DE1302576C2 - REINFORCED CONCRETE CHIMNEY WITH ACCESSIBLE CEILINGS TO CAPTURE THE BRUSHING - Google Patents

REINFORCED CONCRETE CHIMNEY WITH ACCESSIBLE CEILINGS TO CAPTURE THE BRUSHING

Info

Publication number
DE1302576C2
DE1302576C2 DE1964S0092629 DES0092629A DE1302576C2 DE 1302576 C2 DE1302576 C2 DE 1302576C2 DE 1964S0092629 DE1964S0092629 DE 1964S0092629 DE S0092629 A DES0092629 A DE S0092629A DE 1302576 C2 DE1302576 C2 DE 1302576C2
Authority
DE
Germany
Prior art keywords
chimney
rings
shaft
ceilings
chimney according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE1964S0092629
Other languages
German (de)
Other versions
DE1302576B (en
Inventor
Anton Dipl.-Ing. 8000 München Gattnar
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Walter Bau AG
Original Assignee
Dyckerhoff and Widmann AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dyckerhoff and Widmann AG filed Critical Dyckerhoff and Widmann AG
Priority to DE1964S0092629 priority Critical patent/DE1302576C2/en
Application granted granted Critical
Publication of DE1302576C2 publication Critical patent/DE1302576C2/en
Publication of DE1302576B publication Critical patent/DE1302576B/de
Expired legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

Bei Schornsteinen großer Höhe wird der kegelstumpfförmige Schaft aus Stahlbeton erstellt. Darin ist dann die meist einen genau zylindrischen Kamin umschließende Ausmauerung vorzusehen. Es ist bekannt, diese Ausmauerung nicht in einem Stück von unten nach oben durchzuführen, sondern sie zwei- oder mehrfach in der Länge zu unterteilen und die einzelnen zylindrischen Kaminstücke auf sich an dem Schornsteinschaft abstützende Zwischendecken aufzusetzen. Auf diese Weise ergeben sich verringerte Knickbeanspruchungen und entsprechend kleinere Mauerstärken und -gewichte. Als Zwischendecken dienten bisher an Ort und Stelle betonierte Kreisringplatten, welche auf besonderen Konsolen des Schornsteinschaftes ruhen. Diese Kreisringplatten sind verhältnismäßig schwer und erfordern auch sehr viel Material und Zeit für die Einschalung, zuma! wegen der mit der Höhe sich verringernden Plattendurchmesser und der sich laufend ändernden Abmessungen.For chimneys of great height, the frustoconical shaft is made from reinforced concrete. In this the brickwork, which usually encloses an exactly cylindrical chimney, must then be provided. It is known, do not carry out this lining in one piece from bottom to top, but rather two- or several times to divide the length and the individual cylindrical chimney pieces on to the Put on intermediate ceilings supporting the chimney shaft. This results in decreased Buckling loads and correspondingly smaller wall thicknesses and weights. As false ceilings So far, circular ring plates concreted on the spot were used, which were placed on special brackets on the chimney shaft rest. These circular ring plates are relatively heavy and also require a lot Material and time for the formwork, as well! because of the plate diameter which decreases with height and the constantly changing dimensions.

Der Erfindung liegt die Aufgabe zugrunde, eine demgegenüber im Gewicht wesentlich geringere und auch wesentlich leichter und schneller zu fertigende Abstützung der Zwischendecken und der Ausmauerung zu schaffen. Erfindungsgemäß wird dies bei einem Stahlbetonschornstein mit begehbaren Zwischendecken zum Abfangen der Ausmauerung dadurch erreicht, daß die Abstützung dei Zwischendecken jeweils aus einem formstabilen Verband aus zwei in verschiedenen Höhen innerhalb des Lichtraumes des Schornsteinschaftes vorgesehenen waagerechten Ringen, nämlich einem Druckring und einem Zugring, und aus diese Ringe verbindenden, in gleichmäßigen Abständen radial angeordneten Verbindungselementen gebildet ist, die mit einem Ende in Nischen des Schornsteinschaftes aufliegen. Mit dem Begriff »Ringe« sind nicht nur kreisrunde, sundem auch geometrisch ähnlich geformte Ringe, wie z. B. Polygone, gemeint. Die Ringe können in Ortbeton oder auch an Ort und Stelle aus Betonfertigteilen hergestellt werden.The invention is based on the object of providing a significantly lower weight and also much easier and quicker to produce support of the false ceilings and the brickwork to accomplish. According to the invention, this is done with a reinforced concrete chimney with intermediate ceilings that can be walked on to intercept the brick lining achieved in that the support dei false ceilings each of a dimensionally stable association of two at different heights within the clear space the chimney shaft provided horizontal rings, namely a pressure ring and a Pull ring, and from these rings connecting, at regular intervals radially arranged connecting elements is formed, which rest with one end in niches of the chimney shaft. With The term "rings" are not just circular, sundem also geometrically similar shaped rings such. B. polygons, meant. The rings can be made of in-situ concrete or can be made on site from precast concrete parts.

