screws all along the sides, that prevent the "pendular" movement of the mast when the machine passes.
  • The assembly process for pits that is presented differs from the conventional, as previously mentioned. It is necessary to be able to make the length of the mast grow as the descending spaces, such as pits and parts below worksite level, get deeper. This procedure consists of adding portions of mast at the top part so that, by unlocking the bracings, it is possible to lower the whole unit to the height required, sliding the mast along them with the aid of a crane, hoist or similar. This solution, as in the case of the main assembly, means that no operation has to be carried out from the bottom of the pit.
  • Advantages of the invention
  • This procedure for the descending assembly of an elevator that is presented provides numerous advantages over the devices and procedures currently available, the most important being that it enables the whole process of assembling the elevator to be carried out from the top level of descending spaces such as pits and parts located below the worksite level, without having to carry out any operations from the bottom of the pit.
  • Another important advantage of using this assembly procedure is that it enables portions of mast to be added at the top part, so that, by unlocking the bracings, it is possible to lower the whole unit to the height required, sliding the mast along them.
  • It is noteworthy that the procedure includes a pre-tensioned assembly of the mast that allows the sections of the mast to be pre-compressed so that when it is installed in descending spaces such as pits and parts located below the worksite level, it can neutralise tensile forces, which allows standard masts to be used.
  • It is important to highlight the advantage that this procedure can be applied and adapted to descending spaces, such as pits and parts located below worksite level, of any depth.
  • Another advantage of this invention is that the procedure presented enables the assembly process in the pit to be carried out in precise steps, maintaining safety at all times.
  • Another important advantage is that the procedure presented enables the assembly process to be carried out with reduced and economic assembly means.
  • Description of the figures
  • To gain a better understanding of the subject matter of the present invention, the attached drawing shows a practical preferred embodiment of a bracing device used for the procedure for the descending assembly of an elevator, that is the subject matter of the invention.
    • In the said drawing, figure -1- shows the elevator unit consisting of sections of mast (2) or a support structure, elevation system (3), lower bracings (4) and the top bracing (1)
    • Figure -2- shows how one or several new mast sections (6) are added using a crane, hoist or similar (5)
    • Figure -3- show the lower sections of mast (2) with structural reinforcement profiles (10)
    • Figure -4- shows sections of mast (2) with the pre-tensioning systems
    Preferred embodiment of the invention
  • An elevator consists of, at least, a mast (2), or support structure, elevation system (3) and optionally, in addition, an enclosure. The mast (2) is anchored to the wall of the descending space by means of lower bracings (4). As previously described, the top bracing (1) has, preferably, a reinforced lattice structure and several clamping plates so that it can, from time to time, withstand the weight of the mast (2) complete with the set of elements of the elevator
  • A top bracing device (1) as described previously (or another of a similar configuration or operation) enables a characteristic procedure for the descending assembly of an elevator to be carried out, which, being the subject matter of this invention, comprises:
    • a stage of assembly of the top bracing device (1),
    • a stage of pre-assembly of the sections of the mast (2) of the elevator, elevation system (3),
    • a stage of assembly of the sections of the mast (2) of the elevator, elevation system (3) on the top bracing (1),
    • a stage of anchoring the mast (2) with the top bracing device (1),
    • one or several stages of installing lower bracing devices (4), and/or one or several stages of extending the mast (2).
  • The stage of assembly of the top bracing device (1) comprises:
    • A step of positioning the top bracing (1), on the ground of the top part of the worksite, and
    • A step of anchoring the top bracing (1), on the ground of the top part of the worksite.
  • The stage of pre-assembly of the sections of the mast (2) of the elevator comprises
    • a step of assembly of the different sections that form the first portion of masts (2),
    • a step of screwing the mast (2) set to the machine and, optionally, also the assembly of the enclosure.
    • a step of assembly of the structural reinforcement profiles with screws all along the sides of the first metres of the mast (2), optionally, if required, depending on the application.
  • Several sections of mast (2) must be joined together depending on the length that is required.
  • The enclosure is optional at this point since, depending on the worksite, the enclosure (19) may be installed at the bottom of the pit, in which case the enclosure is installed later, or anchored to the base, which involves installing it at that stage.
