EP0286948B1 - Workpiece for a watch band - Google Patents
Workpiece for a watch band Download PDFInfo
- Publication number
- EP0286948B1 EP0286948B1 EP88105412A EP88105412A EP0286948B1 EP 0286948 B1 EP0286948 B1 EP 0286948B1 EP 88105412 A EP88105412 A EP 88105412A EP 88105412 A EP88105412 A EP 88105412A EP 0286948 B1 EP0286948 B1 EP 0286948B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- link
- worked
- accordance
- cemented carbide
- watch band
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C29/00—Alloys based on carbides, oxides, nitrides, borides, or silicides, e.g. cermets, or other metal compounds, e.g. oxynitrides, sulfides
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22F—WORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
- B22F7/00—Manufacture of composite layers, workpieces, or articles, comprising metallic powder, by sintering the powder, with or without compacting wherein at least one part is obtained by sintering or compression
- B22F7/06—Manufacture of composite layers, workpieces, or articles, comprising metallic powder, by sintering the powder, with or without compacting wherein at least one part is obtained by sintering or compression of composite workpieces or articles from parts, e.g. to form tipped tools
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C27/00—Alloys based on rhenium or a refractory metal not mentioned in groups C22C14/00 or C22C16/00
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C29/00—Alloys based on carbides, oxides, nitrides, borides, or silicides, e.g. cermets, or other metal compounds, e.g. oxynitrides, sulfides
- C22C29/02—Alloys based on carbides, oxides, nitrides, borides, or silicides, e.g. cermets, or other metal compounds, e.g. oxynitrides, sulfides based on carbides or carbonitrides
- C22C29/06—Alloys based on carbides, oxides, nitrides, borides, or silicides, e.g. cermets, or other metal compounds, e.g. oxynitrides, sulfides based on carbides or carbonitrides based on carbides, but not containing other metal compounds
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C29/00—Alloys based on carbides, oxides, nitrides, borides, or silicides, e.g. cermets, or other metal compounds, e.g. oxynitrides, sulfides
- C22C29/02—Alloys based on carbides, oxides, nitrides, borides, or silicides, e.g. cermets, or other metal compounds, e.g. oxynitrides, sulfides based on carbides or carbonitrides
- C22C29/06—Alloys based on carbides, oxides, nitrides, borides, or silicides, e.g. cermets, or other metal compounds, e.g. oxynitrides, sulfides based on carbides or carbonitrides based on carbides, but not containing other metal compounds
- C22C29/08—Alloys based on carbides, oxides, nitrides, borides, or silicides, e.g. cermets, or other metal compounds, e.g. oxynitrides, sulfides based on carbides or carbonitrides based on carbides, but not containing other metal compounds based on tungsten carbide
Definitions
- the present invention relates to a watch band link employed for forming a watch band for a wrist watch.
- a band for a wrist watch which is easily scratched, is preferably formed by a hard alloy.
- cemented carbide is employed as a material for the band of a high-grade wrist watch.
- parts of cemented carbide for a watch band may be formed to be previously provided with such holes.
- sufficient dimensional accuracy cannot be attained if the parts are previously formed to have holes of desired diameters.
- the EP-A-0 169 292 discloses wearparts or cutting tools.
- the part comprises a composite structure body having a core consisting of high speed steel or tool steel and a cover consisting of a material being difficult to ground.
- the US-A-3 837 163 discloses a mar-proof watch-band of materials having a hardness greater than Hv 1,000.
- the watch-band consists of materials like hard nitrides, oxides and carbides in combination with metallic binders.
- the object of the present invention is to provide a watch-band link of excellent machinability for a watch band, which can be manufactured at a low cost, by employing unscratchable cemented carbide.
- the workpiece for a watch band link according to the present invention comprises a worked part to be machined and a base part joined through a diffusion junction with the worked part, which is prepared by a material which is superior in machinability to the base part.
