|
US8682589B2
(en)
*
|
1998-12-21 |
2014-03-25 |
Baker Hughes Incorporated |
Apparatus and method for managing supply of additive at wellsites
|
|
US20080262737A1
(en)
*
|
2007-04-19 |
2008-10-23 |
Baker Hughes Incorporated |
System and Method for Monitoring and Controlling Production from Wells
|
|
AU2002213981A1
(en)
*
|
2000-10-04 |
2002-04-15 |
Sofitech N.V. |
Production optimization methodology for multilayer commingled reservoirs using commingled reservoir production performance data and production logging information
|
|
US7216711B2
(en)
|
2002-01-08 |
2007-05-15 |
Halliburton Eenrgy Services, Inc. |
Methods of coating resin and blending resin-coated proppant
|
|
US7267171B2
(en)
|
2002-01-08 |
2007-09-11 |
Halliburton Energy Services, Inc. |
Methods and compositions for stabilizing the surface of a subterranean formation
|
|
US7343973B2
(en)
|
2002-01-08 |
2008-03-18 |
Halliburton Energy Services, Inc. |
Methods of stabilizing surfaces of subterranean formations
|
|
US6691780B2
(en)
|
2002-04-18 |
2004-02-17 |
Halliburton Energy Services, Inc. |
Tracking of particulate flowback in subterranean wells
|
|
US6675892B2
(en)
*
|
2002-05-20 |
2004-01-13 |
Schlumberger Technology Corporation |
Well testing using multiple pressure measurements
|
|
US20040211561A1
(en)
|
2003-03-06 |
2004-10-28 |
Nguyen Philip D. |
Methods and compositions for consolidating proppant in fractures
|
|
US7114570B2
(en)
|
2003-04-07 |
2006-10-03 |
Halliburton Energy Services, Inc. |
Methods and compositions for stabilizing unconsolidated subterranean formations
|
|
US6978836B2
(en)
|
2003-05-23 |
2005-12-27 |
Halliburton Energy Services, Inc. |
Methods for controlling water and particulate production
|
|
US7413010B2
(en)
|
2003-06-23 |
2008-08-19 |
Halliburton Energy Services, Inc. |
Remediation of subterranean formations using vibrational waves and consolidating agents
|
|
US7114560B2
(en)
|
2003-06-23 |
2006-10-03 |
Halliburton Energy Services, Inc. |
Methods for enhancing treatment fluid placement in a subterranean formation
|
|
US7013976B2
(en)
|
2003-06-25 |
2006-03-21 |
Halliburton Energy Services, Inc. |
Compositions and methods for consolidating unconsolidated subterranean formations
|
|
US7021379B2
(en)
|
2003-07-07 |
2006-04-04 |
Halliburton Energy Services, Inc. |
Methods and compositions for enhancing consolidation strength of proppant in subterranean fractures
|
|
US7066258B2
(en)
|
2003-07-08 |
2006-06-27 |
Halliburton Energy Services, Inc. |
Reduced-density proppants and methods of using reduced-density proppants to enhance their transport in well bores and fractures
|
|
US7059406B2
(en)
|
2003-08-26 |
2006-06-13 |
Halliburton Energy Services, Inc. |
Production-enhancing completion methods
|
|
US7237609B2
(en)
|
2003-08-26 |
2007-07-03 |
Halliburton Energy Services, Inc. |
Methods for producing fluids from acidized and consolidated portions of subterranean formations
|
|
US7156194B2
(en)
|
2003-08-26 |
2007-01-02 |
Halliburton Energy Services, Inc. |
Methods of drilling and consolidating subterranean formation particulate
|
|
US7017665B2
(en)
|
2003-08-26 |
2006-03-28 |
Halliburton Energy Services, Inc. |
Strengthening near well bore subterranean formations
|
|
US7032667B2
(en)
|
2003-09-10 |
2006-04-25 |
Halliburtonn Energy Services, Inc. |
Methods for enhancing the consolidation strength of resin coated particulates
|
|
US7345011B2
(en)
|
2003-10-14 |
2008-03-18 |
Halliburton Energy Services, Inc. |
Methods for mitigating the production of water from subterranean formations
|
|
US7063150B2
(en)
|
2003-11-25 |
2006-06-20 |
Halliburton Energy Services, Inc. |
Methods for preparing slurries of coated particulates
|
|
US8126689B2
(en)
*
|
2003-12-04 |
2012-02-28 |
