EP1497500A1 - A method for creating an infrastructure - Google Patents
A method for creating an infrastructureInfo
- Publication number
- EP1497500A1 EP1497500A1 EP02707074A EP02707074A EP1497500A1 EP 1497500 A1 EP1497500 A1 EP 1497500A1 EP 02707074 A EP02707074 A EP 02707074A EP 02707074 A EP02707074 A EP 02707074A EP 1497500 A1 EP1497500 A1 EP 1497500A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- blocks
- mold
- creating
- concrete
- infrastructure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/0068—Embedding lost cores
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B09—DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
- B09B—DISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
- B09B3/00—Destroying solid waste or transforming solid waste into something useful or harmless
- B09B3/30—Destroying solid waste or transforming solid waste into something useful or harmless involving mechanical treatment
- B09B3/32—Compressing or compacting
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/205—Securing of slopes or inclines with modular blocks, e.g. pre-fabricated
Definitions
- the present invention relates to a method for creating an
- filler material e.g. building roadways, erosion barriers, sea
- the method relates to an
- the concrete is poured between the external
- Another example is creating a cast
- filler materials such as raw dirt are becoming increasingly difficult to manufacture
- the present invention provides an alternative method
- the present invention relates to a method for the creation of an
- the steps of the method comprise creating
- compressed refuse are spaced apart within the mold a predetermined
- the top surface of the mold extends a predetermined distance
- made of compressed refuse are spaced apart within the mold, creating at
- predetermined layers of blocks when casting the molten concrete when casting the molten concrete.
- hollow tubes are provided. Further in accordance with the preferred embodiment, hollow tubes
- Figure 1 illustrates an isometric view of the compressed block of
- Figure 2 illustrates an isometric view of the compressed block of
- Figure 3 illustrates an isometric view of the mold containing the
- Figure 4 illustrates a cross-sectional view of one embodiment of
- the present invention relates to a method for the creation of an
- filler material such as the construction of roadways, erosion
- Figure 1 illustrates the block of compressed refuse(l) enclosed by a
- FIG. 2 illustrates the block of compressed refuse(l), enclosed by
- FIG. 3 illustrates an embodiment of the infrastructure before the
- the mold extends to a predetermined height above the
- the blocks may be spaced a predetermined distance from each other
- a vent hole(5) provides a path for the release of gases as a
- hole may serve as a location for apparatus to capture and utilize said
- Figure 4 illustrates a vertical cross sectional view of the
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Processing Of Solid Wastes (AREA)
Abstract
A method for creating an infrastructure especially useful for construction projects requiring large amounts of filler material, comprising: (a) creating blocks made of compressed refuse; (b) reinforcing each block with a flexible plastic sheet or a plastic or metal band, or a combination thereof, wrapped tightly around said block; (c) arranging said blocks of compressed refuse one above the other, and/or one beside the other within a mold, upon a concrete floor or upon a plurality of spacing element which allow for the flow of molten concrete under said blocks, and spacing said blocks of compressed refuse a predetermined distance from the interior walls of said mold; (d) casting concrete in said mold containing said blocks to a predetermined height above the uppermost surface of said blocks.
Description
A METHOD FOR CREATING AN INFRASTRUCTURE
FIELD OF THE INVENTION
The present invention relates to a method for creating an
infrastructure, especially useful for construction projects requiring large
amounts of filler material (e.g. building roadways, erosion barriers, sea
walls, and the like). More specifically, the method relates to an
infrastructure construction method wherein compressed blocks of refuse
are created, reinforced, arranged with a predetermined spacing upon a
cast concrete floor (or upon a plurality of spacing elements which allow
for the flow of molten concrete under said blocks), within an external
mold of a predetermined shape and dimension, and molten concrete is
poured into said mold and infrastructure.
BACKGROUND OF THE INVENTION
The problem of the disposal of solid waste material is well known.
Billions of cubic meters of solid waste material are produced yearly by
people across the world. One of the most common methods of disposal is
dumping the solid waste material into landfills. The disadvantage of this
method is that it contaminates the environment, including underground
water aquifers. Although recycling exists, recycling efforts target
primarily metals, glass, and paper, and do not fully solve the problem of
solid waste disposal. Furthermore, most of the world does not expend
effort into recycling, leaving the problem of municipal solid waste
disposal largely unremedied.
