[go: up one dir, main page]

DE19652396C1 - Ceiling production unit with machine frame and continuous track chassis - Google Patents

Ceiling production unit with machine frame and continuous track chassis

Info

Publication number
DE19652396C1
DE19652396C1 DE19652396A DE19652396A DE19652396C1 DE 19652396 C1 DE19652396 C1 DE 19652396C1 DE 19652396 A DE19652396 A DE 19652396A DE 19652396 A DE19652396 A DE 19652396A DE 19652396 C1 DE19652396 C1 DE 19652396C1
Authority
DE
Germany
Prior art keywords
machine frame
area
paver
conveyor
crawler tracks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE19652396A
Other languages
German (de)
Inventor
Dirk Heims
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ABG Allgemeine Baumaschinen GmbH
Original Assignee
ABG Allgemeine Baumaschinen GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABG Allgemeine Baumaschinen GmbH filed Critical ABG Allgemeine Baumaschinen GmbH
Priority to DE19652396A priority Critical patent/DE19652396C1/en
Priority to ES97121397T priority patent/ES2206645T3/en
Priority to EP97121397A priority patent/EP0849398B1/en
Priority to DE59710688T priority patent/DE59710688D1/en
Priority to JP9343325A priority patent/JP3042679B2/en
Priority to RU97120968/03A priority patent/RU2193619C2/en
Priority to CNB971262160A priority patent/CN1174145C/en
Application granted granted Critical
Publication of DE19652396C1 publication Critical patent/DE19652396C1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/48Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Machines (AREA)

Abstract

Between the front and rear sides of the machine frame (1) is located a conveyor for transporting structural material from the bucket (3) through a conveyor shafts, over which built-on structures are located, to the area of the distributor worm (6). A built-in board (7) is provided via tractive arms (8) on the machine frame (1) linked behind the area of the distributor worm (7) for floating installation of the structural material. The continuous track chassis (2) in its front area is located rotatably on the machine frame (1) and is height-adjustable in its rear area in relation to the machine frame along a vertical guide (15) located on the machine frame.

Description

Die Erfindung betrifft einen Deckenfertiger nach dem Oberbe­ griff des Anspruchs 1.The invention relates to a paver according to the Oberbe handle of claim 1.

Deckenfertiger (DE-OS 41 01 417), die Einbaubohlen zum schwimmenden Einbau aufweisen, werden üblicherweise für eine Schichtdicke bis etwa 30 cm, ge­ messen hinter der Einbaubohle des Deckenfertigers, ausgelegt. Nur in seltenen Fällen wird bei der Grundauslegung des Deckenfertigers eine größere Schichtdicke vorgesehen. Der Grund hierfür besteht darin, daß für eine größere Schichtdicke das Förderband des Deckenfertigers zumin­ dest im hinteren Maschinenbereich und die Verteilerschnecke sowie der Förderschacht und die Bohlentransportzylinder nebst sämtlichen Aufbau­ ten, die oberhalb der Einbaubohle liegen, höher angeordnet werden müs­ sen. Da Deckenfertiger zur jeweiligen Baustelle mittels Tieflader trans­ portiert werden, wobei gewöhnlich auch Brückenunterführungen zu passie­ ren sind, ist die Transporthöhe, gewöhnlich bestimmt durch Wetterdach- oder Kabinenaufbauten, entsprechend limitiert, um die Transportierbar­ keit zu gewährleisten.Paving machine (DE-OS 41 01 417), the screeds for floating paving have, are usually for a layer thickness up to about 30 cm, ge measure behind the screed of the paver, laid out. Only in In rare cases, the basic design of the paver is a greater layer thickness provided. The reason for this is that for a larger layer thickness, the conveyor belt of the paver finisher least in the rear area of the machine and the auger and the Conveyor shaft and the screed transport cylinder along with all of the superstructure ten above the screed must be placed higher sen. As pavers for the respective construction site using low loader trans ported, usually also bridge underpasses to passie transport height, usually determined by weather roofs  or cabin superstructures, limited accordingly to make them transportable guarantee.

