[go: up one dir, main page]

CN219592036U - Construction site cable protection frame - Google Patents

Construction site cable protection frame Download PDF

Info

Publication number
CN219592036U
CN219592036U CN202320813244.6U CN202320813244U CN219592036U CN 219592036 U CN219592036 U CN 219592036U CN 202320813244 U CN202320813244 U CN 202320813244U CN 219592036 U CN219592036 U CN 219592036U
Authority
CN
China
Prior art keywords
fixed
crossbeam
sleeve
base
cable protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320813244.6U
Other languages
Chinese (zh)
Inventor
代玉菲
李世乾
史灵玉
成书漫
罗福杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Original Assignee
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Construction Engineering Group Co Ltd, Chongqing Construction Residential Engineering Co Ltd filed Critical Chongqing Construction Engineering Group Co Ltd
Priority to CN202320813244.6U priority Critical patent/CN219592036U/en
Application granted granted Critical
Publication of CN219592036U publication Critical patent/CN219592036U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model provides a construction site cable protection frame, which comprises: base, supporting component and crossbeam, the base passes through fixed subassembly and ground detachable connection, and fixed subassembly is at least one, and supporting component sets up the top at the base vertically, and the crossbeam is fixed at supporting component's lateral wall, and the crossbeam is at least one, all is provided with a plurality of sleeves through the link is fixed on each crossbeam, and telescopic middle part is the centre gripping passageway, all is provided with the clamping component who is used for the centre gripping cable in each centre gripping passageway, has solved the problem that the construction site that exists in the prior art is inconvenient to support the protection to the cable.