- the worked part of the watch band link according to the invention can be easily machined in high accuracy, to require no electric discharge machining for a long time as in the conventional case.
- a diffused junction is employed in order to join the worked part to the base part. Therfore, the worked part can be joined to the base part simultaneously with sintering of the base part.
- steps for manufacturing the watch band link are not complicated.
- the watch band link according to the invention is given in claim 1.
- the worked part of the watch band link of the invention consists of a material which is superior in machinability to that for the base part.
- the worked part is preferably prepared by a metal selected from groups IVa, Va and VIa of the periodic table or an alloy of two or more such metals.
- the material for the worked part is preferably prepared by Mo, W or Ta, most preferably by Mo in view of junction strength.
- the cemented carbide is TaC-Ni cemented carbide
- the worked part is preferably prepared by Mo or a W-Ni alloy, most preferably by the W-Ni alloy in view of junction strength.
- a diffused junction is preferably performed by sintering or HIP (hot isostatic pressing).
- Sintering and HIP may be combined with each other.
- HIP may be performed after sintering, or sintering and HIP may be simultaneously performed.
- a sintered worked part may be brought into close contact with an unsintered base part, which in turn is sintered in this state, to thereafter perform HIP forming.
- an unsintered worked part may be brought into close contact with an unsintered base part so that both the base part and the worked part are sintered in this state, to thereafter perform HIP forming.
- a sintered worked part may be brought into close contact with a sintered base part to be re-sintered, to thereafter to perform HIP forming.
- carbide of the material for the worked part is formed in the junction interface in diffused junction, to improve junction strength.
- a material of excellent machinability is joined by diffused junction to the worked part of the workpiece for watch band link according to the invention, which can be easily machined to obtain watch band links of high dimensional accuracy.
- the worked part can be worked by general machining with no electric discharge machining, which has been generally required in the prior art, whereby the working time can be extremely reduced.
- the worked part can be joined to the base part in sintering or HIP forming of the base part.
- the manufacturing steps are not complicated.
- Figs. 1 and 2 are a front sectional view and a side elevational view showing a workpiece for a watch band link according to an embodiment of the present invention.
- a workpiece 1 for a watch band link comprises a base part 2 of cemented carbide and worked parts 3 embedded in holes formed in the base part 2. This workpiece 1 is obtained by embedding sintered worked parts 3 in the holes of the base part 2 being in an unsintered state, sintering the base part 2 and thereafter performing HIP forming.
- non-through type holes may be formed from both of longitudinal end portions of the workpiece 1 toward its center to be filled with the worked parts 3, which are then provided with holes respectively to receive pins in both of longitudinal end portions.
- the holes to be filled with the worked parts 3 are not restricted to be circular in section as shown in the drawings, but the same may be provided in an arbitrary sectional configuration such as a square one.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Mechanical Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Composite Materials (AREA)
- Manufacturing & Machinery (AREA)
- Pressure Welding/Diffusion-Bonding (AREA)
- Powder Metallurgy (AREA)
- Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
Description
- The present invention relates to a watch band link employed for forming a watch band for a wrist watch.
- A band for a wrist watch, which is easily scratched, is preferably formed by a hard alloy. In particular, cemented carbide is employed as a material for the band of a high-grade wrist watch.
- However, it is difficult to work an extremely hard material such as cemented carbide into a desired configuration which is applicable to a watch band. Such a watch band must be provided with holes for receiving pins or screws, which are adapted to couple parts of the watch band with each other. In the case of a workpiece for a watch band made of cemented carbide, such holes are formed by electric discharge machining, which requires a long time.
- On the other hand, parts of cemented carbide for a watch band may be formed to be previously provided with such holes. However, sufficient dimensional accuracy cannot be attained if the parts are previously formed to have holes of desired diameters.
- The EP-A-0 169 292 discloses wearparts or cutting tools. The part comprises a composite structure body having a core consisting of high speed steel or tool steel and a cover consisting of a material being difficult to ground.