Für Anwendungsfälle mit außergewöhnlichen Schichtdicken (z. B. bis 50 cm) werden daher in der Regel die vorgenannten Elemente nur für diesen Sonderfall insgesamt nach oben versetzt, um sie nach Erledigung der Baumaßnahme wieder rückgängig zu machen. Bereits diese Maßnahmen sind mit einem erheblichen Montageaufwand verbunden und führen zudem da­ zu, daß die Querstege des Untertrums des Förderbandes Material vom Ver­ teilerschneckenraum wieder nach vorne unter den Fertiger fördern, da der Freiraum unterhalb des Untertrums des Förderers in seiner Höhe nicht entsprechend vergrößert ist. Dies führt zu entsprechenden Störungen, die sogar zu einem Einbaustillstand führen können.For applications with exceptional layer thicknesses (e.g. up to 50 cm), the above-mentioned elements are therefore usually only for this special case altogether shifted to them after settlement to undo the construction work. Already these measures are associated with a considerable assembly effort and also lead there to that the crossbars of the lower run of the conveyor belt material from Ver Feed the auger section forward again under the paver because the There is no free space below the lower run of the conveyor is enlarged accordingly. This leads to corresponding disturbances can even lead to installation downtime.

Der Erfindung liegt die Aufgabe zugrunde, einen Deckenfertiger nach dem Oberbegriff des Anspruchs 1 zu schaffen, der ohne großen Umrüstaufwand auf einen erhöhten Schichtdickeneinbau umstellbar ist, ohne daß die Ge­ fahr besteht, daß Störungen durch nach vorne gefördertes Material auf­ treten.The invention has for its object a paver according to the Generic preamble of claim 1 to create the without major retooling is convertible to an increased layer thickness without the Ge There is a disturbance due to material being conveyed forward to step.

Diese Aufgabe wird entsprechend dem kennzeichnenden Teil des Anspruchs 1 gelöst.This task is performed according to the characteristic part of the Claim 1 solved.

Hierbei sind die Raupenfahrwerke des Deckenfertigers in ihrem vorderen Bereich drehbar am Maschinenrahmen gelagert und im hinteren Be­ reich in bezug auf den Maschinenrahmen höhenverstellbar, so daß der hin­ tere Bereich des Förderers angehoben wird. Die Verstellung kann äußerst schnell erfolgen und ebenso schnell rückgängig gemacht werden.Here the crawler tracks of the paver finisher are in theirs front area rotatably mounted on the machine frame and in the rear Richly adjustable in height with respect to the machine frame, so that the back tere area of the conveyor is raised. The adjustment can be extreme done quickly and reversed just as quickly.

Weitere Ausgestaltungen der Erfindung sind der nachfolgenden Beschreibung und den Unteransprüchen zu entnehmen.Further refinements of the invention are as follows Description and the dependent claims.

Die Erfindung wird nachstehend anhand eines in der beigefügten Abbildung schematisiert dargestellten Ausführungsbeispiels näher erläu­ tert.The invention is illustrated below in the attached Figure schematically illustrated embodiment explained tert.

Fig. 1 zeigt einen Deckenfertiger in Seitenansicht beim Einbau einer Schicht geringer Dicke. Fig. 1 shows a paver in side view when installing a layer of small thickness.

Fig. 2 zeigt einen Deckenfertiger in Seitenansicht beim Einbau einer Schicht großer Dicke. Fig. 2 shows a paver in side view when installing a layer of great thickness.

