[go: up one dir, main page]

EP3264005B1 - Sealed air boiler air inlet chamber - Google Patents

Sealed air boiler air inlet chamber Download PDF

Info

Publication number
EP3264005B1
EP3264005B1 EP17178153.7A EP17178153A EP3264005B1 EP 3264005 B1 EP3264005 B1 EP 3264005B1 EP 17178153 A EP17178153 A EP 17178153A EP 3264005 B1 EP3264005 B1 EP 3264005B1
Authority
EP
European Patent Office
Prior art keywords
air
boiler
outlet
chamber
sealed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP17178153.7A
Other languages
German (de)
French (fr)
Other versions
EP3264005A1 (en
Inventor
Roger John CHERRINGTON
Steven CHERRINGTON
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mikrofill Systems Ltd
Original Assignee
Mikrofill Systems Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mikrofill Systems Ltd filed Critical Mikrofill Systems Ltd
Publication of EP3264005A1 publication Critical patent/EP3264005A1/en
Application granted granted Critical
Publication of EP3264005B1 publication Critical patent/EP3264005B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/0027Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters using fluid fuel
    • F24H1/0036Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters using fluid fuel of the sealed type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/0005Details for water heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23LSUPPLYING AIR OR NON-COMBUSTIBLE LIQUIDS OR GASES TO COMBUSTION APPARATUS IN GENERAL ; VALVES OR DAMPERS SPECIALLY ADAPTED FOR CONTROLLING AIR SUPPLY OR DRAUGHT IN COMBUSTION APPARATUS; INDUCING DRAUGHT IN COMBUSTION APPARATUS; TOPS FOR CHIMNEYS OR VENTILATING SHAFTS; TERMINALS FOR FLUES
    • F23L1/00Passages or apertures for delivering primary air for combustion 
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23LSUPPLYING AIR OR NON-COMBUSTIBLE LIQUIDS OR GASES TO COMBUSTION APPARATUS IN GENERAL ; VALVES OR DAMPERS SPECIALLY ADAPTED FOR CONTROLLING AIR SUPPLY OR DRAUGHT IN COMBUSTION APPARATUS; INDUCING DRAUGHT IN COMBUSTION APPARATUS; TOPS FOR CHIMNEYS OR VENTILATING SHAFTS; TERMINALS FOR FLUES
    • F23L17/00Inducing draught; Tops for chimneys or ventilating shafts; Terminals for flues
    • F23L17/02Tops for chimneys or ventilating shafts; Terminals for flues
    • F23L17/14Draining devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/08Arrangements for drainage, venting or aerating
    • F24D19/082Arrangements for drainage, venting or aerating for water heating systems
    • F24D19/088Draining arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/12Arrangements for connecting heaters to circulation pipes
    • F24H9/13Arrangements for connecting heaters to circulation pipes for water heaters

