DE20005629U1 - strut - Google Patents
strutInfo
- Publication number
- DE20005629U1 DE20005629U1 DE20005629U DE20005629U DE20005629U1 DE 20005629 U1 DE20005629 U1 DE 20005629U1 DE 20005629 U DE20005629 U DE 20005629U DE 20005629 U DE20005629 U DE 20005629U DE 20005629 U1 DE20005629 U1 DE 20005629U1
- Authority
- DE
- Germany
- Prior art keywords
- strut
- hook
- clamping
- end piece
- piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000008878 coupling Effects 0.000 claims description 18
- 238000010168 coupling process Methods 0.000 claims description 18
- 238000005859 coupling reaction Methods 0.000 claims description 18
- 230000000694 effects Effects 0.000 claims description 5
- 239000011324 bead Substances 0.000 claims description 4
- 238000007373 indentation Methods 0.000 claims description 2
- 238000006073 displacement reaction Methods 0.000 description 3
- 244000309464 bull Species 0.000 description 2
- 230000000284 resting effect Effects 0.000 description 2
- 239000003351 stiffener Substances 0.000 description 2
- 235000003332 Ilex aquifolium Nutrition 0.000 description 1
- 241000209027 Ilex aquifolium Species 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/30—Scaffolding bars or members with non-detachably fixed coupling elements
- E04G7/302—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members
- E04G7/303—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are only fixed at one of the bars or members to connect
- E04G7/304—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are only fixed at one of the bars or members to connect with tying means for connecting the bars or members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/16—Struts or stiffening rods, e.g. diagonal rods
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/30—Scaffolding bars or members with non-detachably fixed coupling elements
- E04G7/302—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members
- E04G7/303—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are only fixed at one of the bars or members to connect
- E04G7/305—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are only fixed at one of the bars or members to connect without tying means for connecting the bars or members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Description
Die Erfindung betrifft eine Strebe für Gerüste oder ähnliche Tragwerke, mit einem an ihrem einen Ende im wesentlichen mittig vorgesehenen Haken, mit dem die Strebe an einem Riegel oder dergleichen Bauelement des Gerüstes einhängbar und schwenkbar ist, und mit einer an einem Holm des Gerüstes arretierbaren, an dem anderen Ende der Strebe befindlichen Klemm-Kupplung aus einem an der Strebe angebrachten Klemmstück und einer an dem Klemmstück gehalterten, den Holm überfangenden Klemmschelle, wobei das Klemmstück eine Lagerschale aufweist, welche an den Holm anlegbar ist.The invention relates to a strut for scaffolding or similar supporting structures, with a hook provided essentially centrally at one end, with which the strut can be suspended and pivoted on a bar or similar structural element of the scaffolding, and with a clamping coupling which can be locked on a beam of the scaffolding and is located at the other end of the strut and consists of a clamping piece attached to the strut and a clamping clamp held on the clamping piece and which covers the beam, wherein the clamping piece has a bearing shell which can be placed on the beam.
Eine Strebe dieser Art kann besonders an einem Gerüst zu dessen diagonaler Versteifung verwendet werden. Ein Rahmenelement für ein solches Gerüst, das mit weiteren gleichartigen Rahmenelementen zusammensetzbar ist, besteht in der Regel aus zwei Leiterelementen mit senkrechten Holmen und diese verbindenden Riegeln, die durch an den Holmen anschließende Geländerläufe, auf den Riegeln aufliegende Podeste und mindestens eineA brace of this type can be used particularly on scaffolding to provide diagonal reinforcement. A frame element for such a scaffolding, which can be assembled with other similar frame elements, usually consists of two ladder elements with vertical beams and connecting bars, which are connected by railings connected to the beams, platforms resting on the bars and at least one
&Lgr; ···· &phgr; * Φ Φ Φ Φ &Lgr; ···· φ * ? ? ? ?
Φ · Φ Φ · Φ » . t Φ? · ? ? · ? » . t ?
• Φ « Φ Φ Φ Φ ΦΦ Φ# · · · ·• ? « ? ? ? ? ?? φ# · · · ·
das Rahmenelement versteifende diagonale Strebe miteinander verbunden sind. Eine an einem Ende mit einem Haken ausgestattete Strebe wird zu diesem Zweck an einem ersten der Leiterelemente in deren oberem Bereich an einem passenden Bauelement eingehängt, während die am anderen Ende befindliche Klemm-Kupplung im unteren Bereich des anderen Leiterelementes an einem von dessen Holmen festgemacht wird. Die Strebe ragt dabei etwas über diesen Holm hinaus, und die Klemm-Kupplung ist deshalb seitlich an der Strebe angebracht.the frame element are connected to each other by a diagonal strut. A strut with a hook at one end is hooked to a suitable structural element in the upper area of a first of the ladder elements, while the clamp coupling at the other end is fastened to one of the beams in the lower area of the other ladder element. The strut extends slightly beyond this beam, and the clamp coupling is therefore attached to the side of the strut.
