Filling shaft alternating firing

Info

Publication number
DE832035C
DE832035C DEP192A DEP0000192A DE832035C DE 832035 C DE832035 C DE 832035C DE P192 A DEP192 A DE P192A DE P0000192 A DEP0000192 A DE P0000192A DE 832035 C DE832035 C DE 832035C
Authority
DE
Germany
Prior art keywords
furnace
partition
halves
gas outlet
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEP192A
Other languages
German (de)
Inventor
Jacob Hellenbrand
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JACOB HELLENBRAND
Original Assignee
JACOB HELLENBRAND
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JACOB HELLENBRAND filed Critical JACOB HELLENBRAND
Priority to DEP192A priority Critical patent/DE832035C/en
Application granted granted Critical
Publication of DE832035C publication Critical patent/DE832035C/en
Expired legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23BMETHODS OR APPARATUS FOR COMBUSTION USING ONLY SOLID FUEL
    • F23B1/00Combustion apparatus using only lump fuel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23BMETHODS OR APPARATUS FOR COMBUSTION USING ONLY SOLID FUEL
    • F23B2700/00Combustion apparatus for solid fuel
    • F23B2700/008Combustion apparatus for solid fuel with interchangeable combustion chambers

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Solid-Fuel Combustion (AREA)

Description

Füllschacht-Wechselfeuerung Die Erfindung betrifft eine Füllschacht-Wechselfeuerung, deren Feuerraum durch eine doppelte, vertikale Zwischenwand, die nicht bis zu -der Rostebene hinunterreicht, in zwei Feuerungshälften geteilt ist, mit einer Umschaltvorrichtung zur wechselweisen Verbindung einer der beiden Feuerraumhälften mit dem Rauchgasabzug.Filling chute changing furnace The invention relates to a feeding chute changing furnace, their combustion chamber by a double, vertical partition that does not go up to the Reaches down the grate level, is divided into two halves of the furnace, with a switchover device for alternating connection of one of the two halves of the combustion chamber with the flue gas outlet.

Der Erfindung liegt die Aufgabe zugrunde, die Schwelgase in die Flammenzone der Feuerung zu führen, um eine möglichst vollständige Verbrennung zu erreichen.The invention is based on the object of the carbonization gases in the flame zone the furnace in order to achieve as complete a combustion as possible.

Es ist bekannt, zu diesem Zwecke den Feuerraum durch eine Trennwand in zwei wechselseitig betriebene Füllschächte zu teilen, von denen der jeweils gefüllte als Entgasungs'kammer und der andere als Feuerraum arbeitet, in welchen die in der Entgasungskammer entwickelten Gase eingeleitet werden und zusammen mit den in der vorgehenden Wechselperiode entgasten Brennstoffresten verbrannt werden. Es ist insbesorndere eine Füllschacht-Wechselfeuerung bekannt, deren Feuerraum durch eine doppelte vertikale Zwischenwand, die nicht bis an die Rostebene hinunterreicht, in zwei Feuerungshälften geteilt ist und zwei Drosselklappen zur wechselweisen Verbindung einer der beiden Feuerraumhälften besitzt. Im Zwischenwandhohlraum wird dabei Verbrennungsluft zugeführt. Bei dieser Feuerung ziehen die Schwelgase der jeweils als Entgasungskammer arbeitenden Feuerraumhälfte in absteigender Richtung durch die zwischen der Zwischenwand und dem Rost freibleibende Öffnung in die andere, als Verbrennungsraum arbeitende Feuerraumhälfte.For this purpose it is known to use a partition wall to open the combustion chamber to be divided into two mutually operated filling chutes, each of which is filled as a degassing chamber and the other works as a furnace, in which the in the Gases developed in the degassing chamber are introduced and together with those in the previous change period degassed fuel residues are burned. It is especially a feed chute alternating firing known, the combustion chamber by a double vertical Partition that does not reach down to the grate level, in two halves of the furnace is divided and two throttle valves for alternating connection of one of the two Has firebox halves. Combustion air is supplied in the intermediate wall cavity. With this firing, the carbonization gases pull each one working as a degassing chamber Firebox half in descending direction through the between the partition wall and The opening in the other half of the combustion chamber, which works as a combustion chamber, remains free from the grate.

