EP1843940B1 - Cargo handling arrangement and system on a cargo ship - Google Patents
Cargo handling arrangement and system on a cargo ship Download PDFInfo
- Publication number
- EP1843940B1 EP1843940B1 EP06700665.0A EP06700665A EP1843940B1 EP 1843940 B1 EP1843940 B1 EP 1843940B1 EP 06700665 A EP06700665 A EP 06700665A EP 1843940 B1 EP1843940 B1 EP 1843940B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- cargo
- ship
- loading
- arrangement
- deck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/16—Arrangement of ship-based loading or unloading equipment for cargo or passengers of lifts or hoists
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B19/00—Arrangements or adaptations of ports, doors, windows, port-holes, or other openings or covers
- B63B19/08—Ports or like openings in vessels' sides or at the vessels' bow or stern
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B25/00—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
- B63B25/22—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for palletised articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/19—Other loading or unloading equipment involving an intermittent action, not provided in groups B63B27/04 - B63B27/18
Definitions
- the present invention relates to a cargo handling arrangement on a cargo ship according to the preamble of claim 1.
- Cargo handling arrangements on cargo ships for side loading and unloading are previously disclosed. Examples of such arrangements are so-called side loading arrangements on ships, where the load in the form of cargo, such as general cargo, is carried on several decks in the ship on various levels, in conjunction with which a cargo hoist is arranged in a shaft and is capable of vertical displacement between the different decks.
- an unloading station Arranged in conjunction with an opening in the ship is an unloading station, which is situated at an appropriate level above a quay.
- the loading station can be used for loading the ship via the cargo hoist and onto the various decks. In relation to the load capacity of the ship, very often with large decks on several levels, the loading station very often represents a restriction of the load capacity.
- WO 9524336 proposes a system for loading and unloading a container ship.
- the ship is equipped with a first hoist, which moves vertically inside the ship, and with a second hoist, which moves on the outside of the ship, together with horizontal conveyors, which move between the hoists.
- the zone between the hoists is used as a buffer zone for the cargo.
- the object of the present invention is to increase the cargo capacity for a certain hoist capacity or hatch opening size.
- Fig. 1 shows a schematic cross section through a ship, which is moored alongside a quay 4, which is situated at a level 5 that can vary relative to the ship, on the one hand between different ports, on the other hand due to the actual height of the tide, and also due to the actual weight of the cargo on the ship.
- Two different quay levels are illustrated in Fig. 1 .
- the opposite side 3 can also be provided with loading openings.
- the ship is provided, as can be appreciated from Fig. 1 , with a number of decks 8-14, which are accessible to the cargo handling arrangement 1 in accordance with the invention.
- Each deck exhibits along one side an inner unloading opening 15 that is so arranged as to be closed between loading occasions by means of an inner hatch 20, which is illustrated in Fig. 1 in both an open and a closing position.
- the inner hatches are pivotally suspended about hinges on their upper edge.
- Arranged on every deck or deck level is at least one, and in the illustrated example two, loading/unloading deck conveyors 16, 17 in the form of, for example, belt conveyors; see Figs. 2 , 3 and 4.
- a hoist shaft 18 Arranged between the loading/unloading conveyors is a hoist shaft 18, that is to say an open space extending between all the decks, in which space a cargo hoist 19 is capable of vertical displacement between the cargo decks 8-14, that is to say it is so arranged as to stop at every deck level, including the loading/unloading deck 9.
- the loading/unloading deck conveyors 16, 17 are arranged to either side of the cargo hoist 19 or, more specifically, the hoist shaft 18, and they extend and have a working direction in the longitudinal sense of the ship in the illustrated example; see the double arrows 32. These conveyors 16, 17 serve as buffer conveyors and move with advantage intermittently. They can also with advantage have the same load capacity as the cargo hoist 19, which can similarly be provided with advantage with a conveyor and can possibly also accommodate a loading truck 21, as indicated in Figs. 3 and 4. When loading general cargo of the load pallet type or container type, the loading truck 21 is used on the respective deck levels 8-14 for the purpose of moving the cargo between its position on the respective deck and the loading/unloading conveyors 16, 17.