Die leicht und schnell herzustellende Abstützkonstruktion gemäß der Erfindung gewährleistet, das Gewicht der Ausmauerungsstücke in vorteilhafter Weise querkraftfrei in den Betonschornsteinschaft abzutragen.The easy and quick to produce support structure according to the invention ensures that Weight of the lining pieces in an advantageous manner free of transverse forces in the concrete chimney shaft to be removed.

Die Erfindung sei nachstehend an zwei in der Zeichnung schematisch wiedergegebenen Ausführungsbeispielen erläutert. Es zeigtThe invention is based on two exemplary embodiments shown schematically in the drawing explained. It shows

Fig. 1 einen erfindungsgemäß ausgebildeten Schornstein im Längsschnitt,1 shows a chimney designed according to the invention in a longitudinal section,

Fig. 2 einen Längsschnitt durch eine Seite des Schornsteins mit einer Zwischendecke,Fig. 2 is a longitudinal section through one side of the Chimney with a false ceiling,

F i g. 3 einen Querschnitt in Richtung der Linie a-a der Fig. 2,F i g. 3 shows a cross section in the direction of the line aa of FIG. 2,

F i g. 4 einen Querschnitt in Richtung der Linie b-b der F i g. 2,F i g. 4 shows a cross section in the direction of line bb of FIG . 2,

F i g. 5 einen Schnitt in Richtung der Linie c-c der Fig. 2, jedoch in die Ebene abgewickelt,F i g. 5 shows a section in the direction of the line cc of FIG. 2, but developed in the plane,

Fig. 6 eine vergrößerte Darstellung eines lotrechten Schnitts durch eine Auflagernische des Schornsteinschaftes, 6 shows an enlarged illustration of a vertical Section through a niche in the chimney shaft,

Fig. 7 einen Längsschnitt dutch die rechte Hälfte :ines Schornsteins mit zwei Zwischendecken eines iweitcn Ausführungsbeispiels,7 shows a longitudinal section through the right half: a chimney with two intermediate ceilings one In another embodiment,

F1 g. 8 die Draufsicht auf die untere Zwischendecke von der Ebene a-a der Fig. 7 aus undF1 g. 8 the top view of the lower false ceiling from the plane a-a of Fig. 7 and

F i g. 9 eine Seitenansicht in Richtung der Linie b-b der F i g. 7, jedoch in die Ebene abgewickelt.F i g. 9 is a side view in the direction of line bb of FIG . 7, but handled in the plane.

Fig. 1 zeigt einen Längsschnitt durch den Schorn stein, dessen Höhe etwa 150 bis 200 m betragei möge. Der Schornsteinschaft 1 ist kegelstumpfförmig besteht aus Stahlbeton und wird in bekannter Weise etwa nach dem Gleitschalungsverfahren, erstellt. Ir dem Schaft befindet sich ein durch die Ausmauerung 2 gebildeter zylindrischer Kamin, der unten ir nicht dargestellter Weise an den Fuchs einer Dampf-Kesselfeuerung od. dgl. angeschlossen und nach ober offen ist. Die zylindrische Ausmauerung 2 besteht aus elf Stücken, wobei die zehn oberen auf zehn Zwischendecken aufgesetzt sind.Fig. 1 shows a longitudinal section through the chimney stone, the height of which may amount to about 150 to 200 m. The chimney shaft 1 is frustoconical consists of reinforced concrete and is created in a known manner, for example using the slipform process. Ir the shaft is a cylindrical chimney formed by the lining 2, which is below ir Not shown way to the fox of a steam boiler furnace or the like. Connected and above is open. The cylindrical lining 2 consists of eleven pieces, with the ten upper pieces being ten Suspended ceilings are in place.