Simultaneously, the construction industry wastes money and
ecological resources on building elements such as new concrete products,
when cheaper, recycled substitute materials are available and would be
equally effective. Furthermore, the construction industry wastes
resources on the materials used secondary to the final construction
product itself. To give a specific example, the construction of a molten
concrete wall requires not only the concrete and metal reinforcement
elements for the wall itself, but also material for the construction of the
mold for said wall. Creating a single vertical molten concrete wall
requires a mold having double (internal and external) walls, typically
made from wood or iron. The concrete is poured between the external
and internal walls in said mold. Another example is creating a cast
concrete ceiling. Aside from the waste of labor time in erecting
scaffolding to support the mold, and creating said mold to contain the
molten concrete, there is also the waste of building materials used to
create the scaffolding and the mold. Although rigid filler material would
serve the same purposes in creating such walls or ceilings, unfortunately,
there exists a considerable waste of natural resources for the materials
used in construction projects.
Furthermore, the most common method of obtaining raw materials
for construction projects, i.e., opening a quarry or open pit, is opposed by
environmentalists because of the deleterious effect on the ecosystem.
Thus, due to environmental regulations and concerns, the availability of
filler materials, such as raw dirt are becoming increasingly difficult to
obtain.
Surprisingly, the present invention provides an alternative method
for the disposal of solid waste and for more environmentally friendly and
cost effective construction filler materials, combined with the creation of
an infrastructure. Said method uses construction elements that are useful
for creating an infrastructure, and such as for building roadways, sea
walls, erosion barriers, and the like.
SUMMARY OF THE INVENTION
The present invention relates to a method for the creation of an
infrastructure especially useful for construction projects requiring large
amounts of filler material. The steps of the method comprise creating
block made of compressed refuse; reinforcing each block made of
compressed refuse with a flexible plastic sheet or a plastic or metal band,
or a combination thereof, wrapped tightly around said block; arranging
said blocks of compressed refuse, one above the other, and/or one beside
the other within a mold, upon a concrete floor or upon a plurality of
spacing elements which allow for the flow of molten concrete under said
blocks, and spacing said blocks of compressed refuse a predetermined
distance from the interior surface of said mold; and casting concrete in
said mold containing said blocks to a predetermined height above the
uppermost surface of said blocks.
According to the preferred embodiment, the blocks made of
compressed refuse are spaced apart within the mold a predetermined
distance from the interior surface of the walls of the mold, creating a
continuous vertical space extending from the bottom to the top of said
mold, and extending longitudinally along each interior mold wall, for
creating the infrastructure's external walls, abutting said blocks. The
blocks thus serve as an internal mold wall for the creation of said
concrete wall, obviating the need for additional construction time and
material to create an inner mold wall.
The top surface of the mold extends a predetermined distance
above the top surface of the arrangement of the blocks, for creating a
concrete top surface for the infrastructure during the pouring of the
molten concrete.
Further in accordance with the preferred embodiment, the blocks
made of compressed refuse are spaced apart within the mold, creating at
least one continuous vertical space extending from the bottom to the top
of said mold, and from one mold wall to an opposite mold wall, for
creating at least one interior concrete wall within the mold during the
pouring of the molten concrete. The internal walls of concrete provide
additional structural strength to the infrastructure.
Still further in accordance with the preferred embodiment, there is
created at least one intermediate horizontal layer of concrete upon
predetermined layers of blocks when casting the molten concrete..
Further in accordance with the preferred embodiment, hollow tubes
extend from the inner surface of the cement wall to the exterior surface of
said wall, thus creating holes for releasing gases produced as a result of
the decomposition of the refuse.
BRIEF DESCRIPTION OF THE DRAWINGS
The present invention is herein described, by way of example only,
with reference to the accompanying drawings, wherein:
Figure 1 illustrates an isometric view of the compressed block of
refuse wrapped with a flexible plastic sheet.
Figure 2 illustrates an isometric view of the compressed block of
refuse wrapped with a flexible plastic sheet and bands.
Figure 3 illustrates an isometric view of the mold containing the
blocks before the casting of the concrete.
Figure 4 illustrates a cross-sectional view of one embodiment of
the infrastructure.
DETAILED DESCRIPTION OF THE PREFERRED
EMBODIMENT
The present invention relates to a method for the creation of an
infrastructure especially useful for construction projects requiring large
amounts of filler material, such as the construction of roadways, erosion
barriers, sea walls, and the like.
The method will be further described in detail as relating to Figure
1-4. This description by no means intends to limit the scope of the
invention, but to clarify and illustrate one of the preferred embodiments
of the invention.
Figure 1 illustrates the block of compressed refuse(l) enclosed by a
sheet of plastic(2) which prevents the constituent elements of the block
from dispersing, and adds clear and constant boundaries to the block of
compressed refuse.