Definitions

  • Embodiments of the present invention relate to a sealed air boiler air inlet chamber, a sealed air boiler including the air inlet chamber and a heating system including the sealed air boiler.
  • Commercial boilers may be used for large scale heating, and may be located in a specifically designated room, e.g. a plant room.
  • Air is required for the combustion of fuel (e.g. gas or oil) to produce heat energy.
  • fuel e.g. gas or oil
  • air may be admitted to a boiler from the surrounding environment (e.g. a plant room), for example, through an opening in the housing of the boiler.
  • boiler housings may be sealed to the surrounding environment (e.g. a plant room), and instead receive air through an inlet such as a ventilation shaft or other pipe.
  • a ventilation shaft or other pipe Such a pipe may be open to outdoor air. Government regulations or other factors may favour boilers that are sealed to the surrounding environment.
  • Such boilers may be known by various names, such as “sealed air boilers” or “room-sealed boilers”.
  • Outdoor air may be damp, i.e. contain water. Therefore, air entering a sealed air boiler from outdoors may contain a significant fraction of water. It may be advantageous for the air entering the furnace of a boiler to be relatively dry.
  • JP2003287287 describes a boiler having an outer case part that prevents rainwater and dust from entering an air supply port. This document discloses a sealed air boiler air inlet chamber according to the preamble of claim 1.
  • an inlet chamber for a sealed air boiler which may reduce the amount of water within the air which is fed to the furnace of the boiler.
  • a sealed air boiler air inlet chamber comprising a casing, defining a volume, an air and water inlet aperture, a first outlet for water, and a second outlet for air, a spacer configured to inhibit an object within the chamber from contacting a surface of the chamber, and a barrier, spaced from the second outlet, demarking a first region of the casing including the first outlet and a second region of the casing including the second outlet, wherein the barrier is configured to inhibit the flow of water from the first region to the second region and to permit the flow of air from the first region to the second region.
  • the barrier may extend a height from a plane of the casing including the second outlet.
  • the barrier may extend between a first surface and a second surface of the casing.
  • a surface of the casing may be inclined towards the first outlet in use.
  • the sealed air boiler air inlet chamber may further comprise a connector for connecting the first outlet to a drain.
  • the sealed air boiler air inlet chamber may further comprise a connector for connecting the second outlet to a furnace.
  • the first outlet and the second outlet may be of different sizes.
  • the first outlet may be smaller than the second outlet.
  • the spacer may be for inhibiting an open end of the pipe from contacting a surface of the chamber, such that the pipe remains open.
  • the sealed air boiler air inlet chamber may further comprise a fixing for fitting the air inlet chamber to a sealed-air boiler.
  • the chamber may have an outer rim and the fixing may be located on the outer rim of the chamber.
  • the boiler may be a sealed air boiler.
  • thermoelectric heating system comprising a boiler as described above.
  • the heating system may be a central heating system and/or a water heating system.
  • a sealed air boiler (sometimes referred to as a room sealed boiler) draws in air for combustion from outside the space in which the boiler is located. Accordingly, the air drawn into the boiler may have different characteristics from the air in the space in which the boiler is located (for example, the air drawn into a sealed air boiler may be wetter than air in the immediate surrounds of the boiler).
  • boilers can function more effectively when the air used for combustion is drier, that is, not wet. It is therefore a first non-exclusive aim to provide a sealed air boiler air inlet chamber, which can separate water from combustion air.
  • a sealed air boiler air inlet chamber indicated generally at 1 comprises a casing, defining a volume, an air and water inlet aperture 101, a first outlet 3 for water, and a second outlet 4 for air.
  • the barrier 2 demarks a first region 30 of the casing which includes the first outlet 3 and a second region 40 of the casing which includes the second outlet 4.
  • the barrier 2 is configured to inhibit the flow of water from the first region 30 to the second region 40 and to permit the flow of air from the first region 30 to the second region 40.
  • Such a sealed air boiler air inlet chamber 1 may provide an advantageous high separation of water from feed air (e.g. outside air).
  • feed air e.g. outside air
  • water which may be present as a contaminate in the feed air will predominantly exit through the first outlet 3 in the first region 30 and air will predominantly exit through the second outlet 4 in the second region 40.
  • drier air may be provided to the furnace of a sealed air boiler.
  • the sealed air boiler air inlet chamber 1 may be used with a sealed air boiler which can still operate as a sealed air boiler even when the housing of the boiler is open, as will be described in more detail below.
  • the casing may include side surfaces and/or a base.
  • the side surfaces may be substantially vertical walls 10.
  • Surfaces 100 of the casing may be inclined with respect to the walls 10.
  • the walls 10 may include inclined portions 100.
  • the barrier 2 may extend a height from a plane of the casing including the second outlet 4. Such a construction may be particularly simple, and therefore economic.
  • the barrier 3 may extend between a first surface and a second surface of the casing.
  • the barrier 2 may contact a first surface and a second surface of the chamber 1.
  • the first surface may be a wall 10 or an inclined surface 100.
  • the second surface may be a wall 10 or an inclined surface 100.
  • the barrier may contact multiple walls 10.
  • the barrier may extend between opposite walls 10.
  • the barrier may contact multiple points on the same wall 10.
  • the barrier 2 may be a substantially straight barrier 2, as shown in Figs 1 to 4 .
  • the barrier 2 may define an angle.
  • the barrier 2 may extend between a first wall 10 and a second wall 10 that are substantially perpendicular to one another, such that the barrier 2 defines a right angle.
  • the barrier 2 may extend between a first wall 10 and a second wall 10 at any angle, e.g. any other angle.
  • the barrier 2 may extend between a first wall 10 and a second wall 10 where both walls 10 are on the same side of the casing.
  • the barrier 2 may extend a height that is generally level with the top of an inclined surface 100.
  • the barrier 2 may extend a height based on the expected volume of water that may enter the first region 30 of the casing in use. Additionally or alternatively, the barrier 2 may extend a height based on the efficiency with which water leaves the chamber 1 via the first outlet 3.
  • the barrier 2 may contact a base of the casing of the chamber 1 such that the contact is air-and-water-tight. Such contact may be achieved by any means apparent to the skilled person, for example, by welding the barrier 2 to the chamber 1. Alternatively, such contact may be achieved by forming the barrier 2 integrally with the chamber 1. Air-and-water-tight contacts between the barrier 2 and a wall 10 and/or a base of the casing of the chamber 1 may be achieved using any means apparent to the skilled person.
  • the barrier 2 may also be spaced from the first outlet 3.
  • the barrier as described above can provide a particularly distinct second region 40 for the second outlet 4, which in turn can be used to provide good separation of water from the air to be fed to the furnace of the boiler.
  • a surface of the casing may be inclined towards the first outlet 3 in use. Such inclined surfaces may contribute to the flow of water towards the first outlet 3 within the first region 30, thereby providing good or increased separation efficiency.
  • the first outlet 3 may be in a base of the chamber 1. However, the first outlet 3 may be defined in a wall 10 or inclined surface 100 of the chamber 1, within the first region 30 of the casing. For example, the first outlet 3 may be defined in a corner of the chamber 1.
  • the sealed air boiler air inlet chamber 1 may further comprise a connector 301 for connecting the first outlet 3 to a drain.
  • the first outlet 3 may be connected to a first connector 301 for connecting the chamber 1 to a pipe.
  • the first connector 301 may extend a length away from the surface defining the first outlet 3.
  • the first connector 301 may form part of the inner surface of the first outlet 3.