Der dargestellte Deckenfertiger umfaßt ein Maschinenrahmen 1 mit seitlichen Raupenfahrwerken 2. Frontseitig ist ein Kübel 3 mit seit­ lich auseinanderklappbaren Seitenwandteilen 4 vorgesehen, die an ent­ sprechenden, darunter befindlichen, feststehenden Seitenwandteilen 5 an­ gelenkt sind, um auseinandergeklappt einen Einfülltrichter für einzubau­ endes Material zu bilden. Ein umlaufender, gewöhnlich mit Querstegen versehener Förderer (nicht dargestellt) bildet den Boden des Kübels 3 und fördert eingefülltes Material zur Rückseite des Maschinenrahmens 1 in den Bereich einer dort befindlichen Verteilerschnecke 6, die das Ma­ terial über die Einbaubreite verteilt. Das so verteilte Material wird mittels einer Einbaubohle 7, die gegebenenfalls zum Verbreitern seitlich ausfahrbar und/oder anstückelbar ist, unter Verdichten und Glätten eingebaut. Die auf dem einzubauenden Material schwimmende Einbaubohle 7 ist über Zugarme 8 am Maschinenrahmen 1 angelenkt und über Stellzylinder 9 in bezug auf eine gewünschte Einbauhöhe des einzubauenden Materials höhenverstellbar. Die Einbaubohle 7 kann Stampf- und/oder Vibrationsag­ gregate 10, 11 umfassen. Die Einbaubohle 7 ist über einen Bohlentrans­ portzylinder 12 in eine zum Transport des Deckenfertigers geeignete Stellung anhebbar. Über dem Förderschacht des Förderers sind Aufbauten mit einem Fahrerstand 13, einem Antriebsmotor und dergleichen angeord­ net.The paver shown comprises a machine frame 1 with lateral crawler tracks 2 . At the front, a bucket 3 is provided with side wall parts 4 that can be opened apart, which are directed to corresponding, underneath, fixed side wall parts 5 to unfold to form a funnel for material to be installed. A circumferential, usually provided with crossbars conveyor (not shown) forms the bottom of the bucket 3 and conveys filled material to the rear of the machine frame 1 in the area of a screw auger 6 located there, which distributes the material over the installation width. The material distributed in this way is installed by compacting and smoothing by means of a screed 7 , which can optionally be extended laterally and / or can be cut to pieces. The screed 7 floating on the material to be installed is articulated on the machine frame 1 via tension arms 8 and height-adjustable by means of actuating cylinders 9 in relation to a desired installation height of the material to be installed. The screed 7 can include ramming and / or vibration units 10 , 11 . The screed 7 can be raised via a screed port cylinder 12 into a position suitable for transporting the paver finisher. Above the conveyor shaft of the conveyor superstructures with a driver's platform 13 , a drive motor and the like are net angeord.

Die Raupenfahrwerke 2 sind im Bereich ihres vorderen Drittels um eine Achse 14 drehbar am Maschinenrahmen 1 gelagert. In ihrem hinte­ ren Bereich sind die Raupenfahrwerke 2 gegenüber einer vertikalen Gleit­ führung 15, die fest mit dem Maschinenrahmen 1 verbunden ist, vertikal verstellbar. Für die Ausgangsstellung, aus der der Maschinenrahmen 1 hinten gegenüber den Raupenfahrwerken 2 anhebbar ist, kann ein Anschlag vorgesehen sein.The crawler tracks 2 are mounted on the machine frame 1 in the area of their front third about an axis 14 . In their rear area, the crawler tracks 2 are vertically adjustable relative to a vertical sliding guide 15 , which is firmly connected to the machine frame 1 . A stop can be provided for the starting position from which the machine frame 1 can be raised at the rear relative to the crawler tracks 2 .

Die vertikale Verstellung der Raupenfahrwerke 2 gegenüber dem Maschinenrahmen 1 kann beispielsweise mittels Schraubspindeln vorgenom­ men werden. Jedoch werden entsprechende hydraulische Stellzylinder 16, jeweils einer pro Raupenfahrwerk 2, bevorzugt, die beispielsweise über den bei einem Deckenfertiger ohnehin vorhandenen Hydraulikkreislauf mit­ tels eines Vier-/Dreiwegeventils elektrohydraulisch gesteuert und in der jeweils gewünschten Position über ein entsperrbares Zwillingsrückschlag­ ventil gehalten werden können.The vertical adjustment of the crawler tracks 2 relative to the machine frame 1 can, for example, be carried out by means of screw spindles. However, corresponding hydraulic actuating cylinders 16 , one for each crawler track 2 , are preferred, which can be controlled electrohydraulically, for example, via the hydraulic circuit which is in any case provided by a paver finisher by means of a four / three-way valve and can be held in the desired position via an unlockable twin non-return valve.

