EP0837041B1 - Plasma gasification and vitrification of ashes - Google Patents

Plasma gasification and vitrification of ashes Download PDF

Info

Publication number
EP0837041B1
EP0837041B1 EP97308283A EP97308283A EP0837041B1 EP 0837041 B1 EP0837041 B1 EP 0837041B1 EP 97308283 A EP97308283 A EP 97308283A EP 97308283 A EP97308283 A EP 97308283A EP 0837041 B1 EP0837041 B1 EP 0837041B1
Authority
EP
European Patent Office
Prior art keywords
electrodes
ashes
arc
furnace
slag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP97308283A
Other languages
German (de)
French (fr)
Other versions
EP0837041A1 (en
Inventor
Peter G. Tsantrizos
Michel G. Drouet
Theodora Alexakis
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pyrogenesis Inc
Original Assignee
Pyrogenesis Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pyrogenesis Inc filed Critical Pyrogenesis Inc
Publication of EP0837041A1 publication Critical patent/EP0837041A1/en
Application granted granted Critical
Publication of EP0837041B1 publication Critical patent/EP0837041B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J3/00Production of combustible gases containing carbon monoxide from solid carbonaceous fuels
    • C10J3/02Fixed-bed gasification of lump fuel
    • C10J3/20Apparatus; Plants
    • C10J3/34Grates; Mechanical ash-removing devices
    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B5/00Melting in furnaces; Furnaces so far as specially adapted for glass manufacture
    • C03B5/005Melting in furnaces; Furnaces so far as specially adapted for glass manufacture of glass-forming waste materials
    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B5/00Melting in furnaces; Furnaces so far as specially adapted for glass manufacture
    • C03B5/02Melting in furnaces; Furnaces so far as specially adapted for glass manufacture in electric furnaces, e.g. by dielectric heating
    • C03B5/025Melting in furnaces; Furnaces so far as specially adapted for glass manufacture in electric furnaces, e.g. by dielectric heating by arc discharge or plasma heating
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J3/00Production of combustible gases containing carbon monoxide from solid carbonaceous fuels
    • C10J3/02Fixed-bed gasification of lump fuel
    • C10J3/06Continuous processes
    • C10J3/18Continuous processes using electricity
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/08Incineration of waste; Incinerator constructions; Details, accessories or control therefor having supplementary heating
    • F23G5/085High-temperature heating means, e.g. plasma, for partly melting the waste
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2200/00Details of gasification apparatus
    • C10J2200/12Electrodes present in the gasifier
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/16Integration of gasification processes with another plant or parts within the plant
    • C10J2300/1625Integration of gasification processes with another plant or parts within the plant with solids treatment
    • C10J2300/1628Ash post-treatment
    • C10J2300/1634Ash vitrification
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P40/00Technologies relating to the processing of minerals
    • Y02P40/50Glass production, e.g. reusing waste heat during processing or shaping