Figure 2 illustrates the block of compressed refuse(l), enclosed by
a sheet of plastic(2) wherein the block of compressed refuse is further
reinforced by plastic or metal bands (3, 3', 3").
Figure 3 illustrates an embodiment of the infrastructure before the
casting of the concrete. The blocks of compressed refuse(l) are arranged
within a mold(4). The mold extends to a predetermined height above the
top surface of the blocks of compressed refuse, which creates a space(6)
for the creation of a concrete top surface. The arrangements of the blocks
of compressed refuse are spaced a predetermined distance from the walls
of the mold, thus providing a space(6') for the creation of concrete walls.
The blocks therefore save the need for the construction of an internal
mold wall, saving also significant time and materials savings. Similarly,
the blocks may be spaced a predetermined distance from each other
within the mold, thus providing a space(6") for the creation of concrete
internal walls. A vent hole(5) provides a path for the release of gases as a
result of the decomposition of the compressed refuse material. The vent
hole may serve as a location for apparatus to capture and utilize said
gases, if so desired.
Figure 4 illustrates a vertical cross sectional view of the
infrastructure(12) after the pouring of the concrete having spacing
elements(7,7') placed between the layers of blocks of compressed
refuse(l) and upon the floor of the mold (not shown). The spacing
elements beneath the blocks, and the placement of the blocks a
predetermined distance from the wall of the mold allows the molten
concrete to flow within the spaces surrounding the blocks. This is
creating the infrastructure's concrete floor(8), intermediate layer(9), side
and internal walls(10,10',10"), and top layer(l 1).
Claims
1) A method for creating an infrastructure especially useful for
construction projects requiring large amounts of filler material,
comprising:
a) creating blocks made of compressed refuse;
b) reinforcing each block with a flexible plastic sheet or a
plastic or metal band, or a combination thereof, wrapped tightly
around said block;
c) arranging said blocks of compressed refuse one above the
other, and/or one beside the other within a mold, upon a concrete
floor or upon a plurality of spacing element which allow for the
flow of molten concrete under said blocks, and spacing said blocks
of compressed refuse a predetermined distance from the interior
walls of said mold;
d) casting concrete in said mold containing said blocks to a
predetermined height above the uppermost surface of said blocks.
2) A method for creating an infrastructure, according to claim 1,
wherein the blocks made of compressed refuse are spaced apart within
the mold, creating at least one continuous vertical space extending
from the bottom to the top of said mold, and from one mold wall to an
opposite mold wall, for creating at least one interior concrete wall
within the mold during the pouring of the molten concrete.
3) A method for creating an infrastructure, according to claim 1,
comprising casting at least one intermediate horizontal layer of
concrete upon predetermined layers of blocks.
4) A method for creating an infrastructure, according to claim 1,
comprising an additional step comprising affixing hollow tubes that
extend from the inner surface of the cement wall to the exterior
surface of said wall, thus creating holes for releasing gases produced
as a result of the decomposition of the refuse.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/IL2002/000226 WO2003078742A1 (en) | 2002-03-20 | 2002-03-20 | A method for creating an infrastructure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP1497500A1 true EP1497500A1 (en) | 2005-01-19 |
Family
ID=27840072
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP02707074A Withdrawn EP1497500A1 (en) | 2002-03-20 | 2002-03-20 | A method for creating an infrastructure |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20050029428A1 (en) |
| EP (1) | EP1497500A1 (en) |
| AU (1) | AU2002241226A1 (en) |
| WO (1) | WO2003078742A1 (en) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2005029426A1 (en) * | 2003-09-15 | 2005-03-31 | Igt | Multi-player bingo game with game-winning award selection |
| US20060239782A1 (en) * | 2005-04-21 | 2006-10-26 | Hunt Arthur V | Methods and apparatuses for shaping concrete slab-on-ground foundations |
| NL2001264C2 (en) * | 2008-02-07 | 2009-08-10 | Hanenberg Wegenbouw B V | Band element for applying boundaries in a pavement. |
| EP3415245A1 (en) * | 2017-06-14 | 2018-12-19 | Giuseppe Monaco | Process for obtaining construction blocks suitable to be used in road, rural and civil construction industry out of oversized residues |
