EP3631198A4 - FLANGED RING WIND ROTOR BLADE GASKET KIT - Google Patents
FLANGED RING WIND ROTOR BLADE GASKET KIT Download PDFInfo
- Publication number
- EP3631198A4 EP3631198A4 EP18805496.9A EP18805496A EP3631198A4 EP 3631198 A4 EP3631198 A4 EP 3631198A4 EP 18805496 A EP18805496 A EP 18805496A EP 3631198 A4 EP3631198 A4 EP 3631198A4
- Authority
- EP
- European Patent Office
- Prior art keywords
- rotor blade
- wind rotor
- flanged ring
- ring wind
- blade gasket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D1/00—Wind motors with rotation axis substantially parallel to the air flow entering the rotor
- F03D1/06—Rotors
- F03D1/065—Rotors characterised by their construction elements
- F03D1/0675—Rotors characterised by their construction elements of the blades
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D80/00—Details, components or accessories not provided for in groups F03D1/00 - F03D17/00
- F03D80/30—Lightning protection
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2230/00—Manufacture
- F05B2230/60—Assembly methods
- F05B2230/604—Assembly methods using positioning or alignment devices for aligning or centering, e.g. pins
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/20—Rotors
- F05B2240/30—Characteristics of rotor blades, i.e. of any element transforming dynamic fluid energy to or from rotational energy and being attached to a rotor
- F05B2240/302—Segmented or sectional blades
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/50—Bearings
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Wind Motors (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US15/602,698 US10570879B2 (en) | 2017-05-23 | 2017-05-23 | Joint assembly for a wind turbine rotor blade with flanged bushings |
| PCT/US2018/032177 WO2018217472A1 (en) | 2017-05-23 | 2018-05-11 | Joint assembly for a wind turbine rotor blade with flanged bushings |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP3631198A1 EP3631198A1 (en) | 2020-04-08 |
| EP3631198A4 true EP3631198A4 (en) | 2021-03-03 |
| EP3631198B1 EP3631198B1 (en) | 2022-09-14 |
Family
ID=64395921
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP18805496.9A Active EP3631198B1 (en) | 2017-05-23 | 2018-05-11 | Segmented rotor blade of a wind turbine with a joint assembly having flanged bushings |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US10570879B2 (en) |
| EP (1) | EP3631198B1 (en) |
| DK (1) | DK3631198T3 (en) |
| ES (1) | ES2931058T3 (en) |
| PL (1) | PL3631198T3 (en) |
| WO (1) | WO2018217472A1 (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB201817599D0 (en) * | 2018-10-29 | 2018-12-12 | Blade Dynamics Ltd | Manufacturing of segmented wind turbine blade |
| WO2020122865A1 (en) * | 2018-12-11 | 2020-06-18 | General Electric Company | Method for manufacturing a structural component of a blade segment for a rotor blade of a wind turbine |
| DK3894691T3 (en) * | 2018-12-13 | 2025-05-19 | General Electric Renovables Espana Sl | JOINTED ROTOR BLADE WITH A CHORD-WIDE EXTENDED PIN SUPPORTED VIA ONE OR MORE STRUCTURAL ELEMENTS |
| US11353002B2 (en) * | 2019-01-16 | 2022-06-07 | Roller Bearing Company Of America, Inc. | Multi segment wind turbine blade joint bushing |
| JP7476220B2 (en) * | 2019-03-01 | 2024-04-30 | ゼネラル エレクトリック レノバブレス エスパーニャ, エセ.エレ. | Jointed wind turbine rotor blades having chordwise extending pin bushings designed to minimize chordwise clearance - Patents.com |
| US20210332789A1 (en) * | 2020-04-28 | 2021-10-28 | Lm Wind Power A/S | Wind turbine rotor blade with covered access window |
| WO2021231109A1 (en) * | 2020-05-11 | 2021-11-18 | XFlow Energy Company | Fluid turbine |
| GB202018692D0 (en) * | 2020-11-27 | 2021-01-13 | Lm Wp Patent Holding As | A mechanism for restraining movement of a locking pin |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20100143143A1 (en) * | 2009-04-28 | 2010-06-10 | General Electric Company | Segmented wind turbine blade |
| US20110020126A1 (en) * | 2008-01-14 | 2011-01-27 | Clipper Windpower Technology, Inc. | Modular rotor blade for a power-generating turbine and a method for assembling a power-generating turbine with modular rotor blades |