Definitions

  • the present invention relates to a method and apparatus for plasma gasification and vitrification of ashes.
  • U.S. Patent No. 4,960,380 there is disclosed a method and an apparatus for the reduction of solid waste material, wherein a powerful laser is used to produce a plasma in which the solid waste materials are reduced to a slag-like material.
  • the treatment is not adapted to work in parallel with the primary combustion unit and the energy is not recovered, the objective being solely to produce a slag.
  • a melting furnace for the treatment of the combustion ash resulting from incineration of municipal and other sorts of waste by melting the ash and utilizing the unburnt carbon. contained in the ash itself as the main source of heat. This combustion is assisted by a plasma torch which uses air as its working gas. The treatment of the ash is made in line with the primary combustion unit of the waste.
  • European Patent application number EP-A2-0 625 869 discloses a melting apparatus for vitrification and combustion of waste materials comprising an anode plasma jet and a cathode plasma jet arranged to operate in one of three different modes, wherein the current is transferred already from one jet to another, wherein the current is transferred from one jet to the other via an intermediate conductor, such as a melt pool, or a combination of the two.
  • a method for gasification and vitrification of ashes by means of a plasma arc comprising: (a) feeding a predetermined quantity of ashes into a shaft furnace, which shaft furnace is provided in its heating section with two or three tiltable plasma arc electrodes; (b) igniting an arc between ends of electrodes by contact between them when they are positioned essentially horizontally, facing one another; (c) tilting the electrodes downwardly, thereby increasing distance between their ends and lengthening the plasma arc to heat the ashes, and thereby produce combustion gases and slag; (d) allowing the tilting to proceed until the electrodes are positioned essentially vertically, whereby the arc between the electrodes is broken and separate arcs are formed, one between each electrode and the slag accumulated at the bottom of the furnace, thereby heating said slag and maintaining it in a molten state; and (e) tapping the molten slag when required.
  • apparatus for gasification and vitrification of ashes by means of a plasma arc comprising: (a) a shaft furnace with an opening at its top end to receive a batch of ashes; (b) a gas exhaust outlet at the upper end of said furnace for exhaust of combustion gases; (c) two or three plasma arc producing electrodes located at about mid-level of the furnace and moveable between an essentially horizontal position, in which they face each other and an essentially vertical position in which they are downwardly directed; (d) and means for igniting an arc between said electrodes when they are in said essentially in horizontal position; (e) means for tilting the electrodes between said essentially horizontal position and said essentially vertical position by which tilting, an arc formed between the electrodes is broken and separate arcs (26a, 26b) are formed between the electrode and slag contained at the bottom of the furnace; and (f) a tap hole at the bottom end of the furnace for discharging molten slag when required
  • Embodiments can provide a method and apparatus for treating the hot ash material received from a primary combustion unit, such as that operating in the pulp and paper industry, wherein the primary fuel is hog-fuel and the primary combustion unit is a hog-fuel fired boiler, although the invention is not limited to such boilers.
  • a primary combustion unit such as that operating in the pulp and paper industry, wherein the primary fuel is hog-fuel and the primary combustion unit is a hog-fuel fired boiler, although the invention is not limited to such boilers.
  • aspects of the present invention can provide a new and improved method and apparatus for the gasification of the ashes to produce valuable gases for combustion in the main boiler, thus reducing the amount of purchased gases required to sustain the primary combustion.
  • Further aspects of the present invention can provide a method and apparatus for the vitrification of the solid residues resulting from the gasification of the ashes.
  • the ashes from the boiler can be fed at the top of a vertical shaft furnace where the gasification of the organics can occur.
  • the two or three electrodes are preferably located at the bottom end of the furnace. The electrodes are used to sustain electric arcs that heat the residue of the gasification (the slag) to melting temperature.
  • the energy required for heating the material to the gasification temperature (typically about 2000°F (1100°C)) and the energy required for gasification will be provided by combusting part of the organics contained in the waste. Only the extra energy required for vitrification (typically at about 2700°F (1500°C)) of the inorganic residues will be provided by the electric arc.
  • Gasification can be achieved by injecting both air and steam to produce carbon dioxide and hydrogen according to the following reaction equations: C + air ⁇ CO + N 2 + 26.41 Kcal/mole of C. C + H 2 O ⁇ CO + H 2 - 31.2 Kcal/mole of C.
  • the relative amounts of air and steam injected are controlled in order to reduce the required electrical input energy taking into account the composition of the material and its initial temperature.
  • a typical example is presented later in this disclosure.
  • the CO and H 2 synthesis gases may be returned to the boiler of the primary combustion unit, for example a hog-fired boiler, as a source of energy.
  • Embodiments of the present invention can comprise a shaft furnace which, when viewed from top to bottom in the vertical direction, comprises three zones having the following combination of features, namely:
  • the ash feeding system may include a slide door which would allow the control of the amount of ashes introduced into the furnace from an ash hopper located above the shaft furnace.
  • the orientation of the arc electrodes located at mid-level can be varied.
  • the electrodes can be placed in a horizontal position facing one another, and then arranged to contact one another to ignite the arc.
  • the distance between the electrodes can be slowly increased and, at the same time, the orientation of the electrodes can be varied towards the vertical direction.
  • the frozen slag remaining from a previous operation can be heated by the arc and can start to melt.
  • the slag electrical conductivity increases and arcing can occur between the electrodes and the melt, short circuiting the arc between the electrodes.
  • This operation with two or three arcs being transferred to the molten slag is the normal operation, with heat being generated both by the arcs and the resistance heating through the slag.
  • Gasification of the organics contained in the ashes occurs in the shaft furnace, and the products of gasification can be discharged through the gas outlet located at the upper end of the shaft furnace and may be used as a heat source for the boiler.
  • the remaining ash residues can fall into the crucible at the bottom of the shaft furnace, where they can be melted.
  • the molten slag is preferably poured periodically through the crucible tap hole.
  • ash 10 is fed from hopper 12 of a boiler or the like, into a shaft furnace 14 which, at its upper end, has a feeding mouth 16 and a gas exhaust outlet 18.
  • the feeding of the ash 10 is effected through a sliding door system 20 which, once the predetermined amount of ashes has been fed into the shaft furnace 14, will seal the outlet from the hopper 12 so that no gases produced in the shaft furnace 14, will be discharged into the hopper 12, but rather will be conducted through the outlet 18 to serve as an energy source for the boiler (not shown).
  • Arc electrodes 22a, 22b are located in the mid-level of the shaft furnace 14, which constitutes the heating zone of the furnace. These electrodes are powered via electric cables 24a, 24b by an AC or a DC electrical power supply. However, if three electrodes are used, a three phase AC electrical power supply is required.
  • step (a) of Fig. 1 arc ignition is initiated between arc electrodes 22a, 22b positioned essentially horizontally, and facing one another.
