EP3296020B1 - Appareil et procédé de déchiquetage et de mise en balles - Google Patents
Appareil et procédé de déchiquetage et de mise en balles Download PDFInfo
- Publication number
- EP3296020B1 EP3296020B1 EP17191418.7A EP17191418A EP3296020B1 EP 3296020 B1 EP3296020 B1 EP 3296020B1 EP 17191418 A EP17191418 A EP 17191418A EP 3296020 B1 EP3296020 B1 EP 3296020B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- baling
- shredding
- assembly
- housing
- bale
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B30—PRESSES
- B30B—PRESSES IN GENERAL
- B30B9/00—Presses specially adapted for particular purposes
- B30B9/30—Presses specially adapted for particular purposes for baling; Compression boxes therefor
- B30B9/3003—Details
- B30B9/3035—Means for conditioning the material to be pressed, e.g. paper shredding means
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01F—PROCESSING OF HARVESTED PRODUCE; HAY OR STRAW PRESSES; DEVICES FOR STORING AGRICULTURAL OR HORTICULTURAL PRODUCE
- A01F15/00—Baling presses for straw, hay or the like
- A01F15/07—Rotobalers, i.e. machines for forming cylindrical bales by winding and pressing
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C18/00—Disintegrating by knives or other cutting or tearing members which chop material into fragments
- B02C18/06—Disintegrating by knives or other cutting or tearing members which chop material into fragments with rotating knives
- B02C18/14—Disintegrating by knives or other cutting or tearing members which chop material into fragments with rotating knives within horizontal containers
- B02C18/145—Disintegrating by knives or other cutting or tearing members which chop material into fragments with rotating knives within horizontal containers with knives spaced axially and circumferentially on the periphery of a cylindrical rotor unit
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C18/00—Disintegrating by knives or other cutting or tearing members which chop material into fragments
- B02C18/06—Disintegrating by knives or other cutting or tearing members which chop material into fragments with rotating knives
- B02C18/16—Details
- B02C18/22—Feed or discharge means
- B02C18/2216—Discharge means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C18/00—Disintegrating by knives or other cutting or tearing members which chop material into fragments
- B02C18/06—Disintegrating by knives or other cutting or tearing members which chop material into fragments with rotating knives
- B02C18/16—Details
- B02C18/22—Feed or discharge means
- B02C18/2225—Feed means
- B02C18/2241—Feed means of conveyor belt type
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C18/00—Disintegrating by knives or other cutting or tearing members which chop material into fragments
- B02C18/06—Disintegrating by knives or other cutting or tearing members which chop material into fragments with rotating knives
- B02C18/16—Details
- B02C18/24—Drives
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B30—PRESSES
- B30B—PRESSES IN GENERAL
- B30B9/00—Presses specially adapted for particular purposes
- B30B9/30—Presses specially adapted for particular purposes for baling; Compression boxes therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B30—PRESSES
- B30B—PRESSES IN GENERAL
- B30B9/00—Presses specially adapted for particular purposes
- B30B9/30—Presses specially adapted for particular purposes for baling; Compression boxes therefor
- B30B9/3003—Details
- B30B9/3007—Control arrangements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B30—PRESSES
- B30B—PRESSES IN GENERAL
- B30B9/00—Presses specially adapted for particular purposes
- B30B9/30—Presses specially adapted for particular purposes for baling; Compression boxes therefor
- B30B9/3003—Details
- B30B9/301—Feed means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B30—PRESSES
- B30B—PRESSES IN GENERAL
- B30B9/00—Presses specially adapted for particular purposes
- B30B9/30—Presses specially adapted for particular purposes for baling; Compression boxes therefor
- B30B9/3082—Presses specially adapted for particular purposes for baling; Compression boxes therefor with compression means other than rams performing a rectilinear movement
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B11/00—Wrapping, e.g. partially or wholly enclosing, articles or quantities of material, in strips, sheets or blanks, of flexible material
- B65B11/02—Wrapping articles or quantities of material, without changing their position during the wrapping operation, e.g. in moulds with hinged folders
- B65B11/025—Wrapping articles or quantities of material, without changing their position during the wrapping operation, e.g. in moulds with hinged folders by webs revolving around stationary articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B35/00—Supplying, feeding, arranging or orientating articles to be packaged
- B65B35/10—Feeding, e.g. conveying, single articles
- B65B35/12—Feeding, e.g. conveying, single articles by gravity
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B41/00—Supplying or feeding container-forming sheets or wrapping material
- B65B41/12—Feeding webs from rolls
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B63/00—Auxiliary devices, not otherwise provided for, for operating on articles or materials to be packaged
- B65B63/02—Auxiliary devices, not otherwise provided for, for operating on articles or materials to be packaged for compressing or compacting articles or materials prior to wrapping or insertion in containers or receptacles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B65/00—Details peculiar to packaging machines and not otherwise provided for; Arrangements of such details
- B65B65/02—Driving gear
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01F—PROCESSING OF HARVESTED PRODUCE; HAY OR STRAW PRESSES; DEVICES FOR STORING AGRICULTURAL OR HORTICULTURAL PRODUCE
- A01F15/00—Baling presses for straw, hay or the like
- A01F15/08—Details
- A01F15/10—Feeding devices for the crop material e.g. precompression devices
- A01F15/101—Feeding at right angles to the compression stroke
- A01F2015/105—Feeding at right angles to the compression stroke the pressing chamber is fed from the top side
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C18/00—Disintegrating by knives or other cutting or tearing members which chop material into fragments
- B02C18/0007—Disintegrating by knives or other cutting or tearing members which chop material into fragments specially adapted for disintegrating documents
- B02C2018/0061—Disintegrating by knives or other cutting or tearing members which chop material into fragments specially adapted for disintegrating documents with compacting devices for the disintegrated material
Definitions
- the present invention generally relates to an apparatus and method for shredding and crushing refuse and then baling the crushed material. More specifically, the present invention relates to a mobile apparatus that receives a high volume of material, such as tree branches, trash, demolition materials from a roll-off container, or the like, shreds and/or crushes the material into smaller debris, compresses the debris into a bale, and then wraps the bale with material to hold the bale together for transport and storage purposes.
- the apparatus may be portable so that it can be moved from one site to another and allows for a variety of materials (i.e. wood, metal, plastic, etc.) to be shredded and baled together at one time without the need for separation or sorting of materials.
- a shredder or crusher typically has rotating blades which shred and shear material as it is fed into the shredding apparatus, and the shredded material may then be collected in a receptacle that may be located underneath or in proximity to the shredder.
- shredders are designed to handle a specific type of material, such as plastics, wood, or paper.
- the object of a shredder is to reduce materials to a much smaller size for recycling or disposal, as shredded material occupies much less space than non-shredded, intact material.
- a drawback to typical shredders is the fact that, although the material is reduced in size, the smaller, loose material is harder to collect and contain when transporting and/or disposing. Additionally, typical shredders tend to include a plurality of rotating cutting mechanisms as well as a screening apparatus to ensure that only small sized debris is released from the shredder; any larger sized debris may make additional passes through the shredding mechanism until it is shredded to a much reduced size. It would be advantageous to provide an apparatus that is simplified to a single shredding or cutting mechanism, and whereby the resulting size of the shredded debris need not be screened to a uniform size.
- baling process itself serves to compact the material and reduce the size of space occupied by the garbage or recyclable material.
- a baler is a piece of farm machinery used to compress a cut and raked crop (such as hay, cotton, straw, or silage) into compact bales that are easy to handle, transport, and store.
- a cut and raked crop such as hay, cotton, straw, or silage
- Several different types of balers are commonly used, each producing a different type of bale - rectangular or cylindrical, of various sizes, bound with twine, strapping, netting, or wire.
- Industrial balers are also used in material recycling facilities, primarily for baling metal, plastic, or paper for transport.
- baler in industrialized countries today is the large round baler. It produces cylinder-shaped "round” or “rolled” bales.