Hierdurch läßt sich in äußerst kurzer Zeit der hintere Teil des Deckenfertigers einschließlich der Einbaubohle 7 in eine gegenüber dem Fahrbahngrund 17 erhöhte Position bringen. Dann befinden sich sämt­ liche Aggregate wie Einbaubohle 7, Förderer, Verteilerschnecke 6, Boh­ lentransportzylinder 12 und die Aufbauten oberhalb der Einbaubohle 7 in eine für eine große Schichtdicke der einzubauenden Decke vorteilhaften Lage. Durch die höhere Position des Bohlentransportzylinders 12 kann die Einbaubohle 7 somit entsprechend große Schichtdicken einbauen.As a result, the rear part of the paver including the screed 7 can be brought into an elevated position in relation to the ground 17 in an extremely short time. Then there are all aggregates such as screed 7 , conveyor, auger 6 , Boh oil transport cylinder 12 and the superstructure above the screed 7 in an advantageous position for a large layer thickness of the ceiling to be installed. Due to the higher position of the screed transport cylinder 12 , the screed 7 can thus install correspondingly large layer thicknesses.

Durch den Hub der Stellzylinder 16 wird allerdings die minima­ le Höhe einer einbaubaren Schichtdicke im Verhältnis zur maximalen limi­ tiert. Wenn nach einer Schicht mit entsprechend großer Schichtdicke wie­ derum Normalbeläge wie ca. 4 cm dicke Verschleißbeläge oder ca. 8 cm dicke Binderschichten eingebaut werden sollen, sind die Raupenfahrwerke 2 und damit der Maschinenrahmen 1 über die Stellzylinder 16 wieder ent­ sprechend abzusenken. Allerdings kann dies ebenfalls sehr schnell vorge­ nommen werden, so daß keine langwierigen Umrüstarbeiten entstehen.The stroke of the actuating cylinder 16 , however, limits the minimum height of an installable layer thickness in relation to the maximum. If, after a layer with a correspondingly large layer thickness such as normal coverings such as approx. 4 cm thick wear coverings or approx. 8 cm thick binder layers are to be installed, the crawler tracks 2 and thus the machine frame 1 must be lowered again accordingly via the actuating cylinder 16 . However, this can also be done very quickly, so that no lengthy retrofitting work occurs.

Claims (3)