  • Optionally, the assembly step of the different sections that form the mast (2) in the pre-assembly stage of the sections of the mast (2) of the elevator, is carried out by pre-tensioning and, in turn, comprises:
    • a first sub-step of fitting a top pre-tensioner (7) and a bottom pre-tensioner (8) between several sections of the mast (2),
    • a second sub-step of joining these pre-tensioners (7,8) together with several cables (9) clamped to the bottom pre-tensioner (8) and joined to the top pre-tensioner (7) with thread and nut devices (11), and
    • a third sub-step of tensioning the cables (9) by means of a torque wrench on the thread and nut devices (11).
  • The mast (2) used is a standard design, calculated to work under compression. Working under traction in pits, as is the case in the procedure presented, produces greater forces on the joints of sections of the mast (2) than those permitted, and can lead to their breakage depending on the lengths and loads. To avoid this, pre-tensioned assembly is carried out. This enables the sections of mast (2) to be pre-compressed so that when installed in the descending space, the tensile forces can be neutralised, and greater depths can be achieved.
  • Excessive displacement of the mast (2) in this case requires having to fit, on the first metres of the mast (2), that is, on the part of the installation that will be located lowest and that may only be anchored at the top part, structural profiles (10) to prevent its curvature. Experimental tests have shown that it is particularly effective on the first metres; it will not be necessary on the rest of the mast (2), as it is braced at the top and bottom. Experimental tests carried out allow to conclude that the structural profiles greatly reduce curvature on these first metres. These structural profiles must be fitted using screws and/or flanges or plates all along the sides of the mast (2).
  • The stage of assembly of the sections of the mast (2) of the elevator, the elevation system (3) in the descending space comprises:
    • a step of transporting the unit mounted in the previous step, formed by the mast (2), the base, the tractor carriage and the cabin and, optionally, in addition, the enclosure, using the crane to position it vertically in relation to the pit, making it coincide with the locking flanges of the top bracing (1), and
    • the unit is lowered until it reaches the lower level.
  • It is important to highlight that in this part of the process, the whole unit is supported solely by the top bracing (1).
  • The stage of extending the mast (2), with top bracing (1) comprises:
    • a step of loosening, from the elevation system (3), the lower bracing (4) furthest down, keeping the means for varying the width and the means for varying the separation of the locking flanges of the top bracing (1) tightened,
    • the previous step is repeated as many times as necessary for each of the lower bracings (4) installed, except for the top one,
    • a step of assembly of the new sections to add to the mast (2) already installed,
    • an assembly step, using the crane, hoist or similar, of the new section at the top of the mast (2) already installed in the pit, both parts being joined together outside, and the whole unit being supported by the crane.
    • a step of loosening the top bracing (1) until it does not anchor but it does guide,
    • a step of lowering the mast (2) and the rest of its associated elements, by means of the crane, hoist or similar (5), to the required depth,
    • the ascent of the tractor carriage and its cabin along the mast (2) to the ground level of the worksite,
    • a step of tightening the top bracing (1) until locked,
    • a step of releasing the crane from the mast (2), tractor carriage and cabin (3) unit,
    • a step in which, as the operators descend, they tighten the means for varying the width and the means for varying the separation of the locking flanges on the rest of the lower bracings (4), in descending order.
  • Optionally, as previously described, the step of assembly of the new section, to add to the mast (2) already installed, in the pre-assembly stage of the sections of the mast (2) of the elevator, is carried out by means of pre-tensioning and comprises:
    • a first sub-step of fitting a top pre-tensioner (7) and a bottom pre-tensioner (8) between several sections of the mast (2),
    • a second sub-step of joining these pre-tensioners (7,8) together with several cables (9) clamped to the bottom pre-tensioner (8) and joined to the top pre-tensioner (7) with thread and nut devices (11), and
    • a third sub-step of tensioning the cables (9) by means of a torque wrench on the thread and nut devices (11).
  • Normally, several sections of mast (2) must be joined together depending on the desired length to be extended.
  • A person skilled in the art will easily comprehend that the characteristics of different embodiments can be combined with the characteristics of other possible embodiments, provided that the combination is technically possible.
  • All of the information referring to examples or embodiments form part of the description of the invention.