- the design has a "thatched roof' effect that withstands weather well. Grass is rolled up inside the baler using rubberized belts, fixed rollers, or a combination of the two. When the bale reaches a predetermined size, either netting or twine is wrapped around it to hold its shape. The back of the baler swings open, and the bale is discharged.
- the bales are complete at this stage, but they may also be wrapped in plastic sheeting by a bale wrapper, either to keep hay dry when stored outside or convert damp grass into silage.
- baling was primarily used in connection with hay, cotton, straw, or other types of fibrous materials. It has been contemplated that baling other types of materials, such as dirt, mulch, and household garbage, for instance, would be beneficial, because those materials could be compressed into much smaller units that would occupy significantly smaller volumes than the loose materials that remain uncompressed.
- baling dirt and mulch for example
- One problem, however, with baling dirt and mulch is the difficulty in compressing that material to form into a bale, and then ensuring that the bale would remain intact, rather than simply falling apart.
- Hay, cotton, and straw bales tend to remain intact after the baling operation has been completed, largely due to the length and fibrous nature of those materials. Dirt and mulch, which includes much smaller particulate, would simply crumble out of the sides of the bale during the baling process, and thus, balers for these types of materials have never been successfully manufactured and commercialized.
- U.S. Patent No. 5,052,170 describes a shredder attachment for a round bale hay baler which will effectively shred corn stalks or stubble, milo stubble and the like and discharge the shredded stubble into a round bale hay baler which will form a bale of stubble which has been shredded which can be used for feed, bedding and the like.
- U.S. Patent No. 6,491,245 describes a mobile shredding and material handling and feed system, preferably for use in the handling and shredding of paper and other office related feedstock.
- An embodiment of the system on the input side utilizes an input hopper, a first conveyor, a feed aperture, and a second conveyor which moves excess feedstock away from the entry to the shredder feed aperture to avoid jamming the feed aperture.
- An embodiment of the invention on the output side utilizes a compactor, preferably one or more augers, to compact the shredded material exiting the shredder, and moving said compacted shredded material to the discharge or system output.
- An embodiment of this material handling and feed system also applies for balers.
- U.S. Patent No. 6,499,931 describes a vehicle for collecting, sorting and reducing the volume of recyclable wastes and regular household and commercial garbage includes a large container with plural compartments mounted to the exterior of the vehicle includes a lifting mechanism for lifting the container to the top of the vehicle so that its contents can be dropped through chutes into plural bins. Between the chutes and the bins are crushers and shredders for reducing of volume of wastes deposited in the bins. Other wastes are placed in balers for baling.
- U.S. Patent No. 6,820,542 describes an apparatus for compacting and baling leaves, grass clippings, sticks, pine straw and other debris on lawns, yards, or fields is provided.
- the apparatus may have diagonal brushes to gather debris for processing though a crusher, a conveyor belt to transport the crushed debris, and a baler to compact and bale the debris.
- the baler may compact the debris by rotating the debris in a continuous band, into which baling material may be inserted to bale the debris.
- the debris may be gathered and feed into a crusher that deposits the crushed debris directly into the baler for compacting and baling.
- the apparatus may gather the debris with brushes and feed it onto a conveyor mechanism 30 that then introduces it into a crusher.
- the crushed debris may then be feed into a baling mechanism that compacts and bales the debris for easy removal and disposal.
- the present invention may be connected to a prime mover or alternatively connected to a portable base with a motor for driving the device.
- Document US2009/293426A1 discloses an apparatus and method of processing and transporting waste according the preamble of claim 1.
- the shredders and balers of the prior art suffer from disadvantages such as only being able to shred and bale a particular type of material, the design of the shredding apparatus is more complicated and therefore more expensive, and/or the shredding and baling apparatus is only capable of small scale jobs (i.e. shredding and baling twigs and leaves while being pushed around a lawn).
- the shredder-baler may be mounted on a trailer or flatbed whereby the shredded material may transported to the baler via conveyer, allowing for a portable system that can be scaled up or down in size and driven anywhere shredding and baling is needed.
- One useful technique would be to drive a single shredder-baler to a demolition or disaster site for quick and efficient clean up. For example, rather than needing ten to twenty roll-off container trucks lined up to collect and contain debris and materials, a single shredder-baler may be driven onsite along with a flatbed truck to collect and stack the bales. Potentially, a single flatbed truck could hold 15-20 roll-off containers worth of baled debris.
- Another useful technique would be to use the shredding and baling combination apparatus on a trash or refuse collecting truck in order to compress and bale household or commercial trash.
- the trash workers could load trash directly into a hopper or feeder for the shredder for shredding and subsequent compression and baling.
- the bale of trash could be stacked onto a flatbed of a truck, and additional bales could be stacked on top of one another in a compressed state, which means that such a truck could transport vastly larger quantities of trash than currently available methods allow.
- the bales When the trash bales are delivered to a landfill, the bales could be neatly stacked, creating a much cleaner appearance, with the added benefit that the bales only occupy approximately 10% of the volume of uncompressed, loose trash and refuse. Thus, in this way, a landfill having a certain land area could contain as much as ten times the amount of trash dumped there in an uncompressed, loose manner as is typical of landfills in use today.
- the instant shredding-baling apparatus in a preferred embodiment, includes a shredding apparatus operably connected to a baler via a conveyor.
- the shredder includes an intake hopper with sidewalls for receiving and containing materials as they are fed into the shredder for shredding.
- a rotatable drum with cutting teeth spirally arranged along the drum is preferably centered within a lower portion of the hopper for cutting through material as it is fed into the hooper.
- Fixed cutting teeth are preferably arranged in a row or rows along each of the longitudinal sidewalls of the hopper, adjacent the cutting drum.
- the cutting drum is preferably motor-driven and rotates at a speed sufficient to cut and reduce the material in size so that it may be compressed and baled by the baler.
- the size of the shredded material need not be uniform or a specific dimension, provided the material can be successfully baled by the baler.
- the shredder-baler of the present invention is preferably designed in an industrial size to handle high volumes of material.
- the baler includes housing having a fixed portion and a movable portion (or “door”) pivoting upward and outward in relation to the fixed portion, wherein the door may pivot between an open and closed position.
- a series of rollers are arranged about the periphery of the housing, on an inner portion thereof, in a generally circular configuration.
- a series of large, flexible bands or belts are positioned within the housing, extending almost the entire width of the inside of the housing, and engage the rollers during the baling operation.
- the apparatus includes a hopper for feeding material to be baled (“bale material”) into the baler, and specifically for feeding the bale material to the inside area of the housing between the belts.
- rollers positioned on the fixed portion of the housing include three rollers that are driven by a hydraulic motor (either directly, or indirectly via a pulley mechanism), along with two adjustable rollers that are slidably mounted so that they may move inwardly or outwardly with respect to the housing for purposes of belt replacement.
- the rollers preferably include a driven roller, six fixed rollers, together with a movable tensioner roller.
- the tensioner roller is mounted on a mechanism that includes a pair of tracks extending outwardly from the door, so that the tensioner can move inwardly and outwardly along the tracks.
- the tensioner roll is used to push against the belt inwardly during the baling operation to apply compression forces onto the outer side of the belt, which serves to compress the baling material into an extremely tight configuration, so that the bale can maintain its structural integrity after it has been wrapped and released from the baler.
- the tensioner roll mechanism is driven inwardly and outwardly by a hydraulic piston.
- a pair of rotating auger members are disposed within the housing toward the outer periphery thereof, and are used to catch and remove any errant chips or pieces of bale material that fall between the belts and the housing, in order to prevent any such chips or pieces from interfering with the mechanical components of the baler.
- the chips are caught up in the rotating helical screw blade and transported to an exit port in the side of the housing where they are ejected therefrom.
- the bale material is fed through the hopper, and the hydraulic motors drive the belts that are positioned on the rollers in the baling cavity of the housing.
- the tensioner roller moves inwardly to apply a compressive force against the belt and the bale material disposed within the baling cavity.
- a sensor apparatus monitors the bale size to determine when the bale is nearing and has reached its maximum capacity.
- a wrap feeder begins to feed a wrap (preferably a strong netting material) around the bale through several revolutions under high tension, in order to hold the bale together.