Halliburton Energy Services, Inc. |
Methods for geomechanical fracture modeling
|
|
US7131493B2
(en)
|
2004-01-16 |
2006-11-07 |
Halliburton Energy Services, Inc. |
Methods of using sealants in multilateral junctions
|
|
US20050173116A1
(en)
|
2004-02-10 |
2005-08-11 |
Nguyen Philip D. |
Resin compositions and methods of using resin compositions to control proppant flow-back
|
|
US7211547B2
(en)
|
2004-03-03 |
2007-05-01 |
Halliburton Energy Services, Inc. |
Resin compositions and methods of using such resin compositions in subterranean applications
|
|
US7063151B2
(en)
|
2004-03-05 |
2006-06-20 |
Halliburton Energy Services, Inc. |
Methods of preparing and using coated particulates
|
|
US7091719B2
(en)
*
|
2004-04-30 |
2006-08-15 |
Schlumberger Technology Corporation |
Method for determining properties of formation fluids
|
|
US7541318B2
(en)
|
2004-05-26 |
2009-06-02 |
Halliburton Energy Services, Inc. |
On-the-fly preparation of proppant and its use in subterranean operations
|
|
US7299875B2
(en)
|
2004-06-08 |
2007-11-27 |
Halliburton Energy Services, Inc. |
Methods for controlling particulate migration
|
|
US7073581B2
(en)
|
2004-06-15 |
2006-07-11 |
Halliburton Energy Services, Inc. |
Electroconductive proppant compositions and related methods
|
|
US7255169B2
(en)
*
|
2004-09-09 |
2007-08-14 |
Halliburton Energy Services, Inc. |
Methods of creating high porosity propped fractures
|
|
US7281580B2
(en)
|
2004-09-09 |
2007-10-16 |
Halliburton Energy Services, Inc. |
High porosity fractures and methods of creating high porosity fractures
|
|
US7757768B2
(en)
|
2004-10-08 |
2010-07-20 |
Halliburton Energy Services, Inc. |
Method and composition for enhancing coverage and displacement of treatment fluids into subterranean formations
|
|
US7281581B2
(en)
|
2004-12-01 |
2007-10-16 |
Halliburton Energy Services, Inc. |
Methods of hydraulic fracturing and of propping fractures in subterranean formations
|
|
US7273099B2
(en)
|
2004-12-03 |
2007-09-25 |
Halliburton Energy Services, Inc. |
Methods of stimulating a subterranean formation comprising multiple production intervals
|
|
US7398825B2
(en)
|
2004-12-03 |
2008-07-15 |
Halliburton Energy Services, Inc. |
Methods of controlling sand and water production in subterranean zones
|
|
US7883740B2
(en)
|
2004-12-12 |
2011-02-08 |
Halliburton Energy Services, Inc. |
Low-quality particulates and methods of making and using improved low-quality particulates
|
|
US7788037B2
(en)
*
|
2005-01-08 |
2010-08-31 |
Halliburton Energy Services, Inc. |
Method and system for determining formation properties based on fracture treatment
|
|
US7334635B2
(en)
|
2005-01-14 |
2008-02-26 |
Halliburton Energy Services, Inc. |
Methods for fracturing subterranean wells
|
|
US7334636B2
(en)
|
2005-02-08 |
2008-02-26 |
Halliburton Energy Services, Inc. |
Methods of creating high-porosity propped fractures using reticulated foam
|
|
US7318473B2
(en)
|
2005-03-07 |
2008-01-15 |
Halliburton Energy Services, Inc. |
Methods relating to maintaining the structural integrity of deviated well bores
|
|
US7673686B2
(en)
|
2005-03-29 |
2010-03-09 |
Halliburton Energy Services, Inc. |
Method of stabilizing unconsolidated formation for sand control
|
|
US7448451B2
(en)
|
2005-03-29 |
2008-11-11 |
Halliburton Energy Services, Inc. |
Methods for controlling migration of particulates in a subterranean formation
|
|
US7318474B2
(en)
|
2005-07-11 |
2008-01-15 |
Halliburton Energy Services, Inc. |
Methods and compositions for controlling formation fines and reducing proppant flow-back
|
|
MX2007016595A
(es)
*
|
2005-07-27 |
2008-03-04 |
Exxonmobil Upstream Res Co |
Modelaje de pozo asociado con extraccion de hidrocarburos a partir de yacimientos subterraneos.