Um nicht mit den erforderlichen Geländerläufen zwischen den Leiterelementen zu kollidieren, die an den aufeinander gerichteten Innenseiten der Holme angebracht sind, wird eine solche diagonale Strebe stets an den Außenseiten der äußeren Holme befestigt. Die Anschlusspunkte der hochbelasteten Strebe sind deshalb stets etwas von dem jeweiligen Holm abgerückt, und die in der Strebe während des Betriebs auftretende Kraft verursacht ein gegebenenfalls recht hohes Torsionsmoment in den Holmen, die ohnehin die Hauptlast des Rahmenelementes tragen müssen. Außerdem wird die Schraubenverbindung der Klemmkupplung stark auf Scherung beansprucht.In order to avoid colliding with the required railings between the ladder elements, which are attached to the inner sides of the stiles facing each other, such a diagonal strut is always attached to the outer sides of the outer stiles. The connection points of the highly loaded strut are therefore always slightly offset from the respective stile, and the force occurring in the strut during operation causes a potentially very high torsional moment in the stiles, which have to bear the main load of the frame element anyway. In addition, the screw connection of the clamp coupling is subjected to high shear stress.
Eine Strebe dieser Art kann auch nicht beliebig verwendet werden; dadurch, dass die Klemm-Kupplung an ihr befestigt ist, ist stets an dem nach dem Anbau unteren Ende der Strebe vorgesehenen möglichen Diagonal-Verläufe der Streben eine gesonderte Ausführung erforderlich.A strut of this type cannot be used arbitrarily; because the clamp coupling is attached to it, a separate design is always required at the possible diagonal runs of the struts provided for after the lower end of the strut has been attached.
Besonders unangenehm ist es auch, dass der Haken an dem von ihm überfangenen Riegel einen reinen Formschluss ausbildet. Dies ist zwar hilfreich für die Endbefestigung der Strebe mittels der Klemm-Kupplung, weil der Haken an dem Riegel verschwenkbar und die Klemm-Kupplung so lange an ihrem zugehörigen Holm in Richtung seiner Längsachse verschiebbar ist, bis eine straffe Einspannung der Strebe gewährleistet ist; beim Betrieb des Gerüstes treten aber Belastungen auf, die zu einem Spiel der Hakenöse an dem überfangenen Riegel und, bei Richtungsumkehr der dieses Spiel verursa-It is also particularly unpleasant that the hook forms a purely positive connection with the bar it covers. This is helpful for the final fastening of the strut using the clamp coupling, because the hook can be pivoted on the bar and the clamp coupling can be moved on its associated beam in the direction of its longitudinal axis until the strut is firmly clamped; however, when the scaffold is in operation, loads occur which lead to play in the hook eye on the bar it covers and, when the direction is reversed, the clamp coupling causing this play.
chenden Kräfte, zu einer ruckartigen Belastung der Strebe und vor allem ihrer Anschlüsse in dem Rahmenelement führen können.corresponding forces can lead to a sudden load on the strut and especially on its connections in the frame element.
Die Erfindung hat sich deshalb die Aufgabe gestellt, eine Strebe der eingangs bezeichneten Art so auszubilden, dass diese Nachteile vermieden werden, ohne dass auf die im übrigen sehr vorteilhafte obere Anbindung der Strebe mittels eines an seinem überfangenen Riegel schwenkbaren Hakens verzichtet werden müsste.The invention therefore has the object of designing a strut of the type described at the outset in such a way that these disadvantages are avoided without having to dispense with the otherwise very advantageous upper connection of the strut by means of a hook pivotable on its overlaid latch.
Erfindungsgemäß wird die Aufgabe dadurch gelöst, dass das Klemmstück so an der Strebe angebracht ist, dass die Lagerschale im wesentlichen mittig zu der Längsachse der Strebe ist. Die Strebe stößt dementsprechend an ihrer mit der Klemm-Kupplung versehenen Seite nach ihrer Anbindung in dem Rahmenelement stumpf an den zugehörigen Holm, so dass sich die Längsachsen der Strebe und dieses Holms ungefähr schneiden. Die Strebe befindet sich mithin in der gleichen Ebene wie die äußeren Holme und steht an dem zugehörigen Gerüst weder innen noch außen vor. Ihre Zug- und Druckkräfte werden ohne erhebliches Drehmoment in die Holme eingeleitet. Die Ausbildung der Strebe ist nunmehr auch nicht mehr abhängig von der Richtung ihrer diagonalen Anbindung in dem Gerüst.According to the invention, the object is achieved in that the clamping piece is attached to the strut in such a way that the bearing shell is essentially centered on the longitudinal axis of the strut. Accordingly, the strut abuts the associated beam on its side provided with the clamping coupling after its connection in the frame element, so that the longitudinal axes of the strut and this beam approximately intersect. The strut is therefore in the same plane as the outer beams and protrudes neither inside nor outside of the associated framework. Its tensile and compressive forces are introduced into the beams without significant torque. The design of the strut is now also no longer dependent on the direction of its diagonal connection in the framework.