- the wrap material is cut or broken, and the door opens to release the bale from the baler. At this point, the operation may start over again in order to create the next bale.
- FIG. 1-16 One preferred embodiment of a shredding-baling apparatus 100 is illustrated in Figures 1-16 .
- the apparatus presented herein is capable of being attached to any number of platforms or frames.
- the shredder-baler 100 may be mounted on a dedicated platform 101 that includes a wheel or multiple wheels, so that it may be towed like a trailer behind any large mobile vehicle or piece of equipment, such as a truck, tractor, or the like.
- the shredder-baler 100 may also be mounted to the bed of a large flat-bed truck. Further, the shredder-baler 100 may be attached to or incorporated with another vehicle or piece of equipment such as a trash truck.
- the shredder-baler 100 may be used by itself as a single unit, or in combination with other heavy equipment in many different configurations, as desired. It is contemplated that in a preferred embodiment, the shredder-baler 100 is industrial sized and capable of providing clean-up to construction sites, disaster sites, or any other area where high volume and high-throughput removal of debris is needed.
- the shredder-baler 100 includes a shredding assembly 200 adjacent and operatively connected to a baling assembly 10, preferably with a conveyor means 300 to convey the shredded material to the baling assembly 10.
- the shredding assembly 200 includes an intake hopper 202 for receiving the material that is to be shredded, and a shredding mechanism 201 for shredding the material as it is fed into the intake hopper 202. The shredded material may then fall on to the conveyor means 300 below where it is transported to the baling assembly 10.
- the conveyor means 300 preferably terminates above a baler hopper 46 that feeds the shredded material into the baling assembly 10. Once the material has been baled, compressed, and wrapped, it may be released from the baling assembly 10.
- the shredding assembly 200 of the present invention is efficient in both cost and operation due to the simplicity of the design.
- the shredding assembly 200 consists of a rotatable shredding mechanism 201, such as a cutting drum 208, located within an intake hopper 202.
- a rotatable shredding mechanism 201 such as a cutting drum 208
- the bottom of the intake hopper 202 is preferably open so that the cutting drum 208 is freely exposed to the conveying mechanism 300. In this way, as the material becomes shredded, the debris may fall directly onto the conveyor 300 after being passed over the cutting drum 208.
- the shredder assembly 200 includes an intake hopper 202 for receiving the material that is to be shredded.
- the intake hopper 202 is designed to be top-loaded and is comprised of two opposed side walls 203, 204 that extend upwardly at a preferably obtuse angle, and a front 205 and rear 206 wall that each define an opening 207 for receiving a rotatable shredding mechanism 201.
- the bottom of the intake hopper 202 is preferably open to allow the shredded material to fall directly onto the conveyor 300.
- Each of the opposed side walls 203, 204 preferably include at least one row of fixed teeth 211, 212 mounted horizontally along the length of each side wall 203, 204, as best seen in Figs. 4 and 8 .
- the fixed teeth 211, 212 are discussed in more detail below. It is to be understood that the intake hopper 202 is not limited to the embodiment described and may be any shape or dimension suitable to hold the material that is to be shredded.
- the intake hopper 202 may be loaded by hand by tossing material or pieces of scrap into the hopper 202, or preferably by construction equipment such as a material handler or excavator claw attachment that can grab and lift large quantities of material into the intake hopper 202 at one time.
- the shredding mechanism 201 is comprised of a cutting drum 208 rotatable along a rotational axis and oriented along a horizontal axis.
- the cutting drum 208 is preferably positioned in the lower, central portion of the intake hopper 202, parallel between the two opposed side walls 203,204.
- the diameter and length of the cutting drum 208 may be any suitable dimension depending upon the desired size of the shredding assembly 200.
- the cutting drum 208 preferably comprises at least a support body 209 and a plurality of cutting teeth 210 carried on the outer portion of the drum 208 and preferably arranged in a spiral orientation along the outer surface.
- a shredding mechanism is described in U.S. Pat. No. 7,980,278 of Labbe et al. incorporated herein by reference.
- the resulting cut is more powerful.
- a 2x4 piece of wood is placed in a shredding mechanism with cutting teeth arranged in parallel longitudinal rows, (as typically seen in shredders of the prior art), as the 2x4 comes in contact with the row of cutting teeth, it will be pushed along with the row of cutting teeth, following the rotation of the shredder or drum.
- This type of arrangement results in a less efficient cut that may require additional cutting drums working together, or additional passes through the cutting drum as it rotates.
- the 2x4 makes contact with each cutting tooth following one another in quick succession. Rather than traveling with a row of cutting teeth as the drum rotates, instead the wood is pushed against cutting tooth after cutting tooth consecutively, being pulverized as the drum rotates.
- a plurality of protective collars or ribs may be mounted concentrically at spaced intervals along the outer surface of the cutting drum, with cutting teeth mounted between adjacent collars.
- protective collars is described in U.S. Pat. No. 7,967,044 of Labbe et al. incorporated herein by reference.
- the cutting teeth 210 mounted on the cutting drum 208 may be any suitable type of cutting tooth.
- the mobile teeth 210 may be removable so that different types of cutting teeth 210 may be mounted on the drum 208 as desired depending on the type or types of material that is to be cut.
- hammer teeth may mounted on the drum 208 for cutting mixed materials found at a demolition site, such as garbage, metal, plastic, wood, etc.
- a brush cutting tooth may be used.
- An exemplary cutting tooth and cutting tooth mount is described in U.S. Pat. No. 8,893,997 of Gaudreault, incorporated herein by reference.
- each of the opposed side walls 203, 204 of the intake hopper 202 preferably include at least one row of fixed cutting teeth 211, 212 mounted horizontally along the length of each side wall 203, 204.
- the type and arrangement of fixed teeth may vary.
- Figs.4 and 8 shows fixed cutting teeth 211 extending out along a horizontal plane toward the rotatable cutting drum 208, while fixed cutting teeth 212 extend upward at an angle similar to that of the side walls 203, 204.
- a variation of the type of fixed teeth included along the walls 203, 204 of the intake hopper 202 may increase the efficiency of the cutting and shredding process.
- the mobile teeth 210 mounted along the cutting drum 208 pass through spaces defined between the fixed cutting teeth 211, 212, as illustrated by Figs. 1 , 2 , and 8 .
- the entire apparatus 100 is powered by a power unit 402 preferably consisting of hydraulic motors 58, 213 and pumps operatively connected to and supplying power to drive the rotation of the shredding assembly 200, the conveyor means 300, and the baling assembly 10.
- the power unit 402 is preferably controlled by a computer operatively connected to the power unit 402 so that the entire assembly of shredder 200, conveyor 300, and baler 10 operate together and is coordinated automatically.
- the computer system is discussed in more detail herein.
- the hydraulic pump 400 or pumps may include pressure sensors 401 to monitor the pressure of at least the shredding mechanism 201.
- the power unit may also include an engine such as a diesel engine 403.
- a motor 213 drives rotation of the cutting drum 208 at a relatively slow speed.
- a preferred range of speed may be 35-55 rpm, with a more preferable speed of 45 rpm for example; although, it is to be understood that the speed may be set at any desired or suitable rpm depending upon the use. Although a faster speed may be used, a slower speed may allow for a more powerful and efficient cutting as large quantities of mixed materials are dropped into the shredding assembly 200.
- the power unit 402 may be designed such that if the cutting drum 208 becomes obstructed in any way, for example an object gets stuck or lodged in the drum 208 as it rotates, then the motor 213 may automatically counter-rotate the drum 208 in the opposite direction for a predetermined amount of time until the obstruction is removed and cutting may resume. Preferably, this process is automatically controlled by the power unit 402, negating the need for operator intervention.
- the predetermined time interval for reverse rotation may be set by a timer operatively connected to the motor 213 and/or incorporated into the computer system; the timer may be set for 30 seconds, 45 seconds, or any time interval as desired or needed to dislodge an obstruction.
