EP3030719B1 - Scaffold - Google Patents
Scaffold Download PDFInfo
- Publication number
- EP3030719B1 EP3030719B1 EP14835241.2A EP14835241A EP3030719B1 EP 3030719 B1 EP3030719 B1 EP 3030719B1 EP 14835241 A EP14835241 A EP 14835241A EP 3030719 B1 EP3030719 B1 EP 3030719B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- holes
- scaffolding
- arms
- scaffolding unit
- vertical arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/24—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/10—Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
- E01D19/106—Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/34—Mobile scaffolds; Scaffolds with mobile platforms characterised by supporting structures provided on the roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/001—Safety or protective measures against falling down relating to scaffoldings
- E04G5/002—Protections or covers for scaffolding connections
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/007—Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/30—Scaffolding bars or members with non-detachably fixed coupling elements
- E04G7/302—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members
- E04G7/303—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are only fixed at one of the bars or members to connect
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/30—Scaffolding bars or members with non-detachably fixed coupling elements
- E04G7/34—Scaffolding bars or members with non-detachably fixed coupling elements with coupling elements using positive engagement, e.g. hooks or pins
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/06—Consoles; Brackets
- E04G5/064—Consoles; Brackets specially adapted for attachment to building floors
Definitions
- the present invention relates to scaffolding unit intended to form working stages and the support structures required in work for use in connection with repair, installation, and maintenance work on bridges and other structures with a deck, according to the preamble of claim 1.
- the invention relates to the creation of repair scaffolding for bridges.
- WO2008132277 discloses one scaffolding arrangement suitable for repair work on a bridge deck.
- the arrangement consists of a number of scaffolding supports to be installed on the deck of the bridge, which are supported from the bridge by bolting the support to the upper surface of the deck of the bridge and then carrying the support on rotatable support elements on the undersurface of the deck.
- Publication WO2012062968 discloses an attachment element for attaching a scaffolding support to the deck of a bridge.
- the scaffolding support to be attached is arranged to be carried on two support points to the upper side of the deck of the bridge. At least one of the support points is arranged to take the compressive force of the attachment elements attached to the deck of the bridge and at least one is arranged to take the tensile force.
- the attachment element is arranged to be detachably attached to the deck of the bridge with at least two attachment means and comprises at least one attachment means for attaching the attachment element to the support point taking the tensile force of the scaffolding support.
- scaffolding supports must be able to carry quite a large load of repair tools, repair workers, and possibly casting formwork and similar, the supports easily become quite massive. Thus, lifting means are needed to handle them and heavy vehicles to transport them. In addition, the installation of the supports usually requires several people. All these factors increase the repair costs.
- the scaffolding also requires special attachment devices, such as bolts running through the bridge deck and possibly a flat surface in the deck for attachment.
- the formwork required for repairing and casting the edge of the bridge must be moved with jacks and continuous casting in the longitudinal direction of the bridge or deck is not possible. Work is also hindered by the support required by the scaffolding against the undersurface of the bridge.
- WO 91/03603 A1 discloses a scaffolding unit according to the preamble of claim 1.
- the present invention is intended to create a solution, in which the position of the support level formed by the scaffolding can be easily altered in the height direction.
- the invention is also intended to create a solution, in which adjustment of the height direction does not alter the lateral positioning.
- inventions embodiments are intended to create scaffolding, which can, when desired, be transported in parts and assembled at the point of use.
- inventions embodiments are intended to create scaffolding, the structure of which is simple and easily manufactured.
- the invention's embodiments are also intended to permit the adjustment within wide limits of the location of the scaffolding's work stages, formwork, and other structures at least in the height direction of the bridge deck, preferably also in the transverse direction relative to the longitudinal direction of the deck level.
- the invention's embodiments are also intended to permit adjustment of the scaffolding's height-direction position relative to the deck of the bridge or other level at least partly from the top of the deck of the bridge or similar, most preferably from the side of the attachment frame of the scaffolding opposite to the edge of the deck.
- the invention is based on a scaffolding unit according to claim 1.
- the scaffolding can be dismantled into parts and assembled at the point of use.
- one scaffolding unit comprises only one operating device for altering the vertical position of the set of carrier arms.
- the structure of the scaffolding unit according to the invention is light, but can nevertheless be dimensioned to carry a large load, which is required for carrying the devices and materials to be used in bridge repair work.
- the scaffolding unit can be easily dismantled into parts for transportation and assembled at the point of use. Heavy lifting devices are not needed to move the parts and installation of the scaffolding can be done even by one workman.
- One of the most important advantages of a preferred embodiment of the invention is that the location of the carrier level formed with the aid of the scaffolding, relative to the undersurface of the bridge, can be easily altered within a large adjustment range without the angle of the carrier level or the distance from the edge of the deck essentially changing.
- the components of the scaffolding are plate and beam structures, so that it is cheap to manufacture.
- the assembly of the scaffolding unit requires only pivot pins to be set in place, so that installation work is easy and special tools are not required.
- the downward direction is the direction from on top of the deck structure pointing towards its upper surface and the direction pointing upwards is the direction opposite to that.
- the scaffolding unit consists of a set of carrier arms 2 for forming work levels and for carrying the work machines and formwork required in the work and connecting the set of arms of the attachment frame 1 to the upper surface of the bridge or other deck structure 15 and for adjusting the attitude and location of the scaffolding.
- the set of arms 2 comprises a vertical arm 4, at the lower end of which is a transverse carrier beam 5, which forms a T-shaped structure at the end of the vertical arm.