  • the first connector 301 may be integrally formed as part of the chamber 1, or may be otherwise attached to the chamber 1.
  • the first connector 301 may be continuous around the circumference of the first outlet 3.
  • the first connector 301 may be another type of connector, designed so as to mesh with the desired exhaust means, such as a pipe.
  • the first connector 301 may provide a water-tight connection between the chamber 1 and an exhaust means. As shown in Fig. 1 , the first connector 301 can be seen extending a vertical length from the casing 1.
  • the sealed air boiler air inlet chamber 1 may further comprise a second connector 401 for connecting the second outlet 4 to a furnace.
  • the second connector 401 may extend a length away from the surface defining the second outlet 4.
  • the second connector 401 may form part of the inner surface of the second outlet 4.
  • the second connector 401 may be integrally formed as part of the chamber 1, or may be otherwise attached to the chamber 1.
  • the second connector 401 may be continuous around the circumference of the second outlet 4, as shown in figure 1 .
  • the second connector 401 may be another type of connector, designed so as to mesh with the desired exhaust means, such as a pipe.
  • the second connector 401 can be seen extending a vertical length from the circumference of the second outlet 4.
  • the second connector 401 may extend a horizontal length away from the second outlet 4, and may extend along the outer surface of the chamber 1, in order to connect the chamber 1 to an exhaust means.
  • the second connector 401 may otherwise mate with the chamber 1.
  • the sealed air boiler air inlet chamber 1 may have a first outlet 3 and the second outlet 4 of different sizes.
  • the first outlet 3 may be smaller than the second outlet 4. This may be advantageous, as the volume of air passing through the inlet chamber 1 and out of the second outlet 4 will usually be much larger than the volume of water passing through the inlet chamber 1 and out of the first outlet 3.
  • the sealed air boiler air inlet chamber 1 may further comprise a spacer 5.
  • the function of the spacer 5 can be for inhibiting (e.g. for stopping or substantially preventing) an object within the chamber 1 from contacting the base of the casing.
  • the spacer 5 may be located within the first region 30 of the casing.
  • the spacer 5 can space an open end of an air (and water) inlet pipe, from the casing of the chamber 1, to inhibit (e.g. substantially prevent) the open end of such a pipe from contacting and therefore being closed off by contacting a surface of the chamber 1. Accordingly, the pipe may remain open.
  • multiple spacers 5 may be provided.
  • the spacer 5 may extend across a width of the chamber 1.
  • the chamber 1 may comprise a fixing 12 for fitting the air inlet chamber 1 to a sealed-air boiler. As shown in Figs 1 to 4 , the fixing 12 may be located on an outer rim 11 of the chamber.
  • the outer rim 11 may be continuous around the perimeter of the casing of the chamber 1, as shown in figures 1 to 4 . Additionally or alternatively, the outer rim 11 may be a continuation of the walls 10, e.g. the top of the walls 10 may be shaped to form the outer rim 11.
  • the outer rim 11 may define a plane which may be substantially perpendicular to that of the walls 10 of the chamber 1.
  • the fixing 12 may be a cut-out, for use with a further means of fixing the chamber 1 in place.
  • the cut-out may be of dimensions to fit a screw or another fixing.
  • the outer rim 11 may not define cut-outs 12 and may instead be designed to fit in any other way, as will be apparent to the skilled person.
  • the outer rim 11 may further include hooks or another type of fixing means.
  • rails or another receiving means for the chamber 1 may be positioned in a boiler to allow the chamber 1 to be fixed in place.
  • the chamber 1 may be fixed in place within a boiler using an adhesive, e.g. a sealing adhesive or a sealant.
  • an adhesive may be applied to the outer rim 11.
  • the chamber 1 may be removably fixable to a boiler, for example to facilitate servicing of the boiler including removal of the chamber 1.
  • a boiler 6 including an air-inlet chamber 1 as described above.
  • the boiler 6 may be a sealed air boiler 6.
  • Inclusion of the air inlet chamber 1 in a sealed air boiler 6, may be particularly advantageous as it can help to provide a sealed air boiler which is sealed both when the housing of the boiler is open (e.g. during adjustment) and whilst the housing of the boiler is closed (e.g. during normal use). Accordingly, a sealed air boiler 6 which is more easily correctly commissioned can be provided.
  • the chamber 1 may be positioned at the top of the boiler 6, as shown.
  • a surface of the boiler 6 may close-off a top of the chamber 1 that is open when not installed within the boiler 6.
  • the chamber 1 may be closed-off or contained in some other way, as would be apparent to the skilled person.
  • the chamber 1 is for use between the air and water inlet (for example the air and water inlet aperture 101) of a boiler 6 and the rest of the boiler system.
  • the boiler 6 may include an air and water inlet pipe.
  • the air and water inlet aperture 101 of the chamber 1 may receive an air and water inlet pipe in use. Accordingly, water may drip from the air and water inlet pipe. Any water admitted to the inlet chamber 1, is admitted in the first region 30 of the casing, accordingly, the water can exit the first outlet 3.
  • the air and water inlet aperture 101 should not open directly into the second region 40 of the casing, as the barrier 2 would not then be able to fulfil its function of substantially preventing or inhibiting water from entering the second region 40 of the casing and exiting the second outlet 4.
  • Air from the air and water inlet aperture 101 is passable over the barrier 2 into the second region 40 of the casing, such that air may exit the chamber 1 via the second outlet 4 and may be drawn beyond the chamber 1 further into the boiler 6 for combustion.
  • air is the useful part of the intake into the chamber 1 and may be drawn into the boiler 6 from the second outlet 4 in any suitable way.
  • the sealed air boiler air inlet chamber 1 can be suitable for use with any suitable suction means known in the art of boilers.
  • the term 'drawn' does not exclude the free flow of air into the boiler 6 without the use of any particular suction means or other means of inciting air flow.
  • a first pipe 302 is shown, which can connect the first outlet 3 of the chamber 1, for example using a first connector 301, to part of the boiler 6.
  • the first outlet 3 may be connected to a drain 303.
  • the drain 303 may be external to the boiler 6 such that the first pipe 302 traverses the boiler 6.
  • the drain 303 may be external to the boiler 6 such that water from the first outlet 3 does not interact with any other part of the interior of the boiler 6 except for the first pipe 302.
  • the drain 303 may otherwise be a drainage component inside the boiler 6 that includes a reservoir or a similar water collecting receptacle.
  • the drain 303 may be the same drain as is used for condensate from the boiler.
  • a second pipe 402 which connects the chamber 1 at the second outlet 4, by the second connector 401, to a further part of the boiler 6.
  • the second outlet 4 may be connected directly or indirectly to a furnace.
  • the second pipe 402 may have a diameter corresponding to that of the second outlet 4.
  • the second pipe 402 may be connected in an air-tight manner to the second outlet 4.
  • An air tight connection may be advantageous as it can allow the boiler to be air sealed even when a cover of the boiler is not in place.
  • the chamber 1 may be shaped to fit to the shape of part of the boiler 6.
  • a heating system 8 comprising a boiler 6 as described above, including the inlet 1 described above.
  • the heating system 8 may be a central heating system. Additionally or alternatively, the heating system 8 may be a water heating system.
  • the heating system 8 may comprise a heating element 7, which is in communication with the boiler 6.
  • the heating element 7 may be a wall-mounted radiator.
  • the heating element 7 may be a water heater.
  • a single heating system 8 may comprise multiple heating elements 7 and may comprise different types of heating elements 7.
  • the heating system 8 may include a single boiler 6.
  • the heating system 8 may include multiple boilers 6 if the heating system 8 is large-scale.
  • the heating system 8 may include one or more boilers 6 that include a sealed air boiler air inlet chamber 1 and one or more boilers 6 without a chamber 1, i.e. the heating system 8 may comprise a combination of sealed air boilers and open boilers.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Air Supply (AREA)