Eine ganz besonders vorteilhafte Ausführung der Erfindung erhält man, wenn an dem schwenkbaren Haken eine Hakenöse so ausgebildet ist, dass die Strebe in ihre Gebrauchslage einschwenkbar, der Haken dann aber an dem Riegel oder dergleichen Bauelement verkeilt ist, dessen Querschnitt eine vom Kreis abweichende Außenkontur aufweist. Die Keilwirkung kann dabei ohne besondere Schwierigkeit so bemessen sein, dass die damit verbundenen Reibungskräfte beim Einschwenken der Strebe in ihre endgültige Stellung nur in dem Maße zunehmen, dass eine von Hand an der Strebe aufbringbare Schwenkkraft noch stets eine Verschwenkung der Strebe gegen die Keilwirkung erlaubt. Bei einer solchen Anordnung wird der Formschluss der Haken-Verbindung an dem Riegel oder dergleichen Bauelement noch durch einen Kraftschluss ergänzt, der zu einer stets spielfreien EinspannungA particularly advantageous embodiment of the invention is obtained if a hook eye is designed on the pivoting hook in such a way that the strut can be pivoted into its position of use, but the hook is then wedged onto the bolt or similar component whose cross section has an outer contour that deviates from a circle. The wedge effect can be dimensioned without particular difficulty in such a way that the associated friction forces when the strut is pivoted into its final position only increase to the extent that a pivoting force that can be applied to the strut by hand still allows the strut to pivot against the wedge effect. In such an arrangement, the positive connection of the hook connection to the bolt or similar component is supplemented by a force connection that always results in a clamping that is free of play.
der Strebe in dem Gerüst führt, so dass die oben erläuterten Gefahren nicht auftreten können, bei denen während des Betriebes eine Belastungsumkehr an dem Gerüst zu Kraftstößen an den Holmen führen kann.the strut in the scaffolding so that the dangers described above cannot occur, where a reversal of the load on the scaffolding during operation can lead to force shocks on the beams.
Die Strebe ist auf ganz einfache Weise für ihre Anbindung an einen Riegel oder dergleichen Bauelement geeignet, wenn der Haken an einem flach angestauchten Endstück der Strebe dadurch ausgebildet ist, dass aus dem Endstück die Hakenöse ausgenommenen ist; dabei kann das Endstück mit einer zu dieser etwas längeren, zusammen mit dem Endstück gestauchten Hülse ausgefüttert sein, deren Querschnitt so gewählt ist, dass die Außenkontur der Hülse etwa gleich der Innenkontur des ungestauchten Endstückes ist.The strut is very easily suitable for its connection to a bar or similar structural element if the hook is formed on a flatly compressed end piece of the strut by removing the hook eye from the end piece; the end piece can be lined with a sleeve which is slightly longer than the latter and compressed together with the end piece, the cross-section of which is selected such that the outer contour of the sleeve is approximately the same as the inner contour of the uncompressed end piece.
Durch die Umformung des hakenseitigen Rohrendes und der Hülse in ein als flacher Steg ausgebildetes Endstück und die folgende Ausnehmung der Hakenöse wird das Widerstandsmoment des Rohrendes vermindert; die Unterfütterung des Rohrendes gleicht diesen Verlust an Formsteifigkeit weitgehend oder vollständig aus, so dass die Strebe weiterhin voll belastbar ist, obgleich ihr tragender Querschnitt an dem Rohrende zunächst vermindert worden ist. Die Hülse hat auf die Ausbildung des Endstückes keinen Einfluss, sie wird wie das Rohrende ebenfalls gestaucht und verhält sich einfach wie eine lokale Erhöhung der Wanddicke der Strebe an dem hakenseitigen Rohrende.By forming the hook-side pipe end and the sleeve into an end piece designed as a flat web and the subsequent recess of the hook eye, the section modulus of the pipe end is reduced; the underlay of the pipe end largely or completely compensates for this loss of dimensional rigidity, so that the strut can still bear full loads, although its load-bearing cross-section at the pipe end has initially been reduced. The sleeve has no influence on the design of the end piece; it is also compressed like the pipe end and simply behaves like a local increase in the wall thickness of the strut at the hook-side pipe end.
Um die Verbindung der Hülse mit dem Endstück inniger zu gestalten und eine gegenseitige Verschiebung vor allem in Richtung der Längsachse der Strebe weiter zu verhindern, ist es vorteilhaft, wenn in die Oberflächen des flach angestauchten Endstückes Sicken oder ähnliche Einbuchtungen eingetieft sind, die bis in die Oberfläche der Hülse reichen.In order to make the connection between the sleeve and the end piece more intimate and to further prevent mutual displacement, especially in the direction of the longitudinal axis of the strut, it is advantageous if beads or similar indentations are cut into the surfaces of the flat-stamped end piece, which extend into the surface of the sleeve.
Die Strebe erhält an ihrem hakenseitigen Rohrende ein gefälliges Aussehen, wenn die freie Stirnseite des Endstückes und die äußere Stirnseite der HülseThe strut gets a pleasing appearance at its hook-side tube end when the free face of the end piece and the outer face of the sleeve
» iiii Si *»■·· ♦· ··'» iiii Si *»■·· ♦· ··'
miteinander bündig sind, so dass kaum noch erkennbar ist, dass der Bereich des Hakens innen unterfüttert ist.are flush with each other, so that it is hardly noticeable that the area of the hook is lined on the inside.