- a second branch of the T is installed to point towards the bridge deck 15, so that the opposite branch points away from the deck. Walkways for the workers and the installations required for the work machines and formwork on the deck side of the bridge can be set on these branches.
- the upper beam 11 of which is a straight box-section beam and is attached at its end to the end of the vertical arm 4 at the pivot point 16 and extends from it in the direction of the attachment unit.
- a lower parallel beam 3 Under the upper beam 11 is situated a lower parallel beam 3.
- the lower beam 3 is a triangular beam or one that is otherwise reinforced at the location of the jack, which, when triangular, comprises a straight lower beam and a triangle formed on top of the lower beam, which consists of two sloping beams and a vertical support connecting the point of the triangle and the lower beam.
- the advantage of this beam construction is lightness and a good load-bearing capacity.
- the upper and lower beams 3, 11 are attached to the attachment frame 1 by means of pivot pins 6 to pivot point 12 and 17 located at a distance from each other vertically, in such a way that the upper beam 11 is attached to pivot point 12 in the upper part of the attachment frame 1 and the lower beam 3 to pivot point 17 beneath it in the lower part of the attachment frame 1.
- the pivot points 12 and 17 of the attachment frame are on the same vertical straight line, but by altering the locations of the pivot points the paths of motion of the set of arms can, if necessary, be altered.
- the upper and lower beam 3, 11 are attached by pivot pins 6 to lugs 13 in the end of the vertical arm 4, in which are also formed on top of each other on the same straight line in the vertical direction the pivot points 16, 18 to the upper beam 11 and the lower beam 3.
- the pivot points 12, 16, 17, and 18 form, together with the upper and lower beams 3, 11 a pivoted parallelogram, with the aid of which the vertical arm 4 and the transverse carrier beam 5 at its lower end can be moved vertically.
- the transverse carrier beam 5 is attached by pivot pins 6 to lugs 14 at the lower end of the vertical arm 14. In this attachment method, the transverse carrier beam 5 is locked to the horizontal attitude and the pin attachment is intended to create an easily assembled joint.
- the attachment frame 1 can comprise attachment plates, which form a stand arrangement, which preferably includes attachment bolts that can be adjusted vertically, to attach the scaffolding to the bridge deck.
- the attachment bolts can be fitted into holes drilled in the bridge deck and secured with a chemical binding agent, thus making the attachment strong and reliable.
- the operating device is a jack 9, which is installed on top of the attachment frame 1 between the attachment frame 1 and the pivoted parallelogram's triangularly shaped lower beam 3.
- the jack 9 is located at the vertical support under the point of the beam triangle, so that a strong working point is obtained for the jack 9.
- the jack 9 can be a simple screw jack, a hydraulic jack, or some similar lifting device. Because continuous adjustment of the vertical position is not needed, the jack can be a simple and strong device.
- the scaffolding is in the upper position and in Figure 4 in the lower position.
- the vertical arm 4 of the scaffolding remains precisely vertical and the carrier beam 5 horizontal.
- the margin of movement of the height adjustment is quite large. This is an extremely important advantage compared to previously known solutions, because in these the adjustment margins have been quite limited and the adjustments difficult to make.
- the scaffolding of Figure 5 differs slightly from that described above.
- the scaffolding's lower beam 3 is unified, not necessarily straight, and continues to the opposite side of the pivot point between the attachment frame 1 and the lower beam 3 relative to the vertical arm 4.
- the lower beam 3 thus forms a lever extending to both sides of the lower pivot point 17 of the attachment frame 1.
- a hydraulic jack 21 and a screw jack 22 is fitted to the end of this lever, also on the opposite side of the pivot point between the attachment frame 1 and the lower beam 3, relative to the vertical arm 4.
- the shafts of the jacks 21, 22 are supported on the stand 20 of the attachment frame 1.
- Both jacks can be used independently to adjust the position of the vertical arm 4 and the carrier beam 5 with the arm of the lever formed by the lower beam 3, but the adjustment is preferably made with the aid of the hydraulic jack while the position of the scaffolding is locked with the screw jack 22.
- the terms hydraulic jack and screw jack refer to any hydraulic or screw-operated operating device whatever, by changing the length of which compression, or tractive force, or locking in position are achieved.
- the adjustment of position and locking can be done with only a screw jack if desired, but a hydraulic jack can be used as an aid in adjusting the height, or in parallel with the screw jack. Other operating devices or power tools are not required here.
- the adjustment can be made easily and safely on the opposite side of the attachment frame to the bridge deck.
- the lever can also be formed in a corresponding manner in the upper beam 11 or in both beams 3, 11. It is then possible to optionally fit either of the jacks to the upper beam and the other to the lower beam or both in connection with either the lower beam or upper
- the scaffolding unit (attachment frame 1) is preferably attached to the deck of the bridge or other structure with the aid of screwed bolts 23 from the stand 20. Attachment to the deck takes place by gluing or casting the bolts into blind holes made in the deck.
- the attachment is made from two stands 20 at a distance from each other and with the aid of the screwed bolts the scaffolding can be raised from the deck, so that a gap 24 forms between the scaffolding and the deck.
- the deck surface can then be worked on and the surface cast with the scaffolding attached.
- the positioning of the scaffolding unit in the height direction relative to the deck of the bridge or other structure takes place by altering, in addition to the pivoted parallelogram, the locations of the attachment points (pivot points) 16 and 18 between the vertical arm 4 and the pivoted parallelogram 12, 16, 17, 18.
- attachment holes 25 on top of each other, which have a predefined distance between them.