1. Deckenfertiger mit einem Maschinenrahmen (1) und Raupen­ fahrwerken (2), wobei der Maschinenrahmen (1) vorderseitig einen Kübel (3) und rückseitig eine Verteilerschnecke (6) aufweist, zwischen denen ein Förderer zum Transportieren von einzubauendem Material aus dem Kübel (3) durch einen Förderschacht, über dem sich Aufbauten befinden, in den Bereich der Verteilerschnecke (6) angeordnet ist, während eine Einbau­ bohle (7) über Zugarme (8) am Maschinenrahmen (1) angelenkt hinter dem Bereich der Verteilerschnecke (6) zum schwimmenden Einbau des einzubau­ enden Materials vorgesehen ist, dadurch gekennzeichnet, daß die Raupenfahrwerke (2) in ihrem vorderen Bereich drehbar am Maschinen­ rahmen (1) gelagert und in ihrem hinteren Bereich in bezug auf den Ma­ schinenrahmen (1) längs einer am Maschinenrahmen (1) befindlichen Verti­ kalführung (15) höhenverstellbar angeordnet sind. 1. paver with a machine frame ( 1 ) and crawler tracks ( 2 ), the machine frame ( 1 ) having a bucket ( 3 ) on the front and a screw conveyor ( 6 ) on the back, between which a conveyor for transporting material to be installed from the bucket ( 3 ) through a conveyor shaft, above which there are superstructures, is arranged in the area of the auger ( 6 ), while an installation screed ( 7 ) is articulated via draw arms ( 8 ) on the machine frame ( 1 ) behind the area of the auger ( 6 ) Floating installation of the material to be installed is provided, characterized in that the crawler tracks ( 2 ) are rotatably mounted on the machine frame ( 1 ) in their front area and in their rear area with respect to the machine frame ( 1 ) along one on the machine frame ( 1 ) located vertical guide ( 15 ) are arranged adjustable in height. 2. Deckenfertiger nach Anspruch 1, dadurch gekennzeichnet, daß die Raupenfahrwerke (2) über hydraulische Stellzylinder (16) höhenver­ stellbar sind.2. paver according to claim 1, characterized in that the crawler tracks ( 2 ) via hydraulic actuating cylinders ( 16 ) are height adjustable. 3. Deckenfertiger nach Anspruch 2, dadurch gekennzeichnet, daß die Stellzylinder (16) mittels eines Vier-/Dreiwegeventils elektrohy­ draulisch mit einem Hydraulikkreislauf des Deckenfertigers gekoppelt und betätigbar sind, wobei sie in der jeweils gewünschten Position mittels eines entsperrbaren Zwillingsrückschlagventils haltbar sind.3. paver according to claim 2, characterized in that the actuating cylinder ( 16 ) by means of a four / three-way valve electrohy draulically coupled and actuatable with a hydraulic circuit of the paver, wherein they are stable in the desired position by means of an unlockable twin check valve.
DE19652396A 1996-12-17 1996-12-17 Ceiling production unit with machine frame and continuous track chassis Expired - Lifetime DE19652396C1 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
DE19652396A DE19652396C1 (en) 1996-12-17 1996-12-17 Ceiling production unit with machine frame and continuous track chassis
ES97121397T ES2206645T3 (en) 1996-12-17 1997-12-05 ROAD SIGNATURE FINISHING MACHINE.
EP97121397A EP0849398B1 (en) 1996-12-17 1997-12-05 Paver
DE59710688T DE59710688D1 (en) 1996-12-17 1997-12-05 pavers
JP9343325A JP3042679B2 (en) 1996-12-17 1997-12-12 Road finisher
RU97120968/03A RU2193619C2 (en) 1996-12-17 1997-12-16 Road pavement placing machine
CNB971262160A CN1174145C (en) 1996-12-17 1997-12-17 Road paving machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19652396A DE19652396C1 (en) 1996-12-17 1996-12-17 Ceiling production unit with machine frame and continuous track chassis

Publications (1)

Publication Number Publication Date
DE19652396C1 true DE19652396C1 (en) 1998-01-29

Family

ID=7814934

Family Applications (2)

Application Number Title Priority Date Filing Date
DE19652396A Expired - Lifetime DE19652396C1 (en) 1996-12-17 1996-12-17 Ceiling production unit with machine frame and continuous track chassis
DE59710688T Expired - Lifetime DE59710688D1 (en) 1996-12-17 1997-12-05 pavers

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE59710688T Expired - Lifetime DE59710688D1 (en) 1996-12-17 1997-12-05 pavers

Country Status (6)

Country Link
EP (1) EP0849398B1 (en)
JP (1) JP3042679B2 (en)
CN (1) CN1174145C (en)
DE (2) DE19652396C1 (en)
ES (1) ES2206645T3 (en)
RU (1) RU2193619C2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019143464A (en) * 2017-12-13 2019-08-29 ヨゼフ フェゲーレ アーゲー Road finisher with rotary type material deflection plate
CN110438869A (en) * 2018-05-02 2019-11-12 卡特彼勒路面机械公司 Leveling part towing point component for paver

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002264555A (en) 2001-03-12 2002-09-18 Fuji Photo Film Co Ltd Original plate for direct drawing type lithographic printing plate
RU2232842C1 (en) * 2002-12-31 2004-07-20 Открытое акционерное общество "Гипронииавиапром" Apparatus for high-speed construction of rigid aerodrome coatings
CN101974879B (en) * 2010-11-02 2012-05-30 三一重工股份有限公司 Automatic positioning device in lifting of large arm of spreader and spreader
PL3498915T3 (en) * 2017-12-13 2021-05-17 Joseph Vögele AG Road finisher with raisable chassis
PL3498914T3 (en) 2017-12-13 2024-09-30 Joseph Vögele AG Adjustment of the levelling cylinder in a road finisher
EP3498913B1 (en) 2017-12-13 2020-05-13 Joseph Vögele AG Road finisher with raisable chassis