- An obstruction of the cutting drum 208 may be determined by an increase in pressure detected by the pressure sensor 401 on the hydraulic pump 400. For example, if the drum 208 is rotating counterclockwise as it shreds through material, and resulting debris gets lodged in the cutting mechanism 201 causing an obstruction, then the pressure in the hydraulic pump 400 may rise.
- the motor 213 driving the drum 208 may automatically switch rotation of the drum 208 in a clockwise direction for the predetermined time interval (for example, 30 seconds) to allow for the obstruction to become dislodged.
- the motor 213 will resume rotation of the drum 208 in a counterclockwise direction, thus resuming the cutting operation. This entire rotation, counter-rotation process preferably occurs automatically and is controlled by the various components of the power unit 402.
- a conveyor means 300 such as a conveyor belt, is powered by a motor and operatively connected to the shredding assembly 200 and the baling assembly 10.
- the front of the conveyor 300 is located directly underneath the shredding mechanism 201, substantially aligned with the front of the shredding assembly 201, as illustrated best by Fig. 7 .
- the conveyor 300 moves in a direction that carries the shredded debris away from the shredding assembly 200 and toward the baling assembly 10, terminating above the baling assembly 10, as shown in Fig. 1 .
- the cutting drum 208 is preferably open to the conveyor 300 such that as shredded material drops from the shredding mechanism, it may fall directly onto the conveyor 300 where it may be carried to and dropped into the baler hopper 46 of the baler assembly 10 for baling.
- the conveyor 300 is operatively connected to the same power unit that drives the rotation of the cutting drum 208 and the operation of the baling assembly 10 so that all units of the apparatus 100 operate together. If the baling assembly 10 reaches capacity and ceases operation to prepare for releasing a bale, then operation of the conveyor 300 may cease as well. If operation of the baling assembly 10 and shredding assembly 200 resume, then operation of the conveyor 300 may resume as well.
- a housing 12 includes a fixed member 14 and a pivoting door member 16.
- the front 18 and rear sides 20 of the housing 12 preferably include an inner wall 22 and an outer wall 23.
- a series of rollers (24,26,28,34) are disposed about the inner periphery of the inner wall 22 of the housing 12 in a generally circular configuration.
- a series of belts (40,42,44) are disposed about the rollers within the inner walls 22 of the housing 12.
- a baler hopper 46 is positioned on the top of the housing 12, and is used to screen and feed bale material into the baler 10.
- a wrap feeder 48 is positioned on an outer portion of the housing 12, and holds a roll of wrap material, preferably in the form of a strong netting material, which may be fed into the baler 10 and wrapped around the bale once the bale has been formed and compressed.
- the housing 12 is comprised of a fixed member 14 and a door member 16 that may pivot upward and outward as shown in Fig. 16b .
- the housing 12 includes front 18 and rear 20 frame members that are spaced apart and occupy parallel planes.
- the frame members (18,20) are connected by various components, including support members, rollers, and a base 50.
- Each frame member (18,20) in a preferred embodiment, includes two separate walls- an inner wall 22 and an outer wall 23.
- Rollers (24,26,28,34) are situated between the frame members (18,20), and a baling cavity 52 is defined between the frame members (18,20), and the rollers extend about a periphery of the housing 12 in a generally circular configuration between the inner walls 22 of the frame members (18,20).
- the outer wall 23 is spaced apart from the inner wall 22 on each frame member, creating a defined and enclosed space for various components, including hydraulic pistons 38 and components, pulleys 54, drive belts 56, and the like. This arrangement allows these components to be separated from the baling cavity 52, and further, to be isolated between the inner 22 and outer walls 23, which protects them from outside elements, including water, dust, dirt, and the like.
- An additional benefit to this configuration is that sections of the outer wall 23 may be removed for repair and maintenance purposes.
- rollers 24,26,28,34
- some of the rollers are disposed in a fixed position with respect to the housing, and are rotationally driven by a hydraulic motor 58 (either directly, or are driven indirectly via a belt or chain drive mechanism). These rollers are referred to herein as “driven rollers” 24.
- driven rollers A second set of rollers 26 is fixed to the housing 12 (not adjustable, not driven), and these rollers are referred to herein as "fixed rollers" 26.
- the fixed rollers 26 simply rotate in correspondence with the belt (40,42,44) that engages them, due to frictional engagement with the belt.
- a third set of rollers 28 is adjustable with respect to the housing 12, so that they may slide inwardly toward a central portion of the housing 12, thus loosening the belt; or outwardly toward a perimeter thereof, thus tightening the belt, and these rollers are referred to herein as "adjustable rollers" 28.
- the adjustable rollers 28 are actually fixed during the baling operation, so for operational purposes, the adjustable rollers 28 behave in the same manner as the fixed rollers 26.
- the adjustable rollers 28 are mounted to a slide mechanism 30 that is received into slots 32 in the housing 12, as shown, so that the slide mechanism 30 may be moved between an operational position (creating higher tension on the engaged belt) and a maintenance position (relaxing tension on the engaged belt), and secured into either position.
- a means for adjustment is provided on these adjustable rollers 28 for maintenance purposes, simply to facilitate removal and reattachment of the belts that engage those rollers 28 when maintenance needs to be performed.
- a tensioner roll 34 is used to push the belt against the bale material during the baling operation.
- the tensioner roll 34 is mounted onto a track 36, as shown, and a hydraulic motor is used to push the tensioner roll 34 inwardly along the track 36 and against the belt 40 from the outside of the belt 40 (from within the belt “loop") via a hydraulic piston 38, as shown, in order to apply significant compression forces to the bale material during the baling operation.
- the tensioner roll 34 is not driven in a rotational manner in a preferred embodiment, but instead is simply forced against the belt inwardly as described above.
- the track 36 includes a chain mechanism 39 that engages with a gear 41 that is disposed on the outer part of the tensioner roll 34 axis.
- the gear 41 and chain 39 assembly ensure that both sides of the tensioner roll 34 remain evenly positioned between the tracks, which helps to keep uniform pressure against the belt and baling material. Additionally, this gear and chain mechanism helps to provide a smoothly shaped, symmetrical bale, rather than a lumpy, irregularly shaped bale. This same gear and chain mechanism may also be applied to and incorporated in the hinged portion 62 of the door 16, discussed below, in order to provide uniform compression on each side of the bale during a baling operation.
- the rollers (24,26,28) may include a small notch on a side thereof, for expelling small bale material chips that become lodged between the circular side of the roller and the inner wall 22 of the housing 12.
- the concept is that the chip, which is pinched between the side of the roller and the wall 22, will fall into the notch during rotation of the roller, and then fall out when that portion of the roller disengages from the belt during normal rotation. Then, the chip can be expelled from the housing by the auger mechanisms 60.
- a series of large, flexible belts (40,42,44) are used to rotate, compress and form the bales from the bale material.
- Each of these belts (40,42,44) engage and wrap around a specific set of rollers (24,26,28,34) within the inner walls 22 of the housing, so that the driven rollers 24 rotationally drive the belts, and the fixed rollers 26 and adjustable rollers 28 guide the belts.
- the adjustable rollers 28 are moved into maintenance position, thus loosening and reducing tension on the belt to facilitate removal of the belt from the rollers.
- the adjustable roller 28 is then moved back into its operational position, which may provide tension to the belt, and then the adjustable roller 28 is tightened and secured into that operational posture.
- three separate belts are used within the baler.
- One belt 40 extends around all of the rollers that are positioned on the door side of the housing ("door belt” 40).
- the top roller 24 that engages the door belt 40 is driven directly by a hydraulic motor 58, which is mounted on the side of the housing 12.
- the remaining rollers (26) on the door side of the housing that engage the door belt 40 are fixed rollers, with the exception of the tensioner roller 34.
- the upper portion of the inner wall 22 of the housing on the door side includes a hinged portion 62 that allows the upper three rollers to move upwardly and downwardly in concert with one another.
- a hydraulic piston 38 is disposed between the hinged portion 62 of the door housing 16 on the inner wall 22 and a fixed portion 64 of the door housing 16 on an inner wall 22, as shown.