- The US-A-3 837 163 discloses a mar-proof watch-band of materials having a hardness greater than Hv 1,000. The watch-band consists of materials like hard nitrides, oxides and carbides in combination with metallic binders.
- The object of the present invention is to provide a watch-band link of excellent machinability for a watch band, which can be manufactured at a low cost, by employing unscratchable cemented carbide.
- The workpiece for a watch band link according to the present invention comprises a worked part to be machined and a base part joined through a diffusion junction with the worked part, which is prepared by a material which is superior in machinability to the base part. Thus, the worked part of the watch band link according to the invention can be easily machined in high accuracy, to require no electric discharge machining for a long time as in the conventional case. Further, a diffused junction is employed in order to join the worked part to the base part. Therfore, the worked part can be joined to the base part simultaneously with sintering of the base part. Thus, steps for manufacturing the watch band link are not complicated. The watch band link according to the invention is given in
claim 1. - The worked part of the watch band link of the invention consists of a material which is superior in machinability to that for the base part. When the base is prepared by cemented carbide, the worked part is preferably prepared by a metal selected from groups IVa, Va and VIa of the periodic table or an alloy of two or more such metals. Particularly when the cemented carbide is WC-Co cemented carbide, the material for the worked part is preferably prepared by Mo, W or Ta, most preferably by Mo in view of junction strength. When the cemented carbide is TaC-Ni cemented carbide, the worked part is preferably prepared by Mo or a W-Ni alloy, most preferably by the W-Ni alloy in view of junction strength.
- A diffused junction is preferably performed by sintering or HIP (hot isostatic pressing). Sintering and HIP may be combined with each other. In case of such combination, HIP may be performed after sintering, or sintering and HIP may be simultaneously performed.
- For example, a sintered worked part may be brought into close contact with an unsintered base part, which in turn is sintered in this state, to thereafter perform HIP forming. Alternatively, an unsintered worked part may be brought into close contact with an unsintered base part so that both the base part and the worked part are sintered in this state, to thereafter perform HIP forming. Further, a sintered worked part may be brought into close contact with a sintered base part to be re-sintered, to thereafter to perform HIP forming.
- It may be considered that carbide of the material for the worked part is formed in the junction interface in diffused junction, to improve junction strength.
- A material of excellent machinability is joined by diffused junction to the worked part of the workpiece for watch band link according to the invention, which can be easily machined to obtain watch band links of high dimensional accuracy. Further, the worked part can be worked by general machining with no electric discharge machining, which has been generally required in the prior art, whereby the working time can be extremely reduced.
- Due to employment of diffused junction, the worked part can be joined to the base part in sintering or HIP forming of the base part. Thus, the manufacturing steps are not complicated.
- These and other objects, features, aspects and advantages of the present invention will become more apparent from the following detailed description of the present invention when taken in conjunction with the accompanying drawings, in which
- Fig. 1 is a front sectional view of a workpiece for forming a watch band link according to an embodiment of the present invention;
- Fig. 2 is a side elevational view of the workpiece of Fig. 1;
- Fig. 3 is a front sectional view showing a state in which the workpiece of Figs. 1 and 2 is worked to be provided with holes; and
- Fig. 4 is a side elevational view showing the state in which the workpiece of Figs. 1 and 2 are worked to be provided with holes.
