[go: up one dir, main page]

EP2670569A1 - Method and device for populating a multilayer solid wood composite component - Google Patents

Method and device for populating a multilayer solid wood composite component

Info

Publication number
EP2670569A1
EP2670569A1 EP12705049.0A EP12705049A EP2670569A1 EP 2670569 A1 EP2670569 A1 EP 2670569A1 EP 12705049 A EP12705049 A EP 12705049A EP 2670569 A1 EP2670569 A1 EP 2670569A1
Authority
EP
European Patent Office
Prior art keywords
boards
layer
board
nailed
feed conveyor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP12705049.0A
Other languages
German (de)
French (fr)
Inventor
Richard Schmidler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Michael Weinig AG
Original Assignee
Michael Weinig AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Michael Weinig AG filed Critical Michael Weinig AG
Publication of EP2670569A1 publication Critical patent/EP2670569A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27FDOVETAILED WORK; TENONS; SLOTTING MACHINES FOR WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES
    • B27F7/00Nailing or stapling; Nailed or stapled work
    • B27F7/003Nailing or stapling machines provided with assembling means

Definitions

  • the invention relates to a method for equipping a multilayer solid wood composite component according to the preamble of claim 1 and to a device for equipping a multilayer solid wood composite component according to the preamble of claim 11.
  • Such solid wood composite components are known from DE 20 2006 005 108 U 1 for prefabricated houses, namely for use as roof, ceiling and in particular wall elements.
  • a layer of adjacent, mutually falzverbundenen boards is held together by means of a first attacking alongside clamping device and then another layer of parallel to each other and falzverbundenen, held together by a second such tensioning boards transversely to the directly below located board layer on this; whereupon a bridge equipped with a nailing machine travels longitudinally in the direction of the larger board length above this topmost layer in order to connect it to the underlying board layer at predetermined positions by means of holding pins. This repeats for at least a third board position.
  • headlamp pins are at least used for connecting the respective two uppermost board layers with longitudinally staggered along their shafts circumferential beads.
  • the present invention is based on the technical problem of being able to manufacture solid wood composite components of the generic type in a technologically problem-free manner and even with significantly increased cycle rate even in considerably larger dimensions; at the same time at least reduced accumulation of hazardous waste, preferably completely avoided.
  • This object is achieved in the generic method according to the invention with the characterizing features of claim 1 and in the generic device according to the invention with the characterizing features of claim 1 1.
  • a first (complete) layer of boards is transferred to the assembly table. It can be moved programmatically in its plane and, if necessary, also transversely to its plane up and down to be movable.
  • the boards of this first layer may be held together in the transverse direction of the board by means of a tensioning device, or may already be joined to one another in a material-locking or form-fitting manner to form a single-layered board element, for example glued or folded.
  • the transfer of the position of the boards is also to be understood that the boards passed to the assembly table and with them the location is formed on the assembly table.
  • the first board of a second board layer is applied to the assembled assembly table, pivoted in relation to the orientation of the boards of the first layer.
  • the assembly table moves so far below the delivery edge of the feed conveyor that it applies the first board of the next layer on its existing position on its delivery edge, for example postpones or attract attention.
  • the boards of the next layer are pivoted, i. at an angle to the boards of the first layer.
  • the angular position of this board opposite the boards of the underlying layer is adjustable by the orientation of the delivery edge;
  • the board layers are orthogonal to each other, so that successively come the boards of a layer in a conventional manner each transverse to the boards of the previous situation to each other.
  • the thus applied first board of the current situation to be created is nailed to the already below previous location by means of pins, nails, staples or staples.
  • the portal In order not to have to accelerate the large mass of a nailer portal along approximately the longitudinal extension of the board just applied and to slow down position exactly, the portal is stationary.
  • the assembled assembly table step by step in the longitudinal direction of this board - with a sufficiently wide board in the transverse direction - under the Nagler portal proceeding parallel to the delivery edge, preferably installed directly next to the delivery edge of the feeder stationary and with at least one stationary or along the portal movable nailing machine including its reservoir is equipped.
  • this currently applied board is nailed to the hitherto uppermost layer, it is advantageous if the assembly table is moved with respect to the delivery edge of the feed conveyor according to the width of the next board at a distance from the board just applied. The next board is then placed next to the board just nailed to the top of the mounting table and then pushed under the stationary nail portal; and so on, until the previous top layer one after the other with the boards of this currently formed location completely covered and nailed.
  • the supply of the boards can be made from a material buffer by means of a longitudinal feed to the delivery edge for transfer to the topmost position on the assembly table and is - as is common in the technology of joinery - even with very long boards in their longitudinal direction in extremely high clock rate possible , Due to the lack of turning requirements and sagging of the longitudinally supported boards, there are no kinetic problems that slow down the working cycle. Therefore, the length of the planks is now practically no longer limited, at least with more than twelve meters at least twice as large as they can be until after max. procedure was manageable.
  • the Nagier-Portai or the travel of his nails machine extends over at least the length of the longest of the applied boards.
  • the width of the board now to be applied can be measured by means of photocells or laser scanning for each required positioning of the assembly table below the delivery edge of the feeder before, whereby the currently nachzuarriessornde board again just alongside against the previously nailed board of the currently created boards Position in attachment device.
  • At least one support stop is provided on the mounting table. This stops the transverse displacement of a complete layer of boards or the first board of the respective follow-up situation.
  • the respective follow-up board of this situation then runs with its kinetic transfer energy against the previously rigidly positioned by his nailing board, which is already guaranteed the required tight packing in the board position without the need of a tensioning device.
  • a stationary straightening stop is set up below the delivery edge or at the nail portal, the correspondingly lowered assembly table can be moved forward with the board that has just been applied, in order to make it directly accessible. bar in front of his nostrils additionally intimately alongside to nude the previously nailed board.
  • the assembly table is reduced to take over a meanwhile provided next, now again complete situation. He can be lowered by the strength of the previously formed board position to easily postpone the next board situation without handling problems on the previously formed location can.
  • This new, complete layer can now be nailed to the underlying board position. This can be done over the entire surface of this situation by the assembly table is moved under the nail portal, for example in zigzag from one to the next board, before again using the delivery edge just loading with the board sequence for the next layer.
  • a chop saw is installed in the course of the longitudinal feed conveyor for loading the delivery edge, which firstly performs an end cut on the board delivered from the material buffer in the longitudinal direction. leads and then trims the board to the length or length, which is determined by the length of the composite component.
  • this dimension corresponds to the length of the wall of vorverbundenen so-called vertical or vertical boards and is thus determined by the number of boards of known width. Since in such used as a wall element composite components, the first and then the third layer of vertical boards, these layers are hereinafter referred to as odd.
  • the length of such a wall also corresponds to the length of the so-called horizontal or horizontal boards applied successively to such odd-numbered layers and through-nailed in the layers referred to below as even-numbered.
  • a long side to be supplied from the material buffer on the longitudinal feed conveyor to the delivery edge board does not reach this predetermined length, then it is expediently nachgeschoben a part board of at least the required additional length after his trimming cut to the delivery edge after trimming. This then passes frontally adjacent sub-boards simultaneously on the odd-numbered, currently topmost position on the mounting table, so that this position is occupied again over its entire length, now assembled on the front side, for example, two partial boards.
  • the longitudinal feed conveyor is in the region of its delivery edge expediently equipped with a positioning device.
  • This can be realized immaterial as position control on the longitudinal feed conveyor, or material as about adjustable end or positioning stop against which the first part board an Arthur and is supported when starting the subsequent second part board before then both sub-boards coaxially positioned simultaneously over the Delivery edge on the currently top (odd) board location on the assembly table to be passed.
  • the individual with a full wall length corresponding length zuge felicitten horizontal boards can come to rest on this positioning stop and thus accurately positioned are applied to the previous, odd-numbered position.
  • the longitudinal feeder partial boards are provided in longitudinal alignment now not on impact, but on the gap at the delivery edge and transferred to the current upper, odd-numbered position. These gaps are (viewed in the longitudinal direction of the boards of the even layers) each as long as predetermined by the respective width of the recess in the odd-numbered position.
  • these positioning devices of the aforementioned type along the feed area are provided approximately as staggered material positioning stops.
  • the nail portal can also be equipped with processing units, such as with a swivel saw or with a tool change receiver for drills or about milling cutters, the latter to rework the inner edges of door and window openings in a wall element; the accumulation of chips is correspondingly low, in particular no hazardous waste is generated.
  • processing units are expediently at the Installed side facing away from the Nageiautomaten side of the portal, on the one hand not to limit traversing movements of the automatic nailer along the boards of the topmost layer and on the other hand to be able to be moved along the stationary portal.
  • the delivery of the board for the second layer can also be done via a longitudinal feed conveyor still downstream cross-feed conveyor.
  • This has the advantage of buffering several boards of the current even-numbered layer to a certain extent and then to be able to transfer as a group to the uppermost, odd-numbered position.
  • the mounting table is moved back relative to the delivery edge of the feed conveyor according to the width of the group of boards at a distance to the just last applied board
  • intermediate layers of other materials can be introduced between the individual even-numbered and odd-numbered board layers and joined together, in particular nailed, to the board layers.
  • Such intermediate layers may for example also be full-surface, ie formed in one piece and plate-shaped and serve for thermal insulation. Necessary recesses for window or door openings are advantageously also already taken into account and cut out or cut out in the intermediate layers.
  • the liners can, for example, from other wood or h'oizersatzwerkstoffen, plywood, chipboard, polystyrene or other plastics.
  • a in this example case already equipped with window and door recesses 1 1 and possibly already alongside molded or cohesively interconnected lamellae or boards 12n prefabricated, odd-numbered board layer 13.n (starting with n 1) of a multi-layer solid wood composite component 14 is spent by means of a transport unit 15 in the form of about a sliding or roller table or a transfer bridge by gripping means in a transfer direction 17 lying on a mounting table 16. So that the board position 13.n comes to lie in the transfer direction 17 in an exact position on the mounting table 16, an unillustrated support stop in the travel path of the boards 13.n be present. The positioning can also be done programmatically.
  • the assembly table 16 is program-controlled continuously or discontinuously movable in its plane and transverse to its plane.
  • the assembly table 16 has been moved back to a position which is at least the width of the boards 12 m behind the delivery edge 22 of the transverse feed conveyor 21.
  • This preferably has a sliding bed 23 under at least one, preferably as outlined below a plurality of mutually adjacent, circumferential driving belt 24.
  • the sliding bed 23 is inclined from the higher level of the transverse feeder 21 in the direction of the lower support level of the mounting table 16. Due to its kinetic energy, the first of the boards 12m moves over the layer 13.1 until it rests against the support stops 19.
  • this board 12m is positioned by means of the program-controlled assembly table 16 under a parallel to the delivery edge 22 stationarily provided portal 25, with at least one here called nailing machine 26 together with reservoir 27 for his pins (nails) or staples (staples) over the entire length of the board 12m can be moved longitudinally.
  • the nailing machines 26 are thus moved along the stationary portal 25 and thus along the positioned underneath, currently nailing board 12m programmatically.
  • the mounting table 16 can also move the board 12m forwards or backwards if, for example with a wide board 12m, an additional nail track is to be pulled parallel to the previous one. So the board will be 12m at all pre-programmed position NEN with the underlying odd-numbered layer 13.n, positively and non-positively connected buckling safe.
  • the assembly table 16 is then moved into the position corresponding to the width of the boards 12m behind the delivery edge 22, ie. H. around a path that corresponds to the width of the next of the boards 12m.
  • This next of the boards 12m is supported longitudinally against the board just nailed down 12m and can be additionally pressed alongside it by approaching the directional stops 18 before it, as described above, is nailed under the portal 25; and so on.
  • movable Richtanange for example in the form of adjustable by means of pneumatic cylinder ruler can be used, press the last applied board against the just nailed board 12m with a fixed mounting table the last applied board.
  • the individual boards 12m of the even-numbered layers 13m are successively transferred, for example from a material buffer 28, to a longitudinal feed conveyor 29 and guided past a chop saw 30, in order to achieve a clean frontal cut to that predetermined by the odd-numbered layers 13.n. Length to trim, ie cut to length.
  • the boards are cut 12m successively, still stable on the longitudinal feed conveyor 29 resting, in the longitudinal direction up to a in and opposite feed direction of the boards adjustable positioning stop 31 at the end of the feed area 32 to the cross-feed conveyor 21 advances.
  • this board is 12m - if necessary, after initial cross-pulse by means of a vibrator or a ruler - on the delivery edge 22 'of the longitudinal feed conveyor 29 on the belt 24 of the transverse feed conveyor 21 and as described on the delivery edge 22 away on the odd-numbered layer thirteenth .n passed. It is also possible to buffer a plurality of boards 12 m initially on the transverse feed conveyor 21 and then pass them directly successively onto the uppermost odd-numbered board layer 13. n, in order to then be nailed one after the other. On the other hand, can be dispensed with for reasons of saving on required installation space on the intermediate transverse feeder 21. Then the nailer portal 25 moves directly parallel to the delivery edge 22 'at the feed area 32 to the longitudinal feed conveyor 29 zoom.
  • the boards supplied there can be pushed, for example, by one or more tactile or adjustable rulers from the longitudinal feed conveyor 29 via its delivery edge 22 'on the mounting table 16 and the topmost layer provided thereon.
  • the sub-boards are 12 mm deported via the delivery edge 22 'on the mounting table 16.
  • the movement of the nailing machines 26 is then controlled so that they reach 12mm under the portal 25 only over the lengths of the sub-boards to the effect.
  • At least one further pair of layers 13n-13m can be applied.
  • the composite member 14 finished from the predetermined, usually odd number of plies 13n + 13m + 13n is then delivered to possibly only allow easy finishing of the inner edges of the recesses 11, e.g. to learn by means of a milling robot.
  • Such further processing can also take place at the portal 25, when the processing unit 33 shown only schematically in the drawing is equipped in addition to the at least one automatic nailer 26, such as a swivel circular saw and / or with a tool change head, such as drill and cutter.
  • the processing unit 33 shown only schematically in the drawing is equipped in addition to the at least one automatic nailer 26, such as a swivel circular saw and / or with a tool change head, such as drill and cutter.
  • the currently board 12m to be boarded - and later the next adopted odd numbered position 13n + 2 at the position of a board 12m to be applied - by means of the mounting table 16th Move under the longitudinally of the board 13m movable nailing machine 26 of the stationary portal 25.
  • the boards are milled 12m for the even layers 13m corresponding to the total length of the wall element, the width and position of the recesses and simultaneously as a successive, aligned with each other and correspondingly spaced Part boards 12mm applied by the transverse feed conveyor 21 to the current odd-numbered layer 13.n.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Forests & Forestry (AREA)
  • Attitude Control For Articles On Conveyors (AREA)
  • Automatic Assembly (AREA)