- the hydraulic piston 38 exerts a closing or compression force on the hinged portion 62 of the door housing 16, and during the baling operation, as the bale grows larger, the hinged portion 62 is forced upwardly by the increasing size of the bale.
- This arrangement helps to provide compression forces to the bale material during the baling operation.
- a pair of contact sensors (66,68) engage the hinged portion 62 of the housing to determine 1) when the bale is nearing maximum capacity but has not yet reached maximum capacity, and 2) when the bale has reached maximum capacity. The sensor system will be discussed in more detail herein below.
- an upper belt 42 engages the rollers on the upper side of the housing 12, while a lower belt 44 engages the rollers on the lower side of the housing 12, as shown.
- the upper belt 42 is rotated by a driven roller 24 having an axle that extends outwardly through the inner wall 22 of the housing 12, which engages a drive belt 56 attached to a hydraulic motor 58.
- a belt tensioner 70 mounted on the outer portion of the inner wall 22, engages the drive belt 56 that runs between the hydraulic motor 58 and the driven roller 24, in order to maintain tension on the drive belt 56.
- the top roller 28 on the fixed side 14 of the housing 12 is an adjustable roller 28, while the remaining roller(s) engaged by the top belt 42 are preferably fixed rollers 26.
- a lower belt 44 engages the rollers disposed on the lower side of the fixed portion 14 of the housing 12.
- the top roller 24 that engages the lower belt 44 is directly driven by a hydraulic motor 58 that is disposed between the inner wall 22 and the outer wall 23 of the housing 12, as shown.
- the bottom roller 24 that engages the lower belt 44 is indirectly driven by the hydraulic motor 58 via a drive belt 56 extending therebetween, which is also positioned between the inner 22 and outer walls 23 of the housing 12.
- a belt tensioner 70 engages the drive belt 56 between the hydraulic motor 58 and the bottom driven roller 24, as shown.
- the belts (40,42,44) are positioned so that they are each in close proximity to one another, such as in the lower portions of the baling cavity 52 (where the bale is formed within the housing 12), except for a gap between the door belt 40 and the upper belt 42.
- This gap in the top of the baling cavity 52 is adjacent to the hopper 46, and allows baling material to be fed by the hopper 46, through the gap, and into the baling cavity 52.
- This arrangement allows baling material to be fed into the baling cavity 52 without having significant amounts of the baling material fall through any small cracks or gaps between the belts in the lower portion of the housing.
- a pair of hydraulically driven augers 60 are positioned in parallel relation to the rollers (24,26,28,34) within the belts (40,42,44), near an outer periphery of the inner walls 22 of the housing 12, as shown. These augers 60 are rotated and directly driven by hydraulic motors 58 during the baling operation.
- the chips are caught up in the rotating helical screw blade and transported to an exit port 72 in the side of the housing 12 where they are ejected therefrom.
- a chute 74 may be mounted on an outer portion of the housing 12 adjacent the exit port 72 to direct the flow of ejected chips.
- baling material will fall between the small gap between the bottom of the door belt 40 and the lower belt 44 on the fixed side 14 of the housing 12.
- a small enclosure is placed below the gap to catch the baling material that falls therethrough.
- the baling material within the enclosure acts as a stopper, preventing any additional baling material from falling between the gap.
- the enclosure empties out when the bale is released from the baler, and tends to refill during every baling cycle.
- a series of sensors are used to monitor the progress and functional aspects of the baling operation in progress.
- Contact sensors (66,68) are used to monitor the size of the bale within the baling cavity as shown in Figure 8a.
- a preliminary contact sensor 66 is attached to the housing on the door 16 adjacent to the hinged portion 62, and senses when the hinged portion 62 begins to "open,” or move upwardly and outwardly due to the size of the bale. This preliminary contact sensor 66 is used to tell the operator that the bale is nearing its maximum capacity, but has not yet reached maximum capacity.
- a final contact sensor 68 is mounted above the hinged portion 62 of the housing 12 on the door 14, and provides an alert signal when the hinged portion 62 has extended outwardly far enough to indicate that the bale has reached its maximum capacity.
- the final contact sensor 68 alert is used to initiate the wrapping process, whereby the wrap feeder 48 engages and begins to wrap the bale in the final step before the bale is released from the baler 10.
- a door contact sensor is disposed at a point between the fixed housing 14 and the door 16, to indicate whether the door 16 is opened or closed.
- the computer is programmed to provide systematically increasing pressure on the belt 40 and baling material as the baling operation progresses, so that the maximum pressure is exerted by the tensioner roll toward the end of the baling cycle when the bale is reaching maximum capacity.
- the computer controls the amount of pressure applied by the tensioner roll 34, and preferably provides intermittent, cyclical pressure, so that the tensioner roll applies high pressure, then backs off and releases some pressure, and then reapplies significant pressure, all in a continuous cycle.
- These sensors are all operatively connected to a computer system, which not only displays the information gleaned from the sensors on a display for the operator's information, but also for use in triggering and controlling other actions by the baler (or baler components) during the baling operation.
- the majority of the moving components of the baler 10 are driven by the hydraulic system, which includes hydraulic motors 58 for rotating the driven rollers 24, and hydraulic pistons 38 for opening and closing the door 16 and for providing compression forces to the tensioner roll 34 and the hinged portion 62 of the housing 12 on the door side 16.
- a hydraulic distribution valve 78 (“body valve”) is used to distribute the hydraulic forces to the various hydraulic components, and is mounted on the side of the housing 12 between the inner 22 and outer walls 23.
- a hydraulic motor 58 also powers the wrap feeder 48, and small hydraulic motors 58 drive the augers 60.
- the hydraulic motors 58 are preferably driven by a standard hydraulic pump, which may be directly attached to the baler 10, or which may be attached to and powered by another piece of equipment used in conjunction with the baler.
- the other hydraulic components are driven by a low pressure sensing pump, which is connected to the body valve 78.
- the body valve 78 works as a distribution valve, sending hydraulic fluid under pressure to the desired component at the desired time, and it is also capable of monitoring pressure levels, acting as a sensor in that way.
- the low pressure sensing pump and body valve 78 are operatively connected to the computer system, which is programmed to control the body valve 78 and to receive information (including pressure levels, etc.) for monitoring and safety purposes.
- a computer is operationally connected to various components of the shredder-baler 100 in order to monitor and control different aspects of the assembly operation.
- a touch screen display is used as an interface between the operator and the shredder-baler apparatus 100, so that the operator can control and monitor many aspects of the operation.
- the computer is used to monitor the signals from the various sensors, as described above. This information is preferably displayed on the display screen as information to the operator.
- the computer is used to automate and control many aspects of the baling operation. For instance, when the computer receives a signal from the preliminary contact sensor 66, it activates an alert signal for the operator to let him or her know that the bale is nearing maximum capacity. The operator may then begin to maneuver a skid steer near where the bale may be released, thus increasing time efficiency for lifting and bale and carrying it to a flatbed for stacking. When the final sensor indicates that the bale has reached maximum capacity, the computer automatically actuates the wrap feeder 48, so that the wrap material begins feeding into the baling cavity 52 to wrap the bale prior to releasing the bale from the baler 10.
- the computer also monitors the pressure forces on the bales, the operation of the hydraulic motors 58, the hydraulic distribution valve 78, the hydraulic low pressure sensing pump, the actuation and speed of the wrap feeder 48 (for tension), and other parameters and systems, to ensure proper and safe operation. Certain events or warning signals received by the computer from sensors may act as a trigger to shut down the shredding and baling operation for safety reasons, in order to prevent additional damage to the shredder-baler apparatus 100 or its components due to a malfunction or improper use.
- touch screen is the preferred display and interface
- other types of displays or controls may be used.
- the display and/or controls may be located in any desired position or location, whether attached directly to the housing of the baler, the shredding assembly, or remotely (in the cab of a truck or vehicle that is connected to the assembly, for instance.)
- the shredder-baler apparatus 100 may be driven onsite wherever large clean-up or material removal is needed.
- equipment such as a material handler or excavator with claw attachment may be used to pick up and drop material to be shredded and baled into the intake hopper 202 of the shredding assembly 200.