|
|
MX2007016574A
(es)
*
|
2005-07-27 |
2008-03-04 |
Exxonmobil Upstream Res Co |
Modelaje de pozo asociado con extraccion de hidrocarburos a partir de yacimientos subterraneos.
|
|
EA015435B1
(ru)
*
|
2005-07-27 |
2011-08-30 |
Эксонмобил Апстрим Рисерч Компани |
Способ моделирования технологических показателей скважин
|
|
US8620636B2
(en)
*
|
2005-08-25 |
2013-12-31 |
Schlumberger Technology Corporation |
Interpreting well test measurements
|
|
US7369979B1
(en)
|
2005-09-12 |
2008-05-06 |
John Paul Spivey |
Method for characterizing and forecasting performance of wells in multilayer reservoirs having commingled production
|
|
BRPI0520693A2
(pt)
*
|
2005-11-21 |
2009-06-13 |
Chevron Usa Inc |
método para otimização de produção em escala de campo
|
|
US7819192B2
(en)
|
2006-02-10 |
2010-10-26 |
Halliburton Energy Services, Inc. |
Consolidating agent emulsions and associated methods
|
|
US7926591B2
(en)
|
2006-02-10 |
2011-04-19 |
Halliburton Energy Services, Inc. |
Aqueous-based emulsified consolidating agents suitable for use in drill-in applications
|
|
US8613320B2
(en)
|
2006-02-10 |
2013-12-24 |
Halliburton Energy Services, Inc. |
Compositions and applications of resins in treating subterranean formations
|
|
CA2637876A1
(fr)
*
|
2006-02-10 |
2007-08-23 |
Exxonmobil Upstream Research Company |
Procede de completion de puits polyvalent
|
|
US7665517B2
(en)
|
2006-02-15 |
2010-02-23 |
Halliburton Energy Services, Inc. |
Methods of cleaning sand control screens and gravel packs
|
|
US7407010B2
(en)
|
2006-03-16 |
2008-08-05 |
Halliburton Energy Services, Inc. |
Methods of coating particulates
|
|
US7346457B2
(en)
*
|
2006-03-24 |
2008-03-18 |
Schlumberger Technology Corporation |
Method for identification of inhibited wells in the mature fields
|
|
BRPI0713448B1
(pt)
*
|
2006-06-26 |
2019-03-06 |
Exxonmobil Upstream Research Company |
Método para realocar uma vazão final predita para uma zona individual e sistema
|
|
US7500521B2
(en)
|
2006-07-06 |
2009-03-10 |
Halliburton Energy Services, Inc. |
Methods of enhancing uniform placement of a resin in a subterranean formation
|
|
US7577527B2
(en)
*
|
2006-12-29 |
2009-08-18 |
Schlumberger Technology Corporation |
Bayesian production analysis technique for multistage fracture wells
|
|
US7934557B2
(en)
|
2007-02-15 |
2011-05-03 |
Halliburton Energy Services, Inc. |
Methods of completing wells for controlling water and particulate production
|
|
US7805248B2
(en)
|
2007-04-19 |
2010-09-28 |
Baker Hughes Incorporated |
System and method for water breakthrough detection and intervention in a production well
|
|
US7711486B2
(en)
*
|
2007-04-19 |
2010-05-04 |
Baker Hughes Incorporated |
System and method for monitoring physical condition of production well equipment and controlling well production
|
|
US20080257544A1
(en)
*
|
2007-04-19 |
2008-10-23 |
Baker Hughes Incorporated |
System and Method for Crossflow Detection and Intervention in Production Wellbores
|
|
US7580796B2
(en)
*
|
2007-07-31 |
2009-08-25 |
Halliburton Energy Services, Inc. |
Methods and systems for evaluating and treating previously-fractured subterranean formations
|
|
US8548782B2
(en)
*
|
2007-08-24 |
2013-10-01 |
Exxonmobil Upstream Research Company |
Method for modeling deformation in subsurface strata
|
|
US8423337B2
(en)
*
|
2007-08-24 |
2013-04-16 |
Exxonmobil Upstream Research Company |
Method for multi-scale geomechanical model analysis by computer simulation