Abstract

The invention relates to a solid wood composite component (14) having at least one layer (13.m) comprising boards (12m) oriented parallel to each other and pivoted with respect to the previous layer (13.n). The layers are connected to each other by means of an automatic nailer (26). One layer (13.n) made of the boards (12.n) is transferred to an assembly table (16) that is transported beneath a feeder edge (22, 22') of at least one feeder (21, 29) for boards (12m) of a next board layer (13.m), said boards being pivoted in orientation relative to the boards (12.n). Said boards are placed in series on the top layer (13.n) and each nailed to said layer or to the layer beneath said layer at a stationary portal (25), until a layer (13.m) is reached on which the next subsequent layer (13.n) is placed. The device has the displaceable assembly table (16) for receiving the board layers (13.m, 13.n) and a longitudinal feeder (29) for the boards (12.m) of a next layer (13.m), said boards being placed in series on the corresponding layer (13.n) by means of a feeder edge (22, 22'). The device further comprises a stationary portal (25) in parallel to the feeder edge (22, 22') and comprising at least one automatic nailer (26).

Description

Verfahren und Einrichtung zum Bestücken eines mehrlagigen Vollholz-Verbundbauteiles  Method and device for equipping a multilayer solid wood composite component
Die Erfindung betrifft ein Verfahren zum Bestücken eines mehrlagigen Vollholz-Verbundbauteils nach dem Oberbegriff des Anspruches 1 sowie eine Einrichtung zum Bestücken eines mehrlagigen Vollholz-Verbundanteils nach dem Oberbegriff des Anspruches 1 1. The invention relates to a method for equipping a multilayer solid wood composite component according to the preamble of claim 1 and to a device for equipping a multilayer solid wood composite component according to the preamble of claim 11.
Derartige Vollholz-Verbundbauteile sind aus der DE 20 2006 005 108 U 1 für den Fertighausbau bekannt, nämlich zum Einsatz als Dach-, Decken- und insbesondere Wandelemente. Eine Lage von nebeneinander liegenden, untereinander falzverbundenen Brettern wird mittels einer ersten längsseits angreifenden Spanneinrichtung zusammengehalten und dann eine weitere Lage von ebenfalls zueinander parallelen und untereinander falzverbundenen, mittels einer zweiten derartigen Spanneinrichtung zusammengehaltenen Brettern quer zu der direkt darunter gelegenen Bretter-Lage auf diese aufgepresst; woraufhin eine mit einem Nagelautomaten bestückte Brücke in Richtung der größeren Bretterlänge über dieser aktuell obersten Lage längsverfährt, um sie mit der darunter gelegenen Bretter-Lage an vorbestimmten Positionen mittels Haltestiften zu verbinden. Das wiederholt sich für mindestens eine dritte Bretterlage. Weil ein abschließendes Glatthobeln der Oberfläche des so erstellten Verbundbauteiles die Köpfe von Nägeln abscheren und dadurch die Verbindung destabilisieren könnte, werden, jedenfalls zum Verbinden der jeweils beiden obersten Bretter-Lagen miteinander, kopflose Stifte mit längs ihren Schäften versetzt umlaufenden Wülsten eingesetzt. Such solid wood composite components are known from DE 20 2006 005 108 U 1 for prefabricated houses, namely for use as roof, ceiling and in particular wall elements. A layer of adjacent, mutually falzverbundenen boards is held together by means of a first attacking alongside clamping device and then another layer of parallel to each other and falzverbundenen, held together by a second such tensioning boards transversely to the directly below located board layer on this; whereupon a bridge equipped with a nailing machine travels longitudinally in the direction of the larger board length above this topmost layer in order to connect it to the underlying board layer at predetermined positions by means of holding pins. This repeats for at least a third board position. Because a final Glatthobeln the surface of the composite component thus created shear off the heads of nails and thereby destabilize the connection, headlamp pins are at least used for connecting the respective two uppermost board layers with longitudinally staggered along their shafts circumferential beads.
Apparativ problematisch ist das Beherrschen der Durchbiegungen und der Schwingungen beim programmgesteuerten Handhaben der einzelnen nach- Apparat problematic is the mastery of the deflections and the vibrations during program-controlled handling of the individual nach-
BESTÄTIGUNGSKOPIE einander zu einer Lage nebeneinander abzulegenden langen Bretter. Sie müssen dafür nacheinander einem Materialpuffer entnommen und vor ihrem positionsgenauen Absetzen auf die aktuell oberste Lage deren Brettern gegenüber jeweils noch um definiert 90° verschwenkt werden. Abgesehen vom Zeitbedarf für das Hantieren der langen Bretter beschränkt deren Schwingungsproblematik in der Praxis die Höhe beziehungsweise Länge solcher Vollholz-Verbundbauteile auf typisch eine Größenordnung von bis zu maximal sechs Metern. Zum Zusammenfügen einer Lage sind noch längere Bretter so nicht mehr handhabbar; für beispielsweise längere Wände müssen solche Verbundbauteile deshalb am Montageort erst noch aufwändig mit weiteren solchen Verbundbauteilen zusammengesetzt werden. Ein weiteres Problem ergibt sich daraus, dass die jeweils, zum Vernageln der beiden aktuell ober-sten Bretter-Lagen miteinander, über das Verbundbauteil in Richtung dessen größerer Abmessung zu verfahrende Brücke mit ihrem Nagelautomaten samt dessen Nagel-Vorratsbehälter eine sehr große Masse darstellt, weshalb die Brücke zum rechnergesteuerten Anfahren vorgegebener Nagelpositionen nicht besonders schnell beschleunigt und positionsgenau wieder abgebremst werden kann. Das beschränkt den Fertigungstakt zusätzlich zu den Handhabungsproblemen langer Bretter. Ein besonderes Problem stellt es darüber hinaus dar, dass beim Freischneiden von Fenstern und Türen aus derartigen, etwa als Außenwände einzusetzenden Verbundbauteilen erhebliche Mengen an mit Stiften durchsetztem Restholz anfallen. Dieses darf deshalb nicht einfach verbrannt werden; das ist Sondermüll, den der Bauherr (oder der Fabrikant) kostenaufwändig entsorgen muss. CONFIRMATION COPY each other to a position next to each other to be deposited long boards. They have to be removed one after the other from a material buffer and, before being placed in the exact position on the topmost layer of their boards, they must be swiveled 90 ° counter to each other. Apart from the time required for handling the long boards whose vibration problem in practice limits the height or length of such solid wood composite components to typically a magnitude of up to a maximum of six meters. To assemble a layer even longer boards are no longer manageable; For example, for longer walls such composite components must be assembled at the installation still consuming with other such composite components. Another problem arises from the fact that the respective, for nailing the two currently top-most board layers together, over the composite component in the direction of its larger dimension to be moved bridge with its nailing machine together with its nail reservoir is a very large mass, which is why the bridge can not be accelerated very quickly and can be braked with exact position accuracy again for computer-controlled approaching of predetermined nail positions. This limits the production cycle in addition to the handling problems of long boards. A particular problem it also represents that when clearing windows and doors from such, to be used as external walls composite components incurred considerable amounts of interspersed with pins waste wood. Therefore, this must not be burned easily; this is hazardous waste, which the builder (or the manufacturer) must dispose of costly.
In Erkenntnis derartiger Probleme liegt vorliegender Erfindung die technische Problemstellung zugrunde, Vollholz-Verbundbauteile gattungsgemäßer Art technologisch problemlos und selbst bei gesteigerter Taktrate auch noch in wesentlich größeren Abmessungen herstellen zu können; wobei zugleich Anfall an Sondermüll wenigstens reduziert, vorzugsweise ganz vermieden werden soll. Diese Aufgabe wird beim gattungsgemäßen Verfahren erfindungsgemäß mit den kennzeichnenden Merkmalen des Anspruches 1 und bei der gattungsgemäßen Einrichtung erfindungsgemäß mit den kennzeichnenden Merkmalen des Anspruches 1 1 gelöst. In recognition of such problems, the present invention is based on the technical problem of being able to manufacture solid wood composite components of the generic type in a technologically problem-free manner and even with significantly increased cycle rate even in considerably larger dimensions; at the same time at least reduced accumulation of hazardous waste, preferably completely avoided. This object is achieved in the generic method according to the invention with the characterizing features of claim 1 and in the generic device according to the invention with the characterizing features of claim 1 1.
Beim erfindungsgemäßen Verfahren wird eine erste (komplette) Lage aus Brettern dem Montagetisch übergeben. Er kann programmgesteuert in seiner Ebene verschiebbar und gegebenenfalls auch quer zu seiner Ebene auf- und ab bewegbar sein. Die Bretter dieser ersten Lage können in Bretter- Querrichtung mittels einer Spanneinrichtung zusammengehalten oder schon jeweils längsseitig miteinander stoff- oder formschlüssig zu einem einlagigen Plattenelement verbunden, etwa verklebt oder verfalzt, sein. Die Übergabe der Lage der Bretter ist auch so zu verstehen, dass die Bretter an den Montagetisch übergeben und mit ihnen die Lage auf dem Montagetisch gebildet wird. Auf den so bestückten Montagetisch wird, verschwenkt gegenüber der Ausrichtung der Bretter der ersten Lage, das erste Brett einer zweiten Bretter-Lage aufgebracht. Dazu fährt der Montagetisch so weit unter die Ablieferungskante des Zuförderers, dass er über seine Ablieferungskante das erste Brett der nächsten Lage auf die vorhandene Lage aufbringt, etwa aufschiebt oder auffallen lässt. Die Bretter der nächsten Lage liegen verschwenkt, d.h. unter einem Winkel zu den Brettern der ersten Lage. Die Winkellage dieses Brettes gegenüber den Brettern der darunter gelegenen Lage ist über die Ausrichtung der Ablieferungskante einstellbar; üblicherweise sind die Bretter-Lagen orthogonal zueinander orientiert, so dass nacheinander die Bretter der einen Lage in an sich bekannter Weise jeweils quer zu den Brettern der vorherigen Lage aufeinander zu liegen kommen. In the method according to the invention, a first (complete) layer of boards is transferred to the assembly table. It can be moved programmatically in its plane and, if necessary, also transversely to its plane up and down to be movable. The boards of this first layer may be held together in the transverse direction of the board by means of a tensioning device, or may already be joined to one another in a material-locking or form-fitting manner to form a single-layered board element, for example glued or folded. The transfer of the position of the boards is also to be understood that the boards passed to the assembly table and with them the location is formed on the assembly table. The first board of a second board layer is applied to the assembled assembly table, pivoted in relation to the orientation of the boards of the first layer. For this purpose, the assembly table moves so far below the delivery edge of the feed conveyor that it applies the first board of the next layer on its existing position on its delivery edge, for example postpones or attract attention. The boards of the next layer are pivoted, i. at an angle to the boards of the first layer. The angular position of this board opposite the boards of the underlying layer is adjustable by the orientation of the delivery edge; Usually, the board layers are orthogonal to each other, so that successively come the boards of a layer in a conventional manner each transverse to the boards of the previous situation to each other.