- the spirally arranged mobile cutting teeth 210 and fixed cutting teeth 211, 212 cut through the debris, shredding it and reducing it in size.
- the cutting drum 208 rotates, the shredded debris is gravity fed from the intake hopper 202 and the cutting drum 208 onto the moving conveyor means 300. The debris may then be conveyed from the shredding assembly 200 to the baler hopper 46 of the baling assembly 10.
- the conveying means 300 is provided for feeding baling material into the baler hopper 46 in a continuous fashion.
- the hydraulic motors 58 of the baler 10 are rotating the driven rollers 24, which, in turn, rotate the upper 42 and lower belts 44.
- the rotation of the upper 42 and lower belts 44 then cause the fixed rollers 26 to rotate.
- the upper 42 and lower belts 44 will rotate due to frictional engagement between the belts and the driven rollers 24.
- the belt 40 On the door side 16, usually the belt 40 will not begin to rotate until the volume of bale material has reached the point where it forces the belt 40 against the driven roller 24, because in an empty baler, the door belt 40 hangs loosely on the rollers.
- the adjustable rollers 28 on the door side 16 operate as fixed rollers during the bailing process; therefore, the rotation of the belt 40 on the door side 16 results in the rotation of the adjustable rollers 28.
- the belts When the baling material has reached the "critical mass" to engage all of the belts (40,42,44), then all of the belts rotate the bale material in a clockwise manner, and the tensioner roll 34 begins the process of applying pressure inwardly on the belt 40 and the baling material.
- the belts in a preferred embodiment, all rotate at the same speed and in the same direction during the baling operation, and the computer monitors and controls the hydraulic motors 58 to ensure proper speed for each motor and belt.
- the auger members 60 are constantly rotating, transporting errant chips and pieces of the baling material that have inadvertently escaped the baling cavity 52 from the housing 12.
- the preliminary contact sensor 66 indicates that the bale is nearing maximum capacity
- a signal is sent to the operator.
- the final contact sensor 68 signals the wrap feeder and actuates the wrap feeder 48 to begin feeding the wrap around the bale.
- the contact sensor signals the shredding assembly 200 and conveyor means 300 to automatically and temporarily cease operation to avoid overloading the baling assembly 10 once it has reached maximum capacity.
- the wrap feeder 48 may also be controlled by the computer.
- the wrap feeder 48 is preferably positioned on the fixed side 14 of the housing 12, as shown, and includes a mounted roll of wrap material. This material is fed through a slot in the housing 12 between the upper 42 and lower belts 44 and into the bailing cavity 52, thereby coming into contact with the outer periphery of the bale material. As the belts turn the bale material within the baling cavity 52, the wrap material is fed into the cavity, wrapping around the baling material in the process.
- the wrap feeder 48 is directly driven by a hydraulic motor 58, and the computer controls the motor speed so that the wrap is fed into the baling cavity 52 at a slightly slower pace than the belts (40,42,44) that rotate the bale material.
- the wrap material is under significant tension as it wraps around the bale material, providing additional compressive forces on the bale during the wrapping operation.
- the computer stops the wrap feeder 48 from feeding any additional wrap material into the baling cavity 52, and the wrap material (preferably high-strength polymeric netting) simply snaps, and the bale wrap separates from the wrap material positioned within the wrap feeder 48.
- a bale release platform 80 may be positioned below the door 16 to catch the released bale and prevent it from an uncontrolled release.
- the bales may weigh as much as a ton or more, and the bale release platform 80 facilitates a safe and controlled release of the bale from the baler 10.
- a skid steer may be used to lift the bale and move it to another location, such as onto a flatbed truck for transportation off-site. It is contemplated that a preferred embodiment of the shredder-baler assembly 100 can bale an entire 40 yard roll-off container in an estimated 2 bales at approximately one bale per minute. In this way, a large demolition or logging site can be cleared quickly and efficiently.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Food Science & Technology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental Sciences (AREA)
- Crushing And Pulverization Processes (AREA)
Claims (14)
- Appareil de déchiquetage et de mise en balles comprenant :
un ensemble de déchiquetage comprenant :une trémie de réception (202) destinée à recevoir un matériau à déchiqueter, ladite trémie de réception (202) comportant une partie inférieure essentiellement ouverte afin de permettre au matériau déchiqueté de passer librement à travers elle ;un moyen (300) de transport relié de manière fonctionnelle à un mécanisme de déchiquetage (201) et disposé sous celui-ci, l'avant dudit moyen (300) de transport étant essentiellement aligné avec l'avant dudit mécanisme de déchiquetage (201), le matériau déchiqueté étant ainsi transféré par gravité dudit mécanisme de déchiquetage sur ledit moyen (300) de transport ;ledit moyen (300) de transport étant relié de manière fonctionnelle à un ensemble de mise en balles (10) et se terminant au-dessus de celui-ci de telle sorte que le matériau déchiqueté puisse être acheminé audit ensemble de mise en balles et transféré par gravité dans celui-ci, ledit ensemble de mise en balles (10) comprenant :un logement (12) comportant un élément fixe (14) et un élément formant porte pivotant (16), ledit logement (12) définissant une cavité de compression dans une partie intérieure de celui-ci ;une série de rouleaux rotatifs (24, 26, 28, 34) placés à l'intérieur dudit logement (12), un premier jeu desdits rouleaux étant attachés à rotation à l'intérieur dudit élément fixe (14) dudit logement (12), et un second jeu desdits rouleaux étant attachés à rotation à l'intérieur dudit élément formant porte pivotant (16) dudit logement (12) ;un mécanisme d'entraînement attaché audit logement (12) et relié de manière fonctionnelle à au moins un desdits rouleaux (24), ledit mécanisme d'entraînement mettant en rotation ledit rouleau (24) qui est relié à lui de manière fonctionnelle ;une trémie de presse à balles (46) attachée à une partie supérieure dudit logement (12) pour recevoir le matériau déchiqueté, ledit matériau pour mise en balles étant transféré à travers ladite trémie de presse à balles (46) dans ladite chambre de compression ;un dispositif de distribution de matériau d'emballage (48) disposé sur une partie extérieure dudit logement (12), ledit dispositif de distribution de matériau d'emballage (48) servant à distribuer un matériau d'emballage dans ladite cavité de compression pour l'enrouler autour d'une balle du matériau pour mise en balles une fois que ladite balle a été formée dans celle-ci ;une unité d'alimentation en énergie (402) destinée à alimenter en énergie ledit ensemble de déchiquetage, ledit ensemble de mise en balles et ledit moyen (300) de transport, etun ordinateur relié de manière fonctionnelle à ladite unité d'alimentation en énergie (402) pour l'automatisation et la commande dudit appareil,caractérisé en ce queledit ensemble de déchiquetage comprend en outre :ledit mécanisme de déchiquetage (201) comprenant un tambour de coupe (208) rotatif le long d'un axe de rotation et orienté le long d'un axe horizontal, ledit tambour de coupe (208) étant placé dans une partie centrale de ladite trémie de réception (202) et apte à tourner librement à travers ladite partie inférieure essentiellement ouverte de celle-ci ;une pluralité de dents de coupe (210) agencées en spirale et supportées sur une partie extérieure dudit tambour de coupe (208) ;ladite trémie de réception (202) dudit ensemble de déchiquetage comprend en outre des parois latérales opposées (203, 204), et comportant au moins une rangée de dents de coupe fixes (211, 212) fixées le long de la longueur de chacune desdites parois latérales (203, 204) ;ledit ensemble de mise en balles comprend en outre :une série de courroies (40, 42, 44) disposées autour desdits rouleaux (24, 26, 28), de sorte que lesdites courroies (40, 42, 44) puissent tourner autour desdits rouleaux (24, 26, 28) ;ladite unité d'alimentation en énergie (402) comprend :
au moins un moteur hydraulique (58, 213) relié de manière fonctionnelle à au moins une pompe hydraulique et au moins une conduite hydraulique, ladite au moins une conduite hydraulique reliant de manière fonctionnelle chacun dudit ensemble de déchiquetage, dudit ensemble de mise en balles et dudit moyen (300) de transport. - Appareil de déchiquetage et de mise en balles selon la revendication 1, ledit appareil étant fixé sur un véhicule de telle sorte que ledit appareil puisse être transporté d'un endroit à un autre.