Die Zwischendecke ist bei dem in den F i g. 2 bis 6 gezeigten Ausführungsbeispiel aus acht gleichmäßig über den Umfang des Schornsteinschafts verteilten Verbindungselementen 3 in Form von dreieckförmigen Böcken sowie aus zwei Ringen 4 und 5 gebildet. Die Herstellung der Zwischendecken erfolgt von einer f reitragenden Arbeitsbühne 10 aus. Diese wird nach Herstellung des Schornsteinschafts in dessen Innern in Bodenhöhe unter Verwendung von bekannten Gerüstträgern zusammengebaut und von der Bühne der für die Herstellung des Schornsteinschafts benutzten Gleitschalung aus im Innern bis kurz unter den Punkt, wo die oberste Zwischendecke erstellt werden soll, hochgezogen und dort durch Herausschieben der Gerüstträgerenden 10 a in besonderen Wandnischen 106 des Stahlbetonschafts aufgelagert. Zunächst wird also die oberste Zwischendecke hergestellt, und im Anschluß daran werden nacheinander die darunter folgenden Decken gefertigt. Man kommt also mit einer einzigen Arbeitsbühne 10, die am oberen Ende des Schornsteinschafts eingehängt ist, aus.In the case of the one shown in FIGS. 2 to 6 shown embodiment of eight equally Distributed over the circumference of the chimney shaft connecting elements 3 in the form of triangular Trestles and two rings 4 and 5 formed. The false ceilings are produced from a cantilever Working platform 10 off. After the chimney shaft has been manufactured, this is inside it at floor level assembled using known scaffolding girders and from the stage of the for the manufacture of the chimney shaft used sliding formwork from inside to just below the Point where the uppermost false ceiling is to be created, pulled up and there by pushing it out the scaffold girder ends 10 a superimposed in special wall niches 106 of the reinforced concrete shaft. First So the uppermost false ceiling is made, and then one after the other the ceilings below were made. So you come with a single working platform 10, the is attached to the upper end of the chimney shaft.

In Höhe der Zwischendecken sind auf der Innenseite des Schornsteinschafts 1, gleichmäßig über den Umfang verteilt, acht Nischen 6 vorgesehen, in welehe die Verbindungselemente 3 eingeschoben werden. Die Wandungen der Nischen sind in aus F i g. 6 ersichtlicher Weise mit bituminierten Weichfaserplatten 7 ausgekleidet, um die freie Beweglichkeit der Deckenkonstruktion gegenüber dem Stahlbetonschaft bei Temperaturänderungen zu ermöglichen. In jeder Nische ist eine Auflagerplatte 8 angeordnet. Nach dem Einsetzen der acht Böcke werden diese durch aus Betonfertigteilen bestehende Stäbe 9 (vgl. F i g. 5) gegeneinander ausgesteift, so daß ihre Mittelebenen lotrecht und radial zur Außenwand des Betonschafts gerichtet stehen. Danach werden der Ring 4 (Druckring) und der Ring 5 (Zugring) eingeschalt, bewehrt und an Ort und Stelle betoniert. Wenn die Ring" genügend erhärtet sind, ergibt sich eine starre Zwischendecke, die erforderlichenfalls mit einem Belag versehen werden kann, so daß sich eine ringförmig entlang der Schaftinnenwand verlaufende Zwischendecke ergibt. Später kann dann auf dem Rjng 4 das im wesentlichen zylindrische Ausmauerungsstück2e aufgemauert werden. Von der nächst tieferen Decke aus erfolgt die Aufmauerung des darunterliegenden Ausmauerungsstücks 2b. Die beiden Ausmauerungsstücke überdecken sich in Höhe des Ringes 4 möglichst dicht.At the level of the intermediate ceilings, eight niches 6 are provided on the inside of the chimney shaft 1, evenly distributed over the circumference, into which the connecting elements 3 are inserted. The walls of the niches are shown in FIG. 6 lined with bituminized soft fiber boards 7, as can be seen, in order to enable the free mobility of the ceiling structure with respect to the reinforced concrete shaft in the event of temperature changes. A support plate 8 is arranged in each niche. After the eight brackets have been inserted, they are stiffened against one another by rods 9 (cf. FIG. 5) consisting of precast concrete parts, so that their central planes are perpendicular and radially directed to the outer wall of the concrete shaft. Then ring 4 (compression ring) and ring 5 (tension ring) are shuttered, reinforced and concreted on site. When the ring "are sufficiently hardened, the result is a rigid false ceiling, which can be, if necessary, provided with a coating, so that a ring-shaped along the shaft inner wall extending between the ceiling results. Later, the substantially cylindrical Ausmauerungsstück2e may then on the Rj ng 4 will be supported From the next lower ceiling, the bricklaying of the underlying brickwork piece 2 b takes place. The two brickwork pieces overlap at the level of the ring 4 as closely as possible.