Das so aufgebrachte erste Brett der aktuell zu erstellenden Lage wird mit der schon darunter gelegenen vorherigen Lage mittels Stiften, Nägeln, Krampen oder Klammern vernagelt. Um dazu nicht die große Masse eines Nagler-Portals längs etwa der Längserstreckung des gerade aufgebrachten Brettes beschleunigen und positionsgenau wieder abbremsen zu müssen, ist das Portal stationär angeordnet. Dann kann beispielsweise zum Verna- gein dieses gerade aufgebrachten Bretts der bestückte Montagetisch programmgesteuert schrittweise in Längsrichtung dieses Brettes - bei einem hinreichend breiten Brett auch in dessen Querrichtung - unter das Nagler- Portal verfahren, das parallel zur Ablieferungskante, vorzugsweise unmittelbar neben der Ablieferungskante des Zuförderers stationär installiert und mit mindestens einem stationären oder längs des Portals verfahrbaren Nagelautomaten einschließlich dessen Vorratsbehälter bestückt ist. The thus applied first board of the current situation to be created is nailed to the already below previous location by means of pins, nails, staples or staples. In order not to have to accelerate the large mass of a nailer portal along approximately the longitudinal extension of the board just applied and to slow down position exactly, the portal is stationary. Then, for example, Programmed in this straight applied board the assembled assembly table step by step in the longitudinal direction of this board - with a sufficiently wide board in the transverse direction - under the Nagler portal proceeding parallel to the delivery edge, preferably installed directly next to the delivery edge of the feeder stationary and with at least one stationary or along the portal movable nailing machine including its reservoir is equipped.
Kinetisch zweckmäßiger ist es, einen danach dann stillstehenden Montagetisch mit dem aktuell aufgebrachten Brett unter das Nagler-Portal zu positionieren und nur wenigstens einen Nagelautomaten längs des parallel zu den Brettern der zweiten Lage stationär installierten Portals zu verfahren, also längs des aktuell aufgebrachten und mit der darunter gelegenen Lage zu vernagelnden Brettes. Kinetically expedient it is to then position a then stationary assembly table with the currently applied board under the Nagler portal and only at least one nailing machine along the parallel to the boards of the second layer stationarily installed portal to move, ie along the currently applied and with the underneath location to be nailed board.
Wenn dieses aktuell aufgebrachte Brett so mit der bisher obersten Lage vernagelt ist, ist es vorteilhaft, wenn der Montagetisch bezüglich der Ablieferungskante des Zuförderers gemäß der Breite des nächstfolgenden Brettes auf Abstand zum soeben aufgebrachten Brett verfahren wird. Das nächste Brett wird dann neben das soeben vernagelte Brett auf die auf dem Montagetisch zuoberst vorhandene Lage aufgebracht und dann unter das stationäre Nagel-Portal geschoben; und so fort, bis die zuvor oberste Lage nacheinander mit den Brettern dieser aktuell gebildeten Lage komplett belegt und jeweils vernagelt ist. If this currently applied board is nailed to the hitherto uppermost layer, it is advantageous if the assembly table is moved with respect to the delivery edge of the feed conveyor according to the width of the next board at a distance from the board just applied. The next board is then placed next to the board just nailed to the top of the mounting table and then pushed under the stationary nail portal; and so on, until the previous top layer one after the other with the boards of this currently formed location completely covered and nailed.
Die Zufuhr der Bretter kann aus einem Materialpuffer mittels eines Längs- Zuförderers zur Ablieferungskante zwecks Übergabe auf die aktuell oberste Lage auf den Montagetisch erfolgen und ist - wie aus der Technologie der Abbundanlagen geläufig - selbst bei sehr langen Brettern in ihrer Längsrichtung in außerordentlich hoher Taktrate möglich. Mangels Wendeerfordernissen und Durchhängens der längsseits aufliegend geförderten Bretter treten keine die Arbeitstaktfolge bremsenden kinetischen Probleme auf. Deshalb ist die Bretterlänge nun auch praktisch nicht mehr begrenzt, jedenfalls mit über zwölf Metern mindestens doppelt so groß, wie sie maximal nach bishe- rigen Verfahren handhabbar war. Das Nagier-Portai beziehungsweise der Verfahrweg seiner Nagelautomaten erstreckt sich über wenigstens die Länge der längsten der aufzubringenden Bretter. Da außerdem zum Vernageln des jeweiligen Brettes an steuerungstechnisch vorgegebenen Positionen nun nur der Montagetisch oder gar nur der wenigstens eine Nagelautomat bewegt werden muss, aber jedenfalls nicht die große Masse des Portals mit seiner Nagler-Bestückung, können die nacheinander beigebrachten Bretter für die nun oberste Lage in überaus hoher Taktrate aufgebracht und mit der darunterliegenden Bretter-Lage vernagelt werden. The supply of the boards can be made from a material buffer by means of a longitudinal feed to the delivery edge for transfer to the topmost position on the assembly table and is - as is common in the technology of joinery - even with very long boards in their longitudinal direction in extremely high clock rate possible , Due to the lack of turning requirements and sagging of the longitudinally supported boards, there are no kinetic problems that slow down the working cycle. Therefore, the length of the planks is now practically no longer limited, at least with more than twelve meters at least twice as large as they can be until after max. procedure was manageable. The Nagier-Portai or the travel of his nails machine extends over at least the length of the longest of the applied boards. Since also for nailing the respective board to control-technical positions now only the assembly table or even only the at least one nail machine must be moved, but certainly not the bulk of the portal with its Nagler placement, the successively taught boards for the now topmost position applied at a very high clock rate and nailed to the underlying board position.
Die programmgesteuert schrittweise Bewegung des belegten Montagetisches unter die Ablieferungskante des Zuförderers in eine Position, in der das nächste Brett vor das soeben festgenagelte Brett abgeliefert wird, führt ohne besondere Handhabungserfordernisse unmittelbar dazu, dass das nächste Brett schon in die vernagelungsgerechte Position längsseits direkt neben das soeben vernagelte Brett zu liegen kommt. Bei Brettern unterschiedlicher Breite kann für die jeweils erforderliche Positionierung des Montagetisches unter der Ablieferungskante des Zuförderers zuvor die Breite des nun aufzubringenden Brettes etwa mittels Photozellen oder Laserabtastung vermessen werden, wodurch das aktuell nachzuliefernde Brett wieder gerade längsseits gegen das zuvor aufgenagelte Brett der aktuell zu erstellenden Bretter-Lage in Anlage gerät. The program-controlled stepwise movement of the occupied assembly table below the delivery edge of the feed conveyor in a position in which the next board is delivered before the just nailed board, without any special handling requirements directly to the fact that the next board already in the position suitable for nailings alongside next to the just boarded board comes to rest. For boards of different widths, the width of the board now to be applied can be measured by means of photocells or laser scanning for each required positioning of the assembly table below the delivery edge of the feeder before, whereby the currently nachzuliefernde board again just alongside against the previously nailed board of the currently created boards Position in attachment device.
Zweckmäßigerweise ist am Montagetisch wenigstens ein Stütz-Anschlag vorgesehen. Dieser stoppt die Querverschiebung einer kompletten Lage aus Brettern oder des ersten Brettes der jeweiligen Folgelage. Das jeweilige Folgebrett dieser Lage läuft dann mit seiner kinetischen Übergabeenergie gegen das zuvor durch seine Vernagelung starr positionierte Brett an, wodurch ohne Erfordernis einer Spanneinrichtung bereits die wünschenswert dichte Packung in der Bretterlage gewährleistet ist. Wenn etwa unter der Ablieferungskante oder beim Nagel-Portal ein stationärer Richt-Anschlag eingerichtet ist, kann der entsprechend abgesenkte Montagetisch mit dem gerade aufgebrachten Brett dagegen vorgefahren werden, um es unmittel- bar vor seinem Vernagein zusätzlich noch inniger längsseits an das vorangehend vernagelte Brett anzuschmiegen. Conveniently, at least one support stop is provided on the mounting table. This stops the transverse displacement of a complete layer of boards or the first board of the respective follow-up situation. The respective follow-up board of this situation then runs with its kinetic transfer energy against the previously rigidly positioned by his nailing board, which is already guaranteed the required tight packing in the board position without the need of a tensioning device. If, for example, a stationary straightening stop is set up below the delivery edge or at the nail portal, the correspondingly lowered assembly table can be moved forward with the board that has just been applied, in order to make it directly accessible. bar in front of his nostrils additionally intimately alongside to nude the previously nailed board.
Nachdem so auch das letzte Brett der aktuellen Lage mit der darunter gelegenen Lage vernagelt ist, wird der Montagetisch zur Übernahme einer unterdessen bereitgestellten nächsten, jetzt wiederum kompletten Lage zurückgefahren. Dabei kann er um die Stärke der zuvor gebildeten Bretterlage abgesenkt werden, um die nächste Bretterlage ohne Handhabungsprobleme einfach über die zuvor gebildete Lage aufschieben zu können. After also the last board of the current situation with the underlying situation is nailed down, the assembly table is reduced to take over a meanwhile provided next, now again complete situation. He can be lowered by the strength of the previously formed board position to easily postpone the next board situation without handling problems on the previously formed location can.
Diese neue, komplette Lage kann nun mit der darunter gelegenen Bretter- Lage vernagelt werden. Das kann über die gesamte Fläche dieser Lage erfolgen, indem der Montagetisch unter dem Nagel-Portal beispielsweise im Zickzack von einem zum nächsten Brett verfahren wird, ehe wieder über die Ablieferungskante das soeben beschriebene Beschicken mit der Bretterfolge für die nächste Lage einsetzt. This new, complete layer can now be nailed to the underlying board position. This can be done over the entire surface of this situation by the assembly table is moved under the nail portal, for example in zigzag from one to the next board, before again using the delivery edge just loading with the board sequence for the next layer.
Kinematisch günstiger ist es jedoch, die komplette Lage mit der darunter gelegenen Lage immer nur längs desjenigen Brettes zu vernageln, das gerade für die aktuell zu bildende Lage über die Ablieferungskante aufgebracht wurde. Allerdings müssten eigens dafür Stifte oder Klammern doppelter Eindring-Länge eingeschleust werden, wenn dieses Vernageln durch das aktuelle Brett und die zuvor aufgebrachte komplette Lage hindurch in die darunter liegende Lage hinein erfolgen sollte. Deshalb wird bevorzugt an der späteren Position des nächsten Brettes der aktuell im Entstehen begriffenen Lage zunächst noch die zuvor aufgebrachte komplette Lage mit der darunter gelegenen Lage vernagelt; und erst auf diese Nagelspur in der zuvor aufgebrachten kompletten Lage wird dann das Brett für die aktuell zu bildende Lage wie vorstehend beschrieben aufgebracht sowie mit jener vernagelt. However, it is kinematically more favorable to nail the complete layer with the underlying layer only along that board which has just been applied for the currently to be formed layer via the delivery edge. However, pens or staples of double penetration length would have to be introduced especially if this nailing should be done by the current board and the previously applied complete layer into the underlying layer inside. Therefore, preferably at the later position of the next board of the position currently being formed, first the previously applied complete layer is nailed to the underlying layer; and only on this nail trace in the previously applied complete position then the board for the currently to be formed layer is applied as described above and nailed to that.