- Figs. 1 and 2 are a front sectional view and a side elevational view showing a workpiece for a watch band link according to an embodiment of the present invention. Referring to Figs. 1 and 2, a
workpiece 1 for a watch band link comprises abase part 2 of cemented carbide and workedparts 3 embedded in holes formed in thebase part 2. Thisworkpiece 1 is obtained by embedding sintered workedparts 3 in the holes of thebase part 2 being in an unsintered state, sintering thebase part 2 and thereafter performing HIP forming. - Various samples of
such workpieces 1 were manufactured by combining materials for thebase parts 2 and the workedparts 3 as listed in Table 1. As shown in Figs. 3 and 4, eachworkpiece 1 thus obtained was formed withholes 5 in the workedparts 3 through machining, and workability thereof was evaluated as an index. Evaluation was made on the working step and working ability thereof. As to the working step, the average value in working ability of hole working by drilling was expressed as an index. - For the purpose of comparison, workability indices were also evaluated as to the case of working holes in
base parts 2 being joined with no workedparts 3, i.e., being provided with no holes themselves. The results are also listed in Table 1. In each case, such evaluation was made on the working step and working ability thereof, similarly to the above. As to the working step, the average value in working ability of hole working by electric discharge machining was expressed as an index. - In table 1, a best possible workability index is "100", lower numbers indicating a poorer machinability.
Table 1 Base Part Worked Part Workability Index Example A WC-Co Cemented Carbide Mo 100 Example B -do.- W 100 Example C -do.- Ta 90 Reference Example D -do.- None 37.5 Example E TaC-Ni Cemented Carbide Mo 100 Example F -do.- W-Ni Alloy 100 Reference Example G -do.- None 35 - Although the
workpiece 1 is formed with through holes to be filled with the workedparts 3 in the aforementioned embodiment, non-through type holes may be formed from both of longitudinal end portions of theworkpiece 1 toward its center to be filled with the workedparts 3, which are then provided with holes respectively to receive pins in both of longitudinal end portions. Further, the holes to be filled with the workedparts 3 are not restricted to be circular in section as shown in the drawings, but the same may be provided in an arbitrary sectional configuration such as a square one.
Claims (9)
- A watch band link comprising a base part prepared by a cemented carbide having blind holes or throughholes provided with bushings for receiving connecting pins inter-connecting the watch band links with each other, characterized in that the bushing are formed by worked parts (3) prepared by a metal selected from the groups IVa, Va and VIa of the periodic table or an alloy or two or more such metals and being joined with the base part (2) by diffused junction, wherein the bushing is formed by working the worked part (3) which is superior in machinability to the said base part (2).
- A link in accordance with claim 1, wherein said cemented carbide is WC-Co cemented carbide.
- A link in accordance with claim 1, wherein said cemented carbide is TaC-Ni cemented carbide.
- A link in accordance with claim 2, wherein said worked part (3) is prepared by Mo, W or Ta.
- A link in accordance with claim 3, wherein said worked part (3) is prepared by Mo or a W-Ni alloy.
- A link in accordance with claim 1, wherein said diffused junction is sintering diffused junction.
- A link in accordance with claim 1, wherein said diffused junction is HIP a diffused junction.
- A link in accordance with claim 1, wherein said diffused junction is achieved by sequentially performing sintering and HIP.