wie F i g. I erkennen Hißt, werden die Zwischendecken von oben nach unten immer breiter. Es sind dann entsprechend größere Verbindungselemente zu verwenden. Da diese aus Betonfertigteilen hergestellt werden, ist es verhältnismäßig leicht, die verschicdenen Größen durch dieselben Einschalunesteile zulike F i g. I recognize that is, the false ceilings getting wider from top to bottom. There are then correspondingly larger connecting elements use. Since these are made of precast concrete, it is relatively easy to send them Sizes by the same shuttering parts

erzielen, wenn diese entsprechend gegeneinander versteilbar sind.achieve if these are mutually adjustable accordingly.

Wichtig ist, daß bei dem beschriebenen Ausführungsbeispiel die Ringe 4 und 5 bei allen Zwischendecken den gleichen Durchmesser haben. Das führt zu einer wesentlichen Verbilligung der Schalungskoslen. It is important that in the embodiment described, the rings 4 and 5 have the same diameter in all intermediate ceilings. This leads to a significant reduction in the cost of the formwork.

Es sei noch erwähnt, daß an Stelle einer krei?nngförmigen Ausbildung der Ringe 4 und S auch eine polygonförmige Ausbildung dieser Ringe möglich ist, so wie dies aus F i g. 4 für den unteren Ring 5 angegeben ist. In jedem Fall erfolgt ein formstabilcs Vergießen der Verbindungselemente mit den zugehörigen Ringen.It should also be mentioned that instead of a circular Formation of the rings 4 and S also a polygonal formation of these rings possible is, as shown in FIG. 4 is indicated for the lower ring 5. In each case there is a dimensionally stable Potting the connecting elements with the associated rings.

Anstatt die Ringe in Ortbeton herzustellen, ist es auch möglich, sie an Ort und Stelle aus Fertigbetonteilen zusammenzusetzen und anschließend diese Teile miteinander mit Betonmörtel zu vergießen. Bei dem in F i g. 7 bis 9 schematisch angegebenen zweiten Ausführungsbeispiel ist dies für den Druckring, den polygonförmigen Ring 11, der Fall, während der untere Ring 12 (Zugring) in Ortbeton herzustellen ist. Die Verbindungselemente 3 in Form von dreieckförmigen Böcken sind bei diesem Ausführungsbeispiel so in entsprechenden Nisehen 6 des Schornsteinschafts 1 eingehängt, daß auf der oberen Dreieckseite ein Gitterrost 13 verlegt werden kann. Dieser ist ringförmig und hat eine jeweils dem Abstand zwischen der Ausmauerung und dem Schornsteinschaft entsprechende Breite. Die Herstellung des unteren Ringes 12 erfolgt so, wie es bereits mit Bezug auf das erste Ausführungsbeispiei beschrieben wurde. Der obere Ring 11 wird aus Fertigteilen Ho, llö, Hc usw. aufgebaut, die dann anschließend miteinander verbolzt, verschraubt oder auch vergossen werden. Die aus Fertigbeion bestehenden Gitterroststäbe 15 werden lose aufgelegt.Instead of making the rings in in-situ concrete, it is also possible to make them on the spot from precast concrete parts assemble and then pour these parts together with concrete mortar. In the case of the FIG. 7 to 9 schematically indicated second embodiment is for this the pressure ring, the polygonal ring 11, the case, while the lower ring 12 (tension ring) in in-situ concrete is to be established. The connecting elements 3 in the form of triangular blocks are in this Embodiment so hung in corresponding Nisehen 6 of the chimney shaft 1 that on the upper side of the triangle a grating 13 can be laid. This is ring-shaped and has a width corresponding to the distance between the brickwork and the chimney shaft. the Production of the lower ring 12 takes place as it has already been done with reference to the first exemplary embodiment has been described. The upper ring 11 is built from prefabricated parts Ho, Llö, Hc, etc., which then then bolted, screwed or even potted together. The ones made up of prefabricated beions Grating bars 15 are placed loosely.