Vorteilhafterweise ist im Verlaufe des Längs-Zuförderers zum Beschicken der Ablieferungskante eine Kappsäge installiert, die am aus dem Materialpuffer in Längsrichtung angelieferten Brett zunächst einen Stirnschnitt aus- führt und das Brett dann auf die Länge trimmt bzw. ablängt, die durch die Länge des Verbundbauteiles vorgegeben ist. Wenn das Verbundbauteil als Wandelement eingesetzt wird , dann entspricht diese Abmessung der Länge der Wand aus vorverbundenen sogenannten stehenden oder Vertikal-Brettern und ist also durch die Anzahl an Brettern bekannter Breite bestimmt. Da bei solchen als Wandelement eingesetzten Verbundbauteilen die erste und dann wieder die dritte Lage aus Vertikal-Brettern besteht, werden diese Lagen nachfolgend als ungeradzahlig bezeichnet. Die Länge einer solchen Wand entspricht auch der Länge der auf solche ungeradzahligen Lagen nacheinander aufgebrachten und durchgenagelten sogenannten liegenden oder Horizontal-Bretter in den nachfolgend als geradzahlig bezeichneten Lagen. Advantageously, a chop saw is installed in the course of the longitudinal feed conveyor for loading the delivery edge, which firstly performs an end cut on the board delivered from the material buffer in the longitudinal direction. leads and then trims the board to the length or length, which is determined by the length of the composite component. If the composite component is used as a wall element, then this dimension corresponds to the length of the wall of vorverbundenen so-called vertical or vertical boards and is thus determined by the number of boards of known width. Since in such used as a wall element composite components, the first and then the third layer of vertical boards, these layers are hereinafter referred to as odd. The length of such a wall also corresponds to the length of the so-called horizontal or horizontal boards applied successively to such odd-numbered layers and through-nailed in the layers referred to below as even-numbered.
Wenn ein längsseits aus dem Materialpuffer über den Längs-Zuförderer der Ablieferungskante zuzuführendes Brett diese vorgegebene Länge noch nicht erreicht, dann wird zweckmäßigerweise nach dem Trimmschnitt gleich ein Teilbrett von wenigstens der erforderlichen Ergänzungslänge nach seinem Trimmschnitt an die Ablieferungskante nachgeschoben. Diese übergibt dann stirnseitig aneinandergrenzende Teilbretter gleichzeitig auf die ungeradzahlige, aktuell oberste Lage auf dem Montagetisch, so dass diese Lage wieder über ihre gesamte Länge belegt wird, nun stirnseitig zusammengesetzt aus beispielsweise zwei Teilbrettern. If a long side to be supplied from the material buffer on the longitudinal feed conveyor to the delivery edge board does not reach this predetermined length, then it is expediently nachgeschoben a part board of at least the required additional length after his trimming cut to the delivery edge after trimming. This then passes frontally adjacent sub-boards simultaneously on the odd-numbered, currently topmost position on the mounting table, so that this position is occupied again over its entire length, now assembled on the front side, for example, two partial boards.
Damit der stirnseitig bündige Stoß des nun aus Teilbrettern zusammengesetzten Längsbrettes und dessen Positionierung sichergestellt sind, ist der Längs-Zuförderer im Bereich seiner Ablieferungskante zweckmäßigerweise mit einer Positioniereinrichtung ausgestattet. Diese kann immateriell als Positionsregelung am Längs-Zuförderer realisiert sein, oder materiell etwa als einstellbarer End- oder Positionier-Anschlag, gegen den das erste Teilbrett anfährt und sich beim Anlaufen des nachfolgenden zweiten Teilbrettes abstützt, ehe dann beide Teilbretter so koaxial positioniert gleichzeitig über die Ablieferungskante auf die aktuell oberste (ungeradzahlige) Bretter-Lage auf dem Montagetisch übergeben werden. Selbstverständlich können auch die einzelnen mit einer der vollen Wandlänge entsprechenden Länge zugeförderten Horizontal-Bretter an diesem Positionier-Anschlag zur Anlage kommen und damit lagegenau auf die vorherige, ungeradzahlige Lage aufgebracht werden. Thus, the front side flush joint of the now composed of partial boards longitudinal board and its positioning are ensured, the longitudinal feed conveyor is in the region of its delivery edge expediently equipped with a positioning device. This can be realized immaterial as position control on the longitudinal feed conveyor, or material as about adjustable end or positioning stop against which the first part board anfährt and is supported when starting the subsequent second part board before then both sub-boards coaxially positioned simultaneously over the Delivery edge on the currently top (odd) board location on the assembly table to be passed. Of course, the individual with a full wall length corresponding length zugeförderten horizontal boards can come to rest on this positioning stop and thus accurately positioned are applied to the previous, odd-numbered position.
Wenn die ungeradzahligen Lagen, wie insbesondere bei vorverbundenen stehenden Brettern anzutreffen, mit Aussparungen oder dergleichen Öffnungen für das zu erstellende Verbundbauteil, etwa für Fenster oder Türen in Wandbauteilen, auf den Montagetisch angeliefert werden, dann werden diese Aussparungen zweckmäßigerweise auch gleich in den geradzahligen Lagen freigespart. Dazu werden vom Längs-Zuförderer Teilbretter in Längsflucht nun nicht auf Stoß, sondern auf Lücke bei der Ablieferungskante bereitgestellt und auf die aktuelle obere, ungeradzahlige Lage übergeben. Diese Lücken sind (in Längsrichtung der Bretter der geradzahligen Lagen betrachtet) jeweils so lang, wie von der jeweiligen Breite der Aussparung in der ungeradzahligen Lage vorgegeben. Für das gegenseitige Positionieren dieser Teilbretter sind mehrere Positioniereinrichtungen vorerwähnter Art längs des Zuführbereiches etwa als versetzte materielle Positionier- Anschläge vorgesehen. Diese können bei aufeinander folgendem Zulauf der getrimmten Teilbretter zur Ablieferungskante programmgesteuert in den Zuführbereich des Längs-Zuförderers hinein bewegt werden. So werden Lücken vorgegebener Längen zwischen axial aufeinanderfolgenden Teilbrettern zu deren gleichzeitiger Übergabe über die Ablieferungskante hervorgerufen, bis gegebenenfalls wieder Bretter über die gesamte Länge der ungeradzahligen Lage nachfolgen. If the odd-numbered layers, as encountered in particular in pre-connected standing boards, with recesses or similar openings for the composite component to be created, such as windows or doors in wall components, are delivered to the assembly table, then these recesses are expediently also freed equal in the even-numbered layers , For this purpose, the longitudinal feeder partial boards are provided in longitudinal alignment now not on impact, but on the gap at the delivery edge and transferred to the current upper, odd-numbered position. These gaps are (viewed in the longitudinal direction of the boards of the even layers) each as long as predetermined by the respective width of the recess in the odd-numbered position. For the mutual positioning of these partial boards several positioning devices of the aforementioned type along the feed area are provided approximately as staggered material positioning stops. These can be moved programmatically in the feed region of the longitudinal feed conveyor in successive feed the trimmed part boards to the delivery edge. Thus, gaps of predetermined lengths between axially successive part boards are caused to their simultaneous transfer over the delivery edge, to possibly follow again boards over the entire length of the odd-numbered layer.
Das Nagel-Portal kann zusätzlich mit Bearbeitungsaggregaten, wie mit einer Schwenksäge oder mit einer Werkzeugwechselaufnahme für Bohrer oder etwa für Fräser ausgestattet sein, letzteres um bei einem Wandelement die Innenränder von Türen- und Fensteröffnungen nachzuarbeiten; der Anfall an Spänen ist entsprechend gering, insbesondere fällt dabei kein Sondermüll an. Solche Bearbeitungsaggregate sind zweckmäßigerweise an der vom Nageiautomaten abgewandten Seite des Portals installiert, um einerseits Verfahrbewegungen der Nagelautomaten längs der Bretter der obersten Lage nicht einzuschränken und andererseits ihrerseits längs des stationären Portals verfahren werden zu können. Während der lichte Abstand des Portals über der jeweils obersten Bretterlage auf dem absenkbaren Montagetisch zweckmäßigerweise den Bedürfnissen der Naglerfunktion angepasst ist, sind für das Ausrichten und Haltern der Werkzeuge auf der anderen Seite des Portals dann etwa Roboter-Schwenkarme, Teleskope oder dergleichen installiert. The nail portal can also be equipped with processing units, such as with a swivel saw or with a tool change receiver for drills or about milling cutters, the latter to rework the inner edges of door and window openings in a wall element; the accumulation of chips is correspondingly low, in particular no hazardous waste is generated. Such processing units are expediently at the Installed side facing away from the Nageiautomaten side of the portal, on the one hand not to limit traversing movements of the automatic nailer along the boards of the topmost layer and on the other hand to be able to be moved along the stationary portal. While the clear distance of the portal above the respective uppermost layer of boards on the lowerable assembly table is expediently adapted to the requirements of the nailer function, robotic swivel arms, telescopes or the like are then installed for aligning and holding the tools on the other side of the portal.
Es kann aber auch vorgesehen sein, ein bereits mit Öffnungen erstelltes Verbundbauteil für solches Nacharbeiten an einen gesondert betriebenen Werkzeugroboter zu übergeben, um den Montagetisch möglichst rasch wieder zur Aufnahme der ersten Lage des nächstfolgenden Wandelementes oder dergleichen Verbundbauteiles verfügbar zu haben. However, it can also be provided to transfer an already created with openings composite component for such reworking on a separately operated tool robot to the assembly table as soon as possible to have available again for receiving the first layer of the next wall element or the like composite component.
Das Abliefern des Brettes für die zweite Lage kann auch über einen dem Längs-Zuförderer noch nachgeschalteten Quer-Zuförderer erfolgen. Das hat den Vorteil, darauf mehrere Bretter der aktuellen geradzahligen Lage gewissermaßen puffern und dann gleich als Gruppe auf die oberste, ungeradzahlige Lage übergeben zu können. In diesem Fall wird der Montagetisch bezüglich der Ablieferungskante des Zuförderers gemäß der Breite der Gruppe der Bretter auf Abstand zum soeben zuletzt aufgebrachten Brett zurückgefahren The delivery of the board for the second layer can also be done via a longitudinal feed conveyor still downstream cross-feed conveyor. This has the advantage of buffering several boards of the current even-numbered layer to a certain extent and then to be able to transfer as a group to the uppermost, odd-numbered position. In this case, the mounting table is moved back relative to the delivery edge of the feed conveyor according to the width of the group of boards at a distance to the just last applied board