| CN102200100A (en) * | 2011-06-02 | 2011-09-28 | 东方电气集团东方汽轮机有限公司 | Split-assembling-type blade of wind driven generator |
| EP2957765A1 (en) * | 2014-06-19 | 2015-12-23 | General Electric Company | Wind blade tip joint |
| EP3144526A1 (en) * | 2015-09-16 | 2017-03-22 | Siemens Aktiengesellschaft | Joint for a segmented wind turbine rotor blade |
Family Cites Families (60)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2503450A (en) | 1945-03-05 | 1950-04-11 | Universal Moulded Products Cor | Airfoil |
| US3771748A (en) | 1972-10-10 | 1973-11-13 | I M Ind Kynock Ltd | Structures |
| US4130380A (en) | 1976-05-13 | 1978-12-19 | Kaiser Heinz W | Wind powered turbine and airfoil construction |
| DE3113079C2 (en) | 1981-04-01 | 1985-11-21 | Messerschmitt-Bölkow-Blohm GmbH, 8000 München | Large aerodynamic wing and process for its manufacture |
| US4671470A (en) | 1985-07-15 | 1987-06-09 | Beech Aircraft Corporation | Method for fastening aircraft frame elements to sandwich skin panels covering same using woven fiber connectors |
| AT398064B (en) | 1992-07-01 | 1994-09-26 | Hoac Austria Flugzeugwerk Wr N | PLASTIC COMPOSITE PROFILE, ESPECIALLY WING SLEEVE FOR AIRCRAFT CONSTRUCTION |
| JP2000043796A (en) | 1998-07-30 | 2000-02-15 | Japan Aircraft Development Corp | Wing-shaped structure of composite material and molding method thereof |
| US6513757B1 (en) | 1999-07-19 | 2003-02-04 | Fuji Jukogyo Kabushiki Kaisha | Wing of composite material and method of fabricating the same |
| DE19962454A1 (en) | 1999-12-22 | 2001-07-05 | Aerodyn Eng Gmbh | Rotor blade for wind turbines |
| US6520706B1 (en) | 2000-08-25 | 2003-02-18 | Lockheed Martin Corporation | Composite material support structures with sinusoidal webs and method of fabricating same |
| US6863767B2 (en) | 2001-08-23 | 2005-03-08 | Lockheed Martin Corporation | Paste-bond clevis joint |
| US6800956B2 (en) | 2002-01-30 | 2004-10-05 | Lexington Bartlett | Wind power system |
| DK175718B1 (en) | 2002-04-15 | 2005-02-07 | Ssp Technology As | Möllevinge |
| US6945727B2 (en) | 2002-07-19 | 2005-09-20 | The Boeing Company | Apparatuses and methods for joining structural members, such as composite structural members |
| US6964723B2 (en) | 2002-10-04 | 2005-11-15 | The Boeing Company | Method for applying pressure to composite laminate areas masked by secondary features |
| BR0318120A (en) | 2003-02-28 | 2006-02-07 | Vestas Wind Sys As | Method of Fabricating a Wind Turbine Blade, Wind Turbine Blade, Front Covering Cover and Using a Front Covering Cover |
| US7244487B2 (en) | 2003-04-24 | 2007-07-17 | Lockheed Martin Corporation | Apparatus, system, and method of joining structural components with a tapered tension bond joint |
| US7037568B1 (en) | 2003-07-15 | 2006-05-02 | Rogers Terry W | Joining member for mechanically joining a skin to a supporting rib |
| FR2864175B1 (en) | 2003-12-22 | 2008-03-28 | Airbus | WIND TURBINE |
| US7258828B2 (en) | 2004-09-03 | 2007-08-21 | Lockheed Martin Corporation | Infusion joining of composite structures |
| JP4691565B2 (en) | 2004-12-29 | 2011-06-01 | ヴェスタス ウィンド システムズ アー/エス | Method for manufacturing a wind turbine blade shell member having a fixing member and a wind turbine blade having a fixing member |
| US20060225278A1 (en) | 2005-03-31 | 2006-10-12 | Lin Wendy W | Wind blade construction and system and method thereof |
| US7393488B2 (en) | 2005-05-25 | 2008-07-01 | The Boeing Company | Methods of joining structures and joints formed thereby |
| DE102005026010B4 (en) | 2005-06-07 | 2010-12-30 | Airbus Deutschland Gmbh | Method for producing a reinforced shell for forming subcomponents for aircraft |
| DK1754886T3 (en) | 2005-08-17 | 2012-12-17 | Gen Electric | Rotor blade for a wind turbine |
| DE102005054594A1 (en) | 2005-11-14 | 2007-05-16 | Daubner & Stommel Gbr | Rotor blade for a wind energy plant |
| US7427189B2 (en) | 2006-02-13 | 2008-09-23 | General Electric Company | Wind turbine rotor blade |
| US7810757B2 (en) | 2006-11-02 | 2010-10-12 | The Boeing Company | Mounting device for an aircraft |