Description

    Field of the Invention
  • Embodiments of the present invention relate to a sealed air boiler air inlet chamber, a sealed air boiler including the air inlet chamber and a heating system including the sealed air boiler.
  • Background of the Invention
  • Commercial boilers may be used for large scale heating, and may be located in a specifically designated room, e.g. a plant room.
  • Air is required for the combustion of fuel (e.g. gas or oil) to produce heat energy.
  • In some arrangements, air may be admitted to a boiler from the surrounding environment (e.g. a plant room), for example, through an opening in the housing of the boiler.
  • Alternatively, boiler housings may be sealed to the surrounding environment (e.g. a plant room), and instead receive air through an inlet such as a ventilation shaft or other pipe. Such a pipe may be open to outdoor air. Government regulations or other factors may favour boilers that are sealed to the surrounding environment. Such boilers may be known by various names, such as "sealed air boilers" or "room-sealed boilers".
  • Outdoor air may be damp, i.e. contain water. Therefore, air entering a sealed air boiler from outdoors may contain a significant fraction of water. It may be advantageous for the air entering the furnace of a boiler to be relatively dry.
  • JP2003287287 describes a boiler having an outer case part that prevents rainwater and dust from entering an air supply port. This document discloses a sealed air boiler air inlet chamber according to the preamble of claim 1.
  • Accordingly, it is a non-exclusive object of the invention to provide an inlet chamber for a sealed air boiler, which may reduce the amount of water within the air which is fed to the furnace of the boiler.
  • Summary of the Invention
  • There is provided a sealed air boiler air inlet chamber, comprising a casing, defining a volume, an air and water inlet aperture, a first outlet for water, and a second outlet for air, a spacer configured to inhibit an object within the chamber from contacting a surface of the chamber, and a barrier, spaced from the second outlet, demarking a first region of the casing including the first outlet and a second region of the casing including the second outlet, wherein the barrier is configured to inhibit the flow of water from the first region to the second region and to permit the flow of air from the first region to the second region.
  • The barrier may extend a height from a plane of the casing including the second outlet.
  • The barrier may extend between a first surface and a second surface of the casing.
  • A surface of the casing may be inclined towards the first outlet in use.
  • The sealed air boiler air inlet chamber may further comprise a connector for connecting the first outlet to a drain.
  • The sealed air boiler air inlet chamber may further comprise a connector for connecting the second outlet to a furnace.
  • The first outlet and the second outlet may be of different sizes. In particular, the first outlet may be smaller than the second outlet.
  • The spacer may be for inhibiting an open end of the pipe from contacting a surface of the chamber, such that the pipe remains open.
  • The sealed air boiler air inlet chamber may further comprise a fixing for fitting the air inlet chamber to a sealed-air boiler.
  • The chamber may have an outer rim and the fixing may be located on the outer rim of the chamber.
  • There is also provided a boiler comprising an air-inlet chamber as described above.
  • The boiler may be a sealed air boiler.
  • There is also provided a heating system comprising a boiler as described above.
  • The heating system may be a central heating system and/or a water heating system.
  • Brief Description of the Figures
  • Embodiments of the present invention are described herein, by way of example only, with reference to the accompanying drawings, in which:
    • Fig. 1 shows a perspective view of a sealed air boiler air inlet chamber in accordance with embodiments of the invention;
    • Fig. 2 shows a plan view of the sealed air boiler air inlet chamber of Fig. 1;
    • Fig. 3 shows a part-sectional side view of the sealed air boiler air inlet chamber of Fig. 1;
    • Fig. 4 shows a part-sectional front view of the air inlet chamber of Fig. 1;
    • Fig. 5 shows a part-sectional front view of a boiler including the sealed air boiler air inlet chamber of Fig. 1;
    • Fig. 6 shows a part-sectional side view of the boiler of Fig. 5; and
    • Fig. 7 shows a heating system including the boiler of Fig. 5.
    Detailed Description
  • A sealed air boiler (sometimes referred to as a room sealed boiler) draws in air for combustion from outside the space in which the boiler is located. Accordingly, the air drawn into the boiler may have different characteristics from the air in the space in which the boiler is located (for example, the air drawn into a sealed air boiler may be wetter than air in the immediate surrounds of the boiler).
  • In general, boilers can function more effectively when the air used for combustion is drier, that is, not wet. It is therefore a first non-exclusive aim to provide a sealed air boiler air inlet chamber, which can separate water from combustion air.
  • Most boilers (including sealed air boilers) require adjustment during commissioning, for example, it may be necessary to adjust a gas valve when commissioning a boiler. For example, during commissioning it may be necessary to adjust maximum load and minimum load adjusters on a gas valve of a boiler when the boiler is in place. Normally, such gas valve adjusters are within the housing of the boiler to hinder unauthorised or inappropriate access. If the adjusters are located inside the housing of the boiler, the housing must be opened to allow access to the adjusters. It is a common feature of prior art sealed air boilers that the housing is used to isolate the combustion air from the surroundings of the boiler. As will be apparent, in such an arrangement the sealed air boiler is not isolated from its surroundings whilst the boiler housing is open. Accordingly, adjustments made whilst the housing is open may not result in the optimum parameters being set for operation whilst the housing is closed.
  • It is therefore a second non-exclusive aim to provide a sealed air boiler inlet chamber, which can be used in the provision of a sealed air boiler, which is sealed both when the housing is open (e.g. during adjustment) and whilst the housing is closed (e.g. during normal use).
  • Referring firstly to Figs 1 to 4 of the accompanying drawings, a sealed air boiler air inlet chamber indicated generally at 1, comprises a casing, defining a volume, an air and water inlet aperture 101, a first outlet 3 for water, and a second outlet 4 for air.
  • There is also a barrier 2, spaced from the second outlet 4. The barrier 2 demarks a first region 30 of the casing which includes the first outlet 3 and a second region 40 of the casing which includes the second outlet 4. The barrier 2 is configured to inhibit the flow of water from the first region 30 to the second region 40 and to permit the flow of air from the first region 30 to the second region 40.