- Appareil de déchiquetage et de mise en balles selon la revendication 1 ou 2, dans lequel ladite pluralité de dents de coupe (210) sont amovibles et interchangeables, ceci permettant la fixation de différents types de dents de coupe sur ledit tambour de coupe (208).
- Appareil de déchiquetage et de mise en balles selon l'une quelconque des revendications 1 à 3, dans lequel ledit tambour de coupe (208) tourne dans un premier sens pour couper, et ledit moteur hydraulique est approprié pour mettre ledit tambour de coupe (208) en rotation inverse dans un sens inverse audit premier sens afin de déloger toute obstruction au niveau dudit mécanisme de déchiquetage.
- Appareil de déchiquetage et de mise en balles selon la revendication 4, comprenant en outre au moins un capteur de pression (401) relié de manière fonctionnelle à ladite au moins une pompe hydraulique (400), la détection d'une augmentation de pression au-delà d'une valeur de pression seuil prédéterminée déclenchant ladite rotation inverse dudit tambour de coupe (208) pendant un temps prédéterminé.
- Appareil de déchiquetage et de mise en balles selon l'une quelconque des revendications 1 à 5, comprenant en outre au moins un capteur de contact (66, 68) attaché audit logement (12) de ladite presse à balles (10) et relié de manière fonctionnelle audit ordinateur pour détecter lorsqu'une balle a atteint un volume maximum à l'intérieur de ladite cavité de compression (52).
- Appareil de déchiquetage et de mise en balles selon la revendication 6, dans lequel ledit capteur de contact (66, 68) envoie un premier signal audit ensemble de déchiquetage (200) et audit moyen de transport pour qu'ils cessent de fonctionner lorsqu'une balle a atteint un volume maximum, et ledit capteur de contact (66, 68) envoie un second signal audit ensemble de déchiquetage (200) et audit moyen de transport pour qu'ils recommencent à fonctionner lorsque ledit élément formant porte pivotant dudit ensemble de mise en balles se ferme après la libération d'une balle.
- Appareil de déchiquetage et de mise en balles selon l'une quelconque des revendications 1 à 7, comprenant en outre lesdits rouleaux étant disposés en une configuration globalement circulaire ou ronde et étant disposés de manière globalement parallèle les uns par rapport aux autres ; etladite série de courroies disposées autour desdits rouleaux, de sorte que lesdites courroies puissent tourner autour desdits rouleaux, au moins une courroie étant disposée autour de plusieurs desdits rouleaux placés à l'intérieur dudit élément fixe dudit logement, et au moins une courroie étant disposée autour de plusieurs desdits rouleaux placés à l'intérieur dudit élément formant porte pivotant dudit logement,ledit dispositif de distribution de matériau d'emballage disposé sur une partie extérieure dudit logement, ledit dispositif de distribution de matériau d'emballage servant à distribuer un matériau d'emballage dans ladite cavité de compression pour l'enrouler autour d'une balle du matériau déchiqueté une fois que ladite balle a été formée dans celle-ci.
- Appareil de déchiquetage et de mise en balles selon l'une quelconque des revendications 1 à 8, dans lequel ledit mécanisme de déchiquetage tourne à une vitesse allant de 35 tr/min à 55 tr/min.
- Procédé pour déchiqueter et mettre en balles un matériau au moyen d'un appareil de déchiquetage et de mise en balles selon l'une quelconque des revendications 1 à 9 comprenant les étapes consistant à :prévoir un ensemble de déchiquetage, ledit ensemble de déchiquetage comprenant un mécanisme de déchiquetage rotatif et un moyen pour mettre ledit mécanisme de déchiquetage en rotation ;prévoir un ensemble de mise en balles, ledit ensemble de mise en balles comprenant un logement comprenant une partie fixe et une porte, une série de rouleaux disposés à l'intérieur dudit logement, une pluralité de courroies disposées autour desdits rouleaux, un dispositif de distribution de matériau d'emballage pour distribuer un matériau d'emballage autour dudit matériau de balle, et un moyen pour mettre au moins un desdits rouleaux en rotation ;prévoir un moyen pour transporter le matériau déchiqueté dudit ensemble de déchiquetage audit ensemble de mise en balles ;introduire du matériau à déchiqueter dans ledit ensemble de déchiquetage ;mettre ledit mécanisme de déchiquetage en rotation dans un premier sens pour déchiqueter ledit matériau ;transporter ledit matériau déchiqueté dudit ensemble de déchiquetage audit ensemble de mise en balles ;introduire le matériau déchiqueté dans ledit logement dudit ensemble de mise en balles ; etmettre ledit matériau déchiqueté en balle.
- Procédé selon la revendication 10, comprenant en outre l'étape consistant à prévoir un capteur de contact attaché audit logement dudit ensemble de mise en balles pour détecter lorsqu'une balle a atteint un volume maximum.
- Procédé selon la revendication 10 ou 11, comprenant en outre les étapes consistant à :mettre ledit matériau déchiqueté en rotation entre lesdites courroies ;comprimer ledit matériau déchiqueté ;activer ledit dispositif de distribution de matériau d'emballage de sorte qu'il distribue un matériau d'emballage autour dudit matériau déchiqueté ;appliquer une tension audit matériau d'emballage tandis que ledit matériau d'emballage est enroulé autour dudit matériau déchiqueté ;couper ledit matériau d'emballage ; etouvrir ladite porte dudit logement pour libérer une balle emballée.
- Procédé selon l'une quelconque des revendications 10 à 12, comprenant en outre l'étape consistant à prévoir un ordinateur pour commander ledit moyen pour mettre ledit mécanisme de déchiquetage en rotation, pour commander ledit moyen pour entraîner ledit rouleau dudit ensemble de mise en balles, pour commander ledit dispositif de distribution de matériau d'emballage, et pour commander ladite porte dudit ensemble de mise en balles.