Description

Construction site cable protection frame
Technical Field
The utility model relates to the technical field of building construction equipment, in particular to a construction site cable protection frame.
Background
In construction sites, various types of electrical equipment are needed, electrical cables are needed to be used for providing electrical energy for the electrical equipment when the electrical equipment is used, various cables are arranged in a complicated way, great difficulty is brought to operators and maintenance and investigation staff, meanwhile, if the cables are distributed in the construction sites in a disordered way, the management of the field cables by the constructors is inconvenient, the cables are easy to damage in the construction operation process, and meanwhile, potential safety hazards are brought to the staff in the construction sites, so that the cables are needed to be limited and fixed by using the cable racks, the cables can be orderly arranged in the construction sites, but the existing cable racks are usually fixed on walls, but are limited by the environment of the construction sites, and the walls cannot be effectively found to fix the racks, so that the existing cable racks cannot be well suitable for the construction sites.
Disclosure of Invention
Aiming at the defects existing in the prior art, the utility model provides a construction site cable protection frame, which solves the problem that the cable is inconvenient to support and protect in a construction site in the prior art.
According to an embodiment of the present utility model, a construction site cable protection rack includes: base, supporting component and crossbeam, the base passes through fixed subassembly and ground detachable connection, and fixed subassembly is at least one, and supporting component sets up the top at the base vertically, and the crossbeam is fixed at supporting component's lateral wall, and the crossbeam is at least one, all is provided with a plurality of sleeves through the link is fixed on each crossbeam, and telescopic middle part is the centre gripping passageway, all is provided with the clamping component who is used for the centre gripping cable in each centre gripping passageway.
Compared with the prior art, the utility model has the following beneficial effects: this cable protection frame, can be as required reasonable the selection need fixed position, then fix the base subaerial through fixed subassembly can, set up a plurality of crossbeams on supporting component, and all set up a plurality of sleeves on each crossbeam, can realize the centre gripping and the work of supporting many cables, and then be convenient for realize the centre gripping to the cable in the optional position on construction site, carry out unified management with all cables on construction site, the maintainer inspection circuit of being convenient for also can prevent simultaneously that the mistake from touching the potential safety hazard that the cable produced.
Further, the support assembly includes: the mounting column and support column, the top of mounting column is sunken to form vertical spout, and the one end and the spout sliding connection of support column, the support column passes through bolt and mounting column locking, is provided with a plurality of vertical mounting holes that supply the bolt to pass on the support column.
Further, each of the clamping assemblies includes: clamping seat and slip post, the clamping seat is two, and two clamping seats are circular arc shape, and two clamping seat symmetry sets up in the installation passageway, and the top of two clamping seats all is provided with the slip post, the sleeve is all vertically worn out to the one end of two slip posts, and two slip posts all with sleeve sliding connection, all fixedly be provided with the spring between every clamping seat and the sleeve, two clamping seats clamp the cable in the installation passageway under the elasticity of spring.
Further, a plurality of rollers are arranged on one surface, close to the cable, of each clamping seat in a rolling manner.
Further, a limiting block is fixed on the side wall of one end of each sliding column extending out of the sleeve.
Further, each of the fixing assemblies includes: the transverse plate is horizontally fixed on the side wall of the base, and the transverse plate is detachably connected with the ground through the screw.
Further, the side wall of base still articulates the one end that is provided with the protective cover, and the other end of protective cover is used for the overlap joint at the top of diaphragm.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present utility model.
Fig. 2 is a schematic structural view of a clamping assembly according to the present utility model.
In the above figures: 1. a base; 2. a cross beam; 3. a connecting frame; 4. a sleeve; 5. a chute; 6. a mounting column; 7. a support column; 8. a bolt; 9. a clamping seat; 10. a cable; 11. a sliding column; 12. a spring; 13. a roller; 14. a limiting block; 15. a cross plate; 16. a screw; 17. and a protective cover.
Detailed Description
The technical scheme of the utility model is further described below with reference to the accompanying drawings and examples.
As shown in fig. 1, an embodiment of the present utility model provides a construction site cable protection rack, including: base 1, supporting component and crossbeam 2, base 1 can dismantle with ground through fixed subassembly and be connected, and fixed subassembly is at least one, and supporting component sets up at the top of base 1 vertically, and crossbeam 2 is fixed at supporting component's lateral wall, and crossbeam 2 is at least one, all is provided with a plurality of sleeve 4 through link 3 is fixed on each crossbeam 2, and sleeve 4's middle part is the centre gripping passageway, all is provided with the centre gripping subassembly that is used for centre gripping cable 10 in each centre gripping passageway.
This cable protection frame, can be as required reasonable the fixed position of selection needs, then through fixed subassembly with base 1 fix subaerial can, set up a plurality of crossbeams 2 on supporting component, and all set up a plurality of sleeves 4 on each crossbeam 2, can realize the centre gripping and the work of supporting many cables 10, and then be convenient for realize the centre gripping to cable 10 in the optional position in construction site, carry out unified management with all cables 10 in construction site, the maintainer inspection circuit of being convenient for also can prevent simultaneously that the mistake from touching the potential safety hazard that cable 10 produced.
Further, as shown in fig. 1, the support assembly includes: the installation post 6 and support column 7, the top of installation post 6 is sunken to form vertical spout 5, and the one end and the spout 5 sliding connection of support column 7, support column 7 pass through bolt 8 and the locking of installation post 6, are provided with a plurality of vertical distributions on the support column 7 and supply the mounting hole that bolt 8 passed. The height of the cross beam 2 is adjusted by sliding the support column 7 and the mounting column 6 so as to adjust the height of the support column 7 extending out of the mounting column 6 according to the requirement, and then the fixed height of the cable 10 is controlled.
As shown in fig. 2, each of the clamping assemblies includes: clamping seat 9 and slip post 11, clamping seat 9 are two, and two clamping seats 9 are the circular arc shape, and two clamping seats 9 symmetry sets up in the installation passageway, and the top of two clamping seats 9 all is provided with slip post 11, the sleeve 4 is all vertically worn out to the one end of two slip posts 11, and two slip posts 11 all with sleeve 4 sliding connection, all fixedly between every clamping seat 9 and the sleeve 4 be provided with spring 12, two clamping seats 9 clamp down the cable 10 in the installation passageway under spring 12's elasticity.
Specifically, the two clamping seats 9 are arranged to drive the cable 10 to be fixed by the springs 12, so that clamping of different cables 10 can be realized, when the cable 10 needs to be released, only the corresponding sliding column 11 needs to be pulled, and further, in order to reduce the friction force between the cable 10 and the clamping seats 9, a plurality of rollers 13 are arranged on one surface, close to the cable 10, of each clamping seat 9 in a rolling manner; simultaneously, the side walls of the sliding column 11 extending out of one end of the sleeve 4 can be respectively fixed with a limiting block 14 to prevent the sliding column 11 from being separated from the sleeve 4.
Specifically, each of the fixing assemblies includes: the horizontal plate 15 and the screw 16, horizontal plate 15 is fixed in the lateral wall of base 1, and horizontal plate 15 passes through screw 16 and ground detachable connection. And in order to prevent the feet of the worker from being hurt by lifting the feet of the worker to the base 1, one end of the protective cover 17 is also hinged on the side wall of the base 1, the other end of the protective cover 17 is used for being lapped on the top of the transverse plate 15, and further, the material of the protective cover 17 can be selected from rubber materials with certain elasticity.
Finally, it is noted that the above embodiments are only for illustrating the technical solution of the present utility model and not for limiting the same, and although the present utility model has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that modifications and equivalents may be made thereto without departing from the spirit and scope of the technical solution of the present utility model, which is intended to be covered by the scope of the claims of the present utility model.