- lugs 26 which are arranged on both sides of the vertical arm and in which there are also attachment holes 27 on top of each other, which have a predefined distance between them.
- the distances between the vertical arm's attachment holes 25 are greater than the distances between the lugs' 26 attachment holes 27.
- the adjustment of the position of the carrier beam 5 relative to the edge of the bridge deck or other structure can be carried out with a corresponding hole distribution.
- Figure 5 shows a dense hole distribution in the carrier beam 5 and four holes in the attachment lugs of the vertical arm. This hole distribution is also flexible and the number and distribution of the holes can be altered to create an adequate adjustment precision. Though a dense hole distribution can also be made in the long load-bearing components such as the vertical arm or the carrier beam, in these it is preferable to use a larger hole distribution, to minimize the number of holes and preserve strength.
- a pivoted parallelogram is used, but the lengths of the sides and the location of the pivots can be altered as required, making it a pivoted rectangle.
- the scaffolding there can be integrated working stages and these can include rails or attachments for formwork, tools such as abrasive water jets, or handrails.
- the scaffolding can be attached to a rail in the bridge deck, so that it can be moved as work progresses parallel to the deck.
- the attachment components there can be toolboxes for the safe storage of tools and other materials and lifting hooks or similar can be installed in the scaffolding so that it can be moved as an entire system.
- the scaffolding unit according to the invention can be transported to the work site ready assembled or dismantled into its principal components. Assembly of the scaffolding unit takes place simply by installing the pivot pins 6 in place and locking them with cotters. Thus in principle, the assembly of the scaffolding unit requires no tools at all.
- the scaffolding unit is easily dismantled into relatively light parts and can be moved to a new location after use. Because several scaffolding units are required for a bridge deck or similar work site, significant advantages are achieved with the aid of easy.assembly, disassembly, and transportation. In place of pivot pins and cotters it is possible, of course, to use other corresponding attachment elements such as bolts and nuts.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Movable Scaffolding (AREA)
Description
- The present invention relates to scaffolding unit intended to form working stages and the support structures required in work for use in connection with repair, installation, and maintenance work on bridges and other structures with a deck, according to the preamble of claim 1.
- In particular, the invention relates to the creation of repair scaffolding for bridges.
- Publication
WO2008132277 discloses one scaffolding arrangement suitable for repair work on a bridge deck. The arrangement consists of a number of scaffolding supports to be installed on the deck of the bridge, which are supported from the bridge by bolting the support to the upper surface of the deck of the bridge and then carrying the support on rotatable support elements on the undersurface of the deck. - Publication
WO2012062968 discloses an attachment element for attaching a scaffolding support to the deck of a bridge. The scaffolding support to be attached is arranged to be carried on two support points to the upper side of the deck of the bridge. At least one of the support points is arranged to take the compressive force of the attachment elements attached to the deck of the bridge and at least one is arranged to take the tensile force. The attachment element is arranged to be detachably attached to the deck of the bridge with at least two attachment means and comprises at least one attachment means for attaching the attachment element to the support point taking the tensile force of the scaffolding support. - Because scaffolding supports must be able to carry quite a large load of repair tools, repair workers, and possibly casting formwork and similar, the supports easily become quite massive. Thus, lifting means are needed to handle them and heavy vehicles to transport them. In addition, the installation of the supports usually requires several people. All these factors increase the repair costs.
- Another factor slowing repair work and increasing costs is that the vertical adjustment margin of the supports relative to the bridge deck is quite small. In addition, in some cases the lifting of the support level relative to the bridge deck causes it to tilt, which either makes the work difficult or must be compensated for in some way. Due to the large loads, all the adjustment elements and operating devices must be dimensioned to be heavy, which increases the weight and costs of the structure.
- The scaffolding also requires special attachment devices, such as bolts running through the bridge deck and possibly a flat surface in the deck for attachment. The formwork required for repairing and casting the edge of the bridge must be moved with jacks and continuous casting in the longitudinal direction of the bridge or deck is not possible. Work is also hindered by the support required by the scaffolding against the undersurface of the bridge.
-
discloses a scaffolding unit according to the preamble of claim 1.WO 91/03603 A1 - The present invention is intended to create a solution, in which the position of the support level formed by the scaffolding can be easily altered in the height direction.
- The invention is also intended to create a solution, in which adjustment of the height direction does not alter the lateral positioning.
- Further, the invention's embodiments are intended to create scaffolding, which can, when desired, be transported in parts and assembled at the point of use.
- Further, the invention's embodiments are intended to create scaffolding, the structure of which is simple and easily manufactured.
- The invention's embodiments are also intended to permit the adjustment within wide limits of the location of the scaffolding's work stages, formwork, and other structures at least in the height direction of the bridge deck, preferably also in the transverse direction relative to the longitudinal direction of the deck level.
- The invention's embodiments are also intended to permit adjustment of the scaffolding's height-direction position relative to the deck of the bridge or other level at least partly from the top of the deck of the bridge or similar, most preferably from the side of the attachment frame of the scaffolding opposite to the edge of the deck.
- The invention is based on a scaffolding unit according to claim 1.
- According to one embodiment of the invention, the scaffolding can be dismantled into parts and assembled at the point of use.
- According to one embodiment of the invention, one scaffolding unit comprises only one operating device for altering the vertical position of the set of carrier arms.
- Several advantages are gained with the aid of the invention.