Claims (8)

Patentansprüche:Patent claims: 1. Stahlbetonschornstein mit begehbaren Zwischendecken zum Abfangen der Ausmauerung, dadurch gekennzeichnet, daß die Abstützung der Zwischendecken jeweils aus einem formstabilen Verband aus zwei in verschiedenen Höhen innerhalb des Lichtraumes des Schornsteinschaftes vorgesehenen waagerechten Ringen (4 und 5 bzw. 11 und 12), nämlich einem Druckring und einem Zugring, und aus diese Ringe verbindenden, in gleichmäßigen Abständen radial angeordneten Verbindungselementen (3) gebildet ist, die mit einem Ende in Nischen (6) des Schornsteinschaftes aufliegen.1. Reinforced concrete chimney with accessible false ceilings to support the brickwork, characterized in that the support of the intermediate ceilings each from a dimensionally stable association of two at different heights within the clear space of the Chimney shaft provided horizontal rings (4 and 5 or 11 and 12), namely one Pressure ring and a pull ring, and from these rings connecting, at regular intervals radially arranged connecting elements (3) is formed with one end in Rest niches (6) in the chimney shaft. 2. Schornstein nach Anspruch 1, dadurch gekennzeichnet, daß die beiden Ringe (4 und 5) aus Ortbeton sind und im wesentlichen gleichen Durchmesser besitzen.2. Chimney according to claim 1, characterized in that the two rings (4 and 5) are made of in-situ concrete and have essentially the same diameter. 3. Schornstein nach Anspruch 1, dadurch gekennzeichnet, daß die beiden Ringe (4 und 5 bzw. 11 und 12) aus Betonfertigteilen zusammengesetzt und an Ort und Stelle mit den Verbindungselementen (3) mittels Betonmörtels vergossen sind.3. Chimney according to claim 1, characterized in that the two rings (4 and 5 or 11 and 12) composed of precast concrete parts and in place with the connecting elements (3) are cast with concrete mortar. 4. Schornstein nach Anspruch 2 oder 3, dadurch gekennzeichnet, daß die Verbindungselemente (3) als dreieckförmige Böcke ausgebildet und durch zwischen sie einsetzbare, vorzugsweise ebenfalls aus Betonfertigteilen bestehende Stäbe (9) so gegeneinander ausgesteift sind, daß die Mittelebenen der Böcke radial zum zylindrischen Schornsteinschaft (1) verlaufende Lotebenen sind.4. Chimney according to claim 2 or 3, characterized in that the connecting elements (3) designed as triangular brackets and preferably also consisting of precast concrete parts that can be inserted between them Rods (9) are stiffened against each other so that the central planes of the brackets are radial to cylindrical chimney shaft (1) are running solder planes. 5. Schornstein nach Anspruch 2 und 4, dadurch gekennzeichnet, daß das Ausmauerungsstück (2 α bzw. 2 b) jeweils auf den Druckring (5) aufgesetzt ist (F i g. 2).5. Chimney according to claim 2 and 4, characterized in that the lining piece (2 α or 2 b) is placed on the pressure ring (5) (F i g. 2). 6. Schornstein nach Anspruch 3 und 4, dadurch gekennzeichnet, daß das Ausmauerungsstück (2 α bzw. 2 b) jeweils auf den Zugring (12) aufgesetzt ist (Fig. 7).6. Chimney according to claim 3 and 4, characterized in that the lining piece (2 α or 2 b) is placed on the pull ring (12) (Fig. 7). 7. Schornstein nach einem der Ansprüche 4 bis 6, dadurch gekennzeichnet, daß die Böcke in den Nischen (6) des Schornsteinschaftes (1) auf Platten (8) gelagert sind.7. Chimney according to one of claims 4 to 6, characterized in that the trestles in the niches (6) of the chimney shaft (1) are mounted on plates (8). 8. Schornstein nach Anspruch 7, dadurch gekennzeichnet, daß die im wesentlichen lotrechten Nischenwandungen mit Weichfaserplatten (7) ausgekleidet sind.8. Chimney according to claim 7, characterized in that the substantially perpendicular Niche walls are lined with soft fiber boards (7). Hierzu 4 Blatt ZeichnungenFor this purpose 4 sheets of drawings
DE1964S0092629 1964-08-13 1964-08-13 REINFORCED CONCRETE CHIMNEY WITH ACCESSIBLE CEILINGS TO CAPTURE THE BRUSHING Expired DE1302576C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1964S0092629 DE1302576C2 (en) 1964-08-13 1964-08-13 REINFORCED CONCRETE CHIMNEY WITH ACCESSIBLE CEILINGS TO CAPTURE THE BRUSHING