Claims (5)

  1. Procedure for the descending assembly of elevation systems (3) and pre-tensioned mast (2), characterised in that it comprises the following phases:
    - Initial descending installation, in turn comprising
    a. a step of assembling a top bracing device (1) for anchoring a mast (2) of the elevation system (3), allowing the sliding of the sections of the mast (2), once the anchoring system is released,
    b. a step of assembling the sections of the mast (2) of the elevation system, and of the elevation elements of the system,
    c. a step of anchoring the sections of the mast (2) with the top bracing device (1) and the elevation elements of the system with the mast, the elevation system at that moment being left operative.
    - Descending extension, carried out as many times as necessary, for the descent of the elevation system to the position/positions required, in turn comprising
    a. a step of loosening the anchorings of all of the lower bracings (4) that have been installed, with the sections of the mast (2) facilitating the sliding of the masts (2), the weight of the whole elevation system and the masts (2) being supported by the top bracing (1),
    b. a step of adding the required number of new masts sections (6) at the top of the existing portion of masts (2) by means of a crane, hoist or similar (5), so that, once joined, the crane, hoist or similar (5) does not permit their descent once the first top bracing is released,
    c. a step of loosening the anchorings of the top bracing (1) with the section of mast (2) so that all the elevation system is supported by the crane, hoist or similar,
    d. a step of lowering of the elevation system unit by means of the crane, hoist or similar (5) to the position required, sliding the system along the top bracing (1) and the lower bracings (4) that may be mounted,
    e. a step of anchoring the first top bracing (1) with the mast section (6),
    f. a step of separating the crane, hoist or similar (5) so that the whole system is supported by the top bracing (1),
    g. a step of anchoring the lower bracings (4) that may be mounted, so that the system is operative again.
    - Installation of lower bracings (4), descending to the position required by the operation
    - Fitting of one or several profiles (10) for reinforcing the said structure of masts to limit the pendular movement of the end masts of the portion of masts (2) that are free at the bottom end,
  2. Procedure for the descending assembly of elevation systems (3) and pre-tensioned mast (2), according to claim 1, wherein, to neutralise the tensile loads on the mast (2), the masts (2) are pre-tensioned by means of:
    - The fitting a top pre-tensioner (7) and a bottom pre-tensioner (8) between one or several sections of the mast (2)
    - The joining together of these pre-tensioners (7, 8) with one or several cables (9)
    - The tensioning of the cables (9) to the calculated tension that causes the masts to work under traction.
  3. Procedure for the descending assembly of elevation systems (3) and pre-tensioned mast (2), according to claim 1, wherein the elevation system (3) is used to install lower bracings (4).
  4. Procedure for the descending assembly of elevation systems (3) and pre-tensioned mast (2), according to claim 1, wherein external systems such as baskets or platforms are used to install lower bracings (4).
  5. Pre-tensioned mast for elevator, wherein it comprises a top pre-tensioner (7) and a bottom pre-tensioner (8) between several sections of the mast, cables (9) clamped to the bottom pre-tensioner (8) and joined to the top pre-tensioner (7) with thread and nut devices (11), the said cables (9) being able to be tensioned by means of a torque wrench.
EP20204161.2A 2019-10-30 2020-10-27 Procedure for a descending assembly of elevation systems and a pre-tensioned mast Withdrawn EP3816083A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ES201930957A ES2822326B2 (en) 2019-10-30 2019-10-30 ASSEMBLY PROCEDURE FOR LOWERING LIFTING SYSTEMS AND PRE-STRESSED MAST

Publications (1)

Publication Number Publication Date
EP3816083A1 true EP3816083A1 (en) 2021-05-05

Family

ID=75239179

Family Applications (1)

Application Number Title Priority Date Filing Date
EP20204161.2A Withdrawn EP3816083A1 (en) 2019-10-30 2020-10-27 Procedure for a descending assembly of elevation systems and a pre-tensioned mast

Country Status (2)

Country Link
EP (1) EP3816083A1 (en)
ES (1) ES2822326B2 (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES92450A1 (en) 1925-02-03 1925-05-16 Kryha Alexander Von Encryption machine.
ES228761U (en) 1977-05-26 1977-07-01 Potain Iberica, S. A. Perfect structure for construction worktops (Machine-translation by Google Translate, not legally binding)
SU583075A1 (en) * 1976-06-02 1977-12-05 Специальное Конструкторское Бюро "Скб-Мосстрой" Главного Управления По Жилищному И Гражданскому Строительству В Г.Москве Safety device for construction hoist
JPH06317100A (en) * 1993-05-10 1994-11-15 Shimizu Corp Elevator device for underground construction and underground construction method using the same
JPH09328271A (en) * 1996-06-11 1997-12-22 Taisei Corp Construction elevator and climbing method
JPH11141271A (en) * 1997-11-07 1999-05-25 Taisei Corp Guide column device for temporary elevator, method of extending and removing the same
ES1050969U (en) 2002-01-28 2002-06-01 Lizarralde Juan Mari Arabolaza The improved device bracing tubular scaffolds. (Machine-translation by Google Translate, not legally binding)
ES1055692U (en) 2003-08-12 2004-01-01 Elevadores Goian S L Modular automotive lift truck. (Machine-translation by Google Translate, not legally binding)
EP2006234A2 (en) 2006-04-11 2008-12-24 Elevadores Goian, S.L. Modular elevator with self-propelled cabin on a mast
WO2009033287A1 (en) * 2007-09-14 2009-03-19 Joseph Teberah Power lift system
WO2010072848A1 (en) 2008-12-22 2010-07-01 Elevadores Goian, S.L. Modular lift with self-propelled cage on support member