- The structure of the scaffolding unit according to the invention is light, but can nevertheless be dimensioned to carry a large load, which is required for carrying the devices and materials to be used in bridge repair work. The scaffolding unit can be easily dismantled into parts for transportation and assembled at the point of use. Heavy lifting devices are not needed to move the parts and installation of the scaffolding can be done even by one workman. One of the most important advantages of a preferred embodiment of the invention is that the location of the carrier level formed with the aid of the scaffolding, relative to the undersurface of the bridge, can be easily altered within a large adjustment range without the angle of the carrier level or the distance from the edge of the deck essentially changing.
- Preferably, the components of the scaffolding are plate and beam structures, so that it is cheap to manufacture. Preferably, the assembly of the scaffolding unit requires only pivot pins to be set in place, so that installation work is easy and special tools are not required.
- In
figure 5 , the invention is described in greater detail. - The embodiments of
figures 1-4 do not form part of the invention. -
Figure 1 shows a side view of a scaffolding unit. -
Figure 2 is an exploded view of the scaffolding unit ofFigure 1 . -
Figure 3 shows the scaffolding unit ofFigures 1 and2 in a first adjustment position. -
Figure 4 shows the scaffolding unit ofFigures 1 and2 in a second adjustment position. -
Figure 5 shows an embodiment of the invention. - In the following, the downward direction is the direction from on top of the deck structure pointing towards its upper surface and the direction pointing upwards is the direction opposite to that.
- In the embodiment of
Figure 1 , the scaffolding unit consists of a set ofcarrier arms 2 for forming work levels and for carrying the work machines and formwork required in the work and connecting the set of arms of the attachment frame 1 to the upper surface of the bridge orother deck structure 15 and for adjusting the attitude and location of the scaffolding. The set ofarms 2 comprises avertical arm 4, at the lower end of which is atransverse carrier beam 5, which forms a T-shaped structure at the end of the vertical arm. A second branch of the T is installed to point towards thebridge deck 15, so that the opposite branch points away from the deck. Walkways for the workers and the installations required for the work machines and formwork on the deck side of the bridge can be set on these branches. - At the opposite end of the
vertical arm 4 there is a pivoted parallelogram formed by two beams, theupper beam 11 of which is a straight box-section beam and is attached at its end to the end of thevertical arm 4 at thepivot point 16 and extends from it in the direction of the attachment unit. Under theupper beam 11 is situated a lower parallel beam 3. In this case, the lower beam 3 is a triangular beam or one that is otherwise reinforced at the location of the jack, which, when triangular, comprises a straight lower beam and a triangle formed on top of the lower beam, which consists of two sloping beams and a vertical support connecting the point of the triangle and the lower beam. The advantage of this beam construction is lightness and a good load-bearing capacity. - The upper and
lower beams 3, 11 are attached to the attachment frame 1 by means of pivot pins 6 to 12 and 17 located at a distance from each other vertically, in such a way that thepivot point upper beam 11 is attached topivot point 12 in the upper part of the attachment frame 1 and the lower beam 3 topivot point 17 beneath it in the lower part of the attachment frame 1. In this example, the pivot points 12 and 17 of the attachment frame are on the same vertical straight line, but by altering the locations of the pivot points the paths of motion of the set of arms can, if necessary, be altered. At the opposite end, the upper andlower beam 3, 11 are attached by pivot pins 6 tolugs 13 in the end of thevertical arm 4, in which are also formed on top of each other on the same straight line in the vertical direction the 16, 18 to thepivot points upper beam 11 and the lower beam 3. Thus, the pivot points 12, 16, 17, and 18 form, together with the upper and lower beams 3, 11 a pivoted parallelogram, with the aid of which thevertical arm 4 and thetransverse carrier beam 5 at its lower end can be moved vertically. Thetransverse carrier beam 5 is attached by pivot pins 6 to lugs 14 at the lower end of thevertical arm 14. In this attachment method, thetransverse carrier beam 5 is locked to the horizontal attitude and the pin attachment is intended to create an easily assembled joint. - The attachment frame 1 can comprise attachment plates, which form a stand arrangement, which preferably includes attachment bolts that can be adjusted vertically, to attach the scaffolding to the bridge deck. The attachment bolts can be fitted into holes drilled in the bridge deck and secured with a chemical binding agent, thus making the attachment strong and reliable.