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1964S0092629 DE1302576C2 (en) 1964-08-13 1964-08-13 REINFORCED CONCRETE CHIMNEY WITH ACCESSIBLE CEILINGS TO CAPTURE THE BRUSHING

Publications (2)

Publication Number Publication Date
DE1302576C2 true DE1302576C2 (en) 1975-05-22
DE1302576B DE1302576B (en) 1975-05-22

Family

ID=7517357

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1964S0092629 Expired DE1302576C2 (en) 1964-08-13 1964-08-13 REINFORCED CONCRETE CHIMNEY WITH ACCESSIBLE CEILINGS TO CAPTURE THE BRUSHING

Country Status (1)

Country Link
DE (1) DE1302576C2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL7711621A (en) * 1977-10-22 1979-04-24 Hoogovens Ijmuiden Bv CHIMNEY CONSTRUCTION.
DE2849247C2 (en) * 1978-11-13 1983-05-05 Karrena GmbH, 4000 Düsseldorf chimney

Also Published As

Publication number Publication date
DE1302576B (en) 1975-05-22

Similar Documents

Publication Publication Date Title
DE2350129A1 (en) DEVICE FOR ERECTING PREFERABLY ENCLOSED CONCRETE BUILDINGS
DE1302576C2 (en) REINFORCED CONCRETE CHIMNEY WITH ACCESSIBLE CEILINGS TO CAPTURE THE BRUSHING
EP0098962B1 (en) Erecting scaffold for shutterings for circular structures of concrete or the like
DE3309099A1 (en) CAR GARAGE AND METHOD FOR THEIR PRODUCTION
DE3036539A1 (en) Prefabricated brick wall element for the full assembly of houses
DE2854888C2 (en) Internal formwork that can be dismantled for the production of large-scale concrete structures
DE834446C (en) Process for the production of walls from prefabricated components
EP0099090B1 (en) Method of erecting a concrete cover shaped as a dome, cone or pyramid for high and low rise structures
DE554729C (en) Process for the production of hollow stone beams
DE1128114B (en) Process for erecting buildings with the help of assembly supports
DE824548C (en) Masonry made of hollow blocks
DE3115212C2 (en)
DE2742000C3 (en) Free standing chimney
DE3418313A1 (en) Prefabricated element for a wall
DE852606C (en) Process for the production of building walls and other supporting members using hollow blocks
DE859667C (en) Formworkless steel stone or reinforced concrete ribbed ceiling
DE1932517C3 (en) Climbing formwork for the production of reinforced concrete structures with outer walls that are strongly curved in outline and elevation
DE957258C (en) Process for the production of Schuettbetonwandenden as well as formwork and shaped stone for this
AT346048B (en) CASED CONCRETE - PREFABRICATED ELEMENT
DE2415280C3 (en) Transportable prefabricated element for chimneys
DE919135C (en) Process for the production of ceilings from cylindrical or prismatic shells and reinforced in-situ concrete ribs
DE8506249U1 (en) Cover for a berm
DE1129674B (en) Reinforced concrete cooling tower, the shell of which consists essentially of prefabricated parts
DE804033C (en) Method and device for producing a building ceiling
CH492835A (en) Process for the production of cesspools, caissons or shafts

Legal Events

Date Code Title Description
E77 Valid patent as to the heymanns-index 1977
EHJ Ceased/non-payment of the annual fee