| CN111441207B (en) * | 2020-04-07 | 2021-06-22 | 安徽省交通规划设计研究总院股份有限公司 | Soft foundation treatment split type guest grid replacing and filling structure and construction method |
| SE547052C2 (en) * | 2022-02-15 | 2025-04-08 | Bo Altenstam Ab | Filler body to be used in a construction element, and a construction element |
| FR3160420A1 (en) | 2024-03-19 | 2025-09-26 | T.P.B. | Building block and associated manufacturing process |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2006425A (en) * | 1931-12-10 | 1935-06-02 | Porete Mfg Co | Process for the production of cementitious masses |
| US3734988A (en) * | 1971-11-08 | 1973-05-22 | Interna Systems Management Cor | Use of composted refuse to make construction products |
| FR2166574A5 (en) * | 1971-12-30 | 1973-08-17 | Zucco Noel | |
| US4242220A (en) * | 1978-07-31 | 1980-12-30 | Gentaku Sato | Waste disposal method using microwaves |
| US4780433A (en) * | 1986-10-30 | 1988-10-25 | Keller Jr Fred | Insulating ceramic building material and method with fired clay and garbage mixture |
| FR2639663B1 (en) * | 1988-11-30 | 1992-04-10 | Jacques Perrin | METHOD OF CONSTRUCTING A LIGHTWEIGHT AND FLEXIBLE CONSTRUCTION MASS FROM ELEMENTARY BLOCKS OF FRAGMENTS OF COMPRESSED MATERIALS |
| JP3291534B2 (en) * | 1992-05-09 | 2002-06-10 | ケイコン株式会社 | Concrete product using aggregate crushed from molten slag and method for producing the same |
| US5795106A (en) * | 1996-04-01 | 1998-08-18 | Herd; Ian M. | Retaining wall system and method of construction thereof |
| US6610224B2 (en) * | 2001-02-22 | 2003-08-26 | Sullivan Concrete Textures | Processes for producing monolithic architectural cementitious structures having decorative aggregate-containing cementitious surfaces |
-
2002
- 2002-03-20 WO PCT/IL2002/000226 patent/WO2003078742A1/en not_active Ceased
- 2002-03-20 AU AU2002241226A patent/AU2002241226A1/en not_active Abandoned
- 2002-03-20 EP EP02707074A patent/EP1497500A1/en not_active Withdrawn
-
2004
- 2004-09-20 US US10/943,970 patent/US20050029428A1/en not_active Abandoned
Non-Patent Citations (1)
| Title |
|---|
| See references of WO03078742A1 * |
Also Published As
| Publication number | Publication date |
|---|---|
| AU2002241226A1 (en) | 2003-09-29 |
| WO2003078742A1 (en) | 2003-09-25 |
| US20050029428A1 (en) | 2005-02-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN1991094B (en) | Thin wall form component for hollowing concrete | |
| US20100154348A1 (en) | Construction for buildings protected against radiation | |
| WO2003078742A1 (en) | A method for creating an infrastructure | |
| CA1218551A (en) | Prefabricated pavement module | |
| JP2000314191A (en) | Improved building material using plastics material, improved building structural portion produced by using the material, and method for producing the same | |
| CN207110214U (en) | A kind of prefabricated interior fill concrete wallboard | |
| JO2342B1 (en) | Modular security safe with offset security bolt box having expandable characteristics and method of manufacturing same | |
| CN106906999B (en) | Straw core mould production method and application in a kind of civil engineering | |
| US20050257478A1 (en) | Foundation void former unit | |
| CN105019593A (en) | Building insulation precast block and modular reinforcement cast-in-place construction method thereof | |
| KR100937719B1 (en) | Manufacturing method and manufacturing device of body for a concrete sewage disposal tank | |
| JP2001173230A (en) | Synthetic resin formwork unit and synthetic resin formwork | |
| JP2005138544A (en) | Manufacturing method of outer wall panel | |
| CN1548676A (en) | Steel reinforced concrete hollow slab | |
| CN221030324U (en) | Non-pressure-bearing invisible well lid easy to open | |
| CN100467769C (en) | A reinforced concrete hollow slab | |
| CN101016772B (en) | Cavity component | |
| JP2002235368A (en) | Kit of concrete boards for catch basin and the catch basin made by assembling the concrete boards | |
| Faisal et al. | Recycling and Reuse of Building Materials From Construction and Demolition: An Environmental Evaluation for Sustainable Growth | |
| AU2002365670B2 (en) | Improved foundation void former unit | |
| CN100357541C (en) | Hollow component | |
| CN208996023U (en) | Lining wall structure with cavity reinforced concrete | |
| JP2004100383A (en) | Construction method for void slab effectively utilizing remaining material of form plywood | |
| JPH03115612A (en) | Drain ditch construction method | |
| CN100554619C (en) | A kind of Cavity structural member |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20041020 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
| AX | Request for extension of the european patent |
Extension state: AL LT LV MK RO SI |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
| 18D | Application deemed to be withdrawn |
Effective date: 20061027 |