  • Such a sealed air boiler air inlet chamber 1 may provide an advantageous high separation of water from feed air (e.g. outside air). In particular, water which may be present as a contaminate in the feed air will predominantly exit through the first outlet 3 in the first region 30 and air will predominantly exit through the second outlet 4 in the second region 40. In this way drier air may be provided to the furnace of a sealed air boiler.
  • Additionally, the sealed air boiler air inlet chamber 1 may be used with a sealed air boiler which can still operate as a sealed air boiler even when the housing of the boiler is open, as will be described in more detail below.
  • As shown, the casing may include side surfaces and/or a base. The side surfaces may be substantially vertical walls 10. Surfaces 100 of the casing may be inclined with respect to the walls 10. In some example embodiments, the walls 10 may include inclined portions 100.
  • As shown in Fig. 1, the barrier 2 may extend a height from a plane of the casing including the second outlet 4. Such a construction may be particularly simple, and therefore economic.
  • The barrier 3 may extend between a first surface and a second surface of the casing. In particular, the barrier 2 may contact a first surface and a second surface of the chamber 1. The first surface may be a wall 10 or an inclined surface 100. The second surface may be a wall 10 or an inclined surface 100.
  • The barrier may contact multiple walls 10. For example, the barrier may extend between opposite walls 10. The barrier may contact multiple points on the same wall 10.
  • The barrier 2 may be a substantially straight barrier 2, as shown in Figs 1 to 4. Alternatively, the barrier 2 may define an angle. For example, the barrier 2 may extend between a first wall 10 and a second wall 10 that are substantially perpendicular to one another, such that the barrier 2 defines a right angle. The barrier 2 may extend between a first wall 10 and a second wall 10 at any angle, e.g. any other angle. The barrier 2 may extend between a first wall 10 and a second wall 10 where both walls 10 are on the same side of the casing.
  • The barrier 2 may extend a height that is generally level with the top of an inclined surface 100. The barrier 2 may extend a height based on the expected volume of water that may enter the first region 30 of the casing in use. Additionally or alternatively, the barrier 2 may extend a height based on the efficiency with which water leaves the chamber 1 via the first outlet 3.
  • The barrier 2 may contact a base of the casing of the chamber 1 such that the contact is air-and-water-tight. Such contact may be achieved by any means apparent to the skilled person, for example, by welding the barrier 2 to the chamber 1. Alternatively, such contact may be achieved by forming the barrier 2 integrally with the chamber 1. Air-and-water-tight contacts between the barrier 2 and a wall 10 and/or a base of the casing of the chamber 1 may be achieved using any means apparent to the skilled person.
  • The barrier 2 may also be spaced from the first outlet 3.
  • The barrier as described above can provide a particularly distinct second region 40 for the second outlet 4, which in turn can be used to provide good separation of water from the air to be fed to the furnace of the boiler.
  • A surface of the casing may be inclined towards the first outlet 3 in use. Such inclined surfaces may contribute to the flow of water towards the first outlet 3 within the first region 30, thereby providing good or increased separation efficiency.
  • As shown in Fig. 2, the first outlet 3 may be in a base of the chamber 1. However, the first outlet 3 may be defined in a wall 10 or inclined surface 100 of the chamber 1, within the first region 30 of the casing. For example, the first outlet 3 may be defined in a corner of the chamber 1.
  • The sealed air boiler air inlet chamber 1 may further comprise a connector 301 for connecting the first outlet 3 to a drain. The first outlet 3 may be connected to a first connector 301 for connecting the chamber 1 to a pipe. The first connector 301 may extend a length away from the surface defining the first outlet 3. The first connector 301 may form part of the inner surface of the first outlet 3. The first connector 301 may be integrally formed as part of the chamber 1, or may be otherwise attached to the chamber 1. The first connector 301 may be continuous around the circumference of the first outlet 3. The first connector 301 may be another type of connector, designed so as to mesh with the desired exhaust means, such as a pipe. The first connector 301 may provide a water-tight connection between the chamber 1 and an exhaust means. As shown in Fig. 1, the first connector 301 can be seen extending a vertical length from the casing 1.
  • The sealed air boiler air inlet chamber 1 may further comprise a second connector 401 for connecting the second outlet 4 to a furnace. The second connector 401 may extend a length away from the surface defining the second outlet 4. The second connector 401 may form part of the inner surface of the second outlet 4. The second connector 401 may be integrally formed as part of the chamber 1, or may be otherwise attached to the chamber 1. The second connector 401 may be continuous around the circumference of the second outlet 4, as shown in figure 1. The second connector 401 may be another type of connector, designed so as to mesh with the desired exhaust means, such as a pipe.
  • In Fig. 1 the second connector 401 can be seen extending a vertical length from the circumference of the second outlet 4. In some examples the second connector 401 may extend a horizontal length away from the second outlet 4, and may extend along the outer surface of the chamber 1, in order to connect the chamber 1 to an exhaust means. The second connector 401 may otherwise mate with the chamber 1.
  • The sealed air boiler air inlet chamber 1 may have a first outlet 3 and the second outlet 4 of different sizes. In particular, the first outlet 3 may be smaller than the second outlet 4. This may be advantageous, as the volume of air passing through the inlet chamber 1 and out of the second outlet 4 will usually be much larger than the volume of water passing through the inlet chamber 1 and out of the first outlet 3.
  • The sealed air boiler air inlet chamber 1 may further comprise a spacer 5. The function of the spacer 5 can be for inhibiting (e.g. for stopping or substantially preventing) an object within the chamber 1 from contacting the base of the casing.
  • As shown in the Figs, the spacer 5 may be located within the first region 30 of the casing. The spacer 5 can space an open end of an air (and water) inlet pipe, from the casing of the chamber 1, to inhibit (e.g. substantially prevent) the open end of such a pipe from contacting and therefore being closed off by contacting a surface of the chamber 1. Accordingly, the pipe may remain open.