- With the aid of the pivoted parallelogram, the
vertical arm 4 and thetransverse carrier beam 5 attached to it can be raised and lowered. In this embodiment, the operating device is ajack 9, which is installed on top of the attachment frame 1 between the attachment frame 1 and the pivoted parallelogram's triangularly shaped lower beam 3. Thejack 9 is located at the vertical support under the point of the beam triangle, so that a strong working point is obtained for thejack 9. Thejack 9 can be a simple screw jack, a hydraulic jack, or some similar lifting device. Because continuous adjustment of the vertical position is not needed, the jack can be a simple and strong device. - In
Figure 3 , the scaffolding is in the upper position and inFigure 4 in the lower position. As can be seen from the figures, even in the extreme positions thevertical arm 4 of the scaffolding remains precisely vertical and thecarrier beam 5 horizontal. In addition, it can be seen that the margin of movement of the height adjustment is quite large. This is an extremely important advantage compared to previously known solutions, because in these the adjustment margins have been quite limited and the adjustments difficult to make. - The scaffolding of
Figure 5 differs slightly from that described above. First of all, the scaffolding's lower beam 3 is unified, not necessarily straight, and continues to the opposite side of the pivot point between the attachment frame 1 and the lower beam 3 relative to thevertical arm 4. The lower beam 3 thus forms a lever extending to both sides of thelower pivot point 17 of the attachment frame 1. Ahydraulic jack 21 and ascrew jack 22 is fitted to the end of this lever, also on the opposite side of the pivot point between the attachment frame 1 and the lower beam 3, relative to thevertical arm 4. The shafts of the 21, 22 are supported on thejacks stand 20 of the attachment frame 1. Both jacks can be used independently to adjust the position of thevertical arm 4 and thecarrier beam 5 with the arm of the lever formed by the lower beam 3, but the adjustment is preferably made with the aid of the hydraulic jack while the position of the scaffolding is locked with thescrew jack 22. Here, the terms hydraulic jack and screw jack refer to any hydraulic or screw-operated operating device whatever, by changing the length of which compression, or tractive force, or locking in position are achieved. The adjustment of position and locking can be done with only a screw jack if desired, but a hydraulic jack can be used as an aid in adjusting the height, or in parallel with the screw jack. Other operating devices or power tools are not required here. The adjustment can be made easily and safely on the opposite side of the attachment frame to the bridge deck. The lever can also be formed in a corresponding manner in theupper beam 11 or in bothbeams 3, 11. It is then possible to optionally fit either of the jacks to the upper beam and the other to the lower beam or both in connection with either the lower beam or upper beam. - The scaffolding unit (attachment frame 1) is preferably attached to the deck of the bridge or other structure with the aid of screwed
bolts 23 from thestand 20. Attachment to the deck takes place by gluing or casting the bolts into blind holes made in the deck. The attachment is made from twostands 20 at a distance from each other and with the aid of the screwed bolts the scaffolding can be raised from the deck, so that agap 24 forms between the scaffolding and the deck. The deck surface can then be worked on and the surface cast with the scaffolding attached. There can be a spirit level or spirit levels ready in the attachment frame to facilitate the adjustment of its position. - In this embodiment, the positioning of the scaffolding unit in the height direction relative to the deck of the bridge or other structure takes place by altering, in addition to the pivoted parallelogram, the locations of the attachment points (pivot points) 16 and 18 between the
vertical arm 4 and the pivoted 12, 16, 17, 18. In theparallelogram vertical arm 4 there are attachment holes 25 on top of each other, which have a predefined distance between them. At the ends of the upper andlower beams 11, 3 there are lugs 26, which are arranged on both sides of the vertical arm and in which there are also attachment holes 27 on top of each other, which have a predefined distance between them. The distances between the vertical arm's attachment holes 25 are greater than the distances between the lugs' 26 attachment holes 27. In this way, a large adjustment margin is obtained with the aid of the vertical arm's 4 attachment holes 25 and a smaller adjustment margin with the aid of the lugs' 26 attachment holes 27. When this manner of adjustment is combined with the adjustment taking place with the aid of the pivoted parallelogram, the position of the scaffolding unit can be set precisely as desired within quite large limits. This permits, among other things, easy and accurate placing of the bridge's edge casting 19. - The adjustment of the position of the
carrier beam 5 relative to the edge of the bridge deck or other structure can be carried out with a corresponding hole distribution. -
Figure 5 shows a dense hole distribution in thecarrier beam 5 and four holes in the attachment lugs of the vertical arm. This hole distribution is also flexible and the number and distribution of the holes can be altered to create an adequate adjustment precision. Though a dense hole distribution can also be made in the long load-bearing components such as the vertical arm or the carrier beam, in these it is preferable to use a larger hole distribution, to minimize the number of holes and preserve strength. - In the invention, a pivoted parallelogram is used, but the lengths of the sides and the location of the pivots can be altered as required, making it a pivoted rectangle.
- The features of the embodiment described above can easily be combined and the corresponding components replaced with each other in order to create a structure more suitable for its purpose, within the scope defined by the claims.
- In the scaffolding, there can be integrated working stages and these can include rails or attachments for formwork, tools such as abrasive water jets, or handrails. The scaffolding can be attached to a rail in the bridge deck, so that it can be moved as work progresses parallel to the deck. In the attachment components there can be toolboxes for the safe storage of tools and other materials and lifting hooks or similar can be installed in the scaffolding so that it can be moved as an entire system.
- The scaffolding unit according to the invention can be transported to the work site ready assembled or dismantled into its principal components. Assembly of the scaffolding unit takes place simply by installing the pivot pins 6 in place and locking them with cotters. Thus in principle, the assembly of the scaffolding unit requires no tools at all. The scaffolding unit is easily dismantled into relatively light parts and can be moved to a new location after use. Because several scaffolding units are required for a bridge deck or similar work site, significant advantages are achieved with the aid of easy.assembly, disassembly, and transportation. In place of pivot pins and cotters it is possible, of course, to use other corresponding attachment elements such as bolts and nuts.
- It is obvious that the various parts of the example described above can be replaced with functional and structural equivalents within the scope defined by the Claims.
Claims (9)
- Scaffolding unit to be attached to a bridge or similar deck structure, which comprises- a set of arms (2) for carrying the working levels and support structures needed in work, and- an attachment frame (1) for attaching the set of arms to the upper surface of the deck structure,wherein the set of arms (2) is connected to the attachment frame (1) by means of a pivoted parallelogram (12, 16, 17, and 18), wherein the pivoted parallelogram comprises an upper beam (11)and a lower beam (3) and upper pivot points (12, 16) and lower pivot points (17, 18) for connecting the beams (3, 11) to the attachment frame (1) and the set of arms (2), characterized in that the lower beam (3) and/or the upper beam extends to the opposite side of the lower pivot point (17) / upper pivot point (12) of the attachment frame (1) from the set of arms (2) to form a lever, and at least one operating device selected from the group comprising a hydraulic jack (21) and screw jack (22) is arranged at the end of the lever formed by the lower beam (3) or the upper beam (11) to adjust the vertical position of the set of arms (2).