  • the ash contained in the shaft furnace 14 is thereby heated and a portion of the organics in the ash are burned producing some of the energy for gasification thereof, while the inorganics which form the slag are melted as shown in step (b) of Fig. 1.
  • the electrodes 22a, 22b are tilted downwardly producing a longer arc 26.
  • the arc transfer operation proceeds as shown in step (c) of Fig.
  • the shaft furnace 14 is illustrated in greater detail in Fig. 2. It consists of a steel shell 11 made of a hollow steel cylinder joined to a hollow conical section. The furnace interior walls are lined with a high temperature refractory layer or lining 13. The inner side of this refractory lining 13 may be made of a magnesia-carbon brick, such as manufactured by North American Refractories, because of its good capacity to resist severe mechanical stresses in the presence of metal and slag at temperature typically up to 1700°C. On the outside of the refractory lining 13, next to the steel shell 11, one may use an insulating refractory material such as a magnesia gunning mix, also manufactured by North American Refractories.
  • a magnesia gunning mix also manufactured by North American Refractories.
  • the shaft furnace 14 is heated by electric plasma arcs 26a, 26b struck between the two graphite electrodes 22a, 22b and the molten slag 28, as illustrated in Fig. 1(c) and also by the resistive heating of the molten slag 28 resulting from the conduction of the electrical current through such slag.
  • the bottom end of the furnace is provided with a cylindrical crucible 30, also made of a steel shell 15 lined with a refractory lining 17 which may be the same as the lining of the shaft furnace 14.
  • the crucible may be equipped with two tap holes 32 and 33, used to pour the molten slag 28 and molten metal 21 respectively, if such molten metal is contained at the bottom of the crucible.
  • a steel probe 23 is also mounted at the bottom of the crucible and is used during the operation of the furnace to monitor the voltage of the melt in order to balance the electrical power delivered by each of the two arcs, by adjusting the position of each electrode 22a, 22b, thus correcting for the erosion of each electrode tip by the arc.
  • the top end of the shaft furnace has an opening 16 connected to a slide door system 20 which is also shown in Fig. 3 by way of a top, partly sectional view.
  • the slide door 25 is moved in the horizontal direction by a piston 27 and is used to prevent any gases produced in the shaft furnace 14 from discharging into the hopper 12 containing the ashes 10.
  • the slide door 25 is also used to transfer a controlled amount of ashes 10 from the hopper 12 into the shaft furnace 14; for this purpose, the slide door 25 presents an opening 29 which will be filled with ashes 10 from the hopper 12 when the slide door 25 is in the non-extended position; i.e. when the opening 29 is located just beneath the outlet of the hopper 12.
  • the slide door 25 is pushed by the piston 27 and, once in the extended position, illustrated in Fig. 2, the ash material contained in the opening 29 of the slide door 25 falls into the shaft furnace 14 through the opening 16.
  • a gas exhaust outlet 18 with an opening 19 is also provided at the upper end of the shaft furnace 14 for discharging the gases produced in the shaft furnace 14 by gasification of the ashes 10.
  • a reset electrode 35 is provided to allow the reset of the position of the electrodes 22a, 22b, before ignition of the arc between said electrodes.
  • the reset operation is preferredbecause the electrode tips are continuously worn out by the action of the arc. (c.f. "Physics of High-Current Arcs in the Journal of The Iron and Steel Institute, June 1969, p. 803)
  • the electrode tip loss per day can be approximately one inch (2.5 cm) in length.
  • the reset electrode 35 is first extended as shown in Fig. 5; then, one at a time, each of the electrodes 22a, 22b is moved by a piston (not shown) until electrical contact is made between the electrode 22a or 22b being positioned and the reset electrode 35; when electrical contact is made, the electrode position controller is reset to zero. Then, the same procedure is repeated for the second electrode. Once the electrode positions have been reset, the reset electrode 35 is pulled back, and the two electrodes 22a, 22b are made to contact one another to ignite the arc.
  • the electrodes are tilted from the horizontal position by pistons (not shown) acting on levers 37a, 37b which rotate trunnions 38a, 38b holding the electrode refractory sleeves 34a, 34b.
  • the shape of the crucible 30 is designed to ensure that the falling ash material does not affect the displacement of the electrodes 22a, 22b from the horizontal ignition position to the almost vertical normal operating position. Furthermore, the design of the crucible ensures complete melting of the slag 28 (Fig. 2).
  • the shaft furnace 14 installed with connections to the ash hopper 12 for charging with ashes 10, and to the boiler (not shown) for discharging of the gasification product gases (CO + H 2 ) through opening 19, is filled with ashes almost to the top as shown in Fig. 2, by moving the slide door 25 back and forth with piston 27.
  • the electrodes 22a, 22b are retracted in their sleeves 34a, 34b by a piston (not shown) and raised to the horizontal position using the trunnions 38a, 38b and levers 37a, 37b rotated by pistons (not shown).
  • the reset electrode 35 is extended by piston 36, as shown in Fig. 5.
  • electrode 22a is moved by a piston (not shown) until electrical contact is made between said electrode 22a and the reset electrode 35; when electrical contact is made, the electrode position controller is reset to zero. Then the same procedure is repeated for the second electrode 22b.
  • the reset electrode 35 is pulled back by piston 36, and the two electrodes 22a, 22b are made to contact one another to ignite a plasma arc between them.
  • the distance between the electrodes 22a, 22b is slowly increased by pulling them within their protective refractory sleeves 34a, 34b using pistons (not shown).
  • the orientation of the electrodes 22a, 22b is varied towards the vertical direction as shown in Fig. 1(b) by pistons (not shown), acting on levers 37a, 37b which rotate the trunnions 38a, 38b holding the refractory sleeves 34a, 34b.
  • the elongated plasma arc 26 heats the solid residues contained in the ashes and remelts the frozen slag 28 remaining from a previous operation of the furnace as illustrated in Fig. 1(b). With increasing temperature, the slag electrical conductivity increases and the elongated arc is short-circuited through the melt, as illustrated in Fig. 1(c). This operation, with one arc between each electrode and the melt, is the normal operation with heat generated by both arcs and the resistance heating through the melt.
  • each arc As the melt level rises in the crucible 30, it is preferable to adjust the length of each arc. This is achieved by maintaining the voltage of each arc constant, said voltage being monitored using the voltage probe 23 (Fig. 2) located at the bottom of the crucible 30.
  • Periodic pouring of the slag 28 is made through the tap hole 32.
  • a molten iron heel 21 is used at the bottom of the crucible 30 (Fig. 2) to provide that, after slag pouring, a high heat capacity melt remains in the crucible to stabilize the gasification operation, to maintain the two arc operation illustrated in Fig. 1(c) and to protect the voltage probe 23 and ensure its operation of arc voltage monitoring.
  • the various components of the process energy balance are as follows: ENERGY COMPONENTS Input Absorbed ⁇ Heating of the 5.2 tonnes of ashes to 2,000°F - 7,240MJ ⁇ Partial combustion of the organics +17,249MJ ⁇ Heating of the steam from 1,000 to 2,000°F - 2,174MJ ⁇ Production of synthesis gas by steam injection - 6,988MJ ⁇ Heat losses - 987MJ ⁇ Vitrification of residues - 1,800MJ ⁇ Plasma heating + 1,800MJ TOTAL +19,189MJ - 19,189MJ
  • the heating value of the product gas is 5.59 MJ per normal cubic meter.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Organic Chemistry (AREA)
  • Combustion & Propulsion (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Gasification And Melting Of Waste (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)

Description

  • The present invention relates to a method and apparatus for plasma gasification and vitrification of ashes.
  • Methods and apparatus have been proposed to more efficiently burn all the available fuel in waste products, such as wood scraps, bark, shavings, plywood trim, and rejects. The objectives are both to maximize the amount of combustion heat and to minimize the volume of the ash produced. Apparatus and methods have also been proposed for reburning ash material of a previously burned primary fuel. The extent of the ash problem is well illustrated by the fact that, for example, in Canada approximately 1000 tonnes of ashes are produced every day solely from the burning of bark.
  • Thus, in U.S. Patent No. 5,161,471, the reburning apparatus has been adapted to work in parallel with the primary combustion unit. In this case, combustion air is introduced over the whole floor area of an ash reburn vessel. The reburned ash is then disposed of without further treatment.
  • By contrast, in U.S. Patent No. 4,960,380, there is disclosed a method and an apparatus for the reduction of solid waste material, wherein a powerful laser is used to produce a plasma in which the solid waste materials are reduced to a slag-like material. In this case, however, the treatment is not adapted to work in parallel with the primary combustion unit and the energy is not recovered, the objective being solely to produce a slag.
  • In Canadian Patent Application No. 2,106,746, a melting furnace is disclosed for the treatment of the combustion ash resulting from incineration of municipal and other sorts of waste by melting the ash and utilizing the unburnt carbon. contained in the ash itself as the main source of heat. This combustion is assisted by a plasma torch which uses air as its working gas. The treatment of the ash is made in line with the primary combustion unit of the waste.
  • Use of a plasma torch is a very inefficient use of energy and requires specialised personnel for its operation and maintenance.
  • European Patent application number EP-A2-0 625 869 discloses a melting apparatus for vitrification and combustion of waste materials comprising an anode plasma jet and a cathode plasma jet arranged to operate in one of three different modes, wherein the current is transferred already from one jet to another, wherein the current is transferred from one jet to the other via an intermediate conductor, such as a melt pool, or a combination of the two.
  • In accordance with an aspect of the invention, there is provided a method for gasification and vitrification of ashes by means of a plasma arc, the method comprising: (a) feeding a predetermined quantity of ashes into a shaft furnace, which shaft furnace is provided in its heating section with two or three tiltable plasma arc electrodes; (b) igniting an arc between ends of electrodes by contact between them when they are positioned essentially horizontally, facing one another; (c) tilting the electrodes downwardly, thereby increasing distance between their ends and lengthening the plasma arc to heat the ashes, and thereby produce combustion gases and slag; (d) allowing the tilting to proceed until the electrodes are positioned essentially vertically, whereby the arc between the electrodes is broken and separate arcs are formed, one between each electrode and the slag accumulated at the bottom of the furnace, thereby heating said slag and maintaining it in a molten state; and (e) tapping the molten slag when required.
  • In accordance with a further aspect of the invention, there is provided apparatus for gasification and vitrification of ashes by means of a plasma arc, the apparatus comprising: (a) a shaft furnace with an opening at its top end to receive a batch of ashes; (b) a gas exhaust outlet at the upper end of said furnace for exhaust of combustion gases; (c) two or three plasma arc producing electrodes located at about mid-level of the furnace and moveable between an essentially horizontal position, in which they face each other and an essentially vertical position in which they are downwardly directed; (d) and means for igniting an arc between said electrodes when they are in said essentially in horizontal position; (e) means for tilting the electrodes between said essentially horizontal position and said essentially vertical position by which tilting, an arc formed between the electrodes is broken and separate arcs (26a, 26b) are formed between the electrode and slag contained at the bottom of the furnace; and (f) a tap hole at the bottom end of the furnace for discharging molten slag when required.
  • It is an object of the present invention to alleviate some or all of the problems associated with the prior art. Embodiments can provide a method and apparatus for treating the hot ash material received from a primary combustion unit, such as that operating in the pulp and paper industry, wherein the primary fuel is hog-fuel and the primary combustion unit is a hog-fuel fired boiler, although the invention is not limited to such boilers.
  • Aspects of the present invention can provide a new and improved method and apparatus for the gasification of the ashes to produce valuable gases for combustion in the main boiler, thus reducing the amount of purchased gases required to sustain the primary combustion.
  • Further aspects of the present invention can provide a method and apparatus for the vitrification of the solid residues resulting from the gasification of the ashes.
  • In embodiments of the present invention, the ashes from the boiler can be fed at the top of a vertical shaft furnace where the gasification of the organics can occur. The two or three electrodes are preferably located at the bottom end of the furnace. The electrodes are used to sustain electric arcs that heat the residue of the gasification (the slag) to melting temperature.
  • Preferably, the energy required for heating the material to the gasification temperature (typically about 2000°F (1100°C)) and the energy required for gasification will be provided by combusting part of the organics contained in the waste. Only the extra energy required for vitrification (typically at about 2700°F (1500°C)) of the inorganic residues will be provided by the electric arc.
  • Gasification can be achieved by injecting both air and steam to produce carbon dioxide and hydrogen according to the following reaction equations: C + air → CO + N2 + 26.41 Kcal/mole of C. C + H2O → CO + H2 - 31.2 Kcal/mole of C.
  • Preferably, the relative amounts of air and steam injected are controlled in order to reduce the required electrical input energy taking into account the composition of the material and its initial temperature. A typical example is presented later in this disclosure.
  • The CO and H2 synthesis gases may be returned to the boiler of the primary combustion unit, for example a hog-fired boiler, as a source of energy.
  • Embodiments of the present invention can comprise a shaft furnace which, when viewed from top to bottom in the vertical direction, comprises three zones having the following combination of features, namely:
  • (1) an ash feeding system and a gas exhaust outlet at the top of the shaft furnace;
  • (2) a heating zone; located at mid-level, with two or three arc electrodes;
  • (3) means(such as a crucible) , located at the bottom . of . the shaft furnace, to contain the molten slag, and equipped with a tap hole for pouring the slag.
  • The ash feeding system may include a slide door which would allow the control of the amount of ashes introduced into the furnace from an ash hopper located above the shaft furnace.
  • The orientation of the arc electrodes located at mid-level can be varied. At the start of the operation, the electrodes can be placed in a horizontal position facing one another, and then arranged to contact one another to ignite the arc. After arc ignition, the distance between the electrodes can be slowly increased and, at the same time, the orientation of the electrodes can be varied towards the vertical direction. As a result, the frozen slag remaining from a previous operation can be heated by the arc and can start to melt. With increasing temperature, the slag electrical conductivity increases and arcing can occur between the electrodes and the melt, short circuiting the arc between the electrodes. This operation with two or three arcs being transferred to the molten slag is the normal operation, with heat being generated both by the arcs and the resistance heating through the slag.
  • Gasification of the organics contained in the ashes occurs in the shaft furnace, and the products of gasification can be discharged through the gas outlet located at the upper end of the shaft furnace and may be used as a heat source for the boiler. The remaining ash residues can fall into the crucible at the bottom of the shaft furnace, where they can be melted. The molten slag is preferably poured periodically through the crucible tap hole.
  • As each electrode wears off during operation, it is preferable:
  • (a) to reset the electrode position before ignition (a reset electrode can be provided for that purpose);
  • (b) to monitor the arc length of each of the arcs during operation (an arc voltage probe connected to the melt at the bottom of the crucible can be provided for that particular purpose); and
  • (c) to protect the electrode side walls from gasification (a refractory sleeve enclosing each electrode can be provided for that purpose).
  • Embodiments of the invention will further be described, by way of example only, with reference to the accompanying drawings, in which:
  • Fig. 1 shows schematic diagrams illustrating the operations of a shaft furnace as follows:
  • (a) shows a side view of the shaft furnace in an ignition mode;
  • (b) shows a side view of the shaft furnace in an arc elongation mode;
  • (c) shows a side view of the shaft furnace in an arc transfer operation mode; and
  • (d) shows that the crucible may be removed from the furnace for maintenance;
  • Fig. 2 is a vertical cross-sectional view of the shaft furnace but omitting the electrode displacement mechanism.
  • Fig. 3 is a horizontal cross-sectional view of the slide door taken substantially along line 3-3 of Fig. 2;
  • Fig. 4 is a horizontal cross-sectional view of the shaft furnace taken substantially along line 4-4 of Fig. 2;
  • Fig. 5 is a horizontal cross-sectional view of the shaft furnace taken substantially along line 5-5 of Fig. 2, but with one of the electrodes in the reset position; and
  • Fig. 6 is a horizontal cross-sectional view of the crucible taken substantially along line 6-6 of Fig. 2.
  • In Fig. 1, the method of operation of the apparatus is illustrated. According to this method, ash 10 is fed from hopper 12 of a boiler or the like, into a shaft furnace 14 which, at its upper end, has a feeding mouth 16 and a gas exhaust outlet 18. The feeding of the ash 10 is effected through a sliding door system 20 which, once the predetermined amount of ashes has been fed into the shaft furnace 14, will seal the outlet from the hopper 12 so that no gases produced in the shaft furnace 14, will be discharged into the hopper 12, but rather will be conducted through the outlet 18 to serve as an energy source for the boiler (not shown).
  • Arc electrodes 22a, 22b are located in the mid-level of the shaft furnace 14, which constitutes the heating zone of the furnace. These electrodes are powered via electric cables 24a, 24b by an AC or a DC electrical power supply. However, if three electrodes are used, a three phase AC electrical power supply is required.
  • In step (a) of Fig. 1, arc ignition is initiated between arc electrodes 22a, 22b positioned essentially horizontally, and facing one another. The ash contained in the shaft furnace 14 is thereby heated and a portion of the organics in the ash are burned producing some of the energy for gasification thereof, while the inorganics which form the slag are melted as shown in step (b) of Fig. 1. At the same time, the electrodes 22a, 22b are tilted downwardly producing a longer arc 26. Then, the arc transfer operation proceeds as shown in step (c) of Fig. 1 and whereby the molten slag 28 accumulated in the crucible 30, which is located at the bottom of the shaft furnace 14, is contacted by the arc created between each electrode and the slag. At this point of the arc transfer, the arc is short-circuited between the two electrodes and the two arcs 26a, 26b thereby produced are transferred into the slag 28, generating heat and helping to melt the slag. Molten slag is then periodically discharged through a tap hole 32. In view of the intense heat generated in the crucible 30, periodic crucible maintenance is required, and the crucible, made detachable from the shaft furnace for this purpose, may be removed for maintenance as shown in step (d) of Fig. 1. Air and steam are also injected into the furnace via lances 39 and 40 respectively (Fig. 2) to assist in the gasification of the organics in the ashes and to produce a combustion gas suitable to be used as a source of energy in the boiler or the like.
  • The shaft furnace 14 is illustrated in greater detail in Fig. 2. It consists of a steel shell 11 made of a hollow steel cylinder joined to a hollow conical section. The furnace interior walls are lined with a high temperature refractory layer or lining 13. The inner side of this refractory lining 13 may be made of a magnesia-carbon brick, such as manufactured by North American Refractories, because of its good capacity to resist severe mechanical stresses in the presence of metal and slag at temperature typically up to 1700°C. On the outside of the refractory lining 13, next to the steel shell 11, one may use an insulating refractory material such as a magnesia gunning mix, also manufactured by North American Refractories.
  • In normal operation, the shaft furnace 14 is heated by electric plasma arcs 26a, 26b struck between the two graphite electrodes 22a, 22b and the molten slag 28, as illustrated in Fig. 1(c) and also by the resistive heating of the molten slag 28 resulting from the conduction of the electrical current through such slag.
  • The bottom end of the furnace is provided with a cylindrical crucible 30, also made of a steel shell 15 lined with a refractory lining 17 which may be the same as the lining of the shaft furnace 14. The crucible may be equipped with two tap holes 32 and 33, used to pour the molten slag 28 and molten metal 21 respectively, if such molten metal is contained at the bottom of the crucible. A steel probe 23 is also mounted at the bottom of the crucible and is used during the operation of the furnace to monitor the voltage of the melt in order to balance the electrical power delivered by each of the two arcs, by adjusting the position of each electrode 22a, 22b, thus correcting for the erosion of each electrode tip by the arc.
  • Furthermore, as illustrated in Fig. 2, the top end of the shaft furnace has an opening 16 connected to a slide door system 20 which is also shown in Fig. 3 by way of a top, partly sectional view. The slide door 25 is moved in the horizontal direction by a piston 27 and is used to prevent any gases produced in the shaft furnace 14 from discharging into the hopper 12 containing the ashes 10.
  • The slide door 25 is also used to transfer a controlled amount of ashes 10 from the hopper 12 into the shaft furnace 14; for this purpose, the slide door 25 presents an opening 29 which will be filled with ashes 10 from the hopper 12 when the slide door 25 is in the non-extended position; i.e. when the opening 29 is located just beneath the outlet of the hopper 12. once the opening 29 is filled with ash, the slide door 25 is pushed by the piston 27 and, once in the extended position, illustrated in Fig. 2, the ash material contained in the opening 29 of the slide door 25 falls into the shaft furnace 14 through the opening 16.
  • Moreover, as illustrated in Figs. 2 and 4, a gas exhaust outlet 18 with an opening 19 is also provided at the upper end of the shaft furnace 14 for discharging the gases produced in the shaft furnace 14 by gasification of the ashes 10.
  • Refering to Fig. 5, a reset electrode 35 is provided to allow the reset of the position of the electrodes 22a, 22b, before ignition of the arc between said electrodes. The reset operation is preferredbecause the electrode tips are continuously worn out by the action of the arc. (c.f. "Physics of High-Current Arcs in the Journal of The Iron and Steel Institute, June 1969, p. 803) For example, for a 3 inch (7.5 cm) graphite electrode operating at a current of 4 kiloamperes, the electrode tip loss per day can be approximately one inch (2.5 cm) in length.
  • In order to reset the electrode position, the reset electrode 35 is first extended as shown in Fig. 5; then, one at a time, each of the electrodes 22a, 22b is moved by a piston (not shown) until electrical contact is made between the electrode 22a or 22b being positioned and the reset electrode 35; when electrical contact is made, the electrode position controller is reset to zero. Then, the same procedure is repeated for the second electrode. Once the electrode positions have been reset, the reset electrode 35 is pulled back, and the two electrodes 22a, 22b are made to contact one another to ignite the arc.
  • Following arc ignition between the electrodes 22a, 22b, the electrodes are tilted from the horizontal position by pistons (not shown) acting on levers 37a, 37b which rotate trunnions 38a, 38b holding the electrode refractory sleeves 34a, 34b.
  • As illustrated in Fig. 6, the shape of the crucible 30 is designed to ensure that the falling ash material does not affect the displacement of the electrodes 22a, 22b from the horizontal ignition position to the almost vertical normal operating position. Furthermore, the design of the crucible ensures complete melting of the slag 28 (Fig. 2).
  • The apparatus described above is operated in the following manner:
  • The shaft furnace 14, installed with connections to the ash hopper 12 for charging with ashes 10, and to the boiler (not shown) for discharging of the gasification product gases (CO + H2) through opening 19, is filled with ashes almost to the top as shown in Fig. 2, by moving the slide door 25 back and forth with piston 27.
  • The electrodes 22a, 22b are retracted in their sleeves 34a, 34b by a piston (not shown) and raised to the horizontal position using the trunnions 38a, 38b and levers 37a, 37b rotated by pistons (not shown). The reset electrode 35 is extended by piston 36, as shown in Fig. 5. Then, electrode 22a is moved by a piston (not shown) until electrical contact is made between said electrode 22a and the reset electrode 35; when electrical contact is made, the electrode position controller is reset to zero. Then the same procedure is repeated for the second electrode 22b.
  • Once the position of both electrodes has been reset, the reset electrode 35 is pulled back by piston 36, and the two electrodes 22a, 22b are made to contact one another to ignite a plasma arc between them. Following arc ignition, the distance between the electrodes 22a, 22b is slowly increased by pulling them within their protective refractory sleeves 34a, 34b using pistons (not shown). At the same time, the orientation of the electrodes 22a, 22b is varied towards the vertical direction as shown in Fig. 1(b) by pistons (not shown), acting on levers 37a, 37b which rotate the trunnions 38a, 38b holding the refractory sleeves 34a, 34b. The elongated plasma arc 26 heats the solid residues contained in the ashes and remelts the frozen slag 28 remaining from a previous operation of the furnace as illustrated in Fig. 1(b). With increasing temperature, the slag electrical conductivity increases and the elongated arc is short-circuited through the melt, as illustrated in Fig. 1(c). This operation, with one arc between each electrode and the melt, is the normal operation with heat generated by both arcs and the resistance heating through the melt.
  • As the melt level rises in the crucible 30, it is preferable to adjust the length of each arc. This is achieved by maintaining the voltage of each arc constant, said voltage being monitored using the voltage probe 23 (Fig. 2) located at the bottom of the crucible 30.
  • Periodic pouring of the slag 28 is made through the tap hole 32. A molten iron heel 21 is used at the bottom of the crucible 30 (Fig. 2) to provide that, after slag pouring, a high heat capacity melt remains in the crucible to stabilize the gasification operation, to maintain the two arc operation illustrated in Fig. 1(c) and to protect the voltage probe 23 and ensure its operation of arc voltage monitoring.
  • The invention is now further illustrated by the following example:
  • EXAMPLE
  • Ashes were fed to a shaft furnace at a rate of 5.2 metric tonnes per hour. The heating value of the ash was determined to be 15,738 MJ per metric tonne. The relative amounts of injected air and steam were controlled to reduce the required electrical input energy. In such operation, the various components of the process energy balance are as follows:
    ENERGY COMPONENTS Input Absorbed
    · Heating of the 5.2 tonnes of ashes to 2,000°F - 7,240MJ
    · Partial combustion of the organics +17,249MJ
    · Heating of the steam from 1,000 to 2,000°F - 2,174MJ
    · Production of synthesis gas by steam injection - 6,988MJ
    · Heat losses - 987MJ
    · Vitrification of residues - 1,800MJ
    · Plasma heating + 1,800MJ
          TOTAL +19,189MJ - 19,189MJ
  • The heat and mass balances are further illustrated by the following data:
    INPUT OUTPUT
    - Waste input
    5.2 tonnes/hr
    81,842 MJ/hr
    - Product gases
    14.95 t/hr
    72,069 MJ/hr
    - Air 11.25 t/hr - Slag 2.44 t/hr
    - Steam 1,000°F
    0.94 t/hr
    2,174 MJ/hr
    - Slag and gas sensible heat and vessel losses 13,747 MJ/hr
    - Plasma heat
    1,800 MJ/hr
  • The heating value of the product gas is 5.59 MJ per normal cubic meter.
  • It should be understood that the above described preferred embodiments and example are not limitative and various modifications can be made without departing from the scope of the present invention. For instance, three plasma arc electrodes could be used instead of two, with obvious adjustments, to produce similar results.

Claims (10)

  1. A method for gasification and vitrification of ashes by means of a plasma arc, the method comprising:
    (a) feeding a predetermined quantity of ashes into a shaft furnace (14), which shaft furnace (14) is provided in its heating section with two or three tiltable plasma arc electrodes (22a, 22b);
    (b) igniting an arc (26) between ends of the electrodes (22a, 22b) by contact between them when they are positioned essentially horizontally, facing one another;
    (c) tilting the electrodes downwardly, thereby increasing distance between their ends and lengthening the plasma arc (26) to heat the ashes, and thereby produce combustion gases and slag;
    (d) allowing the tilting to proceed until the electrodes are positioned essentially vertically, whereby the arc (26) between the electrodes (22a, 22b) is broken and separate arcs (26a, 26b) are formed, one between each electrode (22a, 22b) and the slag (28) accumulated at the bottom of the furnace (14), thereby heating said slag and maintaining it in a molten state; and
    (e) tapping the molten slag (28) when required.
  2. A method according to claim 1, in which the ashes fed into the shaft furnace (14) are hot ashes.
  3. A method according to claim 1 or 2, in which, during heating of the ashes, air and steam are injected into the shaft furnace (14).
  4. A method according to Claim 1, 2 or 3 wherein CO and H2 combustion gases are returned, as a source of energy, to a boiler the ashes are derived from.
  5. A method according to claim 1, in which the separate arcs (26a, 26b), are adapted to melt solid slag (28) remaining from a previous operation.
  6. Apparatus for gasification and vitrification of ashes by means of a plasma arc, the apparatus comprising:
    (a) a shaft furnace (14) with an opening at its top end to receive a batch of ashes (10);
    (b) a gas exhaust outlet (18) at the upper end of said furnace (14) for exhaust of combustion gases;
    (c) two or three plasma arc producing electrodes (22a, 22b) located at about mid-level of the furnace (14) and movable between an essentially horizontal position in which they face each other and an essentially vertical position in which they are downwardly directed;
    (d) means for igniting an arc (26) between said electrodes (22a, 22b) when they are in said essentially horizontal position;
    (e) means for tilting the electrodes (22a, 22b) between said essentially horizontal position and said essentially vertical position, by which tilting an arc (26) formed between the electrodes is broken and separate arcs (26a, 26b) are formed between the electrode and slag (28) contained at the bottom of the furnace; and
    (f) a tap hole (32) at the bottom end of the furnace (14) for discharging the molten slag when required.
  7. Apparatus according to claim 6, further comprising an ash feeding system (20) for feeding the ashes (10) into the shaft furnace (14) in controlled amounts.
  8. Apparatus according to claim 6, further comprising a reset electrode (35) to reset the position of the electrodes (22a, 22b) prior to ignition of the arc (26).
  9. Apparatus according to claim 6, further comprising a voltage probe (23) to monitor the arc length of each arc (26a, 26b) formed between each electrode (22a, 22b) and slag (28) at the bottom of the furnace (14).
  10. Apparatus according to claim 6, further comprising a refractory sleeve (34a, 34b) enclosing each electrode (22a, 22b) to protect its sidewalls from gasification.
EP97308283A 1996-10-21 1997-10-17 Plasma gasification and vitrification of ashes Expired - Lifetime EP0837041B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CA2188357 1996-10-21
CA002188357A CA2188357C (en) 1996-10-21 1996-10-21 plasma gasification and vitrification of ashes

Publications (2)

Publication Number Publication Date
EP0837041A1 EP0837041A1 (en) 1998-04-22
EP0837041B1 true EP0837041B1 (en) 2003-10-01

Family

ID=4159116

Family Applications (1)

Application Number Title Priority Date Filing Date
EP97308283A Expired - Lifetime EP0837041B1 (en) 1996-10-21 1997-10-17 Plasma gasification and vitrification of ashes

Country Status (4)

Country Link
US (1) US5958264A (en)
EP (1) EP0837041B1 (en)
CA (1) CA2188357C (en)
DE (1) DE69725256D1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8306665B2 (en) 2006-05-05 2012-11-06 Plasco Energy Group Inc. Control system for the conversion of carbonaceous feedstock into gas
US8435315B2 (en) 2006-05-05 2013-05-07 Plasco Energy Group Inc. Horizontally-oriented gasifier with lateral transfer system
US9109172B2 (en) 2006-05-05 2015-08-18 Plasco Energy Group Inc. Low temperature gasification facility with a horizontally oriented gasifier

Families Citing this family (54)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6502520B1 (en) * 1998-01-30 2003-01-07 Hitachi, Ltd. Solid material melting apparatus
US6362449B1 (en) * 1998-08-12 2002-03-26 Massachusetts Institute Of Technology Very high power microwave-induced plasma
RU2244042C2 (en) * 1999-03-12 2005-01-10 Айзенманн Машиненбау Кг (Комплементэр: Айзенманн-Штифтунг) Method of neutralization of materials hazardous or having a high energy potential and a device for realization of the method
IL141814A (en) * 2001-03-05 2006-08-20 David Pegaz Apparatus for processing waste with mixing chamber for oxidiser
US6987792B2 (en) * 2001-08-22 2006-01-17 Solena Group, Inc. Plasma pyrolysis, gasification and vitrification of organic material
CA2465905C (en) * 2001-08-22 2010-12-14 Solena Group, Inc. Plasma pyrolysis, gasification and vitrification of organic material
EP1501622B1 (en) 2002-05-08 2013-08-14 Benjamin Chun Pong Chan Method and apparatus for treating off-gas from a waste treatment system
CA2418836A1 (en) * 2003-02-12 2004-08-12 Resorption Canada Ltd. Multiple plasma generator hazardous waste processing system
RU2252363C2 (en) * 2003-03-19 2005-05-20 Гнеденко Валерий Герасимович Plasma-chemical reactor loading device gate
US6971323B2 (en) 2004-03-19 2005-12-06 Peat International, Inc. Method and apparatus for treating waste
WO2006081661A1 (en) * 2005-02-04 2006-08-10 Plasco Energy Group Inc. Coal gasification process and apparatus
AU2006254673A1 (en) * 2005-06-03 2006-12-07 Plasco Energy Group Inc. A system for the conversion of coal to a gas of a specified composition
CA2610806C (en) * 2005-06-03 2013-09-17 Plasco Energy Group Inc. A system for the conversion of carbonaceous feedstocks to a gas of a specified composition
CA2612732C (en) * 2005-06-21 2014-08-19 Phoenix Haute Technology Inc. Three step ultra-compact plasma system for the high temperature treatment of waste onboard ships
US7832344B2 (en) * 2006-02-28 2010-11-16 Peat International, Inc. Method and apparatus of treating waste
CA2646416C (en) * 2006-03-20 2015-11-17 Tetronics Limited Hazardous waste treatment process
JP2009536097A (en) 2006-05-05 2009-10-08 プラスコエナジー アイピー ホールディングス、エス.エル.、ビルバオ、シャフハウゼン ブランチ Gas homogenization system
EP2043951A4 (en) 2006-05-05 2010-04-14 Plascoenergy Ip Holdings Slb A gas reformulating system using plasma torch heat
KR20090019816A (en) 2006-05-05 2009-02-25 플라스코에너지 아이피 홀딩스, 에스.엘., 빌바오, 샤프하우젠 브랜치 Gas conditioning system
US9206364B2 (en) 2006-05-12 2015-12-08 Inentec Inc. Gasification system
US8118891B2 (en) * 2008-01-14 2012-02-21 InEn Tec, LLC Grate for high temperature gasification systems
US8118892B2 (en) * 2006-05-12 2012-02-21 Inentec Llc Gasification system
US7854775B2 (en) * 2006-05-12 2010-12-21 InEn Tec, LLC Combined gasification and vitrification system
US7752983B2 (en) * 2006-06-16 2010-07-13 Plasma Waste Recycling, Inc. Method and apparatus for plasma gasification of waste materials
BRPI0822209A2 (en) * 2007-02-27 2019-09-24 Plascoenergy Ip Holdings S L Bilbao Schaffhausen Branch gasification system with processed raw material / coal conversion and gas reformulation
US20080277265A1 (en) * 2007-05-11 2008-11-13 Plasco Energy Group, Inc. Gas reformulation system comprising means to optimize the effectiveness of gas conversion
US20100154304A1 (en) * 2007-07-17 2010-06-24 Plasco Energy Group Inc. Gasifier comprising one or more fluid conduits
US20090050561A1 (en) * 2007-08-20 2009-02-26 Jon Inman Sattler System and method for processing wastewater
US9074152B2 (en) * 2007-09-12 2015-07-07 General Electric Company Plasma-assisted waste gasification system
US9222039B2 (en) 2008-01-14 2015-12-29 Inentec Inc. Grate for high temperature gasification systems
US20110041404A1 (en) * 2008-03-14 2011-02-24 Atomic Energy Council - Institute Of Nuclear Energy Research Plasma-based apparatus for gasifying bio-waste into synthetic gas
US9284503B2 (en) * 2008-04-21 2016-03-15 Christopher Lawrence de Graffenried, SR. Manufacture of gas from hydrogen-bearing starting materials
US20100199557A1 (en) * 2009-02-11 2010-08-12 Dighe Shyam V Plasma gasification reactor
US9416328B2 (en) 2010-01-06 2016-08-16 General Electric Company System and method for treatment of fine particulates separated from syngas produced by gasifier
EP2526339A4 (en) 2010-01-21 2015-03-11 Powerdyne Inc Generating steam from carbonaceous material
US8425637B2 (en) 2010-06-04 2013-04-23 John R. Lersch Process and system for converting waste material to fuel or synthetic gas feedstock
US9321640B2 (en) 2010-10-29 2016-04-26 Plasco Energy Group Inc. Gasification system with processed feedstock/char conversion and gas reformulation
US20120210645A1 (en) * 2011-02-17 2012-08-23 Oaks Plasma Llc Multi-ring Plasma Pyrolysis Chamber
RU2595747C2 (en) * 2011-04-13 2016-08-27 АЛЬТЕР ЭнЭрДжи КОРП. Process and apparatus for treatment of incinerator ash
KR20150053943A (en) 2012-09-05 2015-05-19 파워다인, 인코포레이티드 Fuel generation using high-voltage electric fields methods
HK1212439A1 (en) 2012-09-05 2016-06-10 Powerdyne, Inc. Fuel generation using high-voltage electric fields methods
WO2014039726A1 (en) 2012-09-05 2014-03-13 Powerdyne, Inc. System for generating fuel materials using fischer-tropsch catalysts and plasma sources
HK1212279A1 (en) 2012-09-05 2016-06-10 Powerdyne, Inc. Method for sequestering heavy metal particulates using h2o, co2, o2, and a source of particulates
HK1212437A1 (en) 2012-09-05 2016-06-10 Powerdyne, Inc. Fuel generation using high-voltage electric fields methods
HK1212413A1 (en) 2012-09-05 2016-06-10 Powerdyne, Inc. Methods for power generation from h2o, co2, o2 and a carbon feed stock
US9677431B2 (en) 2012-09-05 2017-06-13 Powerdyne, Inc. Methods for generating hydrogen gas using plasma sources
US9469819B2 (en) * 2013-01-16 2016-10-18 Clearsign Combustion Corporation Gasifier configured to electrodynamically agitate charged chemical species in a reaction region and related methods
CN104650988A (en) * 2013-11-25 2015-05-27 航天长征化学工程股份有限公司 Carbon-containing substance reaction system and method
CN106001071A (en) * 2016-07-12 2016-10-12 浙江民生源环保设备有限公司 Electric arc plasma solid waste treatment device and system
DE102016214242B4 (en) 2016-08-02 2023-03-02 Gidara Energy B.V. Plant and process for converting carbonaceous fuels into synthesis gas
US10675633B2 (en) 2016-08-08 2020-06-09 Bradley Nelson Ion plasma disintegrator
US10998165B2 (en) 2016-08-08 2021-05-04 Bradley Nelson Ion plasma disintegrator
IL249923B (en) * 2017-01-03 2018-03-29 Shohat Tsachi Smart waste container
EP3694957A4 (en) * 2017-10-13 2021-08-25 Pyrogenesis Canada Inc. DC ARC FURNACE FOR WASTE MELTING AND GASIFICATION

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3749803A (en) * 1972-08-24 1973-07-31 Techn Applic Services Corp Trough hearth construction and method for plasma arc furnace
AT382890B (en) * 1982-10-05 1987-04-27 Voest Alpine Ag PLASMA MELTING OVEN
US4960380A (en) * 1989-09-21 1990-10-02 Phoenix Environmental Ltd. Method and apparatus for the reduction of solid waste material using coherent radiation
US5319176A (en) * 1991-01-24 1994-06-07 Ritchie G. Studer Plasma arc decomposition of hazardous wastes into vitrified solids and non-hazardous gasses
US5161471A (en) * 1991-11-13 1992-11-10 Riley Stoker Corporation Apparatus for reburning ash material of a previously burned primary fuel
JP3284606B2 (en) * 1992-09-24 2002-05-20 石川島播磨重工業株式会社 Ash melting furnace
EP0645584B1 (en) * 1993-03-08 1998-07-22 Kabushiki Kaisha Kobe Seiko Sho Method of operating a plasma furnace
US5548611A (en) * 1993-05-19 1996-08-20 Schuller International, Inc. Method for the melting, combustion or incineration of materials and apparatus therefor
DE69428150T2 (en) * 1993-05-19 2002-07-04 Johns Manville International, Inc. Process for melting, burning or cremating materials and device therefor
FR2710861B1 (en) * 1993-10-08 1995-11-03 Commissariat Energie Atomique Method of incineration and vitrification of waste in a crucible.
SE9401065D0 (en) * 1993-12-27 1994-03-30 W & E Umwelttechnik Ag Method and apparatus for the treatment of ash
JPH0949616A (en) * 1995-08-10 1997-02-18 Ngk Insulators Ltd Waste melting furnace and waste melting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8306665B2 (en) 2006-05-05 2012-11-06 Plasco Energy Group Inc. Control system for the conversion of carbonaceous feedstock into gas
US8435315B2 (en) 2006-05-05 2013-05-07 Plasco Energy Group Inc. Horizontally-oriented gasifier with lateral transfer system
US9109172B2 (en) 2006-05-05 2015-08-18 Plasco Energy Group Inc. Low temperature gasification facility with a horizontally oriented gasifier

Also Published As

Publication number Publication date
CA2188357A1 (en) 1998-04-21
EP0837041A1 (en) 1998-04-22
CA2188357C (en) 1999-09-07
US5958264A (en) 1999-09-28
DE69725256D1 (en) 2003-11-06

Similar Documents

Publication Publication Date Title
EP0837041B1 (en) Plasma gasification and vitrification of ashes
KR102655624B1 (en) DC arc furnace for waste melting and gasification
SK341992A3 (en) Electric arc furnace arrangement for producing steel
CZ280147B6 (en) Process of increased input of energy for saving electrical energy in electric arc steel-making furnaces
JPH0771733A (en) Method for melting, burning or incineration of materials and apparatus therefor
EP0764815B1 (en) A burner
EP0312044B1 (en) Method and furnace for the preparation of a melt for mineral wool production
KR20010106104A (en) Facility and method for arc-melting cold iron source
JP6357104B2 (en) Starting the smelting process
US1904683A (en) Combustion-arc process and apparatus
JP2002090066A (en) Scrap preheating type electric steel making furnace
JP3393302B2 (en) Metal melting method
JP2980481B2 (en) Operation method of double arc furnace equipment
US6432162B1 (en) Process for melting ashes, slags or glass
JP2001074377A (en) Melting method and melting equipment for cold iron source
JP7115662B1 (en) Molten iron manufacturing method using electric furnace equipped with image device
JPH0631686B2 (en) Exhaust gas heat recovery method and apparatus for melting furnace
RU2206623C2 (en) Method of making steel in converter
JPH02217788A (en) Scrap melting method in arc electric furnace and arc electric furnace for scrap melting
JP2002048321A (en) Waste treatment method
JP2004169999A (en) Incineration and melting furnace
JP2747983B2 (en) Method and apparatus for melting municipal solid waste incineration ash
JPH0248830B2 (en)
JP2003083517A (en) Waste plasma melting method and waste plasma melting device
JP2001124313A (en) Ash melting slag making device and ash melting slag making system

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE LI

AX Request for extension of the european patent

Free format text: AL;LT;LV;RO;SI

17P Request for examination filed

Effective date: 19981012

AKX Designation fees paid

Free format text: AT BE CH DE LI

RBV Designated contracting states (corrected)

Designated state(s): AT BE CH DE LI

RBV Designated contracting states (corrected)

Designated state(s): DE FR GB SE

17Q First examination report despatched

Effective date: 20020808

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE FR GB SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20031001

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 69725256

Country of ref document: DE

Date of ref document: 20031106

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040101

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040103

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20040101

26N No opposition filed

Effective date: 20040702

EN Fr: translation not filed