- One of the cargo decks 8-14, cargo deck 9 in the illustrated example serves not only as a cargo deck for the stowage of the cargo on board the ship, but also as a loading and unloading deck, in conjunction with which the cargo opening or the cargo openings 6 are arranged on at least one side 2 of the ship, but possibly also on both sides of the ship, where a special loading and unloading arrangement 22 is also situated.
- the loading and unloading arrangement can be executed with advantage as a lifting arrangement of the telpher hoist type 25, which is capable of displacement between an inner position inside the ship and an outer position at an appropriate loading level above the quay.
- the crane is so arranged as to be retracted into the ship while the ship is under way, and, on the other hand, the mobile crane is capable of moving between an inner position for collecting/delivering cargo and an outer position for delivering/collecting cargo.
- the loading arrangement 22 in the illustrated example is executed with two parallel crane girders 23, 24 that are capable of displacement in their longitudinal sense in guides between an inner and an outer position and are situated at a high level so that they are able to project at the top into the cargo opening 6.
- transverse traveling carriage 25 which on the one hand is capable of travelling along the girders, and on the other hand permits the crane to travel transversely across the longitudinal direction of the girders to permit flexible handling in conjunction with the positioning of cargo in a desired location.
- both cargo openings are provided with a loading arrangement to permit a higher capacity or, alternatively, flexibility in the choice of loading station on a quay.
- Fig. 3 It can also be appreciated from Fig. 3 that separate buffer zones 26, 27, positioned between the deck conveyors 16, 17 that are arranged on all the cargo decks 8-14, are arranged on the cargo deck 9, as illustrated in Fig. 3 .
- the buffer zones 26, 27 are provided with buffer conveyors 28, 29, which have a direction of working in the direction of the double arrow 30, 31 that is to say between the respective deck conveyor 16, 17 and the ship opening 6.
- a very effective flow of cargo with a maximum capacity in relation to the available transport routes is thus obtained by means of the cargo handling arrangement in accordance with the invention that is a constituent part of a total cargo handling system for the loading and unloading of cargo respectively to and from a cargo ship.
- the system is controlled by a control system with a number of proximity sensors on one or more of the conveyors, the separate deck conveyors 16, 17 and the buffer conveyors 28, 29 for the purpose of recording the presence of a load on the conveyors and, with a computer system, for controlling the conveyors for the stepped feed, and also for controlling the hoist and transmitting information to an operator in respect of the actual status of the cargo handling process.
- the successive, stepped feed of cargo, on the one hand on every deck, and on the other hand in conjunction with loading and unloading, on the one hand creates space for loading and on the other hand ensures that cargo is constantly available for unloading.
- a plurality of openings may be arranged on the side of the ship with a view to further increasing the cargo capacity, in conjunction with which a corresponding number of cargo hoists and cargo arrangements are arranged at the respective opening.
- the ship can be equipped with three or more receiving and delivery stations for mobile cargo units.
- the lifting crane can be of a pivoting type with extending crane girders.
- the telpher crane can be used alternatively with one or more crane girders.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Ship Loading And Unloading (AREA)
Description
- The present invention relates to a cargo handling arrangement on a cargo ship according to the preamble of
claim 1. - Cargo handling arrangements on cargo ships for side loading and unloading are previously disclosed. Examples of such arrangements are so-called side loading arrangements on ships, where the load in the form of cargo, such as general cargo, is carried on several decks in the ship on various levels, in conjunction with which a cargo hoist is arranged in a shaft and is capable of vertical displacement between the different decks. Arranged in conjunction with an opening in the ship is an unloading station, which is situated at an appropriate level above a quay. Provided on the quay are traveling, mobile loading units in the form of, for example, fork-lift trucks for collecting the general cargo for transport to warehouses or the like. Conversely, the loading station can be used for loading the ship via the cargo hoist and onto the various decks. In relation to the load capacity of the ship, very often with large decks on several levels, the loading station very often represents a restriction of the load capacity.
-
proposes a system for loading and unloading a container ship. The ship is equipped with a first hoist, which moves vertically inside the ship, and with a second hoist, which moves on the outside of the ship, together with horizontal conveyors, which move between the hoists. The zone between the hoists is used as a buffer zone for the cargo.WO 9524336 - The object of the present invention is to increase the cargo capacity for a certain hoist capacity or hatch opening size.