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0139398Y1 (en) * 1996-10-28 1999-04-15 한윤석 Mid-mist support tie for top-down lift
CN103663053B (en) * 2013-12-06 2015-12-02 中联重科股份有限公司 Movable wall-attached device and movable wall-attached frame thereof
CN206562242U (en) * 2016-11-18 2017-10-17 天津京龙工程机械有限公司 A kind of slidably wall-attached frame of underground lift

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES92450A1 (en) 1925-02-03 1925-05-16 Kryha Alexander Von Encryption machine.
SU583075A1 (en) * 1976-06-02 1977-12-05 Специальное Конструкторское Бюро "Скб-Мосстрой" Главного Управления По Жилищному И Гражданскому Строительству В Г.Москве Safety device for construction hoist
ES228761U (en) 1977-05-26 1977-07-01 Potain Iberica, S. A. Perfect structure for construction worktops (Machine-translation by Google Translate, not legally binding)
JPH06317100A (en) * 1993-05-10 1994-11-15 Shimizu Corp Elevator device for underground construction and underground construction method using the same
JPH09328271A (en) * 1996-06-11 1997-12-22 Taisei Corp Construction elevator and climbing method
JPH11141271A (en) * 1997-11-07 1999-05-25 Taisei Corp Guide column device for temporary elevator, method of extending and removing the same
ES1050969U (en) 2002-01-28 2002-06-01 Lizarralde Juan Mari Arabolaza The improved device bracing tubular scaffolds. (Machine-translation by Google Translate, not legally binding)
ES1055692U (en) 2003-08-12 2004-01-01 Elevadores Goian S L Modular automotive lift truck. (Machine-translation by Google Translate, not legally binding)
EP2006234A2 (en) 2006-04-11 2008-12-24 Elevadores Goian, S.L. Modular elevator with self-propelled cabin on a mast
WO2009033287A1 (en) * 2007-09-14 2009-03-19 Joseph Teberah Power lift system
WO2010072848A1 (en) 2008-12-22 2010-07-01 Elevadores Goian, S.L. Modular lift with self-propelled cage on support member

Also Published As

Publication number Publication date
ES2822326B2 (en) 2023-06-19
ES2822326A1 (en) 2021-04-30

Similar Documents

Publication Publication Date Title
US9803384B2 (en) Safety barrier netting system
US10125507B2 (en) Fall protection system
US9528285B2 (en) Safety barrier netting system with rigid panel net supports and stopper mechanisms
EP3368730B1 (en) Climbing equipment for the construction of buildings
US20090020363A1 (en) Scaffolding fall protection system
JP2019534959A (en) Safety rail system
KR101215356B1 (en) Device for sling pile
CN113167072A (en) Construction site equipment with climbing formwork and elevator system
KR101038453B1 (en) Pile lifting equipment
US8701827B2 (en) Climbing screen support system
CN104695752B (en) Rapid rush-repair Tower System and its erection method
KR20200030196A (en) Outside workbench for offshore structures
US6425712B1 (en) Method and apparatus for providing lateral support to a post
RU2400609C2 (en) Complex system of accident prevention support in construction
US20050217934A1 (en) Scaffolding system
US3763964A (en) Outside elevator
CN105297639A (en) Multifunctional hydraulic lifting system and construction method thereof
EP2345623A1 (en) A system comprising a movable work platform, as well as an apparatus and a crane device
EP3816083A1 (en) Procedure for a descending assembly of elevation systems and a pre-tensioned mast
WO2009062243A1 (en) Perimeter screening system
KR100929311B1 (en) Dabbit device
JP3220397B2 (en) Elevating scaffold
KR102207793B1 (en) Moving type crane and assembling method thereof
GB2360316A (en) Suspended scaffold system with stabilising restraint wire
AU2019201299A1 (en) System and method for a vertically adjustable tower crane

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20211104

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20221221

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230529

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20240910

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20250111