Zwischen den einzelnen geradzahligen und ungeradzahligen Bretterlagen können je nach Ausbildung des mehrlagigen Vollholz-Verbundbauteils Zwischenlagen aus anderen Materialien eingebracht werden und zusammen mit den Bretterlagen verbunden, insbesondere vernagelt werden. Solche Zwischenlagen können beispielsweise auch vollflächig, d.h. einstückig und plattenförmig ausgebildet sein und zur Wärmeisolierung dienen. Notwendige Aussparungen für Fenster- oder Türöffnungen sind vorteilhaft ebenfalls bereits berücksichtigt und in den Zwischenlagen ausgespart bzw. ausgeschnitten. Die Zwischenlagen können beispielsweise aus anderen Holz- oder h'oizersatzwerkstoffen, Sperrholz, Spanplatte, Styropor oder anderen Kunststoffen bestehen. Depending on the design of the multi-layer solid wood composite component, intermediate layers of other materials can be introduced between the individual even-numbered and odd-numbered board layers and joined together, in particular nailed, to the board layers. Such intermediate layers may for example also be full-surface, ie formed in one piece and plate-shaped and serve for thermal insulation. Necessary recesses for window or door openings are advantageously also already taken into account and cut out or cut out in the intermediate layers. The liners can, for example, from other wood or h'oizersatzwerkstoffen, plywood, chipboard, polystyrene or other plastics.
Zusätzliche Abwandlungen und Weiterbildungen der erfindungsgemäßen Lösung ergeben sich aus den weiteren Ansprüchen und, auch hinsichtlich deren Vorteile, aus nachstehender Beschreibung eines bevorzugten Realisierungsbeispieles zum Erstellen eines mehrlagigen Wandelementes als dem Vollholz-Verbundbauteil. Die einzige Figur der Zeichnung zeigt, unmaßstäblich auf das Funktionswesentliche abstrahiert skizziert, das Belegen einer aus so genannten Vertikal-Brettern vorgefertigten durchbrochenen ungeradzahligen Bretter-Lage mit den Horizontal-Brettern einer geradzahligen Lage unter Aussparen der von der ersten (untersten) Lage vorgegebenen Öffnungen. Additional modifications and developments of the inventive solution will become apparent from the other claims and, including the advantages thereof, from the following description of a preferred implementation example for creating a multilayer wall element than the solid wood composite component. The sole figure of the drawing, sketched out of scale to the functional essentials outlines, occupying a so-called vertical boards prefabricated openwork odd-numbered boards position with the horizontal boards of an even-numbered layer, leaving out the predetermined from the first (lowest) position openings.
Eine in diesem Beispielsfalle bereits mit Fenster- und Türen-Aussparungen 1 1 ausgestattete und eventuell schon längsseits form- oder stoffschlüssig miteinander verbundenen Lamellen oder Brettern 12n vorgefertigte, ungeradzahlige Bretter-Lage 13.n (beginnend mit n = 1 ) eines mehrlagigen Vollholz-Verbundbauteiles 14 wird mittels einer Transporteinheit 15 in Form etwa eines Gleit- oder Rollentisches oder einer Übergabebrücke mittels Greifeinrichtungen in einer Übergaberichtung 17 auf einen Montagetisch 16 liegend verbracht. Damit die Bretter-Lage 13.n in der Übergaberichtung 17 in exakter Position auf dem Montagetisch 16 zu liegen kommt, kann ein nicht dargestellter Stützanschlag im Verfahrweg der Bretter-Lage 13.n vorhanden sein. Die Positionierung kann auch programmgesteuert erfolgen. Der Montagetisch 16 ist in seiner Ebene und quer zu seiner Ebene programmgesteuert kontinuierlich oder diskontinuierlich verfahrbar. Er fährt quer zur Übergaberichtung 17 mit der aufliegenden ersten, ungeradzahligen Bretter- Lage 13.n (n = 1 ) gegen wenigstens einen stationären Richt-Anschlag 18 unter einer rückwärtigen Ablieferungskante 22 eines Quer-Zuförderers 21 vor, um diese vorgefertigte Lage 13.n, dieser Vorbewegung entgegen, gegen montagetischfeste Stütz-Anschläge 19 anzudrücken und damit definiert auf dem Montagetisch 16 auszurichten. Daraufhin wird erforderlichenfalls der Montagetisch 16 um die Bretterstärke dieser Bretter-Lage 13.n abgesenkt. Das erste Brett 12m der jetzt folgenden nächsten Lage 13. m (beginnend mit m = 2 d.h.13.2) wird in diesem Beispielsfalle mittels des Quer-Zuförderers 21 über dessen rückwärtige Ablieferungskante 22 hinaus, quer zu den Brettern 12n der ersten Lage 13.1 orientiert, auf jene ungerade Lage 13.1 aufgebracht. Der Montagetisch 16 ist dafür in eine Position zurückgefahren, die um wenigstens die Breite der Bretter 12m hinter der Ablieferungskante 22 des Quer-Zuförderers 21 liegt. Dieser weist bevorzugt ein Gleitbett 23 unter wenigstens einem, vorzugsweise wie skizziert unter mehreren einander benachbarten, umlaufenden Mitnahme-Riemen 24 auf. Das Gleitbett 23 ist von der höheren Ebene des Quer- Zuförderers 21 in Richtung auf die niedrigere Auflageebene des Montagetisches 16 geneigt. Aufgrund seiner kinetischen Energie bewegt das erste der Bretter 12m sich über die Lage 13.1 hinweg bis zur Anlage gegen die Stütz- Anschläge 19. Das kann durch einen vorübergehend nach rückwärts geneigten Montagetisch 16 gefördert werden; zweckmäßiger kann es aber sein, die exakte Ausrichtung dieses ersten der Bretter 12m erforderlichenfalls dadurch sicherzustellen, dass der Montagetisch 16 nun mit diesem ersten Brett 12m einmal gegen die stationären Richt-Anschläge 18 vor- und dann zum Vernageln des Brettes 12m mit der darunter gelegenen Lage 13. n wieder zurückgefahren wird. A in this example case already equipped with window and door recesses 1 1 and possibly already alongside molded or cohesively interconnected lamellae or boards 12n prefabricated, odd-numbered board layer 13.n (starting with n = 1) of a multi-layer solid wood composite component 14 is spent by means of a transport unit 15 in the form of about a sliding or roller table or a transfer bridge by gripping means in a transfer direction 17 lying on a mounting table 16. So that the board position 13.n comes to lie in the transfer direction 17 in an exact position on the mounting table 16, an unillustrated support stop in the travel path of the boards 13.n be present. The positioning can also be done programmatically. The assembly table 16 is program-controlled continuously or discontinuously movable in its plane and transverse to its plane. It travels transversely to the transfer direction 17 with the resting first, odd-numbered board position 13.n (n = 1) against at least one stationary directional stop 18 under a rear delivery edge 22 of a transverse feed conveyor 21 in front of this prefabricated layer 13.n , This pre-movement against pressing against assembly table fixed support stops 19 and thus defined on the assembly table 16 align. Then, if necessary, the mounting table 16 is lowered by the board thickness of these boards position 13.n. The first board 12m of the next following layer 13.m (starting with m = 2 dh13.2) is oriented in this example case by means of the transverse feed conveyor 21 beyond its rear delivery edge 22, transverse to the boards 12n of the first layer 13.1, applied to that odd position 13.1. For this purpose, the assembly table 16 has been moved back to a position which is at least the width of the boards 12 m behind the delivery edge 22 of the transverse feed conveyor 21. This preferably has a sliding bed 23 under at least one, preferably as outlined below a plurality of mutually adjacent, circumferential driving belt 24. The sliding bed 23 is inclined from the higher level of the transverse feeder 21 in the direction of the lower support level of the mounting table 16. Due to its kinetic energy, the first of the boards 12m moves over the layer 13.1 until it rests against the support stops 19. This can be promoted by a temporary rearwardly inclined mounting table 16; but it may be more appropriate to ensure the exact alignment of this first of the boards 12m, if necessary, by the mounting table 16 now with this first board 12m once against the stationary directional stops 18 and then pre-nailing the board 12m with the underlying layer 13. n will be reduced again.
Dazu wird dieses Brett 12m mittels des programmgesteuerten Montagetisches 16 unter ein parallel zur Ablieferungskante 22 stationär vorgesehenes Portal 25 positioniert, das mit wenigstens einem hier sogenannten Nagelautomaten 26 samt Vorratsbehälter 27 für seine Stifte (Nägel) oder Klammern (Krampen) über die gesamte Länge des Brettes 12m längsverfahrbar bestückt ist. Die Nagelautomaten 26 werden also längs des stationären Portals 25 und somit längs des darunter positionierten, aktuell zu vernagelnden Brettes 12m programmgesteuert verfahren. Der Montagetisch 16 kann das Brett 12m auch vor- oder zurückbewegen, wenn, etwa bei einem breiten Brett 12m, eine zusätzliche Nagelspur parallel zur vorangegangenen gezogen werden soll. So wird das Brett 12m an allen vorprogrammierten Positio- nen mit der darunter gelegenen ungeradzahligen Lage 13.n, form- und kraftschlüssig verwölbungssicher verbunden. For this purpose, this board 12m is positioned by means of the program-controlled assembly table 16 under a parallel to the delivery edge 22 stationarily provided portal 25, with at least one here called nailing machine 26 together with reservoir 27 for his pins (nails) or staples (staples) over the entire length of the board 12m can be moved longitudinally. The nailing machines 26 are thus moved along the stationary portal 25 and thus along the positioned underneath, currently nailing board 12m programmatically. The mounting table 16 can also move the board 12m forwards or backwards if, for example with a wide board 12m, an additional nail track is to be pulled parallel to the previous one. So the board will be 12m at all pre-programmed position NEN with the underlying odd-numbered layer 13.n, positively and non-positively connected buckling safe.
Zur Aufnahme des nächstfolgenden der über den Quer-Zuförderer 21 nachgelieferten der Bretter 12m wird der Montagetisch 16 sodann in die der Breite der Bretter 12m entsprechende Stellung hinter der Ablieferungskante 22 gefahren, d. h. um einen Weg, der der Breite des nachfolgenden der Bretter 12m entspricht. Dieses nächste der Bretter 12m stützt sich längsseitig gegen das soeben vernagelte Brett 12m ab und kann durch Anfahren gegen die Richt-Anschläge 18 zusätzlich längsseits angepresst werden, ehe es, wie zuvor beschrieben, unter dem Portal 25 vernagelt wird; und so fort. In order to receive the next of the boards 12m subsequently fed in via the transverse feed conveyor 21, the assembly table 16 is then moved into the position corresponding to the width of the boards 12m behind the delivery edge 22, ie. H. around a path that corresponds to the width of the next of the boards 12m. This next of the boards 12m is supported longitudinally against the board just nailed down 12m and can be additionally pressed alongside it by approaching the directional stops 18 before it, as described above, is nailed under the portal 25; and so on.
Anstelle der stationären Richtanschläge 18, gegen welche das aufgebrachte Brett mit dem Montagetisch gefahren wird, können auch verfahrbare Richtanschläge beispielsweise in Form eines mittels Pneumatikzylinder verstellbaren Lineals eingesetzt werden, die bei feststehendem Montagetisch das zuletzt aufgebrachte Brett gegen das soeben vernagelte Brett 12m pressen. Instead of the stationary Richtanschläge 18, against which the applied board is driven to the mounting table, movable Richtanschläge for example in the form of adjustable by means of pneumatic cylinder ruler can be used, press the last applied board against the just nailed board 12m with a fixed mounting table the last applied board.