Gemäß der Erfindung wird eine eingangs genannte Füllschacht-Wechselfeuerungvorgeschlagen, die derart ausgebildet ist, daß in der doppelten Zwischenwand zwei vertikale Umführungskanäle nebeneinander angeordnet sind, welche oben durch je eine seitliche Eintrittsöffnung in der Zwischenwand mit je einer der beiden Feuerraumhälften verbunden sind und unten an der der Eintrittsseite entgegengesetzten Zwischenwandseite Öffnungen für den Gasaustritt besitzen.According to the invention, a hopper changeover system mentioned at the outset is proposed, which is designed so that in the double Partition two vertical bypass channels are arranged side by side, which above each by one Lateral inlet opening in the partition with one of the two halves of the furnace are connected and below on the opposite side of the partition wall from the entry side Have openings for the gas outlet.

Die Schwelgase der Entgasungskammer durchströmen dabei den Schacht in aufsteigender Richtung.The carbonization gases from the degassing chamber flow through the shaft in an ascending direction.

Ein weiteres Merkmal des Erfindungsgegenstandes besteht darin, daß als Abschluß gegen den Rauchgasabzug über der jeweils als Entgasungsraum dienenden Feuerraumhälfte eine horizontale, als Absperrschieber ausgebildete Decke angeordnet ist, welche auf der Unterseite von der Oberkante der Zwischenwand berührt -wird und wechselweise über eine der beiden Feuerungshälften geschoben werden kann.Another feature of the subject invention is that as a closure against the smoke outlet above the one serving as a degassing space The combustion chamber half has a horizontal ceiling designed as a gate valve which is touched on the underside by the upper edge of the partition wall and can be pushed alternately over one of the two furnace halves.

In der Zeichnung ist ein Ausführungsbeispiel des Erfindungsgegenstandes dargestellt, und zwar zeigt Abb. 1 und 2 je einen Vertikalschnitt d-d und c-c durch die `'Wechselfeuerung in beiden Betriebsfällen, Abb. 3 einen Horizontalschnitt a-a, Abb. q. einen Horizontalschnitt b-b, Abb. 5 einen Vertikalschnitt e-e und Abb. 6 einen Vertikalschnitt f-f.The drawing shows an embodiment of the subject matter of the invention shown, namely Fig. 1 and 2 each show a vertical section d-d and c-c the alternating firing in both operating cases, Fig. 3 a horizontal section a-a, Fig.q. a horizontal section b-b, Fig. 5 a vertical section e-e and Fig. 6 a vertical section f-f.

Der Feuerraum ist in der Mitte durch eine Trennw -and C in zwei Kammern A, B geteilt, die wechselweise als Entgasungs- und Verbrennungskammer dienen. Die Trennwand reicht mit ihrer Unterkante nicht ganz bis zur Rostebene, sie läßt vielmehr zwischen dem Rost den Spalt H frei. Die Trennwand kann aus Schamotte, Metall oder einem anderen geeigneten Material ausgeführt und nötigenfalls mit einer Kühlung versehen sein. Die Zwischenwand enthält zwei nebeneinander angeordnete vertikale Umführungskanäle K1, K2, deren Eintrittsöffnungen Ft, F2 die Trennwände oben in entgegengesetzten Seiten durchbrechen, während die Austrittsöffnungen G1, G2 der Zugkanäle die Trennwände unten, und zwar an den den Eintrittsöffnungen entgegengesetzten Seiten durchbrechen.The combustion chamber is divided in the middle by a partition wall C into two chambers A, B , which alternately serve as degassing and combustion chambers. The lower edge of the partition does not extend all the way to the level of the grate, rather it leaves the gap H free between the grate. The partition wall can be made of fireclay, metal or another suitable material and, if necessary, can be provided with cooling. The partition wall contains two vertical bypass channels K1, K2, whose inlet openings Ft, F2 break through the separating walls at the top on opposite sides, while the outlet openings G1, G2 of the draw channels break through the separating walls below, on the sides opposite the inlet openings.