|
|
US8768672B2
(en)
*
|
2007-08-24 |
2014-07-01 |
ExxonMobil. Upstream Research Company |
Method for predicting time-lapse seismic timeshifts by computer simulation
|
|
WO2009029135A1
(fr)
*
|
2007-08-24 |
2009-03-05 |
Exxonmobil Upstream Research Company |
Procédé de prédiction de la fiabilité d'un puits par simulation informatique
|
|
WO2009085395A1
(fr)
*
|
2007-12-31 |
2009-07-09 |
Exxonmobil Upstream Research Company |
Procédés et systèmes pour déterminer des caractéristiques proches de puits de forage et des propriétés de réservoir
|
|
WO2009142798A2
(fr)
*
|
2008-05-22 |
2009-11-26 |
Exxonmobil Upstream Research Company |
Procédés de régulation d’écoulement dans des intervalles multizones
|
|
RU2478783C2
(ru)
*
|
2008-06-19 |
2013-04-10 |
Шлюмберже Текноложи Б.В. |
Способ добычи углеводородов из скважины, проходящей через многослойный резервуар с гидроразрывом
|
|
US8078402B2
(en)
|
2008-07-16 |
2011-12-13 |
Schlumberger Technology Corporation |
Method of ranking geomarkers and compositional allocation of wellbore effluents
|
|
CA2743827C
(fr)
*
|
2008-12-16 |
2018-01-23 |
Exxonmobil Upstream Research Company |
Systemes et procedes pour l'optimisation du developpement et de la gestion de reservoirs d'hydrocarbures
|
|
US8914268B2
(en)
|
2009-01-13 |
2014-12-16 |
Exxonmobil Upstream Research Company |
Optimizing well operating plans
|
|
US7762329B1
(en)
|
2009-01-27 |
2010-07-27 |
Halliburton Energy Services, Inc. |
Methods for servicing well bores with hardenable resin compositions
|
|
US8756016B2
(en)
*
|
2009-01-29 |
2014-06-17 |
Schlumberger Technology Corporation |
Method and system to estimate fracture aperture in horizontal wells
|
|
CN102640155B
(zh)
*
|
2009-05-07 |
2015-01-28 |
沙特阿拉伯石油公司 |
计算储层模拟器的近似油井泄油压力的系统、计算机实现方法和计算机可读程序产品
|
|
US8359163B2
(en)
*
|
2009-06-01 |
2013-01-22 |
Schlumberger Technology Corporation |
Estimating fluid flow in a reservoir
|
|
US8781747B2
(en)
*
|
2009-06-09 |
2014-07-15 |
Schlumberger Technology Corporation |
Method of determining parameters of a layered reservoir
|
|
US20110067857A1
(en)
*
|
2009-09-23 |
2011-03-24 |
Schlumberger Technology Corporation |
Determining properties of a subterranean structure during hydraulic fracturing
|
|
US9085957B2
(en)
|
2009-10-07 |
2015-07-21 |
Exxonmobil Upstream Research Company |
Discretized physics-based models and simulations of subterranean regions, and methods for creating and using the same
|
|
US8386226B2
(en)
*
|
2009-11-25 |
2013-02-26 |
Halliburton Energy Services, Inc. |
Probabilistic simulation of subterranean fracture propagation
|
|
US8437962B2
(en)
*
|
2009-11-25 |
2013-05-07 |
Halliburton Energy Services, Inc. |
Generating probabilistic information on subterranean fractures
|
|
US8898044B2
(en)
|
2009-11-25 |
2014-11-25 |
Halliburton Energy Services, Inc. |
Simulating subterranean fracture propagation
|
|
US9176245B2
(en)
*
|
2009-11-25 |
2015-11-03 |
Halliburton Energy Services, Inc. |
Refining information on subterranean fractures
|
|
US8392165B2
(en)
*
|
2009-11-25 |
2013-03-05 |
Halliburton Energy Services, Inc. |
Probabilistic earth model for subterranean fracture simulation
|
|
US8886502B2
(en)
*
|
2009-11-25 |
2014-11-11 |
Halliburton Energy Services, Inc. |
Simulating injection treatments from multiple wells
|
|
US20110139446A1
(en)
*
|
2009-12-15 |
2011-06-16 |
Baker Hughes Incorporated |
Method of Determining Queried Fluid Cuts Along a Tubular