| US7976282B2 (en) | 2007-01-26 | 2011-07-12 | General Electric Company | Preform spar cap for a wind turbine rotor blade |
| US8075275B2 (en) | 2007-09-27 | 2011-12-13 | General Electric Company | Wind turbine spars with jointed shear webs |
| US8221085B2 (en) * | 2007-12-13 | 2012-07-17 | General Electric Company | Wind blade joint bonding grid |
| US8167569B2 (en) | 2007-12-21 | 2012-05-01 | General Electric Company | Structure and method for self-aligning rotor blade joints |
| EP2110552B2 (en) | 2008-04-15 | 2018-12-26 | Siemens Aktiengesellschaft | Wind turbine blade with an integrated lightning conductor and method for manufacturing the same |
| GB0807515D0 (en) | 2008-04-24 | 2008-06-04 | Blade Dynamics Ltd | A wind turbine blade |
| EP2288807B1 (en) | 2008-05-07 | 2013-09-18 | Vestas Wind Systems A/S | A sectional blade |
| CN102066747A (en) | 2008-06-23 | 2011-05-18 | 丹麦技术大学 | A wind turbine blade with angled girders |
| WO2009155920A1 (en) | 2008-06-24 | 2009-12-30 | Danmarks Tekniske Universitet | A reinforced wind turbine blade |
| DK2334932T4 (en) | 2008-08-25 | 2024-05-27 | Vestas Wind Sys As | DEVICE AND PROCEDURE FOR MANUFACTURING A DEVICE |
| US20110158788A1 (en) * | 2008-08-31 | 2011-06-30 | Vestas Wind Systems A/S | A sectional blade |
| WO2010048370A1 (en) | 2008-10-22 | 2010-04-29 | Vec Industries, L.L.C. | Wind turbine blade and method for manufacturing thereof |
| US7841835B2 (en) | 2009-02-20 | 2010-11-30 | General Electric Company | Spar cap for wind turbine blades |
| ES2373154B2 (en) | 2009-04-22 | 2012-06-07 | Gamesa Innovation & Technology, S.L. | RAY PROTECTION SYSTEM FOR SECTIONAL BLADES. |
| DE102009031947A1 (en) | 2009-07-07 | 2011-01-13 | Nordex Energy Gmbh | Rotor blade for a wind energy plant and method for its production |
| DK2357357T3 (en) | 2009-10-01 | 2017-01-09 | Vestas Wind Sys As | The wind turbine blade |
| DK2390498T3 (en) | 2010-05-27 | 2017-05-01 | Siemens Ag | Wind turbine blade with coating for lightning protection and method for producing the wind turbine blade |
| EP2416005A1 (en) | 2010-08-02 | 2012-02-08 | Siemens Aktiengesellschaft | Lightning protection of a wind turbine blade |
| US7997874B2 (en) | 2010-08-19 | 2011-08-16 | General Electric Company | Wind turbine rotor blade joint |
| ES2396839B1 (en) | 2010-11-30 | 2014-01-02 | Gamesa Innovation & Technology, S.L. | PARARRAYOS SYSTEM FOR AEROGENERATOR SHOVEL WITH CARBON FIBER LAMINATES. |
| US8262362B2 (en) | 2011-06-08 | 2012-09-11 | General Electric Company | Wind turbine blade shear web with spring flanges |
| US8257048B2 (en) | 2011-07-19 | 2012-09-04 | General Electric Company | Wind turbine blade multi-component shear web with intermediate connection assembly |
| US8393871B2 (en) | 2011-07-19 | 2013-03-12 | General Electric Company | Wind turbine blade shear web connection assembly |
| US8235671B2 (en) | 2011-07-19 | 2012-08-07 | General Electric Company | Wind turbine blade shear web connection assembly |
| US20120027615A1 (en) | 2011-08-15 | 2012-02-02 | General Electric Company | Rotor blade |
| IN2012DE00573A (en) * | 2012-02-29 | 2015-06-05 | Gen Electric | |
| US8449259B1 (en) | 2012-05-15 | 2013-05-28 | Modular Wind Energy, Inc. | Lightning protection for wind turbine blades, and associated systems and methods |
| GB2521809A (en) | 2013-10-17 | 2015-07-08 | Vestas Wind Sys As | Improvements relating to lightning protection systems for wind turbine blades |
| EP2930350B1 (en) | 2014-04-11 | 2018-02-14 | Siemens Aktiengesellschaft | Segmented rotor blade with a bolt connection |
| FI10797U1 (en) | 2014-12-04 | 2015-03-10 | Wicetec Oy | A conductor joint for connecting a copper conductor |
| DE102014118004B3 (en) | 2014-12-05 | 2016-03-31 | Deutsches Zentrum für Luft- und Raumfahrt e.V. | Rotor blade for wind turbines |
| US9759183B2 (en) | 2015-01-05 | 2017-09-12 | General Electric Company | System and method for attaching components to a web in a wind turbine rotor blade |
-
2017
- 2017-05-23 US US15/602,698 patent/US10570879B2/en active Active