  • Optionally, multiple spacers 5 may be provided. The spacer 5 may extend across a width of the chamber 1.
  • The chamber 1 may comprise a fixing 12 for fitting the air inlet chamber 1 to a sealed-air boiler. As shown in Figs 1 to 4, the fixing 12 may be located on an outer rim 11 of the chamber.
  • The outer rim 11 may be continuous around the perimeter of the casing of the chamber 1, as shown in figures 1 to 4. Additionally or alternatively, the outer rim 11 may be a continuation of the walls 10, e.g. the top of the walls 10 may be shaped to form the outer rim 11.
  • The outer rim 11 may define a plane which may be substantially perpendicular to that of the walls 10 of the chamber 1. The fixing 12 may be a cut-out, for use with a further means of fixing the chamber 1 in place. The cut-out may be of dimensions to fit a screw or another fixing. The outer rim 11 may not define cut-outs 12 and may instead be designed to fit in any other way, as will be apparent to the skilled person. For example, the outer rim 11 may further include hooks or another type of fixing means. For example, rails or another receiving means for the chamber 1 may be positioned in a boiler to allow the chamber 1 to be fixed in place.
  • The chamber 1 may be fixed in place within a boiler using an adhesive, e.g. a sealing adhesive or a sealant. For example, an adhesive may be applied to the outer rim 11. The chamber 1 may be removably fixable to a boiler, for example to facilitate servicing of the boiler including removal of the chamber 1.
  • As shown in Figs 5 and 6, there is also provided a boiler 6 including an air-inlet chamber 1 as described above.
  • The boiler 6 may be a sealed air boiler 6. Inclusion of the air inlet chamber 1 in a sealed air boiler 6, may be particularly advantageous as it can help to provide a sealed air boiler which is sealed both when the housing of the boiler is open (e.g. during adjustment) and whilst the housing of the boiler is closed (e.g. during normal use). Accordingly, a sealed air boiler 6 which is more easily correctly commissioned can be provided.
  • The chamber 1 may be positioned at the top of the boiler 6, as shown.
  • A surface of the boiler 6 may close-off a top of the chamber 1 that is open when not installed within the boiler 6. Alternatively, the chamber 1 may be closed-off or contained in some other way, as would be apparent to the skilled person.
  • The chamber 1 is for use between the air and water inlet (for example the air and water inlet aperture 101) of a boiler 6 and the rest of the boiler system.
  • The boiler 6 may include an air and water inlet pipe. The air and water inlet aperture 101 of the chamber 1 may receive an air and water inlet pipe in use. Accordingly, water may drip from the air and water inlet pipe. Any water admitted to the inlet chamber 1, is admitted in the first region 30 of the casing, accordingly, the water can exit the first outlet 3. The air and water inlet aperture 101 should not open directly into the second region 40 of the casing, as the barrier 2 would not then be able to fulfil its function of substantially preventing or inhibiting water from entering the second region 40 of the casing and exiting the second outlet 4.
  • Air from the air and water inlet aperture 101 is passable over the barrier 2 into the second region 40 of the casing, such that air may exit the chamber 1 via the second outlet 4 and may be drawn beyond the chamber 1 further into the boiler 6 for combustion.
  • As will be appreciated, air is the useful part of the intake into the chamber 1 and may be drawn into the boiler 6 from the second outlet 4 in any suitable way. The sealed air boiler air inlet chamber 1 can be suitable for use with any suitable suction means known in the art of boilers. The term 'drawn' does not exclude the free flow of air into the boiler 6 without the use of any particular suction means or other means of inciting air flow.
  • With reference to Figs 5 and 6 in particular, a first pipe 302 is shown, which can connect the first outlet 3 of the chamber 1, for example using a first connector 301, to part of the boiler 6. For example the first outlet 3 may be connected to a drain 303.
  • The drain 303 may be external to the boiler 6 such that the first pipe 302 traverses the boiler 6. The drain 303 may be external to the boiler 6 such that water from the first outlet 3 does not interact with any other part of the interior of the boiler 6 except for the first pipe 302. The drain 303 may otherwise be a drainage component inside the boiler 6 that includes a reservoir or a similar water collecting receptacle. In some embodiments, where the boiler 6 is a condensing boiler, the drain 303 may be the same drain as is used for condensate from the boiler.
  • With reference to Figs 5 and 6 in particular, a second pipe 402 is shown, which connects the chamber 1 at the second outlet 4, by the second connector 401, to a further part of the boiler 6. In particular, the second outlet 4 may be connected directly or indirectly to a furnace. The second pipe 402 may have a diameter corresponding to that of the second outlet 4.
  • The second pipe 402 may be connected in an air-tight manner to the second outlet 4. An air tight connection may be advantageous as it can allow the boiler to be air sealed even when a cover of the boiler is not in place.
  • The chamber 1 may be shaped to fit to the shape of part of the boiler 6.
  • As shown in Fig. 7, there is also provided a heating system 8, comprising a boiler 6 as described above, including the inlet 1 described above.
  • The heating system 8 may be a central heating system. Additionally or alternatively, the heating system 8 may be a water heating system.
  • The heating system 8 may comprise a heating element 7, which is in communication with the boiler 6. The heating element 7 may be a wall-mounted radiator. The heating element 7 may be a water heater.
  • A single heating system 8 may comprise multiple heating elements 7 and may comprise different types of heating elements 7.
  • The heating system 8 may include a single boiler 6. The heating system 8 may include multiple boilers 6 if the heating system 8 is large-scale. The heating system 8 may include one or more boilers 6 that include a sealed air boiler air inlet chamber 1 and one or more boilers 6 without a chamber 1, i.e. the heating system 8 may comprise a combination of sealed air boilers and open boilers.
  • Accordingly, the passage of water, which is a waste product in an air and water intake, into the parts of a boiler 6 that use air and that work more efficiently with drier air, is satisfactorily prevented by the sealed air boiler air inlet chamber 1 provided.
  • When used in this specification and claims, the terms "comprises" and "comprising" and variations thereof mean that the specified features, steps or integers are included. The terms are not to be interpreted to exclude the presence of other features, steps or components.