- The aforementioned object is achieved by means of an arrangement according to
claim 1. - The invention is now described in greater detail below as a couple of illustrative embodiments with reference to the accompanying drawings, in which:
- Fig. 1
- illustrates one embodiment of a cargo handling arrangement in accordance with the invention as a schematic cross section through a ship next to a quay;
- Fig. 2
- is a schematic side view of a section of the ship with the cargo handling arrangement in accordance with the invention;
- Fig. 3
- is a schematic view from above of a larger section of the ship showing the loading deck; and
- Fig. 4
- is a schematic view from above showing one of the upper cargo decks.
- The
cargo handling arrangement 1 in accordance with the invention is described initially with reference toFig. 1. Fig. 1 shows a schematic cross section through a ship, which is moored alongside a quay 4, which is situated at a level 5 that can vary relative to the ship, on the one hand between different ports, on the other hand due to the actual height of the tide, and also due to the actual weight of the cargo on the ship. Two different quay levels are illustrated inFig. 1 . Arranged on oneside 2 of the ship is at least one, and in the example two,cargo openings 6, which are shown open, although they are intended to be closed when loading is not taking place by means of adoor 7, which is capable of being moved out of the way by being so arranged as to pivot about hinges, or alternatively is capable of displacement in guides. Theopposite side 3 can also be provided with loading openings. - The ship is provided, as can be appreciated from
Fig. 1 , with a number of decks 8-14, which are accessible to thecargo handling arrangement 1 in accordance with the invention. Each deck exhibits along one side an inner unloading opening 15 that is so arranged as to be closed between loading occasions by means of aninner hatch 20, which is illustrated inFig. 1 in both an open and a closing position. In the illustrated example, the inner hatches are pivotally suspended about hinges on their upper edge. Arranged on every deck or deck level is at least one, and in the illustrated example two, loading/ 16, 17 in the form of, for example, belt conveyors; seeunloading deck conveyors Figs. 2 ,3 and 4. Arranged between the loading/unloading conveyors is a hoist shaft 18, that is to say an open space extending between all the decks, in which space a cargo hoist 19 is capable of vertical displacement between the cargo decks 8-14, that is to say it is so arranged as to stop at every deck level, including the loading/unloading deck 9. - The loading/
16, 17 are arranged to either side of the cargo hoist 19 or, more specifically, the hoist shaft 18, and they extend and have a working direction in the longitudinal sense of the ship in the illustrated example; see theunloading deck conveyors double arrows 32. These 16, 17 serve as buffer conveyors and move with advantage intermittently. They can also with advantage have the same load capacity as the cargo hoist 19, which can similarly be provided with advantage with a conveyor and can possibly also accommodate aconveyors loading truck 21, as indicated inFigs. 3 and 4. When loading general cargo of the load pallet type or container type, theloading truck 21 is used on the respective deck levels 8-14 for the purpose of moving the cargo between its position on the respective deck and the loading/ 16, 17.unloading conveyors - One of the cargo decks 8-14,
cargo deck 9 in the illustrated example, serves not only as a cargo deck for the stowage of the cargo on board the ship, but also as a loading and unloading deck, in conjunction with which the cargo opening or thecargo openings 6 are arranged on at least oneside 2 of the ship, but possibly also on both sides of the ship, where a special loading and unloading arrangement 22 is also situated. In order to be able to undertake loading with theloading deck 9 situated at a certain distance above the level 5 of the quay, the loading and unloading arrangement can be executed with advantage as a lifting arrangement of thetelpher hoist type 25, which is capable of displacement between an inner position inside the ship and an outer position at an appropriate loading level above the quay. On the one hand, the crane is so arranged as to be retracted into the ship while the ship is under way, and, on the other hand, the mobile crane is capable of moving between an inner position for collecting/delivering cargo and an outer position for delivering/collecting cargo. For this purpose, the loading arrangement 22 in the illustrated example is executed with twoparallel crane girders 23, 24 that are capable of displacement in their longitudinal sense in guides between an inner and an outer position and are situated at a high level so that they are able to project at the top into thecargo opening 6. Also provided is atransverse traveling carriage 25, which on the one hand is capable of travelling along the girders, and on the other hand permits the crane to travel transversely across the longitudinal direction of the girders to permit flexible handling in conjunction with the positioning of cargo in a desired location. As can be appreciated fromFig. 