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4101417A1 (en) * 1990-04-06 1991-10-10 Joseph Voegele Ag Automotive road-surfacing machine - is driven by continuous track and incorporates bunker from which material is conveyed to distributor and sprayer for bitumen emulsion

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2593200B1 (en) * 1986-01-20 1990-03-16 Blandin Yves MULTI-PURPOSE FINISHER
US4801218A (en) * 1987-01-20 1989-01-31 Cedarapids, Inc. Three-point suspension for bituminous pavers
SU1502680A1 (en) * 1987-06-15 1989-08-23 Минское научно-производственное объединение "Дормаш" Crawler asphalt-laying machine
EP0535273A1 (en) * 1991-10-03 1993-04-07 DOMENIGHETTI, Domenico Road paver with multiple, parallel running locomotion means

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4101417A1 (en) * 1990-04-06 1991-10-10 Joseph Voegele Ag Automotive road-surfacing machine - is driven by continuous track and incorporates bunker from which material is conveyed to distributor and sprayer for bitumen emulsion

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019143464A (en) * 2017-12-13 2019-08-29 ヨゼフ フェゲーレ アーゲー Road finisher with rotary type material deflection plate
CN110438869A (en) * 2018-05-02 2019-11-12 卡特彼勒路面机械公司 Leveling part towing point component for paver

Also Published As

Publication number Publication date
DE59710688D1 (en) 2003-10-09
ES2206645T3 (en) 2004-05-16
RU2193619C2 (en) 2002-11-27
CN1185504A (en) 1998-06-24
JP3042679B2 (en) 2000-05-15
EP0849398B1 (en) 2003-09-03
EP0849398A1 (en) 1998-06-24
JPH10183527A (en) 1998-07-14
CN1174145C (en) 2004-11-03

Similar Documents

Publication Publication Date Title
EP2455543B1 (en) Slipform machine
EP0115567B1 (en) Tamping beam for a road finisher
DE2739452A1 (en) DITCH LINING TOOL
DE19709131A1 (en) Road finisher or paving machine
DE19652396C1 (en) Ceiling production unit with machine frame and continuous track chassis
EP1582629B1 (en) Paver and method for simultaneously applying multiple layers of material
EP3498915B1 (en) Road finisher with raisable chassis
DE2147691A1 (en) DEVICE FOR COMPACTION IN THE FINAL TREATMENT OF ROAD COVERS MADE OF HOT MIXED MATERIAL
WO2011042130A1 (en) Method and device for reinforcing a pavement structure
DE3823917A1 (en) Finisher for large working widths and high placing capacities for asphalt and concrete road construction
EP1261775B1 (en) Accessory for a road finishing machine
DE10358363B4 (en) Slipform paver for the production of surface coverings
DE9211854U1 (en) Paver
DE2534387C3 (en)
DE102005047096B3 (en) Height adjustable side shield e.g. for mounting plank of paver, has two lifting mechanisms which are connected to connecting element and central adjustment device cooperates with connecting element
DE202005004049U1 (en) Compact asphalt production system, includes machine for laying base layer and machine for laying top layer on top of still hot base layer
DE20216202U1 (en) Plant for the rehabilitation of a formation
DE2158818A1 (en) PROCESS FOR MANUFACTURING AND SEALING BOOSTS, FOR EXAMPLE FOR CANALS AND STORAGE BASINS AND DEVICE FOR CARRYING OUT THE PROCESS
DE20000148U1 (en) Paver in container size
DE102005019139B4 (en) Screed with upstream compaction unit
EP0513942B1 (en) Lifting device for a finisher
DE20320895U1 (en) Slipform paver for the production of surface coverings
EP1873313A2 (en) Paver and method for building a hard shoulder in reverse gear
EP4617429A1 (en) Road finisher with height-adjustable deflector plate
DE9210628U1 (en) Installation device for screed or similar

Legal Events

Date Code Title Description
8100 Publication of the examined application without publication of unexamined application
D1 Grant (no unexamined application published) patent law 81
8364 No opposition during term of opposition
R071 Expiry of right