Es ist zweckmäßig, wenn die Kontur der Hakenöse und die Außenkontur am Querschnitt des Riegels oder dergleichen Bauelementes so ausgebildet sind, dass beim Verschwenken der Strebe in ihre Gebrauchslage eine selbsthaltende Keilwirkung eintritt; der Keilwinkel zwischen beiden Konturen ist dementsprechend relativ klein. Am einfachsten ist es dabei, wenn der Querschnitt des Riegels oder dergleichen Bauelementes eine etwa quadratische Außenkontur aufweist, deren eine Seite als konvexer Bogen, vorzugsweise als Halbkreisbogen, ausgeführt ist, und wenn weiterhin die Kontur der Hakenöse mindestens zwei Kreisbogen-Segmente aufweist, deren Mittelpunkte auseinanderfallen. Die jeweils dazu erforderlichen Zieh- und Stanzwerkzeuge können dann sehr einfach hergestellt werden, weil komplizierte Kurvenverläufe sowohl an dem Riegel als auch an der Hakenöse vermieden worden sind und gleichwohl erreichbar ist, dass gerade im Bereich der Gebrauchslage der Strebe die gewünschte dosierte Keilwirkung eintritt.It is expedient if the contour of the hook eye and the outer contour on the cross section of the bolt or similar component are designed in such a way that a self-retaining wedge effect occurs when the strut is pivoted into its position of use; the wedge angle between the two contours is accordingly relatively small. The simplest way is for the cross section of the bolt or similar component to have an approximately square outer contour, one side of which is designed as a convex arc, preferably as a semicircular arc, and if the contour of the hook eye also has at least two circular arc segments whose centers diverge. The drawing and punching tools required for this can then be manufactured very easily because complicated curves on both the bolt and the hook eye have been avoided and it is nevertheless possible to ensure that the desired dosed wedge effect occurs precisely in the area of the position of use of the strut.
Eine besonders einfache Ausgestaltung des Knotenpunktes zwischen dem kupplungsseitigen Rohrende der Strebe und dem zugehörigen Holm kann gewährleistet werden, wenn die Klemm-Kupplung so an der Strebe angebracht ist, dass ihre mit der Längsachse des Holms zusammenfallende Klemmachse um einen Winkel gegen die Längsachse der Strebe abgewinkelt ist, der etwa dem Winkel zwischen dem Holm und der Strebe in deren Gebrauchslage gleich ist. Bei einer solchen Anbindung der Klemm-Kupplung an die Strebe ist sichergestellt, dass die Lagerschale und die Klemmschelle großflächig an der Oberfläche des Holms anliegen, die damit einer gleichmäßigen Flächenpressung ausgesetzt und schonend belastet wird, wenn die Strebe in die Gebrauchslage eingeschwenkt und die Klemm-Kupplung geschlossen worden ist. Hierdurch wird gleichermaßen automatisch eine vertikale Ausrichtung der Rohrelemente erreicht, so dass der Gerüstaufbau wesentlich vereinfacht wird.A particularly simple design of the node point between the coupling-side pipe end of the strut and the associated beam can be ensured if the clamp coupling is attached to the strut in such a way that its clamp axis, which coincides with the longitudinal axis of the beam, is angled against the longitudinal axis of the strut by an angle that is approximately the same as the angle between the beam and the strut in its position of use. With such a connection of the clamp coupling to the strut, it is ensured that the bearing shell and the clamp rest on the surface of the beam over a large area, which is thus subjected to uniform surface pressure and gently loaded when the strut has been swiveled into the position of use and the clamp coupling has been closed. This also automatically achieves a vertical alignment of the pipe elements, so that the scaffolding construction is made much easier.
In gleicher Weise wird die Oberfläche des Holms beim Einschwenken geschützt, wenn die Lagerschale in Richtung der Klemmachse ballig ausgebildet ist und/oder die Stirnkanten der Lagerschale eine Fase aufweisen.In the same way, the surface of the bar is protected when pivoting in if the bearing shell is crowned in the direction of the clamping axis and/or the front edges of the bearing shell have a chamfer.
Die Erfindung wird nachstehend an Hand der Zeichnung an einem Ausführungsbeispiel näher erläutert. Es zeigenThe invention is explained in more detail below with reference to an embodiment example and the drawing.