Die einzelnen Bretter 12m der geradzahligen Lagen 13. m werden nacheinander, etwa aus einem Materialpuffer 28, vereinzelt auf einen Längs-Zuförderer 29 übergeben und an einer Kappsäge 30 vorbeigeführt, um sie nach einem sauberen Stirnschnitt auf die von den ungeradzahligen Lagen 13.n vorgegebene Länge zu trimmen, d. h. abzulängen. So zugeschnitten werden die Bretter 12m nacheinander, weiterhin stabil auf dem Längs-Zuförderer 29 aufliegend, in Längsrichtung bis zu einem in und entgegen Zuführrichtung der Bretter einstellbaren Positionier-Anschlag 31 am Ende des Zufuhrbereiches 32 zum Quer-Zuförderer 21 vorbewegt. Dort wird dieses Brett 12m - erforderlichenfalls nach einleitendem Querimpuls mittels eines Rüttlers oder eines Lineals - über die Ablieferungskante 22' des Längs-Zuförderers 29 hinweg auf die Riemen 24 des Quer-Zuförderers 21 und wie beschrieben über dessen Ablieferungskante 22 hinweg auf die ungeradzahlige Lage 13.n übergeben. Es können auch mehrere Bretter 12m zunächst auf dem Quer-Zuförderer 21 gepuffert und dann unmittelbar aufeinanderfolgend auf die oberste ungeradzahlige Bretterlage 13.n übergeben werden, um dann gleich nacheinander vernagelt zu werden. Andererseits kann aus Gründen der Ersparnis an erforderlichem Installationsraum auch auf den zwischengeschalteten Quer- Zuförderer 21 verzichtet werden. Dann rückt das Nagler-Portal 25 direkt parallel zur Ablieferungskante 22' beim Zuführbereich 32 an den Längs- Zuförderer 29 heran. The individual boards 12m of the even-numbered layers 13m are successively transferred, for example from a material buffer 28, to a longitudinal feed conveyor 29 and guided past a chop saw 30, in order to achieve a clean frontal cut to that predetermined by the odd-numbered layers 13.n. Length to trim, ie cut to length. Thus, the boards are cut 12m successively, still stable on the longitudinal feed conveyor 29 resting, in the longitudinal direction up to a in and opposite feed direction of the boards adjustable positioning stop 31 at the end of the feed area 32 to the cross-feed conveyor 21 advances. There, this board is 12m - if necessary, after initial cross-pulse by means of a vibrator or a ruler - on the delivery edge 22 'of the longitudinal feed conveyor 29 on the belt 24 of the transverse feed conveyor 21 and as described on the delivery edge 22 away on the odd-numbered layer thirteenth .n passed. It is also possible to buffer a plurality of boards 12 m initially on the transverse feed conveyor 21 and then pass them directly successively onto the uppermost odd-numbered board layer 13. n, in order to then be nailed one after the other. On the other hand, can be dispensed with for reasons of saving on required installation space on the intermediate transverse feeder 21. Then the nailer portal 25 moves directly parallel to the delivery edge 22 'at the feed area 32 to the longitudinal feed conveyor 29 zoom.
Die dort zugeführten Bretter können beispielsweise durch ein oder mehrere takt- oder verstellbare Lineale von dem Längs-Zuförderer 29 über dessen Ablieferungskante 22' auf den Montagetisch 16 und die darauf bereitgestellte oberste Lage geschoben werden. The boards supplied there can be pushed, for example, by one or more tactile or adjustable rulers from the longitudinal feed conveyor 29 via its delivery edge 22 'on the mounting table 16 and the topmost layer provided thereon.
In der Zeichnungsskizze ist berücksichtigt, dass in den Brettern 12n der ungeradzahligen Lagen 13.n etwa eines Wandelementes freigesparte Aussparungen 11 nicht durch darüber zu nagelnde Bretter 12m der nächsten Lage 13m wieder verschlossen werden sollen. Deshalb werden die entsprechenden Bretter 12m nicht einstückig aufgebracht, sondern als, mittels der Kappsäge 30 getrimmte (abgelängte) zueinander axial distanzierte Teilbretter 12mm. Der der Breite einer Aussparung 1 1 entsprechende lichte Abstand zwischen axial einander benachbarten Teilbrettern 12mm wird durch programmgesteuert in den Zufuhrbereich 32 zum Quer-Zuförderer 21 hineinragende weitere Positionier-Anschläge 31 gewährleistet. Die so zueinander distanzierten Teilbretter 12mm werden dann gleichzeitig von den Riemen 24 des Quer-Zuförderers 21 erfasst und auf die Lage 13. n übergeben. Bei Verzicht auf den Quer-Zuförderer 21 werden die Teilbretter 12 mm über die Ablieferungskante 22'auf den Montagetisch 16 abgeschoben. Die Bewegung der Nagelautomaten 26 wird dann so gesteuert, dass sie nur über die Längen der Teilbretter 12mm unter dem Portal 25 zur Wirkung gelangen. In the drawing sketch it is taken into account that in the boards 12n of the odd-numbered layers 13.n of a wall element free-cut recesses 11 should not be closed again by boards 12m of the next layer 13m to be nailed over them. Therefore, the corresponding boards 12m are not applied in one piece, but as, trimmed by the chop saw 30 (cut to length) to each other axially spaced part boards 12mm. The width of a recess 1 1 corresponding clear distance between axially adjacent part boards 12mm is ensured by programmatically controlled in the supply area 32 to the transverse feed conveyor 21 further positioning stops 31. The partial boards 12mm, which are thus distanced to one another, are then simultaneously grasped by the belts 24 of the transverse feed conveyor 21 and transferred to the position 13. When dispensing with the transverse feed conveyor 21, the sub-boards are 12 mm deported via the delivery edge 22 'on the mounting table 16. The movement of the nailing machines 26 is then controlled so that they reach 12mm under the portal 25 only over the lengths of the sub-boards to the effect.
Wenn so die Lage 13.2 aus Brettern 12m nacheinander über die Ablieferungskante 22 beziehungsweise 22' auf die vorgefertigt übernommene Lage 13.1 aufgebracht und unter dem Nagelportal 25 mit ihr verbunden ist, fährt der Montagetisch 16 ganz zurück, um die unterdessen gefertigte nächste ungeradzahlige Lage 13.n+2 = 13.3 auf die soeben erstellte Lage 13. m (m = 2) zu übernehmen. Daraufhin wird wieder unter das Portal 25 querverfahren. Dort wird diese neue ungeradzahlige Lage 13.3 mit der vorangehenden geradzahligen Lage 13.2 verbunden, nach den eingangs bereits beschriebenen unterschiedlichen Verfahrensweisen, vorzugsweise in dem Bereich, in dem dann gleich anschließend das erste Brett 12m der nächsten Lage 13.m (m = 4) aufgebracht und mit der Lage 13.3 vernagelt wird; und so fort, bis beide Lagen 13.3 und 13.4 vernagelt und fertiggestellt sind. Thus, when the layer 13.2 of boards 12m successively applied via the delivery edge 22 or 22 'to the prefabricated inherited position 13.1 and connected under the nail portal 25 with her, drives the assembly table 16 all the way back to take over the meanwhile produced next odd-numbered layer 13.n + 2 = 13.3 on the just created layer 13. m (m = 2). Then again under the portal 25 cross process. There, this new odd-numbered layer 13.3 is connected to the preceding even-numbered layer 13.2, according to the above-described different procedures, preferably in the area in which then immediately afterwards the first board 12m of the next layer 13.m (m = 4) applied and nailed to the 13.3 position; and so on until both layers 13.3 and 13.4 are nailed and finished.
In gleicher Weise kann wenigstens ein weiteres Paar von Lagen 13n-13m aufgebracht werden. Das aus der vorgegebenen, gewöhnlich ungeradzahligen Anzahl von Lagen 13n+13m +13n fertiggestellte Verbundbauteil 14 wird dann abgeliefert, um eventuell lediglich noch eine leichte Fertigbearbeitung der Innenränder der Aussparungen 1 1 z.B. mittels eines Fräsroboters zu erfahren. In the same way, at least one further pair of layers 13n-13m can be applied. The composite member 14 finished from the predetermined, usually odd number of plies 13n + 13m + 13n is then delivered to possibly only allow easy finishing of the inner edges of the recesses 11, e.g. to learn by means of a milling robot.
Solche Weiterbearbeitung kann aber auch gleich beim Portal 25 erfolgen, wenn das in der Zeichnung nur schematisch dargestellte Bearbeitungsaggregat 33 zusätzlich zu dem wenigstens einen Nagelautomaten 26 entsprechend ausgestattet ist, etwa mit einer Schwenkkreissäge und/oder mit einem Werkzeugwechselkopf, etwa für Bohrer und Fräser. Such further processing can also take place at the portal 25, when the processing unit 33 shown only schematically in the drawing is equipped in addition to the at least one automatic nailer 26, such as a swivel circular saw and / or with a tool change head, such as drill and cutter.
Um beim Erstellen eines Vollholz-Verbundbauteiles 14, wie insbesondere eines Fertighaus-Wandelementes, den Problemen bei der Handhabung langer Bretter 12m, die verschwenkt, d.h. unter einem Winkel gegenüber den Brettern 12n einer schon erstellten Bretter-Lage 13.n auf diese aufzubringen sind, zu entgehen, wird eine ungeradzahlige Lage 13.n aus vorzugsweise schon längsseits untereinander vorverbundenen, sogenannten stehenden Brettern 12n von dem dreiachsig bewegbaren Montagetisch 16 übernommen und unter den Quer-Zuförderer 21 für die sogenannten liegenden Bretter 12m der nächsten, nun geradzahligen Lage 13.m verfahren, die nacheinander auf die vorhandene Lage 13.n aufgebracht und jeweils sogleich mit ihr vernagelt werden. Um die Probleme beim Bewegen großer Massen, wie einer mit ageiautomaten 26 samt ihren Vorratsspeichern 27 bestückten verfahrbaren Brücke zu entgehen, wird das aktuell zu vernagelnde Brett 12m - und später auch die nächste übernommene ungeradzahlige Lage 13.n+2 an der Position eines aufzubringenden Brettes 12m - mittels des Montagetisches 16 unter die längs des Brettes 13m verfahrbaren Nagelautomaten 26 des stationären Portals 25 verfahren. Wo in der ungeradzahligen Lage 13.n Aussparungen 1 1 vorgegeben sind, werden die Bretter 12m für die geradzahligen Lagen 13.m entsprechend der Gesamtlänge des Wandelementes, der Breite und Lage der Aussparungen abgelängt und gleichzeitig als aufeinanderfolgende, fluchtend zueinander und entsprechend auf Abstand liegende Teilbretter 12mm vom Quer-Zuförderer 21 auf die aktuelle ungeradzahlige Lage 13.n aufgebracht. Das Beschicken des Quer-Zuförderers 21 mit den Brettern 12m beziehungsweise mit der Folge von Teilbrettern 12mm für die geradzahligen Lagen 13.m erfolgt ohne Wendeerfordernisse in der ausgereiften Transport- und Positionierungstechnologie der Abbundanlagen mittels des mit der Kappsäge 30 bestückten Längs-Zuförderers 29. So lassen sich aufgrund der beschriebenen Maßnahmen Vollholz-Verbundbauteile 14 praktisch beliebig großer Abmessungen in überaus schneller Taktrate fertigen, und das ohne Anfall von Sondermüll für ein nachträgliches Einbringen von Fenster- und Türen-Aussparungen 1. In order to create a solid wood composite component 14, such as in particular a prefabricated house wall element, the problems in handling long boards 12m, which are pivoted, ie at an angle to the boards 12n an already created board position 13.n are applied to this To escape, an odd-numbered layer 13.n of preferably already alongside each vorverbundenen, so-called standing boards 12n taken from the three-axis moving assembly table 16 and under the transverse feed conveyor 21 for the so-called lying boards 12m of the next, now even-layer 13.m procedure, which are successively applied to the existing layer 13.n and nailed to it at once. To the problems when moving big Masses, such as one with ageiautomaten 26 equipped with their memory 27 equipped movable bridge, the currently board 12m to be boarded - and later the next adopted odd numbered position 13n + 2 at the position of a board 12m to be applied - by means of the mounting table 16th Move under the longitudinally of the board 13m movable nailing machine 26 of the stationary portal 25. Where in the odd-numbered position 13.n recesses 1 1 are given, the boards are milled 12m for the even layers 13m corresponding to the total length of the wall element, the width and position of the recesses and simultaneously as a successive, aligned with each other and correspondingly spaced Part boards 12mm applied by the transverse feed conveyor 21 to the current odd-numbered layer 13.n. The loading of the transverse feed conveyor 21 with the boards 12m or with the sequence of partial boards 12mm for the even layers 13.m takes place without turning requirements in the mature transport and positioning technology of the joinery by means of the equipped with the chop saw 30 longitudinal feed conveyor 29. So can be due to the measures described solid wood composite components 14 practically arbitrarily large dimensions finished in a very fast cycle, and without the seizure of hazardous waste for subsequent introduction of window and door recesses. 1