- Scaffolding unit according to Claim 1, characterized in that the pivot points (12, 17) of the attachment frame (1) are on a straight line parallel to the pivot points (16, 18) of the set of arms (2), according to the definition of a pivoted parallelogram, and the straight lines are preferably vertical.
- Scaffolding unit according to any of Claims 1 - 2, characterized in that the lower beam of the pivoted parallelogram is a triangular beam (3).
- Scaffolding unit according to any of Claims 1 - 3, characterized in that at least the joints between the set of arms (2), the attachment frame (1), and the pivoted parallelogram (3, 6, 11, 12) are implemented with detachable attachment elements (6).
- Scaffolding unit according to Claim 4, characterized in that the attachment elements are pivot pins (6).
- Scaffolding unit according to any of the above Claims, which comprises a vertical arm (4) and carrier beam (5) attached transversely to one end of it characterized in that the lower and upper beams (3, 11) are attached to the vertical arm (4) by means of lugs (26), in each of which is one row of holes, in which there is a first distance between the holes (27) and in which vertical arm there is a row of holes, in which there is a different distance between the holes (25) than between the lugs' holes (27).
- Scaffolding unit according to Claim 6, characterized in that the distances between the holes (25) in the vertical arm (4) are greater than the distances between the holes (27 in the lugs (26).
- Scaffolding unit according to any of the above Claims 6 - 7, characterized in that the vertical arm (4) and the carrier beam (5) are attached to each other by means of lugs at the end of the vertical arm (4), in each of which lugs there is a row of holes, in which there is a first distance between the holes and in which carrier beam (5) there is a row of holes, in which there is a different distance between the holes than between the lugs' holes.
- Scaffolding unit according to Claim 8, characterized in that the distances between the holes in the carrier beam (5) are greater than the distances between the vertical arm's lugs.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL14835241T PL3030719T3 (en) | 2013-08-06 | 2014-08-06 | SCAFFOLDING |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FI20135815A FI20135815A7 (en) | 2013-08-06 | 2013-08-06 | Rack |
| PCT/FI2014/050610 WO2015018979A1 (en) | 2013-08-06 | 2014-08-06 | Scaffold |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP3030719A1 EP3030719A1 (en) | 2016-06-15 |
| EP3030719A4 EP3030719A4 (en) | 2017-01-18 |
| EP3030719B1 true EP3030719B1 (en) | 2018-12-19 |
Family
ID=52460714
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP14835241.2A Active EP3030719B1 (en) | 2013-08-06 | 2014-08-06 | Scaffold |
Country Status (14)
| Country | Link |
|---|---|
| US (1) | US20160177584A1 (en) |
| EP (1) | EP3030719B1 (en) |
| JP (1) | JP6470285B2 (en) |
| CN (1) | CN105705701B (en) |
| AU (1) | AU2014304378B2 (en) |
| BR (1) | BR112016002722B1 (en) |
| CA (1) | CA2920075C (en) |
| ES (1) | ES2714860T3 (en) |
| FI (1) | FI20135815A7 (en) |
| MX (1) | MX2016001556A (en) |
| PL (1) | PL3030719T3 (en) |
| RU (1) | RU2668608C2 (en) |
| TR (1) | TR201903150T4 (en) |
| WO (1) | WO2015018979A1 (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FI126870B (en) * | 2014-08-06 | 2017-07-14 | Fast Beam Oy | Position |
| CN108203925B (en) * | 2017-11-23 | 2019-04-23 | 广西桂资工程集团有限公司 | A bridge deck laying device |
| CN108221665B (en) * | 2017-11-23 | 2019-05-17 | 广西诚鑫工程有限公司 | An improved bridge deck laying device |
| US11834852B2 (en) | 2020-08-07 | 2023-12-05 | Peri Se | Striking tool and method |
| US12305410B2 (en) | 2021-09-30 | 2025-05-20 | Peri Se | Striking element and method |
Family Cites Families (30)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2598730A (en) * | 1948-03-03 | 1952-06-03 | John L Thompson | Portable dock scaffold |
| US3043395A (en) * | 1961-06-02 | 1962-07-10 | Ellis W Volkel | Mechanized ladder device |
| US3357517A (en) * | 1965-12-27 | 1967-12-12 | Elmer A Wagner | Mobile scaffold |
| BE786440A (en) * | 1971-07-20 | 1973-01-19 | Interlake Inc | LOAD LOCK |
| IT1059351B (en) * | 1976-02-27 | 1982-05-31 | Fip Formatura Inienzione Poli | SELF-TRANSPORTED AND SELF-TRANSPORTING TELESCOPIC AND ARTICULATED RETICULAR STRUCTURE PARTICULARLY SUITABLE FOR INSPECTION AND MAINTENANCE OF ROAD ART WORKS |
| IT1123032B (en) * | 1976-11-09 | 1986-04-30 | Autostrade Concess Const | RETRACTABLE SUSPENDED SCAFFOLDING ON A SELF-PROPELLED TROLLEY PARTICULARLY SUITABLE FOR MAINTENANCE WORK ON ROAD AND SIMILAR BRIDGES |
| US4168764A (en) * | 1978-04-24 | 1979-09-25 | Tom Walters | Level step stair walkway |
| US4217971A (en) * | 1979-02-16 | 1980-08-19 | Theodore Rivinius | Rotating powered step |
| GB2106074B (en) * | 1981-08-13 | 1985-05-30 | Gray Mackenzie Technical Servi | Workplatform |
| GB8407141D0 (en) * | 1984-03-19 | 1984-04-26 | Secr Defence | Under-bridge access assembly |
| JPS61113909A (en) * | 1984-11-08 | 1986-05-31 | 鹿島建設株式会社 | Elevated structure construction equipment |
| JPS626006A (en) * | 1985-07-01 | 1987-01-13 | 石川島播磨重工業株式会社 | Bridge repair work vehicle and its construction method |
| US4646875A (en) * | 1985-12-30 | 1987-03-03 | Paxton-Mitchell Company | Articulated boom structure |
| US5226776A (en) * | 1988-05-17 | 1993-07-13 | Godtfred Vestergaard | Foldable link rod for carrying an operative platform |
| DE8910749U1 (en) * | 1989-09-08 | 1991-02-07 | Moog, Alfons, 7774 Deggenhausertal | Bridge underside inspection device |
| US5435410A (en) * | 1993-07-21 | 1995-07-25 | Langston; Ralph C. | Bridge sidewalk vehicle |