Fig. 1 ein Rahmenelement eines Gerüstes mit einer Strebe nach der Erfindung in räumlicher Darstellung,Fig. 1 a frame element of a scaffold with a strut according to the invention in a spatial representation,
Fig. 2 eine Vorderansicht Fig. 2a und eine Draufsicht Fig. 2b auf das Rahmenelement aus Fig. 1,Fig. 2 a front view Fig. 2a and a plan view Fig. 2b of the frame element from Fig. 1,
Fig. 3 eine erfindungsgemäße Strebe aus Fig. 1, 2 in Vorderansicht; Fig. 3a und Draufsicht Fig. 3b ebenfalls etwas vergrößert und dabei verschwenkt gezeichnet sowie in Fig. 3c die nochmals vergrößerte Kontur der Hakenöse aus Fig. 3a, undFig. 3 shows a strut according to the invention from Fig. 1, 2 in front view; Fig. 3a and top view Fig. 3b also slightly enlarged and drawn pivoted, and in Fig. 3c the even more enlarged contour of the hook eye from Fig. 3a, and
Fig. 4 eine Seitenansicht Fig. 4a auf das Rahmenelement aus Fig. 1, 2 sowie in Fig. 4b eine Einzelheit A aus Fig. 4a und in Fig. 4c einen Schnitt B-B aus Fig. 4a, beides stark vergrößert,Fig. 4 a side view Fig. 4a of the frame element from Fig. 1, 2 and in Fig. 4b a detail A from Fig. 4a and in Fig. 4c a section B-B from Fig. 4a, both greatly enlarged,
sämtlich in schematischer, vereinfachter Darstellung.all in a schematic, simplified representation.
Das in Fig. 1, 2 dargestellte Rahmenelement 1 ist mit einer Vielzahl weiterer Rahmenelemente verbindbar und so zu einem mehr oder weniger umfangreichen Gerüst komplettierbar. Es besteht aus Holmen 2, die durch Riegel 3, 4 paarweise zu senkrechten Leiterelementen 5 miteinander verbunden sind. Die Leiterelemente 5 sind ihrerseits durch eine diagonale Strebe 6 sowie durch in der Zeichnung weggelassene, auf den Riegeln 3, 4 aufliegende Podeste zu einer sehr formsteifen Anordnung verbindbar. Die oberen Riegel 3 sind durch Ecksteifen 7 verstärkt, die mit kurzen Rohrstücken 8 an die Holme 2 anschließen; die Rohrstücke 8 weisen hier einen Querschnitt entsprechend Fig. 4c auf. An den Holmen 2 befinden sich außerdem einander zugewandteThe frame element 1 shown in Fig. 1, 2 can be connected to a large number of other frame elements and thus completed to form a more or less extensive scaffold. It consists of beams 2 which are connected to each other in pairs by crossbars 3, 4 to form vertical ladder elements 5. The ladder elements 5 can in turn be connected to a very rigid arrangement by a diagonal strut 6 and by platforms resting on the crossbars 3, 4 (omitted in the drawing). The upper crossbars 3 are reinforced by corner stiffeners 7 which are connected to the beams 2 by short pipe sections 8; the pipe sections 8 here have a cross section corresponding to Fig. 4c. The beams 2 also have mutually facing
'♦*·♦'♦*·♦
kurze Stutzen 9, an denen z.B. gleichseitig mit der Strebe 6 Geländerläufe 10 befestigt sind; ihre Halterung ist besonders gut in der Fig. 4b zu erkennen.short supports 9, to which, for example, railings 10 are attached on the same side as the strut 6; their mounting can be seen particularly well in Fig. 4b.
In der Fig. 3 ist eine Strebe 6 nach der Erfindung mit zwei unterschiedlich ausgebildeten Rohrenden 11, 12 dargestellt. An ihrem einen Rohrende 11 ist ein Haken 13 ausgebildet. Zu diesem Zweck ist dort ein flaches Endstück 14 quer zu der Längsachse 15 der Strebe 6 angestaucht und bildet einen zu der Längsachse 15 mittigen, flachen Steg 16, aus dem eine Hakenöse 17 ausgenommen ist, so dass der Haken 13 übrigbleibt. Die Hakenöse 17 ist dem Querschnitt der an dem oberen Riegel 3 befindlichen Rohrstück 8 entsprechend ausgeformt, den sie knapp übergreift, auf diese Weise die Strebe 6 in Richtung ihrer Längsachse 15 arretierend.Fig. 3 shows a strut 6 according to the invention with two differently designed tube ends 11, 12. A hook 13 is formed on one of its tube ends 11. For this purpose, a flat end piece 14 is compressed transversely to the longitudinal axis 15 of the strut 6 and forms a flat web 16 central to the longitudinal axis 15, from which a hook eye 17 is cut out so that the hook 13 remains. The hook eye 17 is shaped to match the cross section of the tube piece 8 located on the upper bar 3, which it slightly overlaps, thus locking the strut 6 in the direction of its longitudinal axis 15.
Trotz der Umformung des Rohrendes 11 zu einem flachen Endstück 14 lässt sich gleichwohl eine weiterhin hohe Steifigkeit des Rohrendes 11 erzielen, so dass dieses weiterhin hoch belastbar ist.Despite the deformation of the pipe end 11 into a flat end piece 14, a high rigidity of the pipe end 11 can still be achieved, so that it can still withstand high loads.