Claims

Patentansprüche claims
1 . Verfahren zum Bestücken eines mehrlagigen Vollholz-Verbundbauteiles (14) mit mindestens einer Lage (13. m) untereinander parallel orientierter, gegenüber den Brettern (12n) der vorangehenden Lage (13.n) verschwenkter Bretter (12m) unter Verbinden der Bretterlagen (13.1 + 13.2, 13.2+13.3) miteinander mittels wenigstens eines Nagelautomaten (26), dadurch gekennzeichnet, dass eine Lage (13. n; n = 1 , 3, ... ) aus Brettern (12n) auf einen Montagetisch (16) übergeben und dieser unter eine Ablieferungskante (22 oder 22') wenigstens eines Zuförderers (21 oder 29) für verschwenkt gegenüber den Brettern (12n) orientierte Bretter (12m) einer nächsten Bretter-Lage 1 . Method for equipping a multilayer solid wood composite component (14) with at least one layer (13 m) with mutually parallel, with respect to the boards (12n) of the previous layer (13.n) pivoted boards (12m) to connect the board layers (13.1 + 13.2, 13.2 + 13.3) with each other by means of at least one automatic nailer (26), characterized in that a layer (13, n; n = 1, 3, ...) of boards (12n) transferred to a mounting table (16) and this under a delivery edge (22 or 22 ') of at least one feed conveyor (21 or 29) for pivoted relative to the boards (12n) oriented boards (12m) of a next board position
(13.m) verfahren wird, welche nacheinander auf die oberste Lage (13. n) aufgebracht und jeweils mit dieser oder der unter dieser liegenden Lage an einem stationären Portal (25) vernagelt werden, bis eine Lage (13. m; m = 2, 4, ... ) erreicht ist, auf weiche die nächstfolgende Lage (13.n+2 = 13.3) aufgebracht wird.  (13.m), which are successively applied to the uppermost layer (13.n) and nailed to this or the underlying layer on a stationary portal (25), until a layer (13.m; m = 2, 4, ...) is reached, on which the next following layer (13.n + 2 = 13.3) is applied.
2. Verfahren nach Anspruch 1 , dadurch gekennzeichnet, dass die Bretter (12m) dieser nächsten Lage (13.3) auf die vernagelte oberste Lage (13.2) aufgenagelt werden. 2. The method according to claim 1, characterized in that the boards (12m) of this next layer (13.3) are nailed to the nailed top layer (13.2).
3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass der Montagetisch (16) jeweils mit einer Lage (13.n) und dann mit den aufeinanderfolgenden Brettern (12m) der nächstfolgenden Lage (13. m) gegen wenigstens einen stationären Richt-Anschlag (18) angefahren wird. 3. The method according to claim 1 or 2, characterized in that the assembly table (16) each with a layer (13.n) and then with the successive boards (12m) of the next following position (13. m) against at least one stationary straightening Stop (18) is approached.
4. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass die jeweilige Lage (13.n) und danach das erste darauf ver- brachte der Bretter (12m) der nächstfolgenden Lage (13.m) gegen wenigstens einen montagetischfesten Stütz-Anschlag (19) zurückgeschoben werden. 4. The method according to any one of claims 1 to 3, characterized in that the respective position (13.n) and then the first on it brought the boards (12m) of the next following position (13.m) against at least one assembly table fixed support stop (19) are pushed back.
5. Verfahren nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass der Montagetisch (16) mit den schon auf die bereits gebildete Lage (13. n) genagelten Brettern (12m) der aktuell zu bildenden Lage (13.m) zur Aufnahme des nächstfolgenden der Bretter (12m) um einen Weg zurückgefahren wird, der der Breite des vor das zuvor aufgenagelte Brett (12m) aufzubringenden Folgebrettes (12m) entspricht. 5. The method according to any one of claims 1 to 4, characterized in that the assembly table (16) with the already on the already formed layer (13. n) nailed boards (12m) of the currently to be formed layer (13.m) for receiving the next of the boards (12m) is reduced by a distance corresponding to the width of the follower board (12m) to be applied in front of the previously nailed board (12m).
6. Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass der Längsvorschub des Brettes (12m) mittels eines Längs- Zuförderers (29) bis zur Ablieferungskante (22, 22') gegen wenigstens einen materiellen oder immateriellen Positionier-Anschlag (31 ) erfolgt. 6. The method according to any one of claims 1 to 5, characterized in that the longitudinal feed of the board (12m) by means of a longitudinal feed conveyor (29) to the delivery edge (22, 22 ') against at least one material or immaterial positioning stop (31 ) he follows.
7. Verfahren nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass gleichzeitig mehrere, stirnseitig aufeinanderfolgende Teilbretter (12mm) über die Ablieferungskante (22, 22') auf die aktuell obere Lage (13.n) aufgebracht werden.. 7. The method according to any one of claims 1 to 6, characterized in that at the same time a plurality of end side successive part boards (12mm) on the delivery edge (22, 22 ') are applied to the currently upper layer (13.n).
8. Verfahren nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass stirnseitig aufeinanderfolgende Teilbretter (12mm) mittels im Zuführbereich (32) selektiv aktivierbarer materieller oder immaterieller Positionier-Anschläge (31 ) unter gegenseitigen axialen Abständen über die Ablieferungskante (22, 22') auf die aktuell obere Lage (13.n) aufgebracht werden. 8. The method according to any one of claims 1 to 7, characterized in that the end side successive partial boards (12mm) by means of the feed region (32) selectively activatable material or immaterial positioning stops (31) at mutual axial distances on the delivery edge (22, 22 '). ) are applied to the currently upper layer (13.n).
9. Verfahren nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass der Montagetisch (16) jeweils um die Brettstärke der zuletzt gebildeten Lage (13. m, 13. n) abgesenkt wird. 9. The method according to any one of claims 1 to 8, characterized in that the assembly table (16) is lowered in each case by the board thickness of the last formed layer (13. m, 13. n).
10. Verfahren nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass die Lage (13. n) in dem Bereich mit der darunter gelegenen Lage (13. m) vernagelt wird, auf den sodann ein Brett (12m) der nächstfolgenden Lage 13.m) aufgebracht und vernagelt wird. 10. The method according to any one of claims 1 to 9, characterized in that the layer (13. n) in the area with the underlying layer (13. m) is nailed to the then a board (12 m) of the next following position thirteenth .m) is applied and nailed.
1 1. Einrichtung zum Bestücken eines Vollholz-Verbundbauteiles (14) mit Lagen (13.m) aus untereinander parallel orientierten Brettern (12m), die unter einem Winkel gegenüber der jeweils vorangehenden Lage (13. n) aus untereinander parallel orientierten Brettern (12n) liegen, und zum Verbinden der Bretter-Lagen (13. n, 13. m) miteinander, gekennzeichnet durch einen bewegbaren Montagetisch (16) zum Aufnehmen der Bretter-Lagen (13 m, 13n), durch einen Längs-Zuförderer (29) für die Bretter (12m) einer über eine Ablieferungskante (22, 22') auf die jeweilige Lage ( 3.n) nacheinander aufzubringenden Bretter (12m) einer nächsten Lage (13. m), sowie durch ein parallel zur Ablieferungskante (22, 22') installiertes, mit wenigstens einem Nagelautomaten (26) bestückten stationären Portal (25). 1 1. Device for loading a solid wood composite component (14) with layers (13.m) of mutually parallel oriented boards (12m), which at an angle to the respective preceding layer (13. n) from mutually parallel oriented boards (12n ), and for connecting the board layers (13. n, 13. m) to each other, characterized by a movable assembly table (16) for receiving the board layers (13 m, 13 n), by a longitudinal feed conveyor (29) for the boards (12m) of boards (12m) to be successively applied via a delivery edge (22, 22 ') to the respective layer (3.n) of a next layer (13.m) and by a line parallel to the delivery edge (22, 22 '), equipped with at least one nailing machine (26) stationary portal (25).