Die beiden Kammern A, B können durch eine als Absperrschieber D ausgebildete verschiebbare Decke, welche auf der Unterseite von der Oberkante der Zwischenwand C berührt wird, wechselweise abgedeckt werden. Dadurch kann der Rauchgasweg von je einer der beiden Kammern zum Rauchgasabzug E versperrt werden.The two chambers A, B can be configured as a gate valve D by a valve sliding ceiling, which is on the bottom of the top of the partition C is touched, covered alternately. This allows the flue gas path from one of the two chambers to the flue gas vent E can be blocked.

Die Wirkungsweise der Wechselfeuerung ist folgende: Zur Inbetriebnahme wird die eine Kammer mit Brennstoff vollgefüllt und mit dem Schieber D verschlossen. In der anderen Kammer wird ein Feuer angelegt und nur eine Teilfüllung aufgebracht. Das Feuer greift auch auf die untere Brennstoffschicht der anderen, als Entgasungskammer arbeitenden Feuerraumhälfte über. Infolge des großen Zugwiderstandes in der hohen Brennstoffschicht und . im absteigenden Umführungskanal tritt jedoch nur eine geringe Luftmenge in die Entgasungskammer ein, so daß in dieser Kammer hauptsächlich nur eine Entgasung des Brennstoffes eintritt und nur die unterste Brennstoffschicht verbrennt. Selbstverständlich wird der über der brennenden untersten Brennstoffschicht gelagerte glühende, von kohlendioxydhaltigem Gas durchströmte Koks auch zum Teil vergast. Während die Verbrennungskammerfüllung niederbrennt, bildet sich in der Entgasungskammer aus der Brennstoffüllung unter Volumverminderung eine glühende Koksmenge. Wenn die Verbrennungskammerfüllung niedergebrannt ist, wird diese Kampier mit Brennstoff vollgefüllt und der Schieber umgestellt, so daß die frühere Entgasungskammer nunmehr mit dem Rauchgasabzug verbunden ist und als Verbrennungskammer weiterarbeitet, in der nunmehr der Koks zusammen mit den aus der Entgasungskammer übergeleiteten Gasen und flüchtigen Bestandteilen verbrennt.The mode of operation of the alternating firing is as follows: For commissioning one chamber is filled with fuel and closed with the slide D. A fire is set up in the other chamber and only part of the filling is applied. The fire also attacks the lower fuel layer of the other, as a degassing chamber working fire box half over. As a result of the great tensile resistance in the high Fuel layer and. however, only a small amount occurs in the descending bypass channel Amount of air into the degassing chamber, so that in this chamber mainly only a degassing of the fuel occurs and only the lowest fuel layer burns. It goes without saying that the one above the burning lowest fuel layer stored glowing coke, through which carbon dioxide-containing gas flowed, also partly gassed. As the combustion chamber charge burns down, the Degassing chamber from the fuel filling with a reduction in volume a glowing one Amount of coke. When the combustion chamber charge has burned down, it becomes a camp Filled with fuel and repositioned the slide, so that the earlier degassing chamber is now connected to the flue gas outlet and continues to work as a combustion chamber, in which the coke is now passed over together with the coke from the degassing chamber Burns gases and volatile components.

Claims (2)