| CA2227986C (en) * | 1997-01-31 | 2004-12-28 | Kidde Industries, Inc. | Lift apparatus having an articulated double parallelogram boom assembly |
| US6598702B1 (en) * | 2000-07-13 | 2003-07-29 | Mcgillewie, Jr. Garth E. | Under bridge access apparatus with cross-linking member connecting tower with vehicular chassis |
| JP2006132127A (en) * | 2004-11-04 | 2006-05-25 | Hasegawa Kogyo Co Ltd | Collapsible working platform |
| RU2310033C1 (en) * | 2006-01-27 | 2007-11-10 | Открытое акционерное общество "Мостотрест" (ОАО "Мостотрест") | Projecting scaffold and method for scaffold or reinforced concrete bridge span structure coping block erection |
| US20080053750A1 (en) * | 2006-08-31 | 2008-03-06 | Chung-En Tseng | Transport equipment |
| FI20070334A0 (en) * | 2007-04-27 | 2007-04-27 | Destia Tieliikelaitos | Rack system and method for repairing a concrete bridge edge structure |
| US8516751B2 (en) * | 2008-05-15 | 2013-08-27 | National Oilwell Varco L.P. | Mobile drilling rig |
| CN201460177U (en) * | 2009-03-20 | 2010-05-12 | 湖南运想重工科技有限公司 | Parallelogram arm folding mechanism |
| US8479882B2 (en) * | 2010-07-07 | 2013-07-09 | Aluminum Ladder Company | Cement industry gangway |
| US8561239B2 (en) * | 2010-08-17 | 2013-10-22 | Safe Rack Llc | Articulating cage |
| US8789654B2 (en) * | 2010-08-17 | 2014-07-29 | Jlg Industries, Inc. | Mast lift with screw drive and gas strut |
| FI123034B (en) * | 2010-11-12 | 2012-10-15 | Moldtech Oy | Rack Mounting Arrangement |
| US20130313044A1 (en) * | 2012-05-25 | 2013-11-28 | J. Aubrey Stewart | Extension boom apparatus |
| US9695024B2 (en) * | 2015-01-23 | 2017-07-04 | Jeremy Herauf | Unique roadworthy sidewalk boom trailer, having on-site interchangeable boom, on-site interchangeable ladder, and on-site interchangeable catwalk sized to access narrow openings and nooks over and under bridges |
-
2013
- 2013-08-06 FI FI20135815A patent/FI20135815A7/en not_active Application Discontinuation
-
2014
- 2014-08-06 MX MX2016001556A patent/MX2016001556A/en active IP Right Grant
- 2014-08-06 CN CN201480044397.2A patent/CN105705701B/en not_active Expired - Fee Related
- 2014-08-06 WO PCT/FI2014/050610 patent/WO2015018979A1/en not_active Ceased
- 2014-08-06 AU AU2014304378A patent/AU2014304378B2/en not_active Ceased
- 2014-08-06 PL PL14835241T patent/PL3030719T3/en unknown
- 2014-08-06 CA CA2920075A patent/CA2920075C/en active Active
- 2014-08-06 ES ES14835241T patent/ES2714860T3/en active Active
- 2014-08-06 JP JP2016532709A patent/JP6470285B2/en not_active Expired - Fee Related
- 2014-08-06 US US14/909,989 patent/US20160177584A1/en not_active Abandoned
- 2014-08-06 RU RU2016105165A patent/RU2668608C2/en active
- 2014-08-06 BR BR112016002722-1A patent/BR112016002722B1/en not_active IP Right Cessation
- 2014-08-06 EP EP14835241.2A patent/EP3030719B1/en active Active
- 2014-08-06 TR TR2019/03150T patent/TR201903150T4/en unknown
Also Published As
| Publication number | Publication date |
|---|---|
| JP6470285B2 (en) | 2019-02-13 |
| RU2668608C2 (en) | 2018-10-02 |
| CA2920075C (en) | 2021-08-17 |
| FI20135815L (en) | 2015-02-07 |
| US20160177584A1 (en) | 2016-06-23 |
| CA2920075A1 (en) | 2015-02-12 |
| RU2016105165A (en) | 2017-09-14 |
| AU2014304378B2 (en) | 2018-05-17 |
| TR201903150T4 (en) | 2019-03-21 |
| AU2014304378A1 (en) | 2016-02-25 |
| ES2714860T3 (en) | 2019-05-30 |
| FI20135815A7 (en) | 2015-02-07 |
| CN105705701B (en) | 2019-10-25 |
| EP3030719A4 (en) | 2017-01-18 |
| BR112016002722B1 (en) | 2022-02-01 |
| JP2016529424A (en) | 2016-09-23 |
| PL3030719T3 (en) | 2019-06-28 |
| RU2016105165A3 (en) | 2018-03-29 |
| BR112016002722A2 (en) | 2017-08-01 |
| MX2016001556A (en) | 2016-08-03 |
| CN105705701A (en) | 2016-06-22 |
| WO2015018979A1 (en) | 2015-02-12 |
| EP3030719A1 (en) | 2016-06-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3177774B1 (en) | Scaffold for supporting a working platform for bridges | |
| WO2016079372A1 (en) | Scaffolding arrangement | |
| EP3030719B1 (en) | Scaffold | |
| EP2978651B1 (en) | Skidding system for an offshore installation or vessel | |
| US9670684B2 (en) | Apparatus and method for lifting and sliding a structure attached to the wall | |
| CN102071798B (en) | Hydraulic climbing system for wall-attached support frame | |
| US20240240474A1 (en) | Suspension shoe, climbing unit and method for erecting a building | |
| WO2012062968A1 (en) | Scaffolding attachment arrangement | |
| CN110901851A (en) | Ship large-scale equipment broadside installation device | |
| CN116005557B (en) | Installation method of special-shaped arch rib structure in the space of large-span flying swallow basket steel box arch bridge | |
| CN113152294A (en) | Three-dimensionally adjustable large-scale component conveying platform device and construction method | |
| CN204662274U (en) | Leaning tower template system | |
| CN202227365U (en) | Movable formwork for guide wall of underground diaphragm wall | |
| CN202592526U (en) | Steel bar positioning device for prefabricated T-shaped beam | |
| ITTO20100134U1 (en) | ELEVATION PLATFORM FOR THE REVISION OF GAS MILLS | |
| CN210766423U (en) | Diagonal web member bracket trolley with adjustable inclination angle | |
| CN100431943C (en) | Movable assembled repairing frame | |
| CN112554074A (en) | Self-climbing type installation system of steel cable tower | |
| CN223428383U (en) | Photovoltaic installation platform | |
| CN223547605U (en) | Slide well word roof beam jack-up hoist device | |
| CN119898685A (en) | Slideway cross beam lifting and hoisting system and its lifting and positioning method | |
| SE533665C2 (en) | Device for the erection of a building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20160304 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| DAX | Request for extension of the european patent (deleted) | ||