3 , both cargo openings are provided with a loading arrangement to permit a higher capacity or, alternatively, flexibility in the choice of loading station on a quay. - It can also be appreciated from
Fig. 3 that 26, 27, positioned between theseparate buffer zones 16, 17 that are arranged on all the cargo decks 8-14, are arranged on thedeck conveyors cargo deck 9, as illustrated inFig. 3 . The 26, 27 are provided withbuffer zones 28, 29, which have a direction of working in the direction of thebuffer conveyors 30, 31 that is to say between thedouble arrow 16, 17 and the ship opening 6.respective deck conveyor - A very effective flow of cargo with a maximum capacity in relation to the available transport routes is thus obtained by means of the cargo handling arrangement in accordance with the invention that is a constituent part of a total cargo handling system for the loading and unloading of cargo respectively to and from a cargo ship. The system is controlled by a control system with a number of proximity sensors on one or more of the conveyors, the
16, 17 and theseparate deck conveyors 28, 29 for the purpose of recording the presence of a load on the conveyors and, with a computer system, for controlling the conveyors for the stepped feed, and also for controlling the hoist and transmitting information to an operator in respect of the actual status of the cargo handling process. The successive, stepped feed of cargo, on the one hand on every deck, and on the other hand in conjunction with loading and unloading, on the one hand creates space for loading and on the other hand ensures that cargo is constantly available for unloading.buffer conveyors - The invention is not restricted to the illustrative embodiments described above and illustrated in the drawings, but may be varied within the scope of the following patent claims. For example, a plurality of openings may be arranged on the side of the ship with a view to further increasing the cargo capacity, in conjunction with which a corresponding number of cargo hoists and cargo arrangements are arranged at the respective opening. If the cargo capacity can be further increased, the ship can be equipped with three or more receiving and delivery stations for mobile cargo units. The lifting crane can be of a pivoting type with extending crane girders. The telpher crane can be used alternatively with one or more crane girders.
Claims (4)
- A cargo handling arrangement on a cargo ship for handling cargo between a ship (3) and a quay (4) in conjunction with loading and unloading, comprising a number of cargo decks (8-14) situated at different levels in the ship, a cargo hoist (19), which is arranged in the ship and is capable of displacement between the various cargo decks and a loading/unloading arrangement for transferring the cargo between the ship and the quay (4) via at least one opening (6) arranged in the ship situated on one of the cargo decks (9), in conjunction with which the cargo handling arrangement exhibits at least one buffer zone (26, 27) with a buffer conveyor (28, 29), which has a direction of working between the ship opening (6) and the cargo decks (9) and which is so arranged as to hold cargo temporarily for subsequent transfer between the loading/unloading arrangement and the respective cargo deck, characterized in that at least one deck conveyor (16, 17) is arranged next to the cargo hoist (19) on each cargo deck (8-14) and serves as a buffer conveyor for the stepped feed of cargo to/from the hoist (19), wherein each deck conveyor (16, 17) have a direction of working in the longitudinal sense of the ship.
- The cargo handling arrangement as claimed in patent claim 1, characterized in that the loading/unloading arrangement (22) consists of a lifting crane that is situated on the vessel (1) and is so arranged as to be changed over between an effective cargo position and a storage position on the ship.
- The cargo handling arrangement as claimed in patent claim 2, characterized in that the lifting crane is of the telpher type with crane beams (23, 24) that are capable of displacement between an extended loading position and a retracted storage position.