Claims (13)

  1. A sealed air boiler air inlet chamber (1), comprising:
    a casing, defining a volume, an air and water inlet aperture (101), a first outlet (3) for water, and a second outlet (4) for air;
    a barrier (2), spaced from the second outlet (4), demarking a first region (30) of the casing including the first outlet (3) and a second region (40) of the casing including the second outlet (4),
    wherein the barrier (2) is configured to inhibit the flow of water from the first region (30) to the second region (40) and to permit the flow of air from the first region (30) to the second region (40).
    characterized in that the sealed air boiler air inlet chamber further comprises a spacer (5) configured to inhibit an object within the chamber (1) from contacting the surface of the chamber.
  2. A sealed air boiler air inlet chamber (1) according to claim 1, wherein the barrier (2) extends a height from a plane of the casing including the second outlet (4).
  3. A sealed air boiler air inlet chamber (1) according to claim 1 or claim 2, wherein the barrier (2) extends between a first surface and a second surface of the casing.
  4. A sealed air boiler air inlet chamber (1) according to claim 1, claim 2 or claim 3, wherein a surface (100) of the casing is inclined towards the first outlet (3) in use.
  5. A sealed air boiler air inlet chamber (1) according to any preceding claim, further comprising a connector (301) for connecting the first outlet (3) to a drain.
  6. A sealed air boiler air inlet chamber (1) according to any preceding claim, further comprising a connector (401) for connecting the second outlet (4) to a furnace.
  7. A sealed air boiler air inlet chamber (1) according to any preceding claim, wherein the first outlet (3) and the second outlet (4) are of different sizes.
  8. A sealed air boiler air inlet chamber (1) according to claim 7, wherein the first outlet (3) is smaller than the second outlet (4).
  9. A sealed air boiler air inlet chamber (1) according to claim 1, wherein the object is an air inlet pipe, and wherein the spacer (5) is for inhibiting an open end of the pipe from contacting a surface of the chamber, such that the pipe remains open.
  10. A sealed air boiler air inlet chamber (1) according to any preceding claim, wherein the chamber (1) comprises a fixing (12) for fitting the air inlet chamber (1) to a sealed-air boiler (6).
  11. A sealed air boiler air inlet chamber (1) according to claim 10, comprising an outer rim (11) such that the fixing (12) is located on the outer rim (11) of the chamber (1).
  12. A boiler (6), comprising an air-inlet chamber (1) according to any preceding claim.
  13. A heating system (8), comprising a boiler (6) according to claim 12.
EP17178153.7A 2016-06-29 2017-06-27 Sealed air boiler air inlet chamber Active EP3264005B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB1611266.6A GB2551749B (en) 2016-06-29 2016-06-29 Sealed air boiler air inlet chamber