Claims (7)

1. A construction site cable protection rack, comprising: base (1), supporting component and crossbeam (2), base (1) can dismantle with ground through fixed subassembly and be connected, and fixed subassembly is at least one, and supporting component sets up the top at base (1) vertically, and crossbeam (2) are fixed at supporting component's lateral wall, and crossbeam (2) are one at least, all are provided with a plurality of sleeve (4) through link (3) are fixed on each crossbeam (2), and the middle part of sleeve (4) is the centre gripping passageway, all is provided with the centre gripping subassembly that is used for centre gripping cable (10) in each centre gripping passageway.
2. The job site cable protection rack of claim 1, wherein the support assembly comprises: the mounting column (6) and support column (7), the top of mounting column (6) is sunken to form vertical spout (5), and the one end and the spout (5) sliding connection of support column (7), support column (7) pass through bolt (8) and locking of mounting column (6), are provided with a plurality of vertical distributions on support column (7) and supply the mounting hole that bolt (8) passed.
3. The job site cable protection rack of claim 1, wherein each of the clamping assemblies comprises: clamping seat (9) and slip post (11), clamping seat (9) are two, and two clamping seats (9) are the circular arc shape, and two clamping seat (9) symmetry sets up in the installation passageway, and the top of two clamping seats (9) all is provided with slip post (11), sleeve (4) are all vertically worn out to the one end of two slip posts (11), and two slip posts (11) all with sleeve (4) sliding connection, all fixedly between every clamping seat (9) and sleeve (4) be provided with spring (12), two clamping seats (9) press from both sides tight cable (10) in the installation passageway under the elasticity of spring (12).
4. A construction site cable protection rack according to claim 3, wherein each clamping seat (9) is provided with a plurality of rollers (13) in a rolling manner on the surface close to the cable (10).
5. A construction site cable protection rack according to claim 4, wherein a limiting block (14) is fixed to the side wall of each sliding column (11) extending out of one end of the sleeve (4).
6. A job site cable protection rack as set forth in any one of claims 1-5 wherein each of the fixed assemblies comprises: the horizontal plate (15) and the screw rod (16), the horizontal plate (15) is horizontally fixed on the side wall of the base (1), and the horizontal plate (15) is detachably connected with the ground through the screw rod (16).
7. A construction site cable protection rack according to claim 6, wherein the side wall of the base (1) is further provided with one end of a protection cover (17) in a hinged manner, and the other end of the protection cover (17) is used for being lapped on the top of the transverse plate (15).
CN202320813244.6U 2023-04-12 2023-04-12 Construction site cable protection frame Active CN219592036U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320813244.6U CN219592036U (en) 2023-04-12 2023-04-12 Construction site cable protection frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320813244.6U CN219592036U (en) 2023-04-12 2023-04-12 Construction site cable protection frame

Publications (1)

Publication Number Publication Date
CN219592036U true CN219592036U (en) 2023-08-25

Family

ID=87697027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320813244.6U Active CN219592036U (en) 2023-04-12 2023-04-12 Construction site cable protection frame

Country Status (1)

Country Link
CN (1) CN219592036U (en)

Similar Documents

Publication Publication Date Title
JP2017022826A (en) High place attachment device for electrical machine
CN219592036U (en) Construction site cable protection frame
CN218881530U (en) Adjustable elevator shaft operating platform support frame
CN202142796U (en) Novel transformer platform
CN213636874U (en) Cable laying and arranging tool for cable bridge in finish rolling area
CN218420708U (en) Safety protection device suitable for high-place operation
CN214935749U (en) Electric power overhauls uses construction platform
CN111009849B (en) A working bracket for insulator replacement
CN214087541U (en) Heavy clamp hydraulic pressure rack
CN213418456U (en) Building scaffold wall connecting piece
CN211417912U (en) Material rack for placing candles
CN221552665U (en) Fault early warning overhauling device
CN218438649U (en) A warning device for construction of fire control facility
CN210922816U (en) Weighing system applied under various conditions
CN211729155U (en) Multi-dimensional guide rail hoisting support mechanism suitable for special inspection robot
CN219865064U (en) Supporting device
KR20230121368A (en) Wire pulling device for indirect live wire and indirect live wire method using the same
CN112343320A (en) Combined working support
CN210163091U (en) Quick hoisting device of cable trench cover
CN210195457U (en) A safety fence for civil construction
CN212387587U (en) Protective fence device of crane
CN222146905U (en) General type switch board of chemical industry is cabinet-connected device
CN213016417U (en) Hydraulic support side guard plate mounting equipment
CN215004680U (en) Compression-resistant clamp for pressure testing machine
CN220519942U (en) Large-scale bearing installation frock

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant