[go: up one dir, main page]

EP0697485A1 - Method and installation for making railway tracks - Google Patents

Method and installation for making railway tracks Download PDF

Info

Publication number
EP0697485A1
EP0697485A1 EP94401834A EP94401834A EP0697485A1 EP 0697485 A1 EP0697485 A1 EP 0697485A1 EP 94401834 A EP94401834 A EP 94401834A EP 94401834 A EP94401834 A EP 94401834A EP 0697485 A1 EP0697485 A1 EP 0697485A1
Authority
EP
European Patent Office
Prior art keywords
concrete
saddles
rails
crosspieces
adjustment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP94401834A
Other languages
German (de)
French (fr)
Other versions
EP0697485B1 (en
Inventor
J Malod-Panisset
P Dorangeon
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
COGIFER Compagnie Generale dInstallations Ferroviaires SA
Original Assignee
MONTCOCOL TP
COGIFER Compagnie Generale dInstallations Ferroviaires SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MONTCOCOL TP, COGIFER Compagnie Generale dInstallations Ferroviaires SA filed Critical MONTCOCOL TP
Priority to AT94401834T priority Critical patent/ATE174084T1/en
Priority to EP94401834A priority patent/EP0697485B1/en
Priority to DE69415005T priority patent/DE69415005D1/en
Publication of EP0697485A1 publication Critical patent/EP0697485A1/en
Application granted granted Critical
Publication of EP0697485B1 publication Critical patent/EP0697485B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B21/00Track superstructure adapted for tramways in paved streets
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • E01B1/004Ballastless track, e.g. concrete slab trackway, or with asphalt layers with prefabricated elements embedded in fresh concrete or asphalt
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/06Height or lateral adjustment means or positioning means for slabs, sleepers or rails
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/09Ballastless systems
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/10Making longitudinal or transverse sleepers or slabs in situ or embedding them
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/13Dowels for slabs, sleepers or rail-fixings

Definitions

  • the invention relates to a new track device for railway vehicles of the tramway type which are intended to travel on the same tracks as ordinary road vehicles.
  • the invention allows the realization of a simple, therefore inexpensive, track, the essential elements of which can be manufactured in the factory and then brought to the place of assembly and assembled in a short time but with great precision and using means. extremely simple adjustment, the presetting of the railway being ensured by its own constituent elements.
  • the invention makes it possible simultaneously to set up various pipes without complicating the work of making the track.
  • the railroad device in particular for urban vehicles, of the tramway type, is characterized by a concrete form or slab placed in a shaped bottom and delimiting, from its top, a space and trenches or engravings for reinforcements and the support for screws for adjusting the altimetric dimension of sleepers having holes for centering saddles supporting rails by forming lost templates for said rails fixed to the saddles by lag bolts or screws screwed into sheaths or sockets extending below the saddles and which are embedded in concrete poured at least in said trenches or pits.
  • the invention also extends to a method for implementing the above railroad device.
  • the method is characterized in that a form bottom is produced, in that it is poured by means of a sliding formwork carried by a vehicle in the form or concrete slab, in what we put in place, in longitudinal trenches or engravings formed, reinforcements, in that we link together said reinforcements, in that we put in sleepers, in that we put on said sleepers saddles, in that the rails are placed on the saddles, in that there are lag bolts in blades resting on the rails, in that said lag bolts are screwed in sheaths, in that there are altimeter adjustment screws in the crosspieces, in that said altimeter adjustment screws are supported by spacers, in that the rails are pushed by means of jacks against said spacers and in that a filling concrete is poured to drown the said reinforcements and the said sheaths or sockets remove the adjustment cylinders and the altimeter adjustment screws.
  • Fig. 1 is a plan seen from above of the railway track device produced in accordance with the invention.
  • Fig. 2 is a sectional view along line II-II of FIG. 1.
  • Fig. 3 is a section similar to FIG. 2 illustrating specific operations for producing the railway track device.
  • Fig. 4 is a partial section, on a larger scale, showing particular characteristics of the invention.
  • Fig. 5 is a schematic cross section illustrating one of the operations for producing the railway.
  • Fig. 6 is a schematic section showing another operation for the production of the railway.
  • Fig. 7 is a perspective of an accessory element appearing in FIG. 6.
  • Fig. 8 is a perspective of another accessory element appearing in FIG. 6.
  • Fig. 9 is a partial section showing a development of the invention.
  • the rail track device comprises a concrete form or slab 1 which, in the illustrated embodiment, has in section substantially the shape of a trapezoid.
  • the shape 1 delimits two longitudinal trenches or engravings 2, 3 in which are successive reinforcements 4.
  • the reinforcements 4 are, for example, constituted by successive metal cages arranged equidistantly in the engravings 2, 3 and connected together by longitudinal connecting irons, for example those designated by 5 in FIG. 4.
  • the concrete form 1 has, on its two lateral sides, raised edges 6, 6a which border the trenches or engravings 2, 3.
  • the space 7 delimited between the edges 6, 6a and between the trenches or engravings 2, 3 serves when putting in place crosspieces 8 formed by metal profiles having in section the shape of the letter U, the bottom of the profile being disposed at the top.
  • the crosspieces 8 are arranged at equal distance from each other for example every 180 cm and they are provided, at their bottom, with threads or welded nuts 9 arranged with precision.
  • the sleepers have, near the threads or welded nuts 9, oblong holes 10 whose major axis is parallel to the axis of each sleeper.
  • the oblong holes 10 are used for the passage of bolts 11 (fig. 2) for holding saddles 12 intended to support rails 13 represented in the form of grooved rails for guiding railway vehicles intended to travel on a road traffic lane .
  • the saddles 12 are made of composite or other material (steel, cast iron, etc.) or are provided with a lining 14 of elastic material on which the sole 13a of the rails rests.
  • the threaded or welded nut 9 is used for the establishment of a screw 15 or other removable cylinder intended to bear against the bottom of the trench or corresponding groove 2.
  • a screw 15 or other removable cylinder intended to bear against the bottom of the trench or corresponding groove 2.
  • the screws 15 are also used for setting up adjustment shims 16 constituted by a square plate having an eccentric hole 17 (fig. 3). It is also possible that the adjustment shim has another polygonal shape as illustrated in 16a, the hole 17a also being eccentric.
  • the positioning of the adjustment shim threaded on the screw 15 makes it possible to constitute a stop making it possible to ensure an extremely precise spacing of the rails of a track by choosing the side of the shim which is suitable for a determined spacing, for example 141 cm, 141.5 cm, etc.
  • the shim 16 or 16a constitutes a stop against which the saddle 12 of each rail is applied. It is also possible, in order not to take account of possible imperfections in the saddles 12, to arrange the shims so that it is directly the lateral edge of the sole 13a of the rail which comes to bear against the shims.
  • sockets 18 are provided in the form or slab 1 made of concrete, these sockets serving to set up adjustment jacks 19 (fig. . 3 and 4).
  • the jacks 19 are retained by a curved edge 20 against the rim 6 and they actuate a movable part 21 constituting a vice jaw by the end 21a which ensures the thrust of the rail.
  • each cross member 8 constitutes a lost template serving both for centering and for maintaining the rails 13.
  • each cross member 8 After tightening the lag bolts 23, the space 7 as well as the trenches or engravings 2, 3 as well as the interior of each cross member 8 are filled with concrete supplied by pouring and vibrated in situ so as to extend to the level from the top of the edges 6.
  • the screws 15 forming height adjustment cylinders can then be removed by unscrewing them, and the same applies to the adjustment cylinders 19 which can be reused.
  • a filling material 25 for example concrete or asphalt or the like, is spread until it is flush with the top of the rail 13.
  • Fig. 7 shows a pin 28 which has a groove 28a for centering a longitudinal or transverse iron of the frame panel.
  • fig. 9 shows a retaining wedge which comprises a locking clip 30 for an iron of the reinforcement panel and a base 31 having openings 32 for the installation of anchoring pins not shown.
  • the retaining wedges thus prevent any sliding of the reinforcement panels with respect to the form bottom.
  • the concrete form or slab 1 is poured into a sliding formwork 33 carried by a vehicle 34 which is moved on wheels or tracks 35.
  • the vehicle 34 is normally controlled by members allowing it to be maintained according to a pre-established attitude so that the top of the concrete bottom or slab 1 has the flatness sought and to be respected.
  • the concrete form 1 can, if necessary, be completed as illustrated in FIG. 9 so as to comprise, in one or the other of its sides, pipes 36 which are put in place in a manner known in itself at the same time as the vehicle 34 carrying the sliding formwork 33 is moved along the path to be followed later by the track.
  • the reinforcement cages 4 are then put in place and longitudinal fittings, not shown, are tied to the reinforcement cages before positioning the crosspieces 8 then the saddles 12 fixed to the crosspieces as explained in the foregoing.
  • Fig. 1 shows that intermediate saddles 12a can be put in place between the successive crosspieces 8 forming a holding template.
  • sheaths or sockets 24 being alone anchored in the concrete, it remains possible, if necessary, to replace sections of rail and saddles since the lag bolts can always be unscrewed and then screwed back.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)

Abstract

Dispositif de voies ferrées, notamment pour véhicules urbains du genre tramways, caractérisé par une forme ou dalle (1) en béton disposée dans un fond de forme (26) et délimitant à partir de son dessus un espace (7) et des tranchées ou engravures (2, 3) pour des armatures (4) et le support de vis de réglage (15) de la cote altimétrique de traverses (8) présentant des trous (10) pour le centrage de selles (12) supportant des rails (13) en formant des gabarits perdus pour lesdits rails fixés aux selles (12) par des tirefonds (23) vissés dans des gaines ou douilles (24) s'étendant en dessous des selles (12) et qui sont noyées dans du béton coulé au moins dans lesdites tranchées ou engravures (2, 3).

Figure imgaf001
Railway track device, in particular for urban vehicles of the tramway type, characterized by a concrete form or slab (1) disposed in a shaped bottom (26) and delimiting from its top a space (7) and trenches or engravings (2, 3) for armatures (4) and the support for adjusting screws (15) of the altimetric dimension of crosspieces (8) having holes (10) for centering saddles (12) supporting rails (13) by forming lost templates for said rails fixed to the saddles (12) by lag bolts (23) screwed into sheaths or sockets (24) extending below the saddles (12) and which are embedded in concrete poured at least in said trenches or engravings (2, 3).
Figure imgaf001

Description

L'invention concerne un nouveau dispositif de voies ferrées destiné à des véhicules ferroviaires du genre tramways qui sont destinés à circuler sur de mêmes voies que des véhicules routiers ordinaires.The invention relates to a new track device for railway vehicles of the tramway type which are intended to travel on the same tracks as ordinary road vehicles.

L'invention permet la réalisation d'une voie simple, donc bon marché, dont les éléments essentiels peuvent être fabriqués en usine puis amenés sur le lieu de montage et assemblés en un temps bref mais avec une grande précision et en mettant en oeuvre des moyens de réglage extrêmement simples, le préréglage de la voie ferrée étant assuré par ses propres éléments constitutifs.The invention allows the realization of a simple, therefore inexpensive, track, the essential elements of which can be manufactured in the factory and then brought to the place of assembly and assembled in a short time but with great precision and using means. extremely simple adjustment, the presetting of the railway being ensured by its own constituent elements.

Par ailleurs, l'invention rend possible simultanément de mettre en place des canalisations diverses sans compliquer le travail de réalisation de la voie.Furthermore, the invention makes it possible simultaneously to set up various pipes without complicating the work of making the track.

Conformément à l'invention, le dispositif de voies ferrées, notamment pour véhicules urbains, du genre tramways, est caractérisé par une forme ou dalle en béton disposée dans un fond de forme et délimitant, à partir de son dessus, un espace et des tranchées ou engravures pour des armatures et le support de vis de réglage de la cote altimétrique de traverses présentant des trous pour le centrage de selles supportant des rails en formant des gabarits perdus pour lesdits rails fixés aux selles par des tirefonds ou vis vissés dans des gaines ou douilles s'étendant en dessous des selles et qui sont noyées dans du béton coulé au moins dans lesdites tranchées ou engravures.According to the invention, the railroad device, in particular for urban vehicles, of the tramway type, is characterized by a concrete form or slab placed in a shaped bottom and delimiting, from its top, a space and trenches or engravings for reinforcements and the support for screws for adjusting the altimetric dimension of sleepers having holes for centering saddles supporting rails by forming lost templates for said rails fixed to the saddles by lag bolts or screws screwed into sheaths or sockets extending below the saddles and which are embedded in concrete poured at least in said trenches or pits.

L'invention s'étend également à un procédé pour la mise en oeuvre du dispositif de voies ferrées ci-dessus.The invention also extends to a method for implementing the above railroad device.

Conformément à cette seconde disposition de l'invention, le procédé est caractérisé en ce qu'on réalise un fond de forme, en ce qu'on coule au moyen d'un coffrage glissant porté par un véhicule la forme ou dalle en béton, en ce qu'on met en place, dans des tranchées longitudinales ou engravures formées, des armatures, en ce qu'on lie entre elles lesdites armatures, en ce qu'on met en place des traverses, en ce qu'on pose sur lesdites traverses des selles, en ce qu'on met en place les rails sur les selles, en ce qu'on dispose des tirefonds dans des lames prenant appui sur les rails, en ce qu'on visse lesdits tirefonds dans des gaines, en ce qu'on dispose des vis de réglage altimétrique dans les traverses, en ce qu'on fait supporter auxdites vis de réglage altimétrique des cales d'écartement, en ce qu'on pousse les rails au moyen de vérins contre lesdites cales et en ce qu'on coule un béton de remplissage pour noyer lesdites armatures et lesdites gaines ou douilles avant de retirer les vérins de réglage et les vis de réglage altimétrique.In accordance with this second arrangement of the invention, the method is characterized in that a form bottom is produced, in that it is poured by means of a sliding formwork carried by a vehicle in the form or concrete slab, in what we put in place, in longitudinal trenches or engravings formed, reinforcements, in that we link together said reinforcements, in that we put in sleepers, in that we put on said sleepers saddles, in that the rails are placed on the saddles, in that there are lag bolts in blades resting on the rails, in that said lag bolts are screwed in sheaths, in that there are altimeter adjustment screws in the crosspieces, in that said altimeter adjustment screws are supported by spacers, in that the rails are pushed by means of jacks against said spacers and in that a filling concrete is poured to drown the said reinforcements and the said sheaths or sockets remove the adjustment cylinders and the altimeter adjustment screws.

Diverses autres caractéristiques de l'invention ressortent d'ailleurs de la description détaillée qui suit.Various other characteristics of the invention will also emerge from the detailed description which follows.

Des formes de réalisation de l'objet de l'invention sont représentées, à titre d'exemples non limitatifs, au dessin annexé.Embodiments of the subject of the invention are shown, by way of nonlimiting examples, in the accompanying drawing.

La fig. 1 est un plan vu de dessus du dispositif de voies ferrées réalise conformément à l'invention.Fig. 1 is a plan seen from above of the railway track device produced in accordance with the invention.

La fig. 2 est une coupe vue suivant la ligne II-II de la fig. 1.Fig. 2 is a sectional view along line II-II of FIG. 1.

La fig. 3 est une coupe analogue à la fig. 2 illustrant des opérations particulières de réalisation du dispositif de voies ferrées.Fig. 3 is a section similar to FIG. 2 illustrating specific operations for producing the railway track device.

La fig. 4 est une coupe partielle, à plus grande échelle, faisant apparaître des caractéristiques particulières de l'invention.Fig. 4 is a partial section, on a larger scale, showing particular characteristics of the invention.

La fig. 5 est une coupe transversale schématique illustrant une des opérations pour la réalisation de la voie ferrée.Fig. 5 is a schematic cross section illustrating one of the operations for producing the railway.

La fig. 6 est une coupe schématique faisant apparaître une autre opération pour la réalisation de la voie ferrée.Fig. 6 is a schematic section showing another operation for the production of the railway.

La fig. 7 est une perspective d'un élément accessoire apparaissant à la fig. 6.Fig. 7 is a perspective of an accessory element appearing in FIG. 6.

La fig. 8 est une perspective d'un autre élément accessoire apparaissant à la fig. 6.Fig. 8 is a perspective of another accessory element appearing in FIG. 6.

La fig. 9 est une coupe partielle faisant ressortir un développement de l'invention.Fig. 9 is a partial section showing a development of the invention.

Ainsi que l'illustrent en particulier les fig. 1 et 2, le dispositif de voies ferrées comporte une forme ou dalle en béton 1 qui, dans la réalisation illustrée, présente en section sensiblement la forme d'un trapèze.As illustrated in particular in FIGS. 1 and 2, the rail track device comprises a concrete form or slab 1 which, in the illustrated embodiment, has in section substantially the shape of a trapezoid.

La réalisation particulière de la forme 1 est décrite dans ce qui suit.The particular embodiment of form 1 is described in the following.

La forme 1 délimite deux tranchées longitudinales ou engravures 2, 3 dans lesquelles sont disposées des armatures successives 4. Les armatures 4 sont, par exemple, constituées par des cages métalliques successives disposées de façon équidistante dans les engravures 2, 3 et reliées entre elles par des fers de liaison longitudinaux par exemple ceux désignés par 5 à la fig. 4.The shape 1 delimits two longitudinal trenches or engravings 2, 3 in which are successive reinforcements 4. The reinforcements 4 are, for example, constituted by successive metal cages arranged equidistantly in the engravings 2, 3 and connected together by longitudinal connecting irons, for example those designated by 5 in FIG. 4.

La forme en béton 1 présente, sur ses deux côtés latéraux, des rebords surélevés 6, 6a qui bordent les tranchées ou engravures 2, 3. L'espace 7 délimité entre les rebords 6, 6a et entre les tranchées ou engravures 2, 3 sert à la mise en place de traverses 8 constituées par des profilés métalliques présentant en section la forme de la lettre U, le fond du profilé étant disposé à la partie supérieure.The concrete form 1 has, on its two lateral sides, raised edges 6, 6a which border the trenches or engravings 2, 3. The space 7 delimited between the edges 6, 6a and between the trenches or engravings 2, 3 serves when putting in place crosspieces 8 formed by metal profiles having in section the shape of the letter U, the bottom of the profile being disposed at the top.

Les traverses 8 sont disposées à égale distance les unes des autres par exemple tous les 180 cm et elles sont munies, dans leur fond, de taraudages ou d'écrous soudés 9 disposés avec précision. De même, les traverses présentent, à proximité des taraudages ou écrous soudés 9, des trous oblongs 10 dont le grand axe est parallèle à l'axe de chaque traverse.The crosspieces 8 are arranged at equal distance from each other for example every 180 cm and they are provided, at their bottom, with threads or welded nuts 9 arranged with precision. Similarly, the sleepers have, near the threads or welded nuts 9, oblong holes 10 whose major axis is parallel to the axis of each sleeper.

Les trous oblongs 10 servent au passage de boulons 11 (fig. 2) pour le maintien de selles 12 destinées à supporter des rails 13 représentés sous la forme de rails à rainure pour le guidage de véhicules ferroviaires destinés à circuler sur une voie de circulation routière.The oblong holes 10 are used for the passage of bolts 11 (fig. 2) for holding saddles 12 intended to support rails 13 represented in the form of grooved rails for guiding railway vehicles intended to travel on a road traffic lane .

Les selles 12 sont réalisées en matière composite ou autre (acier, fonte ...) ou sont munies d'une garniture 14 en matière élastique sur laquelle repose la semelle 13a des rails.The saddles 12 are made of composite or other material (steel, cast iron, etc.) or are provided with a lining 14 of elastic material on which the sole 13a of the rails rests.

Le taraudage ou écrou soudé 9 sert à la mise en place d'une vis 15 ou autre vérin amovible destiné à prendre appui contre le fond de la tranchée ou engravure 2 correspondante. En vissant plus ou moins la vis 15, la traverse 8 est soulevée et peut ainsi être réglée en hauteur avec une grande facilité puisque des vis 15 sont prévues en regard de chaque tranchée 2 comme le montre la fig. 3. Etant donné que le fond des tranchées ou engravures est en béton et présente une surface régulière, le réglage des vis est précis et fiable.The threaded or welded nut 9 is used for the establishment of a screw 15 or other removable cylinder intended to bear against the bottom of the trench or corresponding groove 2. By screwing more or less the screw 15, the cross member 8 is raised and can thus be adjusted in height with great ease since screws 15 are provided opposite each trench 2 as shown in fig. 3. Since the bottom of the trenches or engravings is made of concrete and has a regular surface, the adjustment of the screws is precise and reliable.

Les vis 15 servent aussi à la mise en place de cales de réglage 16 constituées par une plaquette carrée présentant un trou excentré 17 (fig. 3). Il est possible aussi que la cale de réglage présente une autre forme polygonale comme illustré en 16a, le trou 17a étant également excentré.The screws 15 are also used for setting up adjustment shims 16 constituted by a square plate having an eccentric hole 17 (fig. 3). It is also possible that the adjustment shim has another polygonal shape as illustrated in 16a, the hole 17a also being eccentric.

Le taraudage ou l'écrou soudé 9 étant disposé avec précision, la mise en place de la cale de réglage enfilée sur la vis 15 permet de constituer une butée rendant possible d'assurer un écartement extrêmement précis des rails d'une voie en choisissant le côté de la cale qui convient pour un écartement déterminé, par exemple 141 cm, 141,5 cm, etc... En effet, la cale 16 ou 16a constitue une butée contre laquelle la selle 12 de chaque rail est appliquée. Il est possible aussi, pour ne pas tenir compte d'imperfections éventuelles des selles 12, de disposer les cales pour que ce soit directement le bord latéral de la semelle 13a du rail qui vienne en appui contre les cales.The tapped thread or the welded nut 9 being placed with precision, the positioning of the adjustment shim threaded on the screw 15 makes it possible to constitute a stop making it possible to ensure an extremely precise spacing of the rails of a track by choosing the side of the shim which is suitable for a determined spacing, for example 141 cm, 141.5 cm, etc. In fact, the shim 16 or 16a constitutes a stop against which the saddle 12 of each rail is applied. It is also possible, in order not to take account of possible imperfections in the saddles 12, to arrange the shims so that it is directly the lateral edge of the sole 13a of the rail which comes to bear against the shims.

Pour être assuré que chaque rail est bien serré contre les cales de réglage portées par chaque traverse 8, il est prévu des douilles 18 dans la forme ou dalle 1 en béton, ces douilles servant à la mise en place de vérins de réglage 19 (fig. 3 et 4). Les vérins 19 sont retenus par un bord cambré 20 contre le rebord 6 et ils actionnent une partie mobile 21 constituant un mors d'étau par l'extrémité 21a qui assure la poussée du rail.To be sure that each rail is securely tightened against the adjustment shims carried by each cross member 8, sockets 18 are provided in the form or slab 1 made of concrete, these sockets serving to set up adjustment jacks 19 (fig. . 3 and 4). The jacks 19 are retained by a curved edge 20 against the rim 6 and they actuate a movable part 21 constituting a vice jaw by the end 21a which ensures the thrust of the rail.

Ce qui précède montre que chaque traverse 8 constitue un gabarit perdu servant à la fois au centrage et au maintien des rails 13.The above shows that each cross member 8 constitutes a lost template serving both for centering and for maintaining the rails 13.

La semelle 13a des rails est ensuite fixée à chaque selle 12 au moyen de lames 22 traversées par des tirefonds 23 vissés dans des gaines ou douilles 24 prenant appui contre le dessous du fond de la traverse 8.The sole 13a of the rails is then fixed to each saddle 12 by means of blades 22 crossed by lag bolts 23 screwed into sheaths or sockets 24 bearing against the underside from the bottom of the sleeper 8.

Après serrage des tirefonds 23, l'espace 7 de même que les tranchées ou engravures 2, 3 ainsi que l'intérieur de chaque traverse 8 sont remplis de béton amené par coulée et vibré in situ de façon à s'étendre jusqu'au niveau du dessus des rebords 6.After tightening the lag bolts 23, the space 7 as well as the trenches or engravings 2, 3 as well as the interior of each cross member 8 are filled with concrete supplied by pouring and vibrated in situ so as to extend to the level from the top of the edges 6.

Les vis 15 formant vérins de réglage en hauteur peuvent être ensuite retirées en les dévissant et il en est de même des vérins de réglage 19 qui peuvent être réutilisés.The screws 15 forming height adjustment cylinders can then be removed by unscrewing them, and the same applies to the adjustment cylinders 19 which can be reused.

Après durcissement du béton coulé, une matière de remplissage 25, par exemple du béton ou de l'enrobé ou autre, est étendue jusqu'à affleurer le dessus du rail 13.After the poured concrete has hardened, a filling material 25, for example concrete or asphalt or the like, is spread until it is flush with the top of the rail 13.

Pour la réalisation de la voie ferrée, on procède comme suit :
On réalise tout d'abord un fond de forme 26 comme illustré par la fig. 5, puis on dispose des panneaux d'armature 27 maintenus à distance du sol du fond de forme par des pions 28 et des cales de retenue 29.
For the construction of the railway, we proceed as follows:
First of all, a bottom 26 is produced as illustrated in FIG. 5, then there are reinforcement panels 27 held at a distance from the ground from the bottom of the form by pins 28 and retaining wedges 29.

La fig. 7 montre un pion 28 qui présente une rainure 28a pour le centrage d'un fer longitudinal ou transversal du panneau d'armature. De même, la fig. 9 montre une cale de retenue qui comporte une pince d'arrêt 30 pour un fer du panneau d'armature et un socle 31 présentant des lumières 32 pour la mise en place de broches d'ancrage non représentées.Fig. 7 shows a pin 28 which has a groove 28a for centering a longitudinal or transverse iron of the frame panel. Likewise, fig. 9 shows a retaining wedge which comprises a locking clip 30 for an iron of the reinforcement panel and a base 31 having openings 32 for the installation of anchoring pins not shown.

Les cales de retenue empêchent ainsi tout coulissement des panneaux d'armature par rapport au fond de forme.The retaining wedges thus prevent any sliding of the reinforcement panels with respect to the form bottom.

Après mise en place des panneaux d'armature 27, la forme ou dalle en béton 1 est coulée dans un coffrage glissant 33 porté par un véhicule 34 qui est déplacé sur des roues ou chenilles 35. Le véhicule 34 est normalement contrôlé par des organes permettant qu'il soit maintenu suivant une assiette pré-établie faisant que le dessus du fond de forme en béton ou dalle 1 présente la planéité recherchée et devant être respectée.After installation of the reinforcing panels 27, the concrete form or slab 1 is poured into a sliding formwork 33 carried by a vehicle 34 which is moved on wheels or tracks 35. The vehicle 34 is normally controlled by members allowing it to be maintained according to a pre-established attitude so that the top of the concrete bottom or slab 1 has the flatness sought and to be respected.

La forme en béton 1 peut, le cas échéant, être complétée comme illustrée par la fig. 9 de façon à comporter, dans l'un ou l'autre de ses côtés, des tubulures 36 qui sont mises en place de façon connue en elle-même en même temps que le véhicule 34 portant le coffrage glissant 33 est déplacé le long du trajet que doit suivre ultérieurement la voie.The concrete form 1 can, if necessary, be completed as illustrated in FIG. 9 so as to comprise, in one or the other of its sides, pipes 36 which are put in place in a manner known in itself at the same time as the vehicle 34 carrying the sliding formwork 33 is moved along the path to be followed later by the track.

Les cages d'armature 4 sont ensuite mises en place et des ferrures longitudinales non représentées sont ligaturées aux cages d'armature avant mise en place des traverses 8 puis des selles 12 fixées aux traverses comme expliqué dans ce qui précède.The reinforcement cages 4 are then put in place and longitudinal fittings, not shown, are tied to the reinforcement cages before positioning the crosspieces 8 then the saddles 12 fixed to the crosspieces as explained in the foregoing.

Les rails 13 sont ensuite posés sur les selles puis les lames 22 sont elles-mêmes mises en place de même que les tirefonds 23 dont le serrage n'est effectué qu'après réglage de l'écartement des rails comme expliqué dans ce qui précède.The rails 13 are then placed on the saddles, then the blades 22 are themselves put in place, as are the lag bolts 23, the tightening of which is carried out only after adjusting the spacing of the rails as explained in the foregoing.

La fig. 1 montre que des selles intermédiaires 12a peuvent être mises en place entre les traverses successives 8 formant gabarit de maintien.Fig. 1 shows that intermediate saddles 12a can be put in place between the successive crosspieces 8 forming a holding template.

Le réglage à la cote altimétrique de la voie est finalement réalisé au moyen des vis 15 puis le béton est déversé et vibré ou injecté et vibré pour remplir complètement l'espace 7 et les tranchées ou engravures longitudinales, ce qui a pour effet de noyer les armatures et d'ancrer les gaines ou douilles 24 qui assurent le maintien des tirefonds ou vis.The adjustment to the altimetric dimension of the track is finally achieved by means of the screws 15 then the concrete is poured and vibrated or injected and vibrated to completely fill the space 7 and the longitudinal trenches or engravings, which has the effect of drowning the reinforcements and anchor the sheaths or sockets 24 which maintain the lag bolts or screws.

Les gaines ou douilles 24 étant seules ancrées dans le béton, il demeure possible, le cas échéant, de remplacer des tronçons de rail et des selles puisque les tirefonds peuvent toujours être dévissés puis revissés.The sheaths or sockets 24 being alone anchored in the concrete, it remains possible, if necessary, to replace sections of rail and saddles since the lag bolts can always be unscrewed and then screwed back.

L'invention n'est pas limitée aux exemples de réalisation, représentés et décrits en détail, car diverses modifications peuvent y être apportées sans sortir de son cadre. En particulier elle peut être mise en oeuvre avec tous types de rails, tous types de selles, tous types d'attaches, etc.The invention is not limited to the exemplary embodiments, shown and described in detail, since various modifications can be made thereto without departing from its scope. In particular, it can be implemented with all types of rails, all types of saddles, all types of fasteners, etc.

Claims (10)

Dispositif de voies ferrées, notamment pour véhicules urbains du genre tramways caractérisé par une forme ou dalle (1) en béton disposée dans un fond de forme (26) et délimitant à partir de son dessus un espace (7) et des tranchées ou engravures (2, 3) pour des armatures (4) et le support de vis de réglage (15) de la cote altimétrique de traverses (8) présentant des trous (10) pour le centrage de selles (12) supportant des rails (13) en formant des gabarits perdus pour lesdits rails fixés aux selles (12) par des tirefonds (23) vissés dans des gaines ou douilles (24) s'étendant en dessous des selles (12) et qui sont noyées dans du béton coulé au moins dans lesdites tranchées ou engravures (2, 3).Railway track device, in particular for urban vehicles of the tramway type, characterized by a concrete form or slab (1) arranged in a shaped bottom (26) and delimiting from its top a space (7) and trenches or engravings ( 2, 3) for armatures (4) and the support for adjusting screws (15) of the altimetric dimension of crosspieces (8) having holes (10) for centering saddles (12) supporting rails (13) in forming lost templates for said rails fixed to the saddles (12) by lag screws (23) screwed into sheaths or sockets (24) extending below the saddles (12) and which are embedded in concrete poured at least in said trenches or engravings (2, 3). Dispositif suivant la revendication 1, caractérisé en ce que les vis (15) de réglage altimétrique des traverses reposent sur le fond des tranchées ou engravures (2, 3).Device according to claim 1, characterized in that the screws (15) for the altimetric adjustment of the sleepers rest on the bottom of the trenches or pits (2, 3). Dispositif suivant l'une des revendications 1 et 2, caractérisé en ce que les vis de réglage altimétrique (15) sont vissées dans des taraudages ou écrous soudés (9) disposés avec précision dans le fond des traverses (8).Device according to either of Claims 1 and 2, characterized in that the altimeter adjustment screws (15) are screwed into threads or welded nuts (9) precisely arranged in the bottom of the crosspieces (8). Dispositif suivant l'une des revendications 1 à 3, caractérisé en ce que les traverses (8) présentent en section la forme de la lettre U, leur fond étant tourné vers le haut et l'intérieur desdites traverses étant rempli de béton.Device according to one of claims 1 to 3, characterized in that the crosspieces (8) have in section the shape of the letter U, their bottom being turned upwards and the inside of said crosspieces being filled with concrete. Dispositif suivant l'une des revendications 1 à 4, caractérisé en ce que les vis de réglage altimétrique supportent des cales de réglage constituées par des plaquettes polygonales présentant un trou excentré de manière que lesdites plaquettes forment des butées pour maintenir les rails d'une même voie à un écartement pré-établi choisi.Device according to one of claims 1 to 4, characterized in that the altimeter adjustment screws support adjustment shims constituted by polygonal plates having an eccentric hole so that said plates form stops to hold the rails together way to a chosen preset spacing. Dispositif suivant l'une des revendications 1 à 5, caractérisé par des vérins de réglage montés de façon amovible sur la forme ou dalle en béton (1).Device according to one of claims 1 to 5, characterized by adjustment cylinders removably mounted on the concrete form or slab (1). Procédé pour la mise en oeuvre du dispositif de voies ferrées de l'une des revendications 1 à 6, caractérisé en ce qu'on réalise un fond de forme, en ce qu'on coule au moyen d'un coffrage glissant (33) porté par un véhicule (34) la forme ou dalle (1) en béton, en ce qu'on met en place, dans des tranchées longitudinales ou engravures (2, 3) formées, des armatures (4), en ce qu'on lie entre elles lesdites armatures, en ce qu'on met en place des traverses (8), en ce qu'on pose sur lesdites traverses des selles (12), en ce qu'on met en place les rails (13) sur les selles, en ce qu'on dispose des tirefonds dans des lames prenant appui sur les rails, en ce qu'on visse lesdits tirefonds dans des gaines (24), en ce qu'on dispose des vis de réglage altimétrique dans les traverses, en ce qu'on fait supporter auxdites vis de réglage altimétrique des cales d'écartement (16, 16a), en ce qu'on pousse les rails au moyen de vérins contre lesdites cales et en ce qu'on coule un béton de remplissage pour noyer lesdites armatures et lesdites gaines ou douilles avant de retirer les vérins de réglage (19) et les vis de réglage altimétrique (15).Method for implementing the rail track device of one of claims 1 to 6, characterized in that a shaped bottom is produced, in that it flows by means of a sliding formwork (33) carried by a vehicle (34) the form or slab (1) of concrete, in that one sets up, in longitudinal trenches or engravings (2, 3) formed, reinforcements (4), in that one binds between them said reinforcements, in that one places crosspieces (8), in that one places on said crosspieces saddles (12), in that one places the rails (13) on the saddles , in that there are lag bolts in blades resting on the rails, in that said lag bolts are screwed in sheaths (24), in that there are altimetric adjustment screws in the crossbars, in that that said altimetric adjustment screws are made to support spacers (16, 16a), in that the rails are pushed by means of jacks against said spacers and that concrete is poured filling to drown said frames and said sheaths or sockets before removing the adjustment cylinders (19) and the altimeter adjustment screws (15). Procédé suivant la revendication 7, caractérisé en ce qu'on dispose des panneaux d'armature (27) sur des pions (28) avant la coulée du béton dans le coffrage glissant (33).Method according to claim 7, characterized in that the reinforcement panels (27) are arranged on pins (28) before the concrete is poured into the sliding formwork (33). Procédé suivant l'une des revendications 6 et 7, caractérisé en ce qu'on met en place des cales de retenue (29) ancrées au sol par des broches entre le fond de forme et l'armature pour empêcher tout déplacement de ladite armature lors de la coulée du béton dans le coffrage glissant.Method according to either of Claims 6 and 7, characterized in that retaining wedges (29) anchored to the ground by pins are placed between the form bottom and the reinforcement to prevent any displacement of said reinforcement during pouring the concrete into the sliding formwork. Dispositif pour la réalisation de voies ferrées et procédé pour sa mise en oeuvre sensiblement tels que décrits et représentés aux dessins annexés.Device for making railways and method for implementing it substantially as described and shown in the accompanying drawings.
EP94401834A 1994-08-09 1994-08-09 Method and installation for making railway tracks Expired - Lifetime EP0697485B1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
AT94401834T ATE174084T1 (en) 1994-08-09 1994-08-09 DEVICE AND METHOD FOR PRODUCING RAILWAY TRACKS
EP94401834A EP0697485B1 (en) 1994-08-09 1994-08-09 Method and installation for making railway tracks
DE69415005T DE69415005D1 (en) 1994-08-09 1994-08-09 Device and method for the production of railway tracks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP94401834A EP0697485B1 (en) 1994-08-09 1994-08-09 Method and installation for making railway tracks

Publications (2)

Publication Number Publication Date
EP0697485A1 true EP0697485A1 (en) 1996-02-21
EP0697485B1 EP0697485B1 (en) 1998-12-02

Family

ID=8218034

Family Applications (1)

Application Number Title Priority Date Filing Date
EP94401834A Expired - Lifetime EP0697485B1 (en) 1994-08-09 1994-08-09 Method and installation for making railway tracks

Country Status (3)

Country Link
EP (1) EP0697485B1 (en)
AT (1) ATE174084T1 (en)
DE (1) DE69415005D1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998051863A1 (en) * 1997-05-13 1998-11-19 Mecno-Rail S.R.L. Track superstructure, in particular for tramway, tram-railway and underground railway lines
EP2397608A3 (en) * 2010-06-21 2014-11-12 ARGE Farhbahn Transtec Gotthard Temporary track grid-support system
CN111395055A (en) * 2020-03-16 2020-07-10 中铁上海工程局集团有限公司 Construction method of track integral ballast bed
CN111501446A (en) * 2020-05-07 2020-08-07 中铁十四局集团第五工程有限公司 Device and method for controlling size of reserved groove of ballastless turnout switch machine
CN117966521A (en) * 2024-03-28 2024-05-03 高速铁路建造技术国家工程研究中心 Adjustable assembled track structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0379148A2 (en) * 1989-01-18 1990-07-25 Heilit & Woerner Bau-AG Method of and device for constructing a ballastless superstructure
EP0546380A1 (en) * 1991-12-11 1993-06-16 Getzner-Chemie Gesellschaft m.b.H. Railway track structure
EP0576392A1 (en) * 1992-05-22 1993-12-29 Vape Rail International S.A. Method for the construction of a track in concrete

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0379148A2 (en) * 1989-01-18 1990-07-25 Heilit & Woerner Bau-AG Method of and device for constructing a ballastless superstructure
EP0546380A1 (en) * 1991-12-11 1993-06-16 Getzner-Chemie Gesellschaft m.b.H. Railway track structure
EP0576392A1 (en) * 1992-05-22 1993-12-29 Vape Rail International S.A. Method for the construction of a track in concrete

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
HILLIGES & BITTNER: "Mechanisierte Herstellung der festen Fahrbahn Bauart Rheda", EISENBAHNTECHNISCHE RUNDSCHAU, vol. 38, no. 3, DARMSTADT, pages 133 - 136 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998051863A1 (en) * 1997-05-13 1998-11-19 Mecno-Rail S.R.L. Track superstructure, in particular for tramway, tram-railway and underground railway lines
EP2397608A3 (en) * 2010-06-21 2014-11-12 ARGE Farhbahn Transtec Gotthard Temporary track grid-support system
CN111395055A (en) * 2020-03-16 2020-07-10 中铁上海工程局集团有限公司 Construction method of track integral ballast bed
CN111501446A (en) * 2020-05-07 2020-08-07 中铁十四局集团第五工程有限公司 Device and method for controlling size of reserved groove of ballastless turnout switch machine
CN117966521A (en) * 2024-03-28 2024-05-03 高速铁路建造技术国家工程研究中心 Adjustable assembled track structure
CN117966521B (en) * 2024-03-28 2024-06-04 高速铁路建造技术国家工程研究中心 Adjustable assembled track structure
WO2025200742A1 (en) * 2024-03-28 2025-10-02 高速铁路建造技术国家工程研究中心 Adjustable assembly type track structure

Also Published As

Publication number Publication date
EP0697485B1 (en) 1998-12-02
DE69415005D1 (en) 1999-01-14
ATE174084T1 (en) 1998-12-15

Similar Documents

Publication Publication Date Title
EP0576392B1 (en) Method for the construction of a track in concrete
EP2191070B1 (en) Prefabricated module for the track of a self-guided urban transport vehicle on tyres
EP0697485B1 (en) Method and installation for making railway tracks
EP2851468B1 (en) Mounting assembly for a rail
FR2825728A1 (en) Method ensuring continuity in highway separation walls in which interruptions are made comprises positioning end pieces in which truss frames are housed, pouring concrete and placing cover above interruption between end pieces
EP3486369B1 (en) Assembly comprising prefabricated slab for railway and a sleeper, installation method
EP2171178A2 (en) Support device for a railing
FR2842224A1 (en) MODULAR RETENTION DEVICE AND METHOD FOR LAYING SUCH A DEVICE
FR2865225A1 (en) Track crossing unit support assembly for railway network, has fixation unit with elastic fastener mounted on brace so that insulator is fixed with concrete support using screw and fastener, in position for fixing base on support
EP1258565A1 (en) Prefabricated bridge bearing
EP1457599B1 (en) Method for constructing a railroad level-crossing
FR3013062A1 (en) ARMED CONCRETE SUPPORT STRUCTURE FOR RAILWAY AND METHOD OF OBTAINING
FR2714406A1 (en) Motor road safety barrier
EP1460175A1 (en) Method for laying a traffic or railway platform and thus obtained platform
EP4341490B1 (en) Assembly comprising at least one rail and a support
EP1094156A1 (en) Method and apparatus for confining a bituminous road covering around a rail
US20210148056A1 (en) Vehicle rail mounting device
FR2643920A1 (en) Railway track bearing plates
FR2791712A1 (en) Process for laying rail track section on rigid support with height adjustment uses swingle bar for implementing process
EP3828340A1 (en) Adjustment system for the lateral and/or vertical position of a profile on a support
FR2896519A1 (en) Rail supporting reinforced concrete beam for flyover rail track of passenger train, has wall bordering outer side of base having rail, metallic element connected to core by soldering, and drainage parts including slope descending from wall
FR2971527A1 (en) MOLD BLOCK FOR MANUFACTURING MODULAR EQUIPMENT AND METHOD OF MANUFACTURE
FR2556753A1 (en) LEVEL CROSSING
BE1028455A1 (en) Lag screw sheath for an anchor assembly
FR3150215A3 (en) Mold for making a support in fixing material for the direct installation of rails on a concrete structure

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19940816

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LI LU MC NL PT SE

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: COGIFER

17Q First examination report despatched

Effective date: 19970120

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LI LU MC NL PT SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19981202

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT

Effective date: 19981202

Ref country code: GR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19981202

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19981202

Ref country code: ES

Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY

Effective date: 19981202

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19981202

REF Corresponds to:

Ref document number: 174084

Country of ref document: AT

Date of ref document: 19981215

Kind code of ref document: T

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 69415005

Country of ref document: DE

Date of ref document: 19990114

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: FRENCH

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19990302

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19990302

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19990302

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19990303

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
GBV Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed]

Effective date: 19981202

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990809

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990820

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990831

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990831

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990831

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
BERE Be: lapsed

Owner name: COGIFER

Effective date: 19990831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20000229

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: FR

Ref legal event code: CD

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20100908

Year of fee payment: 17

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20120430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110831