| A4 | Supplementary search report drawn up and despatched |
Effective date: 20161216 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: B66F 11/04 20060101ALI20161212BHEP Ipc: E06C 9/06 20060101ALI20161212BHEP Ipc: E01D 19/10 20060101ALI20161212BHEP Ipc: E04G 3/00 20060101ALI20161212BHEP Ipc: E04G 3/28 20060101ALI20161212BHEP Ipc: E04G 3/34 20060101ALI20161212BHEP Ipc: E01D 22/00 20060101AFI20161212BHEP Ipc: E04G 5/06 20060101ALI20161212BHEP Ipc: E04G 7/34 20060101ALI20161212BHEP Ipc: E04G 7/30 20060101ALI20161212BHEP |
|
| REG | Reference to a national code |
Ref country code: HK Ref legal event code: DE Ref document number: 1224711 Country of ref document: HK |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
| 17Q | First examination report despatched |
Effective date: 20171107 |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20180706 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602014038359 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1078857 Country of ref document: AT Kind code of ref document: T Effective date: 20190115 |
|
| REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181219 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190319 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181219 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181219 |
|
| REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20181219 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2714860 Country of ref document: ES Kind code of ref document: T3 Effective date: 20190530 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181219 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181219 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181219 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190419 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181219 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181219 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181219 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181219 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190419 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602014038359 Country of ref document: DE |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181219 |
|
| 26N | No opposition filed |
Effective date: 20190920 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181219 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190806 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181219 |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190831 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190806 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190831 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181219 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20140806 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181219 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20220225 Year of fee payment: 8 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181219 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: TR Payment date: 20220719 Year of fee payment: 9 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20220711 Year of fee payment: 9 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20230131 Year of fee payment: 9 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: UEP Ref document number: 1078857 Country of ref document: AT Kind code of ref document: T Effective date: 20181219 |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20230927 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220807 |
|
| REG | Reference to a national code |
Ref country code: HK Ref legal event code: WD Ref document number: 1224711 Country of ref document: HK |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 1078857 Country of ref document: AT Kind code of ref document: T Effective date: 20230806 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20240208 Year of fee payment: 10 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230806 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230806 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FI Payment date: 20240220 Year of fee payment: 10 Ref country code: DE Payment date: 20240228 Year of fee payment: 10 Ref country code: GB Payment date: 20240215 Year of fee payment: 10 Ref country code: CH Payment date: 20240219 Year of fee payment: 10 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20240219 Year of fee payment: 10 Ref country code: NO Payment date: 20240221 Year of fee payment: 10 Ref country code: IT Payment date: 20240219 Year of fee payment: 10 Ref country code: FR Payment date: 20240215 Year of fee payment: 10 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230806 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230806 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602014038359 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| REG | Reference to a national code |
Ref country code: SE Ref legal event code: EUG |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MM Effective date: 20240901 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240806 |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20240806 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240831 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240831 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240901 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20250301 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240806 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240806 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240831 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240807 |