-
2018
- 2018-05-11 WO PCT/US2018/032177 patent/WO2018217472A1/en not_active Ceased
- 2018-05-11 DK DK18805496.9T patent/DK3631198T3/en active
- 2018-05-11 PL PL18805496.9T patent/PL3631198T3/en unknown
- 2018-05-11 ES ES18805496T patent/ES2931058T3/en active Active
- 2018-05-11 EP EP18805496.9A patent/EP3631198B1/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20110020126A1 (en) * | 2008-01-14 | 2011-01-27 | Clipper Windpower Technology, Inc. | Modular rotor blade for a power-generating turbine and a method for assembling a power-generating turbine with modular rotor blades |
| US20100143143A1 (en) * | 2009-04-28 | 2010-06-10 | General Electric Company | Segmented wind turbine blade |
| CN102200100A (en) * | 2011-06-02 | 2011-09-28 | 东方电气集团东方汽轮机有限公司 | Split-assembling-type blade of wind driven generator |
| EP2957765A1 (en) * | 2014-06-19 | 2015-12-23 | General Electric Company | Wind blade tip joint |
| EP3144526A1 (en) * | 2015-09-16 | 2017-03-22 | Siemens Aktiengesellschaft | Joint for a segmented wind turbine rotor blade |
Non-Patent Citations (1)
| Title |
|---|
| See also references of WO2018217472A1 * |
Also Published As
| Publication number | Publication date |
|---|---|
| EP3631198A1 (en) | 2020-04-08 |
| US10570879B2 (en) | 2020-02-25 |
| WO2018217472A1 (en) | 2018-11-29 |
| DK3631198T3 (en) | 2022-12-12 |
| ES2931058T3 (en) | 2022-12-23 |
| US20180340510A1 (en) | 2018-11-29 |
| EP3631198B1 (en) | 2022-09-14 |
| PL3631198T3 (en) | 2022-12-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3631198A4 (en) | FLANGED RING WIND ROTOR BLADE GASKET KIT | |
| EP3607579A4 (en) | GASKET FOR MICROELECTRONIC ASSEMBLY | |
| EP3411607A4 (en) | ROTATING JOINT WITH SEAL GASKET | |
| FR3034453B1 (en) | TURBINE RING ASSEMBLY WITH SEALING | |
| EP3665385A4 (en) | SEAL KIT FOR A WIND TURBINE ROTOR BLADE | |
| EP3707373A4 (en) | WIND TURBINE BLADE SEALS WITH FLOATING CONNECTORS | |
| EP3894693C0 (en) | WIND TURBINE BLADE | |
| FR3058460B1 (en) | CONNECTION ASSEMBLY FOR COOLING TURBOMACHINE TURBINE | |
| EP3770470A4 (en) | SEAL RING | |
| EP4074969A4 (en) | SHAFT SEAL | |
| EP3311024A4 (en) | PORTABLE AND MODULAR HANDLING ASSEMBLY FOR A WIND TURBINE | |
| EP3820780A4 (en) | TAB SEAL GRIP IMPROVEMENTS | |
| EP3679692A4 (en) | DIRECT INTERCONNECTION GATEWAY | |
| FR3040461B1 (en) | LABYRINTH SEALING ELEMENT FOR TURBINE | |
| EP3793663A4 (en) | INSTRUMENT SEAL | |
| EP3726100A4 (en) | GASKET | |
| FR3019604B1 (en) | BEARING COMPRISING A FIXING FLANGE ASSEMBLED ON ITS OUTER RING | |
| EP3425222A4 (en) | SEAL BEARING | |
| MA52127A (en) | HANDLING A WIND TURBINE BLADE | |
| EP3821123C0 (en) | WIND BLADE IMPROVEMENTS | |
| EP3553352C0 (en) | RADIAL SHAFT SEAL | |
| EP3827136C0 (en) | COVER OF A MANHOLE | |
| EP3792601A4 (en) | ANGLE DETECTOR | |
| EP3658426A4 (en) | FITTING AND WIPER ASSEMBLY | |
| MA50781A (en) | CABLE SEAL KIT |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20191213 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| A4 | Supplementary search report drawn up and despatched |
Effective date: 20210202 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: F03D 13/10 20160101ALI20210127BHEP Ipc: F03D 1/06 20060101AFI20210127BHEP |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20220413 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602018040725 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1518833 Country of ref document: AT Kind code of ref document: T Effective date: 20221015 |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
| REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20221208 |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2931058 Country of ref document: ES Kind code of ref document: T3 Effective date: 20221223 |
|
| REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221214 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1518833 Country of ref document: AT Kind code of ref document: T Effective date: 20220914 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221215 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230116 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230114 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602018040725 Country of ref document: DE |