- Procédé selon l'une quelconque des revendications 10 à 13, comprenant en outre les étapes consistant à :interrompre le fonctionnement dudit ensemble de déchiquetage et dudit moyen de transport lorsque ledit ensemble de mise en balles a atteint un volume maximum ; etremettre ledit ensemble de déchiquetage et ledit moyen de transport en fonctionnement une fois qu'une balle a été libérée.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US15/269,071 US10363716B2 (en) | 2015-05-19 | 2016-09-19 | Shredding and baling apparatus and method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP3296020A1 EP3296020A1 (fr) | 2018-03-21 |
| EP3296020B1 true EP3296020B1 (fr) | 2022-01-26 |
Family
ID=57683516
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP17191418.7A Active EP3296020B1 (fr) | 2016-09-19 | 2017-09-15 | Appareil et procédé de déchiquetage et de mise en balles |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US10363716B2 (fr) |
| EP (1) | EP3296020B1 (fr) |
| CA (1) | CA2979636A1 (fr) |
Families Citing this family (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AT16110U1 (de) * | 2017-07-14 | 2019-01-15 | SonnenKlee GmbH | Ballenpresse für halm- oder faserartige Materialien |
| US10669052B2 (en) * | 2017-10-27 | 2020-06-02 | Michael A. Goodhind | Modular baler |
| CN107999231A (zh) * | 2017-11-02 | 2018-05-08 | 铜陵博锋实业有限公司 | 一种有机膨润土粉碎除尘装置 |
| US11029669B1 (en) * | 2018-03-25 | 2021-06-08 | Swift Straw Ii, Llc | Pine straw processing and bagging system |
| USD890223S1 (en) * | 2018-11-15 | 2020-07-14 | Presses Et Cisailles Lefort, Société, Anonyme | Tracked shear baler |
| USD890222S1 (en) * | 2018-11-15 | 2020-07-14 | Presses Et Cisailles Lefort, Société Anonyme | Tracked shear baler |
| USD891482S1 (en) * | 2018-11-15 | 2020-07-28 | Presses Et Cisailles Lefort, Société Anonyme | Tracked shear baler |
| EP3949718A1 (fr) * | 2020-08-03 | 2022-02-09 | Feraboli, Francesco | Presse pour la production de balles de fourrage et similaires |
| CN112264157B (zh) * | 2020-09-17 | 2022-08-12 | 江苏东南植保有限公司 | 用于农药加工生产的输送碎料机构 |
| CN112718169A (zh) * | 2021-01-11 | 2021-04-30 | 成都至诚大道企业管理有限公司 | 一种生活垃圾粉碎压缩打包一体机 |
| US20220330485A1 (en) * | 2021-04-16 | 2022-10-20 | Profile Products L.L.C. | Bale feeder with elevator platform |
| CN113728815A (zh) * | 2021-08-25 | 2021-12-03 | 芜湖瑞丰农牧业装备有限责任公司 | 一种牵引储料式圆捆打捆机及其打捆方法 |
| CN113728819B (zh) * | 2021-09-08 | 2022-10-21 | 淮北市富一晟机电设备有限公司 | 一种自动打包机送料定位装置 |
| CN114289320B (zh) * | 2021-12-31 | 2024-03-12 | 中科微至科技股份有限公司 | 一种用于交叉带分拣系统的全自动供件系统 |
| CN114655478B (zh) * | 2022-02-18 | 2023-09-05 | 赵荣艳 | 一种米饭自动分装装置 |
| CN117160646B (zh) * | 2023-11-01 | 2024-04-12 | 靖江市四州警用器材制造有限公司 | 一种警服裁剪用碎布处理装置 |
| CN117207485B (zh) * | 2023-11-09 | 2024-03-12 | 四川中科航宇新材料有限公司 | 玻纤增强聚芳硫醚类材料挤出前处理螺杆装置及安装方法 |
| CN119213999A (zh) * | 2024-09-29 | 2024-12-31 | 南通棉花机械有限公司 | 一种棉秸秆破碎打包机 |
Family Cites Families (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1809520A (en) * | 1925-09-30 | 1931-06-09 | Clayton Gin Compress Company | Cotton baling machinery |
| CA964632A (en) * | 1972-05-30 | 1975-03-18 | Quinto De Filippi | Refuse disposal apparatus |
| DE3311132A1 (de) * | 1983-03-26 | 1984-09-27 | Claas Ohg, 4834 Harsewinkel | Vorrichtung zum aufwickeln und umhuellen eines zylinderischen erntegutballens |
| US5052170A (en) * | 1990-06-14 | 1991-10-01 | Trenkamp Michael J | Shredder attachment for round hay baler |
| US5255501A (en) * | 1992-02-28 | 1993-10-26 | Mcwilliams Alexander | Baler for forming cylindrical bales |
| US6499931B1 (en) * | 1999-07-12 | 2002-12-31 | Billy J. Garrett, Jr. | Recycling vehicle |
| US6491245B1 (en) * | 2000-04-05 | 2002-12-10 | David E. Rajewski | Mobile shredding system |
| US6722087B1 (en) * | 2000-09-21 | 2004-04-20 | Mic Industries | Building panel and panel crimping machine |
| US6820542B1 (en) | 2001-10-05 | 2004-11-23 | Bobby L. Truitt | Leaf compactor and baler |
| JP3976552B2 (ja) * | 2001-11-19 | 2007-09-19 | 株式会社タカキタ | ロールベーラ |
| GB0324942D0 (en) * | 2003-10-25 | 2003-11-26 | Creo Products Ltd | Baling apparatus and method |
| US8167225B2 (en) | 2005-01-26 | 2012-05-01 | Gyro-Trac Inc. | Cutting tooth for brush cutter |
| US7882683B2 (en) * | 2005-05-16 | 2011-02-08 | Tdm America, Llc | Systems and methods of processing and transporting waste |
| US7980278B2 (en) | 2007-08-17 | 2011-07-19 | Usitech Nov Inc. | Brush cutting head with internally housed drive and bearing assembly |
| US7967044B2 (en) | 2008-08-19 | 2011-06-28 | Usitech Nov Inc. | Protective guard members for cutting tooth assemblies mounted on a brush cutting head |
| EP2346313B1 (fr) * | 2008-09-23 | 2015-12-02 | GYRO-TRAC Corporation | Appareil et procédé de débroussaillage et de mise en balles des copeaux de bois formés au cours des activités de défrichement |
| US8549828B2 (en) * | 2010-10-25 | 2013-10-08 | Deere & Company | Tugger and accumulator for use with an agricultural biomass harvester |
| DE102011109899B4 (de) * | 2011-08-10 | 2013-02-21 | Maschinenfabrik Bernard Krone Gmbh | Landwirtschaftliche Rundballenpresse |
| WO2015179382A2 (fr) * | 2014-05-19 | 2015-11-26 | Gyro-Trac Corporation | Appareil et procédé de mise en balles |
-
2016
- 2016-09-19 US US15/269,071 patent/US10363716B2/en active Active
-
2017
- 2017-09-15 EP EP17191418.7A patent/EP3296020B1/fr active Active
- 2017-09-19 CA CA2979636A patent/CA2979636A1/fr active Pending
Also Published As
| Publication number | Publication date |
|---|---|
| US10363716B2 (en) | 2019-07-30 |
| US20170001400A1 (en) | 2017-01-05 |
| CA2979636A1 (fr) | 2018-03-19 |
| EP3296020A1 (fr) | 2018-03-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3296020B1 (fr) | Appareil et procédé de déchiquetage et de mise en balles | |
| US11375670B2 (en) | Baling apparatus and method | |
| US11707021B2 (en) | Shredding and baling apparatus and method | |
| US3703970A (en) | Apparatus for treating waste material | |
| AU748353B2 (en) | A wrapping machine | |
| USRE40126E1 (en) | Mobile shredding system | |
| CA2737962C (fr) | Appareil et procede de debroussaillage et de mise en balles des copeaux de bois formes au cours des activites de defrichement | |
| CN216906019U (zh) | 一种牵引固定多用途打捆机 | |
| CN117178756A (zh) | 一种自走式秸秆回收打包及残膜回收联合作业机 | |
| CN111727746A (zh) | 一种双上料后出包自动捡拾打捆机 | |
| US6263649B1 (en) | Leaf gathering and compressing machine and method | |
| CN110326434A (zh) | 一种秸秆捡拾破碎打捆机及其打捆机构 | |
| CN209983124U (zh) | 一种全自动圆捆打捆机 | |
| CN207430485U (zh) | 一种农林园艺废弃物料加工处理工程车辆 | |
| IES970545A2 (en) | A combined compacting and wrapping machine | |
| CN117258961A (zh) | 秸秆预处理系统 | |
| CN212573606U (zh) | 一种双上料后出包自动捡拾打捆机 | |
| CN210522463U (zh) | 生物质颗粒机秸秆上料系统 | |
| CN210008233U (zh) | 自走式秸秆收割粉碎打包一体机 | |
| CN216254085U (zh) | 一种智能粉碎生产线 | |
| CN111558436A (zh) | 一种树叶粉碎机及树叶处理工艺 | |
| RU28423U1 (ru) | Измельчитель-раздатчик кормов | |
| CN223600414U (zh) | 一种饲草打捆设备 | |
| CA2343552A1 (fr) | Systeme d'emballage et de dechiquetage mobile | |
| CN111528501A (zh) | 一种秸秆捡拾打捆机 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20180921 |
|
| RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20210817 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1464828 Country of ref document: AT Kind code of ref document: T Effective date: 20220215 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602017052700 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20220126 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1464828 Country of ref document: AT Kind code of ref document: T Effective date: 20220126 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220526 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220426 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220426 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220427 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220526 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602017052700 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed |
Effective date: 20221027 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20220930 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220915 |
|
| P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230526 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220930 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220915 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220930 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220930 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20170915 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220126 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20250925 Year of fee payment: 9 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20250904 Year of fee payment: 9 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20250922 Year of fee payment: 9 |