- A link in accordance with claim 1, wherein said diffused junction is achieved by simultaneously performing sintering and HIP.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP86315/87 | 1987-04-08 | ||
| JP62086315A JPS63252681A (en) | 1987-04-08 | 1987-04-08 | Processed material for watch bands |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP0286948A2 EP0286948A2 (en) | 1988-10-19 |
| EP0286948A3 EP0286948A3 (en) | 1989-12-06 |
| EP0286948B1 true EP0286948B1 (en) | 1992-08-12 |
Family
ID=13883399
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP88105412A Expired - Lifetime EP0286948B1 (en) | 1987-04-08 | 1988-04-05 | Workpiece for a watch band |
Country Status (4)
| Country | Link |
|---|---|
| EP (1) | EP0286948B1 (en) |
| JP (1) | JPS63252681A (en) |
| KR (1) | KR920001630B1 (en) |
| DE (1) | DE3873585T2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SE9001409D0 (en) * | 1990-04-20 | 1990-04-20 | Sandvik Ab | METHOD FOR MANUFACTURING OF CARBON METAL BODY FOR MOUNTAIN DRILLING TOOLS AND WEARING PARTS |
| GB9720059D0 (en) * | 1997-09-19 | 1997-11-19 | Isis Innovation | Method of bonding |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5330352B2 (en) * | 1971-12-14 | 1978-08-26 | ||
| JPS56128688A (en) * | 1980-03-11 | 1981-10-08 | Kobe Steel Ltd | Diffused junction method of materials of different kinds of metal |
| SE440753B (en) * | 1983-05-13 | 1985-08-19 | Santrade Ltd | CUTTING PROCESSING TOOLS EXISTING CORE AND WRAP |
| JPS6071247A (en) * | 1983-09-28 | 1985-04-23 | セイコーエプソン株式会社 | Sheathed part for watch |
-
1987
- 1987-04-08 JP JP62086315A patent/JPS63252681A/en active Granted
-
1988
- 1988-04-05 EP EP88105412A patent/EP0286948B1/en not_active Expired - Lifetime
- 1988-04-05 DE DE8888105412T patent/DE3873585T2/en not_active Expired - Lifetime
- 1988-04-08 KR KR1019880003958A patent/KR920001630B1/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| EP0286948A3 (en) | 1989-12-06 |
| KR920001630B1 (en) | 1992-02-21 |
| EP0286948A2 (en) | 1988-10-19 |
| JPS63252681A (en) | 1988-10-19 |
| DE3873585T2 (en) | 1992-12-10 |
| KR880012788A (en) | 1988-11-29 |
| DE3873585D1 (en) | 1992-09-17 |
| JPH039832B2 (en) | 1991-02-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0380096B1 (en) | Cemented carbide drill | |
| EP0460237B1 (en) | Throw-away drill | |
| US5273379A (en) | Blank material for drill and drill therefrom | |
| EP0453428B1 (en) | Method of making cemented carbide body for tools and wear parts | |
| US5447549A (en) | Hard alloy | |
| EP0295151A2 (en) | Improvements in or relating to the manufacture of cutting elements for rotary drill bits | |
| EP0157625A2 (en) | Composite tool | |
| EP0591122B1 (en) | Ball nose end mills | |
| US4137106A (en) | Super hard metal roll assembly and production thereof | |
| JPS63125602A (en) | Hard alloy for tools | |
| EP0286948B1 (en) | Workpiece for a watch band | |
| EP0505991A1 (en) | Titanium carbide-based cermet alloy | |
| US5178647A (en) | Wear-resistant member | |
| US20040265405A1 (en) | Hot press tool | |
| GB659765A (en) | Shaped bodies made of sintered hard metal | |
| EP0273359A2 (en) | Workpiece for a watchcase | |
| JP2737676B2 (en) | Nitrogen-containing sintered hard alloy | |
| JPS6246489Y2 (en) | ||
| JPS63306839A (en) | Manufacture of cutting tool | |
| JPH0132190B2 (en) | ||
| JPH0351305Y2 (en) | ||
| KR20050052293A (en) | Machining method of a single body microtool with a different kind metals | |
| KR20040001231A (en) | Insert tip for metal machining fabricated by iron baced sintered alloy | |
| Tokhter | Implementation of powder technology in manufacture of tools-electrodes | |
| Lyukevich et al. | Utilisation of the Powder Metallurgy Method When Producing Cutting Tool Bodies and Cutter Knives |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): CH DE LI |
|
| PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
| AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): CH DE LI |
|
| 17P | Request for examination filed |
Effective date: 19891221 |
|
| 17Q | First examination report despatched |
Effective date: 19910322 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): CH DE LI |
|
| REF | Corresponds to: |
Ref document number: 3873585 Country of ref document: DE Date of ref document: 19920917 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed | ||
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 19980414 Year of fee payment: 11 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 19980501 Year of fee payment: 11 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: TROESCH SCHEIDEGGER WERNER AG |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19990430 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19990430 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20000201 |