- The cargo handling arrangement as claimed in patent claim 1 characterized in a control system consisting of a computer system and proximity sensors for detecting the presence of cargo on at least certain of the conveyors and for the intermittent feeding of the cargo on these conveyors.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL06700665T PL1843940T3 (en) | 2005-01-21 | 2006-01-19 | Cargo handling arrangement and system on a cargo ship |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SE0500172A SE530819E (en) | 2005-01-21 | 2005-01-21 | Cargo handling device for cargo vessels |
| PCT/SE2006/000076 WO2006093445A1 (en) | 2005-01-21 | 2006-01-19 | Cargo handling arrangement and system on a cargo ship |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP1843940A1 EP1843940A1 (en) | 2007-10-17 |
| EP1843940A4 EP1843940A4 (en) | 2011-11-02 |
| EP1843940B1 true EP1843940B1 (en) | 2014-12-03 |
Family
ID=36889319
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP06700665.0A Not-in-force EP1843940B1 (en) | 2005-01-21 | 2006-01-19 | Cargo handling arrangement and system on a cargo ship |
Country Status (8)
| Country | Link |
|---|---|
| EP (1) | EP1843940B1 (en) |
| JP (1) | JP2008528355A (en) |
| KR (1) | KR101328193B1 (en) |
| CN (1) | CN100519329C (en) |
| NO (1) | NO20073607L (en) |
| PL (1) | PL1843940T3 (en) |
| SE (1) | SE530819E (en) |
| WO (1) | WO2006093445A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2022069087A1 (en) * | 2020-09-29 | 2022-04-07 | Sh Group A/S | Lift and method for lifting equipment modules |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2414220A2 (en) * | 2009-04-03 | 2012-02-08 | Kjartan Ragnarsson | A vessel adapted to be used as a moveable bottling plant for bottling liquid products |
| NO332033B1 (en) * | 2010-07-12 | 2012-05-29 | Polotec As | Cargo handling system |
| CN104369841B (en) * | 2014-11-21 | 2017-01-25 | 桃源县德威造船有限责任公司 | Rotary type self-unloading conveying belt device for ship |
| JP5982523B1 (en) * | 2015-03-24 | 2016-08-31 | 株式会社新来島どっく | Simultaneous cargo handling cargo ship with two types of cargo handling equipment |
| CN111391980A (en) * | 2020-04-22 | 2020-07-10 | 中国船舶重工集团公司第七0四研究所 | Ship cargo supply system |
Family Cites Families (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2541893A (en) * | 1945-12-03 | 1951-02-13 | Lake Shore Engineering Company | Ship cargo-handling device |
| JPS54132992A (en) * | 1978-04-05 | 1979-10-16 | Ishikawajima Harima Heavy Ind Co Ltd | Container ship |
| EP0298147B1 (en) * | 1987-07-09 | 1991-10-09 | ATEBA Automatisieren-Technik-Bauen für Gewerbe und Industrie GmbH | Loading and unloading device, in particular for ships carrying bulk goods, in particular for loaded pallets |
| JPH01118978A (en) * | 1987-10-31 | 1989-05-11 | Asahi Chem Ind Co Ltd | IC card |
| US4897012A (en) * | 1987-11-06 | 1990-01-30 | Custom Technologies, Inc. | Cargo handling system |
| NO167505C (en) * | 1989-01-30 | 1991-11-13 | Seatrans Ans | LOAD TRANSMISSION SYSTEM FOR SHIPPING AND UNLOADING. |
| WO1995023730A1 (en) * | 1994-03-03 | 1995-09-08 | Westfalia-Wst-Systemtechnik Gmbh & Co. Kg | Palette shelf storage system for/in a watercraft, preferably a refrigeration ship |
| NL194669C (en) * | 1994-03-11 | 2002-11-04 | Tts Mongstad As | System for loading and unloading cargo units in cargo vessels. |
| JPH0939881A (en) * | 1995-07-26 | 1997-02-10 | Enomoto Kaisouten:Kk | Pallet transport ship |
| SE523343C2 (en) * | 2000-12-29 | 2004-04-13 | Macgregor Swe Ab | Cargo handling device for dry cargo vessels |
| FI111529B (en) * | 2001-02-05 | 2003-08-15 | Marine Consulting Suksi Ltd Oy | Movable loading / unloading facility for piece goods |
-
2005
- 2005-01-21 SE SE0500172A patent/SE530819E/en not_active IP Right Cessation
-
2006
- 2006-01-19 EP EP06700665.0A patent/EP1843940B1/en not_active Not-in-force
- 2006-01-19 PL PL06700665T patent/PL1843940T3/en unknown
- 2006-01-19 CN CNB2006800026594A patent/CN100519329C/en not_active Expired - Fee Related
- 2006-01-19 KR KR1020077019144A patent/KR101328193B1/en not_active Expired - Fee Related
- 2006-01-19 JP JP2007552089A patent/JP2008528355A/en active Pending
- 2006-01-19 WO PCT/SE2006/000076 patent/WO2006093445A1/en not_active Ceased
-
2007
- 2007-07-12 NO NO20073607A patent/NO20073607L/en not_active Application Discontinuation
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2022069087A1 (en) * | 2020-09-29 | 2022-04-07 | Sh Group A/S | Lift and method for lifting equipment modules |
Also Published As
| Publication number | Publication date |
|---|---|
| EP1843940A1 (en) | 2007-10-17 |
| SE0500172L (en) | 2006-07-22 |
| KR20070098937A (en) | 2007-10-05 |
| NO20073607L (en) | 2007-08-21 |
| SE530819C2 (en) | 2008-09-16 |