Bereits das unverformte Rohrende 11 ist, bevor das Endstück 14 angestaucht wird, mit einer Hülse 20 unterfüttert, die etwas länger ist als das angestauchten Endstück 14 des Rohres, dessen Stirnseite 18 aber mit der Stirnseite 19 des Endstückes 14 bündig ist. Die Außenkontur 21 der Hülse 20 ist der Innenkontur 22 des Rohrendes 11 ungefähr gleich, so dass die Hülse 20 ohne weiteres in das Rohrende 11 pressbar ist; bestehen die Strebe 6 und die Hülse 20 wie in der Regel aus zylindrischen Rohren, dann wird die Anordnung am besten als leichte Presspassung ausgebildet, welche der Einführung der Hülse 20 nicht allzuviel Widerstand entgegensetzt, diese aber gleichzeitig in der Strebe 6 axial orientiert.Before the end piece 14 is upset, the undeformed pipe end 11 is already lined with a sleeve 20 which is slightly longer than the upset end piece 14 of the pipe, but whose front face 18 is flush with the front face 19 of the end piece 14. The outer contour 21 of the sleeve 20 is approximately the same as the inner contour 22 of the pipe end 11, so that the sleeve 20 can be easily pressed into the pipe end 11; if the strut 6 and the sleeve 20 consist of cylindrical tubes, as is usually the case, then the arrangement is best designed as a slight press fit, which does not offer too much resistance to the insertion of the sleeve 20, but at the same time orientates it axially in the strut 6.
Nachdem das Rohrende 11 zusammen mit der Hülse 20 so gestaucht ist, dass das Endstück 14 angeformt und der Steg 16 ausgebildet ist, ist die gleicherweise verformte Hülse 20 axial in Richtung der Längsachse 15 bereits festgelegt, wie die Fig. 3 zeigt: eine durch die Verformung ausgebildete erste Einziehung 23 entsprechend Fig. 3a blockiert eine Verschiebung der HülseAfter the pipe end 11 is compressed together with the sleeve 20 so that the end piece 14 is formed and the web 16 is formed, the sleeve 20, which has been deformed in the same way, is already fixed axially in the direction of the longitudinal axis 15, as shown in Fig. 3: a first recess 23 formed by the deformation according to Fig. 3a blocks a displacement of the sleeve
• V · «Φ · ·• V · «Φ · ·
20 in Richtung auf das zweite Rohrende 12, eine zweite Einziehung 24 entsprechend Fig. 3b die Verschiebung in der Gegenrichtung. Die Arretierung wird durch Sicken 25 noch verbessert, die so eingebracht werden können, dass sie das Endstück 14 des Rohrendes 11 so verformen, dass sie bis an die Hülse 20 reichen.20 in the direction of the second pipe end 12, a second recess 24 according to Fig. 3b the displacement in the opposite direction. The locking is further improved by beads 25, which can be introduced in such a way that they deform the end piece 14 of the pipe end 11 so that they reach as far as the sleeve 20.
Aus dem auf diese Weise ausgebildeten hoch formstabilen Steg 16 ist die Hakenöse 17 wie oben bereits angedeutet in geeigneter Weise herausgeschnitten, so dass der Haken 13 verbleibt.As already indicated above, the hook eyelet 17 is suitably cut out of the highly dimensionally stable web 16 formed in this way, so that the hook 13 remains.
An dem anderen Rohrende 12 befindet sich eine Klemm-Kupplung 26, mit deren Hilfe die Strebe 6 an einem Holm 2 gehaltert ist, wie das in Fig. 1, 2 gezeigt ist. Die Klemm-Kupplung 26 besteht aus einem an dem Rohrende 12 angebrachten Klemmstück 27 und einer Klemmschelle 28. An dem Klemmstück 27 ist einerseits ein Schwenklager 29 ausgebildet, in dem die Klemmschelle 28 schwenk- und unverlierbar gehaltert ist, und andererseits befindet sich an dem Klemmstück 27 eine schwenkbare Verschlussschraube 30, die in eine Gabel 31 der Klemmschelle 28 einschwenkbar ist und diese an das Klemmstück 27 anschließt, wenn der zugehörige Holm 2 überfangen und die Strebe 6 in ihre Gebrauchslage gebracht worden ist. An dem Klemmstück 27 befindet sich eine Lagerschale 32, die ein im Wesentlichen kreiszylindrisches Segment um eine Klemmachse 33 ausbildet, die bei geschlossener Klemm-Kupplung 26 mit der Längsachse 34 des Holms 2 etwa zusammenfällt. Die Lagerschale 32 kann, in Richtung der Klemmachse 33, etwas ballig ausgebildet oder hilfsweise mit abgefasten Stirnkanten 42 versehen sein.At the other end of the pipe 12 there is a clamp coupling 26, with the aid of which the strut 6 is held on a beam 2, as shown in Fig. 1, 2. The clamp coupling 26 consists of a clamping piece 27 attached to the end of the pipe 12 and a clamping clip 28. On the one hand, a pivot bearing 29 is formed on the clamping piece 27, in which the clamping clip 28 is held pivotably and captively, and on the other hand there is a pivotable locking screw 30 on the clamping piece 27, which can be pivoted into a fork 31 of the clamping clip 28 and connects this to the clamping piece 27 when the associated beam 2 has been overhung and the strut 6 has been brought into its position of use. On the clamping piece 27 there is a bearing shell 32 which forms an essentially circular cylindrical segment around a clamping axis 33 which, when the clamping coupling 26 is closed, approximately coincides with the longitudinal axis 34 of the beam 2. The bearing shell 32 can be slightly spherical in the direction of the clamping axis 33 or alternatively be provided with chamfered front edges 42.