|
|
US9594186B2
(en)
|
2010-02-12 |
2017-03-14 |
Exxonmobil Upstream Research Company |
Method and system for partitioning parallel simulation models
|
|
US9367564B2
(en)
|
2010-03-12 |
2016-06-14 |
Exxonmobil Upstream Research Company |
Dynamic grouping of domain objects via smart groups
|
|
CA2823017A1
(fr)
|
2011-01-26 |
2012-08-02 |
Exxonmobil Upstream Research Company |
Procede d'analyse des compartiments d'un reservoir en utilisant la structure topologique d'un modele de terre 3d
|
|
CA2808858C
(fr)
*
|
2012-03-16 |
2016-01-26 |
Weatherford/Lamb, Inc. |
Surveillance et analyse en temps reel de la fracturation dans un puits
|
|
US9416642B2
(en)
|
2013-02-01 |
2016-08-16 |
Halliburton Energy Services, Inc. |
Modeling subterranean rock blocks in an injection treatment simulation
|
|
US9798042B2
(en)
|
2013-02-01 |
2017-10-24 |
Halliburton Energy Services, Inc. |
Simulating an injection treatment of a subterranean zone
|
|
US9217318B2
(en)
|
2013-03-14 |
2015-12-22 |
Halliburton Energy Services, Inc. |
Determining a target net treating pressure for a subterranean region
|
|
US9297250B2
(en)
|
2013-03-14 |
2016-03-29 |
Halliburton Energy Services, Inc. |
Controlling net treating pressure in a subterranean region
|
|
US10584570B2
(en)
|
2013-06-10 |
2020-03-10 |
Exxonmobil Upstream Research Company |
Interactively planning a well site
|
|
US9239407B2
(en)
|
2013-08-27 |
2016-01-19 |
Halliburton Energy Services, Inc. |
Injection treatment simulation using condensation
|
|
US9864098B2
(en)
|
2013-09-30 |
2018-01-09 |
Exxonmobil Upstream Research Company |
Method and system of interactive drill center and well planning evaluation and optimization
|
|
GB2521268A
(en)
*
|
2013-11-27 |
2015-06-17 |
Chevron Usa Inc |
Determining reserves of a reservoir
|
|
US9470086B2
(en)
|
2013-12-18 |
2016-10-18 |
King Fahd University Of Petroleum And Minerals |
Inflow performance relationship for horizontal wells producing oil from multi-layered heterogeneous solution gas-drive reservoirs
|
|
US20150218939A1
(en)
*
|
2014-02-06 |
2015-08-06 |
King Fahd University Of Petroleum And Minerals |
Graphical method for assisting multi-zones commingling decision
|
|
US10119396B2
(en)
|
2014-02-18 |
2018-11-06 |
Saudi Arabian Oil Company |
Measuring behind casing hydraulic conductivity between reservoir layers
|
|
CN104213906B
(zh)
*
|
2014-07-30 |
2015-08-19 |
中国石油集团钻井工程技术研究院 |
一种钻井井筒压力校正方法
|
|
US10392922B2
(en)
|
2015-01-13 |
2019-08-27 |
Saudi Arabian Oil Company |
Measuring inter-reservoir cross flow rate between adjacent reservoir layers from transient pressure tests
|
|
US10180057B2
(en)
|
2015-01-21 |
2019-01-15 |
Saudi Arabian Oil Company |
Measuring inter-reservoir cross flow rate through unintended leaks in zonal isolation cement sheaths in offset wells
|
|
US10094202B2
(en)
*
|
2015-02-04 |
2018-10-09 |
Saudi Arabian Oil Company |
Estimating measures of formation flow capacity and phase mobility from pressure transient data under segregated oil and water flow conditions
|
|
CN104912538B
(zh)
*
|
2015-04-16 |
2018-01-05 |
中国石油天然气股份有限公司 |
一种油田区块边界流量确定方法及装置
|
|
CN105089659B
(zh)
*
|
2015-07-07 |
2017-10-17 |
中国石油天然气股份有限公司 |
一种砾岩油藏渗流单元识别方法
|
|
WO2017041074A1
(fr)
*
|
2015-09-03 |
2017-03-09 |
Schlumberger Technology Corporation |
Procédé d'intégration d'opérations de fracture, de production et de réservoir dans des opérations géo-mécaniques d'un emplacement de forage.