| JP2008528355A (en) | 2008-07-31 |
| WO2006093445A1 (en) | 2006-09-08 |
| CN100519329C (en) | 2009-07-29 |
| SE530819E (en) | 2016-08-30 |
| KR101328193B1 (en) | 2013-11-08 |
| CN101107160A (en) | 2008-01-16 |
| PL1843940T3 (en) | 2015-08-31 |
| EP1843940A4 (en) | 2011-11-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4106639A (en) | Container conveyor apparatus and method for vessel loading crane-yard interface | |
| EP2146894B1 (en) | Port storage and distribution system for international shipping containers | |
| US3807582A (en) | Loading and unloading device for ship containers | |
| US4750429A (en) | Transportation systems | |
| RU2007104336A (en) | METHOD AND SYSTEM FOR LOAD LOADING | |
| WO2012133278A1 (en) | Container terminal and control method therefor | |
| CA2281092C (en) | Transporter container-loading bridge | |
| JP4171024B2 (en) | Cargo handling facilities at the port or inner port | |
| CN114084701A (en) | Ship loading and unloading integrated machine and ship loading and unloading method | |
| SK378892A3 (en) | Device for transshipment of unit loads | |
| US20240326956A1 (en) | Storage and distribution system for containers | |
| EP1843940B1 (en) | Cargo handling arrangement and system on a cargo ship | |
| US3727776A (en) | An integrated system for loading and unloading containers in or from container ships | |
| JP4184665B2 (en) | Empty container warehouse | |
| HU212383B (en) | Establishment for transloading unit loads | |
| US20050226713A1 (en) | Process for handling cargo and cargo handling facility | |
| SE0500172A1 (en) | Cargo handling device for cargo ships | |
| KR20020089306A (en) | Device for loading/unloading cargo and method therefor | |
| JPH10194461A (en) | Cargo handling equipment for coastal container vessels | |
| US5197843A (en) | Device for loading and unloading unitary cargo onto and from ships | |
| KR101203636B1 (en) | Continuous coil crane | |
| JPH05185984A (en) | Vehicle storage device in vehicle carrier ship | |
| EP0952955B1 (en) | Crane | |
| KR20180000929U (en) | Container ship cargo bottom plate to the width direction moving | |
| FI78660C (en) | HISS FOER ETT KYLFARTYGS AVLASTNINGSSYSTEM. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20070817 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
| DAX | Request for extension of the european patent (deleted) | ||
| A4 | Supplementary search report drawn up and despatched |
Effective date: 20110929 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: B63B 27/16 20060101AFI20110923BHEP |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| INTG | Intention to grant announced |
Effective date: 20140605 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
| RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: MACGREGOR SWEDEN AB |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 699202 Country of ref document: AT Kind code of ref document: T Effective date: 20141215 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602006043862 Country of ref document: DE Effective date: 20150115 |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20141203 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 699202 Country of ref document: AT Kind code of ref document: T Effective date: 20141203 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150304 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150403 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150403 Ref country code: LU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150119 |
|
| REG | Reference to a national code |
Ref country code: PL Ref legal event code: T3 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602006043862 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150131 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150131 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20150930 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
| 26N | No opposition filed |
Effective date: 20150904 |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20150303 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150203 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150303 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150119 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20170125 Year of fee payment: 12 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20060119 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20170117 Year of fee payment: 12 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20170123 Year of fee payment: 12 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602006043862 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180801 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180119 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180119 |