Publications (2)

Publication Number Publication Date
EP3264005A1 EP3264005A1 (en) 2018-01-03
EP3264005B1 true EP3264005B1 (en) 2019-11-06

Family

ID=56891634

Family Applications (1)

Application Number Title Priority Date Filing Date
EP17178153.7A Active EP3264005B1 (en) 2016-06-29 2017-06-27 Sealed air boiler air inlet chamber

Country Status (2)

Country Link
EP (1) EP3264005B1 (en)
GB (1) GB2551749B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110345641A (en) * 2018-04-03 2019-10-18 青岛经济技术开发区海尔热水器有限公司 Give exhaust box, exhaust system and gas heating stove
CN108444107A (en) * 2018-04-03 2018-08-24 青岛经济技术开发区海尔热水器有限公司 Exhaust system and gas heating stove
US11512872B2 (en) * 2020-10-20 2022-11-29 Rheem Manufacturing Company Tankless water heater connector

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2478269A1 (en) * 1980-03-13 1981-09-18 Sdecc METHOD FOR CONNECTING A FORCE-DRIVEN SEAL-TYPE GAS BOILER TO A CONVENTIONAL SMOKE DUCT
JPH10205746A (en) * 1997-01-20 1998-08-04 Fujitsu General Ltd Air supply and exhaust system
JP3965561B2 (en) * 2002-03-27 2007-08-29 株式会社ノーリツ Combustion device
JP4176588B2 (en) * 2003-08-20 2008-11-05 パロマ工業株式会社 Water heater
KR101020858B1 (en) * 2010-02-17 2011-03-09 주식회사종합건축사사무소가람건축 Outer cap for natural ventilation
JP5846254B2 (en) * 2013-12-25 2016-01-20 株式会社ノーリツ Water heater

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
GB2551749B (en) 2020-06-17
GB201611266D0 (en) 2016-08-10
EP3264005A1 (en) 2018-01-03
GB2551749A (en) 2018-01-03

Similar Documents

Publication Publication Date Title
US10145581B2 (en) Condensate pan with condensate trap
EP3264005B1 (en) Sealed air boiler air inlet chamber
AU739485B2 (en) A switchgear cabinet and associated ventilator assembly
KR102432375B1 (en) Cap and water heating device having the same
JPH10253099A (en) Outdoor unit for separation type air conditioner
CN106288038B (en) Shell assembly of air conditioner outdoor unit and air conditioner outdoor unit
US20050155535A1 (en) Method and components for draining and trapping
US4564142A (en) Hydronic system with circulators connected to a header
US9464816B1 (en) Attic ventilation system
CN101418965B (en) Indoor unit of cir conditioner
CN203349381U (en) Built-in air conditioner
EP3071898B1 (en) Cover for condensing boilers
JP6489312B2 (en) Air conditioner
CN111480037A (en) Ventilation device for buildings
EP0979973B1 (en) Wall duct with a collar counteracting recirculation
JP7138371B2 (en) Filter equipment and water heater
US7097210B2 (en) Method and apparatus for providing a transition connector to introduce outside air and vent flue for boiler combustion
US11725888B2 (en) Multi-position condensation kit and bracket
KR20200032037A (en) Outdoor unit of air conditioner and air conditioner equipped with the same
JP2016223666A (en) Air conditioner
KR101602230B1 (en) A heating dispenser
CN207936508U (en) a condensate drain
JP2016223667A (en) Air conditioner
JP5232667B2 (en) Embedded ceiling air conditioner
CN204923378U (en) Condensed water self -evaporating unit

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180703

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

RIC1 Information provided on ipc code assigned before grant

Ipc: F24H 9/00 20060101AFI20190329BHEP

Ipc: F23L 17/14 20060101ALI20190329BHEP

Ipc: F24D 19/08 20060101ALI20190329BHEP

Ipc: F23L 1/00 20060101ALI20190329BHEP

Ipc: F24H 9/12 20060101ALI20190329BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20190529

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1199272

Country of ref document: AT

Kind code of ref document: T

Effective date: 20191115

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602017008360

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20191106

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200306

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200206

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200207

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200206

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200306

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602017008360

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1199272

Country of ref document: AT

Kind code of ref document: T

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20200807

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200627

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20200630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200627

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200630

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200630

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200630

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 602017008360

Country of ref document: DE

Representative=s name: DEHNS, DE

Ref country code: DE

Ref legal event code: R082

Ref document number: 602017008360

Country of ref document: DE

Representative=s name: DEHNS PATENT AND TRADEMARK ATTORNEYS, DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230829

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20230821

Year of fee payment: 7

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602017008360

Country of ref document: DE

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20240627

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20250101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240627