12. Einrichtung nach Anspruch 1 1 , dadurch gekennzeichnet, dass am 12. Device according to claim 1 1, characterized in that on
Montagetisch (16) wenigstens ein Stütz-Anschlag (19) für die Bretter und bei der Ablieferungskante (22, 22') wenigstens ein Richt- Anschlag (18) für die Bretter vorgesehen sind.  Mounting table (16) at least one support stop (19) for the boards and at the delivery edge (22, 22 ') at least one directional stop (18) are provided for the boards.
13. Einrichtung nach Anspruch 1 1 oder 12, dadurch gekennzeichnet, 13. Device according to claim 1 1 or 12, characterized
dass der Richt-Anschlag (18) ortsfest angeordnet ist.  that the directional stop (18) is arranged stationary.
14. Einrichtung nach Anspruch 13, dadurch gekennzeichnet, dass der Richt-Anschlag (18) verstellbar ist. 14. Device according to claim 13, characterized in that the directional stop (18) is adjustable.
15. Einrichtung nach einem Ansprüche 1 1 bis 14, dadurch gekennzeichnet, dass zwischen einem Materialpuffer (28) für die mittels des Längs-Zuförderers (29) transportierten Bretter (12m) und der Abiiefe- rungskante (22, 22') wenigstens eine Kappsäge (30) vorgesehen ist. 15. Device according to one claims 1 1 to 14, characterized in that between a material buffer (28) for by means of Longitudinal feed conveyor (29) transported boards (12m) and the Abiiefer- edge (22, 22 ') at least one chop saw (30) is provided.
Einrichtung nach einem der Ansprüche 11 bis 15, dadurch gekennzeichnet, dass das Portal (25) dem wenigstens einen Nagelautomaten (26) gegenüber versetzt mit wenigstens einem Bearbeitungsaggregat (33) ausgestattet ist. Device according to one of Claims 11 to 15, characterized in that the gantry (25) is equipped with at least one processing unit (33) offset relative to the at least one nailing machine (26).
Einrichtung nach einem der Ansprüche 1 1 bis 16, dadurch gekennzeichnet, dass zwischen dem Längs-Zuförderer (29) und der Ablieferungskante (22) wenigstens ein Quer-Zuförderer (21 ) vorgesehen ist. Device according to one of claims 1 1 to 16, characterized in that between the longitudinal feed conveyor (29) and the delivery edge (22) at least one transverse feed conveyor (21) is provided.
EP12705049.0A 2011-02-04 2012-02-04 Method and device for populating a multilayer solid wood composite component Withdrawn EP2670569A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE102011011783 2011-02-04
DE201110122687 DE102011122687A1 (en) 2011-02-04 2011-12-30 Method and device for equipping a multilayer solid wood composite component with a respective even-numbered board layer
PCT/EP2012/000502 WO2012104100A1 (en) 2011-02-04 2012-02-04 Method and device for populating a multilayer solid wood composite component

Publications (1)

Publication Number Publication Date
EP2670569A1 true EP2670569A1 (en) 2013-12-11

Family

ID=46547136

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12705049.0A Withdrawn EP2670569A1 (en) 2011-02-04 2012-02-04 Method and device for populating a multilayer solid wood composite component

Country Status (3)

Country Link
EP (1) EP2670569A1 (en)
DE (1) DE102011122687A1 (en)
WO (1) WO2012104100A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106393308A (en) * 2016-08-30 2017-02-15 福建明鑫机器人科技有限公司 Automatic nailing device
CA3129218C (en) 2019-02-08 2023-08-22 Miralis Inc. Robotic systems and methods for assembling furniture
DE102023116006B3 (en) 2023-06-19 2024-05-23 Minda Industrieanlagen Gmbh Process for manufacturing cross laminated timber panels with cut-outs

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU560514B2 (en) * 1981-12-23 1987-04-09 Pitters Pty. Ltd. Nailing machine
JPH09248805A (en) * 1996-03-14 1997-09-22 Sekisui Chem Co Ltd Automatically nailing device
DE29706060U1 (en) * 1997-04-05 1997-07-24 Terwort, Roland, 48565 Steinfurt Wooden pallet lid nailing machine
US6058601A (en) * 1998-07-27 2000-05-09 Dekoning; Hubertus C. M. Apparatus for automatic fence panel assembly
DE10224912A1 (en) * 2002-06-04 2003-12-18 Hans Hundegger Device and method for joining multilayer panels, and panels of this type
DE202006005108U1 (en) 2006-03-30 2006-07-06 Hundegger, Hans Building construction component, e.g. for walls or ceilings or roofs, is of a compound material of boards in different alignments forming a layer structure bonded together by holding pins

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2012104100A1 *

Also Published As

Publication number Publication date
DE102011122687A1 (en) 2012-08-09
WO2012104100A1 (en) 2012-08-09

Similar Documents

Publication Publication Date Title
EP0910248B1 (en) Method, device and cutting tool for producing individual pieces of dough from a continuous line of dough
DE102008018410B3 (en) Device and method for introducing a spring into a groove
EP2618972B1 (en) Method for producing flat panel elements
EP2100704B1 (en) Simultaneous processing of multiple workpieces
EP2681371B1 (en) Method for the continuous production of composite formwork panel elements
EP1635971B1 (en) Device for producing structural elements
EP2670569A1 (en) Method and device for populating a multilayer solid wood composite component
EP1688227A1 (en) Method of operation of a wood working machine and wood working machine
WO2002090044A1 (en) Device for returning workpieces
DE3203025C2 (en)
AT514168B1 (en) Device for producing a strand
EP3045278A1 (en) Method for manufacturing panels and/or blocks made of wood
EP1369214B1 (en) Method for assembling multilayer panels
DE202004010298U1 (en) Woodworking machine tool for formation of dovetail joints and finger joints has vertical milling head advancing within a guide close to pneumatic jet
AT504611B1 (en) METHOD FOR PRODUCING COMPONENTS COMPRISING COMPONENTS CONTAINING WEDGE PENCIL COMPOSITIONS AND DEVICE FOR CARRYING OUT THIS METHOD
EP1395378B1 (en) Installation for continuously producing components
EP1764177B1 (en) Apparatus for cutting glazing bars or the like to lenth and method for cutting glazing bars or the like
EP2740575A1 (en) Method and device for processing plates
EP4480657B1 (en) Method for producing board plywood panels provided with cut-outs and wood panel production device
EP0808700A2 (en) Method and device for manufacturing a wood panel from residual wood
DE102018205073A1 (en) METHOD AND DEVICE FOR TREATING MATERIAL PLATES
DE1962320A1 (en) Process for producing formwork panels in a continuous flow and device for carrying out this process as well as formwork panel produced with the new process
EP1026109B1 (en) Process and device for the distribution of work-pieces at predetermined distances
DE2354465C3 (en) Device for gluing and joining furniture parts to form a furniture body
DE2512185A1 (en) Tongue and groove wood panel production - has desired panel length produced on press and heat applicator

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20130904

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
17Q First examination report despatched

Effective date: 20140623

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20150204

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: MICHAEL WEINIG AG

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20150616