Die Stirnseite 35 des Rohrendes 12 ist zur Längsachse 15 schräg gestellt um einen Winkel ß, so dass diesen Winkel auch die Klemmachse 33 mit der Längsachse 15 einschließt und der dem Winkel ß' zwischen der Strebe 6 und dem Holm 2 in der Gebrauchslage der Strebe 6 gleich ist.The front side 35 of the pipe end 12 is inclined to the longitudinal axis 15 by an angle ß, so that this angle is also included by the clamping axis 33 with the longitudinal axis 15 and is equal to the angle ß' between the strut 6 and the beam 2 in the position of use of the strut 6.
In der Fig. 4c ist zu erkennen, wie der Haken 13 den Riegel 3, hier an seinem Rohrstück 8 überfängt, so dass eine form- und kraftschlüssige VerbindungIn Fig. 4c it can be seen how the hook 13 overlaps the bolt 3, here at its pipe section 8, so that a positive and force-locking connection
hergestellt ist, wenn die Strebe 6 in ihre Gebrauchslage der Fig. 1, 2 eingeschwenkt wurde. Das Rohrstück 8 des Riegels 3 hat eine etwa quadratische Außenkontur 36; ihre obere Seite 37 ist aber abweichend als konvexer Halbkreisbogen 41, ausgebildet.is produced when the strut 6 has been pivoted into its position of use in Fig. 1, 2. The tubular piece 8 of the bolt 3 has an approximately square outer contour 36; its upper side 37, however, is designed as a convex semicircular arch 41.
Komplementär zu diesem Querschnitt weist die Kontur 38 der Hakenöse 17 mindestens zwei ineinander übergehende Kreisbogen-Segmente 39 auf, deren Mittelpunkte entsprechend Fig. 3c auseinanderfallen. Sie sind so bemessen, dass ihre Krümmungsradien r1 und r2 nur wenig größer sind als der Radius des Halbkreisbogens 41 und dass die Kontur 38 an einer unteren Kante 40 des Rohrstückes 8 anliegt und dort verkeilbar ist, wenn die Strebe 6 in ihre Gebrauchslage eingeschwenkt ist, den gewünschten Formschluss ausbildend. Dabei ist zu beachten, dass ein gewisser Abstand a der Strebe 6 von den Geländerläufen 10 eingehalten wird, wie das in der Fig. 4b gezeigt ist. Dies kann in einfacher Weise dadurch erfolgen, dass die Geländerläufe 10 etwas von den Holmen 2 nach innen abgerückt an den zugehörigen, an den Holmen 2 ansetzenden Stutzen 9 befestigt werden. Ein Abstand a von 2 mm hat sich als ausreichend erwiesen, um eine Kollision sicher zu vermeiden. Complementary to this cross-section, the contour 38 of the hook eye 17 has at least two circular arc segments 39 which merge into one another and whose centers diverge as shown in Fig. 3c. They are dimensioned such that their radii of curvature r1 and r2 are only slightly larger than the radius of the semicircular arc 41 and that the contour 38 rests against a lower edge 40 of the pipe section 8 and can be wedged there when the strut 6 is pivoted into its position of use, forming the desired positive connection. It should be noted that a certain distance a between the strut 6 and the railings 10 is maintained, as shown in Fig. 4b. This can be done in a simple manner by attaching the railings 10 slightly inwards from the beams 2 to the associated supports 9 which are attached to the beams 2. A distance a of 2 mm has proven to be sufficient to safely avoid a collision.