|
| P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230522 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed |
Effective date: 20230615 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 |
|
| REG | Reference to a national code |
Ref country code: FI Ref legal event code: PCE Owner name: LM WIND POWER A/S |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732E Free format text: REGISTERED BETWEEN 20231123 AND 20231129 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 602018040725 Country of ref document: DE Owner name: GENERAL ELECTRIC RENOVABLES ESPANA S.L., ES Free format text: FORMER OWNER: GENERAL ELECTRIC COMPANY, SCHENECTADY, NY, US Ref country code: DE Ref legal event code: R081 Ref document number: 602018040725 Country of ref document: DE Owner name: LM WIND POWER A/S, DK Free format text: FORMER OWNER: GENERAL ELECTRIC COMPANY, SCHENECTADY, NY, US Ref legal event code: R082 Country of ref document: DE Ref country code: DE Ref legal event code: R082 Ref document number: 602018040725 Country of ref document: DE Representative=s name: ZIMMERMANN & PARTNER PATENTANWAELTE MBB, DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20230531 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230511 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230531 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230531 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602018040725 Country of ref document: DE Representative=s name: ZIMMERMANN & PARTNER PATENTANWAELTE MBB, DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230511 |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: PD Owner name: GENERAL ELECTRIC RENOVABLES ESPANA, S.L.; ES Free format text: DETAILS ASSIGNMENT: CHANGE OF OWNER(S), ASSIGNMENT; FORMER OWNER NAME: GENERAL ELECTRIC COMPANY Effective date: 20240410 Ref country code: NL Ref legal event code: PD Owner name: GENERAL ELECTRIC RENOVABLES ESPANA, S.L.; ES Free format text: DETAILS ASSIGNMENT: CHANGE OF OWNER(S), ASSIGNMENT; FORMER OWNER NAME: LM WIND POWER A/S Effective date: 20240410 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230511 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230531 |
|
| REG | Reference to a national code |
Ref country code: FI Ref legal event code: PCE Owner name: GENERAL ELECTRIC RENOVABLES ESPANA, S.L. |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: PC2A Owner name: LM WIND POWER A/S Effective date: 20240820 |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: PC2A Owner name: GENERAL ELECTRIC RENOVABLES ESPANA, S.L. Effective date: 20241015 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602018040725 Country of ref document: DE Ref country code: DE Ref legal event code: R081 Ref document number: 602018040725 Country of ref document: DE Owner name: GENERAL ELECTRIC RENOVABLES ESPANA S.L., ES Free format text: FORMER OWNER: LM WIND POWER A/S, KOLDING, DK |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732E Free format text: REGISTERED BETWEEN 20241003 AND 20241009 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20250423 Year of fee payment: 8 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FI Payment date: 20250423 Year of fee payment: 8 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20250423 Year of fee payment: 8 Ref country code: PL Payment date: 20250424 Year of fee payment: 8 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20250602 Year of fee payment: 8 Ref country code: GB Payment date: 20250423 Year of fee payment: 8 Ref country code: DK Payment date: 20250423 Year of fee payment: 8 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20250423 Year of fee payment: 8 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20180511 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20250423 Year of fee payment: 8 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20180511 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220914 |