PATENTANSPRÜCHE: i. Füllschacht-Wechselfeuerung, deren Feuerraum durch eine doppelte, vertikale Zwischenwand, die nicht bis zu der Rostebene herunterreicht, in zwei Feuerungshälften geteilt ist, mit einer Umschaltvorrichtung zur wechselweisen Verbindung einer der beiden Feuerraumhälften mit dem Rauchgasabzug, dadurch gekennzeichnet, daß in der doppelten Zwischenwand (C) zwei vertikale Umführungskanäle (K1, K2) nebeneinander angeordnet sind, welche oben durch je eine seitliche Eintrittsöffnung (F1, FZ) in der Zwischenwand (C:) mit je einer der beiden Feuerraumhälften (A, B) verbunden sind und unten an der der Eintrittsseite entgegengesetzten Zwischenwan@dseite Öffnungen (G1, G2) für den Gasaustritt besitzen. PATENT CLAIMS: i. Filling shaft alternating firing, the furnace of which is divided into two furnace halves by a double, vertical partition that does not reach down to the grate level, with a switchover device for alternately connecting one of the two furnace halves to the flue gas outlet, characterized in that in the double partition ( C) two vertical bypass channels (K1, K2) are arranged side by side, which are connected to one of the two fire chamber halves (A, B) at the top through a lateral inlet opening (F1, FZ) each in the partition (C :) and at the bottom to the the intermediate wall opposite the inlet side have openings (G1, G2) for the gas outlet. 2. Füllschacht-Wechselfeuerung nach Anspruch i, dadurch gekennzeichnet, daß als Abschluß gegen den Rauchgasabzug (E) über der jeweils als Entgasungsraum dienenden Feuerraumhälfte eine horizontale, als Absperrschieber (D) ausgebildete Decke angeordnet ist, welche auf der Unterseite von der Oberkante der Zwischenwand (C) berührt wird und wechselweise über eine der beiden Feuerungshälften (A, B) geschoben werden kann. Angezogene Druckschriften: USA.-Patentschrift N r. 1 325 522; deutsche Patentschrift Nr. i 1 886.2. Filling chute alternating firing according to claim i, characterized in that a horizontal ceiling designed as a gate valve (D) is arranged as a closure against the flue gas outlet (E) above the furnace half serving as a degassing chamber, which ceiling is arranged on the underside of the upper edge of the partition (C) is touched and can be pushed alternately over one of the two furnace halves (A, B). References: U.S. Patent No. 1,325,522; German patent specification No. i 1 886.
DEP192A 1948-10-02 1948-10-02 Filling shaft alternating firing Expired DE832035C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEP192A DE832035C (en) 1948-10-02 1948-10-02 Filling shaft alternating firing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEP192A DE832035C (en) 1948-10-02 1948-10-02 Filling shaft alternating firing

Publications (1)

Publication Number Publication Date
DE832035C true DE832035C (en) 1952-02-21

Family

ID=7356477

Family Applications (1)

Application Number Title Priority Date Filing Date
DEP192A Expired DE832035C (en) 1948-10-02 1948-10-02 Filling shaft alternating firing

Country Status (1)

Country Link
DE (1) DE832035C (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE11886A (en) * C. mengelberg in Görlitz, Brunnenstrafse 14. - Vom 25. Mai_ 1880 Alternating Regulirofen
US1325522A (en) * 1919-12-23 Eurnace

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE11886A (en) * C. mengelberg in Görlitz, Brunnenstrafse 14. - Vom 25. Mai_ 1880 Alternating Regulirofen
US1325522A (en) * 1919-12-23 Eurnace

Similar Documents

Publication Publication Date Title
DE3339972C2 (en) Chamber ring furnace and process for its operation
DE2658196A1 (en) COK OVEN DOOR
DE832035C (en) Filling shaft alternating firing
DE667742C (en) Shaft furnace with a long burning zone for burning lime and similar substances
DE684822C (en) Horizontal coke chamber furnace
DE490000C (en) Rotary kiln for burning cement, lime, etc. like
AT62278B (en) Device for dry distillation of coal.
DE102012106580A1 (en) Oven device, has oven comprising aperture for discharging gaseous mixture, which is formed by partial combustion of combustible components of another mixture that is partially formed by flue gases under admixture of additional air
DE826950C (en) Half gas firing
DE325733C (en) Furnace with vertical retorts and horizontal heating chambers
AT20482B (en) Oven for roasting finely divided ore, burning dolomite, etc.
DE540275C (en) Slow-burning stove
DE946082C (en) Cyclone firing
DE905968C (en) Chamber furnace battery for coke and gas production with regenerative preheating of the heating gas
DE804239C (en) Stovepipe intermediate piece for increased heat utilization of the flue gases
DE614310C (en) Coke chamber furnace with a gas discharge channel arranged in the vaulted ceiling
DE3150501A1 (en) DEVICE FOR BURNING CEMENT
DE68650C (en) Continuous brick oven
AT201211B (en) Melting chamber firing
DE320012C (en) Flame furnace with burners consisting of air and gas ducts on the forehead and the side surfaces
DE605401C (en) Filling shaft furnace with half gas firing
DE623947C (en) Oven for smoldering or coking fuels
DE474515C (en) Heating stove with air heating shafts arranged around the furnace and surrounded by flues
DE904887C (en) Recuperative coke oven group for heating with high or low gas
DE481397C (en) Ring or zigzag oven for firing pottery