1010
Claims (11)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE20005629U DE20005629U1 (en) | 2000-03-25 | 2000-03-25 | strut |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE20005629U DE20005629U1 (en) | 2000-03-25 | 2000-03-25 | strut |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE20005629U1 true DE20005629U1 (en) | 2000-06-29 |
Family
ID=7939391
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE20005629U Expired - Lifetime DE20005629U1 (en) | 2000-03-25 | 2000-03-25 | strut |
Country Status (1)
| Country | Link |
|---|---|
| DE (1) | DE20005629U1 (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2002066767A1 (en) * | 2001-02-22 | 2002-08-29 | Wilhelm Layher Vermögensverwaltungs-Gmbh | Connecting construction for components of a system frame, coupling unit and framework |
| GB2421538A (en) * | 2004-12-23 | 2006-06-28 | Safestand Ltd | Brace for builders trestles |
| FR2946374A1 (en) * | 2009-06-03 | 2010-12-10 | Duarib | BASE BODY FOR ROLLING SCAFFOLDING SCRAP AND FRAMEWORK INTEGRATING SUCH BODY |
| EP2333200A1 (en) * | 2009-11-25 | 2011-06-15 | Harsco Infrastructure Services GmbH | Connection element and telescopic vertical pipe with same |
| EP2730718A1 (en) * | 2009-11-20 | 2014-05-14 | Harsco Infrastructure B.V. | Scaffolding |
| US8794381B2 (en) | 2004-06-18 | 2014-08-05 | Safestand Limited | Fittings for builders' trestles |
| EP2615224A3 (en) * | 2012-01-13 | 2014-10-29 | XSPlatforms B.V. | Scaffold |
| US20190145115A1 (en) * | 2017-11-16 | 2019-05-16 | Titan Formwork Systems Llc | System for lateral support of shoring posts |
| WO2021084412A1 (en) * | 2019-10-31 | 2021-05-06 | Brand Energy Holdings B.V. | Scaffolding and intermediate element therefor |
-
2000
- 2000-03-25 DE DE20005629U patent/DE20005629U1/en not_active Expired - Lifetime
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2002066767A1 (en) * | 2001-02-22 | 2002-08-29 | Wilhelm Layher Vermögensverwaltungs-Gmbh | Connecting construction for components of a system frame, coupling unit and framework |
| US7413365B2 (en) | 2001-02-22 | 2008-08-19 | Wilhelm Layher Vermogensverwaltungs Gmbh | Connecting construction for components of a system frame, coupling unit and framework |
| US8794381B2 (en) | 2004-06-18 | 2014-08-05 | Safestand Limited | Fittings for builders' trestles |
| GB2421538A (en) * | 2004-12-23 | 2006-06-28 | Safestand Ltd | Brace for builders trestles |
| GB2421538B (en) * | 2004-12-23 | 2006-11-22 | Safestand Ltd | Brace for builders' trestles |
| FR2946374A1 (en) * | 2009-06-03 | 2010-12-10 | Duarib | BASE BODY FOR ROLLING SCAFFOLDING SCRAP AND FRAMEWORK INTEGRATING SUCH BODY |
| EP2730718A1 (en) * | 2009-11-20 | 2014-05-14 | Harsco Infrastructure B.V. | Scaffolding |
| EP2333200A1 (en) * | 2009-11-25 | 2011-06-15 | Harsco Infrastructure Services GmbH | Connection element and telescopic vertical pipe with same |
| EP2615224A3 (en) * | 2012-01-13 | 2014-10-29 | XSPlatforms B.V. | Scaffold |
| US20190145115A1 (en) * | 2017-11-16 | 2019-05-16 | Titan Formwork Systems Llc | System for lateral support of shoring posts |
| US10570633B2 (en) * | 2017-11-16 | 2020-02-25 | Titan Formwork Systems Llc | System for lateral support of shoring posts |
| WO2021084412A1 (en) * | 2019-10-31 | 2021-05-06 | Brand Energy Holdings B.V. | Scaffolding and intermediate element therefor |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP2132388B1 (en) | Coating unit having lift-off protection and method for securing a coating unit against lift-off and method for releasing a coating unit secured against lift-off | |
| DE69201864T2 (en) | METHOD FOR CONNECTING COMPONENTS, PROFILE AND UNIT TO A VARIETY OF PROFILES. | |
| DE2826838B2 (en) | Connecting element for scaffolding, racks or the like. | |
| EP1983129A2 (en) | Support for a space framework and connection device for a railing device and method for fixing a railing device to a support | |
| DE9217419U1 (en) | Step plate for ladders | |
| DE20005627U1 (en) | Pipe element | |
| DE20005629U1 (en) | strut | |
| DE19612867A1 (en) | Scaffolding floor made of longitudinal profiled parts | |
| DE4239805C2 (en) | Bracing system | |
| DE19511847A1 (en) | Support structure arrangement for scaffolding | |
| DE102017216892A1 (en) | Scaffolding element for connection to a disk-shaped connection plate and scaffolding part with such a scaffolding element | |
| DE202009008127U1 (en) | Truss modular scaffold system | |
| DE2727448A1 (en) | PIPE FRAMEWORK | |
| DE29700962U1 (en) | Scaffolding element | |
| DE69822386T2 (en) | Ladder set for fire ladders | |
| WO2005052283A1 (en) | Dismountable scaffolding | |
| EP0457034A1 (en) | Folding laundry drying rack | |
| DE19703558B4 (en) | Bar equipment for a scaffolding system | |
| EP0736648B1 (en) | Scaffold | |
| DE2912005C2 (en) | Device for connecting formwork panels arranged in one plane | |
| DE4440179C2 (en) | Universally usable extruded profile | |
| DE4435417B4 (en) | Tilting pin for a scaffolding | |
| DE2940030C2 (en) | Junction point for detachable rigid corner connections of bars | |
| DE10111279A1 (en) | scaffold tube | |
| DE8007739U1 (en) | Trailer to be attached to a vehicle |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R207 | Utility model specification |
Effective date: 20000803 |
|
| R150 | Utility model maintained after payment of first maintenance fee after three years |
Effective date: 20030604 |
|
| R157 | Lapse of ip right after 6 years |
Effective date: 20061003 |