|
|
CN106761718A
(zh)
*
|
2015-11-24 |
2017-05-31 |
中国石油化工股份有限公司 |
确定中深层油藏动用厚度界限的新方法
|
|
CN105604546B
(zh)
*
|
2015-12-18 |
2018-10-16 |
中国石油天然气股份有限公司 |
双重介质碳酸盐岩储层的定量分类方法
|
|
CN105781540A
(zh)
*
|
2016-03-17 |
2016-07-20 |
成都创源油气技术开发有限公司 |
缝洞性地层测井识别方法
|
|
US10422220B2
(en)
*
|
2016-05-03 |
2019-09-24 |
Schlumberger Technology Corporation |
Method and systems for analysis of hydraulically-fractured reservoirs
|
|
US10215002B2
(en)
*
|
2016-05-05 |
2019-02-26 |
Saudi Arabian Oil Company |
Determining wellbore leak crossflow rate between formations in an injection well
|
|
US10233749B2
(en)
|
2017-05-03 |
2019-03-19 |
Saudi Arabian Oil Company |
Multi-layer reservoir well drainage region
|
|
US11041976B2
(en)
|
2017-05-30 |
2021-06-22 |
Exxonmobil Upstream Research Company |
Method and system for creating and using a subsurface model in hydrocarbon operations
|
|
US10508521B2
(en)
|
2017-06-05 |
2019-12-17 |
Saudi Arabian Oil Company |
Iterative method for estimating productivity index (PI) values in maximum reservoir contact (MRC) multilateral completions
|
|
CN109594968B
(zh)
*
|
2017-09-28 |
2022-04-12 |
中国石油化工股份有限公司 |
一种页岩气多段压裂水平井压后裂缝参数评价方法及系统
|
|
US10900344B2
(en)
|
2017-11-07 |
2021-01-26 |
Saudi Arabian Oil Company |
Determining wellbore leak crossflow rate between formations in an injection well
|
|
CN108561121A
(zh)
*
|
2018-01-05 |
2018-09-21 |
中国海洋石油集团有限公司 |
完井用实时监测产层生产及遥控各油层产量的方法及系统
|
|
US10519768B2
(en)
|
2018-02-21 |
2019-12-31 |
Saudi Arabian Oil Company |
Systems and methods for operating hydrocarbon wells to inhibit breakthrough based on reservoir saturation
|
|
CN110175435B
(zh)
*
|
2018-12-05 |
2022-09-23 |
河南理工大学 |
一种划分煤层瓦斯压力恢复曲线流动阶段的方法
|
|
CN109598099B
(zh)
*
|
2019-01-23 |
2022-11-29 |
中国石油大学(华东) |
一种考虑油藏与井筒耦合的双管sagd长水平井均匀注汽数值模拟方法
|
|
CN110321647B
(zh)
*
|
2019-07-10 |
2023-08-11 |
合肥迪斯贝能源科技有限公司 |
一种确定垂直井多层合采光纤测温确定每层油产量方法
|
|
US11708754B2
(en)
*
|
2020-05-11 |
2023-07-25 |
Saudi Arabian Oil Company |
Systems and methods for generating a drainage radius log
|
|
US11193370B1
(en)
|
2020-06-05 |
2021-12-07 |
Saudi Arabian Oil Company |
Systems and methods for transient testing of hydrocarbon wells
|
|
CN114109370B
(zh)
*
|
2020-08-27 |
2024-06-04 |
中国石油化工股份有限公司 |
断溶体油藏油井产液位置判断方法、装置、系统、存储介质
|
|
CN112031955B
(zh)
*
|
2020-09-11 |
2021-06-29 |
河北工业大学 |
基于可变相干波长的高压直喷天然气发动机进气稳压装置
|
|
US20250067167A1
(en)
*
|
2023-08-21 |
2025-02-27 |
Resman As |
Method and system of monitoring a hydrocarbon reservoir
|
|
CN118167249B
(zh)
*
|
2024-04-03 |
2024-09-24 |
西南石油大学 |
一种气藏优化配产的方法及系统
|